RENCANA ANGGARAN BIAYA RUMAH TYPE 36+ / 84 TYPE Minimalis Harga No.
Item Pekerjaan
Sat.
Total Harga
Satuan
I
Ket.
Vol ###
PEKERJAAN PERSIAPAN 1 Pasang Bouwplank
m1
39.00
15,000
Sub Total II
585,000.00 585,000.00
PEKERJAAN TANAH/PONDASI 1 Galian tanah pondasi
m3
14.93
65,000
970,125.00
2 Urugan kembali + Pemadatan
m3
0.77
45,000
34,641.00
3 Urugan pasir
3
m
2.22
158,400
351,450.00
4 Pondasi batu kali 1:5
m3
5.34
675,000
3,607,031.25
5 Pondasi Rollagh u/ teras bataco + dapur
m1
9.00
78,600
707,400.00
Sub Total III
5,670,647.25
PEKERJAAN STRUKTUR BETON 1 Sloof 20 x 15 cm, Tul besi beton 4Ø 10 - ring Ø 6 (15-20)
m3
1.28
2,510,772
3,220,065.60
2 Kolom 15 x 15 cm Tul besi beton 4Ø 10 - ring Ø 6 (15-20)
3
m
1.52
2,536,228
3,851,896.58
3 Kolom Variasi 12 x 20 cmTul besi beton 4Ø 8 - ring Ø 6 (15-20)
m3
0.11
2,536,228
273,912.65
4 Ring Balok + Sopi-sopi 13 x 15 cm
m3
0.93
2,511,841
2,326,592.91
5 Meja dapur betonTul besi beton Ø 10 + 8 (15) double
m3
0.12
2,916,662
349,999.49
6 Canopy betonTul besi beton Ø 10 + 8 (15) double
m3
0.25
2,916,662
729,165.61
Sub Total IV
10,751,632.84
PEKERJAAN PASANGAN DINDING 1 Pasangan Hebel
m2
201.00
105,000
21,105,000.00
2 Plesteran Mortar + Acian
m2
371.85
52,500
19,522,125.00
Sub Total V
40,627,125.00
PEKERJAAN ATAP 1 Rangka Baja ringan 0.75mm
m2
56.68
120,000
6,801,600.00
2 Listplank GRC
m1
36.00
25,850
930,600.00
3 Pasangan Nok Genteng Beton
m1
8.70
27,522
239,441.40
4 Pasangan Genteng Beton
m2
73.68
58,500
4,310,514.00
5 Waterproofing dak beton
m2
3.50
32,779
114,726.15
Sub Total VI
12,396,881.55
PEKERJAAN PLAFOND 1 Rangka besi hollow galvanis 4x4 &2x4
m2
68.00
46,000
3,128,000.00
2 Penutup Plafond Gypsum 9mm ex. Jayaboard
m2
68.00
38,000
2,584,000.00
3 List Plafond 10cm
m1
60.00
12,500
750,000.00
Sub Total VII
6,462,000.00
PEKERJAAN PINTU DAN JENDELA 1 Kusen Alumunium 4" coating + Daun Pintu Panel P.1
bh
1.00
2,650,000
2,650,000.00
2 Kusen Alumunium 4" coating + Daun Pintu Panel P.2
bh
1.00
2,250,000
4,500,000.00
3 Kusen Alumunium 4" coating + Pintu Double Multiplek P.3
bh
3.00
1,560,000
4,680,000.00
4 Kusen P.3 (PVC)
bh
1.00
375,000
375,000.00
5 Kusen + Daun Jendela Almunium 4" coating J1
bh
2.00
1,235,000
2,470,000.00
6 Kusen + Daun Jendela Almunium 4" coating J2
bh
2.00
1,185,000
2,370,000.00
7 Loster Almunium 4"
bh
8.00
250,000
2,000,000.00
8 Kusen BV
bh
1.00
125,000
125,000.00
Sub Total VIII
PEK. FINISHING LANTAI Page 1
19,170,000.00
### ###
RENCANA ANGGARAN BIAYA RUMAH TYPE 36+ / 84 TYPE Minimalis Harga No.
Item Pekerjaan
Sat.
Total Harga
Satuan
m3
2.25
235,000
528,750.00
2 Granit lantai 60x60 Ruangan + teras + kamar
2
m
36.40
165,000
6,006,000.00
3 Keramik lantai 20x20 unpolish kamar mandi
m2
3.50
75,000
262,500.00
4 Keramik Dinding 20x30 unpolish kamar mandi
m2
7.20
95,000
684,000.00
5 Rabat Beton 1 : 3 : 5 ; dapur
m2
4.00
22,044
88,176.00 7,569,426.00
PEKERJAAN PENGECATAN 1 Cat dinding & Plafond
m2
329.89
15,000
4,948,312.50
2 Cat Listplank
m2
36.00
16,000
576,000.00
Sub Total X
###
1 Screed ; R. Tamu & kamar
Sub Total IX
Ket.
Vol
5,524,312.50
PEKERJAAN SANITARY + INSTALASI PLAMBING 1 Kran dinding 1/2”
bh
3.00
50,000
150,000.00
###
2 Shower + Accs
set
1.00
1,200,000
1,200,000.00
###
3 Closet Duduk
bh
1.00
1,700,000
1,700,000.00
###
4 Washtafel
bh
1.00
750,000
750,000.00
5 Kitchen zinc
set
1.00
550,000
550,000.00
4 Saringan Air Kotor (floor drain)
bh
2.00
35,000
70,000.00
###
5 Instalasi Air Bersih Pipa PVC 1/2”
m'
16.00
11,250
180,000.00
###
6 Instalasi Air Bekas Pipa PVC 3”
m'
22.00
19,000
418,000.00
###
7 Instalasi Air Kotor Pipa PVC 4”
m'
13.00
36,250
471,250.00
###
8 Septiktank
bh
1.00
1,500,000
1,500,000.00
### ###
Sub Total XI
6,989,250.00
PEKERJAAN ELECTRICAL 1 Pasang Titik Lampu
ttk
10.00
135,000
1,350,000.00
2 Pasang Stop Kontak
ttk
5.00
150,000
750,000.00
3 Pasang Box MCB + Arde
ttk
2.00
250,000
500,000.00
Sub Total XII
2,600,000.00
PEKERJAAN DILUAR BANGUNAN 1 Jalan Masuk / Carport
m2
13.50
45,000
607,500.00
1 Sumur Pntek + pompa
ttk
1.00
2,500,000
2,500,000.00
3 Tempat sampah
bh
1.00
250,000
250,000.00
Sub Total
3,357,500.00
TOTAL BIAYA
121,703,775.14 m2
Page 2
2,704,528.34