Report Of Medical Waste Project

  • Uploaded by: Andre Suito
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Report Of Medical Waste Project as PDF for free.

More details

  • Words: 385
  • Pages: 2
PROJECT FACTSHEET UNDP/PAPP

Improvement of Medical Waste management in Ramallah (Pilot project in Ramallah Governmental Hospital & Municipality of Ramallah Programme Area:

Project Description:

020- Environment

The project aims to contribute to the protection of Public health and

02-10-Environmenal policies,

safeguard the environment through improvement of Medical Waste

planning and Legislation;

Management in Ramallah District. The project will focus on Ramallah

02-30- Environmental

Governmental Hospital and Ramallah Municipality as pilot project to be

Enhancement 7 Management

replicated, hopefully in the future.

Project Number:

including Medical waste regulations and guidelines, Medical Waste

Pal 10:47106

Management System and guidelines for Ramallah Governmental

Pal 50: 47107

Hospital; Medical Waste Management System and guidelines for

Award Number:

Ramallah Municipality; procurement of medical equipment for medical

Pal 10:41346;

waste collection, segregation, treatment and transfer, and development

Pal 50: 41347

of capacity building in medical waste management within the

Duration:

counterparts through training of the relevant personnel of the three

January 2006 – March 2008

partners.

Partner:

Objectives:

EQA

Improve medical waste management in Ramallah District, through

Municipality of Ramallah

focusing as a pilot project, on Ramallah Municipality and Ramallah

Ramallah Governmental

Governmental Hospital.

Hospital/Ministry of Health

Locations:

Budget:

Ramallah District

1,000,000

Products (as of end – May 2006):

Donor:

The project only started this year and the MOU with the three partners

Japan

was signed in May 2006.

Project Contact

Products (as of end of 2007):

Information

ƒ

The project will have 6 outputs

Needs Assessment reports & Medical Waste Management

Project Manager: To be

Systems and Manuals developed for both Ramallah Hospital and

appointed in July

Ramallah Municipality;

Name

ƒ

and Municipality of Ramallah;

UNDP Programme Manager: Name:Rima Abu Middain

Last updated: June 2006

Procurement of Equipment for Ramallah Governmental Hospital

ƒ

Medical Waste regulations, and guidelines are developed

PROJECT FACTSHEET UNDP/PAPP

Outputs: Project Office:

ƒ

Medical

Waste

Enforcement

implemented from within the

Governmental Hospital and Ramallah Municipality. Are improved

Email: Website:

Quality

and

Mechanisms

ƒ

Environment

systems

The project will be

three institutions;

in

Management

Authority,

Ramallah

Capacity building regarding Medical Waste Management is enhanced in the three institutions;

ƒ

75 Civil servants of the three beneficiary institutions are trained in MWM;

ƒ

Contribution to public Health protection and enhancement is achieved.

ƒ

Contribution to protection and safe guard of the environment is achieved;

Last updated: June 2006

Related Documents


More Documents from "MZALENDO.NET"