PERHITUNGAN

RENCANA ANGGARAN BIAYA (

UNTUK BANGUNAN RUM

INFORMASI

INPUT DAFTAR HAGRA BAHAN DAN UPAH

Klik aja pilihan mu

INPUT VOLUME PEKERJAAN

Perhitungan Pekerja

PERHITUNGAN

GARAN BIAYA (RAB) PELAKSANAAN

ANGUNAN RUMAH TINGGAL

PUT DAFTAR GRA BAHAN DAN UPAH

hitungan Pekerja

Emmm… Dimana Yaaa..

INFORMASI ► Agar hasil dapat sesuai dengan yang diinginkan, dimohon untuk tidak menghilangkan/menghapus data-data yang telah ada. ► Jika jenis konstruksi tidak terdapat dalam pelaksanaan pembangunan, anda dapat meng_HIDE row atau cell pada bagian tersebut untuk meminimalkan jumlah print out. ► SEBELUM MELAKUKAN PRINT OUT HARAP CEK ULANG SELURUH DATA YANG ADA.

Daftar Harga ► Untuk mempermudah pengaksesan, masukkan harga material/bahan dan upah pekerja sesuai dengan daftar yang telah disediakan. ► Jika anda memasukkan jenis material baru pada daftar harga bahan dan satuan upah, maka material tersebut tidak akan terdeteksi pada sistem range.

Volume Pekerjaan ► Masukkan volume pekerjaan sesuai dengan jenis pekerjaan dalam daftar yang telah disediakan. ► Jika terdapat jenis pekerjaan baru, maka anda harus me_rang sendiri dengan membuat hubungan-hubungan antar sheet sesuai dengan metode yang ada dan menggunakan analisa yang benar. Hingga akhirnya pekerjaan tersebut dapat termuat muali dari harga satuan pekerjaan sampai dengan daftar rekapitulasi sesuai dengan jenis pekerjaan.

Harga Satuan Pekerjaan

Harga Satuan Pekerjaan ► Harga satuan pekerjaan merupakan perkalian antara koefesien tiap satuan pekerjaan dengan harga bahan dan upah kerja per satuan pekerjaan. ► Pada daftar satuan pekerjaan, koefesien yang ada diambil dari analisa yang telah dilakukan dan berdasarkan SNI No 03-2835-2002 Edisi Revisi. ► Jika terdapat perubahan pada sheet volume pekerjaan atau harga bahan dan upah, maka secara otomatis nilai harga satuan pekerjaan akan berubah sesuai dengan ketetapan yang telah dibuat. ► Jika memang terdapat jenis pekerjaan baru atau analisa yang digunakan sudah tidak sesuai dengan keadaan, maka pengguna dapat memanfaatkan data yang ada dengan mengganti koefesien dari tiap-tiap satuan pekerjaan sesuai dengan ketentuan yang ingin digunakan.

RAB (Rencana Anggaran Biaya) ► RAB merupakan nilai/harga dari masing-masing item pekerjaan, yang diperoleh dengan cara mengalikan volume pekerjaan dengan harga satuan pekerjaan. ► Jika terdapat perubahan pada sheet volume pekerjaan/harga bahan dan upah/harga satuan pekerjaan, maka secara otomatis nilai RABpun akan berubah data-data yang baru.

Rekapitulasi ► Rekapitulasi adalah harga keseluruhan nilai pekerjaan, tanpa memasukkan pajak bangunan. ► Nilai Rekapitulasi secara otomatis akan mengikuti perubahan-perubahan yang dilakukan pada sheet-sheet yang lain.

Volume Material Keseluruhan ► Volume material keseluruhan merupakan jumlah banyaknya material/bahan yang akan digunakan dalam penyelesaian pelaksanaan pembangunan. ► Jika terjadi perubahan pada jenis material yang digunakan, maka anda harus melakukan penghitungan ulang ada sheet ini untuk penyesuaian. ► Sebelum melakukan print out pada seet ini, sebaiknya anda mengcek ulang seluruh data yang ada.

Time Schedule dan Kurva S ► Time Schedule dan Kurva "S" pada sheet ini telah terhubung secara langung dengan sheet rekapitulasi. ► Kurva "S" akan berubah mengikuti data-data terbaru, dan jika kurva S yang ada tidak membentuk kurva yang baik lagi, maka anda dapat melakukan penyesuaian ulang dengan cara membagi presentasi bobot pekerjaan per minggu hingga membentuk kurva yang sesuai. ► Jumlah minggu pada time schedule tidak dapat berubah secara langsung, sehingga jika rencana pelaksanaan pembangunan berubah, maka anda harus mengulang perhitungan yang ada.

Perhitungan Kebutuhan Tulangan ► Untuk menesuaikan perhitungan dengan kebutuhan yang sebenarnya, maka pada sheet ini anda diharapkan dapat mengisi sendiri diameter tulangan dan banyaknya tulangan yang digunakan pada kolom yang berwarna hjau. Dengan demikian data-data yang baru tersebut akan memperbaharui/mengganti data-data yang terdahulu pada sheet harga satuan pekerjaan. ► Angka "1" pada perhitungan tulangan pokok dan Ø 15 pada perhitungan tulangan begel/sengkang memiliki arti bahwa jenis konstrruksi tersebut tidak digunakan pada pelaksanaan pembangunan.Namun anda tetap data-data yang ada telah terhubung langsung pada sheet harga satuan pekerjaan, sehingga anda dapat menggunakannya dengan cara seperti pada poin sebelumnya. ► Jika angka pada kolom yang berwarna merah muda tidak terdeteksi, anda dapat mengisikan sendiri nilai dari berat tulangan per meter panjang dari diameter tulangan yang anda gunakan sesuai dengan ketentuan yang ada.

Perhitungan Kebutuhan Pekerja ► Perhitungan kebutuhan pekerja digunakan untuk menentukan lamanya pelaksanaan pekerjaan yang menjadi acuan untuk membuat time schedule. ► Pada sheet perhitungan kebutuhan pekerjaterdapat dua bagian, yaitu bagian perhitungan banyaknya jumlah tenaga kerja yang dibutuhkan dan bagian

► ► ►



perhitungan jumlah hari untuk menyelesaikan pekerjaan. Perhitungan Banyaknya Jumlah Tenaga Kerja. Pada bagai perhitungan jumlah tenaga kerja anda dapat merencanakan sendiri lamanya pelaksanaaan pekerjaan (dalam hari) pada kolom yang berwarna merah muda (kolom "e"). Simbol dengan hurup P, T,KT, dan M memiliki arti Pekerja, Tukang, Kepala Tukang dan Mandor. Kolom yang berwarna hijau muda adalah pembulatan dari nilai yang ada pada kolom disebelahnya (kolom "f"), hal ini dilakukan untuk penyesuaian tenaga kerja. Jika kolom mengeluarka hurup #DIV/0!, artinya anda tidak memasukkan rencana lamanya hari yang dibutukan untuk penyelesaian pekerjaan pada kolom e. Denga demikian dapat diartikan bawa jenis konstruksi tersebut tidak terdapat dalam pelaksanaan pembangunan. Perhitungan Jumlah Hari Untuk Menyelesaikan Pekerjaan Bagian ini berisikan time schedule harian yang telah disesuaikan dengan perhitungan jumlah tenaga kerja. Pada bagian ini tidak terdapat koneksi antara shee maupun cell, sehingga apabila terjadi perubahan hari/lamanya pelaksanaan pekerjaan maka anda harus merencanakan waktu pelaksanaan dari awal secara manual.

eeemmm…..nyamiii

emmm…nyami..

KEEP SMILE..

malkan

range.

n pekerjaan

an data yang

n pekerjaan. erubah sesuai

harus

gan dan gganti

jaan,

ari diameter

agian

erwarna

uaian tenaga

ada kolom e.

i antara sheet wal secara

URAIAN PEKERJAAN I. PEKERJAAN PONDASI 1.1. Pekerjaan Persiapan 1.1.1. Pembersihan Lapangan 1.1.2. Pemasangan Bouplank/Pengukuran 1.1.3. Pengadaan Air Kerja 1.1.4. Pembuatan Gudang Semen dan Alat 1.1.5. Dereksi Keet 1.2. Pekerjaan Galian 1.2.1. Galian Tanah Biasa 1 Meter 1.2.2. Galian Tanah Biasa 2 Meter 1.2.3. Galian Tanah Biasa 3 Meter 1.2.4. Galian Tanah Keras 1 Meter 1.2.5. Galian Tanah Cadas 1 Meter 1.2.6. Galian Tanah Lumpur 1 Meter 1.2.7. Urugan Kembali Galian 1.2.8. Pemadatan Tanah 1.3. Pemasangan Pondasi Batu Kali 1.3.1. Urugan Pasir Bawah Pondasi 1.3.2. Pasangan Pondasi Batu Kosong 1.3.3. Pasangan Pondasi Batu Kali II. PEKERJAAN BETON 2.1. Beton Bertulang 2.1.1. Sloof 15 x 20 2.1.2. Pondasi Plat 2.1.2. Kolom 15 x 15 2.1.3. Kolom 15 x 20 2.1.4. Kolom 15 x 25 2.1.5. Kolom 15 x 30 2.1.6. Kolom 20 x 20 2.1.7. Kolom 20 x 25 2.1.8. Kolom 20 x 30 2.1.9. Kolom 20 x 35 2.1.10. Kolom 20 x 40 2.1.11. Kolom 25 x 25 2.1.12. Kolom 25 x 30 2.1.13. Kolom 25 x 35 2.1.14. Kolom 25 x 40 2.1.15. Kolom 25 x 45 2.1.16. Kolom 25 x 50 2.1.17. Kolom 30 x 30 2.1.18. Kolom 30 x 35 2.1.19. Kolom 30 x 40 2.1.20. Kolom 35 x 45 2.1.21. Kolom 35 x 50 2.1.22. Kolom 40 x 40 2.1.23. Kolom 40 x 45 2.1.24. Kolom 40 x 50

2.1.25. Balok 15 x 20 2.1.26. Balok 15 x 25 2.1.27. Balok 15 x 30 2.1.28. Balok 20 x 20 2.1.29. Balok 20 x 25 2.1.30. Balok 20 x 30 2.1.31. Balok 20 x 35 2.1.32. Balok 20 x 40 2.1.33. Balok 25 x 25 2.1.34. Balok 25 x 30 2.1.35. Balok 25 x 35 2.1.36. Balok 25 x 40 2.1.37. Balok 25 x 45 2.1.38. Balok 25 x 50 2.1.39. Balok 30 x 30 2.1.39. Balok 30 x 35 2.1.40. Balok 30 x 40 2.1.41. Balok 35 x 45 2.1.42. Balok 35 x 50 2.1.43. Balok 40 x 40 2.1.44. Balok 40 x 45 2.1.45. Balok 40 x 50 2.1.46. Plat Beton 2.1.47. Ring Balok 2.1.48. Tangga 2.2. Beton Tak Bertulang 2.2.1. Beton Cor 1 : 2 : 3 III. PEKERJAAN DINDING 3.1. Dinding 3.1.1. Pasangan Dinding 1/2 Bata (1:4) 3.1.2. Pasangan Dinding 1/2 Bata (1:2) 3.2. Kusen 3.2.1. Kusen Pintu dan Jendela 3.2.2. Bout-bout/Angker IV. PEKERJAAN KAP DAN ATAP 4.1. Kap dan Rangka Atap 4.1.1. Balok Dinding 8/12 4.1.2. Pekerjaan Kuda-Kuda 4.1.3. Pekerjaan Rangka Atap 4.1.4. Pekerjaan Listplank 3/25 4.1.5. Pekerjaan Papan Reuter 3/25 4.1.6. Nog dan Gording 8/12 4.1.7. Pekerjaan Talang 4.2. Atap 4.2.1. Pemasangan Atap 4.2.2. Pemasangan Perabung

V. PEKERJAAN PLAFOND 5.1. Balok Plafond 5.1.1. Rangka Plafon 5.2. Memasang Plafond 5.2.1. Memasang Plafond Gypsum 5.2.2. Memasang Lis Plafond VI. PEKERJAAN PLASTERAN DAN ACIAN 6.1. Plasteran 6.1.1. Plasteran Dinding (1:2) 6.1.2. Plasteran Dinding (1:4) 6.1.3. Acian 6.2. Turap Porslen 6.2.1. Pasangan Turap Porslent VII. PEKERJAAN LANTAI 7.1. Urugan Bawah Lantai 7.1.1. Urugan Tanah 7.1.2. Urugan Pasir 7.2. Pasangan Lantai 7.2.1. Pasangan Lantai Kramik 33 x 33 7.2.2. Pasangan Lantai Kramik 20 x 20 VIII. PEKERJAAN PINTU DAN JENDELA 8.1. Pintu dan Jendela 8.1.1. Pasangan Pintu 8.1.2. Pasangan Jendela 8.2. Kaca 8.2.1. Pasangan Kaca Tebal 15 mm 8.3. Penggantung/Kunci 8.3.1. Pasangan Engsel Pintu 8.3.2. Pasangan Engsel Jendela 8.3.3. Pasangan Kunci Taman Antik IX. PEKERJAAN PENGECATAN 9.1. Mendempul dan Mrnggosok Kayu 9.2. Mengecat Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 9.3. Mengecat Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) X. PEKERJAAN PERLENGKAPAN DALAM 10.1. Listrik 10.1.1. Pasangan Lampu Pijar 10.1.2. Pemasangan Stop Kontak 10.1.3. Pemasangan Lampu TL 10.1.4. Pemasangan MCB 10.1.5. Pemasangan Kabel Jaringan 10.1.6. Pitting lampu

10.1.7. Pemasangan Sakelar 10.2. Sanitair dan Instalasi Air 10.2.1. Pemasangna Kloset Jongkok 10.2.2. Pemasangan Kloset Duduk 10.2.3. Pemasangan Floor Draine 10.2.4. Pemasangan Bak Cuci Piring 10.2.5. Pemasangan Wastafel 10.2.6. Pem. Pipa Air Ø 3" Per M' 10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 10.2.10. Pem. Kran Air Ø 3/4" atau 1/2"

11.1. 11.2. 11.3. 11.4. 11.5.

XI. PEKERJAAN PERLENGKAPAN LUAR Saluran Keliling Rabat Beton (1:3:5) Bak Kontrol Resapan Septictank

DAFTAR HAGRA BAHAN DAN SATUAN UPAH HARGA NO

URAIAN

SATUAN

SATUAN

KET

(RUPIAH) A

UPAH: 1

Mandor

hari

65,000.00

2

Kepala Tukang

hari

55,000.00

3

Tukang

hari

45,000.00

4

Pekerja

hari

35,000.00

B

BAHAN/MATERIAL 1

Air Kerja

ls

4,500,000.00

2

Alkali Resisting

kg

60,000.00

3

Cat Dasar

kg

18,300.00

4

Cat Kayu

kg

18,300.00

5

Cat Meni

kg

18,300.00

6

Naturtone Cat Tembok

kg

14,640.00

7

American Standart Kloset Duduk

bh

1,904,000.00

8

Amplas

lbr

3,000.00

9

Anti Lumut

kg

90,000.00

11

Atap Sakura Roof (2 Susun)

m2

51,968.00

12

AW Pipa PVC Ø 1"

m

22,400.00

13

AW Pipa PVC Ø 1/2"

m

11,200.00

14

AW Pipa PVC Ø 3/4"

m

15,680.00

15

AW Pipa PVC Ø 3"

m

63,500.00

16

Batu Apung

kg

15,000.00

17

Batu Bata

bh

225.00

18

Batu Batako 10/20/40

bh

4,000.00

19

Batu Kali

m

3

150,000.00

20

Baut Engsel/Teralis

dos

7,500.00

21

Baut Ø12-15

bh

1,680.00

22

Baut Ø16-20

bh

2,240.00

23

Belucci Kunci

set

112,000.00

24

Besi Polos Ø 10 mm

kg

4,384.42

25

Besi Polos Ø 12 mm

kg

3,705.54

26

Besi Polos Ø 16 mm

kg

3,635.18

27

Besi Polos Ø 8 mm

kg

5,221.45

28

Besi Polos Ø 10 mm

lnjr

32,462.24

29

Besi Polos Ø 12 mm

lnjr

46,720.38

30

Besi Polos Ø 16 mm

lnjr

105,752.20

31

Besi Polos Ø 8 mm

lnjr

26,464.36

32

Besi Strip

kg

5,384.42

33

Diamond Kasar Keramik 20x20

bh

2,440.00

34

Falco Engsel Jendela 3"

bh

20,160.00

35

Falco Engsel Pintu 5 "

bh

33,600.00

36

Gypsum

lbr

61,600.00

37

Hak Angin

psg

11,200.00

38

Ikad Keramik 30x30

bh

6,100.00

39

Impra Dempul

kg

20,000.00

40

Impresso Keramik 30x30

bh

4,990.91

41

Indocement Semen Warna 50 kg

zak

91,500.00

42

Jendela Kaca/Jalusi Miring

bh

250,000.00

43

Kaca Bening t = 5 mm

m2

95,200.00

44

Kaca Hitam t = 5 mm

m2

106,400.00

45

Kawat Bendrad

kg

10,750.00

46

Kawat Beton

kg

11,200.00

47

Kawat Duri

m'

1,400.00

48

Kayau Meranti Papan 3/20 (Kls. 2)

m3

784,000.00

49

Kayau Meranti Papan 3/20 (Kls. 2)

btg

18,700.00

50

Kayu Meranti Balok 5/7 (Kls. 2)

m3

784,000.00

51

Kayu Meranti Balok 5/7 (Kls. 2)

btg

10,900.00

52

Kayu Bengkirai Balok (Kls. 1)

m3

1,456,000.00

53

Kayu Bengkirai Papan (Kls. 1)

m3

1,568,000.00

54

Kayu Bengkirai Balok 5/10 (Kls. 1)

btg

29,500.00

55

Kayu Bengkirai Balok 5/7 (Kls. 1)

btg

20,500.00

56

Kayu Bengkirai Balok 2/3 (Kls. 1)

btg

3,500.00

57

Kayu Bengkirai Balok 8/12 (Kls. 1)

btg

54,000.00

58

Kayu Bengkirai Papan 3/20 (Kls. 1)

btg

60,500.00

59

Kayu Meranti 4/6 (Kls. I)

btg

7,500.00

60

Kayu Ulin Balok (Kls. 1)

btg

38,080.00

61

Kayu Meranti Balok (Kls. 1)

m3

1,008,000.00

62

Kayu Meranti Papan (Kls. 1)

m3

1,064,000.00

63

Kayu Ulin Balok (Kls. 1)

m3

1,904,000.00

64

Kayu Ulin Papan (Kls. 1)

m3

2,072,000.00

66

Kerikil Beton

m3

140,000.00

67

Kia Keramik 40x40

bh

11,183.33

68

Kia Polos Keramik 20x20

bh

2,196.00

69

Kran Air

bh

40,000.00

70

Kuas 4"

bh

7,840.00

71

Kusen Bengkirai Standar

m'

24,000.00

72

Lambersering meranti

btg

15,000.00

73

Lexus Westafel

bh

952,000.00

74

List Profil

m'

10,000.00

75

Lock Wiondow

bh

15,000.00

76

Minyak Bekisting

lt

10,000.00

77

Nicole Kunci

set

78,400.00

78

Nok Surya Roof 100 mm

bh

33,600.00

79

Nok Surya Roof 33 mm

bh

16,800.00

80

Paku Biasa 2" - 5"

kg

9,800.00

81

Paku Sekrup

dos

10,000.00

82

Paku Ulin 1" - 5"

kg

12,200.00

83

Paragon Plamir

kg

8,540.00

84

Pasir Cor

m3

130,000.00

85

Pasir Pasang

m3

100,000.00

86

Pasir urug

m3

80,000.00

87

Pemasangan Listrik

ls

1,500,000.00

88

Perlatan Kecil

ls

100,000.00

89

T-Dos (Kontak Hubung Bagi)

b

4,500.00

90

Pintu Panel Bengkirai 80-100 x 200

bh

390,000.00

91

Playwood t = 6 mm

lbr

56,000.00

92

Playwood t = 9 mm

lbr

100,800.00

93

Playwood t =3 mm

lbr

39,600.00

94

Pujatex Cat Minyak

kg

36,600.00

95

Reservoir/Tangki Air 1200 L

bh

952,000.00

96

Rol Cat

bh

10,000.00

97

Seng Gelombang BJLS 32

lbr

32,480.00

98

Sirtu

m3

125,000.00

99

Talang Air PVC

btg

50,400.00

100

Tanah Urug

m3

45,000.00

101

Terali Pengaman

m2

100,000.00

102

Toto Kloset Jongkok

bh

100,800.00

103

Tonasa Semen Portland 50 kg

zak

51,240.00

104

Bak Cuci Stainless

bh

257,600.00

105

Tulangan

kg

14,308.25

106

Floor Drain

Bh

20,000.00

107

Water Drain dan Asesories

Bh

85,000.00

108

Pipa PVC Listrik

m

7,000.00

109

Saklar Tunggal

Bh

15,000.00

110

Kabel NYY 2.5 mm2

m

7,000.00

111

Kabel NYY 1.5 mm2

m

6,500.00

112

Lampu Pijar 20W

bh

20,000.00

113

Fitting Lampu

bh

10,000.00

114

Inbouw Doss

bh

4,500.00

115

Perlengkapan (Isolasi, Paku, Klem, Samb)

set

1,000.00

116

Stop Kontak

bh

15,000.00

117

Lampu Neon Lengkap

bh

35,000.00

118

Box MCB

bh

10,000.00

119

Seng Plat 3 x 6 BJLS 28

lbr

28,500.00

120

MCB 6A

bh

20,000.00

C

HARGA ALAT YANG DIGUNAKAN UNTUK PELASANAAN KONSTRUKSI 1

Pembersihan Lapangan

m2

0.00

2

Pemasangan Bouplank/Pengukuran

m2

0.00

3

Pengadaan Air Kerja

Ls

0.00

4

Pembuatan Gedung Semen dan Alat

m2

0.00

5

Galian Tanah Biasa 1 Meter

m3

0.00

6

Galian Tanah Biasa 2 Meter

m

3

0.00

7

Galian Tanah Biasa 3 Meter

m3

0.00

8

Galian Tanah Keras 1 Meter

m3

0.00

9

Galian Tanah Cadas 1 Meter

m

3

0.00

10

Galian Tanah Lumpur 1 Meter

m3

0.00

11

Urugan Kembali Galian

m3

0.00

12

Pemadatan Tanah

m

3

0.00

13

Urugan Pasir Bawah Pondasi

m3

0.00

14

Pasangan Pondasi Batu Kosong

m3

0.00

15

Pasangan Pondasi Batu Kali

m3

0.00

16

Sloof 15/20

m3

0.00

17

Pekerjaan Pondasi Plat

m3

0.00

18

Kolom 15/15

m3

0.00

19

Kolom 15/20

m3

0.00

20

Kolom 15/25

m3

0.00

21

Kolom 15/30

m3

0.00

22

Kolom 20 x 20

m3

0.00

23

Kolom 20 x 25

m3

0.00

24

Kolom 20 x 30

m3

0.00

25

Kolom 20 x 35

m

3

0.00

26

Kolom 20 x 40

m3

0.00

27

Kolom 25 x 25

m3

0.00

28

Kolom 25 x 30

m

3

0.00

29

Kolom 25 x 35

m3

0.00

30

Kolom 25 x 40

m3

0.00

31

Kolom 25 x 45

m

3

0.00

32

Kolom 25 x 50

m3

0.00

33

Kolom 30 x 30

m3

0.00

34

Kolom 30 x 35

m3

0.00

35

Kolom 30 x 40

m3

0.00

36

Kolom 35 x 45

m3

0.00

37

Kolom 35 x 50

m3

0.00

38

Kolom 40 x 40

m3

0.00

39

Kolom 40 x 45

m3

0.00

40

Kolom 40 x 50

m3

0.00

41

Balok 15 x 20

m3

0.00

42

Balok 15 x 25

m3

0.00

43

Balok 15 x 30

m3

0.00

44

Balok 20 x 20

m

3

0.00

45

Balok 20 x 25

m3

0.00

46

Balok 20 x 30

m3

0.00

47

Balok 20 x 35

m

3

0.00

48

Balok 20 x 40

m3

0.00

49

Balok 25 x 25

m3

0.00

50

Balok 25 x 30

m

3

0.00

51

Balok 25 x 35

m3

0.00

52

Balok 25 x 40

m3

0.00

53

Balok 25 x 45

m3

0.00

54

Balok 25 x 50

m3

0.00

55

Balok 30 x 30

m3

0.00

56

Balok 30 x 35

m3

0.00

57

Balok 30 x 40

m3

0.00

58

Balok 35 x 45

m3

0.00

59

Balok 35 x 50

m3

0.00

60

Balok 40 x 40

m3

0.00

61

Balok 40 x 45

m3

0.00

62

Balok 40 x 50

m3

0.00

63

Plat Beton

m

3

0.00

64

Ring Balok

m3

0.00

65

Tangga

m3

0.00

66

Pasangan Dinding Batubata (1:4)

m

3

0.00

67

Pasangan Dinding Batubata (1:2)

m3

0.00

68

Kusen Pintu dan Jendela

m3

0.00

69

Balok Dinding

m

3

0.00

70

Pekerjaan Kuda-Kuda

m3

0.00

71

Pekerjaan Rangka Atap

m3

0.00

72

Pekerjaan Listplank 3/25

m3

0.00

73

Gording 8/12

m3

0.00

74

Talang

m'

0.00

75

Pemasangan Atap

m2

0.00

76

Pemasangan Perabung

m3

0.00

77

Rangka Plafon

m2

0.00

78

Memasang Plafond Gypsum

m2

0.00

79

Memasang Lis Plafond

m'

0.00

80

Plasteran Dinding (1:2)

m2

0.00

81

Plasteran Dinding (1:4)

m2

0.00

82

Acian

m

2

0.00

83

Pasangan Turap Porslent

m2

0.00

84

Urugan Pasir

85

0.00

Pasangan Lantai Kramik 33 x 33

m

2

0.00

86

Pasangan Lantai Kramik 20 x 20

m2

0.00

87

Pasangan Pintu

Bh

0.00

88

Pasangan Jendela kaca

m

2

0.00

89

Pasangan Kaca Tebal 15 mm

m2

0.00

90

Pasangan Engsel Pintu

Bh

0.00

91

Pasangan Kunci Taman Antik

Bh

0.00

92

Mendempul dan Mrnggosok Kayu

m2

0.00

93

Mengecat Kayu Baru

m2

0.00

94

Mengecat Tembok Baru

m2

0.00

95

Pemasangan Listrik Baru

Ls

0.00

96

Pemasangna Kloset Jongkok

Bh

0.00

97

Pemasangan Kloset Duduk

Bh

0.00

98

Pemasangan Floor Draine

Bh

0.00

99

Pemasangan Bak Cuci Piring

Bh

0.00

100

Pemasangan Wastafel

Bh

0.00

101

Pem. Pipa Air Ø 3" Per M'

M'

0.00

102

Pem. Pipa Air Ø 3/4" AW Per M'

M'

0.00

103

Pem. Pipa Air Ø 1/2" AW Per M'

M'

0.00

104

Pem. Kran Air Ø 3/4" atau 1/2"

Bh

0.00

105

Rabat Beton (1:3:5)

M3

0.00

106

Bak Kontrol

Bh

0.00

107

Septictank

Bh

0.00

108

Resapan

Bh

0.00

KEMBALI

50.000

VOLUME PEKERJAAN

NO URAIAN PEKERJAAN

VOLUME

SAT

I. PEKERJAAN PONDASI 1.1. Pekerjaan Persiapan 1.1.1. Pembersihan Lapangan

340.0000

M2

56.0000

M

1.0000

Ls

20.0000

M2

1.2.1. Galian Tanah Biasa 1 Meter

148.2500

M3

1.2.3. Galian Tanah Biasa 3 Meter

0.0000

M3

37.0625

M3

1.3.1. Urugan Pasir Bawah Pondasi

12.1513

M3

1.3.2. Pasangan Pondasi Batu Kosong

24.6692

M3

1.3.3. Pasangan Pondasi Batu Kali

56.1260

M3

2.1.1. Sloof 15 x 20

2.5744

M3

2.1.2. Pondasi Plat

3.7960

M3

2.1.2. Kolom 15 x 15

4.9800

M3

2.1.3. Kolom 15 x 20

3.4300

M3

2.1.8. Kolom 20 x 30

5.4600

M3

2.1.25. Balok 15 x 20

2.3400

M3

2.1.39. Balok 30 x 35

6.6045

M3

2.1.46. Plat Beton

7.3600

M3

2.1.47. Ring Balok

3.7400

M3

2.1.48. Tangga

1.8534

M3

0.8920

M3

1.1.2. Pemasangan Bouplank/Pengukuran 1.1.3. Pengadaan Air Kerja 1.1.4. Pembuatan Gudang Semen dan Alat

1.2. Pekerjaan Galian

1.2.7. Urugan Kembali Galian 1.3. Pemasangan Pondasi Batu Kali

II. PEKERJAAN BETON 2.1. Beton Bertulang

2.2. Beton Tak Bertulang 2.2.1. Beton Cor 1 : 2 : 3

III. PEKERJAAN DINDING 3.1. Dinding

3.1.1. Pasangan Dinding 1/2 Bata (1:4)

413.5688

M2

3.1.2. Pasangan Dinding 1/2 Bata (1:2)

51.1000

M2

1.2541

M3

4.1.1. Balok Dinding 8/12

0.2939

M3

4.1.2. Pekerjaan Kuda-Kuda

1.3629

M3

138.0646

M2

4.1.4. Pekerjaan Listplank 3/25

53.9000

M2

4.1.5. Pekerjaan Papan Reuter 3/25

34.1700

M'

5.6300

M3

17.0000

M'

158.0646

M2

34.1700

M3

207.0075

M2

5.2.1. Memasang Plafond Gypsum

165.6500

M2

5.2.2. Memasang Lis Plafond

179.9500

M'

6.1.1. Plasteran Dinding (1:2)

134.5000

M2

6.1.2. Plasteran Dinding (1:4)

780.2350

M2

6.1.3. Acian

914.7350

M2

47.2160

M2

0.0000

M3

3.2. Kusen 3.2.1. Kusen Pintu dan Jendela

IV. PEKERJAAN KAP DAN ATAP 4.1. Kap dan Rangka Atap

4.1.3. Pekerjaan Rangka Atap

4.1.6. Nog dan Gording 8/12 4.1.7. Pekerjaan Talang 4.2. Atap 4.2.1. Pemasangan Atap 4.2.2. Pemasangan Perabung

V. PEKERJAAN PLAFOND 5.1. Balok Plafond 5.1.1. Rangka Plafon 5.2. Memasang Plafond

VI. PEKERJAAN PLASTERAN DAN ACIAN 6.1. Plasteran

6.2. Turap Porslen 6.2.1. Pasangan Turap Porslent

VII. PEKERJAAN LANTAI 7.1. Urugan Bawah Lantai 7.1.1. Urugan Tanah

7.1.2. Urugan Pasir

11.2648

M3

7.2.1. Pasangan Lantai Kramik 33 x 33

182.3750

M2

7.2.2. Pasangan Lantai Kramik 20 x 20

24.6325

M2

8.1.1. Pasangan Pintu

17.0000

Bh

8.1.2. Pasangan Jendela

28.9350

M2

71.5420

M2

68.0000

Bh

0.0000

Bh

12.0000

Bh

90.9809

M2

610.5400

M2

493.7300

M2

10.1.1. Pasangan Lampu Pijar

38.0000

Bh

10.1.2. Pemasangan Stop Kontak

12.0000

Bh

10.1.3. Pemasangan Lampu TL

5.0000

Bh

10.1.4. Pemasangan MCB

1.0000

Bh

348.0000

M'

10.1.6. Pitting lampu

26.0000

Bh

10.1.7. Pemasangan Sakelar

26.0000

Bh

10.2.1. Pemasangna Kloset Jongkok

2.0000

Unit

10.2.2. Pemasangan Kloset Duduk

2.0000

Unit

10.2.3. Pemasangan Floor Draine

4.0000

Bh

10.2.4. Pemasangan Bak Cuci Piring

1.0000

Bh

7.2. Pasangan Lantai

VIII. PEKERJAAN PINTU DAN JENDELA 8.1. Pintu dan Jendela

8.2. Kaca 8.2.1. Pasangan Kaca Tebal 15 mm 8.3. Penggantung/Kunci 8.3.1. Pasangan Engsel Pintu 8.3.2. Pasangan Engsel Jendela 8.3.3. Pasangan Kunci Taman Antik

IX. PEKERJAAN PENGECATAN 9.1. Mendempul dan Mrnggosok Kayu 9.2. Mengecat Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 9.3. Mengecat Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

X. PEKERJAAN PERLENGKAPAN DALAM 10.1. Listrik

10.1.5. Pemasangan Kabel Jaringan

10.2. Sanitair dan Instalasi Air

10.2.5. Pemasangan Wastafel

2.0000

Bh

10.2.6. Pem. Pipa Air Ø 3" Per M'

30.0000

M'

10.2.7. Pem. Pipa Air Ø 3/4" AW Per M'

42.0000

M'

10.2.8. Pem. Pipa Air Ø 1/2" AW Per M'

46.5300

M'

10.2.10. Pem. Kran Air Ø 3/4" atau 1/2"

8.0000

Bh

11.1. Saluran Keliling

57.0000

M'

11.2. Rabat Beton (1:3:5)

21.2100

M2

11.3. Bak Kontrol

1.0000

M3

11.4. Resapan

1.0000

M3

11.5. Septictank

1.0000

M3

XI. PEKERJAAN PERLENGKAPAN LUAR

INFORMASI

HARGA SATUAN PEKERJAAN No I. 1.1 1.1.1

URAIAN PEKERJAAN PEKERJAAN PONDASI PEKERJAAN PERSIAPAN Tiap 1 M2 Pembersihan Lapangan butuh: Tenaga Kerja 0.1000 Org Pekerja 0.0500 Org Mandor

HARGA PER SATUAN

@Rp @Rp

JUM. HARGA PER SATUAN

Rp

6,750.00

35,000.00 Rp 65,000.00 Rp Rp

3,500.00 3,250.00 6,750.00

Rp

0.00

Rp

23,868.02 9,342.86 5,454.17 196.00 14,993.02

Alat

1.1.2

Tiap 1 M' Pasangan Bouwlpank butuh: Bahan 0.8571 Lnjr 0.0120 M3 Kayu Meranti Balok 5/7 0.2917 Lnjr 0.0070 M3 Kayu Meranti Papan 3/20 0.0200 Kg Paku Biasa 2"-5"

@Rp @Rp @Rp

10,900.00 Rp 18,700.00 Rp 9,800.00 Rp Rp

Tenaga Kerja 0.1000 Org 0.1000 Org 0.0100 Org 0.0050 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Pekerja Tukang Kayu Kepala Tukang Mandor

Rp Rp Rp Rp Rp

3,500.00 4,500.00 550.00 325.00 8,875.00

Rp

0.00

Rp 4,500,000.00 Rp

4,500,000.00 4,500,000.00

Rp

384,725.40

Alat

1.1.3

1.1.4

Tiap Biaya Air Kerja butuh: 1.0000 Ls

Air Kerja

@Rp

Tiap 1 M2 Gudang Semen dan Alat butuh: Bahan 1.7000 Lnjr 0.0238 M3 Perancah Meranti Balok 5/7 8.7500 Lnjr 0.2100 M3 Kayu Meranti Papan 3/20 0.3000 Kg Paku Biasa 2"-5" 0.2100 Zak 10.5000 Kg Tonasa Semen portland 50kg 0.0300 M3 Pasir Beton 0.0500 M3 Koral Beton 1.5000 Lbr Seng GeloMbang BJLS 32

@Rp @Rp @Rp @Rp @Rp @Rp @Rp

10,900.00 18,700.00 9,800.00 51,240.00 130,000.00 140,000.00 32,480.00

Rp Rp Rp Rp Rp Rp Rp Rp

18,530.00 163,625.00 2,940.00 10,760.40 3,900.00 7,000.00 48,720.00 255,475.40

Tenaga Kerja 2.0000 Org 1.0000 Org 0.2000 Org 0.0500 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

70,000.00 45,000.00 11,000.00 3,250.00 129,250.00

Rp

0.00

Rp

16,600.00

35,000.00 Rp 65,000.00 Rp Rp

14,000.00 2,600.00 16,600.00

Pekerja Tukang Kayu Kepala Tukang Mandor

Alat

1.2 1.2.1

PEKERJAAN GALIAN Tiap 1 M3 Galian Tanah Biasa Sedalam 1 Meter butuh: Tenaga Kerja 0.4000 Org Pekerja 0.0400 Org Mandor

@Rp @Rp

Alat 1.2.2

Rp Rp

0.00 21,790.00

35,000.00 Rp 65,000.00 Rp Rp

18,410.00 3,380.00 21,790.00

Rp

0.00

Rp

30,502.50

35,000.00 Rp 65,000.00 Rp Rp

25,725.00 4,777.50 30,502.50

Rp

0.00

Rp

25,905.00

35,000.00 Rp 65,000.00 Rp Rp

21,875.00 4,030.00 25,905.00

Rp

0.00

Rp

51,875.00

35,000.00 Rp 65,000.00 Rp Rp

43,750.00 8,125.00 51,875.00

Rp

0.00

Rp

34,200.00

35,000.00 Rp 65,000.00 Rp Rp

28,805.00 5,395.00 34,200.00

Alat

Rp

0.00

Tiap 1 M3 Urugan Kembali Galian Tanah butuh: Tenaga Kerja 0.1920 Org Pekerja 0.0190 Org Mandor

Rp

7,955.00

35,000.00 Rp 65,000.00 Rp Rp

6,720.00 1,235.00 7,955.00

Rp

0.00

Rp

20,750.00

35,000.00 Rp 65,000.00 Rp Rp

17,500.00 3,250.00 20,750.00

Tiap 1 M3 Galian Tanah Biasa Sedalam 2 Meter butuh: Tenaga Kerja 0.5260 Org Pekerja 0.0520 Org Mandor

@Rp @Rp

Alat

1.2.3

Tiap 1 M3 Galian Tanah Biasa Sedalam 3 Meter butuh: Tenaga Kerja 0.7350 Org Pekerja 0.0735 Org Mandor

@Rp @Rp

Alat

1.2.4

Tiap 1 M3 Galian Tanah Keras Sedalam 1 Meter butuh: Tenaga Kerja 0.6250 Org Pekerja 0.0620 Org Mandor

@Rp @Rp

Alat

1.2.5

Tiap 1 M3 Galian Tanah Cadas Sedalam 1 Meter butuh: Tenaga Kerja 1.2500 Org Pekerja 0.1250 Org Mandor

@Rp @Rp

Alat

1.2.6

1.2.7

Tiap 1 M3 Galian Tanah Lumpur Sedalam 1 Meter butuh: Tenaga Kerja 0.8230 Org Pekerja 0.0830 Org Mandor

@Rp @Rp

@Rp @Rp

Alat

1.2.8

Tiap 1 M3 Pemadatan Tanah butuh: Tenaga Kerja 0.5000 Org Pekerja 0.0500 Org Mandor Alat

@Rp @Rp

1.3 1.3.1

Rp

0.00

Rp

107,150.00

PEKERJAAN PONDASI BATU KALI Tiap 1 M3 Urugan Pasir Bawah Pondasi butuh: Bahan 1.2000 M3 Pasir urug

@Rp

80,000.00 Rp Rp

96,000.00 96,000.00

Tenaga Kerja 0.3000 Org 0.0100 Org

@Rp @Rp

35,000.00 Rp 65,000.00 Rp Rp

10,500.00 650.00 11,150.00

Rp

0.00

Rp

253,530.00

150,000.00 Rp 80,000.00 Rp Rp

180,000.00 24,000.00 204,000.00

Pekerja Mandor

Alat

1.3.2

Tiap 1 M3 Pasangan Pondasi Batu Kosong (Aanstampang) butuh: Bahan 1.2000 M3 Batu Kali @Rp 0.3000 M3 Pasir Urug @Rp Tenaga Kerja 0.7800 Org 0.3900 Org 0.0390 Org 0.0390 Org

Pekerja Tukang Batu Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

27,300.00 17,550.00 2,145.00 2,535.00 49,530.00

Rp

0.00

Rp

508,184.60

150,000.00 Rp 51,240.00 Rp 100,000.00 Rp Rp

165,000.00 207,009.60 48,500.00 420,509.60

Alat

1.3.3

Tiap 1 M3 Pasangan Pondasi Batu Kali (1:3) butuh: Bahan 1.1000 M3 Batu Kali 4.0400 Zak 202.0000 Kg Tonasa Semen portland 50kg 0.4850 M3 Pasir Pasang

@Rp @Rp @Rp

Tenaga Kerja 0.6000 Org 0.0600 Org 1.5000 Org 0.0750 Org

@Rp @Rp @Rp @Rp

Tukang Kepala Tukang Pekerja Mandor

45,000.00 55,000.00 35,000.00 65,000.00

Rp Rp Rp Rp Rp

27,000.00 3,300.00 52,500.00 4,875.00 87,675.00

Rp

0.00

Rp

87,084.29

Alat

II 2.1 2.1.1

PEKERJAAN BEKISTING DAN BETON BERTULANG BEKISTING DAN BETON Tiap 1 M2 Bekisting Sloof butuh: Bahan 1.2500 Btg Papan Meranti 3/20 Kelas II 3.2857 Btg 0.0180 M3 Balok Meranti 5/7 Kelas II 0.3000 kg Paku 0.1000 Lt Minyak Bekisting

@Rp @Rp @Rp @Rp

18,700.00 10,900.00 9,800.00 10,000.00

Rp Rp Rp Rp Rp

23,375.00 35,814.29 2,940.00 1,000.00 63,129.29

Tenaga Kerja 0.3000 Org 0.2600 Org 0.0260 Org 0.0050 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp

10,500.00 11,700.00 1,430.00 325.00

Pekerja Tukang Kayu Kepala Tukang Mandor

2.1.2

2.1.3

2.1.4

23,955.00

Rp

105,269.29

Tiap 1 M2 Bekisting Kolom butuh: Bahan 0.3500 Lbr Playwood 9mm 3.2857 Btg 0.0180 M3 Balok Meranti 5/7 Kelas II 0.4000 kg Paku 0.2000 Lt Minyak Bekisting

@Rp @Rp @Rp @Rp

100,800.00 10,900.00 9,800.00 10,000.00

Rp Rp Rp Rp Rp

35,280.00 35,814.29 3,920.00 2,000.00 77,014.29

Tenaga Kerja 0.3200 Org 0.3300 Org 0.0330 Org 0.0060 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

11,200.00 14,850.00 1,815.00 390.00 28,255.00

Rp

105,269.29

Pekerja Tukang Kayu Kepala Tukang Mandor

Tiap 1 M3 Bekisting Balok butuh: Bahan 0.3500 Lbr Playwood 9mm 3.2857 Btg 0.0180 M3 Balok Meranti 5/7 Kelas II 0.4000 kg Paku 0.2000 Lt Minyak Bekisting

@Rp @Rp @Rp @Rp

100,800.00 10,900.00 9,800.00 10,000.00

Rp Rp Rp Rp Rp

35,280.00 35,814.29 3,920.00 2,000.00 77,014.29

Tenaga Kerja 0.3200 Org 0.3300 Org 0.0330 Org 0.0060 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

11,200.00 14,850.00 1,815.00 390.00 28,255.00

Rp

146,573.75

Pekerja Tukang Kayu Kepala Tukang Mandor

Tiap 1 M2 Bekisting Plat Lantai butuh: 0.3500 1.5625 6.0000 0.4000 0.2000

Lbr Btg Btg Kg Lt

Tenaga Kerja 0.3200 Org 0.3300 Org 0.0330 Org 0.0060 Org

2.1.5

Rp

Playwood 9mm 0.0150 M3 Kayu Meranti 4/6 Kelas II Balok Meranti 5/7 Kelas II Paku Minyak Bekisting

Pekerja Tukang Kayu Kepala Tukang Mandor

@Rp @Rp @Rp @Rp @Rp

100,800.00 7,500.00 10,900.00 9,800.00 10,000.00

Rp Rp Rp Rp Rp Rp

35,280.00 11,718.75 65,400.00 3,920.00 2,000.00 118,318.75

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

11,200.00 14,850.00 1,815.00 390.00 28,255.00

Rp

250,877.50

Rp Rp Rp Rp Rp Rp

35,280.00 11,687.50 81,750.00 3,920.00 1,500.00 134,137.50

35,000.00 Rp

11,200.00

Tiap 1 M2 Bekisting Tangga butuh: Bahan 0.3500 Btg 0.0400 M3 Playwood 9mm 0.6250 Btg 0.0150 M3 Kayu Meranti 3/20 (Kls II) 7.5000 Btg 0.1050 M3 Balok Meranti 5/7 Kelas II 0.4000 Kg Paku 0.1500 Lt Minyak Bekisting

@Rp @Rp @Rp @Rp @Rp

Tenaga Kerja 0.3200 Org

@Rp

Pekerja

100,800.00 18,700.00 10,900.00 9,800.00 10,000.00

2.3000 Org 0.0300 Org 0.0060 Org

2.1.6

2.1.7

2.2 2.2.1

Tukang Kayu Kepala Tukang Mandor

@Rp @Rp @Rp

45,000.00 Rp 55,000.00 Rp 65,000.00 Rp Rp

103,500.00 1,650.00 390.00 116,740.00

Rp

46,271.00

Tiap 1 M2 Bekisting Pondasi Plat butuh: Bahan 0.3300 Btg Papan Meranti 3/20 Kelas II 0.6000 Btg Balok Meranti 5/7 Kelas II 0.4000 Kg Paku 0.2000 Lt Minyak Bekisting

@Rp @Rp @Rp @Rp

18,700.00 10,900.00 9,800.00 10,000.00

Rp Rp Rp Rp Rp

6,171.00 6,540.00 3,920.00 2,000.00 18,631.00

Tenaga Kerja 0.3200 Org 0.3200 Org 0.0300 Org 0.0060 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

11,200.00 14,400.00 1,650.00 390.00 27,640.00

Rp

502,503.60

51,240.00 Rp 130,000.00 Rp 140,000.00 Rp Rp

237,753.60 67,600.00 109,200.00 414,553.60

Pekerja Tukang Kayu Kepala Tukang Mandor

Tiap 1 M3 Beton 1Pc : 2 Ps : 3Kr butuh: Bahan 4.6400 Zak 232.0000 Kg Tonasa Semen portland 50kg 0.5200 M3 Pasir Beton 0.7800 M3 Kerikil Beton

@Rp @Rp @Rp

Tenaga Kerja 1.6500 Org 0.2500 Org 0.2500 Org 0.0800 Org

@Rp @Rp @Rp @Rp

Pekerja Tukang Batu Kepala Tukang Mandor

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

57,750.00 11,250.00 13,750.00 5,200.00 87,950.00

Rp

2,522,380.27

BETON BERTULANG Tiap 1M3 Sloof 15/20 butuh: Bahan 13.3333 M2 11.1111 Lnjr 8.0717 Lnjr 2.0040 Kg 1.0000 M3

Bekisting Besi Beton Polos Ø 10 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

87,084.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

1,161,123.81 360,691.59 213,611.47 22,444.80 502,503.60 2,260,375.27

Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

840,091.40

Rp Rp Rp Rp

24,496.41 42,686.39 8,400.00 502,503.60

Alat

2.2.2

Tiap 1M3 Pondasi Plat butuh: Bahan 0.5294 M2 11.5196 Lnjr 0.7500 Kg 1.0000 M3

Bekisting Besi Beton Polos Ø 12 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp

46,271.00 3,705.54 11,200.00 502,503.60

Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp

578,086.40

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

3,616,849.70

Alat

2.2.3.

Tiap 1 M3 Kolom Praktis (15/15) butuh: Bahan 20.0000 M2 Bekisting 14.8148 Lnjr Besi Beton Polos Ø 10 8.9200 Lnjr Besi Beton Polos Ø 6 2.6760 Kg Kawat Beton 1.0000 M3 Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

2,105,385.71 480,922.12 236,062.06 29,971.20 502,503.60 3,354,844.70

Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

3,115,744.55

Pekerja Tukang Besi Kepala Tukang Mandor

Alat

2.2.3.

Tiap 1 M3 Kolom 15/20 butuh: Bahan 16.6667 M2 11.1111 Lnjr 8.0717 Lnjr 2.0040 Kg 1.0000 M3

Bekisting Besi Beton Polos Ø 10 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

1,754,488.10 360,691.59 213,611.47 22,444.80 502,503.60 2,853,739.55

Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

2,437,479.00

Rp Rp Rp Rp Rp Rp

1,228,141.67 270,518.69 163,020.44 11,289.60 502,503.60 2,175,474.00

35,000.00 Rp 45,000.00 Rp 55,000.00 Rp

169,750.00 63,000.00 18,205.00

Alat

2.2.8.

Tiap 1 M3 Kolom 20/30 butuh: Bahan 11.6667 M2 8.3333 Lnjr 6.1600 Lnjr 1.0080 Kg 1.0000 M3

Bekisting Besi Beton Polos Ø 12 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org

Pekerja Tukang Besi Kepala Tukang

@Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

0.1700 Org

Mandor

@Rp

65,000.00 Rp Rp

11,050.00 262,005.00

Rp

0.00

Rp

3,115,744.55

Alat

2.2.6.

Tiap 1 M3 Balok 15/20 butuh: Bahan 16.6667 M2 11.1111 Lnjr 8.0717 Lnjr 2.0040 Kg 1.0000 M3

Bekisting Besi Beton Polos Ø 10 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

1,754,488.10 360,691.59 213,611.47 22,444.80 502,503.60 2,853,739.55

Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

2,125,994.90

Alat

2.2.21. Tiap 1 M3 Balok 30/35 butuh: Bahan 9.0476 M2 5.5556 Lnjr 8.3982 Lnjr 0.5760 Kg 1.0000 M3 Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Bekisting Besi Beton Polos Ø 12 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

952,436.39 180,345.80 222,252.92 6,451.20 502,503.60 1,863,989.90

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

2,412,277.81

Alat

2.2.22. Tiap 1 M3 Balok 30/40 butuh: Bahan 8.3333 M2 0.6944 Lnjr 28.0505 Lnjr 0.5040 Kg 1.0000 M3 Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Bekisting Besi Beton Polos Ø 10 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

877,244.05 22,543.22 742,337.14 5,644.80 502,503.60 2,150,272.81

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Alat

2.2.23. Tiap 1 M3 Balok 35/45 butuh: Bahan 7.3016 M2 0.5291 Lnjr 24.7111 Lnjr 0.3840 Kg 1.0000 M3 Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Rp

2,208,581.74

Bekisting Besi Beton Polos Ø 10 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

768,632.88 17,175.79 653,963.67 4,300.80 502,503.60 1,946,576.74

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

2,138,409.74

Alat

2.2.24. Tiap 1 M3 Balok 35/50 butuh: Bahan 6.8571 M2 0.4762 Lnjr 23.9076 Lnjr 0.3480 Kg 1.0000 M3 Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Bekisting Besi Beton Polos Ø 10 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

721,846.53 15,458.21 632,698.80 3,897.60 502,503.60 1,876,404.74

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

2,229,200.13

Alat

2.2.25. Tiap 1 M3 Balok 40/40 butuh: Bahan 7.5000 M2 0.5208 Lnjr 24.7111 Lnjr 0.3840 Kg 1.0000 M3 Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Bekisting Besi Beton Polos Ø 10 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

789,519.64 16,907.42 653,963.67 4,300.80 502,503.60 1,967,195.13

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

2,125,218.92

105,269.29 Rp 32,462.24 Rp

731,036.71 15,028.82

Alat

2.2.26. Tiap 1 M3 Balok 40/45 butuh: Bahan 6.9444 M2 0.4630 Lnjr

Bekisting Besi Beton Polos Ø 10

@Rp @Rp

23.0832 Lnjr 0.3360 Kg 1.0000 M3 Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

26,464.36 Rp 11,200.00 Rp 502,503.60 Rp Rp 35,000.00 45,000.00 55,000.00 65,000.00

610,881.60 3,763.20 502,503.60 1,863,213.92

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

2,045,595.78

Alat

2.2.27. Tiap 1 M3 Balok 40/50 butuh: Bahan 6.5000 M2 0.4167 Lnjr 21.9144 Lnjr 0.3000 Kg 1.0000 M3 Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Bekisting Besi Beton Polos Ø 10 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

Rp Rp Rp Rp Rp Rp

684,250.36 13,525.93 579,950.89 3,360.00 502,503.60 1,783,590.78

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

1,150,327.91

Alat

2.2.28. Tiap 1 M3 Plat Beton butuh: Bahan 2.2000 M2 0.9167 Lnjr 3.0000 Kg 1.0000 M3 Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Bekisting Besi Beton Polos Ø 10 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp

146,573.75 32,462.24 11,200.00 502,503.60

Rp Rp Rp Rp Rp

322,462.25 29,757.06 33,600.00 502,503.60 888,322.91

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

2,915,054.46

Rp Rp Rp Rp Rp Rp

1,403,590.48 480,922.12 236,062.06 29,971.20 502,503.60 2,653,049.46

35,000.00 Rp

169,750.00

Alat

2.2.29. Tiap 1 M3 Ring Balok butuh: Bahan 13.3333 M2 14.8148 Lnjr 8.9200 Lnjr 2.6760 Kg 1.0000 M3 Tenaga Kerja 4.8500 Org

Bekisting Besi Beton Polos Ø 10 Besi Beton Polos Ø 6 Kawat Beton Beton 1:2:3

@Rp @Rp @Rp @Rp @Rp

Pekerja

@Rp

105,269.29 32,462.24 26,464.36 11,200.00 502,503.60

1.4000 Org 0.3310 Org 0.1700 Org

Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp

45,000.00 Rp 55,000.00 Rp 65,000.00 Rp Rp

63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

4,398,277.54

Alat

2.2.30. Tiap 1 M3 Tangga Beton Bertulang butuh: Bahan 9.1638 M2 Bekisting 40.3038 Lnjr Besi Beton Polos Ø 10 2.3595 Kg Kawat Beton 1.0000 M3 Beton

Tenaga Kerja 4.8500 Org 1.4000 Org 0.3310 Org 0.1700 Org

Pekerja Tukang Besi Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

250,877.50 32,462.24 11,200.00 502,503.60

Rp Rp Rp Rp Rp

2,298,991.98 1,308,350.56 26,426.40 502,503.60 4,136,272.54

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

169,750.00 63,000.00 18,205.00 11,050.00 262,005.00

Rp

0.00

Rp

49,060.20

Rp Rp Rp Rp

15,750.00 11,785.20 4,300.00 31,835.20

Rp Rp Rp Rp Rp

11,200.00 4,500.00 550.00 975.00 17,225.00

Rp

0.00

Rp

56,194.96

Rp Rp Rp Rp

15,750.00 19,419.96 3,800.00 38,969.96

Rp Rp Rp Rp Rp

11,200.00 4,500.00 550.00 975.00 17,225.00

Rp

0.00

Rp

2,786,375.00

Alat

2.3. 2.3.1.

PEKERNJAAN DINDING Tiap 1 M2 Pasangan Dinding Batu Bata (1:4) Ukuran 5 x 11 x 22 cm butuh: Bahan 70.0000 Buah Batu Bata 5/11/22 @Rp 225.00 0.2300 Zak 11.5000 Kg Tonasa Semen portland 50kg @Rp 51,240.00 0.0430 M3 Pasir Pasang @Rp 100,000.00 Tenaga Kerja 0.3200 Org 0.1000 Org 0.0100 Org 0.0150 Org

Pekerja Tukang Batu Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Alat

2.3.2.

Tiap 1 M2 Pasangan Dinding Batu Bata (1:2) Ukuran 5 x 11 x 22 cm butuh: Bahan 70.0000 Buah Batu Bata @Rp 225.00 0.3790 Zak 18.9500 Kg Tonasa Semen portland 50kg @Rp 51,240.00 0.0380 M3 Pasir Pasang @Rp 100,000.00 Tenaga Kerja 0.3200 Org 0.1000 Org 0.0100 Org 0.0150 Org

Pekerja Tukang Batu Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Alat

2.4. 2.4.1.

PEKERJAAN KUSEN Tiap 1 M3 Pasangan Kusen Pintu dan Jendela (Kayu Bengkirai) butuh:

Bahan 28.6458 Lnjr Tenaga Kerja 6.0000 Org 20.0000 Org 2.0000 Org 0.3000 Org

1.1000 M3 Kayu Bengkirai 8/12

Pekerja Tukang Kayu Kepala Tukang Mandor

@Rp

54,000.00

Rp Rp

1,546,875.00 1,546,875.00

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

210,000.00 900,000.00 110,000.00 19,500.00 1,239,500.00

Rp

0.00

Rp

16,037.50 2,337.50 7,840.00 10,177.50

Alat

III 3.1. 3.1.1.

PEKERJAAN KAP DAN ATAP PEKERJAAN KAP DAN RANGKA ATAP Tiap 1 M3 Pekerjaan Balok Dinding 8/12 butuh: Bahan 0.1250 Lnjr 0.0030 M3 Balok Bengkirai 8/12 0.8000 Kg Paku Biasa 2"-5"

@Rp @Rp

18,700.00 Rp 9,800.00 Rp Rp

Tenaga Kerja 0.1000 Org 0.0330 Org 0.0100 Org 0.0050 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Pekerja Tukang Kayu Kepala Tukang Mandor

Rp Rp Rp Rp Rp

3,500.00 1,485.00 550.00 325.00 5,860.00

Rp

0.00

Rp

2,419,981.29

Alat

3.1.2.

Tiap 1 M3 Pekerjaan Kuda-Kuda Kayu (Bengkirai) butuh: Bahan 28.6458 Lnjr 1.1000 M3 Balok Bengkirai 6/12 0.8000 Kg Paku Biasa 2"-5" 15.0000 Kg Besi Strip

@Rp @Rp @Rp

54,000.00 9,800.00 5,384.42

Rp Rp Rp Rp

1,546,875.00 7,840.00 80,766.29 1,635,481.29

Tenaga Kerja 5.5000 Org 8.3000 Org 2.2000 Org 1.5000 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

192,500.00 373,500.00 121,000.00 97,500.00 784,500.00

Rp

0.00

Rp

34,345.00

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

Alat

3.1.3.

Tiap 1 M2 Pekerjaan rangka Atap (Kasau + Reng Bengkirai) butuh: Bahan 1.0000 Btg Balok Bengkirai 2/3 @Rp 1.0000 Btg Balok Bengkirai 5/7 @Rp 0.1500 Kg Paku Biasa 2"-5" @Rp

3,500.00 20,500.00 9,800.00

Rp Rp Rp Rp

3,500.00 20,500.00 1,470.00 25,470.00

Tenaga Kerja 0.1000 Org 0.1000 Org 0.0100 Org 0.0050 Org

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

3,500.00 4,500.00 550.00 325.00 8,875.00

Rp

0.00

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

@Rp @Rp @Rp @Rp

Alat

3.1.4.

Tiap 1M' Papan Lisplank (3/20), Bengkirai butuh: Bahan 0.2400 Ljr 0.0072 M3 Bengkirai Papan 3/25 0.0500 Kg Paku Biasa 2"-5"

@Rp @Rp

Tenaga Kerja 0.1000 Org 0.2000 Org 0.0200 Org 0.0050 Org

@Rp @Rp @Rp @Rp

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

Rp

28,935.00

60,500.00 9,800.00

Rp Rp Rp

14,520.00 490.00 15,010.00

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

3,500.00 9,000.00 1,100.00 325.00 13,925.00

Rp

0.00

Rp

689,120.96

Alat

3.1.5.

Pemasangan 1 M3 Gording, Nog 6/12 butuh: Bahan 0.0422 Lnjr 1.1000 M3 Kayu Bengkirai Balok 6/12 0.8000 kg Paku

@Rp @Rp

54,000.00 9,800.00

Rp Rp Rp

2,280.96 7,840.00 10,120.96

Tenaga Kerja 12.0000 Org 4.0000 Org 1.2000 Org 0.2000 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

420,000.00 180,000.00 66,000.00 13,000.00 679,000.00

Rp

0.00

Rp

519,704.83

Pekerja Tukang kayu Kepala Tukang Mandor

Alat

3.1.6.

Pemasangan 1 M' Talang Miring BJLS 28 butuh: Bahan 0.5000 Lbr Seng Plat 3 x 6 BJLS 28 0.0150 Kg Paku 1/2'-1" 7.9167 Btg 0.1900 M3 Kayu Bengkiai 3/20 0.3000 Kg Meni Besi

@Rp @Rp @Rp @Rp

28,500.00 9,800.00 60,500.00 18,300.00

Rp Rp Rp Rp Rp

14,250.00 147.00 478,958.33 5,490.00 498,845.33

Tenaga Kerja 0.0400 Org 0.4000 Org 0.0250 Org 0.0013 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

1,400.00 18,000.00 1,375.00 84.50 20,859.50

Rp

0.00

Rp

43,785.80

Pekerja Tukang kayu Kepala Tukang Mandor

Alat

3.2. 3.2.1.

PEKERJAAN PENUTUP ATAP Tiap Pemasangan 1 M2 Atap butuh: Bahan 0.6000 Lbr Atap Sakura Roof 2 Susun 0.0500 Kg Paku

@Rp @Rp

51,968.00 9,800.00

Rp Rp Rp

31,180.80 490.00 31,670.80

Tenaga Kerja 0.2000 Org 0.1000 Org 0.0100 Org 0.0010 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

7,000.00 4,500.00 550.00 65.00 12,115.00

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

Alat

3.2.2.

Rp

0.00

Rp

130,387.47

Pemasangan 1 M' Perabung butuh: Bahan 3.0000 Lbr Perabung Dari Sakura Roof 0.1600 Zak Semen 0.5200 M3 Pasir Cor

@Rp @Rp @Rp

16,800.00 51,240.00 130,000.00

Rp Rp Rp Rp

50,400.00 8,198.40 67,600.00 126,198.40

Tenaga Kerja 0.0457 Org 0.0500 Org 0.0050 Org 0.0010 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

1,599.07 2,250.00 275.00 65.00 4,189.07

Rp

0.00

Rp

36,913.93

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

Alat

IV. 4.1. 4.1.1.

PEKERJAAN PLAFON BALOK PLAFON Tiap 1 M2 Rangka Plafon butuh: Bahan 0.8571 Btg 0.0120 M3 Balok Bengkirai 5/7 0.1000 Kg Paku Biasa 2"-5"

@Rp @Rp

20,500.00 9,800.00

Rp Rp Rp

17,571.43 980.00 18,551.43

Tenaga Kerja 0.1500 Org 0.2500 Org 0.0250 Org 0.0075 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

5,250.00 11,250.00 1,375.00 487.50 18,362.50

Rp

0.00

Rp

64,214.67

Pekerja Tukang Kayu Kepala Tukang Mandor

Alat

4.2. 4.2.1.

Memasang Plafon Tiap Memasang 1 M2 Plafond Gypsum butuh: Bahan 0.4167 Lbr Gypsum 0.0100 Kg Paku Biasa 0.0500 Kg Paku Sekrup

@Rp @Rp @Rp

61,600.00 9,800.00 10,000.00

Rp Rp Rp Rp

25,666.67 98.00 500.00 26,264.67

Tenaga Kerja 0.2000 Org 0.6000 Org 0.0600 Org 0.0100 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

7,000.00 27,000.00 3,300.00 650.00 37,950.00

Rp

0.00

Rp

12,394.20

Rp Rp

10,500.00 39.20

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

Alat

4.2.2.

Tiap Memasang Lis Plafond butuh: Bahan 1.0500 M3 Kayu Profil 0.0040 Kg Paku

@Rp @Rp

10,000.00 9,800.00

Tenaga Kerja 0.0210 Org 0.0210 Org 0.0020 Org 0.0010 Org

Pekerja Tukang Kayu Kepala Tukang Kayu Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp

10,539.20

Rp Rp Rp Rp Rp

735.00 945.00 110.00 65.00 1,855.00

Rp

0.00

Rp

26,166.30

Alat

V. 5.1. 5.1.1.

PEKERJAAN PLASTERAN PLASTERAN Tiap 1 M2 Plasteran Dinding (1:2) Tebal 15 cm butuh: Bahan 0.1704 Zak 8.5200 Kg Tonasa Semen portland 50kg 0.0170 M3 Pasir Pasang

@Rp @Rp

51,240.00 130,000.00

Rp Rp Rp

8,731.30 2,210.00 10,941.30

Tenaga Kerja 0.2000 Org 0.1500 Org 0.0150 Org 0.0100 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

7,000.00 6,750.00 825.00 650.00 15,225.00

Rp

0.00

Rp

22,553.96

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

5.1.2.

Tiap 1 M2 Plasteran Dinding (1:4) Tebal 15 cm butuh: Bahan 0.1040 Zak 5.2000 Kg Tonasa Semen portland 50kg 0.0200 M3 Pasir Pasang

@Rp @Rp

51,240.00 100,000.00

Rp Rp Rp

5,328.96 2,000.00 7,328.96

Tenaga Kerja 0.2000 Org 0.1500 Org 0.0150 Org 0.0100 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

7,000.00 6,750.00 825.00 650.00 15,225.00

Rp

0.00

Rp

4,837.48

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

5.1.3.

Tiap 1 M2 Acian Semen butuh: Bahan 0.0020 Zak 0.1000 Kg Tonasa Semen portland 50kg

@Rp

51,240.00

Rp Rp

102.48 102.48

Tenaga Kerja 0.0550 Org 0.0387 Org 0.0020 Org

@Rp @Rp @Rp

45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp

2,475.00 2,130.00 130.00 4,735.00

Rp

0.00

Rp

114,875.64

Rp Rp Rp

54,900.00 9,530.64 1,800.00

Tukang Batu Kepala Tukang Mandor

Alat 5.2. 5.2.1.

Turap Porslin Tiap 1 M2 Pasangan Dinding Porslin 20 x 20 cm, Warna butuh: Bahan 25.0000 Bh Porselin 15 x 15 cm, 0.1860 Zak 9.3000 Kg Semen 0.0180 M3 Pasir Pasang

@Rp @Rp @Rp

2,196.00 51,240.00 100,000.00

0.0300 Zak Tenaga Kerja 0.6000 Org 0.4550 Org 0.0450 Org 0.0300 Org

1.5000 Kg Semen Warna

Pekerja Tukang Batu Kepala Tukang Mandor

@Rp

91,500.00

Rp Rp

2,745.00 68,975.64

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

21,000.00 20,475.00 2,475.00 1,950.00 45,900.00

Rp

0.00

Rp

107,150.00

Alat

VI. 6.1. 6.1.1.

PEKERJAAN LANTAI Urugan Bawah Lantai Tiap 1 M3 Urugan Pasir butuh: Bahan 1.2000 M3 Pasir Urug

@Rp

80,000.00

Rp Rp

96,000.00 96,000.00

Tenaga Kerja 0.3000 Org 0.0100 Org

@Rp @Rp

35,000.00 65,000.00

Rp Rp Rp

10,500.00 650.00 11,150.00

Rp

0.00

Rp

127,032.22

Pekerja Mandor

Alat

6.2. 6.2.1.

Pasangan Lantai Tiap 1 M2 Pasangan Lantai Kramik 40 x 40 butuh: Bahan 6.0000 Bh Kia Keramik 40x40 0.2276 Zak 11.3800 Kg Tonasa Semen portland 50kg 0.0420 M3 Pasir Pasang 0.0300 Zak 1.5000 Kg Semen Warna

@Rp @Rp @Rp @Rp

11,183.33 51,240.00 100,000.00 91,500.00

Rp Rp Rp Rp Rp

67,100.00 11,662.22 4,200.00 2,745.00 85,707.22

Tenaga Kerja 0.6200 Org 0.3500 Org 0.0350 Org 0.0300 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

21,700.00 15,750.00 1,925.00 1,950.00 41,325.00

Rp

0.00

Rp

148,382.22

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

6.2.2.

Tiap 1 M2 Pasangan Lantai Kramik 20 x 20 butuh: Bahan 25.0000 Bh Diamond Kasar Keramik 20x20 0.2276 Zak 11.3800 Kg Tonasa Semen portland 50kg 0.0420 M3 Pasir Pasang 0.3300 Zak 1.5000 Kg IndoceMent Semen Warna 50 kg

@Rp @Rp @Rp @Rp

2,440.00 51,240.00 100,000.00 91,500.00

Rp Rp Rp Rp Rp

61,000.00 11,662.22 4,200.00 30,195.00 107,057.22

Tenaga Kerja 0.6200 Org 0.3500 Org 0.0350 Org 0.0300 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

21,700.00 15,750.00 1,925.00 1,950.00 41,325.00

Rp

0.00

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

VII. 7.1. 7.1.1.

PEKERJAAN PINTU DAN JENDELA Pintu dan Jendela Pasangan 1 Buah Pintu butuh: Bahan 1.0000 Bh Pintu Panel Bengkirai

@Rp

Tenaga Kerja 0.8000 Org 2.0000 Org 0.2000 Org 0.0400 Org

@Rp @Rp @Rp @Rp

Pekerja Tukang Kayu Kepala Tukang Mandor

Rp

521,600.00

390,000.00

Rp Rp

390,000.00 390,000.00

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

28,000.00 90,000.00 11,000.00 2,600.00 131,600.00

Rp

0.00

Rp

219,829.17

Alat

7.1.2.

Pasangan 1 M2 Jendela Kaca butuh: Bahan 1.4583 Bh 0.0350 M3 Papan Bengkirai 3/20 Kls II

@Rp

60,500.00

Rp Rp

88,229.17 88,229.17

Tenaga Kerja 0.8000 Org 2.0000 Org 0.2000 Org 0.0400 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

28,000.00 90,000.00 11,000.00 2,600.00 131,600.00

Rp

0.00

Rp

112,829.75

Pekerja Tukang Kayu Kepala Tukang Mandor

Alat

7.2. 7.2.1.

Kaca Pasangan 1 M2 Kaca Tebal 5 MM butuh: Bahan 1.1000 M2 Kaca Bening t = 5 MM

@Rp

95,200.00

Rp Rp

104,720.00 104,720.00

Tenaga Kerja 0.0150 Org 0.1500 Org 0.0150 Org 0.0002 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

525.00 6,750.00 825.00 9.75 8,109.75

Rp

0.00

Rp

25,592.50

Pekerja Tukang Kayu Kepala Tukang Mandor

Alat

7.3. 7.3.1.

Penggantung/Kunci Tiap 1 Buah Pasangan Engsel Pintu/Jendela butuh: Bahan 1.0000 Bh Falco Engsel Jendela 3"

@Rp

20,160.00

Rp Rp

20,160.00 20,160.00

Tenaga Kerja 0.0100 Org 0.1000 Org 0.0100 Org 0.0005 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

350.00 4,500.00 550.00 32.50 5,432.50

Alat

Pekerja Tukang Kayu Kepala Tukang Mandor

7.3.2.

Rp

0.00

Rp

144,595.00

Tiap 1 Buah Pasangan Kunci Tanam Antik butuh: Bahan 1.0000 Bh Belucci Kunci

@Rp

112,000.00

Rp Rp

112,000.00 112,000.00

Tenaga Kerja 0.0600 Org 0.6000 Org 0.0600 Org 0.0030 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

2,100.00 27,000.00 3,300.00 195.00 32,595.00

Rp

0.00

Rp

7,414.50

Pekerja Tukang Kayu Kepala Tukang Mandor

Alat

VIII. 8.1.

PEKERJAAN PENGECATAN Tiap 1 M2 Mendempul dan Menggosok Kayu butuh: Bahan 0.0800 Kg IMpra DeMpul 0.0200 Kg Pujatex Cat Minyak 0.1000 Kg Batu Apung

@Rp @Rp @Rp

20,000.00 36,600.00 15,000.00

Rp Rp Rp Rp

1,600.00 732.00 1,500.00 3,832.00

Tenaga Kerja 0.0400 Org 0.0400 Org 0.0040 Org 0.0025 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

1,400.00 1,800.00 220.00 162.50 3,582.50

Rp

0.00

Rp

20,915.50

Pekerja Tukang Cat Kepala Tukang Mandor

Alat

8.2.

Tiap 1 M2 Mengecat Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) butuh: Bahan 0.2000 Kg Cat Meni 0.1500 Kg PlaMir 0.1700 Kg Cat Dasar 0.2600 Kg Cat Penutup 2 Kali

@Rp @Rp @Rp @Rp

18,300.00 8,540.00 18,300.00 36,600.00

Rp Rp Rp Rp Rp

3,660.00 1,281.00 3,111.00 9,516.00 17,568.00

Tenaga Kerja 0.0700 Org 0.0090 Org 0.0060 Org 0.0025 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

2,450.00 405.00 330.00 162.50 3,347.50

Rp

0.00

Rp

14,340.80

Rp Rp Rp Rp

854.00 1,830.00 7,612.80 10,296.80

Pekerja Tukang Cat Kepala Tukang Mandor

Alat

8.3.

Tiap 1 M2 Mengecat Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) butuh: Bahan 0.1000 Kg Paragon PlaMir 0.1000 Kg Altex Cat Dasar 0.2600 Kg Cat Penutup 2x Tenaga Kerja

@Rp @Rp @Rp

8,540.00 18,300.00 29,280.00

0.0200 0.0630 0.0063 0.0025

Org Org Org Org

Pekerja Tukang Cat Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

700.00 2,835.00 346.50 162.50 4,044.00

Rp

0.00

Rp

9,380,200.00

Alat

IX. 9.1.

9.2. 9.2.1.

PEKERJAAN INSTALASI DAN SANITASI Tiap Pekerjaan Pemasangan Listrik butuh: Bahan 5.0000 Bh Philips Lampu TL Lengkap 38.0000 Bh Lampu Pijar 20 W 26.0000 Bh Pitting 26.0000 Bh Saklar 12.0000 Bh Stop Kontak 2.0000 Bh MCB 6 A 1.0000 Bh Kotak MCBN 11.0000 Bh Stop Kontak 26.0000 Bh T-Dos (Kontak Hubung Bagi) 348.0000 M' Kabel 3 x 2,5 MM2 69.6000 M' Pipa PVC (Pipa Listrik) 1.0000 Ls KWH (Pasang Baru) 1.0000 Ls Alat Kecil

@Rp @Rp @Rp @Rp @Rp @Rp @Rp @Rp @Rp @Rp @Rp @Rp @Rp

35,000.00 20,000.00 20,000.00 15,000.00 15,000.00 20,000.00 10,000.00 15,000.00 4,500.00 7,000.00 7,000.00 2,500,000.00 100,000.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

175,000.00 760,000.00 520,000.00 390,000.00 180,000.00 40,000.00 10,000.00 165,000.00 117,000.00 2,436,000.00 487,200.00 2,500,000.00 100,000.00 7,880,200.00

Tenaga Kerja 1.0000 Ls

@Rp

1,500,000.00

Rp Rp

1,500,000.00 1,500,000.00

Rp

604,640.00

Biaya Pemasanagan

Pekerjaan Sanitasi Tiap Pemasangna 1 Buah Kloset Jongkok butuh: Bahan 1.0000 Bh Toto Kloset Jongkok 6.0000 Kg 0.1200 Zak Semen Portland 50 kg 0.0100 M3 Pasir Pasang

@Rp @Rp @Rp

100,800.00 51,240.00 100,000.00

Rp Rp Rp Rp

100,800.00 307,440.00 1,000.00 409,240.00

Tenaga Kerja 1.0000 Org 1.5000 Org 1.5000 Org 0.1600 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

35,000.00 67,500.00 82,500.00 10,400.00 195,400.00

Rp

0.00

Rp

2,193,695.00

1,904,000.00 1,904,000.00

Rp Rp Rp

1,904,000.00 114,240.00 2,018,240.00

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp

115,500.00 49,500.00 55.00 10,400.00

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

9.2.2.

Tiap Pemasangan 1 Buah Kloset Duduk butuh: Bahan 1.0000 Bh American Standart Kloset Duduk @Rp 0.0600 Hk Perlengkapan @Rp Tenaga Kerja 3.3000 Org 1.1000 Org 0.0010 Org 0.1600 Org

Pekerja Tukang Batu Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

Rp

175,455.00

Rp

0.00

Rp

25,725.00

Alat

9.2.3.

Tiap Pemasangan 1 Bh Floor Draine butuh: Bahan 1.0000 Bh Floor Drain

@Rp

20,000.00

Rp Rp

20,000.00 20,000.00

Tenaga Kerja 0.0100 Org 0.1000 Org 0.0100 Org 0.0050 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

350.00 4,500.00 550.00 325.00 5,725.00

Rp

0.00

Rp

346,747.50

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

9.2.4.

Memasang 1 Buah Bak Cuci Piring Stainless butuh: Bahan 1.0000 Bh Bak Cuci Stainlees Steel 1.0000 Set Water Draiin + asesorises

@Rp @Rp

257,600.00 85,000.00

Rp Rp Rp

257,600.00 85,000.00 342,600.00

Tenaga kerja 0.0300 Org 0.0300 Org 0.0300 Org 0.0015 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

1,050.00 1,350.00 1,650.00 97.50 4,147.50

Rp

0.00

Rp

1,200,220.00

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

9.2.5.

Memasang 1 Wastafel butuh: Bahan 1.0000 Bh 0.1200 Hk 0.1200 Zak 6.0000 Kg 0.0100 M3

Wastafel Perlengkapan Semen Abu-Abu Pasir Pasang

@Rp @Rp @Rp @Rp

952,000.00 952,000.00 91,500.00 100,000.00

Rp Rp Rp Rp Rp

952,000.00 114,240.00 10,980.00 1,000.00 1,078,220.00

Tenaga Kerja 1.2000 Org 1.4500 Org 0.1500 Org 0.1000 Org

Pekerja Tukang Batu Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

42,000.00 65,250.00 8,250.00 6,500.00 122,000.00

Rp

0.00

Rp

108,337.50

Alat

9.2.6.

Memasang Pipa Air Ø 3" Per M' butuh: Bahan 1.2000 M Pipa PVC Ø 3" tipe D 0.3500 Hb Perlengkapan

@Rp @Rp

63,500.00 63,500.00

Rp Rp Rp

76,200.00 22,225.00 98,425.00

Tenaga Kerja 0.0810 Org 0.1350 Org

@Rp @Rp

35,000.00 45,000.00

Rp Rp

2,835.00 6,075.00

Pekerja Tukang Batu

0.0135 Org 0.0040 Org

Kepala Tukang Mandor

@Rp @Rp

55,000.00 65,000.00

Rp Rp Rp

742.50 260.00 9,912.50

Rp

0.00

Rp

28,514.00

Alat

9.2.7.

Memasang Pipa Air Ø 3/4" AW Per M' butuh: Bahan 1.2000 M Pipa PVC Ø 3/4" tipe AW 0.3500 Hb Perlengkapan

@Rp @Rp

15,680.00 15,680.00

Rp Rp Rp

18,816.00 5,488.00 24,304.00

Tenaga Kerja 0.0300 Org 0.0600 Org 0.0060 Org 0.0020 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

1,050.00 2,700.00 330.00 130.00 4,210.00

Rp

0.00

Rp

21,570.00

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

9.2.8.

Memasang Pipa Air Ø 1/2" AW Per M' butuh: Bahan 1.2000 M Pipa PVC Ø 1/2" tipe AW 0.3500 Hb Perlengkapan

@Rp @Rp

11,200.00 11,200.00

Rp Rp Rp

13,440.00 3,920.00 17,360.00

Tenaga Kerja 0.0300 Org 0.0600 Org 0.0060 Org 0.0020 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

1,050.00 2,700.00 330.00 130.00 4,210.00

Rp

0.00

Rp

47,075.00

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

9.2.9.

Memasangan 1 Kran Air Ø 3/4" atau 1/2" butuh: Bahan 1.0000 Bh Kran air Ø 3/4" atau 1/2" 0.0250 Rol Seal tape

@Rp @Rp

40,000.00 54,000.00

Rp Rp Rp

40,000.00 1,350.00 41,350.00

Tenaga Kerja 0.0100 Org 0.1000 Org 0.0100 Org 0.0050 Org

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

350.00 4,500.00 550.00 325.00 5,725.00

Rp

0.00

Rp

641,206.40

Rp Rp Rp Rp

223,406.40 67,600.00 121,800.00 412,806.40

Pekerja Tukang Batu Kepala Tukang Mandor

Alat

X. 10.1.

PEKERJAAN PERLENGKAPAN LUAR Tiap 1 M3 Rabat Beton (1:3:5) butuh: Bahan 4.3600 Zak Tonasa Semen portland 50kg 0.5200 M3 Pasir cor 0.8700 M3 Kerikil Beton Upah kerja

@Rp @Rp @Rp

51,240.00 130,000.00 140,000.00

5.0000 0.8000 0.0800 0.2000

Org Org Org Org

Pekerja Tukang batu Kepala tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

175,000.00 36,000.00 4,400.00 13,000.00 228,400.00

Rp

0.00

Rp

331,601.21

Alat

10.2.

Tiap 1Buah Bak Kontrol butuh: Bahan 126.0000 Bh 2.2800 Zak 114.0000 Kg 0.1840 M3 0.0330 M3 4.8500 Kg 0.1200 M3

Batu Bata Tonasa Semen portland 50kg Pasir Pasang Kerikil Beton Besi Beton Pasir Cor

@Rp @Rp @Rp @Rp @Rp @Rp

225.00 51,240.00 100,000.00 140,000.00 5,221.45 130,000.00

Rp Rp Rp Rp Rp Rp Rp

28,350.00 116,827.20 18,400.00 4,620.00 25,324.01 15,600.00 209,121.21

Tenaga Kerja 2.2600 Org 0.7200 Org 0.0720 Org 0.1080 Org

Pekerja Tukang Batu Kepala Tukang Mandor

@Rp @Rp @Rp @Rp

35,000.00 45,000.00 55,000.00 65,000.00

Rp Rp Rp Rp Rp

79,100.00 32,400.00 3,960.00 7,020.00 122,480.00

Rp

0.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,138,954.58 174,320.00 21,430.00 64,000.00 57,120.00 418,660.74 18,700.00 384,723.84 1,138,954.58

Rp Rp 30,502.50 Rp

0.00 1,690,248.83 269,375.20

Alat

10.3.

Pembuatan 1 Buah Septictank 2 x 2 x 2 M butuh: 8.0000 M3 Galian Tanah Biasa Sedalam 2 M 0.2000 M3 Urugan Pasir 16.0000 Bh Pas. Batako 1.5000 Btg 0.0300 M3 Ulin Kayu 5/10 16.0000 M2 Plesteran 1 : 2 1.0000 Btg 0.0160 M2 Meranti Papan 2/20 0.6000 M3 Rabat Beton1 : 3 : 5

@Rp @Rp @Rp @Rp @Rp @Rp @Rp

21,790.00 107,150.00 4,000.00 38,080.00 26,166.30 18,700.00 641,206.40

Alat 10.4.

Pembuatan 1 Unit Resapan 1.2 M Dalam 5 M butuh: 8.8313 M3 Galian tanah

@Rp

3.3912 M

3

Pas. Batu kosong

@Rp

253,530.00

Rp

859,770.94

2.2608 M

3

Pasangan batu bata

@Rp

56,194.96

Rp

127,045.57

5.6520 M

2

Plesteran dan acian

@Rp

31,003.78

Rp

175,233.35

0.2250 M

3

Plat beton bertulang tebal 10cm

@Rp

1,150,327.91

Rp Rp

258,823.78 1,690,248.83

Rp

0.00

Alat

KEMBALI

MeMbuat 1 M2 bekisting balok dan Kolom butuh : Bahan : papan kayu 0.04 M3 paku 0.40 kg 0.018 M3 2.00 btg Upah Kerja : Org 0.32 Org 0.32 0.03 0.006 MeMbuat 1 M2 BAHAN : 0.04 0.40 0.02 6.00

Org Org

kayu ukuran 5/7 baMbu Pekerja Tukang kayu Kepala tukang Mandor

bekisting plat deck butuh : M3 kg M3

papan kayu paku kayu 4/6

btg

baMbu

RENCANA ANGGARAN BIAYA (RAB)

NO

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN (Rp)

I. PEKERJAAN PONDASI 1.1. Pekerjaan Persiapan 1.1.1. Pembersihan Lapangan

340.0000

M2

6,750.00

56.0000

M2

23,868.02

1.0000

Ls

4,500,000.00

20.0000

M2

384,725.40

1.2.1. Galian Tanah Biasa 1 Meter

148.2500

M3

16,600.00

1.2.2. Galian Tanah Biasa 2 Meter

0.0000

M

3

21,790.00

1.2.3. Galian Tanah Biasa 3 Meter

0.0000

M3

30,502.50

1.2.4. Galian Tanah Keras 1 Meter

0.0000

M3

25,905.00

1.2.5. Galian Tanah Cadas 1 Meter

0.0000

M

3

51,875.00

1.2.6. Galian Tanah Lumpur 1 Meter

0.0000

M3

34,200.00

37.0625

M3

7,955.00

0.0000

M3

20,750.00

1.3.1. Urugan Pasir Bawah Pondasi

12.1513

M3

107,150.00

1.3.2. Pasangan Pondasi Batu Kosong

24.6692 M3

253,530.00

1.3.3. Pasangan Pondasi Batu Kali

56.1260

M3

508,184.60

2.1.1. Sloof 15/20

2.5744

M3

2,522,380.27

2.1.2. Pekerjaan Pondasi Plat

3.7960

M3

840,091.40

2.1.2. Kolom 15/15

4.9800

M

3

3,616,849.70

2.1.3. Kolom 15/20

3.4300

M3

3,115,744.55

2.1.8. Kolom 20 x 30

5.4600

M3

2,437,479.00

2.1.25. Balok 15 x 20

2.3400

M

3,115,744.55

1.1.2. Pemasangan Bouplank/Pengukuran 1.1.3. Pengadaan Air Kerja 1.1.4. Pembuatan Gedung Semen dan Alat

1.2. Pekerjaan Galian

1.2.7. Urugan Kembali Galian 1.2.8. Pemadatan Tanah

1.3. Pemasangan Pondasi Batu Kali

II. PEKERJAAN BETON 2.1. Beton Bertulang

3

2.1.39. Balok 30 x 35

6.6045

M3

2,125,994.90

2.1.9. Plat Beton

7.3600

M3

1,150,327.91

2.1.10. Ring Balok

3.7400

M3

2,915,054.46

2.1.11. Tangga

1.8534

M3

4,398,277.54

0.8920 M3

502,503.60

2.2. Beton Tak Bertulang 2.2.1. Beton Cor 1 : 2 : 3

III. PEKERJAAN DINDING 3.1. Dinding

3.2.

2.2.1. Pasangan Dinding Batubata (1:4)

413.5688

M3

49,060.20

2.2.2. Pasangan Dinding Batubata (1:2)

51.1000

M3

56,194.96

1.2541

M3

2,786,375.00

4.1.1.. Balok Dinding 8/12

0.2939

M3

16,037.50

4.1.2. Pekerjaan Kuda-Kuda

1.3629

M3

2,419,981.29

138.0646

M3

34,345.00

53.9000

M3

28,935.00

5.6300

M3

689,120.96

17.0000

M'

519,704.83

158.0646 M2

43,785.80

34.1700 M3

130,387.47

207.0075 M2

36,913.93

Kusen 2.3.1. Kusen Pintu dan Jendela

IV. PEKERJAAN KAP DAN ATAP 4.1. Kap dan Rangka Atap

4.1.3. Pekerjaan Rangka Atap 4.1.4. Pekerjaan Listplank 3/25 4.1.5. Gording 8/12 4.1.6. Talang

4.2. Atap 4.2.1. Pemasangan Atap 4.2.2. Pemasangan Perabung

V. PEKERJAAN PLAFOND 5.1. Balok Plafond 5.1.1. Rangka Plafon

5.2. Memasang Plafond 5.2.1. Memasang Plafond Gypsum

165.6500 M2

64,214.67

5.2.2. Memasang Lis Plafond

179.9500

12,394.20

6.1.1. Plasteran Dinding (1:2)

134.5000 M2

26,166.30

6.1.2. Plasteran Dinding (1:4)

780.2350 M2

22,553.96

6.1.3. Aian

914.7350 M2

4,837.48

47.2160 M2

114,875.64

11.2648

107,150.00

VI. PEKERJAAN PLASTERAN 6.1. Plasteran

6.2. Turap Porslen 6.2.1. Pasangan Turap Porslent

VII. PEKERJAAN LANTAI 7.1. Urugan Bawah Lantai 7.1.1. Urugan Pasir

7.2. Pasangan Lantai 7.2.1. Pasangan Lantai Kramik 33 x 33

182.3750 M2

127,032.22

7.2.2. Pasangan Lantai Kramik 20 x 20

24.6325 M2

148,382.22

8.1.1. Pasangan Pintu

28.9350

Bh

521,600.00

8.1.2. Pasangan Jendela kaca

17.0000 M2

219,829.17

71.5420 M2

112,829.75

VIII. PEKERJAAN PINTU DAN JENDELA 8.1. Pintu dan Jendela

8.2. Kaca 8.2.1. Pasangan Kaca Tebal 15 mm

8.3. Penggantung/Kunci 8.3.1. Pasangan Engsel Pintu

68.0000

Bh

25,592.50

8.3.3. Pasangan Kunci Taman Antik

12.0000

Bh

144,595.00

IX. PEKERJAAN PENGECATAN 9.1. Mendempul dan Mrnggosok Kayu

90.9809 M2

7,414.50

9.2. Mengecat Kayu Baru

610.5400 M2

20,915.50

9.3. Mengecat Tembok Baru

464.7500 M2

14,340.80

X. PEK. INSTALASI DAN SANITASI 10.1 Listrik 10.1.1 Pemasangan Listrik Baru

1.0000

Ls

9,380,200.00

10.2.1. Pemasangna Kloset Jongkok

2.0000

Bh

604,640.00

10.2.2. Pemasangan Kloset Duduk

2.0000

Bh

2,193,695.00

10.2.3. Pemasangan Floor Draine

4.0000

Bh

25,725.00

10.2.4. Pemasangan Bak Cuci Piring

1.0000

Bh

346,747.50

10.2.5. Pemasangan Wastafel

2.0000

Bh

1,200,220.00

10.2.6. Pem. Pipa Air Ø 3" Per M'

30.0000

M'

108,337.50

10.2.7. Pem. Pipa Air Ø 3/4" AW Per M'

42.0000

M'

28,514.00

10.2.8. Pem. Pipa Air Ø 1/2" AW Per M'

46.5300

M'

21,570.00

10.2.9. Pem. Kran Air Ø 3/4" atau 1/2"

8.0000

Bh

47,075.00

10.2. Sanitair dan Instalasi Air

XI. PEK. PERLENGKAPAN LUAR 11.1 Rabat Beton (1:3:5)

21.2100

641,206.40

11.2 Bak Kontrol

1.0000

331,601.21

11.3 Septictank

1.0000

1,138,954.58

11.4 Resapan

1.0000

1,690,248.83

KEMBALI

JUMLAH (Rp)

2,295,000.00 1,336,609.33 4,500,000.00 7,694,508.00 15,826,117.33

2,460,950.00 0.00 0.00 0.00 0.00 0.00 294,832.19 0.00 2,755,782.19

1,302,011.80 6,254,382.28 28,522,368.86 36,078,762.93

6,493,615.76 3,188,986.95 18,011,911.50 10,687,003.82 13,308,635.33 7,290,842.26

14,041,133.35 8,466,413.39 10,902,303.68 4,398,277.54 96,789,123.58

448,233.21 448,233.21

20,289,768.04 2,871,562.46 23,161,330.50

3,494,392.89 3,494,392.89

4,713.42 3,298,192.51 4,741,828.69 1,559,596.50 3,879,751.00 8,834,982.17 22,319,064.29

6,920,984.96 4,455,339.71 11,376,324.68

7,641,460.07 7,641,460.07

10,637,159.53 2,230,336.29 12,867,495.82

3,519,366.81 17,597,388.98 4,425,013.64 25,541,769.43

5,423,968.22 5,423,968.22

1,207,023.32 1,207,023.32

23,167,501.85 3,655,025.13 26,822,526.98

15,092,496.00 3,737,095.83 18,829,591.83

8,072,065.97 8,072,065.97

1,740,290.00 1,735,140.00 3,475,430.00

674,577.88 12,769,749.37 6,664,886.80 20,109,214.05

9,380,200.00 9,380,200.00

1,209,280.00 4,387,390.00 102,900.00 346,747.50 2,400,440.00 3,250,125.00 1,197,588.00 1,003,652.10 376,600.00 14,274,722.60

13,599,987.74 331,601.21 1,138,954.58 1,690,248.83 16,760,792.36

REKAPITULASI HARGA

JENIS PEKERJAAN

HARGA PEKERJAAN

I. PEKERJAAN PONDASI

Rp

54,660,662.45

II. PEKERJAAN BETON

Rp

97,237,356.79

III. PEKERJAAN DINDING

Rp

26,655,723.39

III. PEKERJAAN KAP DAN ATAP

Rp

33,695,388.96

IV. PEKERJAAN PLAFOND

Rp

20,508,955.89

V. PEKERJAAN PLASTERAN DAN ACIAN

Rp

30,965,737.65

VI. PEKERJAAN LANTAI

Rp

28,029,550.30

VII. PEKERJAAN PINTU DAN JENDELA

Rp

30,377,087.81

VIII. PEKERJAAN PENGECATAN

Rp

20,109,214.05

IX. PEK. INSTALASI DAN SANITASI

Rp

23,654,922.60

X. PEK. PERLENGKAPAN LUAR

Rp

16,760,792.36

Rp

382,655,392.26

JUMLAH

KEMBALI

VOLUME KEBUTUAN MATERIAL KESELURUHAN No

Material Kloset Duduk Atap Sakura Roof (2 Susun) AW Pipa PVC Ø 1"

Volume 2.0000

bh

94.8388 m2 0.0000

m

AW Pipa PVC Ø 1/2"

55.8360

m

AW Pipa PVC Ø 3"

36.0000

m

AW Pipa PVC Ø 3/4"

50.4000

m

1.0000

bh

32,792.8160

bh

0.0000

bh

Bak Cuci Stainless Batu Bata Batu Batako 10/20/40 Batu Kali Belucci Kunci

61.7386 m3 12.0000 set

Besi Polos Ø 10 mm

304.2631 lnjr

Besi Polos Ø 12 mm

82.1917 lnjr

Besi Polos Ø 16 mm

0.0000 lnjr

Besi Polos Ø 6 mm Besi Strip

234.2351 lnjr 20.4435

kg

1.0000

bh

Cat Dasar

150.2668

kg

Cat Kayu

158.7404

kg

Cat Meni

122.1080

kg

Diamond Kasar Keramik 20x20

615.8125

bh

Falco Engsel Pintu 5 "

68.0000

bh

Fitting Lampu

26.0000

bh

Box MCBN

Floor Drain Gypsum Impra Dempul

4.0000 Bh 69.0208 lbr 7.2785

kg

Indocement Semen Warna 50 kg

15.2565 zak

Kaca Bening t = 5 mm

78.6962 m2

Kaca Hitam t = 5 mm

0.0000 m2

Kawat Bendrat

78.6649

kg

Kayau Meranti Papan 3/20 (Kls. 2)

196.7097 btg

Kayu Meranti Balok 5/7 (Kls. 2)

258.5457 btg

Kayu Bengkirai Balok 2/3 (Kls. 1)

138.0646 btg

Kayu Bengkirai Balok 5/10 (Kls. 1)

0.0000 btg

Kayu Bengkirai Balok 5/7 (Kls. 1)

315.4996 btg

Kayu Bengkirai Balok 8/12 (Kls. 1)

75.2407 btg

Kayu Bengkirai Papan 3/20 (Kls. 1)

147.5193 btg

Kayu Ulin Balok 5/10 (Kls. 1) Kerikil Beton

1.5000 btg 38.1910 m3

Kia Keramik 40x40

1,094.2500

bh

Kia Polos Keramik 20x20

1,180.4000

bh

Kran Air

8.0000

bh

Lampu Neon Lengkap

5.0000

bh

38.0000

bh

Lampu Pijar 20W

Lexus Westafel

2.0000

bh

188.9475

m'

MCB 6A

2.0000

bh

Minyak Bekisting

8.2776

lt

Naturtone Cat Tembok

120.8350

kg

Nok Surya Roof 100 mm

102.5100

bh

List Profil

Paku Biasa 2" - 5"

kg

Paku Sekrup

dos

Paku Ulin 1" - 5"

kg

Paragon Plamir

138.0560

kg

Pasir Cor

46.8598 m3

Pasir Pasang

75.4358 m3

Pasir urug

37.0001 m3

Perlengkapan Instalasi (Isolasi, Paku, dll)

1.0000 set

Pintu Panel Bengkirai 80-100 x 200

17.0000

bh

Pipa PVC Listrik

69.6000

m

Playwood t = 6 mm

0.0000 lbr

Playwood t = 9 mm

13.8474 lbr

Playwood t =3 mm

0.0000 lbr

Pujatex Cat Minyak

1.8196

kg

Saklar

26.0000 Bh

Seng Gelombang BJLS 32

30.0000 lbr

Seng Plat 3 x 6 BJLS 28 Stop Kontak T-Dos (Kontak Hubung Bagi) Semen Portland 50 kg Kloset Jongkok

8.5000 lbr 11.0000

bh

26.0000

bh

817.2107 zak 2.0000

bh

NO URAIAN PEKERJAAN

VOL

SAT

I. PEKERJAAN PONDASI 1.1. Pekerjaan Persiapan 1.1.1. Pembersihan Lapangan 1.1.2. Pemasangan Bouplank/Pengukuran

1.1.3. Pengadaan Air Kerja 1.1.4. Pembuatan Gedung Semen dan Alat

340.0000

M2

56.0000

M2

1.0000

Ls

20.0000

M2

Kayu Meranti Balok 5/7

0.8571

48.00

Lnjr

Kayu Meranti Papan 3/20

0.2917

16.33

Lnjr

Paku Biasa 2"-5"

0.0200

1.12

Kg

Perancah Meranti Balok 5/7

1.7000

34.00

Lnjr

Kayu Meranti Papan 3/20

8.7500

175.00

Lnjr

Paku Biasa 2"-5"

0.3000

6.00

Kg

Semen Portland 50 kg

0.2100

4.20

Zak

Pasir Beton

0.0300

0.60

M3

Koral Beton

0.0500

1.00

M3

Seng GeloMbang BJLS 32

1.5000

30.00

Lbr

1.2. Pekerjaan Galian 1.2.1. Galian Tanah Biasa 1 Meter

148.2500

M3

1.2.2. Galian Tanah Biasa 2 Meter

0.0000

M3

1.2.3. Galian Tanah Biasa 3 Meter

0.0000

M3

1.2.4. Galian Tanah Keras 1 Meter

0.0000

M3

1.2.5. Galian Tanah Cadas 1 Meter

0.0000

M3

1.2.6. Galian Tanah Lumpur 1 Meter

0.0000

M3

37.0625

M3

0.0000

M3

1.3.1. Urugan Pasir Bawah Pondasi

12.1513

M3

Pasir urug

1.2000

14.58

M3

1.3.2. Pasangan Pondasi Batu Kosong

24.6692

M3

Batu Kali

1.2000

29.60

M3

Pasir Urug

0.3000

7.40

M3

Batu Kali

1.1000

61.74

M3

Tonasa Semen Portland 50 kg

4.0400

226.75

Zak

Pasir Pasang

0.4850

27.22

M3

Besi Beton Polos Ø 10

11.1111

28.60

Lnjr

Besi Beton Polos Ø 6

8.0717

20.78

Lnjr

Kawat Beton

2.0040

5.16

Kg

Papan Meranti 3/20 Kelas II

1.2500

3.22

Btg

Balok Meranti 5/7 Kelas II

3.2857

8.46

Btg

Paku

0.3000

0.77

kg

Minyak Bekisting

0.1000

0.26

Lt

Semen Portland 50 kg

4.6400

11.95

Zak

Pasir Beton

0.5200 1.338688

M3

Kerikil Beton

0.7800

2.01

M3

1.2.7. Urugan Kembali Galian 1.2.8. Pemadatan Tanah 1.3. Pemasangan Pondasi Batu Kali

1.3.3. Pasangan Pondasi Batu Kali

56.1260

M3

II. PEKERJAAN BETON 2.2. Beton Bertulang 2.1.1. Sloof 20/20

1.4.2. Pekerjaan Pondasi Plat

2.5744

3.7960

M3

M3

Besi Beton Polos Ø 12

11.5196

43.73

Lnjr

Kawat Beton

0.7500

2.85

Kg

Semen Portland 50 kg

4.6400

17.61

Zak

Pasir Beton

0.5200

1.97392

M3

Kerikil Beton

0.7800

2.96

M3

2.1.2. Kolom 15/15

4.9800

M3

Playwood 9mm

0.3500

1.33

Lbr

Kayu Meranti 4/6 Kelas II

1.5625

5.93

Btg

Balok Meranti 5/7 Kelas II

6.0000

22.78

Btg

Paku

0.4000

1.52

Kg

Minyak Bekisting

0.2000

0.76

Lt

Besi Beton Polos Ø 10

14.8148

73.78

Lnjr

Besi Beton Polos Ø 6

8.9200

44.42

Lnjr

Kawat Beton

2.6760

13.33

Kg

Semen Portland 50 kg

4.6400

23.11

Zak

Pasir Beton

0.4000

1.992

M3

Kerikil Beton

0.2000

1.00

M3

0.35

1.743

Lbr

Balok Meranti 5/7 Kelas II

3.2857

16.36

Btg

Paku

0.4000

1.99

kg

Minyak Bekisting

0.2000

1.00

Lt

Playwood 9mm

2.1.3. Kolom 15/20

2.1.4. Kolom 15/25

2.1.5. Kolom 15/30

2.1.6. Kolom 20 x 20

3.4300

0.0000

0.0000

0.0000

M3

M3

M3

M3

Besi Beton Polos Ø 10

11.1111

38.11

Lnjr

Besi Beton Polos Ø 6

8.0717

27.69

Lnjr

Kawat Beton

2.0040

6.87

Kg

Semen Portland 50 kg

4.6400

15.92

Zak

Pasir Beton

0.4000

1.372

M3

Kerikil Beton

0.2000

0.69

M3

Playwood 9mm

0.3500

1.20

Lbr

Balok Meranti 5/7 Kelas II

3.2857

11.27

Btg

Paku

0.4000

1.37

kg

Minyak Bekisting

0.2000

0.69

Lt

Besi Beton Polos Ø 10

8.8889

0.00

Lnjr

Besi Beton Polos Ø 6

7.5933

0.00

Lnjr

Kawat Beton

1.6080

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

11.1111

0.00

Lnjr

Besi Beton Polos Ø 6

45.5820

0.00

Lnjr

Kawat Beton

1.3440

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

8.3333

0.00

Lnjr

Besi Beton Polos Ø 6

44.3506

0.00

Lnjr

Kawat Beton

1.5000

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

2.1.7. Kolom 20 x 25

2.1.8. Kolom 20 x 30

2.1.9. Kolom 20 x 35

2.1.10. Kolom 20 x 40

2.1.11. Kolom 25 x 25

0.0000

5.4600

0.0000

0.0000

0.0000

M3

M3

M3

M3

M3

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.6667

0.00

Lnjr

Besi Beton Polos Ø 6

40.6982

0.00

Lnjr

Kawat Beton

1.2000

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 12

8.3333

45.50

Lnjr

Besi Beton Polos Ø 6

6.1600

33.63

Lnjr

Kawat Beton

1.0080

5.50

Kg

Semen Portland 50 kg

4.6400

25.33

Zak

Pasir Beton

0.4000

2.18

M3

Kerikil Beton

0.2000

1.09

M3

Playwood 9mm

0.3500

1.91

Lbr

Balok Meranti 5/7 Kelas II

3.2857

17.94

Btg

Paku

0.4000

2.18

kg

Minyak Bekisting

0.2000

1.09

Lt

Besi Beton Polos Ø 10

1.1905

0.00

Lnjr

Besi Beton Polos Ø 6

36.8162

0.00

Lnjr

Kawat Beton

0.8640

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.0417

0.00

Lnjr

Besi Beton Polos Ø 6

35.5014

0.00

Lnjr

Kawat Beton

0.7560

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.3333

0.00

Lnjr

Besi Beton Polos Ø 6

36.7327

0.00

Lnjr

Kawat Beton

0.9600

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

2.1.12. Kolom 25 x 30

0.0000

M3

Besi Beton Polos Ø 10

1.1111

0.00

Lnjr

34.2595

0.00

Lnjr

Kawat Beton

0.8040

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.9524

0.00

Lnjr

Besi Beton Polos Ø 6

32.6838

0.00

Lnjr

Kawat Beton

0.8640

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.8333

0.00

Lnjr

Besi Beton Polos Ø 6

30.7845

0.00

Lnjr

Kawat Beton

0.6000

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.7407

0.00

Lnjr

Besi Beton Polos Ø 6

30.0541

0.00

Lnjr

Kawat Beton

0.5400

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.6667

0.00

Lnjr

Besi Beton Polos Ø 6

28.8018

0.00

Lnjr

Kawat Beton

0.4800

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.9259

0.00

Lnjr

Besi Beton Polos Ø 6

31.5568

0.00

Lnjr

0.6720

0.00

Kg

Besi Beton Polos Ø 6

2.1.13. Kolom 25 x 35

2.1.14. Kolom 25 x 40

2.1.15. Kolom 25 x 45

2.1.16. Kolom 25 x 50

2.1.17. Kolom 30 x 30

0.0000

0.0000

0.0000

0.0000

0.0000

M3

M3

M3

M3

M3

Kawat Beton

2.1.18. Kolom 30 x 35

2.1.19. Kolom 30 x 40

2.1.20. Kolom 35 x 45

2.1.21. Kolom 35 x 50

2.1.22. Kolom 40 x 40

0.0000

0.0000

0.0000

0.0000

0.0000

M3

M3

M3

M3

M3

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.7937

0.00

Lnjr

Besi Beton Polos Ø 6

29.5532

0.00

Lnjr

Kawat Beton

0.5760

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.6944

0.00

Lnjr

Besi Beton Polos Ø 6

28.0505

0.00

Lnjr

Kawat Beton

0.5040

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.5291

0.00

Lnjr

Besi Beton Polos Ø 6

24.7111

0.00

Lnjr

Kawat Beton

0.3840

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.4762

0.00

Lnjr

Besi Beton Polos Ø 6

23.9076

0.00

Lnjr

Kawat Beton

0.3480

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.5208

0.00

Lnjr

Besi Beton Polos Ø 6

23.0414

0.00

Lnjr

Kawat Beton

0.3840

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

2.1.23. Kolom 40 x 45

2.1.24. Kolom 40 x 50

2.1.25. Balok 15 x 20

2.1.26. Balok 15 x 25

2.1.27. Balok 15 x 30

0.0000

0.0000

2.3400

0.0000

0.0000

M3

M3

M3

M3

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.4630

0.00

Lnjr

Besi Beton Polos Ø 6

23.0832

0.00

Lnjr

Kawat Beton

4.6400

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.4167

0.00

Lnjr

Besi Beton Polos Ø 6

21.9144

0.00

Lnjr

Kawat Beton

0.3000

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

11.1111

26.00

Lnjr

Besi Beton Polos Ø 6

8.0717

18.89

Lnjr

Kawat Beton

2.0040

4.69

Kg

Semen Portland 50 kg

4.6400

10.86

Zak

Pasir Beton

0.4000

0.94

M3

Kerikil Beton

0.2000

0.47

M3

Playwood 9mm

0.3500

0.82

Lbr

Balok Meranti 5/7 Kelas II

3.2857

7.69

Btg

Paku

0.4000

0.94

kg

Minyak Bekisting

0.2000

0.47

Lt

Besi Beton Polos Ø 10

2.2222

0.00

Lnjr

Besi Beton Polos Ø 6

47.5438

0.00

Lnjr

Kawat Beton

1.6080

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.8519

0.00

Lnjr

Besi Beton Polos Ø 6

45.5820

0.00

Lnjr

Kawat Beton

1.3440

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting 2.1.28. Balok 20 x 20

2.1.29. Balok 20 x 25

2.1.30. Balok 20 x 30

2.1.31. Balok 20 x 35

2.1.32. Balok 20 x 40

2.1.33. Balok 25 x 25

0.0000

0.0000

0.0000

0.0000

0.0000

0.0000

M3

M3

M3

M3

M3

M3

0.2000

0.00

Lt

Besi Beton Polos Ø 10

2.0833

0.00

Lnjr

Besi Beton Polos Ø 6

44.3506

0.00

Lnjr

Kawat Beton

1.5000

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.6667

0.00

Lnjr

Besi Beton Polos Ø 6

40.6982

0.00

Lnjr

Kawat Beton

1.2000

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.3889

0.00

Lnjr

Besi Beton Polos Ø 6

38.5694

0.00

Lnjr

Kawat Beton

1.0080

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.1905

0.00

Lnjr

Besi Beton Polos Ø 6

36.8162

0.00

Lnjr

Kawat Beton

0.8640

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.0417

0.00

Lnjr

Besi Beton Polos Ø 6

35.5014

0.00

Lnjr

Kawat Beton

0.6000

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.3333

0.00

Lnjr

Besi Beton Polos Ø 6

2.1.34. Balok 25 x 30

0.0000

M3

36.7327

0.00

Kawat Beton

0.9600

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

1.1111

0.00

Lnjr Lnjr

Besi Beton Polos Ø 6

2.1.35. Balok 25 x 35

2.1.36. Balok 25 x 40

2.1.37. Balok 25 x 45

2.1.38. Balok 25 x 50

0.0000

0.0000

0.0000

0.0000

M3

M3

M3

M3

Lnjr

34.2595

0.00

Kawat Beton

0.8040

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.9524

0.00

Lnjr

Besi Beton Polos Ø 6

Lnjr

32.6838

0.00

Kawat Beton

0.6960

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.8333

0.00

Lnjr

Besi Beton Polos Ø 6

Lnjr

30.7845

0.00

Kawat Beton

0.6000

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.7407

0.00

Lnjr

Besi Beton Polos Ø 6

Lnjr

30.0541

0.00

Kawat Beton

0.5400

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.6667

0.00

Lnjr

Besi Beton Polos Ø 6

Lnjr

28.8018

0.00

Kawat Beton

0.4800

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

2.1.39. Balok 30 x 30

2.1.39. Balok 30 x 35

2.1.40. Balok 30 x 40

2.1.41. Balok 35 x 45

2.1.42. Balok 35 x 50

0.0000

6.6045

0.0000

0.0000

0.0000

M3

M3

M3

M3

M3

Pasir Beton

0.4000

0.00

Kerikil Beton

0.2000

0.00

M3 M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.9259

0.00

Lnjr

Besi Beton Polos Ø 6

31.5568

0.00

Lnjr

Kawat Beton

0.6720

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 12

5.5556

36.69

Lnjr

Besi Beton Polos Ø 6

8.3982

55.47

Lnjr

Kawat Beton

0.5760

3.80

Kg

Semen Portland 50 kg

4.6400

30.64

Zak

Pasir Beton

0.4000

2.64

M3

Kerikil Beton

0.2000

1.32

M3

Playwood 9mm

0.3500

2.31

Lbr

Balok Meranti 5/7 Kelas II

3.2857

21.70

Btg

Paku

0.4000

2.64

kg

Minyak Bekisting

0.2000

1.32

Lt

Besi Beton Polos Ø 10

0.6944

0.00

Lnjr

Besi Beton Polos Ø 6

28.0505

0.00

Lnjr

Kawat Beton

0.5040

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.5291

0.00

Lnjr

Besi Beton Polos Ø 6

24.7111

0.00

Lnjr

Kawat Beton

0.3840

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.4762

0.00

Lnjr

Besi Beton Polos Ø 6

23.9076

0.00

Lnjr

Kawat Beton

0.3480

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

2.1.43. Balok 40 x 40

2.1.44. Balok 40 x 45

2.1.45. Balok 40 x 50

2.1.9. Plat Beton

2.1.10. Ring Balok

0.0000

0.0000

0.0000

7.3600

3.7400

M3

M3

M3

M3

M3

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.5208

0.00

Lnjr

Besi Beton Polos Ø 6

Lnjr

24.7111

0.00

Kawat Beton

0.3840

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.4630

0.00

Lnjr

Besi Beton Polos Ø 6

Lnjr

23.0832

0.00

Kawat Beton

0.3360

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.4167

0.00

Lnjr

Besi Beton Polos Ø 6

Lnjr

21.9144

0.00

Kawat Beton

0.3000

0.00

Kg

Semen Portland 50 kg

4.6400

0.00

Zak

Pasir Beton

0.4000

0.00

M3

Kerikil Beton

0.2000

0.00

M3

Playwood 9mm

0.3500

0.00

Lbr

Balok Meranti 5/7 Kelas II

3.2857

0.00

Btg

Paku

0.4000

0.00

kg

Minyak Bekisting

0.2000

0.00

Lt

Besi Beton Polos Ø 10

0.9167

6.75

Lnjr

Kawat Beton

3.0000

22.08

Kg

Semen Portland 50 kg

4.6400

34.15

Zak

Pasir Beton

0.4000

2.94

M3

Kerikil Beton

0.2000

1.47

M3

Playwood 9mm

0.3500

2.58

Lbr

Kayu Meranti 4/6 Kelas II

1.5625

11.50

Btg

Balok Meranti 5/7 Kelas II

6.0000

44.16

Btg

Paku

0.4000

2.94

Kg

Minyak Bekisting

0.2000

1.47

Lt

Besi Beton Polos Ø 10

14.8148

55.41

Lnjr

Besi Beton Polos Ø 6

8.9200

33.36

Lnjr

Kawat Beton

2.6760

10.01

Kg

Semen Portland 50 kg

4.6400

17.35

Zak

Pasir Beton

0.4000

1.50

M3

Kerikil Beton

0.2000

0.75

M3

Playwood 9mm

0.3500

1.31

Lbr

Balok Meranti 5/7 Kelas II

3.2857

12.29

Btg

Paku

0.4000

1.50

kg

Minyak Bekisting

0.2000

0.75

Lt

2.1.11. Tangga

1.8534

M3

Besi Beton Polos Ø 10

40.3038

74.70

Kawat Beton

2.3595

4.37

Lnjr Kg

Semen

4.6400

8.60

Zak

Pasir Beton

0.4000

0.74

M3

Kerikil beton

0.2000

0.37

M3

Playwood 9mm

0.3500

0.65

Btg

Kayu Meranti 3/20 (Kls II)

0.6250

1.16

Btg

Balok Meranti 5/7 Kelas II

7.5000

13.90

Btg

Paku

0.4000

0.74

Kg

Minyak Bekisting

0.1500

0.28

Lt

Tonasa Semen Portland 50 kg

4.6400

4.14

Zak

Pasir Beton

0.5200

0.46

Org

Kerikil Beton

0.7800

0.70

Org

70.0000 28949.82

Buah

2.3. Beton Tak Bertulang 2.2.1. Beton Cor 1 : 2 : 3

0.8920

M3

III. PEKERJAAN DINDING 3.1. Dinding 2.2.1. Pasangan Dinding Batubata (1:4)

2.2.2. Pasangan Dinding Batubata (1:2)

413.5688

51.1000

M3

M3

Batu Bata 5/11/22 Tonasa Semen Portland 50 kg

0.2300

95.12

Zak

Pasir Pasang

0.0430

17.78

M3

Batu Bata

70.0000

3577.00

Buah

Tonasa Semen Portland 50 kg

0.3790

19.37

Zak

Pasir Pasang

0.0380

1.94

M3

3.2. Kusen 2.3.1. Kusen Pintu dan Jendela

1.2541

M3

Kayu Bengkirai 8/12

28.6458

35.92

Lnjr

0.2939

M3

Balok Bengkirai 8/12

0.1250

0.04

Lnjr

Paku Biasa 2"-5"

0.8000

0.24

Kg

28.6458

39.04

Lnjr

0.8000

1.09

Kg

15.0000

20.44

Kg

Balok Bengkirai 2/3

1.0000

138.06

Btg

Balok Bengkirai 5/7

1.0000

138.06

Btg

Paku Biasa 2"-5"

0.1500

20.71

Kg

Bengkirai Papan 3/25

0.2400

12.94

Ljr

Paku Biasa 2"-5"

0.0500

2.70

Kg

Kayu Bengkirai Balok 8/12

0.0422

0.24

Lnjr

Paku

0.8000

4.50

kg

Seng Plat 3 x 6 BJLS 28

0.5000

8.50

Lbr

Paku 1/2'-1"

0.0150

0.26

Kg

Kayu Bengkiai 3/20

7.9167

134.58

Btg

Meni Besi

0.3000

5.10

Kg

Atap Sakura Roof 2 Susun

0.6000

94.84

M2

Paku Biasa

0.0500

7.90

Kg

IV. PEKERJAAN KAP DAN ATAP 4.1. Kap dan Rangka Atap 4.1.1.. Balok Dinding 8/12

4.1.2. Pekerjaan Kuda-Kuda

1.3629

M3

Balok Bengkirai 8/12 Paku Biasa 2"-5" Besi Strip

4.1.3. Pekerjaan Rangka Atap

4.1.4. Pekerjaan Listplank 3/25

4.1.5. Gording 8/12

4.1.6. Talang

138.0646

53.9000

5.6300

17.0000

M3

M3

M3

M'

4.2. Atap 4.2.1. Pemasangan Atap

158.0646

M2

4.2.2. Pemasangan Perabung

34.1700

M3

Nok Sakura Roof

3.0000

102.51

Lbr

Semen

0.1600

5.47

Zak

Pasir Cor

0.5200

17.77

M3

Balok Bengkirai 5/7

0.8571

177.44

Btg

Paku Biasa 2"-5"

0.1000

20.70

Kg

Gypsum

0.4167

69.02

Lbr

Paku Biasa

0.0100

1.66

Kg

Paku Sekrup

0.0500

8.28

Kg

Kayu Profil

1.0500

188.95

M3

Paku

0.0040

0.72

Kg

Semen Portland 50 kg

0.1704

22.92

Zak

Pasir Pasang

0.0170

2.29

M3

Semen Portland 50 kg

0.1040

81.14

Zak

Pasir Pasang

0.0200

15.60

M3

0.0020

1.83

Zak

V. PEKERJAAN PLAFOND 5.1. Balok Plafond 5.1.1. Rangka Plafon

207.0075

M2

5.2. Memasang Plafond 5.2.1. Memasang Plafond Gypsum

5.2.2. Memasang Lis Plafond

165.6500

M2

179.9500

VI. PEKERJAAN PLASTERAN 6.1. Plasteran 6.1.1. Plasteran Dinding (1:2)

6.1.2. Plasteran Dinding (1:4)

6.1.3. Aian

134.5000

780.2350

M2

M2

914.7350

M2

Semen Portland 50 kg

47.2160

M2

Porselin 20 x 20 cm,

6.2. Turap Porslen 6.2.1. Pasangan Turap Porslent

25.0000

1180.40

Bh

Semen

0.1860

8.78

Zak

Pasir Pasang

0.0180

0.85

M3

Semen Warna

0.0300

1.42

Zak

M3

VII. PEKERJAAN LANTAI 7.1. Urugan Bawah Lantai 7.1.1. Urugan Pasir

11.2648

M3

Pasir Urug

1.2000

13.52

182.3750

M2

Kia Keramik 40x40

6.0000

1094.25

Bh

Semen Portland 50 kg

0.2276

41.51

Zak

Pasir Pasang

0.0420

7.66

M3

Semen Warna

0.0300

5.47

Zak

Keramik Kasar 20x20

25.0000

615.81

Bh

Semen Portland 50 kg

0.2276

5.61

Zak

Pasir Pasang

0.0420

1.03

M3

Semen Warna

0.3300

8.13

Zak

Pintu Panel Bengkirai

1.0000

17.00

Bh

0.00

Bh

7.2. Pasangan Lantai 7.2.1. Pasangan Lantai Kramik 40 x 40

7.2.2. Pasangan Lantai Kramik 20 x 20

24.6325

M2

VIII. PEK. PINTU DAN JENDELA 8.1. Pintu dan Jendela 8.1.1. Pasangan Pintu

17.0000

8.1.1. Pasangan Jendela

Bh Bh

8.2. Kaca 8.2.1. Pasangan Kaca Tebal 15 mm

71.5420

M2

Kaca Bening t = 5 MM

1.1000

78.70

M2

68.0000

Bh

Falco Engsel Pintu

1.0000

68.00

Bh

8.3. Penggantung/Kunci 8.3.1. Pasangan Engsel Pintu

8.3.3. Pasangan Kunci Taman Antik

12.0000

Bh

Belucci Kunci

1.0000

12.00

Bh

90.9809

M2

Impra Dempul

0.0800

7.28

Kg

Pujatex Cat Minyak

0.0200

1.82

Kg

0.1

9.09809

Kg

IX. PEKERJAAN PENGECATAN 9.1. Mendempul dan Mrnggosok Kayu

Batu Apung 9.2. Mengecat Kayu Baru

9.3. Mengecat Tembok Baru

610.5400

464.7500

M2

M2

Cat Meni

0.2000

122.11

Kg

Plamir

0.15

91.581

Kg

Cat Dasar

0.17 103.7918

Kg

Cat Penutup 2 Kali

0.26 158.7404

Kg

Paragon Plamir

0.1000

46.48

Kg

Altex Cat Dasar

0.1000

46.48

Kg

Cat Penutup 2x

0.2600

120.84

Kg

X. PEK. PERLENGKAPAN DALAM 10.1 Listrik 10.1.1 Pemasangan Listrik Baru

1.0000

Ls

Philips LaMpu TL Lengkap

5.0000

5.00

Bh

LaMpu Pijar 20 W

38.0000

38.00

Bh

Pitting

26.0000

26.00

Bh

Saklar

26.0000

26.00

Bh

Stop Kontak

12.0000

12.00

Bh

MCB 6 A

2.0000

2.00

Bh

Kotak MCBN

1.0000

1.00

Bh

Stop Kontak

11.0000

11.00

Bh

T-Dos (Kontak Hubung Bagi)

26.0000

26.00

Bh

348.0000

348.00

M'

69.6000

69.60

M'

KWH (Pasang Baru)

1.0000

1.00

Ls

Alat Kecil

1.0000

1.00

Ls

Toto KloSet Jongkok

1.0000

2.00

Bh

Semen Portland 50 kg

6.0000

12.00

Kg

0.01

0.02

M3

Kloset Duduk

1.0000

2.00

Bh

Perlengkapan

0.0600

0.12

Hk

Kabel 3 x 2,5 MM2 Pipa PVC (Pipa Listrik)

10.2. Sanitair dan Instalasi Air 10.2.1. Pemasangna Kloset Jongkok

2.0000

Bh

Pasir Pasang 10.2.2. Pemasangan Kloset Duduk

2.0000

Bh

10.2.3. Pemasangan Floor Draine

4.0000

Bh

Floor Drain

1.0000

4.00

Bh

10.2.4. Pemasangan Bak Cuci Piring

1.0000

Bh

Bak Cuci Stainlees Steel

1.0000

1.00

Bh

Water Draiin + asesorises

1.0000

1.00

Set

Wastafel

1.0000

2.00

Bh

Perlengkapan

0.1200

0.24

Hk

Semen Warana

0.1200

0.24

Zak

Pasir Pasang

0.0100

0.02

M3

Pipa PVC Ø 3" tipe D

1.2000

36.00

M

Perlengkapan

0.3500

10.50

Hb

Pipa PVC Ø 3/4" tipe AW

1.2000

50.40

M

Perlengkapan

0.3500

14.70

Hb

Pipa PVC Ø 1/2" tipe AW

1.2000

55.84

M

10.2.5. Pemasangan Wastafel

10.2.6. Pem. Pipa Air Ø 3" Per M'

10.2.7. Pem. Pipa Air Ø 3/4" AW Per M'

10.2.8. Pem. Pipa Air Ø 1/2" AW Per M'

2.0000

30.0000

42.0000

46.5300

Bh

M'

M'

M'

Perlengkapan 10.2.9. Pem. Kran Air Ø 3/4" atau 1/2"

8.0000

Bh

0.35

16.2855

Hb

Kran air Ø 3/4" atau 1/2"

1.0000

8.00

Bh

Seal tape

0.0250

0.20

Rol

Semen Portland 50 kg

4.3600

92.48

Zak

Pasir cor

0.5200

11.03

M3

Kerikil Beton

0.8700

18.45

M3

126.0000

126.00

Bh

Tonasa Semen Portland 50 kg

2.2800

2.28

Zak

Pasir Pasang

0.1840

0.18

M3

Kerikil Beton

0.0330

0.03

M3

Besi Beton

4.8500

4.85

Kg

Pasir Cor

0.1200

0.12

M3 M3

XI. PEK. PERLENGKAPAN LUAR 11.1 Rabat Beton (1:3:5)

11.2 Bak Kontrol

11.3 Septictank

11.4 Resapan

21.2100

1.0000

1.0000

1.0000

M2

Bh

Bh

Bh

Batu Bata

Pasir urug

1.2000

1.20

Batu Bata

70.0000

70.00

Bh

Tonasa Semen portland 50kg

4.9094

4.91

Zak

Pasir Pasang

0.5750

0.58

M3

Kerikil Beton

0.8700

0.87

M3

Ulin Kayu 5/10

1.5000

1.50

Btg

Meranti Papan 3/20

1.0000

1.00

Btg

Batu Kali

1.2000

1.20

M3

Pasir Urug

0.3000

0.30

M3

Semen Portland 50 kg

5.1914

5.19

Zak

Pasir Pasang

0.2550

0.26

M3

70.0000

70.00

Bh

Besi Beton Polos Ø 10

0.9167

0.92

Lnjr

Kawat Beton

3.0000

3.00

Kg

Kerikil Beton

0.2000

0.20

M3

Kayu Meranti 4/6 Kelas II

1.5625

1.56

Btg

Paku

0.4000

0.40

Kg

Minyak Bekisting

0.2000

0.20

Lt

Batu Bata 5/11/22

166.4933

137.7697

82.1917

304.2631 82.1917

145.4084

88.8267

234.2351

38.3993

40.2655

78.6649

166.4962

92.0496

258.5457

9.2109

28.9800

38.1910

4.2586

3.7409

0.2780

8.2776

10.3966

18.6948

17.7684

46.8598

7.0021

6.1966

0.6487

13.8474

10.6586 335.7221 470.8301

817.21

WAKTU PELAKSANAAN NO

JENIS PEKERJAAN

BOBOT (%)

I

PEK. PONDASI

14.28

II

PEK. BETON

25.41

III

PEK. DINDING

6.97

IV

PEK. KAP DAN ATAP

8.81

V

PEK. PLAFOND

5.36

VI

PEK. PLASTERAN DAN ACIAN

8.09

VII

PEK. LANTAI

7.33

VIII PEK. PINTU DAN JENDELA

1

2

3

4

5

4.29

2.86

2.86

2.86

1.43 4.32

6

7

8

9

10

4.32

4.32

4.07

4.07

4.32

0.49

0.84

1.04

1.04

0.89

11

12

1.18

1.18

1.18

0.79

1.23

1.76

0.81

0.89

1.13

13

14

15

16

17

18

19

20

1.59

1.76

1.67 0.91

0.96

1.02

1.02

0.80

0.64

1.11 2.10

1.13

1.13

1.05

1.05

0.73

1.03

1.47

1.61

1.47

1.03

1.27

1.11

0.95

7.94

IX

PEK. PENGECATAN

5.26

X

PEK. INSTALASI & SANITASI

6.18

XI

PEK. PERLENGKAPAN LUAR

4.38

Total (%)

MINGGU KE

1.84

21

22

23

0.95

0.95

0.95

0.64

1.05

0.26

1.67

2.29

24

25

2.23 1.10

1.23

1.18

0.88

100.00

Rencana fisik per minggu

4.29

2.86

2.86

2.86

5.75

4.81

5.16

6.95

6.00

7.11

4.98

4.08

3.45

3.92

5.10

4.90

3.59

3.00

4.02

2.65

3.50

4.27

1.86

1.18

0.88

Rencana fisik komulatif

4.29

7.14

10.00

12.86

18.60

23.41

28.57

35.52

41.52

48.62

53.60

57.68

61.13

65.05

70.15

75.05

78.64

81.64

85.66

88.30

91.81

96.08

97.94

99.12

100.00

Gambar 4.7 Hasil Out Put Time Schedule dan Kurva "S" Dengan Menggunakan Microsoft Excel

KEMBALI

PERHITUNGAN JUMLAH BERAT TULANGAN PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI No.

Tipe konstruksi

A. Tulangan Pokok 1 Balok sloof 15 x 20 2 Kolom 15 x 15 3 Kolom 15 x 20 4 Kolom 15 x 25 5 Kolom 15 x 30 6 Kolom 20 x 20 7 Kolom 20 x 25 8 Kolom 20 x 30 9 Kolom 20 x 35 10 Kolom 20 x 40 11 Kolom 25 x 25 12 Kolom 25 x 30 13 Kolom 25 x 35 14 Kolom 25 x 40 15 Kolom 25 x 45 16 Kolom 25 x 50 17 Kolom 30 x 30 18 Kolom 30 x 35 19 Kolom 30 x 40 20 Kolom 35 x 45 21 Kolom 35 x 50 22 Kolom 40 x 40 23 Kolom 40 x 45 24 Kolom 40 x 50 25 Balok 15 x 20 26 Balok 15 x 25 27 Balok 15 x 30 28 Balok 20 x 20 29 Balok 20 x 25 30 Balok 20 x 30 31 Balok 20 x 35 32 Balok 20 x 40 33 Balok 25 x 25 34 Balok 25 x 30

Kbthn. Tul (mm)

Pnjng Ekivalen=1m3 lbr tg panj 0.15 0.15 0.15 0.15 0.15 0.20 0.20 0.20 0.20 0.20 0.25 0.25 0.25 0.25 0.25 0.25 0.30 0.30 0.30 0.35 0.35 0.40 0.40 0.40 0.15 0.15 0.15 0.20 0.20 0.20 0.20 0.20 0.25 0.25

0.20 0.15 0.20 0.25 0.30 0.20 0.25 0.30 0.35 0.40 0.25 0.30 0.35 0.40 0.45 0.50 0.30 0.35 0.40 0.45 0.50 0.40 0.45 0.50 0.20 0.25 0.30 0.20 0.25 0.30 0.35 0.40 0.25 0.30

33.33 44.44 33.33 26.67 22.22 25.00 20.00 16.67 14.29 12.50 16.00 13.33 11.43 10.00 8.89 8.00 11.11 9.52 8.33 6.35 5.71 6.25 5.56 5.00 33.33 26.67 22.22 25.00 20.00 16.67 14.29 12.50 16.00 13.33

4 4 4 4 6 4 1 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4 1 1 1 1 1 1 1 1 1

Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø

10.0 10.0 10.0 10.0 10.0 10.0 6.0 12.0 6.0 6.0 6.0 12.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 10.0 10.0 10.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0

Brt Tul (Kg/m') 0.617 0.617 0.617 0.617 0.617 0.617 0.222 0.888 0.222 0.222 0.222 0.888 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.617 0.617 0.617 0.222 0.222 0.222 0.222 0.222 0.222 0.222

Berat per 1m' (kg) 2.468 2.468 2.468 2.468 3.702 2.468 0.222 5.328 0.222 0.222 0.222 0.888 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 0.222 2.468 0.617 0.617 0.222 0.222 0.222 0.222 0.222 0.222 0.222

Kbthn per m3 (kg) 82.27 109.69 82.27 65.81 82.27 61.70 4.44 88.80 3.17 2.78 3.55 11.84 2.54 2.22 1.97 1.78 2.47 2.11 1.85 1.41 1.27 1.39 1.23 1.11 82.27 16.45 13.71 5.55 4.44 3.70 3.17 2.78 3.55 2.96

Pnjng Per M3 11.11 14.81 11.11 8.89 11.11 8.33 1.67 8.33 1.19 1.04 1.33 1.11 0.95 0.83 0.74 0.67 0.93 0.79 0.69 0.53 0.48 0.52 0.46 0.42 11.11 2.22 1.85 2.08 1.67 1.39 1.19 1.04 1.33 1.11

Luasan bkstng (m2) 13.3333 20.0000 16.6667 14.6667 13.3333 15.0000 13.0000 11.6667 10.7143 10.0000 12.0000 10.6667 9.7143 9.0000 8.4444 8.0000 10.0000 9.0476 8.3333 7.3016 6.8571 7.5000 6.9444 6.5000 16.6667 14.6667 13.3333 15.0000 13.0000 11.6667 10.7143 10.0000 12.0000 10.6667

Jumlah Begel 166.67 222.22 166.67 133.33 111.11 125.00 100.00 83.33 71.43 62.50 80.00 66.67 57.14 50.00 44.44 40.00 55.56 47.62 41.67 31.75 28.57 31.25 27.78 25.00 166.67 133.33 111.11 125.00 100.00 83.33 71.43 62.50 80.00 66.67

167 223 167 134 112 125 100 84 72 63 80 67 58 50 45 40 56 48 42 32 29 32 28 25 167 134 112 125 100 84 72 63 80 67

35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

Balok 25 x 35 Balok 25 x 40 Balok 25 x 45 Balok 25 x 50 Balok 30 x 30 Balok 30 x 35 Balok 30 x 40 Balok 35 x 45 Balok 35 x 50 Balok 40 x 40 Balok 40 x 45 Balok 40 x 50 Balok ring 15x15 Pondasi Plat Plat tebal 12 cm Tangga Beton Balok gantung 15cmx25cm Balok gantung 15cmx30cm Plat deck 50 cm Plat deck 110 cm Talang cor

0.25 0.25 0.25 0.25 0.30 0.30 0.30 0.35 0.35 0.40 0.40 0.40 0.15 0.25 1.00 0.12 0.15 0.15 0.50 1.10 0.50

0.35 0.40 0.45 0.50 0.30 0.35 0.40 0.45 0.50 0.40 0.45 0.50 0.15 0.09 1.00 0.18 0.25 0.30 0.10 0.10 0.10

11.43 10.00 8.89 8.00 11.11 9.52 8.33 6.35 5.71 6.25 5.56 5.00 44.44 2.94 1.10 25.46 26.67 22.22 20.00 9.09 20.00

1 1 1 1 1 7 1 1 1 1 1 1 4 47 10 19 1 1 1 1 1

Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø

6.0 6.0 6.0 6.0 6.0 12.0 6.0 6.0 6.0 6.0 6.0 6.0 8.0 12.0 10.0 10.0 10.0 10.0 8.0 10.0 8.0

0.222 0.222 0.222 0.222 0.222 0.888 0.222 0.222 0.222 0.222 0.222 0.222 0.395 0.888 0.617 0.617 0.617 0.617 0.395 0.617 0.395

0.222 0.222 0.222 0.222 0.222 6.216 0.222 0.222 0.222 0.222 0.222 0.222 1.58 41.736 6.17 11.723 0.617 0.617 0.209 0.697 0.209

2.54 2.22 1.97 1.78 2.47 59.20 1.85 1.41 1.27 1.39 1.23 1.11 70.22 122.75 6.79 298.41 16.45 13.71 4.19 6.34 4.19

0.95 0.83 0.74 0.67 0.93 5.56 0.69 0.53 0.48 0.52 0.46 0.42 14.81 11.52 0.92 40.30 2.22 1.85 0.88 0.86 0.88

9.7143 9.0000 8.4444 8.0000 10.0000 9.0476 8.3333 7.3016 6.8571 7.5000 6.9444 6.5000 13.3333 0.5294 2.2000 9.1638 17.3333 16.6667 14.0000 10.9091 14.0000

57.14 50.00 44.44 40.00 55.56 47.62 41.67 31.75 28.57 31.25 27.78 25.00 222.22

58 50 45 40 56 48 42 32 29 32 28 25 223

133.33 111.11

134 112

100.00

100

PERHITUNGAN JUMLAH BERAT SENGKANG PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI No.

Tipe konstruksi

B. Beugel/sengkang dan tul. bagi 1 Balok sloof 15 x 20 2 Kolom 15x15 3 Kolom 15x20 4 Kolom 15x25 5 Kolom 15x30 6 Kolom 20 x 20 7 Kolom 20 x 25 8 Kolom 20 x 30 9 Kolom 20 x 35 10 Kolom 20 x 40 11 Kolom 25 x 25 12 Kolom 25 x 30 13 Kolom 25 x 35 14 Kolom 25 x 40 15 Kolom 25 x 45 16 Kolom 25 x 50 17 Kolom 30 x 30 18 Kolom 30 x 35 19 Kolom 30 x 40 20 Kolom 35 x 45 21 Kolom 35 x 50 22 Kolom 40 x 40 23 Kolom 40 x 45 24 Kolom 40 x 50 25 Balok 15 x 20 26 Balok 15 x 25 27 Balok 15 x 30 28 Balok 20 x 20 29 Balok 20 x 25 30 Balok 20 x 30 31 Balok 20 x 35 32 Balok 20 x 40 33 Balok 25 x 25

Pnjng Ekivalen=1m3 lbr tg panj 0.10 0.10 0.10 0.10 0.10 0.15 0.15 0.15 0.15 0.15 0.20 0.20 0.20 0.20 0.20 0.20 0.25 0.25 0.25 0.30 0.30 0.35 0.35 0.35 0.10 0.10 0.10 0.15 0.15 0.15 0.15 0.15 0.20

0.15 0.10 0.15 0.20 0.25 0.15 0.20 0.25 0.30 0.35 0.20 0.25 0.30 0.35 0.40 0.45 0.25 0.30 0.35 0.40 0.45 0.30 0.40 0.45 0.15 0.20 0.25 0.15 0.20 0.25 0.30 0.35 0.20

0.58 0.48 0.58 0.68 0.78 0.68 0.78 0.88 0.98 1.08 0.88 0.98 1.08 1.18 1.28 1.38 1.08 1.18 1.28 1.48 1.58 1.38 1.58 1.68 0.58 0.68 0.78 0.68 0.78 0.88 0.98 1.08 0.88

Kbthn. Tul (mm) 167 223 167 134 112 125 100 84 72 63 80 67 58 50 45 40 56 48 42 32 29 32 28 25 167 134 112 125 100 84 72 63 80

Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø

6.0 6.0 6.0 6.0 15.0 15.0 15.0 6.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 6.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0 15.0

Brt Tul (Kg/m')

Berat per 1m' (kg)

0.222 0.222 0.222 0.222 1.39 1.39 1.39 0.222 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39 0.222 1.39 1.39 1.39 1.39 1.39 1.39 1.39 1.39

37.07 49.51 37.07 29.75 155.68 173.75 139.00 18.65 100.08 87.57 111.20 93.13 80.62 69.50 62.55 55.60 77.84 66.72 58.38 44.48 40.31 44.48 38.92 34.75 37.07 186.26 155.68 173.75 139.00 116.76 100.08 87.57 111.20

Kbthn per m3 (kg) 21.50 23.76 21.50 20.23 121.43 118.15 108.42 16.41 98.08 94.58 97.86 91.27 87.07 82.01 80.06 76.73 84.07 78.73 74.73 65.83 63.69 61.38 61.49 58.38 21.50 126.66 121.43 118.15 108.42 102.75 98.08 94.58 97.86

Pnjng Per M3 8.07 8.92 8.07 7.59 45.58 44.35 40.70 6.16 36.82 35.50 36.73 34.26 32.68 30.78 30.05 28.80 31.56 29.55 28.05 24.71 23.91 23.04 23.08 21.91 8.07 47.54 45.58 44.35 40.70 38.57 36.82 35.50 36.73

Kebutuhan Kawat Beton 2.0040 2.6760 2.0040 1.6080 1.3440 1.5000 1.2000 1.0080 0.8640 0.7560 0.9600 0.8040 0.6960 0.6000 0.5400 0.4800 0.6720 0.5760 0.5040 0.3840 0.3480 0.3840 0.3360 0.3000 2.0040 1.6080 1.3440 1.5000 1.2000 1.0080 0.8640 0.7560 0.9600

Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg

34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Balok 25 x 30 Balok 25 x 35 Balok 25 x 40 Balok 25 x 45 Balok 25 x 50 Balok 30 x 30 Balok 30 x 35 Balok 30 x 40 Balok 35 x 45 Balok 35 x 50 Balok 40 x 40 Balok 40 x 45 Balok 40 x 50 Balok ring 15x15 Pondasi Plat

0.20 0.20 0.20 0.20 0.20 0.25 0.25 0.25 0.30 0.30 0.35 0.35 0.35 0.10

0.25 0.30 0.35 0.40 0.45 0.25 0.30 0.35 0.40 0.45 0.35 0.40 0.45 0.10

0.98 1.08 1.18 1.28 1.38 1.08 1.18 1.28 1.48 1.58 1.48 1.58 1.68 0.48

67 58 50 45 40 56 48 42 32 29 32 28 25 223

Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø Ø

15.0 15.0 15.0 15.0 15.0 15.0 8.0 15.0 15.0 15.0 15.0 15.0 15.0 6.0

1.39 1.39 1.39 1.39 1.39 1.39 0.395 1.39 1.39 1.39 1.39 1.39 1.39 0.222

93.13 80.62 69.50 62.55 55.60 77.84 18.96 58.38 44.48 40.31 44.48 38.92 34.75 49.51

91.27 87.07 82.01 80.06 76.73 84.07 22.37 74.73 65.83 63.69 65.83 61.49 58.38 23.76

34.26 32.68 30.78 30.05 28.80 31.56 8.40 28.05 24.71 23.91 24.71 23.08 21.91 8.92

0.8040 0.6960 0.6000 0.5400 0.4800 0.6720 0.5760 0.5040 0.3840 0.3480 0.3840 0.3360 0.3000 2.6760 0.7500

Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg

HASIL PERHITUNGAN LAMANYA WAKTU PELAKSANAAN PEKERJAAN

No

Koef Tenaga Kerja Per Satuan Pekerjaan (a)

Kemampuan Pekerja Menyelesaikan Pkrjn Dalam 1 Hari (b) 1/a

Vol Pek

P M

0.1000 0.0500

10.00 20.00

340.00 340.00

34.00 17.00

4.0 4.0

8.50 4.25

9 5

1 M' Pasangan Bouwlpank

P T KT M

0.1000 0.1000 0.0100 0.0050

10.00 10.00 100.00 200.00

56.00 56.00 56.00 56.00

5.60 5.60 0.56 0.28

2.0 2.0 2.0 2.0

2.80 2.80 0.28 0.14

3 3 1 1

1 M2 Gudang Semen dan Alat

P T KT M

2.0000 1.0000 0.2000 0.0500

0.50 1.00 5.00 20.00

20.00 20.00 20.00 20.00

40.00 20.00 4.00 1.00

7.0 7.0 7.0 7.0

5.71 2.86 0.57 0.14

6 3 1 1

P M

0.4000 0.0400

2.50 25.00

148.25 148.25

59.30 5.93

7.0 7.0

8.47 0.85

9 1

P M

0.1920 0.0190

5.21 52.63

37.06 37.06

7.12 0.70

2.0 2.0

3.56 0.35

4 1

Uraian Pekerjaan PEKERJAAN PERSIAPAN 1 M2 Pembersihan Lapangan

PEKERJAAN GALIAN 1 M3 Galian Tanah Biasa Sedalam 1 Meter

1 M3 Urugan Kembali Galian Tanah

(c)

Jmlh Hari Untuk Rencana Jumlah Org Yang Menyelesaikan Kes Vol Pek Hari Kerja Dibutuhkan (1 Org) (d) (e) (f) (g) c/b d/e

PEKERJAAN PONDASI BATU KALI 1 M3 Urugan Pasir Bawah Pondasi

P M

0.3000 0.0100

3.33 100.00

12.15 12.15

3.65 0.12

1.0 1.0

3.65 0.12

4 1

1 M3 Pasangan Pondasi Batu Kosong

P T KT M

0.7800 0.3900 0.0390 0.0390

1.28 2.56 25.64 25.64

24.67 24.67 24.67 24.67

19.24 9.62 0.96 0.96

3.0 3.0 3.0 3.0

6.41 3.21 0.32 0.32

7 4 1 1

1 M3 Pasangan Pondasi Batu Kali (1:3)

P T KT M

1.5000 0.6000 0.0600 0.0750

0.67 1.67 16.67 13.33

56.13 56.13 56.13 56.13

84.19 33.68 3.37 4.21

10.0 10.0 10.0 10.0

8.42 3.37 0.34 0.42

9 4 1 1

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

3.80 3.80 3.80 3.80

18.41 5.31 1.26 0.65

5.0 5.0 5.0 5.0

3.68 1.06 0.25 0.13

4 1 1 1

1M3 Sloof 15/20

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

2.57 2.57 2.57 2.57

12.49 3.60 0.85 0.44

3.0 3.0 3.0 3.0

4.16 1.20 0.28 0.15

5 2 1 1

1 M3 Kolom Praktis (15/15)

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

4.98 4.98 4.98 4.98

24.15 6.97 1.65 0.85

7.0 7.0 7.0 7.0

3.45 1.00 0.24 0.12

4 1 1 1

1 M3 Kolom 15/20

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

3.43 3.43 3.43 3.43

16.64 4.80 1.14 0.58

5.0 5.0 5.0 5.0

3.33 0.96 0.23 0.12

4 1 1 1

1 M3 Kolom 20/30

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

5.46 5.46 5.46 5.46

26.48 7.64 1.81 0.93

8.0 8.0 8.0 8.0

3.31 0.96 0.23 0.12

3 1 1 1

PEKERJAAN BETON 1M3 Pondasi Plat

1 M3 Balok 15/20

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

2.34 2.34 2.34 2.34

11.35 3.28 0.77 0.40

3.0 3.0 3.0 3.0

3.78 1.09 0.26 0.13

4 2 1 1

1 M3 Balok 30/35

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

6.60 6.60 6.60 6.60

32.03 9.25 2.19 1.12

8.0 8.0 8.0 8.0

4.00 1.16 0.27 0.14

4 1 1 1

1 M3 Plat Beton

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

7.36 7.36 7.36 7.36

35.70 10.30 2.44 1.25

10.0 10.0 10.0 10.0

3.57 1.03 0.24 0.13

4 2 1 1

1 M3 Ring Balok

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

3.74 3.74 3.74 3.74

18.14 5.24 1.24 0.64

4.0 4.0 4.0 4.0

4.53 1.31 0.31 0.16

5 2 1 1

1 M3 Tangga Beton Bertulang 200 kg

P T KT M

4.8500 1.4000 0.3310 0.1700

0.21 0.71 3.02 5.88

1.85 1.85 1.85 1.85

8.99 2.59 0.61 0.32

4.0 4.0 4.0 4.0

2.25 0.65 0.15 0.08

2 1 1 1

1 M2 Pasangan Dinding Batu Bata (1:4)

P T KT M

0.3200 0.1000 0.0100 0.0150

3.13 10.00 100.00 66.67

413.57 413.57 413.57 413.57

132.34 41.36 4.14 6.20

34.0 34.0 34.0 34.0

3.89 1.22 0.12 0.18

4 2 1 1

1 M2 Pasangan Dinding Batu Bata (1:2)

P T KT M

0.3200 0.1000 0.0100 0.0150

3.13 10.00 100.00 66.67

51.10 51.10 51.10 51.10

16.35 5.11 0.51 0.77

5.0 5.0 5.0 5.0

3.27 1.02 0.10 0.15

4 1 1 1

1 M3 Pasangan Kusen Pintu dan Jendela

P T KT M

6.0000 20.0000 2.0000 0.3000

0.17 0.05 0.50 3.33

1.25 1.25 1.25 1.25

7.52 25.08 2.51 0.38

7.0 7.0 7.0 7.0

1.07 3.58 0.36 0.05

2 4 1 1

PEKERJAAN KAP DAN ATAP

1 M3 Pekerjaan Balok Dinding

P T KT M P T KT M

0.1000 0.0330 0.0100 0.0050 5.5000 8.3000 2.2000 1.5000

10.00 30.30 100.00 200.00 0.18 0.12 0.45 0.67

0.29 0.29 0.29 0.29 1.36 1.36 1.36 1.36

0.03 0.01 0.00 0.00 7.50 11.31 3.00 2.04

2.0 2.0 2.0 2.0 4.0 4.0 4.0 4.0

0.01 0.00 0.00 0.00 1.87 2.83 0.75 0.51

1 1 1 1 2 3 1 1

1 M2 Pekerjaan rangka Atap

P T KT M

0.1000 0.1000 0.0100 0.0050

10.00 10.00 100.00 200.00

138.06 138.06 138.06 138.06

13.81 13.81 1.38 0.69

7.0 7.0 7.0 7.0

1.97 1.97 0.20 0.10

2 2 1 1

1M' Papan Lisplank

P T KT M

0.1000 0.2000 0.0200 0.0050

10.00 5.00 50.00 200.00

53.90 53.90 53.90 53.90

5.39 10.78 1.08 0.27

3.0 3.0 3.0 3.0

1.80 3.59 0.36 0.09

2 4 1 1

Pemasangan 1 M3 Gording, Nog

P T KT M

12.0000 4.0000 1.2000 0.2000

0.08 0.25 0.83 5.00

5.63 5.63 5.63 5.63

67.56 22.52 6.76 1.13

14.0 14.0 14.0 14.0

4.83 1.61 0.48 0.08

5 2 0 1

Pemasangan 1 M' Talang Miring BJLS 28

P T KT M

0.0400 0.4000 0.0250 0.0013

25.00 2.50 40.00 769.23

17.00 17.00 17.00 17.00

0.68 6.80 0.43 0.02

2.0 2.0 2.0 2.0

0.34 3.40 0.21 0.01

1 4 1 1

Pemasangan 1 M2 Atap Sakura Roof

P T KT M

0.2000 0.1000 0.0100 0.0010

5.00 10.00 100.00 1,000.00

158.06 158.06 158.06 158.06

31.61 15.81 1.58 0.16

4.0 4.0 4.0 4.0

7.90 3.95 0.40 0.04

2 4 1 1

Pemasangan 1 M2 Perabung

P T KT M

0.0457 0.0500 0.0050 0.0010

21.89 20.00 200.00 1,000.00

34.17 34.17 34.17 34.17

1.56 1.71 0.17 0.03

1.0 1.0 1.0 1.0

1.56 1.71 0.17 0.03

2 2 1 1

P

0.1500

6.67

207.01

31.05

12.0

2.59

3

1 M3 Pekerjaan Kuda-Kuda Kayu

PEKERJAAN PLAFON 1 M2 Rangka Plafon

T KT M

0.2500 0.0250 0.0075

4.00 40.00 133.33

207.01 207.01 207.01

51.75 5.18 1.55

12.0 12.0 12.0

4.31 0.43 0.13

4 1 1

1 M2 Plafond Gypsum

P T KT M

0.2000 0.6000 0.0600 0.0100

5.00 1.67 16.67 100.00

165.65 165.65 165.65 165.65

33.13 99.39 9.94 1.66

17.0 17.0 17.0 17.0

1.95 5.85 0.58 0.10

2 6 1 1

Memasang Lis Plafond

P T KT M

0.0210 0.0210 0.0020 0.0010

47.62 47.62 500.00 1,000.00

179.95 179.95 179.95 179.95

3.78 3.78 0.36 0.18

2.0 2.0 2.0 2.0

1.89 1.89 0.18 0.09

2 2 1 1

P T KT M

0.2000 0.1500 0.0150 0.0100

5.00 6.67 66.67 100.00

134.50 134.50 134.50 134.50

26.90 20.18 2.02 1.35

9.0 9.0 9.0 9.0

2.99 2.24 0.22 0.15

3 3 1 1

1 M2 Plasteran Dinding (1:4)

P T KT M

0.2000 0.1500 0.0150 0.0100

5.00 6.67 66.67 100.00

780.24 780.24 780.24 780.24

156.05 117.04 11.70 7.80

40.0 40.0 40.0 40.0

3.90 2.93 0.29 0.20

4 3 1 1

1 M2 Acian Semen

T KT M

0.0550 0.0387 0.0020

18.18 25.82 500.00

914.74 914.74 914.74

50.31 35.43 1.83

12.0 12.0 12.0

4.19 2.95 0.15

5 3 1

1 M2 Pasangan Dinding Porslin

P T KT M

0.6000 0.4550 0.0450 0.0300

1.67 2.20 22.22 33.33

47.2160 47.2160 47.2160 47.2160

28.33 21.48 2.12 1.42

6.0 6.0 6.0 6.0

4.72 3.58 0.35 0.24

5 4 1 1

P M

0.3000 0.0100

3.33 100.00

11.26 11.26

3.38 0.11

1.0 1.0

3.38 0.11

4 1

P T KT M

0.6200 0.3500 0.0350 0.0300

1.61 2.86 28.57 33.33

182.38 182.38 182.38 182.38

113.07 63.83 6.38 5.47

29.0 29.0 29.0 29.0

3.90 2.20 0.22 0.19

4 3 1 1

PEKERJAAN PLASTERAN 1 M2 Plasteran Dinding (1:2)

PEKERJAAN LANTAI 1 M3 Urugan Pasir

1 M2 Pasangan Lantai Kramik 33 x 33

1 M2 Pasangan Lantai Kramik 20 x 20

P T KT M

0.6200 0.3500 0.0350 0.0300

1.61 2.86 28.57 33.33

24.63 24.63 24.63 24.63

15.27 8.62 0.86 0.74

4.0 4.0 4.0 4.0

3.82 2.16 0.22 0.18

4 3 1 1

P T KT M

0.8000 2.0000 0.2000 0.0400

1.25 0.50 5.00 25.00

17.00 17.00 17.00 17.00

13.60 34.00 3.40 0.68

44.0 44.0 44.0 44.0

0.31 0.77 0.08 0.02

2 5 1 1

1 M2 Kaca Tebal 5 MM

P T KT M

0.0150 0.1500 0.0150 0.0002

66.67 6.67 66.67 6,666.67

71.54 71.54 71.54 71.54

1.07 10.73 1.07 0.01

1.0 1.0 1.0 1.0

1.07 10.73 1.07 0.01

1 11 1 1

1 Buah Pasangan Engsel Pintu

P T KT M

0.0100 0.6000 0.0600 0.0030

100.00 1.67 16.67 333.33

68.00 68.00 68.00 68.00

0.68 40.80 4.08 0.20

5.0 5.0 5.0 5.0

0.14 8.16 0.82 0.04

1 5 1 1

1 Buah Pasangan Kunci Tanam Antik

P T KT M

0.0600 0.6000 0.0600 0.0030

16.67 1.67 16.67 333.33

12.00 12.00 12.00 12.00

0.72 7.20 0.72 0.04

2.0 2.0 2.0 2.0

0.36 3.60 0.36 0.02

1 4 1 1

P T KT M

0.0400 0.0400 0.0040 0.0025

25.00 25.00 250.00 400.00

90.98 90.98 90.98 90.98

3.64 3.64 0.36 0.23

1.0 1.0 1.0 1.0

3.64 3.64 0.36 0.23

4 4 1 1

1 M2 Mengecat Kayu Baru

P T KT M

0.0700 0.0090 0.0060 0.0025

14.29 111.11 166.67 400.00

610.54 610.54 610.54 610.54

42.74 5.49 3.66 1.53

8.0 8.0 8.0 8.0

5.34 0.69 0.46 0.19

5 1 1 1

1 M2 Mengecat Tembok Baru

P T KT

0.0200 0.0630 0.0063

50.00 15.87 158.73

493.73 493.73 493.73

9.87 31.10 3.11

6.0 6.0 6.0

1.65 5.18 0.52

3 5 1

PEKERJAAN PINTU DAN JENDELA 1 M2 Pintu dan Jendela kaca

PEKERJAAN PENGECATAN 1 M2 Mendempul dan Menggosok Kayu

M

0.0025

400.00

493.73

1.23

PEKERJAAN PERLENGKAPAN DALAM Pekerjaan Pemasangan Listrik

6.0

0.21

1

12.0

Pemasangna 1 Buah Kloset Jongkok

P T KT M

1.0000 1.5000 1.5000 0.1600

1.00 0.67 0.67 6.25

2.00 2.00 2.00 2.00

2.00 3.00 3.00 0.32

1.0 1.0 1.0 1.0

2.00 3.00 3.00 0.32

2 3 3 1

Pemasangan 1 Buah KloSet Duduk

P T KT M

3.3000 1.1000 0.0010 0.1600

0.30 0.91 1,000.00 6.25

2.00 2.00 2.00 2.00

6.60 2.20 0.00 0.32

2.0 2.0 2.0 2.0

3.30 1.10 0.00 0.16

3 2 1 1

Floor Draine

P T KT M

0.0100 0.1000 0.0100 0.0050

100.00 10.00 100.00 200.00

4.00 4.00 4.00 4.00

0.04 0.40 0.04 0.02

0.5 0.5 0.5 0.5

0.08 0.80 0.08 0.04

1 1 1 1

1 Buah Bak Cuci Piring Stainless

P T KT M

0.0300 0.0300 0.0300 0.0015

33.33 33.33 33.33 666.67

1.00 1.00 1.00 1.00

0.03 0.03 0.03 0.00

0.5 0.5 0.5 0.5

0.06 0.06 0.06 0.00

1 1 1 1

Memasang 1 Wastafel

P T KT M

1.2000 1.4500 0.1500 0.1000

0.83 0.69 6.67 10.00

2.00 2.00 2.00 2.00

2.40 2.90 0.30 0.20

1.0 1.0 1.0 1.0

2.40 2.90 0.30 0.20

3 3 1 1

Memasang Pipa Air Ø 3" Per M'

P T KT M

0.0810 0.1350 0.0135 0.0040

12.35 7.41 74.07 250.00

30.00 30.00 30.00 30.00

2.43 4.05 0.41 0.12

1.0 1.0 1.0 1.0

2.43 4.05 0.41 0.12

3 5 1 1

Memasang Pipa Air Ø 3/4" AW Per M'

P T KT M

0.0300 0.0600 0.0060 0.0020

33.33 16.67 166.67 500.00

42.00 42.00 42.00 42.00

1.26 2.52 0.25 0.08

1.0 1.0 1.0 1.0

1.26 2.52 0.25 0.08

2 3 1 1

Memasang Pipa Air Ø 1/2" AW Per M'

P T KT M

0.0300 0.0600 0.0060 0.0020

33.33 16.67 166.67 500.00

46.53 46.53 46.53 46.53

1.40 2.79 0.28 0.09

1.0 1.0 1.0 1.0

1.40 2.79 0.28 0.09

2 3 1 1

Memasangan 1 Kran Air Ø 3/4" atau 1/2"

P T KT M

0.0100 0.1000 0.0100 0.0050

100.00 10.00 100.00 200.00

8.00 8.00 8.00 8.00

0.08 0.80 0.08 0.04

1.0 1.0 1.0 1.0

0.08 0.80 0.08 0.04

1 1 1 1

P T KT M

5.0000 0.8000 0.0800 0.2000

0.20 1.25 12.50 5.00

21.21 21.21 21.21 21.21

106.05 16.97 1.70 4.24

22.0 22.0 22.0 22.0

4.82 0.77 0.08 0.19

5 1 1 1

Analisis 1Buah Bak Kontrol

P T KT M

2.2600 0.7200 0.0720 0.1080

0.44 1.39 13.89 9.26

1.00 1.00 1.00 1.00

2.26 0.72 0.07 0.11

1.0 1.0 1.0 1.0

2.26 0.72 0.07 0.11

3 1 1 1

1 Buah Septictank 2 x 2 x 2 M

P T KT M

6.3460 1.0500 0.1050 0.2870

0.16 0.95 9.52 3.48

1.00 1.00 1.00 1.00

6.35 1.05 0.11 0.29

4.0 4.0 4.0 4.0

1.59 0.26 0.03 0.07

2 1 1 1

1 Unit Resapan

P TB TBs KT KTbs M

6.8850 0.6950 1.4000 0.1027 0.3310 0.3095

0.15 1.44 0.71 9.73 3.02 3.23

1.00 1.00 1.00 1.00 1.00 1.00

6.89 0.70 1.40 0.10 0.33 0.31

2.0 2.0 2.0 2.0 2.0 2.0

3.44 0.35 0.70 0.05 0.17 0.15

3 1 1 1 1 1

PEKERJAAN PERLENGKAPAN LUAR 1 M3 Rabat Beton (1:3:5)

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN Pembersihan Lapangan Pasangan Bouwlpank Gudang Semen dan Alat PEKERJAAN GALIAN Galian Tanah Urugan Kembali Galian Tanah PEK. PONDASI BATU KALI Urugan Pasir Bawah Pondasi Pasangan Pondasi Batu Kosong Pasangan Pondasi Batu Kali (1:3) PEK. BETON Pondasi Plat

Kolom Balok Plat Beton Ring Balok Tangga Beton Bertulang Plafond Gypsum Memasang Lis Plafond Pasangan Dinding Porslin

Jum Hari

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

Acian PEKERJAAN LANTAI Urugan Pasir Pasangan Lantai Kramik PEK. PINTU DAN JENDELA Pintu dan Jendela kaca Kaca Tebal 5 MM Pasangan Engsel Pintu Pasangan Kunci Tanam Antik PEKERJAAN PENGECATAN Mendempul dan Menggosok Kayu Mengecat Kayu Baru Mengecat Tembok Baru PEK. PERLWNGKAPAN DALAM Pekerjaan Pasangan Listrik Pekerjaan Sanitasi PEK. PERLENGKAPAN LUAR Rabat Beton (1:2:3) Bak Kontrol Septictank Resapan

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

WAKTU PELAKSANAAN (HARI) 77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104 105

106

107

108

109

110

111

112

113 114 115 116 117 118 119

120 121 122 123 124 125

126

127

128

129

130

131

132

133 134 135

136

137

138

139

140

141

142

143

144

145

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

177

178

179

180

181

182

183

184

185

186

187

188

189

190

Tabel 4.1 Daftar Harga Bahan dan Satuan Upah NO A 1 2 3 4 B 1 2 3 4 5 6 7 8 11 12 13 14 15 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54

URAIAN UPAH: Mandor Kepala Tukang Tukang Pekerja BAHAN/MATERIAL Air Kerja Alkali Resisting Cat Dasar Cat Kayu Cat Meni Naturtone Cat Tembok American Standart Kloset Duduk Amplas Atap Sakura Roof (2 Susun) AW Pipa PVC Ø 1" AW Pipa PVC Ø 1/2" AW Pipa PVC Ø 3/4" AW Pipa PVC Ø 3" Batu Bata Batu Batako 10/20/40 Batu Kali Baut Engsel/Teralis Baut Ø12-15 Baut Ø16-20 Belucci Kunci Besi Polos Ø 10 mm Besi Polos Ø 12 mm Besi Polos Ø 16 mm Besi Polos Ø 8 mm Besi Polos Ø 10 mm Besi Polos Ø 12 mm Besi Polos Ø 16 mm Besi Polos Ø 8 mm Besi Strip Diamond Kasar Keramik 20x20 Falco Engsel Jendela 3" Falco Engsel Pintu 5 " Gypsum Hak Angin Ikad Keramik 30x30 Impra Dempul Impresso Keramik 30x30 Indocement Semen Warna 50 kg Jendela Kaca/Jalusi Miring Kaca Bening t = 5 mm Kaca Hitam t = 5 mm Kawat Bendrad Kawat Beton Kawat Duri Kayau Meranti Papan 3/20 (Kls. 2) Kayau Meranti Papan 3/20 (Kls. 2) Kayu Meranti Balok 5/7 (Kls. 2) Kayu Meranti Balok 5/7 (Kls. 2) Kayu Bengkirai Balok (Kls. 1) Kayu Bengkirai Papan (Kls. 1) Kayu Bengkirai Balok 5/10 (Kls. 1)

SATUAN

HARGA UPAH/SATUAN (RUPIAH)

hari hari hari hari

65,000.00 55,000.00 45,000.00 35,000.00

ls kg kg kg kg kg bh lbr m2 m m m m bh bh m3 dos bh bh set kg kg kg kg lnjr lnjr lnjr lnjr kg bh bh bh lbr psg bh kg bh zak bh m2 m2 kg kg m' m3 btg m3 btg m3 m3 btg

4,500,000.00 60,000.00 18,300.00 18,300.00 18,300.00 14,640.00 1,904,000.00 3,000.00 51,968.00 22,400.00 11,200.00 15,680.00 63,500.00 225.00 4,000.00 150,000.00 7,500.00 1,680.00 2,240.00 112,000.00 4,384.42 3,705.54 3,635.18 5,221.45 32,462.24 46,720.38 105,752.20 26,464.36 5,384.42 2,440.00 20,160.00 33,600.00 61,600.00 11,200.00 6,100.00 20,000.00 4,990.91 91,500.00 250,000.00 95,200.00 106,400.00 10,750.00 11,200.00 1,400.00 784,000.00 18,700.00 784,000.00 10,900.00 1,456,000.00 1,568,000.00 29,500.00

KET

55 Kayu Bengkirai Balok 5/7 (Kls. 1)

btg

20,500.00

btg btg btg btg btg m3 m3 m3 m3 m3 bh bh bh bh m' btg bh m' lt set bh bh kg dos kg kg m3 m3 m3 ls ls b bh lbr lbr lbr kg bh bh btg m3 bh zak bh kg Bh Bh m Bh m m bh bh bh set bh bh bh

3,500.00 54,000.00 60,500.00 7,500.00 38,080.00 1,008,000.00 1,064,000.00 1,904,000.00 2,072,000.00 140,000.00 11,183.33 2,196.00 40,000.00 7,840.00 24,000.00 15,000.00 952,000.00 10,000.00 10,000.00 78,400.00 33,600.00 16,800.00 9,800.00 10,000.00 12,200.00 8,540.00 130,000.00 100,000.00 80,000.00 1,500,000.00 100,000.00 4,500.00 390,000.00 56,000.00 100,800.00 39,600.00 36,600.00 952,000.00 10,000.00 50,400.00 45,000.00 100,800.00 51,240.00 257,600.00 14,308.25 20,000.00 85,000.00 7,000.00 15,000.00 7,000.00 6,500.00 20,000.00 10,000.00 4,500.00 1,000.00 15,000.00 35,000.00 10,000.00

Sambungan Tabel 4.1 56 57 58 59 60 61 62 63 64 66 67 68 69 70 71 72 73 74 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 99 100 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118

Kayu Bengkirai Balok 2/3 (Kls. 1) Kayu Bengkirai Balok 8/12 (Kls. 1) Kayu Bengkirai Papan 3/20 (Kls. 1) Kayu Meranti 4/6 (Kls. I) Kayu Ulin Balok (Kls. 1) Kayu Meranti Balok (Kls. 1) Kayu Meranti Papan (Kls. 1) Kayu Ulin Balok (Kls. 1) Kayu Ulin Papan (Kls. 1) Kerikil Beton Kia Keramik 40x40 Kia Polos Keramik 20x20 Kran Air Kuas 4" Kusen Bengkirai Standar Lambersering meranti Lexus Westafel List Profil Minyak Bekisting Nicole Kunci Nok Surya Roof 100 mm Nok Surya Roof 33 mm Paku Biasa 2" - 5" Paku Sekrup Paku Ulin 1" - 5" Paragon Plamir Pasir Cor Pasir Pasang Pasir urug Pemasangan Listrik Perlatan Kecil T-Dos (Kontak Hubung Bagi) Pintu Panel Bengkirai 80-100 x 200 Playwood t = 6 mm Playwood t = 9 mm Playwood t =3 mm Pujatex Cat Minyak Reservoir/Tangki Air 1200 L Rol Cat Talang Air PVC Tanah Urug Toto Kloset Jongkok Tonasa Semen Portland 50 kg Bak Cuci Stainless Tulangan Floor Drain Water Drain dan Asesories Pipa PVC Listrik Saklar Tunggal Kabel NYY 2.5 mm2 Kabel NYY 1.5 mm2 Lampu Pijar 20W Fitting Lampu Inbouw Doss Perlengkapan (Isolasi, Paku, Klem, Samb) Stop Kontak Lampu Neon Lengkap Box MCB

119 120 C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Seng Plat 3 x 6 BJLS 28 lbr 28,500.00 MCB 6A bh 20,000.00 HARGA ALAT YANG DIGUNAKAN UNTUK PELASANAAN KONSTRUKSI Pembersihan Lapangan 0.00 m2 2 Pemasangan Bouplank/Pengukuran m 0.00 Pengadaan Air Kerja Ls 0.00 Pembuatan Gedung Semen dan Alat m2 0.00 3 Galian Tanah Biasa 1 Meter m 0.00 Galian Tanah Biasa 2 Meter m3 0.00 Galian Tanah Biasa 3 Meter m3 0.00 3 Galian Tanah Keras 1 Meter m 0.00 Galian Tanah Cadas 1 Meter m3 0.00 Galian Tanah Lumpur 1 Meter m3 0.00 3 Urugan Kembali Galian m 0.00 Pemadatan Tanah m3 0.00 3 Urugan Pasir Bawah Pondasi 0.00 m Pasangan Pondasi Batu Kosong 0.00 m3 Pasangan Pondasi Batu Kali 0.00 m3 3 Sloof 15/20 m 0.00 Pekerjaan Pondasi Plat m3 0.00 Kolom 15/15 m3 0.00 3 Kolom 15/20 m 0.00 Kolom 15/25 m3 0.00 3 Kolom 15/30 m 0.00 Kolom 20 x 20 m3 0.00 Kolom 20 x 25 m3 0.00 3 Kolom 20 x 30 m 0.00 Kolom 20 x 35 m3 0.00 Kolom 20 x 40 m3 0.00 3 Kolom 25 x 25 0.00 m Kolom 25 x 30 0.00 m3 3 Kolom 25 x 35 0.00 m 3 Kolom 25 x 40 m 0.00 Kolom 25 x 45 m3 0.00 3 Kolom 25 x 50 m 0.00 Kolom 30 x 30 m3 0.00 Kolom 30 x 35 m3 0.00 3 Kolom 30 x 40 m 0.00 Kolom 35 x 45 m3 0.00 Kolom 35 x 50 m3 0.00 3 Kolom 40 x 40 m 0.00 Kolom 40 x 45 m3 0.00 3 Kolom 40 x 50 m 0.00 Balok 15 x 20 0.00 m3 Balok 15 x 25 0.00 m3 3 Balok 15 x 30 0.00 m Balok 20 x 20 m3 0.00 Balok 20 x 25 m3 0.00 3 Balok 20 x 30 m 0.00 Balok 20 x 35 m3 0.00 3 Balok 20 x 40 m 0.00 Balok 25 x 25 m3 0.00 Balok 25 x 30 m3 0.00 3 Balok 25 x 35 m 0.00

52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107

Balok 25 x 40 Balok 25 x 45 Balok 25 x 50 Balok 30 x 30 Balok 30 x 35 Balok 30 x 40 Balok 35 x 45 Balok 35 x 50 Balok 40 x 40 Balok 40 x 45 Balok 40 x 50 Plat Beton Ring Balok Tangga Pasangan Dinding Batubata (1:4) Pasangan Dinding Batubata (1:2) Kusen Pintu dan Jendela Balok Dinding Pekerjaan Kuda-Kuda Pekerjaan Rangka Atap Pekerjaan Listplank 3/25 Gording 8/12 Talang Pemasangan Atap Pemasangan Perabung Rangka Plafon Memasang Plafond Gypsum Memasang Lis Plafond Plasteran Dinding (1:2) Plasteran Dinding (1:4) Acian Pasangan Turap Porslent Urugan Pasir Pasangan Lantai Kramik 33 x 33 Pasangan Lantai Kramik 20 x 20 Pasangan Pintu Pasangan Jendela kaca Pasangan Kaca Tebal 15 mm Pasangan Engsel Pintu Pasangan Kunci Taman Antik Mendempul dan Mrnggosok Kayu Mengecat Kayu Baru Mengecat Tembok Baru Pemasangan Listrik Baru Pemasangna Kloset Jongkok Pemasangan Kloset Duduk Pemasangan Floor Draine Pemasangan Bak Cuci Piring Pemasangan Wastafel Pem. Pipa Air Ø 3" Per M' Pem. Pipa Air Ø 3/4" AW Per M' Pem. Pipa Air Ø 1/2" AW Per M' Pem. Kran Air Ø 3/4" atau 1/2" Rabat Beton (1:3:5) Bak Kontrol Septictank

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m' m2 m3 m2 m2 m' m2 m2 m2 m2 m2 m2 Bh m2 m2 Bh Bh m2 m2 m2 Ls Bh Bh Bh Bh Bh M' M' M' Bh M3 Bh Bh

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

108 Resapan

Bh

0.00

Tabel 4.2 Hasil Daftar Volume/Bobot Pekerjaan NO 1.1.

1.2.

1.3.

2.1.

2.2.

3.1.

3.2.

4.1.

4.2.

5.1. 5.2.

URAIAN PEKERJAAN I. PEKERJAAN PONDASI Pekerjaan Persiapan 1.1.1. Pembersihan Lapangan 1.1.2. Pemasangan Bouplank/Pengukuran 1.1.3. Pengadaan Air Kerja 1.1.4. Pembuatan Gudang Semen dan Alat Pekerjaan Galian 1.2.1. Galian Tanah Biasa 1 Meter 1.2.2. Galian Tanah Biasa 2 Meter 1.2.7. Urugan Kembali Galian Pemasangan Pondasi Batu Kali 1.3.1. Urugan Pasir Bawah Pondasi 1.3.2. Pasangan Pondasi Batu Kosong 1.3.3. Pasangan Pondasi Batu Kali II. PEKERJAAN BETON Beton Bertulang 2.1.1. Sloof 15 x 20 2.1.2. Pondasi Plat 2.1.2. Kolom 15 x 15 2.1.3. Kolom 15 x 20 2.1.8. Kolom 20 x 30 2.1.25. Balok 15 x 20 2.1.39. Balok 30 x 35 2.1.46. Plat Beton 2.1.47. Ring Balok 2.1.48. Tangga Beton Tak Bertulang 2.2.1. Beton Cor 1 : 2 : 3 III. PEKERJAAN DINDING Dinding 3.1.1. Pasangan Dinding 1/2 Bata (1:4) 3.1.2. Pasangan Dinding 1/2 Bata (1:2) Kusen 3.2.1. Kusen Pintu dan Jendela 3.2.2. Bout-bout/Angker IV. PEKERJAAN KAP DAN ATAP Kap dan Rangka Atap 4.1.1. Balok Dinding 8/12 4.1.2. Pekerjaan Kuda-Kuda 4.1.3. Pekerjaan Rangka Atap 4.1.4. Pekerjaan Listplank 3/25 4.1.5. Pekerjaan Papan Reuter 3/25 4.1.6. Nog dan Gording 8/12 4.1.7. Pekerjaan Talang Atap 4.2.1. Pemasangan Atap 4.2.2. Pemasangan Perabung V. PEKERJAAN PLAFOND Balok Plafond 5.1.1. Rangka Plafon Memasang Plafond 5.2.1. Memasang Plafond Gypsum 5.2.2. Memasang Lis Plafond

VOLUME

SAT

340.0000 56.0000 1.0000 20.0000

M2 M Ls M2

148.2500 0.0000 37.0625

M3 M3 M3

12.1513 24.6692 56.1260

M3 M3 M3

2.5744 3.7960 4.9800 3.4300 5.4600 2.3400 6.6045 7.3600 3.7400 1.8534

M3 M3 M3 M3 M3 M3 M3 M3 M3 M3

0.8920

M3

413.5688 51.1000

M2 M2

1.2541 60.2770

M3 Kg

0.2939 1.3629 138.0646 53.9000 34.1700 5.6300 17.0000

M3 M3 M2 M2 M' M3 M'

158.0646 34.1700

M2 M3

207.0075

M2

165.6500 179.9500

M2 M'

VI. PEKERJAAN PLASTERAN DAN ACIAN

Sambungan Tabel 4.2 6.1.

6.2.

7.1.

7.2.

8.1.

8.2. 8.3.

9.1. 9.2. 9.3.

10.1.

10.2.

11.1. 11.2. 11.3. 11.4. 11.5. 10.5.

Plasteran 6.1.1. Plasteran Dinding (1:2) 6.1.2. Plasteran Dinding (1:4) 6.1.3. Acian Turap Porslen 6.2.1. Pasangan Turap Porslent VII. PEKERJAAN LANTAI Urugan Bawah Lantai 7.1.1. Urugan Tanah 7.1.2. Urugan Pasir Pasangan Lantai 7.2.1. Pasangan Lantai Kramik 33 x 33 7.2.2. Pasangan Lantai Kramik 20 x 20 VIII. PEKERJAAN PINTU DAN JENDELA Pintu dan Jendela 8.1.1. Pasangan Pintu 8.1.2. Pasangan Jendela Kaca 8.2.1. Pasangan Kaca Tebal 15 mm Penggantung/Kunci 8.3.1. Pasangan Engsel Pintu dan Jendela 8.3.3. Pasangan Kunci Taman Antik IX. PEKERJAAN PENGECATAN Mendempul dan Mrnggosok Kayu Mengecat Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Mengecat Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) X. PEKERJAAN PERLENGKAPAN DALAM Listrik 10.1.1. Pasangan Lampu Pijar 10.1.2. Pemasangan Stop Kontak 10.1.3. Pemasangan Lampu TL 10.1.4. Pemasangan MCB 10.1.5. Pemasangan Kabel Jaringan 10.1.6. Pitting lampu 10.1.7. Pemasangan Sakelar Sanitair dan Instalasi Air 10.2.1. Pemasangna Kloset Jongkok 10.2.2. Pemasangan Kloset Duduk 10.2.3. Pemasangan Floor Draine 10.2.4. Pemasangan Bak Cuci Piring 10.2.5. Pemasangan Wastafel 10.2.6. Pem. Pipa Air Ø 3" Per M' 10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 10.2.10. Pem. Kran Air Ø 3/4" atau 1/2" XI. PEKERJAAN PERLENGKAPAN LUAR Saluran Keliling Rabat Beton (1:3:5) Bak Kontrol Resapan Septictank Pek. Pilar

134.5000 780.2350 914.7350

M2 M2 M2

47.2160

M2

0.0000 11.2648

M3 M3

182.3750 24.6325

M2 M2

17.0000 28.9350

Bh M2

71.5420

M2

68.0000 12.0000

Bh Bh

90.9809

M2

610.5400

M2

493.7300

M2

38.0000 12.0000 5.0000 1.0000 348.0000 26.0000 26.0000

Bh Bh Bh Bh M' Bh Bh

2.0000 2.0000 4.0000 1.0000 2.0000 30.0000 42.0000 46.5300 8.0000

Unit Unit Bh Bh Bh M' M' M' Bh

57.0000 21.2100 1.0000 1.0000 1.0000 37.0000

M' M2 Bh Bh Bh M'

Tabel 4.3 Hasil Ringkasan Keseluruhan Daftar Harga Satuan Pekerjaan No 1.1.

1.2. 1.3.

2.1.

2.2.

3.1.

3.2.

4.1.

4.2.

5.1. 5.2.

6.1.

6.2.

7.1. 7.2.

URAIAN PEKERJAAN I. PEKERJAAN PONDASI Pekerjaan Persiapan 1.1.1. Pembersihan Lapangan 1.1.2. Pemasangan Bouplank/Pengukuran 1.1.3. Pengadaan Air Kerja Pekerjaan Galian 1.2.1. Galian Tanah Biasa Pemasangan Pondasi Batu Kali 1.3.1. Urugan Pasir Bawah Pondasi 1.3.2. Pasangan Pondasi Batu Kosong 1.3.3. Pasangan Pondasi Batu Kali II. PEKERJAAN BETON Beton Bertulang 2.1.1. Sloof 15/20 2.1.2. Pekerjaan Pondasi Plat 2.1.2. Kolom 15/15 2.1.3. Kolom 15/20 2.1.8. Kolom 20 x 30 2.1.25. Balok 15 x 20 2.1.39. Balok 30 x 35 2.1.9. Plat Beton 2.1.10. Ring Balok 2.1.11. Tangga Beton Tak Bertulang 2.2.1. Beton Cor 1 : 2 : 3 III. PEKERJAAN DINDING Dinding 2.2.1. Pasangan Dinding Batubata (1:4) 2.2.2. Pasangan Dinding Batubata (1:2) Kusen 2.3.1. Kusen Pintu dan Jendela IV. PEKERJAAN KAP DAN ATAP Kap dan Rangka Atap 4.1.1.. Balok Dinding 4.1.2. Pekerjaan Kuda-Kuda 4.1.3. Pekerjaan Rangka Atap 4.1.4. Pekerjaan Listplank 3/25 4.1.5. Gording 8/12 4.1.6. Talang Atap 4.2.1. Pemasangan Atap 4.2.2. Pemasangan Perabung V. PEKERJAAN PLAFOND Balok Plafond 5.1.1. Rangka Plafon Memasang Plafond 5.2.1. Memasang Plafond Gypsum 5.2.2. Memasang Lis Plafond VI. PEKERJAAN PLASTERAN Plasteran 6.1.1. Plasteran Dinding (1:2) 6.1.2. Plasteran Dinding (1:4) 6.1.3. Acian Turap Porslen 6.2.1. Pasangan Turap Porslent VII. PEKERJAAN LANTAI Urugan Bawah Lantai 7.1.1. Urugan Pasir Pasangan Lantai 7.2.1. Pasangan Lantai Kramik 40 x 40

Harga Bahan

Harga Upah Tenaga Kerja

JUM. HARGA PER SAT

0.00 14,993.02 4,500,000.00

6,750.00 8,875.00 0.00

6,750.00 23,868.02 4,500,000.00

0.00

16,600.00

16,600.00

96,000.00 204,000.00 420,509.60

11,150.00 49,530.00 87,675.00

107,150.00 253,530.00 508,184.60

2,260,375.27 578,086.40 3,354,844.70 2,853,739.55 2,175,474.00 2,853,739.55 1,863,989.90 888,322.91 2,653,049.46 4,136,272.54

262,005.00 262,005.00 262,005.00 262,005.00 262,005.00 262,005.00 262,005.00 262,005.00 262,005.00 262,005.00

2,522,380.27 840,091.40 3,616,849.70 3,115,744.55 2,437,479.00 3,115,744.55 2,125,994.90 1,150,327.91 2,915,054.46 4,398,277.54

414,553.60

87,950.00

502,503.60

31,835.20 38,969.96

17,225.00 17,225.00

49,060.20 56,194.96

1,546,875.00

1,239,500.00

2,786,375.00

10,177.50 1,635,481.29 25,470.00 15,010.00 10,120.96 498,845.33

5,860.00 784,500.00 8,875.00 13,925.00 679,000.00 20,859.50

16,037.50 2,419,981.29 34,345.00 28,935.00 689,120.96 519,704.83

31,670.80 126,198.40

12,115.00 4,189.07

43,785.80 130,387.47

18,551.43

18,362.50

36,913.93

26,264.67 10,539.20

37,950.00 1,855.00

64,214.67 12,394.20

10,941.30 7,328.96 102.48

15,225.00 15,225.00 4,735.00

26,166.30 22,553.96 4,837.48

68,975.64

45,900.00

114,875.64

96,000.00

11,150.00

107,150.00

85,707.22

41,325.00

127,032.22

7.2.2. Pasangan Lantai Kramik 20 x 20

107,057.22

41,325.00

148,382.22

390,000.00 88,229.17

131,600.00 131,600.00

521,600.00 219,829.17

104,720.00

8,109.75

112,829.75

20,160.00 112,000.00

5,432.50 32,595.00

25,592.50 144,595.00

17,568.00 10,296.80

3,347.50 4,044.00

20,915.50 14,340.80

9,380,200.00

0.00

9,380,200.00

409,240.00 2,018,240.00 20,000.00 342,600.00 1,078,220.00 98,425.00 24,304.00 17,360.00 41,350.00

195,400.00 175,455.00 5,725.00 4,147.50 122,000.00 9,912.50 4,210.00 4,210.00 5,725.00

604,640.00 2,193,695.00 25,725.00 346,747.50 1,200,220.00 108,337.50 28,514.00 21,570.00 47,075.00

412,806.40 209,121.21 1,138,954.58 1,690,248.83

228,400.00 122,480.00 0.00 0.00

641,206.40 331,601.21 1,138,954.58 1,690,248.83

Sambungan Tabel 4.3 VIII. PEKERJAAN PINTU DAN JENDELA 8.1. Pintu dan Jendela 8.1.1. Pasangan Pintu 8.1.2. Pasangan Jendela kaca 8.2. Kaca 8.2.1. Pasangan Kaca Tebal 15 mm 8.3. Penggantung/Kunci 8.3.1. Pasangan Engsel Pintu 8.3.3. Pasangan Kunci Taman Antik IX. PEKERJAAN PENGECATAN 9.2. Mengecat Kayu Baru 9.3. Mengecat Tembok Baru X. PEK. INSTALASI DAN SANITASI 10.1 Listrik 10.1.1 Pemasangan Listrik Baru 10.2. Sanitair dan Instalasi Air 10.2.1. Pemasangna Kloset Jongkok 10.2.2. Pemasangan Kloset Duduk 10.2.3. Pemasangan Floor Draine 10.2.4. Pemasangan Bak Cuci Piring 10.2.5. Pemasangan Wastafel 10.2.6. Pem. Pipa Air Ø 3" Per M' 10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 10.2.9. Pem. Kran Air Ø 3/4" atau 1/2" XI. PEK. PERLENGKAPAN LUAR 11.1 Rabat Beton (1:3:5) 11.2 Bak Kontrol 11.3 Septictank 11.4 Resapan

Tabel 4.4 Hasil Daftar Rencana Anggaran Biaya (RAB) NO

URAIAN PEKERJAAN

VOLUME

SAT

HARGA SATUAN (Rp)

JUMLAH (Rp)

I. PEKERJAAN PONDASI 1.1. Pekerjaan Persiapan 1.1.1. Pembersihan Lapangan 1.1.2. Pemasangan Bouplank/Pengukuran 1.1.3. Pengadaan Air Kerja

340.0000 56.0000 1.0000

M2 M2 Ls

6,750.00 23,868.02 4,500,000.00

2,295,000.00 1,336,609.33 4,500,000.00 8,131,609.33

1.2. Pekerjaan Galian 1.2.1. Galian Tanah Biasa 1 Meter

148.2500

M3

16,600.00

2,460,950.00 2,460,950.00

12.1513 24.6692 56.1260

M3 M3 M3

107,150.00 253,530.00 508,184.60

1,302,011.80 6,254,382.28 28,522,368.86 36,078,762.93

II. PEKERJAAN BETON 2.1. Beton Bertulang 2.1.1. Sloof 15/20 2.1.2. Pekerjaan Pondasi Plat 2.1.2. Kolom 15/15 2.1.3. Kolom 15/20 2.1.8. Kolom 20 x 30 2.1.25. Balok 15 x 20 2.1.39. Balok 30 x 35 2.1.9. Plat Beton 2.1.10. Ring Balok 2.1.11. Tangga

2.5744 3.7960 4.9800 3.4300 5.4600 2.3400 6.6045 7.3600 3.7400 1.8534

M3 M3 M3 M3 M3 M3 M3 M3 M3 M3

2,522,380.27 840,091.40 3,616,849.70 3,115,744.55 2,437,479.00 3,115,744.55 2,125,994.90 1,150,327.91 2,915,054.46 4,398,277.54

6,493,615.76 3,188,986.95 18,011,911.50 10,687,003.82 13,308,635.33 7,290,842.26 14,041,133.35 8,466,413.39 10,902,303.68 4,398,277.54 96,789,123.58

2.2. Beton Tak Bertulang 2.2.1. Beton Cor 1 : 2 : 3

0.8920

M3

502,503.60

448,233.21 448,233.21

413.5688 51.1000

M3 M3

49,060.20 56,194.96

20,289,768.04 2,871,562.46 23,161,330.50

1.2541

M3

2,786,375.00

3,494,392.89 3,494,392.89

IV. PEKERJAAN KAP DAN ATAP 4.1. Kap dan Rangka Atap 4.1.1.. Balok Dinding 8/12 4.1.2. Pekerjaan Kuda-Kuda 4.1.3. Pekerjaan Rangka Atap 4.1.4. Pekerjaan Listplank 3/25 4.1.5. Gording 8/12 4.1.6. Talang

0.2939 1.3629 138.0646 53.9000 5.6300 17.0000

M3 M3 M3 M3 M3 M'

16,037.50 2,419,981.29 34,345.00 28,935.00 689,120.96 519,704.83

4,713.42 3,298,192.51 4,741,828.69 1,559,596.50 3,879,751.00 8,834,982.17 22,319,064.29

4.2. Atap 4.2.1. Pemasangan Atap 4.2.2. Pemasangan Perabung

158.0646 34.1700

M2 M3

43,785.80 130,387.47

6,920,984.96 4,455,339.71 11,376,324.68

1.3. Pemasangan Pondasi Batu Kali 1.3.1. Urugan Pasir Bawah Pondasi 1.3.2. Pasangan Pondasi Batu Kosong 1.3.3. Pasangan Pondasi Batu Kali

III. PEKERJAAN DINDING 3.1. Dinding 2.2.1. Pasangan Dinding Batubata (1:4) 2.2.2. Pasangan Dinding Batubata (1:2) 3.2.

Kusen 2.3.1. Kusen Pintu dan Jendela

V. PEKERJAAN PLAFOND 5.1. Balok Plafond

5.1.1. Rangka Plafon

207.0075

M2

36,913.93

7,641,460.07 7,641,460.07

5.2. Memasang Plafond 5.2.1. Memasang Plafond Gypsum 5.2.2. Memasang Lis Plafond

165.6500 179.9500

M2

64,214.67 12,394.20

10,637,159.53 2,230,336.29 12,867,495.82

VI. PEKERJAAN PLASTERAN 6.1. Plasteran 6.1.1. Plasteran Dinding (1:2) 6.1.2. Plasteran Dinding (1:4) 6.1.3. Acian

134.5000 780.2350 914.7350

M2 M2 M2

26,166.30 22,553.96 4,837.48

3,519,366.81 17,597,388.98 4,425,013.64 25,541,769.43

6.2. Turap Porslen 6.2.1. Pasangan Turap Porslent

47.2160

M2

114,875.64

5,423,968.22 5,423,968.22

VII. PEKERJAAN LANTAI 7.1. Urugan Bawah Lantai 7.1.1. Urugan Pasir

11.2648

107,150.00

1,207,023.32 1,207,023.32

Sambungan Tabel 3.4

7.2. Pasangan Lantai 7.2.1. Pasangan Lantai Kramik 40 x 40 7.2.2. Pasangan Lantai Kramik 20 x 20

182.3750 24.6325

M2 M2

127,032.22 148,382.22

23,167,501.85 3,655,025.13 26,822,526.98

VIII. PEKERJAAN PINTU DAN JENDELA 8.1. Pintu dan Jendela 8.1.1. Pasangan Pintu 8.1.2. Pasangan Jendela kaca

28.9350 17.0000

Bh M2

521,600.00 219,829.17

15,092,496.00 3,737,095.83 18,829,591.83

8.2. Kaca 8.2.1. Pasangan Kaca Tebal 15 mm

71.5420

M2

112,829.75

8,072,065.97 8,072,065.97

8.3. Penggantung/Kunci 8.3.1. Pasangan Engsel Pintu 8.3.3. Pasangan Kunci Taman Antik

68.0000 12.0000

Bh Bh

25,592.50 144,595.00

1,740,290.00 1,735,140.00 3,475,430.00

IX. PEKERJAAN PENGECATAN 9.2. Mengecat Kayu Baru 9.3. Mengecat Tembok Baru

610.5400 464.7500

M2 M2

20,915.50 14,340.80

12,769,749.37 6,664,886.80 19,434,636.17

X. PEK. INSTALASI DAN SANITASI 10.1 Listrik 10.1.1 Pemasangan Listrik Baru

1.0000

Ls

9,380,200.00

9,380,200.00 9,380,200.00

10.2. Sanitair dan Instalasi Air 10.2.1. Pemasangna Kloset Jongkok 10.2.2. Pemasangan Kloset Duduk 10.2.3. Pemasangan Floor Draine 10.2.4. Pemasangan Bak Cuci Piring 10.2.5. Pemasangan Wastafel 10.2.6. Pem. Pipa Air Ø 3" Per M' 10.2.7. Pem. Pipa Air Ø 3/4" AW Per M' 10.2.8. Pem. Pipa Air Ø 1/2" AW Per M' 10.2.9. Pem. Kran Air Ø 3/4" atau 1/2"

2.0000 2.0000 4.0000 1.0000 2.0000 30.0000 42.0000 46.5300 8.0000

Bh Bh Bh Bh Bh M' M' M' Bh

604,640.00 2,193,695.00 25,725.00 346,747.50 1,200,220.00 108,337.50 28,514.00 21,570.00 47,075.00

1,209,280.00 4,387,390.00 102,900.00 346,747.50 2,400,440.00 3,250,125.00 1,197,588.00 1,003,652.10 376,600.00 14,274,722.60

XI. PEK. PERLENGKAPAN LUAR 11.1 Rabat Beton (1:3:5) 11.2 Bak Kontrol 11.3 Septictank

21.2100 1.0000 1.0000

641,206.40 331,601.21 1,138,954.58

13,599,987.74 331,601.21 1,138,954.58

11.4 Resapan

1.0000

1,690,248.83

1,690,248.83 16,760,792.36

Tabel 4.6 Hasil Perhitungan Lamanya Waktu Pelaksanaan Pekerjaan Uraian Pekerjaan PEKERJAAN PERSIAPAN 1 M2 Pembersihan Lapangan 1 M' Pasangan Bouwlpank 1 M2 Gudang Semen dan Alat PEKERJAAN GALIAN 1 M3 Galian Tanah Biasa Sedalam 1 Meter 1 M3 Urugan Kembali Galian Tanah PEKERJAAN PONDASI BATU KALI 1 M3 Urugan Pasir Bawah Pondasi 1 M3 Pasangan Pondasi Batu Kosong 1 M3 Pasangan Pondasi Batu Kali (1:3) PEKERJAAN BETON 1M3 Pondasi Plat 1M3 Sloof 15/20 1 M3 Kolom Praktis (15/15) 1 M3 Kolom 15/20 1 M3 Kolom 20/30 1 M3 Balok 15/20 1 M3 Balok 30/35 1 M3 Plat Beton 1 M3 Ring Balok 1 M3 Tangga Beton Bertulang 200 kg 1 M2 Pasangan Dinding Batu Bata (1:4) 1 M2 Pasangan Dinding Batu Bata (1:2) 1 M3 Pasangan Kusen Pintu dan Jendela PEKERJAAN KAP DAN ATAP 1 M3 Pekerjaan Balok Dinding 1 M3 Pekerjaan Kuda-Kuda Kayu 1 M2 Pekerjaan rangka Atap 1M' Papan Lisplank Pemasangan 1 M3 Gording, Nog Pemasangan 1 M' Talang Miring BJLS 28 Pemasangan 1 M2 Atap Sakura Roof

(b) 1/a

(c)

(d) c/b

(e)

(f) d/e

(g)

TK

(a)

P M P T P T

0.1000 0.0500 0.1000 0.1000 2.0000 1.0000

10.00 20.00 10.00 10.00 0.50 1.00

340.00 340.00 56.00 56.00 20.00 20.00

34.00 17.00 5.60 5.60 40.00 20.00

4.0 4.0 2.0 2.0 7.0 7.0

8.50 4.25 2.80 2.80 5.71 2.86

9 5 3 3 6 3

P M P M

0.4000 0.0400 0.1920 0.0190

2.50 25.00 5.21 52.63

148.25 148.25 37.06 37.06

59.30 5.93 7.12 0.70

7.0 7.0 2.0 2.0

8.47 0.85 3.56 0.35

9 1 4 1

P M P T P T

0.3000 0.0100 0.7800 0.3900 1.5000 0.6000

3.33 100.00 1.28 2.56 0.67 1.67

12.15 12.15 24.67 24.67 56.13 56.13

3.65 0.12 19.24 9.62 84.19 33.68

1.0 1.0 3.0 3.0 10.0 10.0

3.65 0.12 6.41 3.21 8.42 3.37

4 1 7 4 9 4

P T P T P T P T P T P T P T P T P T P T P T P T P T

4.8500 1.4000 4.8500 1.4000 4.8500 1.4000 4.8500 1.4000 4.8500 1.4000 4.8500 1.4000 4.8500 1.4000 4.8500 1.4000 4.8500 1.4000 4.8500 1.4000 0.3200 0.1000 0.3200 0.1000 6.0000 20.0000

0.21 0.71 0.21 0.71 0.21 0.71 0.21 0.71 0.21 0.71 0.21 0.71 0.21 0.71 0.21 0.71 0.21 0.71 0.21 0.71 3.13 10.00 3.13 10.00 0.17 0.05

3.80 3.80 2.57 2.57 4.98 4.98 3.43 3.43 5.46 5.46 2.34 2.34 6.60 6.60 7.36 7.36 3.74 3.74 1.85 1.85 413.57 413.57 51.10 51.10 1.25 1.25

18.41 5.31 12.49 3.60 24.15 6.97 16.64 4.80 26.48 7.64 11.35 3.28 32.03 9.25 35.70 10.30 18.14 5.24 8.99 2.59 132.34 41.36 16.35 5.11 7.52 25.08

5.0 5.0 3.0 3.0 7.0 7.0 5.0 5.0 8.0 8.0 3.0 3.0 8.0 8.0 10.0 10.0 4.0 4.0 4.0 4.0 34.0 34.0 5.0 5.0 7.0 7.0

3.68 1.06 4.16 1.20 3.45 1.00 3.33 0.96 3.31 0.96 3.78 1.09 4.00 1.16 3.57 1.03 4.53 1.31 2.25 0.65 3.89 1.22 3.27 1.02 1.07 3.58

4 1 5 2 4 1 4 1 3 1 4 2 4 1 4 2 5 2 2 1 4 2 4 1 2 4

P T P T P T P T P T P T P T

0.1000 0.0330 5.5000 8.3000 0.1000 0.1000 0.1000 0.2000 12.0000 4.0000 0.0400 0.4000 0.2000 0.1000

10.00 30.30 0.18 0.12 10.00 10.00 10.00 5.00 0.08 0.25 25.00 2.50 5.00 10.00

0.29 0.29 1.36 1.36 138.06 138.06 53.90 53.90 5.63 5.63 17.00 17.00 158.06 158.06

0.03 0.01 7.50 11.31 13.81 13.81 5.39 10.78 67.56 22.52 0.68 6.80 31.61 15.81

2.0 2.0 4.0 4.0 7.0 7.0 3.0 3.0 14.0 14.0 2.0 2.0 4.0 4.0

0.01 0.00 1.87 2.83 1.97 1.97 1.80 3.59 4.83 1.61 0.34 3.40 7.90 3.95

1 1 2 3 2 2 2 4 5 2 1 4 2 4

Pemasangan 1 M2 Perabung

P T

0.0457 0.0500

21.89 20.00

34.17 34.17

1.56 1.71

1.0 1.0

1.56 1.71

2 2

P T P T P T

0.1500 0.2500 0.2000 0.6000 0.0210 0.0210

6.67 4.00 5.00 1.67 47.62 47.62

207.01 207.01 165.65 165.65 179.95 179.95

31.05 51.75 33.13 99.39 3.78 3.78

12.0 12.0 17.0 17.0 2.0 2.0

2.59 4.31 1.95 5.85 1.89 1.89

3 4 2 6 2 2

P T P T T M P T

0.2000 0.1500 0.2000 0.1500 0.0550 0.0020 0.6000 0.4550

5.00 6.67 5.00 6.67 18.18 500.00 1.67 2.20

134.50 134.50 780.24 780.24 914.74 914.74 47.2160 47.2160

26.90 20.18 156.05 117.04 50.31 1.83 28.33 21.48

9.0 9.0 40.0 40.0 12.0 12.0 6.0 6.0

2.99 2.24 3.90 2.93 4.19 0.15 4.72 3.58

3 3 4 3 5 1 5 4

P M P T P T

0.3000 0.0100 0.6200 0.3500 0.6200 0.3500

3.33 100.00 1.61 2.86 1.61 2.86

11.26 11.26 182.38 182.38 24.63 24.63

3.38 0.11 113.07 63.83 15.27 8.62

1.0 1.0 29.0 29.0 4.0 4.0

3.38 0.11 3.90 2.20 3.82 2.16

4 1 4 3 4 3

P T P T P T P T

0.8000 2.0000 0.0150 0.1500 0.0100 0.6000 0.0600 0.6000

1.25 0.50 66.67 6.67 100.00 1.67 16.67 1.67

17.00 17.00 71.54 71.54 68.00 68.00 12.00 12.00

13.60 34.00 1.07 10.73 0.68 40.80 0.72 7.20

44.0 44.0 1.0 1.0 5.0 5.0 2.0 2.0

0.31 0.77 1.07 10.73 0.14 8.16 0.36 3.60

2 5 1 11 1 5 1 4

P T P T P T

0.0400 0.0400 0.0700 0.0090 0.0200 0.0630

25.00 25.00 14.29 111.11 50.00 15.87

90.98 90.98 610.54 610.54 493.73 493.73

3.64 3.64 42.74 5.49 9.87 31.10

1.0 1.0 8.0 8.0 6.0 6.0

3.64 3.64 5.34 0.69 1.65 5.18

4 4 5 1 3 5

P T P T P T P T P T P T T

1.0000 1.5000 3.3000 1.1000 0.0100 0.1000 0.0300 0.0300 1.2000 1.4500 0.0810 0.1350 0.1000

1.00 0.67 0.30 0.91 100.00 10.00 33.33 33.33 0.83 0.69 12.35 7.41 10.00

2.00 2.00 2.00 2.00 4.00 4.00 1.00 1.00 2.00 2.00 30.00 30.00 8.00

2.00 3.00 6.60 2.20 0.04 0.40 0.03 0.03 2.40 2.90 2.43 4.05 0.80

1.0 1.0 2.0 2.0 0.5 0.5 0.5 0.5 1.0 1.0 1.0 1.0 1.0

2.00 3.00 3.30 1.10 0.08 0.80 0.06 0.06 2.40 2.90 2.43 4.05 0.80

2 3 3 2 1 1 1 1 3 3 3 5 1

P T P T P T P

5.0000 0.8000 2.2600 0.7200 6.3460 1.0500 6.8850

0.20 1.25 0.44 1.39 0.16 0.95 0.15

21.21 21.21 1.00 1.00 1.00 1.00 1.00

106.05 16.97 2.26 0.72 6.35 1.05 6.89

22.0 22.0 1.0 1.0 4.0 4.0 2.0

4.82 0.77 2.26 0.72 1.59 0.26 3.44

5 1 3 1 2 1 3

Sambungan Tabel 4.6 PEKERJAAN PLAFON 1 M2 Rangka Plafon 1 M2 Plafond Gypsum Memasang Lis Plafond PEKERJAAN PLASTERAN 1 M2 Plasteran Dinding (1:2) 1 M2 Plasteran Dinding (1:4) 1 M2 Acian Semen 1 M2 Pasangan Dinding Porslin PEKERJAAN LANTAI 1 M3 Urugan Pasir 1 M2 Pasangan Lantai Kramik 40 x 40 1 M2 Pasangan Lantai Kramik 20 x 20 PEKERJAAN PINTU DAN JENDELA 1 M2 Pintu dan Jendela kaca 1 M2 Kaca Tebal 5 MM 1 Buah Pasangan Engsel Pintu 1 Buah Pasangan Kunci Tanam Antik PEKERJAAN PENGECATAN 1 M2 Mendempul dan Menggosok Kayu 1 M2 Mengecat Kayu Baru 1 M2 Mengecat Tembok Baru PEKERJAAN PERLENGKAPAN DALAM Pemasangna 1 Buah Kloset Jongkok Pemasangan 1 Buah KloSet Duduk Floor Draine 1 Buah Bak Cuci Piring Stainless Memasang 1 Wastafel Memasang Pipa Air Ø 3" Per M'

PEKERJAAN PERLENGKAPAN LUAR 1 M3 Rabat Beton (1:3:5) Analisis 1Buah Bak Kontrol 1 Buah Septictank 2 x 2 x 2 M 1 Unit Resapan

T

Koef Tenaga Kerja Per Satuan Pekerjaan (a)

2.0950

0.48

Kemampuan Pekerja Vol Pek mlh Hari Untuk Menyelesaikan PkrjnMnylskn Kes Vol Pek Dalam 1 Hari (b) ( c ) (1 Org) (d) 1/a c/b

1.00

Rencana Hari Kerja (e)

2.10

2.0

Jml Org Yang Dibutuhkan (f) (g) d/e

1.05

1

Tabel 4.7 Hasil Pembuatan Tabel Time Schedule, dan Perhitungan Bobot Serta Pembangiannya WAKTU PELAKSANAAN NO

JENIS PEKERJAAN

BOBOT (%)

I

PEK. PONDASI

14.28

II

PEK. BETON

25.41

III

PEK. DINDING

6.97

IV

PEK. KAP DAN ATAP

8.81

V

PEK. PLAFOND

5.36

VI

PEK. PLASTERAN DAN ACIAN

8.09

VII

PEK. LANTAI

7.33

VIII PEK. PINTU DAN JENDELA

1

2

3

4

5

4.29

2.86

2.86

2.86

1.43 4.32

6

7

8

9

10

4.32

4.32

4.07

4.07

4.32

0.49

0.84

1.04

1.04

0.89

11

12

1.18

1.18

1.18

0.79

1.23

1.76

0.81

0.89

1.13

13

14

15

16

17

18

19

20

1.59

1.76

1.67 0.91

0.96

1.02

1.02

0.80

0.64

1.11 2.10

1.13

1.13

1.05

1.05

0.73

1.03

1.47

1.61

1.47

1.03

1.27

1.11

0.95

7.94

IX

PEK. PENGECATAN

5.26

X

PEK. INSTALASI & SANITASI

6.18

XI

PEK. PERLENGKAPAN LUAR

4.38

Total (%)

MINGGU KE

1.84

21

22

23

0.95

0.95

0.95

0.64

1.05

0.26

1.67

2.29

24

2.23 1.10

1.23

1.18

100.00

Rencana fisik per minggu

4.29

2.86

2.86

2.86

5.75

4.81

5.16

6.95

6.00

7.11

4.98

4.08

3.45

3.92

5.10

4.90

3.59

3.00

4.02

2.65

3.50

4.27

1.86

1.18

Rencana fisik komulatif

4.29

7.14

10.00

12.86

18.60

23.41

28.57

35.52

41.52

48.62

53.60

57.68

61.13

65.05

70.15

75.05

78.64

81.64

85.66

88.30

91.81

96.08

97.94

99.12

KEMBALI 25

0.88

0.88 100.00

VOLUME KEBUTUAN MATERIAL KESELURUHAN No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Material Kloset Duduk Atap Sakura Roof (2 Susun) AW Pipa PVC Ø 1" AW Pipa PVC Ø 1/2" AW Pipa PVC Ø 3" AW Pipa PVC Ø 3/4" Bak Cuci Stainless Batu Bata Batu Batako 10/20/40 Batu Kali Belucci Kunci Besi Polos Ø 10 mm Besi Polos Ø 12 mm Besi Polos Ø 16 mm Besi Polos Ø 6 mm Besi Strip Box MCBN Cat Dasar Cat Kayu Cat Meni Diamond Kasar Keramik 20x20 Falco Engsel Pintu 5 " Fitting Lampu Floor Drain Gypsum Impra Dempul Indocement Semen Warna 50 kg Kaca Bening t = 5 mm Kaca Hitam t = 5 mm Kawat Bendrat Kayau Meranti Papan 3/20 (Kls. 2) Kayu Meranti Balok 5/7 (Kls. 2) Kayu Bengkirai Balok 2/3 (Kls. 1) Kayu Bengkirai Balok 5/10 (Kls. 1) Kayu Bengkirai Balok 5/7 (Kls. 1) Kayu Bengkirai Balok 8/12 (Kls. 1) Kayu Bengkirai Papan 3/20 (Kls. 1) Kayu Ulin Balok 5/10 (Kls. 1) Kerikil Beton Kia Keramik 40x40

Volume 2.00 94.84 0.00 55.84 36.00 50.40 1.00 32,792.82 0.00 61.74 12.00 304.26 82.19 0.00 234.24 20.44 1.00 150.27 158.74 122.11 615.81 68.00 26.00 4.00 69.02 7.28 15.26 78.70 0.00 78.66 196.71 258.55 138.06 0.00 315.50 75.24 147.52 1.50 38.19 1,094.25

bh m2 m m m m bh bh bh m3 set lnjr lnjr lnjr lnjr kg bh kg kg kg bh bh bh Bh lbr kg zak m2 m2 kg btg btg btg btg btg btg btg btg m3 bh

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66

Kia Polos Keramik 20x20 Kran Air Lampu Neon Lengkap Lampu Pijar 20W Lexus Westafel List Profil MCB 6A Minyak Bekisting Naturtone Cat Tembok Nok Surya Roof 100 mm Paragon Plamir Pasir Cor Pasir Pasang Pasir urug Perlengkapan Instalasi (Isolasi, Paku, dll) Pintu Panel Bengkirai 80-100 x 200 Pipa PVC Listrik Playwood t = 6 mm Pujatex Cat Minyak Saklar Seng Gelombang BJLS 32 Seng Plat 3 x 6 BJLS 28 Stop Kontak T-Dos (Kontak Hubung Bagi) Semen Portland 50 kg Kloset Jongkok

1,180.40 8.00 5.00 38.00 2.00 188.95 2.00 8.28 120.84 102.51 138.06 46.86 75.44 37.00 1.00 17.00 69.60 0.00 1.82 26.00 30.00 8.50 11.00 26.00 817.21 2.00

bh bh bh bh bh m' bh lt kg bh kg m3 m3 m3 set bh m lbr kg Bh lbr lbr bh bh zak bh

TERIMA KA

A KASIH

Related Documents

Time Schedule Rab Contoh
August 2019 27
Time Schedule
June 2020 29
Time Schedule
June 2020 36
Time Schedule
November 2019 40
Rab
June 2020 33

More Documents from ""