RENCANA ANGGARAN BIAYA KEGIATAN PEKERJAAN LOKASI NO

: : REHABILITASI GUDANG : KECAMATAN PORONG KAB. SIDOARJO URAIAN PEKERJAAN

I 1 2

PEKERJAAN PERSIAPAN Pengukuran Pembersihan Lokasi

II 1 2 3 4

PEKERJAAN GALIAN & URUGAN Galian pondasi Urugan Pasir Urug Bawah Pondasi t=5 cm Urugan Peninggian Lantai t=30 cm Urugan tanah kembali

VOLUME

STN

1.00 Ls 1.00 Ls

15.36 1.14 16.00 6.14

m³ m³ m³ m³ Sub Jumlah

III 1 2 3 5 6 7 8 9

PEKERJAAN BETON Sloof 15/20 K-175 Kolom Praktis (KP) 12/15 K-175 Kolom teras 15/15 K-175 Balok latei 12/15 K-175 Ring balk 12/15 K-175 Kolom + Ring gewel 12/15 K-175 Konsol beton 12/15 K-175 Rabat Beton Bawah lantai t=3 cm 1:3:6

0.95 0.46 0.23 0.24 0.40 0.24 0.05 3.36

m³ m³ m³ m³ m³ m³ m³ m³ Sub Jumlah

IV 1 2 3

PEKERJAAN PASANGAN Pasang Dinding Bata + Gewel 1Pc : 5Ps Pasang pondasi batu kali 1Pc : 6Ps Pasang aanstamping

68.93 m² 6.23 m3 3.42 m3 Sub Jumlah

V 1 2 3 4

PEKERJAAN PLESTERAN Plesteran dinding biasa 1 : 5 Plesteran beton 1 : 3 Acian Benangan + tali air

127.89 4.32 132.21 137.90

m² m² m² m¹ Sub Jumlah

VI 1 2 3 4

PEKERJAAN KUSEN, PINTU, JENDELA Pas. Kusen alumunium 4'' brown Pas. Daun Pintu Board WPC Uk. 82 x 210 x 0,5cm Pas. Jalusi Aluminium 1"/2" Pas. Slimar Jendela Aluminium 3/8" Brown Model Casement 3 Profil

56.50 1.00 27.90 12.00

m¹ unit m¹ m¹ Sub Jumlah

VII 1 2 3 4 5 6

PEKERJAAN ATAP Pas. Kuda-kuda Galvalum C75-0,75 mm Pas. Penutup Atap Genteng Karangpilang Pas. Bubungan Karangpilang Pek. Papan Reuter Pas. Usuk + reng galvalum Pas. Lisplank Calciplank L=30

72.00 m2 97.65 m2 9.00 m' 9.00 m' 97.65 m2 39.70 m' Sub Jumlah

NO

URAIAN PEKERJAAN

VIII PEKERJAAN LANGIT - LANGIT 1 Pasang langit-langit Kalsiboard t = 4 mm + rangka hollow galvalum

VOLUME

STN

72.00 m2 Sub Jumlah

IX 1 2 3 4 5

PEKERJAAN PENGGANTUNG KUNCI, KACA Kunci 2x Putar Pintu Engsel pintu Engsel Casement Uk. 12 " Rambuncis Kaca polos 5 mm

1.00 2.00 6.00 6.00 1.73

bh set set bh m² Sub Jumlah

X 1 2 3 4 5 6 7

PEKERJAAN ELEKTRIKAL Instalasi Lampu Instalasi Stop Kontak Pasang Lampu SL 23 Watt tornado Pasang Lampu SL 18 Watt tornado Pasang MCB Pas. Saklar Tunggal Pas. Saklar Ganda

5.00 4.00 4.00 1.00 1.00 1.00 1.00

ttk ttk bh bh unit ttk ttk Sub Jumlah

XI 1 2 3

PEKERJAAN PENGECATAN Pengecatan Lisplank Pengecatan Plafond Pengecatan Dinding + Kolom Teras

11.91 m² 72.00 m² 132.21 m² Sub Jumlah

REKAPITULASI

RENCANA ANGGARAN BIAYA KEGIATAN PEKERJAAN LOKASI

: : REHABILITASI GUDANG : KECAMATAN PORONG KAB. SIDOARJO

NO I II III IV V VI VII VIII IX X XI

URAIAN PEKERJAAN PEKERJAAN PERSIAPAN PEKERJAAN GALIAN & URUGAN PEKERJAAN BETON PEKERJAAN PASANGAN PEKERJAAN PLESTERAN PEKERJAAN KUSEN, PINTU, JENDELA PEKERJAAN ATAP PEKERJAAN LANGIT - LANGIT PEKERJAAN PENGGANTUNG KUNCI, KACA PEKERJAAN ELEKTRIKAL PEKERJAAN PENGECATAN JUMLAH TOTAL JUMLAH PPN 10 % TOTAL DIBULATKAN

TERBILANG :

#NAME?

Dibuat Oleh :

Konsultan perencan

CV. LAVINA CIPTA PER

Ir. BISRI MUSTHO Direktur

HARGA STN (Rp.)

JUMLAH HRG (Rp.)

500,000.00 150,000.00

500,000.00 150,000.00 650,000.00

78,750.00 170,690.00 167,940.00 26,250.00 Sub Jumlah

1,209,600.00 194,586.60 2,687,040.00 161,280.00 4,252,506.60

3,895,700.00 4,456,610.00 5,572,940.00 4,456,610.00 4,456,610.00 4,370,110.00 5,084,170.00 644,460.00 Sub Jumlah

3,716,497.80 2,049,594.94 1,253,911.50 1,058,890.54 1,764,817.56 1,046,204.33 274,545.18 2,165,385.60 13,329,847.45

115,160.00 720,920.00 394,660.00 Sub Jumlah

7,938,497.02 4,487,727.00 1,349,737.20 13,775,961.22

63,890.00 67,200.00 38,640.00 15,920.00 Sub Jumlah

8,171,147.66 290,304.00 5,108,748.96 2,195,368.00 15,765,568.62

93,240.00 1,201,750.00 38,396.67 170,590.00

5,268,060.00 1,201,750.00 1,071,267.00 2,047,080.00

Sub Jumlah

9,588,157.00

161,500 129,910 171,460 66,090 107,970 66,090 Sub Jumlah

11,628,000.00 12,685,711.50 1,543,140.00 594,810.00 10,543,270.50 2,623,773.00 39,618,705.00

HARGA STN (Rp.)

JUMLAH HRG (Rp.)

124,940.00

8,995,680.00

Sub Jumlah

8,995,680.00

221,820.00 26,505.00 24,035.00 24,200.00 131,710.00 Sub Jumlah

221,820.00 53,010.00 144,210.00 145,200.00 227,594.88 791,834.88

190,650 98,590 57,000 50,350 315,875 42,440 47,380 Sub Jumlah

953,250.00 394,360.00 228,000.00 50,350.00 315,875.00 42,440.00 47,380.00 2,031,655.00

45,840.00 19,730.00 19,730.00 Sub Jumlah

545,954.40 1,420,560.00 2,608,582.22 4,575,096.62

JML TOTAL (RP) 650,000.00 4,252,506.60 13,329,847.45 13,775,961.22 15,765,568.62 9,588,157.00 39,618,705.00 8,995,680.00 791,834.88 2,031,655.00 4,575,096.62 113,375,012.39 113,375,012.39 11,337,501.24 124,712,513.628 124,712,000.000

Sidoarjo,

2016

Dibuat Oleh : Konsultan perencana CV. LAVINA CIPTA PERSADA

Ir. BISRI MUSTHOFA Direktur

DAFTAR HARGA BAHAN BANGUNAN SEBELUM PPN SEMESTER I TAHUN ANGGARAN 2016 No.

Nama / Jenis Bahan

1 Sirtu Urug 2 Pasir Pasang 3 Sirtu Ayak 4 Batu belah 15cm/20 cm 5 Pasir beton 6 Pasir beton 7 Kerikil/batu pecah mesin 1/2 8 Kerikil/batu pecah mesin 1/2 9 Bata merah 10 Portland Cement (semen) 11 Portland Cement (semen) 12 Semen warna 13 Besi beton polos 14 Besi beton ulir 15 Besi baja WF 16 Besi profil siku 17 Besi CNP 125.50.20.2,3 18 Besi plat 19 Kawat beton 20 Kawat las 21 Maintruss C 75 22 Reng galvalum UK 30 23 Screw 12 - 14 x 20 24 Screw 12 - 14 x 16 25 Kalsiplang l=30 cm 26 Hollow 4x4 galvalum 27 Hollow 2x4 galvalum 28 Kusen Alumunium 4" lengkap 29 Slimar Alumunium 3/8" 3 profil lengkap 30 Hollow Aluminium 1" x 2 " 31 Skrup Fixer 32 Sealent 33 Profil kaca 34 Besi Strip (2x3)cm 35 Kawat Ram 36 Paku Sekrup 1cm-2,5 cm 37 Paku skrup 10 cm 38 Paku sekrup (Gypsumboard) 39 Paku 1 cm - 2,5 cm

Satuan M3 M3 M3 M3 M3 Kg M3 Kg BJ Kg sak Kg Kg Kg Kg Kg Kg Kg Kg Kg M M Bh Bh M M M M M M Bh Tube M Kg M2 Bh Kg Kg Kg

40 Paku tripleks 41 Paku 5 cm - 10 cm 42 Tripleks 12 mm 43 Tripleks 6 mm 44 Plywood tebal 9 mm 45 Plywood tebal 4 mm Ukuran (90 × 220) cm 46 Teakwood tebal 4mm, Ukuran (120 × 240) cm 47 kalsigibsumboard (1200x2400x9)mm 48 kalsiboard (1200x2400x4)mm 49 Seng plat 0,3 x60 50 Asbes Gelombang kecil 51 List gypsum profil 52 Ramset dinabolt 53 Wall angle 54 Kawat penggantung 55 Cotton plaster 56 Compound 57 List kayu profil 58 Dolken kayu galam ø (8 - 10) cm, panjang 4 m 59 Kayu meranti (papan) 60 Lem kayu 61 Usuk (5 × 7) cm kayu meranti 62 Usuk (4 × 6) cm kayu meranti 63 Reng 2/3 kayu meranti 64 Kayu Klas III 65 Lantai Ubin keramik (30x30) cm 66 Lantai Ubin keramik (40x40) cm 67 Lantai Ubin keramik Rokc Tile (40x40) cm 68 Keramik dinding (20x25) cm 69 Keramik lantai (20x20) cm 70 Paving Stone Abu-2 Tb 6 Cm (4 Persg.Panj. DT3) K300 71 Kanstin uk. 40x20x10 72 Stopper Uskup tebal 6 cm K 300 73 Plamir kayu 74 Plamir tembok 75 Amplas 76 Kuwas / roll 77 Cat tembok 78 Cat Kayu 79 Cat meni 80 Cat meni besi 81 Minyak cat besi 82 Minyak pelumas

Kg Kg Lbr Lbr Lbr Lbr Lbr Lbr Lbr M Lbr M Bh M Kg bh sak M Btg M3 Kg M3 M3 M3 M3 M2 M2 M2 M2 M2 M2 Bh Bh Kg Kg Lbr Bh Kg Kg Kg Kg Ltr Ltr

83 Minyak bekisting 84 Genteng kaca 85 Genteng karang pilang Kw 1 86 Bubungan Genteng karang pilang Kw 1 87 Stop Kontak 88 Kabel NYA 500 Volt 2 x 2,5 mm2 89 Pipa Pralon 5/8 90 T Doos Pvc 91 Isolator 92 Fitting Plafon 93 Saklar Tunggal 94 Saklar Ganda 95 Kloset jongkok porselen 96 Kaca bening 5 mm 97 Kunci pintu 2x putar 98 Engsel pintu 4" 99 Engsel jendela 100 engsel jendela Casement uk. 12" 101 Rambuncis 102 Pintu Board WPC (0,5 cm) 103 Angker 5/8" 50 cm 104 Jarum Keras 5/8" 105 Mur baut 5/8" 106 Mur Baut 3/4 " 107 Mur 1/2" 108 Stak 3/8" 109 Rangka Atap Galvalum C75 + Ongkos Pasang 110 Kran air 111 Seal tape 112 Floor drain 113 Sewa alat 114 Lampu SL 23 Watt 115 Lampu SL 18 Watt 116 MCB 117 Solar 118 Air 119 Benang

1 2 3 4

UPAH Pekerja Tukang Batu Tukang Las konstruksi Tukang alumunium

Ltr Bh Bh Bh Bh M ljr Bh Bh Bh Bh Bh Bh M2 Bh Set Set Set Bh Bh Bh Bh Bh Bh Bh Bh m2 Bh Bh Bh Jam Bh Bh Unit Ltr Ltr M'

Oh Oh Oh Oh

5 6 7 8 9 10

Tukang Kayu Tukang besi Tukang Cat Tukang listrik Kepala Tukang Mandor

Oh Oh Oh Oh Oh Oh

AN RAN 2016 Harga Bahan 115,995.00 210,045.00 137,275.00 137,655.00 292,315.00 208.80 263,340.00 146.30 665.00 1,520.00 60,800.00 12,350.00 7,695.00 7,125.00 8,930.00 6,460.00 7,030.00 7,220.00 17,385.00 31,160.00 13,490.00 5,890.00 475.00 285.00 26,125.00 6,745.00 4,845.00 66,500.00 136,800.00 14,630.00 4,042.25 27,740.00 2,090.00 10,378.75 22,610.00 218.50 20,757.50 22,325.00 18,335.00

18,335.00 14,820.00 163,875.00 81,937.50 117,705.00 81,937.50 90,725.00 61,085.00 80,750.00 29,450.00 94,430.00 8,550.00 1,425.00 2,850.00 22,800.00 16,625.00 80,750.00 5,462.50 14,250.00 6,555,000.00 13,300.00 4,057,925.00 4,665,925.00 7,192,355.00 4,665,925.00 45,220.00 49,020.00 65,075.00 54,340.00 51,015.00 64,505.00 12,065.00 4,370.00 27,645.00 6,175.00 6,460.00 26,695.00 19,190.00 63,650.00 26,220.00 35,150.00 21,850.00 32,917.50

6,650.00 52,250.00 4,750.00 18,050.00 15,010.00 4,370.00 9,405.00 2,375.00 7,600.00 13,775.00 15,295.00 20,235.00 147,535.00 86,355.00 163,875.00 26,505.00 22,325.00 24,035.00 10,925.00 1,201,750.00 20,805.00 22,990.00 3,040.00 9,500.00 570.00 12,065.00 161,500.00 21,185.00 3,135.00 10,260.00 23,750.00 57,000.00 50,350.00 315,875.00 5,367.50 47.50 3,800.00

100,000.00 110,000.00 110,000.00 110,000.00

110,000.00 110,000.00 110,000.00 110,000.00 120,000.00 150,000.00

1 2 3 4 5 6 7 8 9 10

UPAH Pekerja Tukang Batu Tukang Las konstruksi Tukang alumunium Tukang Kayu Tukang besi Tukang Cat Tukang listrik Kepala Tukang Mandor

Oh Oh Oh Oh Oh Oh Oh Oh Oh Oh

100,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 120,000.00 150,000.00

ANALISA PEKERJAAN PERSIAPAN 1.

Harga Satuan Pekerjaan Persiapan 1.1 Pekerjaan 1m2 Bongkaran dinding tembok bata merah Tenaga Kerja Sat. Vol. Uraian Oh 0.250 Pekerja Oh 0.0250 Mandor

@ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan 1.2

Pekerjaan 1m2 Bongkaran Rangka dan Penutup Atap Tidak Dipakai Kembali Tenaga Kerja Sat. Vol. Uraian Oh 0.100 Pekerja @ Rp. Oh 0.0050 Mandor @ Rp. Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan

1.3

Pekerjaan 1m2 Bongkaran Rangka dan Penutup Plafond Tidak Dipakai Kembali Tenaga Kerja Sat. Vol. Uraian Oh 0.050 Pekerja @ Rp. Oh 0.0025 Mandor @ Rp. Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan

1.4

Pekerjaan 1unit Pembuatan dan Pemasangan Papan Nama Proyek Bahan Sat. Vol. Uraian M2 0.960 Triplek tebal 12 mm M2 0.960 Print Out Lapis Vinyl M3 0.020 Usuk 4/6 kayu meranti M 4.000 Lis siku aluminium 3 Cm M2 6.000 Cat tembok Tenaga Kerja

Sat. Oh Oh

Vol. 1.000 1.000

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

Uraian Pekerja Tukang kayu

@ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (unit) dibulatkan 1.3

Pekerjaan 1 m' Pengukuran Bahan An. SNI ( Revisi ) 6.4.1 0.0200 Paku biasa 2" - 5 " kg 0.1000 Benang m' Upah Oh Oh Oh Oh

PEKERJAAN TANAH

An. SNI ( Revisi ) 6.4.2 0.0900 Tukang Kayu 0.1000 Pekerja 0.0100 Kepala Tukang 0.0050 Mandor

@ Rp. @ Rp. Sub total :

@ Rp. @ Rp. @ Rp. @ Rp. Sub total : Total Upah dan Bahan Jumlah Harga Persatuan Pekerjaan (unit)

2.

Harga Satuan Pekerjaan Tanah 2.1

Menggali 1 m 3 Tanah biasa sedalam 1 meter Analisa SNI 2835:2008 Tenaga Kerja Sat. Vol. Oh 0.750 Pekerja Oh 0.025 Mandor

Uraian @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1m 3) dibulatkan 2.2

Mengurug kembali 1 M 3 pasir urug Analisa SNI 2835:2008 Bahan Sat. Vol. M Tenaga Kerja

3

Sat. OH OH

1.200 Vol. 0.300 0.0100

Uraian Pasir Urug

@ Rp. Uraian

Pekerja Mandor Jumlah Harga Persatuan Pekerjaan (1m 3) dibulatkan

@ Rp. @ Rp.

2.3

Mengurug 1 m 3 sirtu padat untuk peninggian lantai bangunan Analisa SNI 2835:2008 Bahan Sat. Vol. Uraian m3 1.200 Sirtu Tenaga Kerja

Sat. Oh Oh

Vol. 0.250 0.025

@ Rp.

Uraian Pekerja Mandor

@ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1m 3) dibulatkan 2.4

Menguruk kembali 1 M3 galian Menguruk kembali 1 M3 galian dihitung 1/3 kali indeks pekerjaan galian

PEKERJAAN PONDASI 3

Harga Satuan Pekerjaan Pondasi 3.1

Memasang 1 m 3 Pondasi batu-belah, campuran 1 PC : 5 PP Analisa SNI 2836:2008 Bahan Sat. Vol. Uraian

Tenaga Kerja

M3 Kg

1.200 136.000

Batu belah 15cm/20 cm Portland Cement

@ Rp. @ Rp.

M3

0.544

Pasir pasang

@ Rp.

Sat. OH OH OH OH

Vol. 1.500 0.750 0.075 0.075

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1m 3) dibulatkan 3.2

Memasang 1 m 3 Pondasi batu-belah, campuran 1 PC : 6 PP Analisa SNI 2836:2008 Bahan Sat. Vol. Uraian

Tenaga Kerja

M3 Kg

1.200 117.000

Batu belah 15cm/20 cm Portland Cement

@ Rp. @ Rp.

M3

0.561

Pasir pasang

@ Rp.

Sat. OH OH OH OH

Vol. 1.500 0.750 0.075 0.075

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1m 3) dibulatkan 3.3

Memasang 1 m 3 Batu Kosong (Aanstamping) Analisa SNI 2836:2008 Bahan Sat. Vol.

Uraian

M3

1.200

Batu belah 15cm/20 cm

@ Rp.

M3

0.432

Pasir Urug

@ Rp.

Tenaga Kerja

Sat. OH OH OH OH

Vol. 0.780 0.390 0.039 0.039

Uraian Pekerja Tukang Batu Kepala Tukang Mandor Jumlah Harga Persatuan Pekerjaan (1m 3) dibulatkan

@ Rp. @ Rp. @ Rp. @ Rp.

PEKERJAAN DINDING 4 Harga Satuan Pekerjaan Dinding 4.1

Memasang 1 m 2 Dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 Analisa SNI 6897:2008 Bahan Sat. Vol. Uraian Bh 70.000 Bata merah @ Rp. Kg 14.370 Portland cement @ Rp. m3 0.040 Pasir pasang @ Rp. Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.300 0.100 0.010 0.015

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1 m 2) dibulatkan 4.2

Memasang 1 m 2 Dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 Analisa SNI 6897:2008 Bahan Sat. Vol. Uraian Bh 70.000 Bata merah @ Rp. Kg 9.680 Portland cement @ Rp. m3 0.045 Pasir pasang @ Rp. Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.300 0.100 0.010 0.015

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1 m 2) dibulatkan

PEKERJAAN PLESTERAN 5

Harga Satuan Pekerjaan Plesteran 5.1 Memasang 1 m 2 Plesteran 1 PC : 3 PP, tebal 15 mm Analisa SNI 2837:2008 Bahan Sat. Vol. Uraian Kg 7.776 Portland cement m3 0.023 Pasir pasang Tenaga Kerja

Sat. Oh Oh Oh Oh

Indeks 0.300 0.150 0.015 0.015

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

Jumlah Harga Persatuan Pekerjaan (m 2) dibulatkan 5.2

Memasang 1 m 2 Plesteran 1 PC : 5 PP, tebal 15 mm Analisa SNI 2837:2008

@ Rp. @ Rp.

@ Rp. @ Rp. @ Rp. @ Rp.

Bahan

Tenaga Kerja

Sat. Kg m3

Vol. 5.184 0.026

Sat. Oh Oh Oh Oh

Indeks 0.300 0.150 0.015 0.015

Uraian Portland cement Pasir pasang

@ Rp. @ Rp. Uraian

Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m 2) dibulatkan 5.3

Memasang 1 m 2 acian Analisa SNI 2837:2008 Bahan Sat. Kg Tenaga Kerja

Sat. Oh Oh Oh Oh

Indeks 3.250

Uraian Portland cement

@ Rp.

Indeks 0.200 0.100 0.010 0.010

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m 2) dibulatkan

5.4

1 m' Benangan Bahan Sat. Kg Tenaga Kerja

Sat. Oh Oh

Uraian Vol. 2.250 Portland cement Indeks Uraian 0.100 Tukang batu 0.010 Mandor

@ Rp.

@ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m 1) dibulatkan

PEKERJAAN BETON 6

Harga Satuan Pekerjaan Beton 6.1 Membuat 1 m 3 beton tumbuk 1Pc : 3Ps : 6Kr Analisa SNI 7394:2008 Bahan Sat. Vol. Uraian Kg 197.000 Portland cement 0.470 Pasir beton m3 kg 0.940 Kerikil (maksimum 30 mm) Tenaga Kerja

Sat. Oh Oh Oh Oh

Indeks 1.650 0.250 0.025 0.080

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp.

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m 3) dibulatkan 6.2

Membuat 1 m 3 beton mutu f' c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 Analisa SNI 7394:2008 Bahan Sat. Kg kg kg liter Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 326.000 760.000 1,029.000 215.000 Indeks 1.650 0.275 0.028 0.083

Uraian Portland cement Pasir beton (kg) Kerikil (maksimum 30 mm) Air

@ Rp. @ Rp. @ Rp. @ Rp.

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m 3) dibulatkan 6.3

Pembesian 10 Kg dengan besi polos Analisa SNI 7394:2008 Bahan Sat. Vol. Kg 10.500 Besi beton 0.150 Kawat beton Kg Tenaga Kerja

Sat. Oh Oh Oh

Indeks 0.070 0.070 0.007

Uraian Pekerja Tukang Batu Kepala Tukang

Uraian @ Rp. @ Rp.

@ Rp. @ Rp. @ Rp.

Oh

0.004 Mandor Jumlah Harga Persatuan Pekerjaan (10 Kg) Jumlah Harga Persatuan Pekerjaan (1 Kg) dibulatkan

@ Rp.

6.4

Pembesian 10 Kg dengan besi ulir Analisa SNI 7394:2008 Bahan Sat. Vol. Kg 10.500 Besi beton 0.150 Kawat beton Kg Tenaga Kerja

Sat. Oh Oh Oh Oh

Indeks 0.070 0.070 0.007 0.004

Uraian

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp.

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (10 Kg) Jumlah Harga Persatuan Pekerjaan (1 Kg) dibulatkan 6.5

Memasang 1 m 2 bekisting Analisa SNI 7394:2008 Bahan Sat. m3 Kg liter Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. Uraian 0.020 Kayu kelas III 0.400 Paku 5 cm - 10 cm 0.200 Minyak bekisting Indeks 0.520 0.260 0.026 0.026

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp.

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m 2) dibulatkan

6.60

6.7

6.8

Membuat 1m3 beton pondasi plat K-175 Sat. Indeks Uraian m3 1.000 Beton K-175 kg 215.000 Besi beton polos

@ Rp. @ Rp.

Membuat 1m3 beton kolom 15x15 K-175 Sat. Indeks Uraian m3 1.000 Beton K-175 kg 204.600 Besi beton polos m2 13.333 Pekerjaan Begesting

@ Rp. @ Rp. @ Rp.

Membuat 1m3 beton sloof 15x20 K-175 Sat. Indeks Uraian m3 1.000 Beton K-175 kg 162.195 Besi beton polos m2 6.667 Pekerjaan Begesting

@ Rp. @ Rp. @ Rp.

6.9

Membuat 1m3 konsol 12x15 K-175 Sat. Indeks Uraian m3 1.000 Beton K-175 kg 187.021 Besi beton polos m2 11.667 Pekerjaan Begesting

@ Rp. @ Rp. @ Rp.

6.10

6.11

6.11

6.12

Membuat 1m3 ring balok/beton latai 12x15 K-175 Sat. Indeks Uraian m3 1.000 Beton K-175 kg 187.021 Besi beton polos m2 8.333 Pekerjaan Begesting

@ Rp. @ Rp. @ Rp.

Membuat 1m3 ring gewel 12x15 K-175 Sat. Indeks Uraian m3 1.000 Beton K-175 kg 178.331 Besi beton polos m2 8.333 Pekerjaan Begesting

@ Rp. @ Rp. @ Rp.

Membuat 1 m 3 beton kolom 20x25 K-175 Sat. Indeks Uraian m3 1.000 Beton K-175 Kg 143.473 Besi beton polos m2 6.000 Pekerjaan Begesting

@ Rp. @ Rp. @ Rp.

Membuat 1 m 3 beton kolom 12x25 K-175 Sat. Indeks Uraian m3 1.000 Beton K-175 Kg 225.011 Besi beton polos m2 7.333 Pekerjaan Begesting

@ Rp. @ Rp. @ Rp.

PEKERJAAN BESI DAN ALUMUNIUM 7

Harga Satuan Pekerjaan Besi dan Allumunium 7.1 Memasang 1 Kg baja profil Siku Analisa SNI 7393:2008 Bahan Sat. Vol. Uraian Kg 1.150 Baja profil Siku Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.060 0.060 0.006 0.003

@ Rp.

Uraian Pekerja Tukang Las Konstruksi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (Kg) dibulatkan Memasang 1 Kg baja WF Analisa SNI 7393:2008 Bahan Sat. Vol. Kg 1.150 Tenaga Kerja

Sat. Oh Oh Oh

Vol. 0.060 0.060 0.006

Uraian Baja WF

@ Rp. Uraian

Pekerja Tukang Las Konstruksi Kepala Tukang

@ Rp. @ Rp. @ Rp.

Oh

0.003

Mandor Jumlah Harga Persatuan Pekerjaan (Kg) dibulatkan

@ Rp.

7.2

Mengerjakan 1 Kg pekerjaan perakitan Analisa SNI 7393:2008 Bahan Sat. Vol. Uraian Liter 0.010 Solar Liter 0.001 Minyak Pelumas Tenaga Kerja

Alat

Sat. OH OH OH OH

Vol. 0.00100 0.00100 0.00001 0.00005

Sat. Jam

Vol. 0.008

@ Rp. @ Rp.

Uraian Pekerja Tukang Las Konstruksi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Uraian Sewa Alat

@ Rp.

Jumlah Harga Persatuan Pekerjaan (1 KG) dibulatkan 7.3

Memasang 1 Kg Gording CNP 125.50.20.2,3 Analisa SNI 7393:2008 Bahan Sat. Vol. Uraian Kg 1.150 Besi CNP 125.50.20.2,3 Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.060 0.060 0.006 0.003

Uraian Pekerja Tukang Las Konstruksi Kepala Tukang Mandor

@ Rp.

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (Kg) dibulatkan 7.4

Memasang 1 Kg Besi plat Analisa SNI 7393:2008 Bahan Sat. Vol. kg 1.150 Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.060 0.060 0.006 0.003

Uraian Besi plat

@ Rp. Uraian

Pekerja Tukang Las Konstruksi Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (Kg) dibulatkan 7.5

Memasang 1 m Kusen Alumunium Analisa SNI 7393:2008 Bahan Sat. Vol. M 1.100 Buah 2.000 Tube 0.060 Tenaga Kerja

Sat. Oh Oh

Vol. 0.043 0.043

Profil 4" Uraian Kusen Alumunium Profil 4" lengkap Skrup Fixer Sealent

@ Rp. @ Rp. @ Rp.

Uraian Pekerja Tukang alumunium

@ Rp. @ Rp.

Oh Oh

0.0043 0.0021

Kepala Tukang Mandor Jumlah Harga Persatuan Pekerjaan (m) dibulatkan

@ Rp. @ Rp.

7.6

Pemasangan Slimar Alumunium Profil 3/8" model cassement 3 profil Bahan Sat. Vol. Uraian M 1.100 Slimar Alumunium Profil 3/8" lengkap Buah 2.000 Skrup Fixer Tube 0.060 Sealent Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.0430 0.0430 0.0043 0.0022

@ Rp. @ Rp. @ Rp.

Uraian Pekerja Tukang alumunium Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m) dibulatkan 7.7

Pemasangan Jalusi aluminium Hollow 2,5x5 cm Bahan Sat. Vol. Uraian m' 1.100 Aluminium Holow 2,5x5 cm Buah 2.000 Paku Sekrup 1cm-2,5 cm Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.0453 0.0667 0.0667 0.0133

@ Rp. @ Rp.

Uraian Pekerja Tukang alumunium Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m) 7.8

Memasang 1 m2 Usuk + Reng galvalume Analisa sendiri Bahan Sat. Vol. Uraian M 2.000 Maintruss C 75 M 4.871 Reng galvalum uk 30 bh 3.000 Screw 12 - 14 x 20 bh 8.000 Screw 12 - 14 x 16 Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.300 0.150 0.015 0.002

@ Rp. @ Rp. @ Rp. @ Rp.

Uraian Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m2) dibulatkan 7.9

Mengerjakan 10 cm pengelasan dengan las listrik Analisa SNI 7393:2008 Bahan Sat. Vol. Uraian Kg 0.400 Kawat las Liter 0.300 Solar Liter 0.040 Minyak pelumas Tenaga Kerja

Sat. Oh Oh Oh

Vol. 0.040 0.020 0.002

@ Rp. @ Rp. @ Rp.

Uraian Pekerja Tukang las konstruksi Kepala Tukang

@ Rp. @ Rp. @ Rp.

Alat

Oh

0.002

Mandor

@ Rp.

Sat. Jam

0.170

Sewa Alat

@ Rp.

Jumlah Harga Persatuan Pekerjaan (10 cm) Jumlah Harga Persatuan Pekerjaan (1 cm) dibulatkan

PEKERJAAN ATAP 8

Harga Satuan Pekerjaan Atap 8.1 Pemasangan Genteng Karang Pilang Kw 1 Analisa Bahan Vol. Sat. Uraian 22.000 Buah Genteng karang pilang Kw 1 Tenaga Kerja

Sat. 0.150 0.075 0.0080 0.0080

Vol. Oh Oh Oh Oh

@ Rp.

Uraian Pekerja Tukang cat Kepala tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

. Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan 8.2

Pemasangan Wuwung Genteng Karang Pilang Kw 1 Analisa Bahan Vol. Sat. Uraian 5.0000 Buah Bubungan Genteng karang pilang Kw 1 @ Rp. 0.0323 m3 Pasir pasang @ Rp. 0.1600 zak Portland Cement 40kg @ Rp. Upah

Vol. 0.400 0.200 0.0200 0.0020

Sat. Oh Oh Oh Oh

Uraian Pekerja Tukang batu Kepala tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

. Jumlah Harga Persatuan Pekerjaan (1m) dibulatkan 8.4

1 m' listplank Kalsiplank l=30cm Bahan Analisa 1.1000 M 0.0500 Kg Upah

Analisa 0.100 0.200 0.0320 0.0032 .

Oh Oh Oh Oh

Kalsiplank l=30 cm Paku skrup 10 cm

@ Rp. @ Rp.

Pekerja tukang kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1m 1) dibulatkan

PEKERJAAN LANGIT-LANGIT 9

Harga Satuan Pekerjaan Langit-langit 9.1 Pasang langit-langit Kalsiboard t = 4 mm + rangka hollow galvalum Analisa sendiri Bahan Sat. Vol. Uraian M 1.650 Hollow 40x40 M 1.650 Hollow 20x40 kg 0.022 Paku sekrup hollow m' 0.733 wall angle

@ Rp. @ Rp. @ Rp. @ Rp.

Tenaga Kerja

kg M Lbr Kg Bh Bh zak

0.122 0.780 0.382 0.028 4.000 0.072 0.125

kawat penggantung Hollow 20x40 (penggantung) Kalsiboard (1200x2400x5)mm sekrup kalsiboard Ramset Dinabolt Cotton plaster Compound

Sat. Oh Oh Oh Oh

Vol. 0.250 0.150 0.025 0.025

Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

Uraian

Jumlah Harga Persatuan Pekerjaan (m2) dibulatkan

@ Rp. @ Rp. @ Rp. @ Rp.

9.2

Memasang 1 m 1 List gypsum profil Analisa SNI 2839:2008 Bahan Sat. Vol. Uraian m' 1.050 List gypsum profil Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.050 0.050 0.005 0.003

@ Rp.

Uraian Pekerja Tukang Kayu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (m 1) dibulatkan

PEKERJAAN PENUTUP LANTAI DAN DINDING 10

Harga Satuan Pekerjaan Penutup Lantai dan Dinding 10.1

Memasang 1 m 2 lantai keramik ukuran (40 x 40) cm Analisa SNI 7395:2008 Bahan Sat. Vol. Uraian M2 1.000 Lantai Ubin keramik (40x40) cm Kg 10.000 Portland cement m3 0.045 Pasir pasang Kg 0.750 Semen warna Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.700 0.350 0.035 0.035

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan dibulatkan 10.1

Memasang 1 m 2 lantai keramik ukuran (40 x 40) cm Analisa SNI 7395:2008 Bahan Sat. Vol. Uraian M2 1.000 Lantai Ubin keramik (40x40) cm Kg 10.000 Portland cement m3 0.045 Pasir pasang Kg 0.750 Semen warna Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.700 0.350 0.035 0.035

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan dibulatkan 10.2

Memasang 1 m 2 keramik uk. 20x25 cm Analisa SNI 7395:2008 Bahan Sat. Vol. Uraian M2 1.000 Keramik dinding (20x25) cm Kg 9.300 Portland cement m3 0.018 Pasir pasang Kg 0.970 Semen warna

@ Rp. @ Rp. @ Rp. @ Rp.

Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.900 0.450 0.045 0.045

Uraian Pekerja Tukang Batu Kepala Tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan dibulatkan

PEKERJAAN KUNCI DAN KACA 11

Harga Satuan Pekerjaan Kunci dan Kaca 11.1 Pekerjaan 1m2 Pasang kaca bening 5mm Bahan Sat. Vol. Uraian m2 1.100 Kaca bening 5mm Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.160 0.1600 0.0160 0.0080

@ Rp.

Uraian Pekerja Tukang kayu Kepala tukang Mandor Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan

@ Rp. @ Rp. @ Rp. @ Rp.

11.2

Pekerjaan Pemasangan 1 buah Konci pintu 2x putar SNI 2002 analisa biaya konstruksi bangunan gedung dan perumahan pek. Kunci dan kaca (6.2) Bahan Sat. Vol. Uraian bh 1.000 Konci pintu 2x putar @ Rp. Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.010 0.5000 0.0100 0.0050

Uraian Pekerja Tukang kayu Kepala tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1bh) dibulatkan 11.3

Pekerjaan Pemasangan 1 set engsel pintu SNI 2002 analisa biaya konstruksi bangunan gedung dan perumahan pek. Kunci dan kaca (6.5) Bahan Sat. Vol. Uraian set 1.000 Engsel pintu 4" @ Rp. Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.015 0.1500 0.0150 0.0008

Uraian Pekerja Tukang besi Kepala tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1bh) dibulatkan 11.4

Pekerjaan Pemasangan 1 set engsel jendela SNI 2002 analisa biaya konstruksi bangunan gedung dan perumahan pek. Kunci dan kaca (6.6) Bahan Sat. Vol. Uraian set 1.000 Engsel jendela @ Rp. Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.010 0.1000 0.0100 0.0005

Uraian Pekerja Tukang besi Kepala tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1 set ) dibulatkan 11.5

Pekerjaan Pemasangan 1 buah Slot rabuncis SNI 2002 analisa biaya konstruksi bangunan gedung dan perumahan pek. Kunci dan kaca Bahan Sat. Vol. Uraian bh 1.000 Slot rabuncis @ Rp. Tenaga Kerja

Sat. Oh Oh Oh Oh

Vol. 0.010 0.1000 0.0100 0.0005

Uraian Pekerja Tukang besi Kepala tukang Mandor Jumlah Harga Persatuan Pekerjaan (1bh) dibulatkan

PEKERJAAN PENGECATAN

@ Rp. @ Rp. @ Rp. @ Rp.

12

Harga Satuan Pekerjaan Pengecatan 12.1 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup ) Bahan An. SNI Vol. Sat. Uraian 0.100 Kg Plamir @ Rp. 0.250 Lbr Amplas @ Rp. 0.020 Bh Kuwas / roll @ Rp. 0.100 Kg Cat tembok dasar @ Rp. 0.260 Kg Cat tembok penutup 2x @ Rp. Upah Vol. 0.020 0.063 0.0063 0.0025

An. SNI ( Revisi ) 6.14.2 Sat. Oh Pekerja Oh Tukang cat Oh Kepala tukang Oh Mandor

Uraian

. Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan

@ Rp. @ Rp. @ Rp. @ Rp.

12.2

1 m2 Pengecatan tembok lama ( Ngamplas, 1x cat dasar, 2x cat penutup ) Bahan An. SNI Vol. Sat. Uraian 0.010 Kg Plamir @ Rp. 0.120 Lbr Amplas @ Rp. 0.033 Bh Kuwas / roll @ Rp. 0.110 Kg Cat tembok dasar @ Rp. 0.220 Kg Cat tembok penutup 2x @ Rp. Upah Vol. 0.028 0.042 0.0042 0.0025

An. SNI Sat. Oh Oh Oh Oh

Uraian Pekerja Tukang cat Kepala tukang Mandor

@ Rp. @ Rp. @ Rp. @ Rp.

. Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan 12.3

1 m2 Pengecatan bidang kayu baru ( 1x plamir , 1x cat dasar, 2x cat penutup ) Bahan An. SNI Vol. Sat. Uraian 0.200 Kg Cat meni @ Rp. 0.150 Kg Plamir @ Rp. 0.170 Kg Cat Kayu dasar @ Rp. 0.260 Kg Cat Kayu penutup 2x @ Rp. Upah Vol. 0.070 0.009 0.0060 0.0025

An. SNI ( Revisi ) 6.8.2 Sat. Oh Pekerja Oh Tukang cat Oh Kepala tukang Oh Mandor

Uraian @ Rp. @ Rp. @ Rp. @ Rp.

. Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan 12.4

1 m2 Pengecatan bidang kayu lama Bahan An. SNI Vol. Sat. Uraian 0.150 Kg Plamir 0.170 Kg Cat Kayu dasar 0.170 Kg Cat Kayu penutup 2x Upah Vol. 0.070 0.075 0.0075 0.0025

An. SNI Sat. Oh Oh Oh Oh .

Uraian Pekerja Tukang cat Kepala tukang Mandor Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan

12.5

@ Rp. @ Rp. @ Rp.

1 m2 Pekerjaan Cat dasar Meni besi Bahan An. SNI

@ Rp. @ Rp. @ Rp. @ Rp.

Vol. 0.100 0.100 Upah

Sat. Kg liter

Uraian Cat meni Minyak cat besi

An. SNI ( Revisi ) 6.8.2 Vol. Sat. 0.075 Oh Pekerja 0.0040 Oh Mandor

@ Rp. @ Rp.

Uraian

. Jumlah Harga Persatuan Pekerjaan (1m 2) dibulatkan

@ Rp. @ Rp.

PEKERJAAN INSTALASI LISTRIK 13

Harga Satuan Pekerjaan Instalasi Listrik 13.1 Pemasangan Titik Stop Kontak Gedung Bahan Analisa Vol. Sat. Uraian 1.000 Buah Stop Kontak 10.000 m' Kabel NYA 500 Volt 2 x 2,5 mm2 1.000 Lonjor Pipa Pralon 5/8 1.000 Buah T Doos Pvc Upah

Analisa Vol. 0.001 0.200 0.0500 .

Sat. Oh Oh Oh

@ Rp. @ Rp. @ Rp. @ Rp.

Uraian Pekerja Tukang Listrik Kepala tukang

@ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan (1 Titik) dibulatkan 13.2

Pemasangan Titik Lampu Bahan Analisa Vol. 4.000 10.000 1.000 1.000 1.000 Upah

Analisa Vol. 0.300 0.500 0.0500 .

Gedung Sat. Buah m' Lonjor Buah Buah

Sat. Oh Oh Oh

Uraian Isolator Kabel NYA 500 Volt 2 x 2,5 mm2 Pipa Pralon 5/8 T Doos Pvc Fitting Plafon

@ Rp. @ Rp. @ Rp. @ Rp. @ Rp.

Uraian Pekerja Tukang Listrik Kepala tukang

@ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan ( 1 Titik ) dibulatkan 13.3

Pemasangan Saklar Tunggal Bahan Analisa Vol. Sat. 1.000 Buah Upah

Analisa Vol. 0.050 0.200 0.001 .

Sat. Oh Oh Oh

Uraian Saklar Tunggal

@ Rp.

Uraian Pekerja Tukang listrik Kepala tukang

@ Rp. @ Rp. @ Rp.

Jumlah Harga Persatuan Pekerjaan ( 1 Titik ) dibulatkan 13.4

Pemasangan Saklar Ganda Bahan Analisa Vol. Sat. 1.000 Buah Upah

Analisa

Uraian Saklar Ganda

@ Rp.

Vol. 0.050 0.200 0.001

Sat. Oh Oh Oh

Uraian Pekerja Tukang listrik Kepala tukang

@ Rp. @ Rp. @ Rp.

. Jumlah Harga Persatuan Pekerjaan ( 1 Titik ) dibulatkan

Harga Satuan 100,000.00 = 150,000.00 = Sub Total =

25,000.00 3,750.00 28,750.00

= =

28,750.00 28,750.00

Harga Satuan 100,000.00 = 150,000.00 = Sub Total =

10,000.00 750.00 10,750.00

= =

10,750.00 10,750.00

Harga Satuan 100,000.00 = 150,000.00 = Sub Total =

5,000.00 375.00 5,375.00

= =

5,375.00 5,370.00

= = = = = =

62,400.00 72,000.00 93,318.50 40,000.00 115,140.00 382,858.50

= = = = =

100,000.00 110,000.00 210,000.00 592,858.50 592,850.00

)

2

)

2

)

2

Harga Satuan 65,000.00 75,000.00 4,665,925.00 10,000.00 19,190.00 Sub Total Harga Satuan 100,000.00 110,000.00 Sub Total

)

Sub total :

14,820.00 = 3,800.00 = =

296.40 380.00 676.40

= = = = = = =

9,900.00 10,000.00 1,200.00 750.00 21,850.00 22,526.40 23,202.80

110,000.00 100,000.00 120,000.00 150,000.00

Sub total : Total Upah dan Bahan unit)

Harga Satuan 100,000.00 = 150,000.00 = Sub Total =

75,000.00 3,750.00 78,750.00

= =

78,750.00 78,750.00

)

3

Harga Satuan

)

3

115,995.00 =

139,194.00

Harga Satuan 100,000.00 = 150,000.00 = Sub Total =

30,000.00 1,500.00 31,500.00

= =

170,694.00 170,690.00

Harga Satuan 115,995.00 Sub Total Harga Satuan 100,000.00 150,000.00 Sub Total )

3

= =

139,194.00 139,194.00

= = =

25,000.00 3,750.00 28,750.00

= =

167,944.00 167,940.00

Harga Satuan 137,655.00 = 1,520.00 = 210,045.00 sub total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 sub total

165,186.00 206,720.00

= =

114,264.48 486,170.48

= = = = =

150,000.00 82,500.00 9,000.00 11,250.00 252,750.00

= =

738,920.48 738,920.00

143,750.00 = 1,520.00 =

172,500.00 177,840.00

)

3

Harga Satuan

210,045.00 sub total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 sub total

= =

117,835.25 468,175.25

= = = = =

150,000.00 82,500.00 9,000.00 11,250.00 252,750.00

= =

720,925.25 720,920.00

143,750.00 =

172,500.00

210,045.00 =

90,739.44

)

3

Harga Satuan

sub total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 sub total )

3

=

263,239.44

= = = = =

78,000.00 42,900.00 4,680.00 5,850.00 131,430.00

= =

394,669.44 394,660.00

campuran spesi 1 PC : 3 Ps Harga Satuan 665.00 1,520.00 210,045.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total )

2

= = = =

46,550.00 21,842.40 8,401.80 76,794.20

= = = = =

30,000.00 11,000.00 1,200.00 2,250.00 44,450.00

= =

121,244.20 121,240.00

campuran spesi 1 PC : 5 Ps Harga Satuan 665.00 1,520.00 210,045.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total )

2

Harga Satuan 1,520.00 210,045.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= = = =

46,550.00 14,713.60 9,452.03 70,715.63

= = = = =

30,000.00 11,000.00 1,200.00 2,250.00 44,450.00

= =

115,165.63 115,160.00

= = =

11,819.52 4,831.04 16,650.56

= = = = = = =

30,000.00 16,500.00 1,800.00 2,250.00 50,550.00 67,200.56 67,200.00

Harga Satuan 1,520.00 210,045.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 1,520.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= = =

7,879.68 5,461.17 13,340.85

= = = = = = =

30,000.00 16,500.00 1,800.00 2,250.00 50,550.00 63,890.85 63,890.00

= =

4,940.00 4,940.00

= = = = = = =

20,000.00 11,000.00 1,200.00 1,500.00 33,700.00 38,640.00 38,640.00

Harga Satuan 1,520.00 Sub Total Harga Satuan 110,000.00 150,000.00 Sub Total

Harga Satuan 1,520.00 292,315.00 146.30 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 1,520.00 208.80 146.30 47.50 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 7,695.00 17,385.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00

= =

3,420.00 3,420.00

= = = = =

11,000.00 1,500.00 12,500.00 15,920.00 15,920.00

= = = =

299,440.00 137,388.05 137.52 436,965.57

= = = = = = =

165,000.00 27,500.00 3,000.00 12,000.00 207,500.00 644,465.57 644,460.00

= = = = =

495,520.00 158,685.29 150,542.70 10,212.50 814,960.49

= = = = = = =

165,000.00 30,250.00 3,360.00 12,450.00 211,060.00 1,026,020.49 1,026,020.00

= = =

80,797.50 2,607.75 83,405.25

= = =

7,000.00 7,700.00 840.00

Kg) Kg)

150,000.00 = Sub Total = = = =

600.00 16,140.00 99,545.25 9,954.53 9,950.00

Harga Satuan 7,125.00 17,385.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= = =

74,812.50 2,607.75 77,420.25

= = = = = = = =

7,000.00 7,700.00 840.00 600.00 16,140.00 93,560.25 9,356.03 9,350.00

= = = =

93,318.50 5,928.00 1,400.00 100,646.50

= = = = = = =

52,000.00 28,600.00 3,120.00 3,900.00 87,620.00 188,266.50 188,260.00

Harga Satuan 1,026,020.49 9,954.53 Jumlah dibulatkan

= = = =

1,026,020.49 2,140,222.88 3,166,243.36 3,166,240.00

Harga Satuan 1,026,020.49 9,954.53 188,266.50 Jumlah dibulatkan

= = = = =

1,026,020.49 2,036,700.24 2,510,220.00 5,572,940.72 5,572,940.00

Harga Satuan 1,026,020.49 9,954.53 188,266.50 Jumlah dibulatkan

= = = = =

1,026,020.49 1,614,574.18 1,255,110.00 3,895,704.67 3,895,700.00

Kg) Kg)

Harga Satuan 4,665,925.00 14,820.00 7,000.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 1,026,020.49 9,954.53 188,266.50 Jumlah dibulatkan

= = = = =

1,026,020.49 1,861,710.09 2,196,442.50 5,084,173.07 5,084,170.00

Harga Satuan 1,026,020.49 9,954.53 188,266.50 Jumlah dibulatkan

= = = = =

1,026,020.49 1,861,710.09 1,568,887.50 4,456,618.07 4,456,610.00

Harga Satuan 1,026,020.49 9,954.53 188,266.50 Jumlah dibulatkan

= = = = =

1,026,020.49 1,775,204.60 1,568,887.50 4,370,112.59 4,370,110.00

Harga Satuan 1,026,020.49 9,954.53 188,266.50 Jumlah dibulatkan

= = = = =

1,026,020.49 1,428,205.57 1,129,599.00 3,583,825.05 3,583,820.00

Harga Satuan 1,026,020.49 9,954.53 188,266.50 Jumlah dibulatkan

= = = = =

1,026,020.49 2,239,873.64 1,380,621.00 4,646,515.13 4,646,510.00

= =

7,429.00 7,429.00

= = = = = = =

6,000.00 6,600.00 720.00 450.00 13,770.00 21,199.00 21,190.00

= =

10,269.50 10,269.50

= = =

6,000.00 6,600.00 720.00

Harga Satuan 6,460.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 8,930.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00

150,000.00 = Sub Total = = =

450.00 13,770.00 24,039.50 24,030.00

Harga Satuan 5,367.50 32,917.50 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total Harga Satuan 23,750.00 Sub Total

G)

Harga Satuan 7,030.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 7,220.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 66,500.00 4,255.00 28,750.00 Sub Total Harga Satuan 100,000.00 110,000.00

= = =

53.68 32.92 86.59

= = = = =

100.00 110.00 1.20 7.50 218.70

= = = =

190.00 190.00 495.29 490.00

= =

8,084.50 8,084.50

= = = = = = =

6,000.00 6,600.00 720.00 450.00 13,770.00 21,854.50 21,850.00

= =

8,303.00 8,303.00

= = = = = = =

6,000.00 6,600.00 720.00 450.00 13,770.00 22,073.00 22,070.00

= = = =

73,150.00 8,510.00 1,725.00 83,385.00

= =

4,300.00 4,730.00

120,000.00 = 150,000.00 = Sub Total = = =

516.00 315.00 9,861.00 93,246.00 93,240.00

Harga Satuan 136,800.00 4,255.00 28,750.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 14,630.00 218.50 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

m)

Harga Satuan 13,490.00 5,890.00 475.00 285.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

)

Harga Satuan 31,160.00 5,367.50 32,917.50 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00

= = = =

150,480.00 8,510.00 1,725.00 160,715.00

= = = = = = =

4,300.00 4,730.00 516.00 330.00 9,876.00 170,591.00 170,590.00

= = =

16,093.00 437.00 16,530.00

= = = = = =

4,533.33 7,333.33 8,000.00 2,000.00 21,866.67 38,396.67

= = = = =

26,980.00 28,690.19 1,425.00 2,280.00 59,375.19

= = = = = = =

30,000.00 16,500.00 1,800.00 300.00 48,600.00 107,975.19 107,970.00

= = = =

12,464.00 1,610.25 1,316.70 15,390.95

= = =

4,000.00 2,200.00 240.00

cm) m)

150,000.00 = Sub Total =

300.00 6,740.00

23,750.00 =

4,037.50

= = =

26,168.45 2,616.85 2,610.00

Harga Satuan 4,750.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= =

104,500.00 104,500.00

= = = = = = =

15,000.00 8,250.00 960.00 1,200.00 25,410.00 129,910.00 129,910.00

= = = =

90,250.00 6,784.45 9,728.00 106,762.45

= = = = = = =

40,000.00 22,000.00 2,400.00 300.00 64,700.00 171,462.45 171,460.00

26,125.00 = 20,757.50 = Sub Total =

28,737.50 1,037.88 29,775.38

)

2

Harga Satuan 18,050.00 210,045.00 60,800.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

)

100,000.00 110,000.00 120,000.00 150,000.00 Sub Total )

1

Harga Satuan 6,745.00 4,845.00 20,757.50 2,850.00

= = = = = = =

10,000.00 22,000.00 3,840.00 480.00 36,320.00 66,095.38 66,090.00

= = = =

11,129.25 7,994.25 456.67 2,089.05

)

22,800.00 4,845.00 80,750.00 22,325.00 1,425.00 16,625.00 80,750.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= = = = = = = =

2,781.60 3,779.10 30,846.50 625.10 5,700.00 1,197.00 10,093.75 76,692.27

= = = = = = =

25,000.00 16,500.00 3,000.00 3,750.00 48,250.00 124,942.27 124,940.00

Harga Satuan 8,550.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 49,020.00 1,520.00 210,045.00 12,350.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 65,075.00 1,520.00 210,045.00 12,350.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 54,340.00 1,520.00 210,045.00 12,350.00

= =

8,977.50 8,977.50

= = = = =

5,000.00 5,500.00 600.00 450.00 11,550.00

= =

20,527.50 20,520.00

= = = = =

49,020.00 15,200.00 9,452.03 9,262.50 82,934.53

= = = = = =

70,000.00 38,500.00 4,200.00 5,250.00 117,950.00 200,884.53 200,880.00

= = = = =

65,075.00 15,200.00 9,452.03 9,262.50 98,989.53

= = = = = =

70,000.00 38,500.00 4,200.00 5,250.00 117,950.00 216,939.53 216,930.00

= = = =

54,340.00 14,136.00 3,780.81 11,979.50

Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

Harga Satuan 86,355.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total )

2

=

84,236.31

= = = = = = =

90,000.00 49,500.00 5,400.00 6,750.00 151,650.00 235,886.31 235,880.00

= =

94,990.50 94,990.50

= = = = =

16,000.00 17,600.00 1,920.00 1,200.00 36,720.00

= =

131,710.50 131,710.00

dan kaca (6.2) Harga Satuan 163,875.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total )

dan kaca (6.5) Harga Satuan 26,505.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total )

dan kaca (6.6) Harga Satuan 22,325.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total et )

)

Harga Satuan 10,925.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= =

163,875.00 163,875.00

= = = = = = =

1,000.00 55,000.00 1,200.00 750.00 57,950.00 221,825.00 221,820.00

= =

26,505.00 26,505.00

= = = = = = =

1,500.00 16,500.00 1,800.00 120.00 19,920.00 46,425.00 46,420.00

= =

22,325.00 22,325.00

= = = = = = =

1,000.00 11,000.00 1,200.00 75.00 13,275.00 35,600.00 35,600.00

= =

10,925.00 10,925.00

= = = = = = =

1,000.00 11,000.00 1,200.00 75.00 13,275.00 24,200.00 24,200.00

Harga Satuan 6,175.00 6,460.00 26,695.00 19,190.00 19,190.00 Sub Total

= = = = = =

617.50 1,615.00 533.90 1,919.00 4,989.40 9,674.80

Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= = = = =

2,000.00 6,930.00 756.00 375.00 10,061.00 19,735.80 19,730.00

= =

)

2

Harga Satuan 6,175.00 6,460.00 26,695.00 19,190.00 19,190.00 Sub Total

= = = = = =

61.75 775.20 889.83 2,110.90 4,221.80 8,059.48

Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= = = = = = =

2,800.00 4,620.00 504.00 375.00 8,299.00 16,358.48 16,350.00

Harga Satuan 26,220.00 27,645.00 63,650.00 63,650.00 Sub Total

= = = = =

5,244.00 4,146.75 10,820.50 16,549.00 36,760.25

Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= = = = = = =

7,000.00 990.00 720.00 375.00 9,085.00 45,845.25 45,840.00

Harga Satuan 27,645.00 63,650.00 63,650.00 Sub Total

= = = =

4,146.75 10,820.50 10,820.50 25,787.75

Harga Satuan 100,000.00 110,000.00 120,000.00 150,000.00 Sub Total

= = = = =

7,000.00 8,250.00 900.00 375.00 16,525.00 42,312.75 42,310.00

= =

Harga Satuan 35,150.00 = 21,850.00 = Sub Total = Harga Satuan 100,000.00 = 150,000.00 = Sub Total = = =

3,515.00 2,185.00 5,700.00

7,500.00 600.00 8,100.00 13,800.00 13,800.00

Harga Satuan 15,010.00 4,370.00 9,405.00 2,375.00 Sub Total

= = = = =

15,010.00 43,700.00 9,405.00 2,375.00 70,490.00

= = = = = =

100.00 22,000.00 6,000.00 28,100.00 98,590.00 98,590.00

= = = = = =

30,400.00 43,700.00 9,405.00 2,375.00 13,775.00 99,655.00

= = = = = =

30,000.00 55,000.00 6,000.00 91,000.00 190,655.00 190,650.00

Harga Satuan 15,295.00 = Sub Total =

15,295.00 15,295.00

Harga Satuan 100,000.00 110,000.00 120,000.00 Sub Total

tik)

Harga Satuan 7,600.00 4,370.00 9,405.00 2,375.00 13,775.00 Sub Total Harga Satuan 100,000.00 110,000.00 120,000.00 Sub Total

itik )

itik )

Harga Satuan 100,000.00 110,000.00 150,000.00 Sub Total

= = = = = =

5,000.00 22,000.00 150.00 27,150.00 42,445.00 42,440.00

Harga Satuan 20,235.00 = Sub Total =

20,235.00 20,235.00

itik )

Harga Satuan 100,000.00 110,000.00 150,000.00 Sub Total

= = = = = =

5,000.00 22,000.00 150.00 27,150.00 47,385.00 47,380.00

KEGIATAN PEKERJAAN LOKASI No.

: PEMBANGUNAN DAN REHABILITASI BANGUNAN SD : PEMBANGUNAN RUANG KELAS BARU SDN TROMPOASRI III : KECAMATAN JABON KAB. SIDOARJO Uraian Pekerjaan

Sat

PEKERJAAN PERSIAPAN Pembersihan lokasi Pek. Bouwpalnk Pembuatan papan nama proyek

Ls M' Unit

1.00 56.00 1.00

m3

15.36 11.76 3.60 0.00 0.00 6.14 1.14 0.84 0.30 0.00 0.00 16.00 12.00 4.00

PEKERJAAN TANAH Galian tanah biasa Pondasi Batu Kali (R.Kelas) Pondasi Batu Kali (Teras) Pondasi Poer Pondasi Teras Urugan tanah kembali Urugan pasir bawah pondasi Pondasi Pondasi Batu Kali (Teras) Pondasi Poer Pondasi Teras Urugan Sirtu Bawah Lantai R. Kelas Teras PEKERJAAN PASANGAN Pasang aanstamping Pondasi Batukali (Kelas) Pondasi Batukali (Teras) Pasang pondasi batu kali 1Pc : 5Ps Pondasi R. Kelas Pondasi Teras Pasang Dinding Bata + Gewel 1Pc : 5Ps Gewel Kaki Kuda Kuda Plesteran 1:3 Kolom 20/25 Kolom 15/15 Kolom 12/25 Acian Benangan Kusen Kolom K1 Kolom K2 Kolom K3 PEKERJAAN BETON Pek. Lantai Kerja T= 5 cm Pondasi Poer 60 Pondasi Poer 50 Pek. Rabatan Lantai R. Kelas Teras

m3 m3

m3

m3

m3

m2

m2

m2 m'

m3

m3

Vol

3.42 2.52 0.90 6.23 4.73 1.50 68.93 4.99 0.00 127.89 0.00 4.32 0.00 132.21 137.90 65.10 0.00 72.80 0.00

0.00 0.00 0.00 3.36 2.88 0.48

Panjang

Lebar

18 +

21 10 0.6 0.5 15.36

10

x x x x x

0.8 0.6 0.6 0.5 0.4

x x x x

21 x 10 x

0.8 0.6 0.36 0.25

x x x x

48 16

x x

21 x 10 x 21 10 21 9.975 16

0.8 x 0.6 x

x x x

0.225 0.15 3.65

x 3.65 x 2.4 x 3.65 x

0.3 9.975 0.4 0.6 0.32

-

65.1

0.36 x 0.25 x 48 16

x

Pek. Plat setempat 60/60/20 (K.175) Pek. Plat Ssetempat 50/50/20 (K.175) Pek. Sloof 15/20 (K.175) Pek. Kolom 20/25 (K.175) Pek. Kolom 15/15 (K 175) Pek. Kolom 12/25 (K.175) Pek. Kolom Praktis 12/15 (K175) Pek. Balok latei 12/15 PJ J BV Pek. Konsol 12/15 (K175) Pek. Ringbalk 12/15 (K175) Pek. Ring Gewel 12/12

m3 m3 m3 m3 m3 m3 m3 m3

m3 m3 m3

0.00 0.00 0.95 0.00 0.23 0.00 0.46 0.24 0.04 0.08 0.12 0.05 0.40 0.24

0.6 0.5 31.8 4.3 4 3.65 3.65

x x x x x x x

0.6 0.5 0.15 0.2 0.15 0.12 0.12

x x x x x x x

2.2 2.2 2.2 3 22 13.3

x x x x x x

0.12 0.12 0.12 0.12 0.12 0.12

x x x x x x

PEKERJAAN ATAP & PLAFOND Pas. Kuda - kuda WF 150.75.5.7 kg Pekerjaan perakitan rangka kuda-kuda baja WFkg Pas. Bubungan Karangpilang kg Pas. Plat plendes tebal 10 mm kg Pas. Plat rib tebal 6 mm kg Pas. Batang tarik besi beton Ø 16 mm kg Pas. Ikatan angin besi beton Ø 16 mm kg Pas. Baut Ø 12 mm bh Pas. Jarum keras Ø 16 mm bh Ikatan Angin Batang Tarik Pek. Stak 3/8" bh Pek. Baut Trekstang bh Pas. Angkur baut Ø 16 mm panjang 50 cm bh Pas. Gording Canal C 125.50.20.2,3 kg Pas. Trackstang Ø 10 mm kg Pas. Plat Pengaku Gording 6 mm kg Pas. Usuk + reng galvalum m²

AXBXC Berat/m' Kg 703.92 50.28 x 14 703.92 65.74 0.84 x 78.27 46.96 0.6 x 78.27 20.32 0.432 x 47.027 44.24 28 x 1.58 52.71 33.36 x 1.58 200.00 12.00 8.00 4.00 20.00 20.00 48.00 975.60 216 x 4.517 39.29 63.72 x 0.617 13.54 0.288 x 47.027 97.65 41.13 9 x 4.57 56.52 9 x 6.28 39.70 39.7 1440.00 (30+30+30+30+30+30) 1440.00 180 x

Pas. lisplang Calsiplank lebar 30cm Pengelasan dengan Las Listrik

m¹ cm

PEK. LANGIT-LANGIT Pas. Rangka Plafond 1 kelas



180.00 72.00

m1

56.50 11.50 20.40 24.60 1.00 12.00 2.40 9.60 1.73 0.48 1.25 0.00 27.90 5.40 9.00 13.50

PEK. KUSEN DAN PENGGANTUNG Pek. Kusen alumunium coklat 4" PJ J BV Pek. Pintu Board WPC Pemasangan Slimar Alumunium Profil 3/8" PJ J Pek. Pas. Kaca bening 5 mm PJ J BV Pas. Jalusi Aluminium 1"/2" PJ J BV PEKERJAAN KERAMIK Pas. Keramik 40/40 Pas. Keramik Rock Tile

PEKERJAAN PENGECATAN Pek. Pengecatan dinding Pek. Pengecatan lisplank Pek. Pengecatan rangka baja Pek. Pengecatan Plafond

bh m'

m2

m'

m2 m2

m2 m2 m2 m2

64.00 9.28 6.40 1.92 0.96 132.21 11.91 94.45 72.00

18 x 8 x

10 9 +

11.5 10.2 8.2

2.4 4.8 0.48 0.63 0.00 5.40 4.50 4.50

48 +

16 +

16 x 1.2 x 0.6 x

0.4 0.8 0.8

39.70 22.626 x

x 71.82

PEKERJAAN INST. LISTRIK Instalasi Lampu Instalasi Stop Kontak Pasang Lampu SL 23 Watt tornado Pasang Lampu SL 18 Watt tornado Pas. Saklar Ganda Pas. Saklar Tunggal

titik titik bh bh bh bh

5.00 4.00 4.00 1.00 1.00 1.00

PEKERJAAN PENGGANTUNG KUNCI, KACA Kunci 2x putar Engsel pintu Engsel Casement Uk. 12 " Rambuncis

bh set set bh

1.00 2.00 6.00 6.00

Tinggi

Banyak

X

2

0.7 0.6 0.8 0.6

x x

0 0

0.05 0.05 0.05 0.05

x x

0 0

0.25 0.25

0.15 0.15 (0.3+0.6)*0.5/2 (0.25+0.5)*0.4/2 x x 0 x x x

10.3 0.5 0 0 3 0

3.65 2.6 3.65

x x x

0 28 0

0.05 0.05

x x

0 0

0.03 0.03

x

2

-

2.403

0.2 0.2 0.2 0.25 0.15 0.25 0.15

x x

0 0

x x x x

0 2.5 0 7

0.15 0.15 0.15 0.15 0.15 0.15

x x x x

1 2 3 1

x

1

A

B

C

12.57

x

4

0.21 0.05 0.01 7 4.17 25

x x x x x x

4 12 4 4 4 4

x x x x

12 1 2 2

4 1 12

x x +

2 4 8

2 12 6 12

x

4

x

4

6 18 10.62 0.01

x x x x

9+9+6.28+6.28+4.57+4.57 2

x

4

0

x

0

x x x

1 2 3 1

x x

1 2

x x x

1 2 3

x x x

1 2 3

x x

2 2

x

1

0

0.3

5 4 4 1 1

2 2

x x

1 2 2 2

+ +

2 2

PEMERINTAH KABUPATEN SIDOARJO DINAS PENDIDIKAN Jl. Pahlawan No. 04 Telp. 031 8960982 Fax. 8951349 S I DOARJ O

RAB (RENCANA ANGGARAN BIAYA)

KEGIATAN PEKERJAAN LOKASI

:

: REHABILITASI GUDANG : KECAMATAN PORONG KAB. SIDOARJO

TN. ANGGARAN : 2016

KONSULTAN PERENCANA

Related Documents

Rab
June 2020 33
Rab Mess.xlsx
November 2019 44
Rab Material.xlsx
October 2019 47
Contoh Rab
May 2020 30
Rab Gizi.doc
November 2019 30
Rab Gpura.docx
December 2019 24

More Documents from "Nanang Sulistiyanto"

Montase.docx
November 2019 31
Rab Gudang.xlsx
November 2019 42
Bhs Indo.docx
November 2019 42
Rab Mess.xlsx
November 2019 44