ANALISIS DE COSTOS PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA CONCEPTO

UNIDAD

CIMBRAS Y ANDAMIOS ANDAMIO DE CABALLETE h=1.10 25 USOS LONG=2.50 m 10 USOS LONG=2.50 m CIMBRA DALA DESPLANTE 15x20 CON DUELA CIMBRA DALA DE LIGA 15x20 CON DUELA CIMBRA CASTILLO 2-C 15x20 CON DUELA TARIMA PARA CIMBRA 50x100 CON DUELA TARIMA TRIPLAY 1.22X2.44X0.016 PLATAFORMA 1.50X1.00 PARA ELEV MAT CIMBRA DALA DESPLANTE 15x20 CON TRIPLAY CIMBRA CASTILLO 2-C 15x15 CON TRIPLAY CIMBRA DALA DE LIGA 15x20 CON TRIPLAY CIMBRA CASTILLO 2-C 15x20 CON TRIPLAY CIMBRA CASTILLO 2-C 15x30 CON TABLA FABRICACION DE CONCRETO FABRICADO DE CONCRETO C/REVOLVEDORA 1 SACO DEMOLICIONES (A MANO Y SIN INCLUIR ACARREOS) DEMOLICION DE CIMIENTOS DE MAMPOSTERIA DEMOLICION DE CIMIENTOS DE CONCRETO ARMADO DEMOLICION DE MUROS DE MAMPOSTERIA DEMOLICON DE MURO DE ADOBE Y TEPETATE DEMOLICION MURO DE TABIQUE E=28 cm DEMOLICION MURO DE TABIQUE E=28 cm C/RECUPER. DEMOLICION MURO DE TABIQUE O BLOCK E=21 cm DEMOLICION MURO DE TABIQUE O BLOCK E=21 cm C/R DEMOLICION MURO DE TABIQUE O BLOCK E=14 cm DEMOLICION MURO DE TABIQUE O BLOCK E=14 cm C/R DEMOLICION MURO DE TABIQUE O BLOCK E=7 cm DEMOLICION MURO DE TABIQUE O BLOCK E=7 cm C/R DEMOLICION CELOSIAS E=10 A 15 cm DEMOLICION ESTRUCTURA CONCRETO ARMADO DEMOLICION PISO CONCRETO SIMPLE E=8 A 10 cm DEMOLICION DE LOSETA DE BARRO C/MORTERO DEMOLICION DE ZOCLO DE LOSETA C/MORTERO DESMONTAJE DE PISO DE DUELA C/BASTIDOR Y BASES DESPEGAR PISO DE LOSETA VINILICA DEMOLICION DE LAMBRIN DE AZULEJO C/MORTERO DEMOLICION DE APLANADOS,.YESO O PASTAS DEMOLICION DE FALSO PLAFOND DE YESO C/BASTIDOR DESMONTAJE DE CANCELERIA METALICA LEVANTAR TAPIZ PLASTICO DESMONTAJE DE PUERTAS DE MADERA C/MARCO DESMONTAJE DE CANCELERIA DE MADERA DESMONTAJE DE VIDRIOS DESMONTAJE DE MUEBLES SANITARIOS DESMONTAJE DE TUBERIA HID. COBRE O GALV. DESMONTAJE DE LAMPARAS SOBREPONER 60x60 DESMONTAJE DE TUBERIA STEEL O PVC C/CONEXIONES DEMOLICION DE GUARNICION DE CONCRETO SIMPLE DEMOLICION DE BANQUETA CONCRETO SIMPLE E=10 cm DEMOLICION CARPETA ASFALTICA E=5 A7 cm

Página 1 de 16

MINIMO

RENDIMIENTO MEDIO

MAXIMO

PZA PZA M2 M2 M2 PZA PZA HR ML ML M2 ML M2

4.00 11.00 13.00 13.00 13.00 18.00 10.00 1.00 13.00 45.00 13.00 13.00 12.00

5.00 12.00 14.00 14.00 14.00 20.00 11.00 2.00 14.00 50.00 14.00 14.00 13.00

6.00 13.00 15.00 15.00 15.00 21.00 12.00 3.00 15.00 53.00 15.00 15.00 14.00

M3

13.00

15.00

16.00

M3 M3 M3 M3 M2 M2 M2 M2 M2 M2 M2 M2 M2 M3 M2 M2 ML M2 M2 M2 M2 M2 M2 M2 PZA M2 M2 PZA ML PZA ML ML M2 M2

1.50 0.50 2.00 4.75 18.00 5.75 23.00 7.75 22.00 11.00 33.00 23.00 25.00 0.55 22.00 16.00 63.00 17.00 41.00 17.00 21.00 21.00 14.00 90.00 8.00 14.00 24.00 5.00 77.00 8.50 18.00 18.00 21.00 17.00

1.75 0.60 2.25 5.50 20.00 6.75 25.00 9.00 25.00 13.00 39.00 27.00 27.00 0.65 26.00 19.00 74.00 20.00 48.00 20.00 25.00 24.00 16.00 100.00 10.00 16.00 28.00 6.00 90.00 10.00 21.00 20.00 24.00 25.00

2.00 0.65 2.50 6.00 21.00 7.25 26.00 9.75 26.00 15.00 42.00 29.00 28.00 0.70 28.00 21.00 80.00 22.00 52.00 22.00 27.00 26.00 17.00 105.00 11.00 17.00 30.00 6.50 97.00 11.00 23.00 21.00 26.00 26.00

ANALISIS DE COSTOS PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA CONCEPTO

UNIDAD

DEMOLICION DE PAVIMENTO CONCRETO SIMPLE DEMOLICION DE PAVIMENTO CONCRETO ARMADO DESMONTAJE MUEBLE TIPO MOSTRADOR S/SECCIONADO DESMONTAJE MUEBLE TIPO MOSTRADOR C/SECCIONADO TALA DE ARBOL DIAM=10 A 30 cm C/DESENRICE TALA DE ARBOL DIAM=31 A 60 cm C/DESENRICE TALA DE ARBOL DIAM=61 A 100 cm C/DESENRICE TALA DE ARBOL DIAM=101 A 120 cm C/DESENRICE DEMOLICION C/POLVO EXPLOSIVO C/BARRENACION LIMPIEZA Y TRAZO LIMPIEZA Y DESENRAICE A MANO H=1.00 m LIMPIEZA A MANO HASTA 8 cm ESPESOR PARA TRAZO LIMPIEZA Y DESENRAICE A MANO H=0.10 A 0.50 m LIMPIEZA GRUESA CON PALA SIN BARRER, POSRETIRO ESCOMBRO TRAZO Y NIVELACION SUP. MENOR A 300 M2 TRAZO Y NIVELACION SUP. DE A 300 A 900 M2 TRAZO Y NIVELACION SUP. MAYOR A 900 M2 EXCAVACIONES EXCAVACION A MANO EN CEPAS PROF<2.00 TIPO I CON AFINE EXCAVACION A MANO EN CEPAS PROF<2.00 TIPO II CON AFINE EXCAVACION A MANO EN CEPAS PROF<2.00 TIPO II-A CON AFINE EXCAVACION A MANO EN CEPAS PROF 2.00 A 4.00 TIPO I CON AFINE Y TARIMA PARA EXCAVACION EXCAVACION A MANO EN CEPAS PROF 2.00 A 4.00 TIPO II CON AFINE Y TARIMA PARA EXCAVACION EXCAVACION A MANO EN CEPAS PROF 2.00 A 4.00 TIPO II-A CON AFINE Y TARIMA PARA EXCAVACION EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO I CON AFINE EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO II CON AFINE EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO II-A CON AFINE EXCAVACION A MANO A CIELO ABIERTO PROF<2.00 TIPO III (ROCA) RELLENOS RELLENO COMPACTADO CON PISON EN CAPAS DE 20 cm RELLENO DE CEPAS COMPACTADO AL 90% CON BAILARINA DREN 30x30 CON GRAVA, INC.: EXC., RELL, TUBO JUNTEADO C/MORTERO CAMA FILTRANTE DE GRAVA 3/4" DE 20 cm DE ESPESOR PLANTILLAS CONSOLIDACION DE FONDO DE CEPAS CON PISON PLANTILLA DE PEDACERIA DE TABIQUE H=10 cm PLANTILLA DE PEDACERIA DE TABIQUE H=15 cm PLANTILLA DE CONCRETO H=5, NO INCLUYE FABRICADO DE CONCRETO PLANTILLA DE CONCRETO H=8, NO INCLUYE FABRICADO DE CONCRETO PLANTILLA DE CONCRETO H=10, NO INCLUYE FABRICADO DE CONCRETO PLANTILLA DE ARENA H=5 cm CIMIENTOS DE MAMPOSTERIA CIMIENTO DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADO C/MORTERO CIMBRA EN CIMENTACION CIMBRA ZAPATA CORRIDA Y AISLADA H=10 A 15 cm INCL. DESCIMBRADO CIMBRA CONTRATRABES DE 20x80 A 25x100 cm INCL. DESCIMBRADO CIMBRA EN ESTRUCTURA CIMBRA EN COLUMNAS CON DUELA DE 30x30 cm A 50x50 cm, H=3.00 m

Página 2 de 16

M3 M3 ML ML PZA PZA PZA PZA M3

MINIMO 0.90 0.38 6.00 3.75 3.50 1.00 0.35 0.34 9.00

RENDIMIENTO MEDIO 1.05 0.45 7.00 4.50 4.00 1.25 0.50 0.40 10.00

MAXIMO 1.15 0.49 7.50 4.75 4.50 1.35 0.65 0.43 11.00

M2 M2 M2 M2 M2 M2 M2

49.00 90.00 65.00 70.00 200.00 250.00 340.00

57.00 100.00 75.00 80.00 240.00 300.00 400.00

62.00 105.00 85.00 87.00 260.00 325.00 430.00

M3 M3 M3 M3

4.00 2.25 1.00 2.25

5.25 3.00 1.35 2.75

M3

1.50

M3

0.85

M3 M3 M3 M3

4.00 3.00 1.25 0.90

4.75 2.75 1.25 2.50 18.50 1.75 18.50 1.00 18.50 4.50 3.60 1.50 1.10

M3 M3 ML M2

5.00 6.50 10.00 16.00

5.75 7.50 12.00 20.00

6.25 8.15 13.00 24.00

M2 M2 M2 M2 M2 M2 M2

43.00 10.00 8.50 27.00 24.00 17.00 30.00

50.00 12.00 10.00 32.00 28.00 20.00 35.00

54.00 13.00 11.00 35.00 30.00 22.00 37.00

M3

2.25

2.75

3.00

M2

10.75

13.50

M2

9.75

12.50 50.00 11.50 30.00

M2

8.00

9.50

10.25

2.00 1.10 4.75 3.90 1.65 1.20

12.50

ANALISIS DE COSTOS PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA CONCEPTO

UNIDAD

RENDIMIENTO MEDIO INCL. DESCIMBRADO 26.28 CIMBRA EN COLUMNAS CON TRIPLAY DE 30x30 cm A 50x50 cm, H=3.00 m M2 7.75 9.00 INCL. DESCIMBRADO 23.00 CIMBRA EN COLUMNA CIRCULAR CON DUELA DIAM 40 cm, H=3.00 m M2 6.00 7.00 INCL. DESCIMBRADO 18.76 CIMBRA EN COLUMNA CIRCULAR CON SONOTUBO DIAM 40 cm, H=3.00 m M2 10.25 12.00 INCL. DESCIMBRADO 19.53 CIMBRA EN TRABES CON DUELA DE 25x40 A 40x60 cm M2 9.00 10.50 INCL. DESCIMBRADO 28.13 CIMBRA EN TRABES CON TRIPLAY DE 25x40 A 40x60 cm M2 8.50 10.00 INCL. DESCIMBRADO 24.61 CIMBRA EN LOSAS CON DUELA DE 10 A 15 cm DE PERALTE M2 8.75 10.25 INCL. DESCIMBRADO 41.00 CIMBRA EN LOSAS CON TRIPLAY DE 10 A 15 cm DE PERALTE M2 9.00 10.50 INCL. DESCIMBRADO 42.00 CIMBRA EN LOSAS CON TARIMA DE 10 A 20 cm DE PERALTE M2 10.75 12.50 INCL. DESCIMBRADO 50.00 CIMBRA EN MUROS DE 20 cm DE ESPESOR M2 8.50 10.00 INCL. DESCIMBRADO 27.22 CIMBRA EN RAMPAS DE ESCALERA DE 15 cm DE PERALTE M2 7.25 8.50 INCL. DESCIMBRADO 34.00 ACERO DE REFUERZO EN CIMENTACION (HABILITADO Y ARMADO) (SIN GANCHOS, TRASLAPES NI ANCLAJES) ACERO DE REFUERZO EN CIMENTACION #2 TON 0.13 0.14 ACERO DE REFUERZO EN CIMENTACION #2.5 TON 0.15 0.17 ACERO DE REFUERZO EN CIMENTACION #3 TON 0.21 0.23 ACERO DE REFUERZO EN CIMENTACION #4 TON 0.27 0.30 ACERO DE REFUERZO EN CIMENTACION #5 TON 0.25 0.30 ACERO DE REFUERZO EN CIMENTACION #6, #8, #10 Y #12 TON 0.30 0.35 ACERO DE REFUERZO EN ESTRUCTURA (HABILITADO Y ARMADO) (SIN GANCHOS, TRASLAPES NI ANCLAJES) ACERO DE REFUERZO EN ESTRUCTURA #2 TON 0.12 0.13 ACERO DE REFUERZO EN ESTRUCTURA #2.5 TON 0.15 0.16 ACERO DE REFUERZO EN ESTRUCTURA #3 TON 0.18 0.20 ACERO DE REFUERZO EN ESTRUCTURA #4 TON 0.23 0.27 ACERO DE REFUERZO EN ESTRUCTURA #5 TON 0.25 0.30 ACERO DE REFUERZO EN ESTRUCTURA #6, #8, #10 Y #12 TON 0.25 0.30 MALLA ELECTROSOLDADA EN PISOS 6x6-4/4 Y 6x6-6/6 M2 67.00 82.00 MALLA ELECTROSOLDADA EN PISOS 6x6-8/8 M2 68.00 84.00 MALLA ELECTROSOLDADA EN PISOS 6x6-10/10 M2 80.00 98.00 MALLA ELECTROSOLDADA EN MUROS 6x6-4/4 M2 56.00 69.00 MALLA ELECTROSOLDADA EN MUROS 6x6-6/6 Y 6x6-8/8 M2 58.00 71.00 MALLA ELECTROSOLDADA EN MUROS 6x6-10/10 M2 67.00 82.00 CONCRETO EN CIMENTACION (COLOCACION, VIBRADO, CURADO) (NO INCLUYE FABRICACION) CONCRETO EN CIMENTACION VACIADO CON CARRETILLA Y BOTES M3 8.00 9.50 3.03 CONCRETO EN CIMENTACION VACIADO CON BOMBA M3 21.00 24.00 3.03 CONCRETO CICLOPEO EN CIMENTACION M3 13.00 15.00 CONCRETO EN ESTRUCTURA (COLOCACION, VIBRADO, CURADO) (NO INCLUYE FABRICACION) CONCRETO EN COLUMNAS Y MUROS VACIADO CON CARRETILLA Y BOTES M3 5.00 6.00 1.60 CONCRETO EN TRABES Y LOSAS VACIADO CON CARRETILLA Y BOTES M3 6.75 8.00 2.14 CONCRETO EN TRABES RETICULARES VACIADO CON CARRETILLA Y BOTES M3 6.00 7.00 MINIMO

Página 3 de 16

MAXIMO 9.75 7.50 13.00 11.50 10.75 11.00 11.25 13.50 10.75 9.25

0.16 0.18 0.24 0.32 0.35 0.40 0.14 0.17 0.21 0.30 0.35 0.35 92.00 94.00 110.00 77.00 80.00 92.00 10.25 26.00 16.00 6.50 8.75 7.50

ANALISIS DE COSTOS PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA CONCEPTO

UNIDAD MINIMO

CONCRETO EN COLUMNAS Y MUROS VACIADO CON BOMBA

M3

13.00

CONCRETO EN TRABES Y LOSAS VACIADO CON BOMBA

M3

19.00

CONCRETO EN TRABES RETICULARES VACIADO CON BOMBA

M3

17.00

DALAS DE DESPLANTE 15x15, 4 #3, E #2 @ 30

ML

8.75

15x20, 4 #3, E #2 @ 30

ML

8.25

15x25, 4 #3, E #2 @ 30

ML

8.00

15x30, 4 #3, E #2 @ 30

ML

7.00

DALAS DE LIGA, TRABES Y CASTILLOS 15x15, 4 #3, E #2 @ 25

ML

8.50

15x20, 4 #3, E #2 @ 15 A 25

ML

8.00

15x25, 4 #3, E #2 @ 25

ML

7.75

15x30 Y 20x25, 4 #3, E #2 @ 25

ML

6.75

20x30, 4 #3, E #2 @ 25

ML

6.00

CASTILLO AHOGADO 1 HUECO DE BLOCK DE 15 cm CON 1 #3 CASTILLO AHOGADO 2 HUECOS DE BLOCK DE 15 cm CON 2 #3 MUROS MURO DE MAMPOSTERIA DE 30 A 40 cm DE ESPESOR SOBREPRECIO POR CARA ACABADO APARENTE MURO MAMPOSTERIA MURO DE TABIQUE E=7 SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=7 MURO DE TABIQUE E=14 SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=14 MURO DE TABIQUE E=21 SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=21 MURO DE TABIQUE E=28 SOBREPRECIO POR CARA ACABADO APARENTE MURO TABIQUE E=28 MURO DE BLOCK 15x20x40, E=15 MURO DE BLOCK 20x20x40, E=20 SOBREPRECIO POR CARA ACABADO APARENTE MURO DE BLOCK FIRMES Y PISOS (NO INCLUYE FABRICADO DE CONCRETO) FIRME DE CONCRETO E=5 cm SIN ACABADO FIRME DE CONCRETO E=8 cm SIN ACABADO FIRME DE CONCRETO E=10 cm SIN ACABADO ACABADO ESCOBILLADO INTEGRAL SOBRE CONCRETO FRESCO ACABADO PULIDO INTEGRAL SOBRE CONCRETO FRESCO FIRME DE CONCRETO E=8 cm CON MALLA ELECTROSOLDADA

ML ML

Página 4 de 16

RENDIMIENTO MEDIO 2.50 15.00 1.60 22.00 2.14 20.00 2.50

MAXIMO 16.00 24.00 22.00

10.25 71.42 9.75 53.70 9.25 43.02 8.25 35.71

11.00

10.75

22.00 14.50

10.00 71.42 9.50 53.70 9.00 43.02 8.00 35.71 7.00 26.75 25.50 17.00

M3 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2

1.75 6.00 10.25 55.00 9.00 46.00 6.50 37.00 5.40 43.00 9.00 8.50 69.00

2.00 7.00 12.00 64.00 10.50 55.00 7.75 43.00 6.00 50.00 10.25 9.75 80.00

2.25 7.50 13.00 69.00 11.50 59.00 8.25 46.00 6.30 54.00 11.00 10.50 86.00

M2

26.00

33.00

M2

20.50

M2

19.50

M2 M2 M2

40.50 25.50 15.00

30.50 26.45 24.00 26.45 23.00 26.45 47.50 30.00 17.50

10.50 10.00 9.00

10.25 9.75 8.75 7.50 27.50 18.50

26.00 25.00 51.00 32.50 19.00

ANALISIS DE COSTOS PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA CONCEPTO

UNIDAD

M2

14.50

M2

20.50

M2

19.50

M2

26.00

M2 M2 M2 M2 M2 M2 M2 M2 ML ML ML M2 M2 M2 ML ML

6.25 5.00 5.50 8.00 7.25 8.50 10.25 10.25 16.00 20.50 20.50 10.00 10.00 30.50 67.00 4.20

RENDIMIENTO MEDIO 26.45 17.00 26.45 24.00 26.45 23.00 26.45 30.50 71.42 7.25 5.75 6.50 9.25 8.50 10.00 12.00 12.00 18.00 24.00 24.00 12.00 12.00 35.50 75.00 5.00

M2 M2 M2

14.00 12.50 11.00

15.00 13.50 12.00

20.00 16.30 12.60

M2

18.50

23.00

REPELLADO EN PLAFONES CON MORTERO CEMENTO-ARENA, e=2 cm

M2

13.50

APLANADO EN MUROS PULIDO A PLANA CON MORTERO C-A, e=2.5 cm

M2

12.00

APLANADO EN PLAFONES PULIDO A PLANA CON MORTERO C-A, e=2.5 cm

M2

8.75

APLANADO EN MUROS PULIDO A LLANA CON MORTERO C-A, e=2.5 cm

M2

10.50

APLANADO EN PLAFONES PULIDO A LLANA CON MORTERO C-A, e=2.5 cm

M2

7.75

PERFILADO DE ARISTAS EN REPELLADO DE 6 cm CON MORTERO C-A

ML

22.50

PERFILADO DE ARISTAS EN APLANADO PULIDO A PLANA DE 6 cm CON MORTERO C-A PERFILADO DE ARISTAS EN APLANADO PULIDO A LLANA DE 6 cm CON MORTERO C-A RASTREADO DE YESO PARA RECIBIR TIROL EN MUROS Y PLAFONES RECUBRIMIENTOS EN MUROS RECUBRIMIENTO DE PASTA ACABADO RAYADO O PICADO

ML

18.00

ML

16.00

M2

31.02

21.50 79.37 16.00 71.43 14.00 79.37 10.25 71.43 12.50 79.37 9.00 71.43 26.50 714.29 21.00 714.29 18.50 714.29 33.00

M2

10.25

13.00

PERFILADO DE ARISTA CON PASTA ACABADO RAYADO O PICADO DE 6 cm

ML

15.50

12.00 79.37 18.00

MINIMO SIN ACABADO FIRME DE CONCRETO E=10 cm CON MALLA ELECTROSOLDADA SIN ACABADO FIRME DE CONCRETO E=8 cm CON FIBRA PLASTICA SIN ACABADO FIRME DE CONCRETO E=10 cm CON FIBRA PLASTICA SIN ACABADO SOBREPISO DE MORTERO E=3 cm SIN ACABADO PISO DE AZULEJO 11x11 cm PISO DE LOSETA 10x20 cm PISO DE LOSETA 15x15 cm PISO DE LOSETA 15x30 cm PISO DE LOSETA 20x20 cm PISO DE LOSETA 20x30 cm PISO DE LOSETA 30x30 cm PISO DE LOSETA 30x40 cm ZOCLO DE AZULEJO 11x11 cm, H=11 cm ZOCLO DE LOSETA 10x20 cm, H=10 cm ZOCLO DE LOSETA 15x15 cm, H=15 cm PISO DE DUELA MACHIMBRADA DE 1/2" BARNIZADA PISO DE PARQUET DE MADERA DE 6 mm PISO DE LOSETA VINILICA ZOCLO VINILICO SARDINEL DE AZULEJO 11X11 cm PLAFONES Y MUROS DIVISORIOS MURO DE TABLAROCA 1/2" C/POSTE @ 61 cm MURO DE TABLAROCA 1/2" C/POSTE @ 41 cm MURO DE TABLAROCA 1/2" C/POSTE @ 30.5 cm APLANADOS EN MUROS Y PLAFONES REPELLADO EN MUROS CON MORTERO CEMENTO-ARENA, e=2 cm

Página 5 de 16

MAXIMO 18.50 26.00 25.00 33.00 7.75 6.25 7.00 10.00 9.25 11.00 13.00 13.00 19.00 26.00 26.00 13.00 13.00 38.50 79.00 5.40

17.50 15.00 11.00 13.50 9.75 28.50 22.50 20.00 34.65

19.50

ANALISIS DE COSTOS PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA CONCEPTO

UNIDAD

8.50 5.25 5.50 5.50 5.50

RENDIMIENTO MEDIO 714.29 10.50 6.00 6.00 6.00 6.00

12.00

14.00

15.00

13.50

16.00

17.50

M2 LOTE PZA

7.75 2.00 2.50

8.75 2.50 2.75

9.25 2.75 3.00

M2 M2 M2

48.50 36.50 45.00

56.00 42.50 53.00 97.47

61.00 46.00 57.00

IMPERMEABILIZACION DE AZOTEA CON 1 IMPERPRIN SSL, 3 FIBRACOAT S-40, 1 VITROCOAT Y RIEGO DE ARENA 1 HIDRO PRIMER, 2 ROOF COATING, 1 FESTER FLEX Y ARENA 1 PRIMER, 3 EMULSION ASFALTICA, 2 FIELTRO Y PINTURA REFLEJANTE

M2 M2 M2

43.50 54.50 40.00

55.00 68.50 49.00

PRIMER, EMULSION ASFALTICA, ASFALTO OXIDADO Y CARTON ARENADO

M2

51.60

51.00 63.50 45.00 222.22 54.90 3333.33

IMPERMEABILIZACION SOBRE DESPLANTE DE MUROS CON 1 ASFALTO OXIDADO Y FIELTRO ASFALTICO

ML

164.00

180.00 1333.33

189.00

M2 ML

23.00 30.00

27.00 33.00

29.00 35.00

PZA PZA PZA

1.50 1.25 1.00

1.75 1.50 1.25

2.00 1.75 1.50

M2 M2 M2 M2 M2 M2 ML M2 M2 M2 M2 M2 M2 M2

25.50 21.00 16.00 24.50 19.00 16.00 19.00 5.25 6.00 20.50 16.50 19.00 15.50 5.75

30.00 24.50 19.00 28.50 22.00 18.50 22.00 6.00 7.00 24.00 19.50 22.50 18.00 6.75

32.50 26.50 20.50 31.00 24.00 20.00 24.00 6.50 7.50 26.00 21.00 24.50 19.50 7.25

MINIMO RECUBRIMIENTO TEXTURIZADO CON PASTA COREV RECUBRIMIENTO DE AZULEJO 11x11 cm RECUBRIMIENTO CON LOSETA 10x20 cm RECUBRIMIENTO CON LOSETA 15x15 cm RECUBRIMIENTO CON LOSETA 15x20 cm RECUBRIMIENTO CON LOSETA 20x20 cm RECUBRIMIENTO CON LOSETA 15x15 cm RECUBRIMIENTO DE ARISTA CON AZULEJO 11x11 cm DE 8 cm RECUBRIMIENTO DE ARISTA CON LOSETA 10x20 cm DE 8 cm RECUBRIMIENTO DE ARISTA CON LOSETA 15x15 cm DE 8 cm COLOCACIONES Y AMACIZADOS COL. DE HERRERIA AMACIZADA CON MORTERO CEMENTO-ARENA COL. DE JUEGO DE 6 PIEZAS DE ACCESORIOS DE BAÑO DE EMPOTRAR COL. DE LAVADERO DE CONCRETO AMACIZADO CON MORTERO C-A IMPERMEABILIZACIONES IMPERMEABILIZACION DE DALAS DE DESPLANTE O CHAROLAS DE BAÑO CON 1 DE IMPERPRIN SL, 2 DE FIBRACOAT Y RIEGO DE ARENA CON 1 DE HIDRO PRIMER, 2 DE VAPORTITE 550, 1 FESTER FELT Y ARENA CON 1 DE PRIMER, 2 EMULSION ASFALTICA, 1 FIELTRO #15 Y ARENA

AZOTEAS ENTORTADO DE 3 cnm DE ESPESOR CON MORTERO CEMENTO-ARENA CHAFLAN 10x10 cm CON CONCRETO ALBAÑALES, DRENES Y REGISTROS REGISTRO 40x60 Y PROF. DE 0.80 m REGISTRO 40x60 Y PROF. DE 1.00 A 1.20 m REGISTRO 40x60 Y PROF. DE 1.40 m YESERIA APLANADO EN MUROS CON YESO-AGUA A TALOCHA APLANADO EN MUROS CON YESO-AGUA C/MAESTRAS A REVENTON APLANADO EN MUROS CON YESO-AGUA C/MAESTRAS A PLOMO Y REGLA APLANADO EN PLAFOND CON YESO-AGUA A TALOCHA APLANADO EN PLAFOND CON YESO-AGUA C/MAESTRAS A REVENTON APLANADO EN PLAFOND CON YESO-AGUA C/MAESTRAS A PLOMO Y REGLA PERFILADO DE ARISTAS CON YESO DE 6 cm DE ANCHO YESO EN COLUMNAS RECTANGULARES C/MAESTRAS A PLOMO Y REGLA YESO EN TRABES C/MAESTRAS A PLOMO, NIVEL Y REGLA TIROL EN MUROS ACABADO RUSTICO TIROL EN MUROS ACABADO PLANCHADO TIROL EN PLAFONES ACABADO RUSTICO TIROL EN PLAFONES ACABADO PLANCHADO FALSO PLAFOND DE YESO CON METAL DESPLEGADO

Página 6 de 16

M2 M2 M2 M2 M2 M2 M2 M2 M2 M2

MAXIMO 11.50 6.50 6.30 6.30 6.30

57.64

ANALISIS DE COSTOS PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA CONCEPTO

UNIDAD MINIMO

HERRERIA REJILLA PLUVIAL DE ANGULO Y SOLERA, FABRICACION Y COLOCACION

KG

18.80

REGISTRO CON TAPA METALICA DE 80x80 cm CON LAMINA NEGRA CAL. 18, CON PORTACANDADO, BISAGRAS, MARCO DE ANGULO, PINTURA ANTICORROSIVA. CARPINTERIA PUERTA C/BASTIDOR DE MADERA Y TRIPLAY DE 0.70x2.10 m PUERTA C/BASTIDOR DE MADERA Y TRIPLAY DE 0.80x2.10 m PUERTA C/BASTIDOR DE MADERA Y TRIPLAY DE 0.90x2.10 m PUERTA C/BASTIDOR DE MADERA FORRADA C/FORMAICA DE 0.70x2.10 m PUERTA C/BASTIDOR DE MADERA FORRADA C/FORMAICA DE 0.80x2.10 m PUERTA C/BASTIDOR DE MADERA FORRADA C/FORMAICA DE 0.90x2.10 m CHAMBRANA P/PUERTA CON BATIENTE SOBREPUESTO CERRADURA COLOCADA EN PUERTA DE MADERA BISAGRA DE DOBLE ACCION COLOCADA EN PUERTA DE MADERA LAMBRIN DE DUELA DE ½" SOBRE BASTIDOR @ 45 cm A.S. LAMBRIN DE DUELA DE ½" SOBRE BASTIDOR @ 60 cm A.S. C/BARNIZ

PZA

3.50

PZA PZA PZA PZA PZA PZA PZA PZA PZA M2 M2

1.60 1.60 1.45 0.95 0.90 0.85 7.30 6.00 6.00 4.25 3.85

FALSO PLAFON DE DUELA CACBADO CON BARNIZ

M2

3.45

M2 M2 M2 M2 M2 M2 M2 M2 M2 ML M2 M2 M2

PINTURA PINTURA VINILICA EN MUROS Y PLAFONES DE YESO, 1S + 2M + PREP. SUP. PINTURA VINILICA EN MUROS Y PLAFONES DE MEZCLA, 1S + 2M + PREP. SUP. PINTURA VINILICA EN MUROS Y PLAFONES CONCRETO, 1S + 2M + PREP. SUP. PINTURA ESMALTE, MUROS Y PLAFONES DE YESO, 1S + 2M + PREP. SUP. PINTURA ESMALTE, MUROS Y PLAFONES CONCRETO, 1S + 2M + PREP. SUP. PINTURA ESMALTE SOBRE SUP. METALICAS, 1P +2M +PREP. SUP. PINTURA ESMALTE EN VENTANERIA METALICA, 1P + 2M + PREP.SUP. BARNIZ NATURAL C/BROCHA S/MADERA, 1S + 2M + PREP.SUP. BARNIZ MARINO C/MUÑECA S/MADERA, 1S + 2M + PREP.SUP. PINTURA ESMALTE EN CHAMBRANAS, TUBERIAS, PERF. METALICOS, ETC PINTURA ESMALTE EN VENTANAS, BARANDALES, REJAS Y ESCALERAS PINTURA ESMALTE EN PUERTAS Y SUP. DE MADERA, 2M + PREP.SUP. PINTURA ESMALTE EN PLAFONES DE MEZCLA, 1S + 2M + PREP. SUP. JARDINERIA SIEMBRA DE PASTO EN ROLLO COLOCACION DE TIERRA VEGETAL PARA JARDINERIA COLOCACION DE TIERRA LAMA PARA JARDINERIA LIMPIEZA LIMPIEZA DE AZULEJO EN MUROS C/ACIDO, JABON EN POLVO Y AGUA LIMPIEZA DE AZULEJO EN PISOS C/ACIDO, JABON EN POLVO Y AGUA LIMPIEZA DE LOSETA VINILICA EN PISOS CON AGUA Y JABON LIMPIEZA DE MUEBLES SANITARIOS CON ACIDO, AGUA Y JABON. LIMPIEZA DE VIDRIOS AMBAS CARAS CON AGUA Y JABON LIMPIEZA DE ESPEJOS CON AGUA Y JABON LIMPIEZA GRUESA GENERAL DE OBRA C/ACOPIO Y ACARREO HOR. A 20m INSTALACION DE MUEBLES SANITARIOS Y ACCESORIOS LAVABO COMPLETO CON ACCESORIOS (REINSTALACION) LAVABO COMPLETO CON ACCESORIOS W.C. TANQUE BAJO COMPLETO CON ACCESORIOS (REINSTALACION) W.C. TANQUE BAJO COMPLETO CON ACCESORIOS

Página 7 de 16

RENDIMIENTO MEDIO

MAXIMO

20.00 101.01 2000.00 4.00 12.23 42.80

21.00

1.80 1.70 1.60 1.00 0.95 0.90 8.00 7.00 7.00 5.00 4.20 5.50 3.75 3.50

1.90 1.80 1.70 1.05 1.00 0.95 8.40 7.50 7.50 5.50 4.45

23.00 18.00 23.00 20.00 20.00 23.00 17.00 13.25 6.30 52.00 17.00 17.00 17.00

25.00 20.00 25.00 22.00 22.00 25.00 20.00 15.00 7.00 60.00 20.00 20.00 20.00

26.00 21.00 26.00 23.00 23.00 26.00 21.50 16.00 7.35 64.00 21.00 21.00 21.00

M2 M3 M3

83.00 10.00 10.00

90.00 11.00 11.00

95.00 11.60 12.00

M2 M2 M2 PZA M2 M2 M2

39.00 45.50 74.00 7.00 25.50 51.00 45.00

45.50 53.00 87.00 8.00 30.00 60.00 50.00

49.00 57.00 94.00 9.00 32.50 65.00 53.00

PZA PZA PZA PZA

3.25 1.00 3.25 2.25

3.75 1.35 3.75 2.75

4.00 1.50 4.00 3.00

4.50

3.95

ANALISIS DE COSTOS PROPUESTA DE RENDIMIENTOS DE MANO DE OBRA CONCEPTO

UNIDAD MINIMO 3.25 3.25 3.25 3.25 1.30 5.00

W.C. C/FLUXOMETRO COMPLETO CON ACCESORIOS MINGITORIO C/FLUX. COMPLETO CON ACCESORIOS FREGADERO ACERO INOX. 2 ESCURR. COMPLETO CON ACCESORIOS CALENTADOR O REGADERA (REINSTALACION) CALENTADOR LLAVE DE NARIZ PARA LAVADERO INSTALACION ELECTRICA ALAMBRE TW CAL. 12 ALAMBRE TW CAL. 10 ALAMBRE TW CAL. 8 CENTRO DE CARGA

PZA PZA PZA PZA PZA JGO ML ML ML PZA

4.50

TUBO STEEL P/GRUESA 13 TUBO STEEL P/GRUESA 19 TUBO STEEL P/GRUESA 25 TUBO STEEL P/GRUESA 38 TUBO STEEL P/GRUESA 50 TUBO STEEL P/DELGADA 13 TUBO PVC 25 SALIDA DE ALUMBRADO O CONTACTOS SALIDA DE TELEFONO O TELEVISION

ML ML ML ML ML ML ML SAL SAL

0.15 2.25

Página 8 de 16

RENDIMIENTO MEDIO 3.75 3.75 3.75 3.75 1.50 5.75 400.00 340.00 290.00 6.00 8.00 60.00 60.00 42.00 32.00 24.00 90.00 63.00 0.20 2.50

MAXIMO 4.00 4.00 4.00 4.00 1.80 6.25

7.00

0.22 2.75

GRUPO

16 16 16 16 16 16 16 16 9 16 16 16 16 5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 1 1 1 1 22 1 17 17 28 30 30 32 32 1 1 1

Página 9 de 16

GRUPO 1 1 17 17 1 1 1 1 9 1 1 1 1 10 10 10 1 1 1 1 16 1 16 1 16 1 1 1 1 1 1 9 1 1 1 1 9 9 9 1 9 16 16 16 16 16

Página 10 de 16

GRUPO 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 13 1 13 1 13 13 1 13 1 13

Página 11 de 16

GRUPO 1 13 1 13 1 13 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 1 9 1 9 1 9 9 9

Página 12 de 16

GRUPO 1 9 1 9 1 9 1 9 1 15 15 15 15 15 15 15 15 8 15 15 17 17 15 15 8 63 63 63 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 9 1 20 9 1 9

Página 13 de 16

GRUPO 1 15 15 15 15 15

15 15 9 15 9

64 64 64 1 64 64 64 1 9 9 9 9 9 9 9 9 9 20 20 20 20 20 20 20 20 20 20 20 20 20 20

Página 14 de 16

GRUPO

22 9 1 22 9 1 17 17 17 17 17 17 17 17 17 17 17 21 17 21 21 21 21 21 21 21 21 21 21 21 21 21 21 9 1 1 1 1 1 1 1 1 1 30 5-INST 30 5-INST

Página 15 de 16