Rana Ashraf

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Rana Ashraf as PDF for free.

More details

  • Words: 1,225
  • Pages: 4
RANA ASHRAF RANA ASHRAF S/O RANA AKRAM House # 83/B, Block - B, Unit # 02, Latifabad, Hyderabad. Phone 022-3812733 Cell # 0332-7502358 E-mail: [email protected]

OBJECTIVE I want to utilize my abilities, skills and expertise to the maximum and grow professionally as well as financially at the same time.

PROFESSIONAL EDUCATION: B.E (Electrical/Power) from Mehran University of Engineering and Technology, Jamshoro in 1st division (2004)

PROFESSIONAL EXPERIENCE SUMMARY: Practicing as Professional Engineer Since 2006 Name of Employing Agency : Siemens Pakistan Engineering . Company Limited, Lahore Department : I.S (Infrastructure Solutions) Position : E&I Engineer. Location of assignment : Different Projects in Pakistan. Period of assignment : From Nov. 2007 to till up to date Joined Siemens as an Electrical Engineer (E&I) in Nov 2007. In Siemens, I worked as Site Engineer on different projects performing following activities: Planning of manpower and material required at site. Making project completion schedule and thereafter monitoring. Coordination with client / consultant and attend progress review meetings. Site management. In respect of man-power and finance. Arrangement of material from Store / Head office. Detail engineering and preparing detailed installation drawings and sketches for site use. Design review, Basic/detail designing Making monthly and periodically HSE (Health, Safety & Environmental), IPI (In-process Instruction), FI (Final Instruction) and QC (Quality Control) reports  Making monthly progress reports        

Testing and commissioning of following type of equipment: 1. 2. 3. 4.

11 KV Panels. LT Panels, MCCs and Distribution Boards. Power and distribution transformers. External and internal lighting systems

5. 6. 7. 8.

HT, LT & Control cables HVAC systems. Instrumentation Cable trays.

9. Supervising the installation of above equipment. During my stay in Siemens I worked on following major projects:1.1 Century Paper Mills Bhai Pherro (Nov 2007 to Dec 2007) Working as an Electrical Engineer (E & I) PLC’s, DCS with the Korian based consulting company (Daewoo International Corporation Ltd) at Century Paper Mills (PM7) project. Responsible for, My key responsibilities include commissioning:  Installed VFDs (Variable Frequency Drives) of LS  Installed PDP (Power Distribution Panels) and CPU 8800 I/O panels of ABB  PLC (Programmable Logic Control) panels of Siemens 1.2 Bulleh shah Paper Mills & Power Plant (Unit of Packages Limited) (Dec 2007 to Still Up to Date) Presently Working as Electrical Engineer (E & I) PLC’s, DCS with the Canadian based consulting company (Jaakko Poyry & Flowtronix) at Bulleh Shah Paper Mills and Power plant, (A unit of Packages Pvt. Ltd.). Packages Limited (www.packages.com.pk) is one of the Pakistan’s Largest Paper & Board Producer & Converting Company with a production capacity of 100,000 tons of paper per year. In year 2004 Packages decided to enhance its production capacity & install a BULLEH SHAH PAPER & Board Mill at Kasur, Pakistan with a production capacity of 300,000 tons per year. Second phase of the project is continue, second phase includes following areas Coating, PM7, DIP (De-inking Plant) and 41MW Power House. Responsible for, • • • • • •

My key responsibilities include: Project Feasibility study Developing Project schedule Project budget estimating, planning and preparation. Basic & Detail Engineering Coordination with foreign & local consultants for process engineering Organizing construction, erection & commissioning of different areas Supervision of Planning, Scheduling Design review, Developing scope of work, Review the base design, Detail design, Technical Specification Vendor Drawings/ Documents for Various Instruments. Datasheets/ Specifications /Hook-up drawings For Various Instruments LikeTransmitters, Control Valves, Analyzers, Control Systems, Fire Systems, Control Room Layout Drawings, Instrument Interconnection Drawings, Instrument Loop Drawings, Logic Diagrams, Functional Block Diagrams. Interact with Other Engineering Disciplines; Identify the Inputs Required by Them and Accordingly Provide the Same vision of Erection, Installation of HT Panels, MCC Panels, Control panels.

Installation erection and commissioning AT800XA version 4.1 (ABB DCS) •

BASIC OPERATION



TOPOLGY DESIGN



DESIGN AND CONFIGURATION ABB DCS SYSTEM DCS Panels/Suctional Derives, VFD’s Power Transformer, cables Tray works, Cables laying and termination, Materials Inspection, Prepared progress reports of on going projects besides reviewing pending works, besides maintaining economic utilization of the resources and manpower. Scrutinized fault reports of the system and progress reports of the projects on daily basis, Supervision, Erection, Installation of all type of Pressure, Differential Pressure, Flow, Level & Temperature Transmitters. Pressure & Temperature gauges Name of Employing Agency Department Position Location of assignment Period of assignment

: Flowtronix Pakistan Engineering Company Limited, Lahore. : E.C (Engineering & Construction). : E&I Engineer. : Various Projects in Pakistan. : From Feb. 2006 to Nov 2007

Joined Flowtronix as an Electrical Engineer (E&I) in Feb. 2006. In Flowtronix, I worked as Site Engineer on various projects. During my stay in Flowtronix I worked on following major projects and performing following activities: 1.3 D.G Cement Factory Distt. Chakwal (Feb 2006 to April 2006) 1) 2) 3) 4)

Installation of Substation Panels. Earthing of plant. cable tray routing cable laying and cable dressing

1.2 ICI Soda Ash Khewra (50 KTPA Extension Project) (May 2006 to July 2006) 1) Electrical work, earthing and lighting installation of the complete plant. 2) Instruments installation, calibration and loop testing 3) Calibration of Instruments e.g. Gauges (Pressure, Level and Temperature), Transmitters (Level, Pressure and Temperature). 4) Installation of all above Instruments and Tubing. 5) Installation of PLC system. 6) Loop Testing of Instruments. 1.3 SEPCOL Power House Raiwand (Aug 2006 to Dec 2006)       

Installation and Erection of 18MW Diesel Generator manufactured by MAN. 1) Cable tray routing 2) Cable laying and cable dressing 3) Cable jointing (H.T Kits), panel 4) High pot testing 5) Earth testing 6) Making Earth Pits 7) Lighting job 8) Panel installation

9) Transformer Installation 10) Dehydration of Transformer 11) Transformer oil testing 12) Instrument installation 1.4 Bulleh shah Paper Mills & Power Plant (Unit of Packages Limited)(Jan 2007 to Nov 2007) Working as Electrical Engineer (E & I) PLC’s, DCS with the Canadian based consulting Company (Jaakko Poyry & Flowtronix) at Bulleh Shah Paper Mills and Power plant, (A unit of Packages Pvt. Ltd.). During my stay in Flowtronix I worked in phase one of the project and performing in these area PM6, OCC, SPP, CTMP, Slush Pulp, Straw Handling, ETP and Lighting of whole project. 1.5 ADDITIONAL EXPERIENCE: Working as a Trainee Engineer (Power House) of 10.058MW. Indus Dyeing & MFG Co. Ltd. S.I.T.E Hyderabad from 5th January 2005 to 3rd February 2006. Operation, Maintenance and trouble shooting of all types of Gas Enginators.  Waukesha Gas Engine 635 KW x 4 (L7042G)  Waukesha Gas Engine 1100 KW x 1 (L7044GSID)  Caterpillar Gas Engine 1110 KW x 2 (3516-B)  Jenbacher Gas Engine 1006 KW x 1 (JGS 320 GS N-L)  GE Jenbacher Gas Engine 1064 x 3 (JGS 320 GS N-L) Installation, erection, operation and Maintenance of 1064 KW x 3 (JGS 320 GS N-L)  Work on Waste Heat Recovery Boiler Duplex D.D.F.C Engineering of 1.6 tons / Hr Steam consume for Dyeing Section and also hot Water from J/Water (Engines) 70oc – 80oc for washing and vessels use.  Installation of Heat Recovery system for Boiler Hot Water and waste heat Recovery Boiler.  Knowledge about cooling towers and their related chemicals and also the chemical use in boiler. COMPUTER: Window XP Professional S5/S7 Software MCSE-2000 VISUO SOFT Window NT Operating Sys. REFERENCE: References can be furnished on Demand.