Rab Type 36+.xls

  • Uploaded by: Arya Raditya
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Rab Type 36+.xls as PDF for free.

More details

  • Words: 695
  • Pages: 2
RENCANA ANGGARAN BIAYA RUMAH TYPE 36+ / 84 TYPE Minimalis Harga No.

Item Pekerjaan

Sat.

Total Harga

Satuan

I

Ket.

Vol ###

PEKERJAAN PERSIAPAN 1 Pasang Bouwplank

m1

39.00

15,000

Sub Total II

585,000.00 585,000.00

PEKERJAAN TANAH/PONDASI 1 Galian tanah pondasi

m3

14.93

65,000

970,125.00

2 Urugan kembali + Pemadatan

m3

0.77

45,000

34,641.00

3 Urugan pasir

3

m

2.22

158,400

351,450.00

4 Pondasi batu kali 1:5

m3

5.34

675,000

3,607,031.25

5 Pondasi Rollagh u/ teras bataco + dapur

m1

9.00

78,600

707,400.00

Sub Total III

5,670,647.25

PEKERJAAN STRUKTUR BETON 1 Sloof 20 x 15 cm, Tul besi beton 4Ø 10 - ring Ø 6 (15-20)

m3

1.28

2,510,772

3,220,065.60

2 Kolom 15 x 15 cm Tul besi beton 4Ø 10 - ring Ø 6 (15-20)

3

m

1.52

2,536,228

3,851,896.58

3 Kolom Variasi 12 x 20 cmTul besi beton 4Ø 8 - ring Ø 6 (15-20)

m3

0.11

2,536,228

273,912.65

4 Ring Balok + Sopi-sopi 13 x 15 cm

m3

0.93

2,511,841

2,326,592.91

5 Meja dapur betonTul besi beton Ø 10 + 8 (15) double

m3

0.12

2,916,662

349,999.49

6 Canopy betonTul besi beton Ø 10 + 8 (15) double

m3

0.25

2,916,662

729,165.61

Sub Total IV

10,751,632.84

PEKERJAAN PASANGAN DINDING 1 Pasangan Hebel

m2

201.00

105,000

21,105,000.00

2 Plesteran Mortar + Acian

m2

371.85

52,500

19,522,125.00

Sub Total V

40,627,125.00

PEKERJAAN ATAP 1 Rangka Baja ringan 0.75mm

m2

56.68

120,000

6,801,600.00

2 Listplank GRC

m1

36.00

25,850

930,600.00

3 Pasangan Nok Genteng Beton

m1

8.70

27,522

239,441.40

4 Pasangan Genteng Beton

m2

73.68

58,500

4,310,514.00

5 Waterproofing dak beton

m2

3.50

32,779

114,726.15

Sub Total VI

12,396,881.55

PEKERJAAN PLAFOND 1 Rangka besi hollow galvanis 4x4 &2x4

m2

68.00

46,000

3,128,000.00

2 Penutup Plafond Gypsum 9mm ex. Jayaboard

m2

68.00

38,000

2,584,000.00

3 List Plafond 10cm

m1

60.00

12,500

750,000.00

Sub Total VII

6,462,000.00

PEKERJAAN PINTU DAN JENDELA 1 Kusen Alumunium 4" coating + Daun Pintu Panel P.1

bh

1.00

2,650,000

2,650,000.00

2 Kusen Alumunium 4" coating + Daun Pintu Panel P.2

bh

1.00

2,250,000

4,500,000.00

3 Kusen Alumunium 4" coating + Pintu Double Multiplek P.3

bh

3.00

1,560,000

4,680,000.00

4 Kusen P.3 (PVC)

bh

1.00

375,000

375,000.00

5 Kusen + Daun Jendela Almunium 4" coating J1

bh

2.00

1,235,000

2,470,000.00

6 Kusen + Daun Jendela Almunium 4" coating J2

bh

2.00

1,185,000

2,370,000.00

7 Loster Almunium 4"

bh

8.00

250,000

2,000,000.00

8 Kusen BV

bh

1.00

125,000

125,000.00

Sub Total VIII

PEK. FINISHING LANTAI Page 1

19,170,000.00

### ###

RENCANA ANGGARAN BIAYA RUMAH TYPE 36+ / 84 TYPE Minimalis Harga No.

Item Pekerjaan

Sat.

Total Harga

Satuan

m3

2.25

235,000

528,750.00

2 Granit lantai 60x60 Ruangan + teras + kamar

2

m

36.40

165,000

6,006,000.00

3 Keramik lantai 20x20 unpolish kamar mandi

m2

3.50

75,000

262,500.00

4 Keramik Dinding 20x30 unpolish kamar mandi

m2

7.20

95,000

684,000.00

5 Rabat Beton 1 : 3 : 5 ; dapur

m2

4.00

22,044

88,176.00 7,569,426.00

PEKERJAAN PENGECATAN 1 Cat dinding & Plafond

m2

329.89

15,000

4,948,312.50

2 Cat Listplank

m2

36.00

16,000

576,000.00

Sub Total X

###

1 Screed ; R. Tamu & kamar

Sub Total IX

Ket.

Vol

5,524,312.50

PEKERJAAN SANITARY + INSTALASI PLAMBING 1 Kran dinding 1/2”

bh

3.00

50,000

150,000.00

###

2 Shower + Accs

set

1.00

1,200,000

1,200,000.00

###

3 Closet Duduk

bh

1.00

1,700,000

1,700,000.00

###

4 Washtafel

bh

1.00

750,000

750,000.00

5 Kitchen zinc

set

1.00

550,000

550,000.00

4 Saringan Air Kotor (floor drain)

bh

2.00

35,000

70,000.00

###

5 Instalasi Air Bersih Pipa PVC  1/2”

m'

16.00

11,250

180,000.00

###

6 Instalasi Air Bekas Pipa PVC  3”

m'

22.00

19,000

418,000.00

###

7 Instalasi Air Kotor Pipa PVC  4”

m'

13.00

36,250

471,250.00

###

8 Septiktank

bh

1.00

1,500,000

1,500,000.00

### ###

Sub Total XI

6,989,250.00

PEKERJAAN ELECTRICAL 1 Pasang Titik Lampu

ttk

10.00

135,000

1,350,000.00

2 Pasang Stop Kontak

ttk

5.00

150,000

750,000.00

3 Pasang Box MCB + Arde

ttk

2.00

250,000

500,000.00

Sub Total XII

2,600,000.00

PEKERJAAN DILUAR BANGUNAN 1 Jalan Masuk / Carport

m2

13.50

45,000

607,500.00

1 Sumur Pntek + pompa

ttk

1.00

2,500,000

2,500,000.00

3 Tempat sampah

bh

1.00

250,000

250,000.00

Sub Total

3,357,500.00

TOTAL BIAYA

121,703,775.14 m2

Page 2

2,704,528.34

Related Documents

Rab Type 36+.xls
May 2020 7
Rab Type 36+ Bm.xls
May 2020 5
Rab
June 2020 33
Type
June 2020 37
Rab Mess.xlsx
November 2019 44
Rab Material.xlsx
October 2019 47

More Documents from "HamidAffandy"

10.pdf
May 2020 16
7.pdf
May 2020 15
9.pdf
May 2020 18
15.pdf
May 2020 10
4.pdf
May 2020 8
2.pdf
May 2020 11