Perhitungan Tabel Besi

PERHITUNGAN BERAT BESI UNTUK TIAP JENIS BETON No.

Jenis/Ukuran Beton

1

2

1 1 2 3 4 5 2 6 7 8 9 10 11 12 3 16 16 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Sloof Beton 15/20 Cm K-175 Sloof Beton 15/25 Cm K-250 Sloof Beton 15/30 Cm K-225 Sloof Beton 20/30 Cm K-275 Kolom Beton Dia 40 Cm K-225 Kolom Beton 30/40 Cm K-225 Kolom Beton 12/12 Cm K-175 Kolom Beton 15/25 Cm K-225 Kolom Beton 20/20 Cm K-275 Kolom Beton 30/30 Cm K-275 Kolom Beton 40/40 Cm K-275 Kolom Beton 20/30 Cm K-225 Kolom Beton 20/40 Cm K-225 Kolom Beton 15/15 Cm K-175 Balok Beton 10/10 Cm K-175 Balok Beton 11/15 Cm K-175 Balok Beton 11/20 Cm K-225 Balok Beton Lantai 25/45Cm K-225 Balok Beton Lantai 15/30 Cm K-225 Balok Beton Lantai 15/25 Cm K-225 Ring Balk Beton 11/20 Cm K-225 Ring Balk Beton 15/25 Cm K-175 Ring Balk Beton 15/30 Cm K-275 Ring Balk Beton 20/30 Cm K-275 Plat Beton Lantai Top Floor t=10 K-225 Plat Beton Lantai 2, t=12 Cm K-225 Plat Beton Penutup Saluran, t=3 Cm K-175 Tangga Dan Borders K-225 Lisplank Beton K 175 Poor Plat Beton K-350 Type 1 Poor Plat Beton K-350 Type 2

Tebal Selimut (M')

0.15 0.15 0.15 0.30

0.20 0.25 0.30 0.30

Diameter Besi Yang Dipergunakan, Berat Besi Per Meter Serta Jumlah Besi

P Balok 1 M3 1/(Luas Pnp. 8 10 12 14 16 19 22 25 Balok) 0.3936 0.6151 0.8857 1.2055 1.5746 2.2204 2.9769 3.8441 (M') 3 4 5 6 7 8 9 10

0.015 0.015 0.015 0.015

4 4 5 8 8 8

0.12 0.15

0.12 0.25

0.015 0.015

0.30

0.30

0.015

4 6 6 8 8

0.12 0.15 0.11 0.11 0.11 0.30 0.30 0.20 0.11

0.12 0.25 0.11 0.15 0.20 0.40 0.50 0.30 0.20

0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015

6 6 4 4 4 4 8 5 5 4 5 5 5

0.12 0.15 0.20 0.25 0.12

0.15 0.30 0.40 0.50 0.20

0.015 0.015 0.015 0.015 0.015

8 8 8 22 10

10 10 10 12 16 16

16 16

33.3333 26.6667 22.2222 11.1111 7.9618 8.3333 69.4444 26.6667 25.0000 11.1111 6.2500 16.6667 69.4444 26.6667 1.0000 60.6061 45.4545 8.3333 6.6667 16.6667 45.4545 26.6667 22.2222 16.6667 10.0000 8.3333 55.5556 22.2222 12.5000 8.0000 41.6667

Panjang Besi (M') 11 33.3333 26.6667 22.2222 11.1111 7.9618 8.3333 69.4444 26.6667 25.0000 11.1111 6.2500 16.6667 69.4444 26.6667 1.0000 60.6061 45.4545 8.3333 6.6667 16.6667 45.4545 26.6667 22.2222 16.6667 10.0000 8.3333 55.5556 22.2222 12.5000 0.0000 0.0000

Berat Besi 1 M3 (kg)

Sub Jum. Berat Besi 1 M3 (kg)

Jumlah Berat Besi 1 M3 (kg)

a b c 12=JB.d1 x 13=JB.d2 x 14=12+13 15=11x14 B. besi/m B. besi/m 3.5428 0.0000 3.5428 118.0917 3.5428 0.0000 3.5428 94.4734 6.0276 0.0000 6.0276 133.9466 9.6442 0.0000 9.6442 107.1573 12.5965 0.0000 12.5965 100.2902 12.5965 0.0000 12.5965 104.9704 3.5428 0.0000 3.5428 246.0244 5.3141 0.0000 5.3141 141.7101 5.3141 0.0000 5.3141 132.8532 9.6442 0.0000 9.6442 107.1573 30.7531 0.0000 30.7531 192.2066 7.2331 0.0000 7.2331 120.5520 7.2331 0.0000 7.2331 502.2999 3.5428 0.0000 3.5428 94.4734 3.5428 0.0000 3.5428 3.5428 2.4602 0.0000 2.4602 149.1057 3.5428 0.0000 3.5428 161.0342 30.7531 0.0000 30.7531 256.2755 7.8728 0.0000 7.8728 52.4852 6.0276 0.0000 6.0276 100.4600 3.5428 0.0000 3.5428 161.0342 6.0276 0.0000 6.0276 160.7360 6.0276 0.0000 6.0276 133.9466 6.0276 0.0000 6.0276 100.4600 4.9205 8.8569 13.7774 137.7737 4.9205 8.8569 13.7774 114.8114 32.0000 50.0000 82.0000 4555.5556 13.5313 14.4662 27.9976 622.1685 6.1506 0.0000 6.1506 76.8826 14.1710 19.2883 33.4593 0.0000 80.0000 19.2883 99.2883 0.0000

Rumah Sakit Umum Buol

Perhitungan Tabel Besi

BESI UNTUK TIAP JENIS BETON Jarak Begel (m)

Jumlah Begel per M' (bh)

0.1500

6.6667

0.2000

5.0000

0.1500 0.1500

6.6667 6.6667

0.1500

6.6667

0.1500 0.2000 0.2000

6.6667 5.0000 5.0000

0.2000

5.0000

Panjang Begel (M')

Berat Begel 1 M3 (kg)

Total Berat Besi 1 M3 (kg)

Dibulatkan

16

17

18=15+16

19=Round,0

0.6400 0.6000 0.8000 1.1400 0.8000 1.3000 0.4200 0.7400 0.7000 1.1400 1.5000 0.8000 1.0000 0.3500 0.3800 0.4600 0.5600 1.2000 0.9000 0.7000 0.5600 0.7000 0.8000 0.8000 0.0000 0.0000 0.0000 0.0000 1.1000 0.0000 0.0000

55.9842 37.7894 41.9882 38.9539 15.0435 25.5865 76.5409 51.7854 41.3321 51.9385 49.8199 31.4911 164.0163 22.0438 0.9972 54.8709 50.0995 23.6183 14.1710 27.5547 50.0995 44.0876 41.9882 31.4911 0.0000 0.0000 0.0000 0.0000 32.4752 0.0000 0.0000

174.0760 132.2627 175.9348 146.1112 115.3337 130.5570 322.5654 193.4955 174.1853 159.0958 242.0265 152.0431 666.3162 116.5172 4.5400 203.9766 211.1337 279.8938 66.6562 128.0147 211.1337 204.8235 175.9348 131.9511 137.7737 114.8114 4555.5556 622.1685 109.3579 0.0000 0.0000

(kg)

174.0000 132.0000 176.0000 146.0000 115.0000 131.0000 323.0000 193.0000 174.0000 159.0000 242.0000 152.0000 666.0000 117.0000 5.0000 204.0000 211.0000 280.0000 67.0000 128.0000 211.0000 205.0000 176.0000 132.0000 138.0000 115.0000 4556.0000 622.0000 109.0000 0.0000 0.0000

Rumah Sakit Umum Buol

RENCANA ANGGARAN BIAYA REKAPITULASI Pekerjaan Lokasi Tahun Anggaran

: Nama Pekerjaan : Nama Lokasi : 2018

No.

Uraian Pekerjaan

1 I. II. III. IV. V. VI. VII.

2 PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN BETON PEKERJAAN BESI PEKERJAAN PENGECATAN PEKERJAAN ELEKTRIKAL PEKERJAAN LAIN-LAIN Jumlah PPn 10% Total Dibulatkan

Terbilang

:

ENCANA ANGGARAN BIAYA REKAPITULASI

Jumlah Harga Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

3 2,107,266.94 611,434.56 17,049,727.94 62,320,583.79 7,422,561.08 24,263,982.00 1,750,000.00 115,525,556.31 11,552,555.63 127,078,111.94 127,078,000.00

RENCANA ANGGARAN BIAYA DAFTAR KUANTITAS DAN HARGA Pekerjaan Lokasi Tahun Anggaran

: Nama Pekerjaan : Nama Lokasi : 2018

No.

Uraian Pekerjaan

Volume

Harga Satuan

1 I.

2

3

4

1. 2.

PEKERJAAN PERSIAPAN Papan Informasi Kegiatan Pengukuran dan pemasangan bouwplank

1. 2. 3.

PEKERJAAN TANAH Penggalian tanah biasa sedalam 2 m Pengurugan kembali galian tanah Pengurugan dengan pasir urug

1. 2. 3.

PEKERJAAN BETON Membuat beton mutu f’c = 19,3 Mpa (K225) Pembesian dengan besi polos atau besi ulir Pemasangan bekisting untuk pondasi

1. 2.

PEKERJAAN BESI Pemasangan besi profil Pengerjaan pekerjaan perakitan

1.

PEKERJAAN PENGECATAN Pengecatan permukaan baja galvanis secara manual 4 lapis

1. 2. 3. 4. 5. 6. 8. 9.

PEKERJAAN ELEKTRIKAL Pemasangan lampu sorot Pemasangan kabel NYY 2 x 1,5 mm Pemasangan photocell control switch Pemasangan MCB 2A + box Pemasangan jarum penangkal petir elektrostatik (main rod) Pemasangan kabel BCC 1 x 50 mm + conduite Pemasangan pentanahan (copper rod ø 5/8") P = 3 m¹ Pemasangan bak kontrol (beton)

1. 2.

PEKERJAAN LAIN-LAIN Pembersihan Akhir Administrasi dan Dokumentasi

II.

III.

IV.

V.

VI.

VII.

1.00 ls Rp 826,773.75 22.56 m¹ Rp 56,759.45 Total Sub Pekerjaan Persiapan 5.38 m³ 2.24 m³ 0.26 m³ Total Sub

Rp 83,902.50 Rp 49,225.00 Rp 195,745.00 Pekerjaan Tanah

2.88 m³ Rp 915,647.59 509.76 kg Rp 15,735.50 38.40 m² Rp 166,441.00 Total Sub Pekerjaan Beton 2,073.19 kg Rp 29,031.75 2,073.19 kg Rp 1,028.56 Total Sub Pekerjaan Besi 111.20 m² Rp 66,749.65 Total Sub Pekerjaan Pengecatan 4.00 bh Rp 2,028,000.00 57.00 m¹ Rp 8,372.00 4.00 bh Rp 180,000.00 4.00 bh Rp 339,069.50 4.00 unit Rp 900,000.00 57.00 m¹ Rp 88,500.00 4.00 ttk Rp 900,000.00 4.00 unit Rp 338,500.00 Total Sub Pekerjaan Elektrikal 1.00 ls Rp 750,000.00 1.00 ls Rp 1,000,000.00 Total Sub Pekerjaan Lain-Lain

NCANA ANGGARAN BIAYA TAR KUANTITAS DAN HARGA

Jumlah Harga 5 Rp Rp Rp

826,773.75 1,280,493.19 2,107,266.94

Rp Rp Rp Rp

451,059.84 110,264.00 50,110.72 611,434.56

Rp Rp Rp Rp

2,637,065.06 8,021,328.48 6,391,334.40 17,049,727.94

Rp Rp Rp

60,188,188.62 2,132,395.16 62,320,583.79

Rp Rp

7,422,561.08 7,422,561.08

Rp Rp Rp Rp Rp Rp Rp Rp Rp

8,112,000.00 477,204.00 720,000.00 1,356,278.00 3,600,000.00 5,044,500.00 3,600,000.00 1,354,000.00 24,263,982.00

Rp Rp Rp

750,000.00 1,000,000.00 1,750,000.00

RENCANA ANGGARAN BIAYA REKAPITULASI Pekerjaan Lokasi Tahun Anggaran No. 1 I. II. III. IV. V. VI. VII. VIII. IX. X. XI. XII.

: Pembangunan Rumah Operator : PP. Kolonodale, Kab. Morowali Utara : 2018 Uraian Pekerjaan 2

PEKERJAAN PERSIAPAN PEKERJAAN TANAH DAN PASIR PEKERJAAN PASANGAN PEKERJAAN PLESTERAN DAN LANTAI PEKERJAAN BETON PEKERJAAN PINTU, JENDELA DAN VENTILASI PEKERJAAN KAP, ATAP DAN PLAFOND PEKERJAAN PENGGANTUNG DAN PENGUNCI PEKERJAAN PENGECATAN PEKERJAAN INSTALASI LISTRIK PEKERJAAN INSTALASI AIR BERSIH/AIR KOTOR PEKERJAAN LAIN-LAIN Jumlah

ENCANA ANGGARAN BIAYA REKAPITULASI

Jumlah Harga Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

3 1,873,061.85 8,628,891.43 36,600,595.25 36,529,325.46 70,461,076.21 9,288,363.56 57,423,319.79 2,183,434.00 10,008,102.61 7,503,534.50 5,882,935.36 750,000.00 247,132,640.00

RENCANA ANGGARAN BIAYA DAFTAR KUANTITAS DAN HARGA Pekerjaan Lokasi Tahun Anggaran

: Pembangunan Rumah Operator : PP. Kolonodale, Kab. Morowali Utara : 2018

No.

Uraian Pekerjaan

Volume

Harga Satuan

1 I.

2

3

4

1.

PEKERJAAN PERSIAPAN Pengukuran dan pemasangan bouwplank

1. 2. 3. 4. 5. 6.

PEKERJAAN TANAH DAN PASIR Galian tanah biasa Urugan tanah bekas galian Urugan sirtu bawah lantai Urugan pasir bawah lantai Urugan pasir bawah pondasi Pemadatan Urugan Tanah dan Sirtu

1. 2. 3.

PEKERJAAN PASANGAN Pas. Batu kosong Pas. Pondasi batu kali 1 : 4 Pas. Batu bata 1 : 5

1. 2. 3. 3. 4. 5. 6.

PEKERJAAN PLESTERAN DAN LANTAI Plesteran dinding 1 : 5 Plesteran kaki pondasi 1 : 5 Acian dinding Pas. Lantai keramik 40 x 40 cm Ubin keramik 20 x 20 cm (KM/WC) Keramik dinding 20 x 25 cm Plesteran kolom teras

II.

III.

IV.

V. 1. 2. 3. 4.

5.

6.

7.

PEKERJAAN BETON Rabat beton keliling bangunan 1 : 3 : 5; t = 5 cm Pas. Cor alas keramik 1 : 3 : 5, t = 8 cm Kolom Beton Bertulang Praktis 11/11 Sloof beton 15/20 Beton 1 : 2 : 3 Besi Bekisting Kolom Beton Bertulang 11/20 Beton 1 : 2 : 3 Besi Bekisting Kolom Beton Bertulang 25/25 Beton 1 : 2 : 3 Besi Bekisting Ring balk 11/20 Beton 1 : 2 : 3 Besi

33.00 m¹ Rp 56,759.45 Total Sub Pekerjaan Persiapan 37.29 m³ Rp 68,612.50 12.43 m³ Rp 49,225.00 14.72 m³ Rp 173,112.50 5.26 m³ Rp 195,745.00 2.78 m³ Rp 195,745.00 27.15 m³ Rp 49,225.00 Total Sub Pekerjaan Tanah Dan Pasir 8.28 m³ Rp 262,663.50 22.17 m³ Rp 752,702.50 115.52 m² Rp 153,552.00 Total Sub Pekerjaan Pasangan 231.04 m² Rp 51,942.60 9.90 m² Rp 51,942.60 245.74 m² Rp 32,000.00 50.76 m² Rp 249,707.70 1.82 m² Rp 220,264.00 8.97 m² Rp 310,286.90 4.80 m² Rp 60,683.04 Total Sub Pekerjaan Plesteran Dan Lantai 1.20 m³ 4.21 m³ 44.20 m¹

Rp Rp Rp

685,812.64 685,812.64 80,165.20

1.53 m³ 213.02 kg 20.40 m²

Rp Rp Rp

915,647.59 15,735.50 159,747.50

0.61 m³ 83.99 kg 81.60 m²

Rp Rp Rp

915,647.59 15,735.50 309,361.25

0.38 m³ 27.43 kg 24.00 m²

Rp Rp Rp

915,647.59 15,735.50 309,361.25

1.12 m³ 208.47 kg

Rp Rp

915,647.59 15,735.50

No.

Uraian Pekerjaan

Volume

1

2

3 20.40 m²

Rp

4 316,167.50

0.14 m³ 24.58 kg 2.70 m²

Rp Rp Rp

915,647.59 15,735.50 316,167.50

0.26 m³ 21.46 kg 21.38 m² Total Sub

Rp 915,647.59 Rp 15,735.50 Rp 335,237.50 Pekerjaan Beton

8.

9.

VI. 1. 2. 3. 4. 5. VII. 1. 2. 3. 4. 5. 6. 7. VIII. 1. 2. 3. 4. 5. 6. 7. IX. 1. 2. 3. 4. X. 1. 2. 3. 4. 5. 6. 7.

Bekisting Ring balk 15/15 Beton 1 : 2 : 3 Besi Bekisting Balok Sunscreen Beton 1 : 2 : 3 Besi Bekisting

Harga Satuan

PEKERJAAN PINTU, JENDELA DAN VENTILASI Kosen pintu, jendela dan ventilasi 0.67 m³ Rp 5,419,727.50 Pintu panil 6.09 m² Rp 540,595.00 Kosen dan Pintu KM/WC Aluminium 1.00 ls Rp 655,039.00 Jendela kaca 5 mm (Bingkai kayu) 8.13 m² Rp 165,526.00 Kosen Pas Kaca Mati 5 mm Aluminium pada atap 2.00 ls Rp 182,078.60 Total Sub PEKERJAAN PINTU, JENDELA DAN VENTILASI PEKERJAAN KAP, ATAP DAN PLAFOND Rangka Atap Baja Ringan (SNI) 123.51 m² Rp 146,272.06 Lisplank Kalsiboard 8,00 mm 65.73 m¹ Rp 42,687.92 Pek. Atap Multi Roof t = 0,30 mm 123.51 m² Rp 158,845.50 Bubungan Metal 23.97 m¹ Rp 108,900.00 Rangka Plafond Baja Ringan SNI (Metal Furring) 90.21 m² Rp 93,415.00 Penutup Plafond Kalsiboard 3,50 mm 90.21 m² Rp 42,687.92 List Plafond Kayu Profil 1 107.60 m² Rp 18,998.10 Total Sub PEKERJAAN KAP, ATAP DAN PLAFOND PEKERJAAN PENGGANTUNG DAN PENGUNCI Kunci tanam 2 slaag 5.00 buah Rp 203,582.50 Engsel pintu ring nylon 5.00 buah Rp 89,238.60 Engsel jendela ring nylon 8.00 buah Rp 38,882.25 Grendel pintu 1.00 buah Rp 129,464.50 Grendel jendela 2.00 buah Rp 46,761.00 Hak angin 2.00 buah Rp 48,411.00 Handel jendela 2.00 buah Rp 44,231.00 Total Sub PEKERJAAN PENGGANTUNG DAN PENGUNCI PEKERJAAN PENGECATAN Pengecatan dinding 245.74 m² Rp 21,747.00 Pengecatan plafond 90.21 m² Rp 21,747.00 Pengecatan kosen, jalusi dan listplank 44.66 m² Rp 49,874.00 Pelitur/vernis pintu 12.18 m² Rp 38,984.00 Total Sub PEKERJAAN PENGECATAN PEKERJAAN INSTALASI LISTRIK Pasangan titik lampu 11.00 titik Rp 386,595.00 Pas. Stop kontak 5.00 buah Rp 133,039.50 Pas. Saklar tunggal 2.00 buah Rp 125,559.50 Pas. Saklar double 3.00 buah Rp 128,859.50 TKO Kisi-kisi Stainless 2 x 18 watt 4.00 buah Rp 220,825.00 Down light 5" + Lampu SL 23 watt 7.00 buah Rp 103,675.00 Panel MCB dan Accsesories 1.00 buah Rp 339,069.50 Total Sub PEKERJAAN INSTALASI LISTRIK

No.

Uraian Pekerjaan

1 XI. 1. 2. 3. 4. 5. XII. 1.

Volume

Harga Satuan

2 3 4 PEKERJAAN INSTALASI AIR BERSIH/AIR KOTOR Pas. Kloset jongkok Lokal 1.00 buah Rp 647,625.00 Pas. Kran Air Ø 0,5" 1.00 buah Rp 84,931.00 Bak Mandi 1.00 buah Rp 2,117,445.00 Septick tank dan peresapan 1.00 unit Rp 2,999,301.86 Floor drain 1.00 buah Rp 33,632.50 Total Sub PEKERJAAN INSTALASI AIR BERSIH/AIR KOTOR PEKERJAAN LAIN-LAIN Pembersihan Akhir 1.00 ls Rp 750,000.00 Total Sub PEKERJAAN LAIN-LAIN

NCANA ANGGARAN BIAYA TAR KUANTITAS DAN HARGA

Jumlah Harga 5 Rp Rp

1,873,061.85 1,873,061.85

Rp Rp Rp Rp Rp Rp Rp

2,558,560.13 611,866.75 2,548,216.00 1,029,618.70 544,171.10 1,336,458.75 8,628,891.43

Rp Rp Rp Rp

2,174,853.78 16,687,414.43 17,738,327.04 36,600,595.25

Rp Rp Rp Rp Rp Rp Rp Rp

12,000,818.30 514,231.74 7,863,680.00 12,675,162.85 400,880.48 2,783,273.49 291,278.59 36,529,325.46

Rp Rp Rp

822,975.17 2,887,271.21 3,543,301.84

Rp Rp Rp

1,400,940.81 3,351,976.21 3,258,849.00

Rp Rp Rp

558,545.03 1,321,624.65 25,243,878.00

Rp Rp Rp

347,946.08 431,624.77 7,424,670.00

Rp Rp

1,025,525.30 3,280,379.69

Jumlah Harga Rp

5 6,449,817.00

Rp Rp Rp

128,190.66 386,778.59 853,652.25

Rp Rp Rp Rp

238,068.37 337,683.83 7,167,377.75 70,461,076.21

Rp Rp Rp Rp Rp Rp

3,631,217.43 3,292,223.55 655,039.00 1,345,726.38 364,157.20 9,288,363.56

Rp Rp Rp Rp Rp Rp Rp Rp

18,066,062.13 2,805,876.98 19,619,007.71 2,610,333.00 8,426,967.15 3,850,877.26 2,044,195.56 57,423,319.79

Rp Rp Rp Rp Rp Rp Rp Rp

1,017,912.50 446,193.00 311,058.00 129,464.50 93,522.00 96,822.00 88,462.00 2,183,434.00

Rp Rp Rp Rp Rp

5,344,107.78 1,961,796.87 2,227,372.84 474,825.12 10,008,102.61

Rp Rp Rp Rp Rp Rp Rp Rp

4,252,545.00 665,197.50 251,119.00 386,578.50 883,300.00 725,725.00 339,069.50 7,503,534.50

Jumlah Harga 5 Rp Rp Rp Rp Rp Rp

647,625.00 84,931.00 2,117,445.00 2,999,301.86 33,632.50 5,882,935.36

Rp Rp

750,000.00 750,000.00

RENCANA ANGGARAN BIAYA REKAPITULASI Pekerjaan Lokasi Tahun Anggaran

: REHABILITASI BANGUNAN GUDANG COKELAT : KEL. TAIPA KEC. PALU UTARA : 2018

No.

Uraian Pekerjaan

1 I. III. IV. V. VII. IX. XII.

2 PEKERJAAN PERSIAPAN PEKERJAAN PASANGAN PEKERJAAN PLESTERAN & LANTAI PEKERJAAN BETON PEKERJAAN KAP, ATAP & PLAFOND PEKERJAAN PENGECATAN PEKERJAAN LAIN-LAIN

Terbilang

:

Realcoast Over Head & Profit 15% Total Dibulatkan Sembilan Ratus Delapan Puluh Tiga Juta Sembilan Ratus Dua Puluh Dua Ribu Ru

ENCANA ANGGARAN BIAYA REKAPITULASI

Jumlah Harga

3 Rp 101,773,092.75 Rp 163,263,880.39 Rp 178,503,628.82 Rp 324,696,057.64 Rp 41,201,728.00 Rp 45,396,782.17 Rp 750,000.00 Rp 855,585,169.76 Rp 128,337,775.46 Rp 983,922,945.23 Rp 983,922,000.00 Delapan Puluh Tiga Juta Sembilan Ratus Dua Puluh Dua Ribu Rupiah

RENCANA ANGGARAN BIAYA DAFTAR KUANTITAS DAN HARGA Pekerjaan Lokasi Tahun Anggaran

: REHABILITASI BANGUNAN GUDANG COKELAT : KEL. TAIPA KEC. PALU UTARA : 2018

No.

Uraian Pekerjaan

Volume

Harga Satuan

1 I.

2

3

4

1. 2. 3. 4.

PEKERJAAN PERSIAPAN Buangan Sisa Pembongkaran Pembongkaran Beton Bertulang Pembongkaran Dinding Batu Bata Pembongkaran Plafond + Rangka

1. 2.

PEKERJAAN PASANGAN Pas. Batu Bata 1 : 5 (Gudang) Pas. Batu Bata 1 : 5 (Pagar)

1. 2. 3. 4.

PEKERJAAN PLESTERAN & LANTAI Plesteran Dinding 1 : 5 (Gudang) Plesteran Dinding 1 : 5 (Pagar) Acian Dinding (Gudang) Acian Dinding (Pagar)

III.

IV.

V. 1. 2.

3. 4.

5.

6.

7.

VII. 5. 6.

PEKERJAAN BETON Rabat Beton Lantai Garasi 1 : 3 : 5, T = 10 cm Sloof Beton Bertulang 11 x 15 (Pagar) Membuat beton mutu f’c = 19,3 MPa (K225) Besi Bekisting Kolom Beton Bertulang Praktis 11 x 11 (Pagar) Kolom Beton Bertulang 25 x 40 (Gudang) Membuat beton mutu f’c = 19,3 MPa (K225) Besi Bekisting Balok Beton Bertulang 20 x 30 (Gudang) Membuat beton mutu f’c = 19,3 MPa (K225) Besi Bekisting Ringbalk Beton Bertulang 15 x 20 Sopi-sopi (Gudang) Membuat beton mutu f’c = 19,3 MPa (K225) Besi Bekisting Ringbalk Beton Bertulang 11 x 15 (Pagar) Membuat beton mutu f’c = 19,3 MPa (K225) Besi Bekisting PEKERJAAN KAP, ATAP & PLAFOND Rangka Plafond Baja Ringan SNI (Metal Furring) Penutup Plafond Gypsumboard 9,00 mm

159.49 m³ Rp 250,000.00 6.43 m³ Rp 930,600.00 101.75 m³ Rp 534,310.00 304.00 m² Rp 5,100.00 Total Sub Pekerjaan Persiapan 891.75 m² Rp 153,552.00 171.50 m² Rp 153,552.00 Total Sub Pekerjaan Pasangan 1,783.50 m² Rp 51,942.60 343.00 m² Rp 51,942.60 1,783.50 m² Rp 32,000.00 343.00 m² Rp 32,000.00 Total Sub Pekerjaan Plesteran & Lantai 36.00 m³

Rp

685,812.64

m³ kg m² m¹

Rp Rp Rp Rp

915,647.59 15,735.50 159,747.50 80,165.20

20.21 m³ 3,577.25 kg 262.74 m²

Rp Rp Rp

915,647.59 15,735.50 309,361.25

10.80 m³ 1,404.00 kg 144.00 m²

Rp Rp Rp

915,647.59 15,735.50 316,167.50

4.53 m³ 625.09 kg 83.04 m²

Rp Rp Rp

915,647.59 15,735.50 316,167.50

1.21 267.80 21.93 63.70

1.21 m³ Rp 915,647.59 267.80 kg Rp 15,735.50 21.93 m² Rp 316,167.50 Total Sub Pekerjaan Beton 304.00 m² Rp 93,415.00 304.00 m² Rp 42,117.00 Total Sub Pekerjaan Kap, Atap & Plafond

No. 1 IX.

Uraian Pekerjaan

Volume

Harga Satuan

2

3

4

1. 2.

PEKERJAAN PENGECATAN Pengecatan Dinding Pengecatan Plafond

1.

PEKERJAAN LAIN-LAIN Pembersihan Akhir

XII.

1,783.50 m² Rp 21,747.00 304.00 m² Rp 21,747.00 Total Sub Pekerjaan Pengecatan 1.00 ls Rp 750,000.00 Total Sub Pekerjaan Lain-Lain

NCANA ANGGARAN BIAYA TAR KUANTITAS DAN HARGA

Jumlah Harga 5 Rp Rp Rp Rp Rp

39,871,806.00 5,983,898.52 54,366,988.23 1,550,400.00 101,773,092.75

Rp Rp Rp

136,929,712.39 26,334,168.00 163,263,880.39

Rp Rp Rp Rp Rp

92,639,435.22 17,816,311.80 57,071,881.79 10,976,000.00 178,503,628.82

Rp

24,689,255.04

Rp Rp Rp Rp

1,104,558.51 4,213,993.78 3,503,738.98 5,106,523.24

Rp Rp Rp

18,505,660.82 56,289,845.29 81,280,339.24

Rp Rp Rp

9,888,993.97 22,092,642.00 45,528,118.86

Rp Rp Rp

4,147,559.44 9,836,121.76 26,255,658.47

Rp Rp Rp Rp

1,104,558.51 4,213,993.78 6,934,495.96 324,696,057.64

Rp Rp Rp

28,398,160.00 12,803,568.00 41,201,728.00

Jumlah Harga 5 Rp Rp Rp

38,785,694.17 6,611,088.00 45,396,782.17

Rp Rp

750,000.00 750,000.00

RENCANA ANGGARAN BIAYA DAFTAR HARGA BAHAN Pekerjaan Lokasi Tahun Anggaran

: Nama Pekerjaan : Nama Lokasi : 2018

No.

Uraian

Kode

Satuan

Harga Satuan

1

2

3 M.02 M.03 M.55

4 ltr lbr kg kg kg kg kg kg kg kg ltr ltr ltr kg kg ltr btg unit bh m² kg m³ m³ m¹ lbr lbr lbr bh bh bh bh bh bh bh bh kg ltr bh m¹ kg kg kg kg

5

1. 2. 3. 4. 5. 6. 7. 8. 9.

10. 11. 12. 13. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41.

Air Ampelas Besi Beton (Polos/Ulir) Besi Siku L 50.50.5 Cat Tembok Dasar (Water Based) Cat Tembok penutup Plamuur Tembok Cat Minyak Dasar (Solvent Based) Cat Minyak Menie (Solvent Based) Cat Minyak Penutup (Solvent Based) Solar Minyak Pelumas Vernis Dempul Kayu Plamuur Kayu Thinner Dolken Kayu, Ø 8 - 10 cm, Panjang 4 m¹ Floor Drain Genteng Metal Kaca Tebal 5 mm Kawat Beton Kayu Kelas II Kayu Kelas III List Kayu Profil Plywood 4 mm, (120 x 240) cm Plywood 6 mm, (120 x 240) cm Plywood 9 mm, (120 x 240) cm Kunci Tanam Kunci Tanam KM Engsel Kupu - Kupu Engsel Pintu Kait Angin Spring Knip Tarikan Jendela Kuas Lem Kayu Minyak Bekisting Nok Genteng Metal Talang Genteng Metal Paku 1 cm - 2,5 cm Paku 10 cm Paku 5 cm - 7 cm Paku 5 cm - 10 cm

M.115.d M.115.e

Rp 190.00 Rp 3,800.00 Rp 12,000.00 Rp 13,050.00 Rp 26,300.00 Rp 30,000.00 Rp 8,400.00 Rp 62,300.00 Rp 27,000.00 Rp 62,300.00 Rp 7,130.00 Rp 33,750.00 Rp 30,300.00 Rp 12,600.00 Rp 26,300.00 Rp 35,600.00 Rp 13,500.00 Rp 18,800.00 Rp 86,300.00 Rp 135,000.00 Rp 24,800.00 Rp 2,062,500.00 Rp 1,687,500.00 Rp 7,100.00 Rp 56,300.00 Rp 93,800.00 Rp 131,300.00 Rp 131,300.00 Rp 67,500.00 Rp 24,000.00 Rp 64,100.00 Rp 26,300.00 Rp 24,800.00 Rp 22,500.00 Rp 3,800.00 Rp 18,400.00 Rp 40,100.00 Rp 55,100.00 Rp 27,400.00 Rp 28,100.00 Rp 28,100.00 Rp 28,100.00 Rp 28,100.00

No.

Uraian

Kode

Satuan

1

2

3

4 kg kg m³ m³ m³ m³ m³ m³ m³ m³ bh

42. 43. 44. 45. 46. 47. 48. 49. 50. 51. 52.

Paku 5 cm - 12 cm Paku Sekrup Tanah Urug Pasir Beton Pasir Pasang Pasir Urug Sirtu Kerikil (Maks 30 mm) Batu Belah Batu Karang Bata Berongga

Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

5 28,100.00 16,900.00 112,500.00 135,000.00 135,000.00 127,500.00 112,500.00 153,800.00 150,000.00 161,300.00 10,700.00

No.

Uraian

Kode

Satuan

1

2

3

4 bh kg kg m¹ bh bh m¹ m¹ m¹ tube bh lbr bh dos dos dos bh bh bh bh unit unit Unit unit bh kg m¹ m¹ m¹ m¹ m¹ m¹ btg m bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh

53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63. 64. 65. 66. 67. 68. 69. 70. 71. 72. 14.

73. 74. 75. 76. 77.

78. 79. 80. 81. 82. 83. 84. 85. 86. 87. 88. 89. 90. 91. 92. 93. 94. 95. 96.

Bata Merah Semen Warna Semen Portland Pintu Alluminium Kusen Dan Daun Pintu PVC Kusen Dan Daun Pintu Alluminium Profil Alluminium Profil Kaca Rangka Metal Hollow 40.40.2 mm Sealant Sealtape Seng Gelombang Ukuran 80 cm x 180 cm BJLS 0,30 Sekrup Fixer Ubin Keramik (40 x 40) cm, 6 bh Ubin Keramik (30 x 30) cm, 11 bh Ubin Keramik (20 x 20) cm, 11 bh Ubin Keramik (20 x 25) cm Plint Keramik (10 x 40) cm Porselen 11 x 11 Kran Air Closet Jongkok Closet Duduk Wastafel Bak Cuci Piring Water Drain Ijuk Pipa PVC ½” Pipa PVC ¾” Pipa PVC 1” Pipa PVC 2” Pipa PVC 3” Pipa PVC 4” Pipa Listrik ⅝” Kabel NYM 3 x 2,5 mm T Dus L Bow Pipa Listrik ⅝” PVC Lasdop 2,5 - 4 mm Klem Pipa Listrik ⅝” PVC MCB (Miniature Circuit Breakers) Frame + Stop Kontak 13A Frame + Saklar Tunggal Frame + Saklar Ganda Inbouwdoos Lampu SL 5 Watt Lampu SL 18 Watt Lampu SL 23 Watt Lampu TL 18 Watt Armature Down Light Ǿ3" Armature Down Light Ǿ4"

M.15

Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

5 1,400.00 4,100.00 1,400.00 66,200.00 286,900.00 512,000.00 56,300.00 56,300.00 12,200.00 65,300.00 5,400.00 56,300.00 1,130.00 93,800.00 92,400.00 77,600.00 5,100.00 3,900.00 1,900.00 33,800.00 326,300.00 1,500,000.00 1,012,500.00 675,000.00 48,600.00 6,000.00 2,400.00 3,800.00 4,690.00 7,500.00 10,400.00 16,800.00 2,600.00 8,800.00 5,000.00 2,000.00 400.00 1,500.00 33,800.00 43,900.00 37,100.00 40,100.00 3,000.00 24,000.00 31,500.00 39,000.00 18,000.00 29,100.00 30,600.00

No.

Uraian

Kode

Satuan

1

2 Armature Down Light Ǿ5" Armature TL Lamp TKO Gypsum Board 3,5 mm Ukuran 120 cm x 240 cm Kalsiboard 3,5 mm Ukuran 120 cm x 240 cm Kalsiplank 0,8 mm Ukuran 20 cm x 300 cm C-75 0,8 C-75 0,6 Reng Baut (10 x 16) mm Dynabolt (8 × 65) mm Gorong-gorong d=80 cm, Panjang 1 m¹ Plastik Cor Joint Sealant Sewa Alat Las Listrik

3

4 bh bh lbr lbr m¹ m¹ m¹ m¹ bh bh bh m² kg Jam

97. 98. 99. 100. 101. 102. 103. 104. 105. 106. 107. 108. 109.

M.166

Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

5 34,400.00 161,900.00 78,000.00 63,800.00 13,500.00 17,300.00 14,600.00 9,400.00 300.00 1,100.00 281,300.00 4,900.00 71,300.00 93,750.00

RENCANA ANGGARAN BIAYA DAFTAR HARGA BAHAN

Keterangan 6

Rp

65,749.32 / m¹

Keterangan 6

Keterangan 6

Keterangan 6

RENCANA ANGGARAN BIAYA DAFTAR HARGA UPAH Pekerjaan Lokasi Tahun Anggaran

: REHABILITASI BANGUNAN GUDANG COKELAT : KEL. TAIPA KEC. PALU UTARA : 2018

No.

Uraian

Kode

Satuan

1

2

3 L.01 L.02 L.02 L.02 L.02 L.02 L.02 L.02 L.02 L.02 L.02 L.02 L.02 L.02 L.02 L.02 L.03 L.04 L.08 L.09

4 OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20.

Pekerja Tukang Tukang Allumunium/Kaca Tukang Batu Tukang Batu/Pipa Tukang Besi Tukang Besi Konstruksi Tukang Cat Tukang Ereksi Tukang Kayu Tukang Khusus Allumunium Tukang Las Tukang Las Biasa Tukang Las Konstruksi Tukang Pipa Tukang Vibrator Kepala Tukang Mandor Operator Alat Pembantu Operator Alat

Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

5 80,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 95,000.00 100,000.00 95,000.00 100,000.00 80,000.00

RENCANA ANGGARAN BIAYA DAFTAR HARGA UPAH

Keterangan 6



Pembongkaran Beton Bertulang Analisa No. : 0 Jenis Pekerjaan : Pembongkaran Beton Bertulang Satuan Pembayaran : m³ No. 1 A.

B.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L.01 L.02 L.03 L.04

OH OH OH OH

TENAGA Pekerja Tukang kayu Kepala tukang Mandor

8.0000 1.6000 0.1600 0.4000 Jumlah Harga Te

BAHAN

Jumlah Harga B C.

ALAT -

Jumlah Harga D. E. F.

Jumlah (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

10.00%

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

Rp Jumlah Harga Bahan

-

Rp Rp

Rp Jumlah Harga Alat

-

Rp Rp Rp Rp Rp

xD

640,000.00 152,000.00 16,000.00 38,000.00 846,000.00 846,000.00 84,600.00 930,600.00



Pembongkaran Dinding Ba 5 Analisa No. : 0 Jenis Pekerjaan : Pembongkaran Dinding Batu Bata Satuan Pembayaran : m³ No. 1 A.

B.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L. 01 L. 04

OH OH

TENAGA Pekerja Pekerja Mandor Mandor

6.6670 0.0100 Jumlah Harga Te

BAHAN

Jumlah Harga B C.

ALAT -

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp Rp 95,000.00 Rp Jumlah Harga Tenaga Rp

533,360.00 950.00 534,310.00

Rp Jumlah Harga Bahan

-

Rp Rp

-

Rp Jumlah Harga Alat

-

Rp Rp Rp

534,310.00

Rp

534,310.00



Pembongkaran Plafond L Analisa No. Jenis Pekerjaan Satuan Pembayaran

5 : 0 : Pembongkaran Plafond Lama dan Rangka : m²

No. 1 A.

B.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L. 01 L. 04

OH OH

TENAGA Pekerja Pekerja Mandor Mandor

0.0400 0.0200 Jumlah Harga Te

BAHAN

Jumlah Harga B C.

ALAT -

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp Rp 95,000.00 Rp Jumlah Harga Tenaga Rp

3,200.00 1,900.00 5,100.00

Rp Jumlah Harga Bahan

-

Rp Rp

-

Rp Jumlah Harga Alat

-

Rp Rp Rp

5,100.00

Rp

5,100.00



Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 5 PP Analisa No. : A.4.4.1.10. Jenis Pekerjaan : Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP Satuan Pembayaran : m² No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L.01 L.02 L.03 L.04

OH OH OH OH

0.3000 0.1000 0.0100 0.0150 Jumlah Harga Te

buah Kg m3

70.0000 9.6800 0.0450 Jumlah Harga B

TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN Bata merah ` Semen Portland Pasir pasang ALAT

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

g bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 5 PP HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

24,000.00 9,500.00 1,000.00 1,425.00 35,925.00

Rp 1,400.00 Rp 1,400.00 Rp 135,000.00 Jumlah Harga Bahan

Rp Rp Rp Rp

98,000.00 13,552.00 6,075.00 117,627.00

Rp Rp Rp

153,552.00

Rp

153,552.00

Rp Jumlah Harga Alat

-



Pemasangan plesteran 1 SP : 5 PP tebal 15 mm Analisa No. : A.4.4.2.5. Jenis Pekerjaan : Pemasangan plesteran 1 SP : 5 PP tebal 15 mm Satuan Pembayaran : m² No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L.01 L.03 L.03 L.04

OH OH OH OH

0.3000 0.1500 0.0150 0.0150 Jumlah Harga Te

Kg m3

5.1840 0.0260 Jumlah Harga B

TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN Semen Portland Pasir Pasang ALAT

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

24,000.00 14,250.00 1,500.00 1,425.00 41,175.00

Rp 1,400.00 Rp Rp 135,000.00 Rp Jumlah Harga Bahan Rp

7,257.60 3,510.00 10,767.60

Rp Jumlah Harga Alat

-

Rp Rp Rp

51,942.60

Rp

51,942.60



Pemasangan acian Analisa No. Jenis Pekerjaan Satuan Pembayaran

: A.4.4.2.27. : Pemasangan acian : m²

No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

5

3

4

TENAGA Pekerja Tukang batu Kepala tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

0.2000 0.1000 0.0100 0.0100 Jumlah Harga Te

BAHAN Semen Portland

M.15

kg

3.2500 Jumlah Harga B

ALAT

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

16,000.00 9,500.00 1,000.00 950.00 27,450.00

Rp 1,400.00 Rp Jumlah Harga Bahan Rp

4,550.00 4,550.00

Rp Jumlah Harga Alat

-

Rp Rp Rp

32,000.00

Rp

32,000.00



Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) Analisa No. : A.4.1.1.4. Jenis Pekerjaan : Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K1 Satuan Pembayaran : m³ No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

5

3

4

TENAGA Pekerja Tukang batu Kepala tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

1.2000 0.2000 0.0200 0.0600 Jumlah Harga Te

BAHAN Semen Portland Pasir Beton Kerikil (Maks 30 mm) Air

M.15 0 0 M.02

kg m³ m³ ltr

230.0000 0.6379 0.7607 200.0000 Jumlah Harga B

ALAT

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

ja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

96,000.00 19,000.00 2,000.00 5,700.00 122,700.00

Rp 1,400.00 Rp 135,000.00 Rp 153,800.00 Rp 190.00 Jumlah Harga Bahan

Rp Rp Rp Rp Rp

322,000.00 86,110.71 117,001.93 38,000.00 563,112.64

Rp Rp

685,812.64

Rp

685,812.64

Rp Jumlah Harga Alat

-



Membuat beton mutu f’c = 19,3 Mpa (K225) Analisa No. : A.4.1.1.7. Jenis Pekerjaan : Membuat beton mutu f’c = 19,3 Mpa (K225) Satuan Pembayaran : m³ No. Uraian Kode Satuan 1 2 3 4 A. TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B.

C.

BAHAN Semen Portland Pasir Beton Kerikil (Maks 30 mm) Air

M.15 0 0 M.02

kg m³ m³ ltr

Koefisien 5

1.6500 0.2750 0.0280 0.0830 Jumlah Harga Te

371.0000 0.4986 0.7756 215.0000 Jumlah Harga B

ALAT

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

Harga Satuan(Rp) 6

Jumlah Harga(Rp) 7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

132,000.00 26,125.00 2,800.00 7,885.00 168,810.00

Rp 1,400.00 Rp 135,000.00 Rp 153,800.00 Rp 190.00 Jumlah Harga Bahan

Rp Rp Rp Rp Rp

519,400.00 67,307.14 119,280.44 40,850.00 746,837.59

Rp Rp Rp

915,647.59

Rp

915,647.59

Rp Jumlah Harga Alat

-

kg

Pembesian dengan besi polos atau besi ulir Analisa No. : A.4.1.1.17. Jenis Pekerjaan : Pembesian dengan besi polos atau besi ulir Satuan Pembayaran : kg No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

5

3

4

TENAGA Pekerja Tukang besi Kepala tukang Mandor

L.01 L.02 L.03 L.04

OH OH OH OH

0.0070 0.0070 0.0007 0.0004 Jumlah Harga Te

BAHAN Besi Beton (Polos/Ulir) Kawat Beton

M.55 0

kg kg

1.0500 0.0150 Jumlah Harga B

ALAT

Jumlah Harga D. E. F.

Jumlah (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

10.00%

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

560.00 665.00 70.00 38.00 1,333.00

Rp 12,000.00 Rp Rp 24,800.00 Rp Jumlah Harga Bahan Rp

12,600.00 372.00 12,972.00

Rp Jumlah Harga Alat xD

Rp Rp Rp Rp

14,305.00 1,430.50 15,735.50



(K3) Pemasangan bekisting untuk sloof Analisa No. : A.4.1.1.21. Jenis Pekerjaan : (K3) Pemasangan bekisting untuk sloof Satuan Pembayaran : m² No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L.01 L.02 L.03 L.04

OH OH OH OH

0.5200 0.2600 0.0260 0.0260 Jumlah Harga Te

0 0 0

m³ kg ltr

0.0450 0.3000 0.1000 Jumlah Harga B

TENAGA Pekerja Tukang kayu Kepala tukang Mandor BAHAN Kayu Kelas III Paku 5 cm - 10 cm Minyak Bekisting ALAT

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

41,600.00 24,700.00 2,600.00 2,470.00 71,370.00

Rp 1,687,500.00 Rp 28,100.00 Rp 40,100.00 Jumlah Harga Bahan

Rp Rp Rp Rp

75,937.50 8,430.00 4,010.00 88,377.50

Rp Rp Rp

159,747.50

Rp

159,747.50

Rp Jumlah Harga Alat

-



Membuat kolom praktis beton bertulang (11 x 11) cm Analisa No. : A.4.1.1.35. Jenis Pekerjaan : Membuat kolom praktis beton bertulang (11 x 11) cm Satuan Pembayaran : m¹ No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

0.1800 0.0200 0.0200 0.0200 0.0060 0.0090 Jumlah Harga Te

m3 kg Liter kg kg kg m3 m3

0.0020 0.0100

TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil

3.0000 0.4500 4.0000 0.0060 0.0090 Jumlah Harga B

ALAT

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 95,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp Rp Rp

14,400.00 1,900.00 1,900.00 1,900.00 600.00 855.00 21,555.00

Rp 1,687,500.00 Rp 28,100.00 Rp 40,100.00 Rp 12,000.00 Rp 24,800.00 Rp 1,400.00 Rp 135,000.00 Rp 153,800.00 Jumlah Harga Bahan

Rp Rp Rp Rp Rp Rp Rp Rp Rp

3,375.00 281.00 36,000.00 11,160.00 5,600.00 810.00 1,384.20 58,610.20

Rp Rp Rp

80,165.20

Rp

80,165.20

Rp Jumlah Harga Alat

-



(K3) Pemasangan bekisting untuk kolom Analisa No. : A.4.1.1.22. Jenis Pekerjaan : (K3) Pemasangan bekisting untuk kolom Satuan Pembayaran : m² No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L.01 L.02 L.03 L.04

OH OH OH OH

0.6600 0.3300 0.0330 0.0330 Jumlah Harga Te

0 0 0 0 0 0

m³ kg ltr m³ lbr btg

0.0400 0.4000 0.2000 0.0150 0.3500 2.0000 Jumlah Harga B

TENAGA Pekerja Tukang kayu Kepala tukang Mandor BAHAN Kayu Kelas III Paku 5 cm - 12 cm Minyak Bekisting Kayu Kelas II Plywood 9 mm, (120 x 240) cm Dolken Kayu, Ø 8 - 10 cm, Panjang 4 m¹ ALAT

Jumlah Harga D. E. F.

Jumlah (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

10.00%

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

52,800.00 31,350.00 3,300.00 3,135.00 90,585.00

Rp 1,687,500.00 Rp 28,100.00 Rp 40,100.00 Rp 2,062,500.00 Rp 131,300.00 Rp 13,500.00 Jumlah Harga Bahan

Rp Rp Rp Rp Rp Rp Rp

67,500.00 11,240.00 8,020.00 30,937.50 45,955.00 27,000.00 190,652.50

Rp Rp Rp Rp Rp

281,237.50 28,123.75 309,361.25

Rp Jumlah Harga Alat xD

-



(K3) Pemasangan bekisting untuk balok Analisa No. : A.4.1.1.23. Jenis Pekerjaan : (K3) Pemasangan bekisting untuk balok Satuan Pembayaran : m² No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L.01 L.02 L.03 L.04

OH OH OH OH

0.6600 0.3300 0.0330 0.0330 Jumlah Harga Te

0 0 0 0 0 0

m³ kg ltr m³ lbr btg

0.0400 0.4000 0.2000 0.0180 0.3500 2.0000 Jumlah Harga B

TENAGA Pekerja Tukang kayu Kepala tukang Mandor BAHAN Kayu Kelas III Paku 5 cm - 12 cm Minyak Bekisting Kayu Kelas II Plywood 9 mm, (120 x 240) cm Dolken Kayu, Ø 8 - 10 cm, Panjang 4 m¹ ALAT

Jumlah Harga D. E. F.

Jumlah (A + B + C) Overhead & Profit Harga Satuan Pekerjaan (D + E)

10.00%

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

52,800.00 31,350.00 3,300.00 3,135.00 90,585.00

Rp 1,687,500.00 Rp 28,100.00 Rp 40,100.00 Rp 2,062,500.00 Rp 131,300.00 Rp 13,500.00 Jumlah Harga Bahan

Rp Rp Rp Rp Rp Rp Rp

67,500.00 11,240.00 8,020.00 37,125.00 45,955.00 27,000.00 196,840.00

Rp Rp Rp Rp Rp

287,425.00 28,742.50 316,167.50

Rp Jumlah Harga Alat xD

-



Memasang Rangka Plafond Metal Furing Jarak 48mm Analisa No. : A.4.2.1.21x Jenis Pekerjaan : Memasang Rangka Plafond Metal Furing Jarak 48mm Satuan Pembayaran : m² No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

oh oh oh oh

0.3500 0.3500 0.0350 0.0180 Jumlah Harga Te

BAHAN Metal Furring Top Cross MF & Cross Joint Universal Joiner Metal Clip Angle Bracket Angle Bracket UK-75 Suspension Rod ø 4mm @ 1m Wall Angle Ramset Nail Concrete Nail

m1 m1 pcs pcs pcs pcs pcs m1 m1 pcs pcs

2.1000 0.8400 0.7400 1.7600 0.7000 0.7000 0.7000 0.7000 0.6000 0.8700 1.5200 Jumlah Harga B

ALAT

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

28,000.00 33,250.00 3,500.00 1,710.00 66,460.00

Rp 5,800.00 Rp 5,800.00 Rp 800.00 Rp 800.00 Rp 800.00 Rp 800.00 Rp 1,100.00 Rp 3,500.00 Rp 3,800.00 Rp 1,300.00 Rp 100.00 Jumlah Harga Bahan

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

12,180.00 4,872.00 592.00 1,408.00 560.00 560.00 770.00 2,450.00 2,280.00 1,131.00 152.00 26,955.00

Rp Rp Rp

93,415.00

Rp

93,415.00

Rp Jumlah Harga Alat

-



Pemasangan langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm Analisa No. : A.4.5.1.7. Jenis Pekerjaan : Pemasangan langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 m Satuan Pembayaran : m² No. 1 A.

B.

C.

Uraian

Kode

Satuan

Koefisien

2

3

4

5

L.01 L.02 L.03 L.04

OH OH OH OH

0.1000 0.0500 0.0050 0.0050 Jumlah Harga Te

0

lbr kg

0.3640 0.1100 Jumlah Harga B

TENAGA Pekerja Tukang kayu Kepala tukang Mandor BAHAN Gypsum Board 3,5 mm Ukuran 120 cm x 240 c Paku skrup ALAT

Jumlah Harga D.

Jumlah (A + B + C)

F.

Harga Satuan Pekerjaan (D + E)

angit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm HargaSatuan

JumlahHarga

6

7

Rp 80,000.00 Rp 95,000.00 Rp 100,000.00 Rp 95,000.00 Jumlah Harga Tenaga

Rp Rp Rp Rp Rp

8,000.00 4,750.00 500.00 475.00 13,725.00

78,000.00 Rp Rp Jumlah Harga Bahan Rp

28,392.00 28,392.00

Rp

Rp Jumlah Harga Alat

-

Rp Rp Rp

42,117.00

Rp

42,117.00

PERHITUNGAN

No.

Lebar Tinggi Karakteristik Potongan Potongan Beton (m') (m')

Jenis Beton

Jenis/Ukuran Beton

Tebal Selimut (m')

Diameter Berat Besi P 6 0.2214

1 1 2 3 4 1

2 Sloof Beton 11/15 cm K-225 Kolom Beton 25/40 cm K-225 Ringbalk Beton 20/30 cm K-225 Ringbalk Beton 15/20 cm K-225 Ringbalk Beton 11/15 cm K-225

Sloof Beton Kolom Beton Ringbalk Beton Ringbalk Beton Ringbalk Beton

K-225 K-225 K-225 K-225 K-225

3

4

11.00 25.00 20.00 15.00 11.00

15.00 40.00 30.00 20.00 15.00

5 1.50 1.50 1.50 1.50 1.50

11 2.4356

36.50 5,453.97 149.4238356164

1 10

36.50 5,453.97 149.4238356164

1 16.6666666667

0.95 114.20 120.2105263158

1 33.3333333333

0.60 136.66 227.7666666667

1 60.6060606061

0.20 46.22 231.1 16.70 2,839.13 170.0077844311 1.56 303.72 194.6923076923

PERHITUNGAN BERAT BESI UNTUK TIAP JENIS BETON Diameter Besi Yang Dipergunakan, Berat Besi Per Meter Serta Jumlah Besi 8

10

12

14

16

19

22

25

P Balok 1 m3/(Luas Pnp.Balok) (m')

0.3936 0.6151 0.8857 1.2055 1.5746 2.2204 2.9769 3.8441 6

7

4

60.6061 10.0000 16.6667 33.3333 60.6061

8 6 4 4

11 4.33 6.7657 9.7426 13.261

17.32

42.285

8 60.6061 10.0000 16.6667 33.3333 60.6061

Sub Jum. Berat Besi 1 m3 (kg)

Berat Besi 1 m3 (kg)

Panjang Besi (m') a

b

c

9=JB.d1 x

10=JB.d2 x

11=9+10

B. besi/m 2.4602 12.5965 5.3141 2.4602 2.4602

B. besi/m -

2.4602 12.5965 5.3141 2.4602 2.4602

Berat Jenis Baja Jumlah Berat Besi 1 m3 (kg)

Jarak Begel (m)

Jumlah Begel per m' (bh)

Panjang Begel (m')

12=8x11

13

14

15

149.1057 125.9645 88.5688 82.0081 149.1057

0.1500 0.1500 0.1500 0.1500 0.1500

6.6667 6.6667 6.6667 6.6667 6.6667

0.4600 1.2400 0.9400 0.6400 0.4600

Berat Begel 1 m3 (kg) 16 73.1612 50.8451 41.1134 55.9842 73.1612

Total Berat Besi 1 m3 (kg)

Dibulatkan (kg)

17=12+16

18=Round,0

222.2669 176.8096 129.6822 137.9924 222.2669

222.0000 177.0000 130.0000 138.0000 222.0000

Volume

Total Besi

Beton

Begel



kg

36.500 36.500 36.500 36.500 36.500

2,670.384 1,855.844 1,500.640 2,043.424 2,670.384 Panjang Total (m¹) Jumlah Batang (btg)

7,831 m3/kg

Total Besi

Panjang

Tulangan

Besi

kg

6

8

10

5,442.359 4,597.705 3,232.761 2,993.297 5,442.359 Panjang Total (m¹) Jumlah Batang (btg)

12

14

16

4,341.657 3,017.333 2,439.822 3,322.311 4,341.657 -

-

3,017 251

19

22

25

3,456.439 2,920.000 2,053.125 1,901.042 3,456.439 -

-

2,920 243

-

-

-

8,112.743 6,453.549 4,733.401 5,036.722 8,112.743

Pasangan Batu Dinding Gudang

1 2 3

229.776051 235.166051 426.806051

1 1 1

Pasangan Batu Dinding Pagar

1 2

98.700000 72.800000

1 1

Kolom 25 x 40

1 2 3 4 5 6 7 8

0.320000 0.446120 0.572239 0.698359 0.700000 0.826120 0.952239 1.078359

0 8 8 4 0 4 4 2

Sloof 11 x 15

1 2

0.225000 0.225000

1 1

Ringbalk 11 x 15

1 2

0.225000 0.225000

1 1

Balok 20 x 30

1

0.225000

48

Plafond

1

304.000000

1

Pembongkaran Dinding Bata

1 2 3

34.466408 35.274908 32.010454

1 1 1

Buangan Sisa Pembongkaran Dinding Bata

1 2 3 4 5

34.466408 35.274908 64.020908 14.805000 10.920000

1 1 1 1 1

Kusen

1 2

54.400000 32.200000

1 1

Ringbalk 15 x 20 Sopi-sopi

1

1.509882

3

Kolom 11 x 11 Pagar 1 Kolom 11 x 11 Pagar 2

1 2

0.025410 0.033880

17 10

Pembongkaran Beton Bertulang

1

6.430151

1

Rabat Beton Lantai Garasi T = 10 cm

1

36.000000

1

m¹²³

229.776051 235.166051 426.806051 891.748153

m² m² m² m²

98.700000 m² 72.800000 m² 171.500000 m² 3.568960 4.577912 2.793436 3.304480 3.808956 2.156718 20.210462

m³ m³ m³ m³ m³ m³ m³ m³ m³

Pas. Batu Bata 1 Pas. Batu Bata 2 Pas. Batu Bata 3

Pas. Batu Bata 1 Pagar Pas. Batu Bata 2 Pagar

Kolom 25 x 40_1A Kolom 25 x 40_2A Kolom 25 x 40_3A Kolom 25 x 40_4A Kolom 25 x 40_1B Kolom 25 x 40_2B Kolom 25 x 40_3B Kolom 25 x 40_4B

0.776407 m³ 0.429907 m³ 1.206314 m³

Sloof 11 x 15_1 Sloof 11 x 15_2

0.776407 m³ 0.429907 m³ 1.206314 m³

Ringbalk 11 x 15_1 Ringbalk 11 x 15_2

10.800000 m³ 10.800000 m³

Balok 20 x 30

304.000000 m² 304.000000 m² 34.466408 m³ 35.274908 m³ 32.010454 m³

Pembongkaran 1 Pembongkaran 2 Pembongkaran 3

101.751770 m³ 34.466408 35.274908 64.020908 14.805000 10.920000 159.487224

m³ m³ m³ m³ m³ m³

Pembuangan 1 Pembuangan 2 Pembuangan 3 Pembuangan 1 Pagar Pembuangan 2 Pagar

54.400000 m¹ 32.200000 m¹ 86.600000 m¹ 4.529646 m³ 4.529646 m³ 0.431970 0.338800 0.770770 63.700000

Ringbalk 15 x 20 Sopi-sopi

m³ m³ m³ m¹

Kolom 11 x 11 Pagar 1 Kolom 11 x 11 Pagar 2

6.430151 m³ 6.430151 m³

Pembongkaran Kolom

36.000000 m³ 36.000000 m³

Rabat Beton

RENCANA ANGGARAN BIAYA REKAPITULASI Pekerjaan Lokasi Tahun Anggaran

: Pengembangan Sarana dan Prasarana PP. Kolonodale : PP. Kolonodale, Kab. Morowali Utara : 2018

No.

Uraian Pekerjaan

1 I. II.

2 NAMA PEKERJAAN PEMBANGUNAN RUMAH OPERATOR

Terbilang

:

Jumlah PPn 10% Total Dibulatkan Enam Ratus Delapan Puluh Dua Juta Enam Ratus Empat Puluh Lima Ribu Rupia

ENCANA ANGGARAN BIAYA REKAPITULASI

Jumlah Harga

Rp Rp Rp Rp Rp Rp lapan Puluh Dua Juta Enam Ratus Empat Puluh Lima Ribu Rupiah

3 115,525,556.31 247,132,640.00 362,658,196.31 36,265,819.63 398,924,015.94 398,924,000.00

JADWAL PELAKSANAAN PEKERJAAN GEDUNG DAN BANGUNAN KANTOR KESEHATAN PELABUHAN KELAS III PALU Pekerjaan Lokasi Tahun Anggaran

: Gedung dan Bangunan Kantor Kesehatan Pelabuhan Kelas III Palu Wilayah Kerja Buol : Kabupaten Buol : 2018

Bulan I No.

1

Uraian Pekerjaan

2 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62.

Papan Nama Proyek Dokumentasi, Pelaporan & Asbuildrawing Pembersihan / Perataan Lokasi Pemasangan Bowplank Galian Tanah (Poor Plat 70 x 70 cm) Urugan Tanah Kembali Bekas Galian Urugan Pasir 5 Cm Galian Tanah (Pondasi Batu Kali) Urugan Tanah Kembali Bekas Galian Urugan Pasir Galian Tanah (Pondasi 1/2 Bata) Urugan Sirtu Dipadatkan (Pekerjaan Peninggian Lantai) Urugan Pasir Perata Lantai Beton K.100 (Bawah Keramik) Lantai Beton K.125 (Drop Of) Lantai Kerja Beton K.100 (Poor Plat 70 x 70 cm) Beton Site Mix K.200 Pembesian Bekisting Pondasi Beton Site Mix K.200 (Pedestal Kolom 30 x 30 cm) Pembesian Bekisting Kolom 2 x Pakai Anstamping Batu Kali Pondasi Batu Kali 1 5 Pondasi 1/2 Bata 1 Pc 3 Ps (Undakan Tangga+Taman) Profil Beton 10/10 (Depan Bangunan) Beton Site Mix K.125 (Balok Sloof (SL1) 15x30 cm) Pembesian Bekisting Sloof 2 x Pakai Beton Site Mix K.125 (Balok Sloof (SL) 11x20 cm) Pembesian Bekisting Sloof 2 x Pakai Beton Site Mix K.200 (Kolom (K1) 30 x30 cm) Pembesian Bekisting Kolom 2 x Pakai Beton Site Mix K.125 (Kolom Praktis (KP) 11 x 11 cm) Pembesian Bekisting Kolom 2 x Pakai Beton Site Mix K.200 (Ring Balk 15 x 35 cm Elv. + 2,76) Pembesian Bekisting Balok 2 x Pakai Beton Site Mix K.125 (Ring Balk 11 x 20 cm Elv. + 3,68) Pembesian Bekisting Balok 2 x Pakai Beton Site Mix K.125 (Balok Latei (BL1) 11 x 15 cm Elv. + 2,71) Pembesian Bekisting Balok 2 x Pakai Beton Site Mix K.125 (Balok Latei (BL2) 11 x 20 cm Elv. + 2,30) Pembesian Bekisting Balok 2 x Pakai Beton Site Mix K.125 (Balok Latei (BL3) 11 x 20 cm Elv. + 2,76) Pembesian Bekisting Balok 2 x Pakai Beton Site Mix K.125 (Balok (B1) 15 x 20 cm Elv. + 2,76) Pembesian Bekisting Balok 2 x Pakai Beton Site Mix K.200 (Sunscreen T = 10 cm Elv. +2,76) Pembesian Bekisting Plat Plesteran 1 Pc 2 Ps Acian Semen Beton Site Mix K.200 (Plat Meja Dapur T = 7 cm)

Volume

3 1.00 Ls 1.00 Ls 184.00 M2 81.00 M1 1.92 M3 1.09 M3 0.10 M3 32.18 M3 8.04 M3 5.08 M3 2.23 M3 102.36 M3 38.56 M3 7.86 M3 1.69 M3 0.10 M3 0.39 M3 72.02 Kg 2.24 M2 0.24 M3 48.70 Kg 3.17 M2 15.30 M3 47.81 M3 29.49 M3 10.20 M1 0.74 M3 118.35 Kg 9.84 M2 2.83 M3 645.05 Kg 51.53 M2 1.17 M3 192.22 Kg 15.55 M2 2.02 M3 462.98 Kg 36.80 M2 0.86 M3 156.21 Kg 13.94 M2 2.83 M3 645.05 Kg 51.53 M2 0.08 M3 14.08 Kg 1.93 M2 0.05 M3 10.68 Kg 1.22 M2 0.10 M3 18.76 Kg 2.40 M2 0.24 M3 42.89 Kg 4.43 M2 0.91 M3 157.16 Kg 9.05 M2 20.07 M2 20.07 M2 0.03 M3

Harga Satuan

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

4 826,773.75 3,700,000.00 14,025.00 56,759.45 68,612.50 49,225.00 195,745.00 68,612.50 49,225.00 195,745.00 68,612.50 173,112.50 195,745.00 685,812.64 870,315.48 685,812.64 979,447.61 15,735.50 83,220.50 979,447.61 15,735.50 154,680.63 262,663.50 714,686.50 175,387.30 870,315.48 870,315.48 15,735.50 79,873.75 870,315.48 15,735.50 79,873.75 979,447.61 15,735.50 154,680.63 870,315.48 15,735.50 154,680.63 979,447.61 15,735.50 158,083.75 870,315.48 15,735.50 158,083.75 870,315.48 15,735.50 158,083.75 870,315.48 15,735.50 158,083.75 870,315.48 15,735.50 158,083.75 870,315.48 15,735.50 158,083.75 979,447.61 15,735.50 335,237.50 64,007.46 32,000.00 979,447.61

Jumlah Harga

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

5 826,773.75 3,700,000.00 2,580,600.00 4,597,515.45 131,736.00 53,655.25 19,574.50 2,207,950.25 395,769.00 994,384.60 153,005.88 17,719,795.50 7,547,927.20 5,390,487.35 1,470,833.16 68,581.26 381,984.57 1,133,270.71 186,413.92 235,067.43 766,318.85 490,337.58 4,018,751.55 34,169,161.57 5,172,171.48 8,877,217.90 644,033.46 1,862,296.43 785,957.70 2,462,992.81 10,150,184.28 4,115,894.34 1,145,953.70 3,024,677.81 2,405,283.72 1,758,037.27 7,285,221.79 5,692,247.00 842,324.94 2,458,042.46 2,203,687.48 2,462,992.81 10,150,184.28 8,146,055.64 69,625.24 221,555.84 305,101.64 43,515.77 168,055.14 192,862.18 87,031.55 295,197.98 379,401.00 208,875.72 674,895.60 700,311.01 891,297.33 2,472,991.18 3,033,899.38 1,284,629.72 642,240.00 29,383.43

Bobot (%)

6 0.10% 0.44% 0.31% 0.54% 0.02% 0.01% 0.00% 0.26% 0.05% 0.12% 0.02% 2.10% 0.89% 0.64% 0.17% 0.01% 0.05% 0.13% 0.02% 0.03% 0.09% 0.06% 0.48% 4.05% 0.61% 1.05% 0.08% 0.22% 0.09% 0.29% 1.20% 0.49% 0.14% 0.36% 0.28% 0.21% 0.86% 0.67% 0.10% 0.29% 0.26% 0.29% 1.20% 0.96% 0.01% 0.03% 0.04% 0.01% 0.02% 0.02% 0.01% 0.03% 0.04% 0.02% 0.08% 0.08% 0.11% 0.29% 0.36% 0.15% 0.08% 0.00%

1

2

3

hari

hari

hari

7

8

7

7

15

22

1-7

8-15

16-22

0.10% 0.44% 0.31% 0.54% 0.02% 0.01% 0.00% 0.26% 0.12% 0.02%

0.01% 0.05% 0.13% 0.02% 0.03% 0.09% 0.06% 0.48% 4.05% 0.61% 0.08% 0.22% 0.09% 0.29% 1.20% 0.49% 0.14% 0.36% 0.28% 0.21% 0.86% 0.67%

Bulan I No.

1 63. 64. 65. 66. 67. 68. 69. 70. 71. 72. 73. 74. 75. 76. 77. 78. 79. 80. 81. 82. 83. 84. 85. 86. 87. 88. 89. 90. 91. 92. 93. 94. 95. 96. 97. 98. 99. 100. 101. 102. 103. 104. 105. 106. 107. 108. 109. 110. 111. 112. 113. 114. 115. 116. 117. 118. 119. 120. 121. 122. 123. 124. 125. 126. 127. 128. 129. 130.

Uraian Pekerjaan

2 Pembesian Bekisting Plat Plesteran 1 Pc 2 Ps Acian Semen Beton Site Mix K.200 (Plat Beton T = 10 cm Elv. + 2,76) Pembesian Bekisting Plat Water Proofing Coating 2 Lapis (Pelapis Anti Bocor) Plesteran 1 Pc 2 Ps Acian Semen Rangka Atap Baja Ringan (Pekerjaan Struktur Atap) Atap Genteng Metal Lisplang GRC 0,8 x 30 Cm Nok Genteng Metal Talang Jurai Dinding 1/2 Bata 1 Pc 5 Ps (Pekerjaan Pasangan, Plesteran da Dinding 1/2 Bata Trasram 1 Pc 3 Psr (Area Km/Wc) Plesteran Dinding 1 Pc 5 Psr Plesteran Dinding 1 Pc 5 Psr Tebal = 3 cm Plesteran Dinding Trasram 1 Pc 3 Psr Plesteran Kolom 1 Pc 3 Psr Plesteran Kaki Pondasi 1 Pc 3 Psr Acian Dinding, Kolom dan Kaki Pondasi Keramik 40 x 40 Keramik 40 x 40 (Teras Entrance) Keramik 40 x 40 (Tangga) Lantai Keramik 20 x 20 (Km/Wc) Dinding Keramik 20 x 25 (Km/Wc) Pintu Frameless Kaca Tempered 12 mm (P.1) Kusen & Pintu Kayu Klas II (P.2) Kusen & Pintu Kayu Klas II (P.3) Kusen & Pintu Kayu Klas II (P.4) Kusen & Pintu Wc Aluminium (P.5) Kusen & Pintu Kayu Klas II + Kusen Ventilasi Kayu + Kaca Beni Kusen & Pintu Kayu Klas II + Kaca Bening 5 mm (PJ) Kusen Kayu Klas II + Kaca Bening 5 mm (J.1) Kusen & Jendela Kayu Klas II + Kusen Ventilasi Kayu + Kaca Be Kusen & Jendela Kayu Klas II + Kusen Ventilasi Kayu + Kaca Be Kusen & Jendela Kayu Klas II + Kusen Ventilasi Kayu + Kaca Be Kusen & Jendela Kayu Klas II + Kusen Ventilasi Kayu + Kaca Be Kusen Kayu Klas II (V.1) Kusen Kayu Klas II (V.2) Pek. Rangka Plafond Kayu Klas II (Bagian Dalam) Pek. Plafond Gypsum 9 mm (Bagian Dalam) Pek. Rangka Plafond Baja Ringan (Bagian Luar) Pek. Plafond GRC 4 mm (Bagian Luar) Cat Dinding Dalam / Interior Cat Dinding Luar / Exterior (Weathershield) Cat Plafond GRC Board (Luar) Cat Plafond Gypsum (Dalam) Cat Lisplank GRC (Menggunakan Cat Weathershield) Wastafel + Kran Air Cermin 60 x 60 cm Closed Duduk Monoblock - Include Jet Shower w/o T- Joint Floor Drain Stainless Steel Kran Air Stainless Steel Kitchen Sink + Kran Leher Angsa Sumur Pantek + Pompa Air 125 Watt PVC 1 (Jaringan Transmisi Dari Pompa Ke Tandon) PVC 1 (Jaringan Distribusi Dari Tandon Ke Pipa Bagi PVC ) PVC (Jaringan Distribusi Dari PVC 1 Ke Kran Air) PVC 3 (Jaringan Pembuangan Dari Closed Ke Septiktank) PVC 2 (Jaringan Pembuangan Dari Floor Drain Ke Sal. Air Huja PVC 1 (Jaringan Pembuangan Dari Tandon Ke Sal. Air Hujan) Galian Tanah (Pondasi Beton) Urugan Kembali Urugan Pasir 5 cm

Volume

3 6.11 Kg 0.41 M2 1.37 M2 1.37 M2 1.67 M3 301.38 Kg 16.69 M2 16.69 M2 33.37 M2 33.37 M2 281.38 M2 281.38 M2 73.92 M1 82.15 M1 30.62 M1 314.20 M2 49.61 M2 628.40 M2 1.29 M2 99.21 M2 93.08 M2 24.69 M2 845.37 M2 134.21 M2 7.44 M2 11.22 M2 8.82 M2 23.58 M2 1.00 Unit 1.00 Unit 4.00 Unit 1.00 Unit 3.00 Unit 2.00 Unit 1.00 Unit 1.00 Unit 1.00 Unit 1.00 Unit 2.00 Unit 5.00 Unit 3.00 Unit 1.00 Unit 150.70 M2 150.70 M2 69.60 M2 69.60 M2 484.45 M2 186.11 M2 69.60 M2 150.70 M2 25.87 M2 2.00 Bh 2.00 Bh 3.00 Bh 3.00 Bh 3.00 Bh 3.00 Bh 1.00 Bh 1.00 Ls 5.14 M1 11.17 M1 19.99 M1 25.44 M1 8.62 M1 6.13 M1 0.22 M3 0.06 M3 0.04 M3

Harga Satuan

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

4 15,735.50 335,237.50 64,007.46 32,000.00 979,447.61 15,735.50 335,237.50 30,327.00 64,007.46 32,000.00 146,272.06 158,845.50 50,616.50 108,900.00 75,383.00 153,552.00 175,387.30 51,942.60 51,942.60 60,683.04 60,683.04 60,683.04 32,000.00 249,707.70 249,707.70 249,707.70 220,264.00 310,286.90 15,000,000.00 2,560,056.75 1,586,802.48 2,560,056.75 655,039.00 1,789,539.94 1,705,360.56 1,198,009.91 1,143,769.51 940,018.16 1,253,705.59 1,517,414.99 95,015.75 134,138.26 98,003.13 42,117.00 93,415.00 42,687.92 21,747.00 30,327.00 21,747.00 21,747.00 30,327.00 2,951,025.00 300,000.00 2,667,170.00 600,000.00 33,632.50 84,931.00 834,817.50 2,600,000.00 18,303.45 18,303.45 18,303.45 40,870.50 28,248.00 18,303.45 68,612.50 49,225.00 195,745.00

Jumlah Harga

5 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

96,143.91 137,447.38 87,690.22 43,840.00 1,635,677.51 4,742,364.99 5,595,113.88 506,157.63 2,135,928.94 1,067,840.00 41,158,032.24 44,695,946.79 3,741,571.68 8,946,135.00 2,308,227.46 48,246,038.40 8,700,963.95 32,640,729.84 67,005.95 6,020,364.40 5,648,377.36 1,498,264.26 27,051,840.00 33,513,270.42 1,857,825.29 2,801,720.39 1,942,728.48 7,316,565.10 15,000,000.00 2,560,056.75 6,347,209.91 2,560,056.75 1,965,117.00 3,579,079.87 1,705,360.56 1,198,009.91 1,143,769.51 940,018.16 2,507,411.19 7,587,074.94 285,047.26 134,138.26 14,769,071.69 6,347,031.90 6,501,684.00 2,971,079.23 10,535,334.15 5,644,157.97 1,513,591.20 3,277,272.90 784,559.49 5,902,050.00 600,000.00 8,001,510.00 1,800,000.00 100,897.50 254,793.00 834,817.50 2,600,000.00 94,079.73 204,449.54 365,885.97 1,039,745.52 243,497.76 112,200.15 15,094.75 2,953.50 7,829.80

Bobot (%)

6 0.01% 0.02% 0.01% 0.01% 0.19% 0.56% 0.66% 0.06% 0.25% 0.13% 4.87% 5.29% 0.44% 1.06% 0.27% 5.71% 1.03% 3.86% 0.01% 0.71% 0.67% 0.18% 3.20% 3.97% 0.22% 0.33% 0.23% 0.87% 1.78% 0.30% 0.75% 0.30% 0.23% 0.42% 0.20% 0.14% 0.14% 0.11% 0.30% 0.90% 0.03% 0.02% 1.75% 0.75% 0.77% 0.35% 1.25% 0.67% 0.18% 0.39% 0.09% 0.70% 0.07% 0.95% 0.21% 0.01% 0.03% 0.10% 0.31% 0.01% 0.02% 0.04% 0.12% 0.03% 0.01% 0.00% 0.00% 0.00%

1

2

3

hari

hari

hari

7

8

7

7

15

22

1-7

8-15

16-22

Bulan I No.

1 131. 132. 133. 134. 135. 136. 137. 138. 139. 140. 141. 142. 143. 144. 145. 146. 147. 148. 149. 150. 151. 152. 153. 154. 155. 156. 157. 158. 159. 160. 161. 162. 163. 164. 165. 166. 167. 168. 169. 170. 171. 172. 173. 174. 175. 176. 177. 178. 179. 180. 181. 182. 183. 184. 185. 186. 187. 188. 189. 190. 191. 192. 193. 194. 195. 196. 197. 198.

Uraian Pekerjaan

Volume

2 3 Lantai Kerja T = 10 cm Beton Site Mix K.100 0.07 M3 Pondasi Beton Site Mix K.200 0.25 M3 Pembesian 170 Kg/M3 42.06 Kg Bekisting 2.72 M2 Menara Besi Siku + Tangga Panjat (Lengkap Dengan Pengecat 1.00 Unit Tandon Air Stainless Steel Kap 1100 Ltr 1.00 Unit Galian Tanah (Pekerjaan Septiktank dan Peresapan 1 Unit) 8.36 M3 Urugan Kembali 2.09 M3 Pipa PVC 4 (Dari Septiktank Ke Peresapan) 4.12 M1 Urugan Pasir 0.56 M3 Lapisan Ijuk Padat 0.39 M3 Lapisan Karang 1.35 M3 Dinding 1/2 Bata Trasram 1 Pc 3 Psr 6.20 M2 Kolom + Balok Beton 12/12 0.32 M3 Plat Beton T = 10 cm 0.30 M3 Lantai Beton K.100 0.17 M3 Plesteran 1Pc 3 Ps 9.23 M2 Acian 9.23 M2 Pipa Vent 1.00 Bh Penyambungan Daya PLN 7.700 VA 1.00 Ls Biaya Legalisir Gambar 1.00 Ls Biaya SLO (Sertifikat Layak Operasi) 7,700.00 VA Lampu SL 24 Watt Type Downlight 4 White 25.00 Bh Lampu SL 11 Watt Type Downlight 4 White 13.00 Bh Stop Kontak 1ph, 220, 10A & 16A 11.00 Bh Saklar Tunggal 5.00 Bh Saklar Ganda 10.00 Bh Titik Penerangan 38.00 Ttk Titik Stop Kontak 11.00 Ttk Box MCB 1.00 Unit Pengadaan, Pemasangan dan Pengetesan Sistem Grounding Be 1.00 Ls Pembersihan / Perataan Lokasi (Pembangunan Pagar Keliling K 142.25 M2 Pemasangan Bowplank 48.00 M1 Galian Tanah (Pondasi Batu Kali ) 55.57 M3 Urugan Tanah Kembali Bekas Galian 13.89 M3 Urugan Pasir 5.55 M3 Lantai Beton K.100 (Gerbang) 1.03 M3 Beton Site Mix K.125 (Balok Sloof 11x20 cm) 3.11 M3 Pembesian 557.91 Kg Bekisting Sloof 2 x Pakai 56.52 M2 Beton Site Mix K.125 (Kolom (K1) 15 x20 cm ) 0.45 M3 Pembesian 76.94 Kg Bekisting Kolom 2 x Pakai 10.50 M2 Beton Site Mix K.125 (Kolom Praktis (KP) 11 x11 cm ) 0.89 M3 Pembesian 204.27 Kg Bekisting Kolom 2 x Pakai 16.24 M2 Beton Site Mix K.125 (Ring Balk 11x11 cm) 1.95 M3 Pembesian 381.80 Kg Bekisting Balok 2 x Pakai 35.52 M2 Anstamping Batu Kali 16.66 M3 Pondasi Batu Kali 1 5 44.23 M3 Dinding 1/2 Bata 1 Pc 5 Ps (Pekerjaan Pasangan,Plesteran, 148.84 M2 Plesteran Dinding 1 Pc 5 Psr 318.21 M2 Plesteran Kolom 1 Pc 3 Psr 32.64 M2 Plesteran Kaki Pondasi 1 Pc 3 Psr 157.98 M2 Acian Dinding, Kolom dan Kaki Pondasi 508.83 M2 Cat Dinding Luar / Exterior (Weathershield) 508.83 M2 Lampu Sorot Out Door 100 Watt , Include Instalasi + Pengam 3.00 Ttk Huruf dan Logo Kantor Acrylic (lht. gbr detail) 1.00 Ls Pagar Type A (lht. gbr detai) (Pekerjaan Pagar Besi (Komplit A 6.00 Unit Pintu Pagar Masuk / Keluar (lht. gbr detai) 2.00 Unit Pembersihan / Perataan Lokasi ( Pembangunan Duicker (2 Uni 24.03 M2 Pemasangan Bowplank 4.00 M1 Galian Tanah (Pekerjaan Tanah dan Pasir / Pondasi Batu Kali) 2.80 M3 Urugan Tanah Kembali Bekas Galian 0.70 M3 Urugan Pasir 0.12 M3 Lantai Kerja Beton K.100 (Pekerjaan Beton) 1.46 M3 Beton Site Mix K.200 (Plat Duicker T = 10 cm (2 Unit) 0.62 M3

Harga Satuan

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

4 685,812.64 979,447.61 15,735.50 83,220.50 4,800,000.00 2,200,000.00 68,612.50 49,225.00 51,782.50 195,745.00 543,675.00 202,075.50 175,387.30 979,447.61 979,447.61 685,812.64 60,683.04 32,000.00 40,000.00 3,000,000.00 400,000.00 38.00 92,323.00 81,345.00 133,039.50 125,559.50 128,859.50 386,595.00 133,039.50 343,658.70 300,000.00 14,025.00 56,759.45 68,612.50 49,225.00 195,745.00 685,812.64 870,315.48 15,735.50 79,873.75 870,315.48 15,735.50 154,680.63 870,315.48 15,735.50 154,680.63 870,315.48 15,735.50 158,083.75 262,663.50 714,686.50 153,552.00 51,942.60 60,683.04 60,683.04 32,000.00 30,327.00 630,000.00 2,200,000.00 3,000,000.00 2,500,000.00 14,025.00 56,759.45 68,612.50 195,745.00 195,745.00 685,812.64 979,447.61

Jumlah Harga

5 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

48,006.88 244,861.90 661,835.13 226,359.76 4,800,000.00 2,200,000.00 573,600.50 102,880.25 213,343.90 109,617.20 212,033.25 272,801.93 1,087,401.26 313,423.24 293,834.28 116,588.15 560,104.46 295,360.00 40,000.00 3,000,000.00 400,000.00 292,600.00 2,308,075.00 1,057,485.00 1,463,434.50 627,797.50 1,288,595.00 14,690,610.00 1,463,434.50 343,658.70 300,000.00 1,995,056.25 2,724,453.60 3,812,796.63 683,735.25 1,086,384.75 706,387.02 2,706,681.14 8,778,992.81 4,514,464.35 391,641.97 1,210,689.37 1,624,146.56 774,580.78 3,214,290.59 2,512,013.35 1,697,115.19 6,007,813.90 5,615,134.80 4,375,973.91 31,610,583.90 22,854,679.68 16,528,654.75 1,980,694.43 9,586,706.66 16,282,560.00 15,431,287.41 1,890,000.00 2,200,000.00 18,000,000.00 5,000,000.00 337,020.75 227,037.80 192,115.00 137,021.50 23,489.40 1,001,286.45 607,257.52

Bobot (%)

6 0.01% 0.03% 0.08% 0.03% 0.57% 0.26% 0.07% 0.01% 0.03% 0.01% 0.03% 0.03% 0.13% 0.04% 0.03% 0.01% 0.07% 0.03% 0.00% 0.36% 0.05% 0.03% 0.27% 0.13% 0.17% 0.07% 0.15% 1.74% 0.17% 0.04% 0.04% 0.24% 0.32% 0.45% 0.08% 0.13% 0.08% 0.32% 1.04% 0.53% 0.05% 0.14% 0.19% 0.09% 0.38% 0.30% 0.20% 0.71% 0.66% 0.52% 3.74% 2.71% 1.96% 0.23% 1.14% 1.93% 1.83% 0.22% 0.26% 2.13% 0.59% 0.04% 0.03% 0.02% 0.02% 0.00% 0.12% 0.07%

1

2

3

hari

hari

hari

7

8

7

7

15

22

1-7

8-15

16-22

12 .2 2%

7. 33 %

7. 33 %

Bulan I No.

1 199. 200. 201. 202. 203. 204. 205. 206.

Uraian Pekerjaan

2

Volume

Harga Satuan

Jumlah Harga

3 4 5 Pembesian 151.22 Kg Rp 15,735.50 Rp 2,379,522.31 Bekisting Plat 2.06 M2 Rp 335,237.50 Rp 690,589.25 Pondasi Batu Kali 1 5 1.45 M3 Rp 714,686.50 Rp 1,036,295.43 Dinding 1/2 Bata 1 Pc 5 Ps (Lening) (Pekerjaan Pasangan, Ples 2.18 M2 Rp 153,552.00 Rp 334,743.36 Plesteran Dinding 1 Pc 5 Psr 21.18 M2 Rp 51,942.60 Rp 1,100,144.27 Plesteran Kaki Pondasi 1 Pc 3 Psr 9.97 M2 Rp 60,683.04 Rp 605,009.91 Acian Dinding, Kolom dan Kaki Pondasi 33.33 M2 Rp 32,000.00 Rp 1,066,560.00 Cat Dinding Luar / Exterior (Weathershield) 21.18 M2 Rp 30,327.00 Rp 642,325.86 Total Pekerjaan Gedung dan Bangunan Kantor Kesehatan Pelabuhan Kelas III Palu Wilayah Kerja Buol Rp 844,611,651.15 Kemajuan Pekerjaan Mingguan (%) Kemajuan Pekerjaan Kumulatif (%)

Bobot (%)

6 0.28% 0.08% 0.12% 0.04% 0.13% 0.07% 0.13% 0. 0 0.08%0% 100.00% 0

1

2

3

hari

hari

hari

7

8

7

7

15

22

1-7

8-15

16-22

1. 81 %

1.81%

5.52%

4.89%

1.81%

7.33%

12.22%

LAKSANAAN PEKERJAAN ATAN PELABUHAN KELAS III PALU WILAYAH KERJA BUOL

Jangka Waktu Pelaksanaan 120 (Seratus Dua Puluh) Hari Kalender Bulan II Bulan III

Bulan I

Bulan IV

4

5

6

7

8

9

10

11

12

13

14

15

16

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

8

7

8

7

8

7

8

7

8

7

8

7

8

30

37

45

52

60

67

75

82

90

97

105

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

7

94 .8 9%

2.10% 0.89% 0.64% 0.17%

1.05%

83 .6 1%

0.10% 0.29% 0.26% 0.29% 1.20% 0.96% 0.01% 0.03% 0.04% 0.01% 0.02% 0.02% 0.01% 0.03% 0.04% 0.02% 0.08% 0.08% 0.11%

70 .9 6%

0.36% 0.15% 0.08% 0.00%

1

12000. 113-120

00 %

10 0. 00 %

8

0.05%

0.29%

1 11200. 00 % 106-112

Keterangan

Jangka Waktu Pelaksanaan 120 (Seratus Dua Puluh) Hari Kalender Bulan II Bulan III

Bulan I 4

5

6

7

8

9

10

11

hari

hari

hari

hari

hari

hari

hari

hari

8

7

8

7

8

7

8

7

30

37

45

52

60

67

75

82

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

12

Bulan IV 13

14

15

16

hari

hari

hari

hari

7

8

7

8

90

97

105

83-90

91-97

98-105

7hari 0. 9 8 6%

7 0.02% 0.01% 0.01% 0.19% 0.56% 0.66% 0.06%

94 .8 9%

0.25% 0.13%

2.86%

0.52%

0.52%

2.44%

2.44%

2.65%

2.65%

0.22%

0.22%

0.53%

0.53%

0.14%

0.14%

3.86% 0.01% 0.71% 0.67% 0.18% 3.20%

58 .0 6%

3.97% 0.22% 0.33% 0.23% 0.87% 1.78%

0.15%

0.15%

0.38%

0.38%

0.15%

0.15%

0.12%

0.12%

0.21%

0.21%

0.10%

0.10%

0.07%

0.07%

0.07%

0.07%

0.06%

0.06%

0.15%

0.15%

0.45%

0.45%

0.02%

0.02%

0.01%

0.01%

1

12000. 113-120

00 %

10 0. 00 %

8

0.01%

2.86%

1 11200. 00 % 106-112

Keterangan

83 .6 1%

49 .2 5% 1.75% 0.75% 0.77% 0.35% 1.25% 0.67% 0.18% 0.39% 0.09% 0.70% 0.07% 0.95% 0.21% 0.01% 0.03%

70 .9 6%

0.10% 0.31% 0.01%

39 .2 7%

0.02% 0.04% 0.12% 0.03% 0.01% 0.00% 0.00% 0.00%

Jangka Waktu Pelaksanaan 120 (Seratus Dua Puluh) Hari Kalender 39 Bulan II Bulan III .

Bulan I

Bulan IV

4

5

6

7

8

27 9%

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

8

7

8

7

8

7

8

7

8

7

8

7

8

30

37

45

52

60

67

75

82

90

97

105

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

10

11

12

13

14

15

16

7 0.03% 0.08% 0.03% 0.57% 0.26% 0.07%

90.01% 4. 89 0.03% % 0.01% 0.03% 0.03% 0.13% 0.04% 0.03% 0.01%

28 .2 1%

0.07% 0.03% 0.00% 0.36% 0.05% 0.03% 0.27% 0.13% 0.17% 0.07% 0.15%

22 .8 9%

1.74% 0.17% 0.04% 0.04%

83 0.24% .6 1%

0.32% 0.45% 0.08% 0.13% 0.08% 0.32%

17 .5 9%

1.04% 0.53% 0.05% 0.14% 0.19% 0.09% 0.38% 0.30% 0.20% 0.71%

12 .3 0%

0.66% 0.52% 1.87%

1.87% 2.71% 1.96% 0.23% 1.14% 1.93% 1.83%

70 .9 6% 7. 33 %

1

12000. 113-120

00 %

10 0. 00 %

8 0.01%

12 .2 2%

1 11200. 00 % 106-112

Keterangan

0.22% 0.26% 2.13% 0.59% 0.04% 0.03% 0.02% 0.02% 0.00% 0.12% 0.07%

7. 33 %

Jangka Waktu Pelaksanaan 120 (Seratus Dua Puluh) Hari Kalender Bulan II Bulan III

Bulan I

Bulan IV

4

5

6

7

8

9

10

11

12

13

14

15

16

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

8

7

8

7

8

7

8

7

8

7

8

7

8

30

37

45

52

60

67

75

82

90

97

105

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

1 11200. 00 % 106-112

Keterangan

1

12000. 113-120

00 %

7

10 0. 00 %

8 0.28% 0.08% 0.12%

1. 81 %

0.04% 0.13% 0.07% 0.13%

0%

90.08% 4. 89 % 0.08%

5.30%

5.30%

5.31%

11.06%

9.99%

8.80%

12.91%

12.65%

11.28%

5.11%

0.00%

0.00%

12.30%

17.59%

22.89%

28.21%

39.27%

49.25%

58.06%

70.96%

83.61%

94.89%

100.00%

100.00%

100.00%

83 .6 1%

70 .9 6%

RENCANA ANGGARAN BIAYA DAFTAR HARGA SATUAN PEKERJAAN Pekerjaan Lokasi Tahun Anggaran No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Pengembangan Sarana dan Prasarana PP. Kolonodale : PP. Kolonodale, Kab. Morowali Utara : ### : : :

#REF! #REF! #REF!

No.

Uraian

1

2 1. 2. 3. 3.

A B C

Helmet Rompi Sarung Tangan Sepatu Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: : Err:509 : Err:509

No.

#REF!

Uraian

1 1. 2. A B C

2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II Pemasangan kaca tebal 5 mm Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: : Pekerjaan Septic Tank + peresapan : Err:509

#REF!

No.

Uraian

1

2 1. 1. 2. 2. 2. 2. 2. 2. 2. 2. 2.

A B C

Galian Tanah Tanah urug lapisan ijuk kerikil pas. Batu karang cor 1;3;5 pas. Bata lapisan pasir urug pas. Besi dia 10 jarak 15 cm pipa pvc 2 pipa GIP 2,5 Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: : Pekerjaan Pipa Air Kotor :

#REF! 0

No.

Uraian

1

2 1. 2.

A B C

Pipa PVC 3" Pipa PVC 4" Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: : Pekerjaan Air Bersih : ls

#REF!

No.

Uraian

1

2 1. 2.

A B C

Pipa PVC 1/2" Pipa PVC 3/4" Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: : Saluran Keliling Bangunan :

No.

#REF! 0 Uraian

1

2 1. 2. 2.

A B C

pas. Bata Pemasangan plesteran 1 SP : 3 PP tebal 15 mm timbunan pasir Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: : Direksi Keet : ls

#REF!

No.

Uraian

1

2 1.

A B C

Err:509 Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: : Papan Nama : unit

#REF!

No.

Uraian

1

2 1.

A B C

Pembuatan Papan Nama Proyek Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pembersihan Lapangan : ls

No.

Uraian

1

2 1.

A B C

(K3) Pembersihan lapangan dan perataan Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pemasangan Bouwplank : m¹

No.

Uraian

1

2 1.

A B C

Pengukuran dan pemasangan Bouwplank Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Galian Pondasi : m³

No.

Uraian

1

2 1.

A B C

Penggalian tanah biasa sedalam 1 m Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Urugan Pasir Bawah Pondasi : m³

No.

Uraian

1

2 1.

A B C

Pengurugan dengan pasir urug Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pondasi Umpak Batu Kali, Spesi 1 PC : 4 Ps : m³

No.

Uraian

1 1. A B C

2 Pemasangan pondasi batu belah campuran 1 SP : 4 PP Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Sloof 15/20 : m³

No.

Uraian

1 1. 2. 3. A B C

2 Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) Pembesian dengan besi polos atau besi ulir (K3) Pemasangan bekisting untuk sloof Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Urugan Tanah kembali yang dipadatkan : m³

No.

Uraian

1

2 1. 2.

A B C

Pengurugan kembali galian tanah (K3) Pemadatan tanah tanah (per 20 cm) Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Rollag Bata : m²

No.

Uraian

1 1. A B C

2 Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 3 PP Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: Err:508 : Pek. Pasang Kolom 12 x 12 : m³ Uraian

1 1. 2. 3. A B C

2 Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) Pembesian dengan besi polos atau besi ulir (K3) Pemasangan bekisting untuk kolom Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Dinding ½ Bata Merah : m²

No.

Uraian

1 1. A B C

2 Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 4 PP Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Ringbalk 10/10 : m¹

No.

Uraian

1 1. 2. 3. A B C

2 Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) Pembesian dengan besi polos atau besi ulir (K3) Pemasangan bekisting untuk balok Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Balok Sopi-sopi : m¹

No.

Uraian

1 1. 2. 3. A B C

2 Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) Pembesian dengan besi polos atau besi ulir (K3) Pemasangan bekisting untuk balok Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: Err:508 : Pek. Kanopi Beton : m³ Uraian

1 1. 2.

2 Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) Pembesian dengan besi polos atau besi ulir

3. A B C

(K3) Pemasangan bekisting untuk lantai Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Rabat Beton Lantai tebal 5 cm : m³

No.

Uraian

1 1. A B C

2 Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Urugan pasir di bawah lantai : m³

No.

Uraian

1

2 1.

A B C

Pengurugan dengan pasir urug Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Urugan Tanah di bawah lantai : m³

No.

Uraian

1

2 1. 2.

A B C

Pengurugan Tanah (K3) Pemadatan tanah tanah (per 20 cm) Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Lantai Keramik 30 x 30 : m²

No.

Uraian

1

2 1.

A B C

Pemasangan lantai keramik ukuran 30 cm x 30 cm Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Keramik 20 x 20 untuk KM : m²

No.

Uraian

1

2 1.

A B C

Pemasangan lantai keramik ukuran 20 cm x 20 cm Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Keramik 20 x 25 untuk Dinding KM : m²

No.

Uraian

1

2 1.

A B C

Pemasangan dinding keramik 20 cm x 25 cm Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Plafond Kalsiboard 3.5 mm dan assesoris + Rangka Hollow 40.40 2 mm (luar + KM) : m²

No.

Uraian

1

2 1. 2.

A B C

Pemasangan Plafon Kalsiboard 3,5 mm Pemasangan rangka besi hollow 1 x 40.40.2mm, modul 60 x 60 cm, untuk plafon Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Plafond Gypsum dan assesoris + Rangka Hollow 40.40 2 mm (dalam) : m²

No.

Uraian

1 1. 2. A B C

2 Pemasangan langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm Pemasangan rangka besi hollow 1 x 40.40.2mm, modul 60 x 60 cm, untuk plafon Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

Uraian

1 1. A B

: Err:508 : Pas. Atap Metal : m²

2 Pemasangan genteng metal ukuran 80 x 100 atap pelana Jumlah Harga Overhead + Profit

C

Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Rangka Baja Ringan : m²

No.

Uraian

1 1. A B C

2 Memasang Kuda-kuda Baja Ringan + Reng Untuk Atap Genteng Metal Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pas. Bubungan metal : m¹

No.

Uraian

1

2 1.

A B C

Pemasangan nok genteng metal Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pas. Listplank Kalsiboard : m¹

No.

Uraian

1

2 1.

A B C

Pemasangan Lisplank Kalsiboard Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

Uraian

1 1. 2. 3. 4. 5. 6. 7. 8. A B C

: Err:508 : Pek. Pasang 1 set Kusen Kayu Pintu Panel dan Jendela Tipe PJ1 plus aksesoris : bh

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II Pemasangan kaca tebal 5 mm Pemasangan kunci tanam biasa Pemasangan engsel pintu Pemasangan engsel jendela kupu-kupu Pemasangan spring knip Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: : Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P2 & P4 plus aksesoris : bh Uraian

1 1. 2. 3. 4. A B C

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II Pemasangan kunci tanam biasa Pemasangan engsel pintu Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: : Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P3 plus aksesoris : bh Uraian

1 1. 2. 3. 4. A B C

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II Pemasangan kunci tanam biasa Pemasangan engsel pintu Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: : Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe PJ plus aksesoris : bh Uraian

1 1. 2. 3. 4. 6. A B C

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II Pemasangan kaca tebal 5 mm Pemasangan kunci tanam biasa Pemasangan engsel pintu Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: : Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P6 plus aksesoris : bh Uraian

1 1. 2. 3. 4.

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II Pemasangan kaca tebal 5 mm Pemasangan kunci tanam biasa

6. A B C

Pemasangan engsel pintu Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

Uraian

1 1. 2. A B C

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pemasangan kaca tebal 5 mm Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: : Pek. Pasang 1 set Jendela Kayu Tipe J2 dan aksesoris : bh Uraian

1 1. 2. 3. 4. 5. A B C

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II Pemasangan kaca tebal 5 mm Pemasangan engsel jendela kupu-kupu Pemasangan spring knip Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: : Pek. Pasang 1 set Jendela Kayu Tipe J3 dan aksesoris : bh Uraian

1 1. 2. 3. 4. 5. A B C

: : Pek. Pasang 1 set Jendela Kayu Tipe J1 dan aksesoris : bh

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II Pemasangan kaca tebal 5 mm Pemasangan engsel jendela kupu-kupu Pemasangan spring knip Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: : Pek. Pasang 1 set Jendela Kayu Tipe J4 dan aksesoris : bh

No.

Uraian

1

2

1. 2. 3. 4. 5. A B C

Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II Pemasangan kaca tebal 5 mm Pemasangan engsel jendela kupu-kupu Pemasangan spring knip Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

Uraian

1 1. 2. 3. 4. 5. A B C

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II Pemasangan kaca tebal 5 mm Pemasangan engsel jendela kupu-kupu Pemasangan spring knip Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: : Pek. Pasang 1 set Ventilasi Kayu Tipe V1 : bh Uraian

1 1. 2. A B C

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pemasangan kaca tebal 5 mm Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

: : Pek. Pasang 1 set Ventilasi Kayu Tipe V2 : bh Uraian

1 1. A B C

: : Pek. Pasang 1 set Jendela Kayu Tipe J5 dan aksesoris : bh

2 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang 1 set Jendela Kayu Tipe J1 dan aksesoris : bh

No.

Uraian

1

2

1. 2. 3. 4. 5. A B C

Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II Pemasangan kaca tebal 5 mm Pemasangan engsel jendela kupu-kupu Pemasangan spring knip Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang 1 set Pintu (P3)/pintu KM PVC incl. accessories : bh

No.

Uraian

1

2 1. 2.

A B C

Pemasangan Kusen dan Daun pintu PVC Pemasangan kunci kamar mandi Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang 1 set Bovenlight Alumunium : bh

No.

Uraian

1

2 1. 2.

A B C

Pemasangan kusen pintu alluminium Pemasangan kaca buram 5 mm Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Jendela Roster : m²

No.

Uraian

1 1. A B C

2 Pemasangan dinding terawang (rooster) 20 x 11 x 20 campuran 1 SP : 4 PP Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm : m²

No.

Uraian

1

2 1.

A B

Pemasangan plesteran 1 SP : 4 PP tebal 15 mm Jumlah Harga Overhead + Profit

C

Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pekerjaan Acian Dinding : m²

No.

Uraian

1

2 1.

A B C

Pemasangan acian Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Cat Tembok Luar dan Dalam (Cat Dasar, Cat Penutup dan Plamur) : m²

No.

Uraian

1 1. A B C

2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Cat Plafond (Cat Dasar, Car Penutup dan Plamur) : m²

No.

Uraian

1 1. A B C

2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Cat Kayu (Lisplank) (Cat Dasar, Cat Penutup, Cat Meni dan Plamur) : m²

No.

Uraian

1 1. A B C

2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Instalasi Penerangan : ttk

No.

Uraian

1

2

1. A B C

Pemasangan Instalasi Penerangan Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Instalasi Stop Kontak : ttk

No.

Uraian

1

2 1.

A B C

Pemasangan Instalasi Stop Kontak Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Saklar tunggal : ttk

No.

Uraian

1

2 1.

A B C

Pemasangan Saklar Tunggal Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Saklar Ganda : ttk

No.

Uraian

1

2 1.

A B C

Pemasangan Saklar Ganda Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Stop kontak : ttk

No.

Uraian

1

2 1.

A B C

Pemasangan Stop Kontak Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Box Sekring 2 Group + MCB 1 unit : unit

No.

Uraian

1

2 1.

A B C

(K3) Pemasangan MCB Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pasang Lampu 15 W : unit

No.

Uraian

1

2 1.

A B C

Pemasangan Lampu 18 Watt Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Biaya Pemasangan Listrik 1300V + SLO : ls

No.

Uraian

1

2 1.

A B C

0 Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Instalasi air bersih pipa PVC dia 3/4" AW+ assesories : m¹

No.

Uraian

1

2 1.

A B C

Pemasangan pipa PVC tipe AW diameter ¾ ” Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Kran air : bh

No.

Uraian

1

2 1.

A B C

Pemasangan kran diameter ½” atau ¾ ” Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Floor Drain Stainless : bh

No.

Uraian

1

2 1.

A B C

Pemasangan floor drain Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pas. Closet Jongkok : bh

No.

Uraian

1

2 1.

A B C

Pemasangan closet jongkok porselen Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Instalasi air kotor pipa PVC dia 3" AW+ Assesories : m¹

No.

Uraian

1

2 1.

A B C

Pemasangan pipa PVC tipe AW diameter 3” Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Instalasi air kotoran pipa PVC dia 4" AW+ Assesories : m¹

No.

Uraian

1

2 1.

A B C

Pemasangan pipa PVC tipe AW diameter 4” Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Pembuatan Septik Tank + Sumur Resapan : unit

No.

Uraian

1

2 1. 2.

Penggalian tanah biasa sedalam 2 m Pengurugan dengan pasir urug

3. 4. 5. 6. 7. 8. 9. A B C

Err:509 Pengurugan kembali galian tanah Pemasangan Gorong-Gorong Beton Diameter 80 cm Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) Pembesian dengan besi polos atau besi ulir (K3) Pemasangan bekisting untuk lantai Pemasangan pipa PVC tipe AW diameter 3” Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: Err:508 : Pek. Sumur bor dangkal + Jet Pump : ls

No.

Uraian

1

2 1.

A B C

0 Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.A.1. : Patok dan Pengukuran : m¹

No.

Uraian

1

2 1.

A B C

Pengukuran dan pemasangan Bouwplank Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.B.1. : Pekerjaan Galian Badan Jalan : m³

No.

Uraian

1

2 1.

A B C

Penggalian tanah biasa sedalam 1 m Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.B.2. : Pek. Bekisting : m³

No.

Uraian

1

2 1.

A B

(K3) Pemasangan bekisting untuk sloof Jumlah Harga Overhead + Profit

C

Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.B.3. : Pek. Lantai Kerja B0 K-100 : m³

No.

Uraian

1 1. A B C

2 Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.B.4. : Penghamparan Bond Breaker : m²

No.

Uraian

1

2 1.

A B C

Pemasangan Plastik Bond Breaker Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.B.5. : Pekerjaan Penulangan Ruji dowel d = 12mm : kg

No.

Uraian

1

2 1.

A B C

Pembesian dengan besi polos atau besi ulir Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.B.6. : Penghamparan Lapisan Beton K-225 : m³

No.

Uraian

1

2 1.

A B C

Membuat beton mutu f’c = 19,3 Mpa (K225) Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.B.7. : Pemasangan Joint cutter & joint sealent : m¹

No.

Uraian

1

2

1. A B C

Pemasangan Joint Cutter & Joint Sealent Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.C.1. : Galian Tanah : m³

No.

Uraian

1

2 1.

A B C

Penggalian tanah biasa sedalam 1 m Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.C.2. : Urugan Pasir : m³

No.

Uraian

1

2 1.

A B C

Pengurugan dengan pasir urug Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.C.3. : Pas. Batu Belah/Kali : m³

No.

Uraian

1 1. A B C

2 Pemasangan pondasi batu belah campuran 1 SP : 4 PP Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.C.4. : Plester : m²

No.

Uraian

1

2 1.

A B C

Pemasangan plesteran 1 SP : 3 PP tebal 15 mm Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran

: III.i.D.1. : Pek. Pengecoran Pelat Deuiker K-175 Untuk Saluran : m³

No.

Uraian

1 1. 2. 3. A B C

2 Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) Pembesian dengan besi polos atau besi ulir (K3) Pemasangan bekisting untuk lantai Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

No. Satuan Pekerjaan Nama Pekerjaan Satuan Pembayaran No.

Uraian

1 1. 2. 3. A B C

: III.i.D.2. : Pek. Pengecoran Pelat Deuiker K-175 Tiap Rumah : m³

2 Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) Pembesian dengan besi polos atau besi ulir (K3) Pemasangan bekisting untuk lantai Jumlah Harga Overhead + Profit Harga Satuan Pekerjaan

A ANGGARAN BIAYA GA SATUAN PEKERJAAN

Kode

Satuan

3

4 bh bh bh bh

Koefisien 5 40.000 40.000 40.000 40.000

Harga Satuan 6 60,000.00 75,000.00 15,000.00 45,000.00

Rp Rp Rp Rp

0.1 x A per - #REF!

Kode

Satuan

3 A.4.6.1.6. A.4.6.2.17.

4 m² m²

Kode

Satuan

3 A.4.6.1.6. A.4.6.1.6. A.4.6.2.17. A.4.6.2.17. A.4.6.2.17. A.4.6.2.17. A.4.6.2.17. A.4.6.2.17. A.4.6.2.17. A.4.6.2.17. A.4.6.2.17.

4 m² m² m2 m3 m3 m3

m1

Koefisien

Jumlah Harga Rp Rp Rp Rp Rp Rp Rp

Harga Satuan

Jumlah Harga

5 1.000 Rp 1.000 Rp

6 374,820.00 Rp 165,526.00 Rp Rp 0.1 x A Rp per - Err:509 Rp

Koefisien 5 5.348 0.165 0.394 0.287 0.213 0.285 11.667 0.220 8.611 6.000 1.000

Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

0.1 x A per - Err:509

6 68,612.50 173,112.50 49,425.00 157,375.00 183,705.00 915,647.59 165,585.00 195,745.00 15,735.50 37,155.00

7 2,400,000.00 3,000,000.00 600,000.00 1,800,000.00 7,800,000.00 780,000.00 8,580,000.00

7 374,820.00 165,526.00 540,346.00 54,034.60 594,380.60

Jumlah Harga Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

7 366,925.93 28,482.37 19,461.09 45,146.95 39,180.79 260,959.56 1,931,958.57 43,022.60 135,496.11 222,930.00 2,726,638.05 272,663.81 2,999,301.86

Kode

Satuan

3

4 m1 m1

Koefisien

Harga Satuan

5 22.750 Rp 20.500 Rp

6 37,155.00 Rp 47,075.00 Rp Rp Rp Rp

0.1 x A per - 0

Kode

Satuan

3

4 m1 m1

Koefisien

Harga Satuan

5 7.500 Rp 11.000 Rp

6 13,090.00 Rp 15,260.00 Rp Rp Rp Rp

0.1 x A per - ls

Kode

Satuan

3 A.4.6.1.6. A.4.6.2.17. A.4.6.2.17.

4 m2 m2 m3

Koefisien

Harga Satuan

5 1.100 Rp 1.120 Rp 0.024 Rp

6 165,585.00 Rp 55,166.40 Rp 177,950.00 Rp Rp Rp Rp

0.1 x A per - 0

Kode

Satuan

3 Err:509

4 Err:509

Koefisien

Harga Satuan

5 12.000 Err:509 0.1 x A per - ls

6

Jumlah Harga 7 845,276.25 965,037.50 1,810,313.75 181,031.38 1,991,345.13

Jumlah Harga 7 98,175.00 167,860.00 266,035.00 26,603.50 292,638.50

Jumlah Harga 7 182,143.50 61,786.37 4,270.80 243,929.87 24,392.99 268,322.85

Jumlah Harga 7 Err:509 Err:509 Err:509 Err:509

Kode

Satuan

3 0

4 m²

Koefisien

Harga Satuan

5 0.960 Rp 0.1 x A per - unit

Kode

Satuan

3 A.2.2.1.9.

4 m²

Koefisien 5 72.000 Rp 0.1 x A per - ls

Kode

Satuan

3 A.2.2.1.4.

4 m¹

Koefisien 5 1.000 Rp 0.1 x A per - m¹

Kode

Satuan

3 A.2.3.1.1.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.2.3.1.11.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

6 751,612.50 Rp Rp Rp Rp

Harga Satuan 6 12,750.00 Rp Rp Rp Rp

Harga Satuan 6 51,599.50 Rp Rp Rp Rp

Harga Satuan 6 62,375.00 Rp Rp Rp Rp

Harga Satuan 6 177,950.00 Rp Rp Rp Rp

Jumlah Harga 7 721,548.00 721,548.00 72,154.80 793,702.80

Jumlah Harga 7 918,000.00 918,000.00 91,800.00 1,009,800.00

Jumlah Harga 7 51,599.50 51,599.50 5,159.95 56,759.45

Jumlah Harga 7 62,375.00 62,375.00 6,237.50 68,612.50

Jumlah Harga 7 177,950.00 177,950.00 17,795.00 195,745.00

Kode

Satuan

3 A.3.2.1.2.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.4.1.1.5. A.4.1.1.17. A.4.1.1.21.

4 m³ kg m²

Koefisien 5 1.000 Rp 174.000 Rp 4.444 Rp 0.1 x A per - m³

Kode

Satuan

3 A.2.3.1.9. A.2.3.1.10.

4 m³ m³

Koefisien 5 1.000 Rp 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.4.4.1.8.

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

Kode

Satuan

Koefisien

Harga Satuan 6 684,275.00 Rp Rp Rp Rp

Harga Satuan 6 856,575.49 Rp 14,305.00 Rp 159,747.50 Rp Rp Rp Rp

Harga Satuan 6 44,750.00 Rp 44,750.00 Rp Rp Rp Rp

Harga Satuan 6 159,443.00 Rp Rp Rp Rp

Harga Satuan

Jumlah Harga 7 684,275.00 684,275.00 68,427.50 752,702.50

Jumlah Harga 7 856,575.49 2,489,070.00 709,988.89 4,055,634.38 405,563.44 4,461,197.82

Jumlah Harga 7 44,750.00 44,750.00 89,500.00 8,950.00 98,450.00

Jumlah Harga 7 159,443.00 159,443.00 15,944.30 175,387.30

Jumlah Harga

3 A.4.1.1.5. A.4.1.1.17. A.4.1.1.22.

4 m³ kg m²

5 1.000 Rp 323.000 Rp 11.111 Rp 0.1 x A per - m³

Kode

Satuan

3 A.4.4.1.9.

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.1.1.5. A.4.1.1.17. A.4.1.1.23.

4 m³ kg m²

Koefisien 5 0.010 Rp 5.000 Rp 0.110 Rp 0.1 x A per - m¹

Kode

Satuan

3 A.4.1.1.5. A.4.1.1.17. A.4.1.1.23.

4 m³ kg m²

Koefisien 5 0.010 Rp 5.000 Rp 0.110 Rp 0.1 x A per - m¹

Kode

Satuan

3 A.4.1.1.5. A.4.1.1.17.

4 m³ kg

Koefisien 5 1.000 Rp 1.000 Rp

6 856,575.49 Rp 14,305.00 Rp 281,237.50 Rp Rp Rp Rp

Harga Satuan 6 155,830.00 Rp Rp Rp Rp

Harga Satuan 6 856,575.49 Rp 14,305.00 Rp 287,425.00 Rp Rp Rp Rp

Harga Satuan 6 856,575.49 Rp 14,305.00 Rp 287,425.00 Rp Rp Rp Rp

Harga Satuan 6 856,575.49 Rp 14,305.00 Rp

7 856,575.49 4,620,515.00 3,124,861.11 8,601,951.60 860,195.16 9,462,146.76

Jumlah Harga 7 155,830.00 155,830.00 15,583.00 171,413.00

Jumlah Harga 7 8,565.75 71,525.00 31,616.75 111,707.50 11,170.75 122,878.26

Jumlah Harga 7 8,565.75 71,525.00 31,616.75 111,707.50 11,170.75 122,878.26

Jumlah Harga 7 856,575.49 14,305.00

A.4.1.1.24.



1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.4.1.1.4.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.2.3.1.11.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.2.3.1.14x A.2.3.1.10.

4 m³ m³

Koefisien 5 1.000 Rp 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.4.4.3.35.

4 m²

Koefisien 5 1.000 s 0.1 x A per - m²

335,237.50 Rp Rp Rp Rp

Harga Satuan 6 685,812.64 Rp Rp Rp Rp

Harga Satuan 6 177,950.00 Rp Rp Rp Rp

Harga Satuan 6 157,375.00 Rp 44,750.00 Rp Rp Rp Rp

335,237.50 1,206,117.99 120,611.80 1,326,729.79

Jumlah Harga 7 685,812.64 685,812.64 68,581.26 754,393.90

Jumlah Harga 7 177,950.00 177,950.00 17,795.00 195,745.00

Jumlah Harga 7 157,375.00 44,750.00 202,125.00 20,212.50 222,337.50

Harga Satuan

Jumlah Harga

6

7 #VALUE! #VALUE! #VALUE! #VALUE!

Kode

Satuan

3 A.4.4.3.36.

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.4.3.54x

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.5.1.7x A.4.2.1.21.

4 m² m²

Koefisien 5 1.000 Rp 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.5.1.7. A.4.2.1.21.

4 m² m²

Koefisien 5 1.000 Rp 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.5.2.32.

4 m²

Koefisien 5 1.000 Rp 0.1 x A

Harga Satuan 6 200,240.00 Rp Rp Rp Rp

Harga Satuan 6 282,079.00 Rp Rp Rp Rp

Harga Satuan 6 38,807.20 Rp 164,060.00 Rp Rp Rp Rp

Harga Satuan 6 42,117.00 Rp 164,060.00 Rp Rp Rp Rp

Harga Satuan 6 144,405.00 Rp Rp Rp

Jumlah Harga 7 200,240.00 200,240.00 20,024.00 220,264.00

Jumlah Harga 7 282,079.00 282,079.00 28,207.90 310,286.90

Jumlah Harga 7 38,807.20 164,060.00 202,867.20 20,286.72 223,153.92

Jumlah Harga 7 42,117.00 164,060.00 206,177.00 20,617.70 226,794.70

Jumlah Harga 7 144,405.00 144,405.00 14,440.50

per - m²

Kode

Satuan

3 A.4.2.1.x

4 m²

Koefisien

Harga Satuan

5 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.5.2.37.

4 m¹

Koefisien 5 1.000 Rp

Satuan

3 A.4.6.1.21x

4 m¹

Koefisien

0.1 x A per - m¹

Kode

Satuan

3 A.4.6.1.2. A.4.6.1.5. A.4.6.1.6. A.4.6.2.17. A.4.6.2.2. A.4.6.2.5. A.4.6.2.6. A.4.6.2.8.

4 m³ m² m² m² buah buah buah buah

Koefisien 5 0.072 1.568 1.380 0.871 1.000 2.000 2.000 2.000

6 132,974.60 Rp Rp Rp Rp

6 99,000.00 Rp Rp Rp Rp

Harga Satuan Rp Rp Rp Rp Rp Rp Rp Rp

0.1 x A per - bh

7 99,000.00 99,000.00 9,900.00 108,900.00

Jumlah Harga

6 46,015.00 Rp Rp Rp Rp

6 4,927,025.00 491,450.00 374,820.00 165,526.00 185,075.00 81,126.00 35,347.50 42,510.00

7 132,974.60 132,974.60 13,297.46 146,272.06

Jumlah Harga

Harga Satuan

5 1.000 Rp

158,845.50

Jumlah Harga

Harga Satuan

0.1 x A per - m¹

Kode

Rp

7 46,015.00 46,015.00 4,601.50 50,616.50

Jumlah Harga Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

7 355,484.85 770,593.60 517,251.60 144,206.25 185,075.00 162,252.00 70,695.00 85,020.00 2,290,578.30 229,057.83 2,519,636.14

Kode

Satuan

3 A.4.6.1.2. A.4.6.1.5. A.4.6.2.2. A.4.6.2.5.

4 m³ m² buah buah

Koefisien 5 0.043 2.940 1.000 6.000

Harga Satuan Rp Rp Rp Rp

6 4,927,025.00 491,450.00 185,075.00 81,126.00

0.1 x A per - bh

Kode

Satuan

3 A.4.6.1.2. A.4.6.1.5. A.4.6.2.2. A.4.6.2.5.

4 m³ m² buah buah

Koefisien 5 0.038 1.680 1.000 3.000

Satuan

3 A.4.6.1.2. A.4.6.1.5. A.4.6.2.17. A.4.6.2.2. A.4.6.2.5.

4 m³ m² m² buah buah

Rp Rp Rp Rp

Koefisien 5 0.056 1.680 0.600 1.000 3.000

6 4,927,025.00 491,450.00 185,075.00 81,126.00

Rp Rp Rp Rp Rp

6 4,927,025.00 491,450.00 165,526.00 185,075.00 81,126.00

Satuan

3 A.4.6.1.2. A.4.6.1.5. A.4.6.2.17. A.4.6.2.2.

4 m³ m² m² buah

Koefisien 5 0.055 1.680 0.160 1.000

Rp Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp

7 188,458.71 825,636.00 185,075.00 243,378.00 1,442,547.71 144,254.77 1,586,802.48

Jumlah Harga Rp Rp Rp Rp Rp Rp Rp Rp

Harga Satuan 6 4,927,025.00 491,450.00 165,526.00 185,075.00

7 210,630.32 1,444,863.00 185,075.00 486,756.00 2,327,324.32 232,732.43 2,560,056.75

Jumlah Harga

Harga Satuan

0.1 x A per - bh

Kode

Rp Rp Rp Rp Rp Rp Rp

Harga Satuan

0.1 x A per - bh

Kode

Jumlah Harga

7 273,449.89 825,636.00 99,315.60 185,075.00 243,378.00 1,626,854.49 162,685.45 1,789,539.94

Jumlah Harga Rp Rp Rp Rp

7 269,754.62 825,636.00 26,484.16 185,075.00

A.4.6.2.5.

buah

3.000 Rp 0.1 x A per - bh

Kode

Satuan

3 A.4.6.1.2. A.4.6.2.17.

4 m³ m²

Koefisien

Harga Satuan

5 0.087 Rp 3.990 Rp 0.1 x A per - bh

Kode

Satuan

3 A.4.6.1.2. A.4.6.1.6. A.4.6.2.17. A.4.6.2.6. A.4.6.2.8.

4 m³ m² m² buah buah

Koefisien 5 0.084 0.720 0.783 4.000 2.000

81,126.00 Rp Rp Rp Rp

Harga Satuan Rp Rp Rp Rp Rp

0.1 x A per - bh

Kode

Satuan

3 A.4.6.1.2. A.4.6.1.6. A.4.6.2.17. A.4.6.2.6. A.4.6.2.8.

4 m³ m² m² buah buah

Koefisien 5 0.059 0.720 0.423 4.000 2.000

Jumlah Harga

6 4,927,025.00 Rp 165,526.00 Rp Rp Rp Rp

6 4,927,025.00 374,820.00 165,526.00 35,347.50 42,510.00

Rp Rp Rp Rp Rp

0.1 x A per - bh

7 428,651.18 660,448.74 1,089,099.92 108,909.99 1,198,009.91

Jumlah Harga Rp Rp Rp Rp Rp Rp Rp Rp

Harga Satuan 6 4,927,025.00 374,820.00 165,526.00 35,347.50 42,510.00

243,378.00 1,550,327.78 155,032.78 1,705,360.56

7 413,870.10 269,870.40 129,639.96 141,390.00 85,020.00 1,039,790.46 103,979.05 1,143,769.51

Jumlah Harga Rp Rp Rp Rp Rp Rp Rp Rp

7 288,230.96 269,870.40 70,050.60 141,390.00 85,020.00 854,561.97 85,456.20 940,018.16

Kode

Satuan

Koefisien

Harga Satuan

Jumlah Harga

3

4

5

6

7

A.4.6.1.2. A.4.6.1.6. A.4.6.2.17. A.4.6.2.6. A.4.6.2.8.

m³ m² m² buah buah

0.068 1.200 0.791 4.000 2.000

Rp Rp Rp Rp Rp

4,927,025.00 374,820.00 165,526.00 35,347.50 42,510.00

0.1 x A per - bh

Kode

Satuan

3 A.4.6.1.2. A.4.6.1.6. A.4.6.2.17. A.4.6.2.6. A.4.6.2.8.

4 m³ m² m² buah buah

Koefisien 5 0.096 1.200 1.391 4.000 2.000

Harga Satuan Rp Rp Rp Rp Rp

6 4,927,025.00 374,820.00 165,526.00 35,347.50 42,510.00

0.1 x A per - bh

Kode

Satuan

3 A.4.6.1.2. A.4.6.2.17.

4 m³ m²

Koefisien 5 0.014 Rp 0.120 Rp 0.1 x A per - bh

Kode

Satuan

3 A.4.6.1.2.

4 m³

Rp Rp Rp Rp Rp Rp Rp Rp

Koefisien 5 0.025 Rp 0.1 x A per - bh

332,574.19 449,784.00 130,964.17 141,390.00 85,020.00 1,139,732.36 113,973.24 1,253,705.59

Jumlah Harga Rp Rp Rp Rp Rp Rp Rp Rp

Harga Satuan 6 4,927,025.00 Rp 165,526.00 Rp Rp Rp Rp

Harga Satuan 6 4,927,025.00 Rp Rp Rp Rp

7 472,994.40 449,784.00 230,279.77 141,390.00 85,020.00 1,379,468.17 137,946.82 1,517,414.99

Jumlah Harga 7 66,514.84 19,863.12 86,377.96 8,637.80 95,015.75

Jumlah Harga 7 121,943.87 121,943.87 12,194.39 134,138.26

Kode

Satuan

Koefisien

Harga Satuan

Jumlah Harga

3

4

5

6

7

A.4.6.1.2. A.4.6.1.6. A.4.6.2.17. A.4.6.2.6. A.4.6.2.8.

m³ m² m² buah buah

0.046 1.380 0.871 2.000 2.000

Rp Rp Rp Rp Rp

4,927,025.00 374,820.00 165,526.00 35,347.50 42,510.00

0.1 x A per - bh

Kode

Satuan

3 A.4.2.1.8x A.4.6.2.3.

4 bh buah

Koefisien 5 1.000 Rp 1.000 Rp 0.1 x A per - bh

Kode

Satuan

3 A.4.2.1.11. A.4.6.2.17x

4 m¹ m²

Koefisien 5 1.000 Rp 1.000 Rp 0.1 x A per - bh

Kode

Satuan

3 A.4.4.1.23x

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.4.2.4.

4 m²

Koefisien 5 1.000 Rp 0.1 x A

Rp Rp Rp Rp Rp Rp Rp Rp

Harga Satuan 6 370,390.00 Rp 120,685.00 Rp Rp Rp Rp

Harga Satuan 6 76,262.50 Rp 165,526.00 Rp Rp Rp Rp

Harga Satuan 6 323,550.00 Rp Rp Rp Rp

Harga Satuan 6 53,151.00 Rp Rp Rp

224,672.34 517,251.60 144,206.25 70,695.00 85,020.00 1,041,845.19 104,184.52 1,146,029.71

Jumlah Harga 7 370,390.00 120,685.00 491,075.00 49,107.50 540,182.50

Jumlah Harga 7 76,262.50 165,526.00 241,788.50 24,178.85 265,967.35

Jumlah Harga 7 323,550.00 323,550.00 32,355.00 355,905.00

Jumlah Harga 7 53,151.00 53,151.00 5,315.10

per - m²

Kode

Satuan

3 A.4.4.2.27.

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.7.1.10.

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.7.1.10.

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

Kode

Satuan

3 A.4.7.1.4.

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

Rp

Harga Satuan 6 32,000.00 Rp Rp Rp Rp

Harga Satuan 6 19,770.00 Rp Rp Rp Rp

Harga Satuan 6 19,770.00 Rp Rp Rp Rp

Harga Satuan 6 45,340.00 Rp Rp Rp Rp

58,466.10

Jumlah Harga 7 32,000.00 32,000.00 3,200.00 35,200.00

Jumlah Harga 7 19,770.00 19,770.00 1,977.00 21,747.00

Jumlah Harga 7 19,770.00 19,770.00 1,977.00 21,747.00

Jumlah Harga 7 45,340.00 45,340.00 4,534.00 49,874.00

Kode

Satuan

Koefisien

Harga Satuan

Jumlah Harga

3

4

5

6

7

A.8.4.6.1.1x

titik

1.000 Rp 0.1 x A per - ttk

Kode

Satuan

3 A.8.4.6.1.2x

4 titik

Koefisien 5 1.000 Rp 0.1 x A per - ttk

Kode

Satuan

3 A.8.4.6.4x

4 buah

Koefisien 5 1.000 Rp 0.1 x A per - ttk

Kode

Satuan

3 A.8.4.6.5x

4 buah

Koefisien 5 1.000 Rp 0.1 x A per - ttk

Kode

Satuan

3 A.8.4.6.3x

4 buah

Koefisien 5 1.000 Rp 0.1 x A per - ttk

351,450.00 Rp Rp Rp Rp

Harga Satuan 6 341,700.00 Rp Rp Rp Rp

Harga Satuan 6 114,145.00 Rp Rp Rp Rp

Harga Satuan 6 117,145.00 Rp Rp Rp Rp

Harga Satuan 6 120,945.00 Rp Rp Rp Rp

351,450.00 351,450.00 35,145.00 386,595.00

Jumlah Harga 7 341,700.00 341,700.00 34,170.00 375,870.00

Jumlah Harga 7 114,145.00 114,145.00 11,414.50 125,559.50

Jumlah Harga 7 117,145.00 117,145.00 11,714.50 128,859.50

Jumlah Harga 7 120,945.00 120,945.00 12,094.50 133,039.50

Kode

Satuan

3 A.8.4.6.2x

4 buah

Koefisien

Harga Satuan

5 1.000 Rp 0.1 x A per - unit

Kode

Satuan

3 A.8.4.6.7x

4 buah

Koefisien

Harga Satuan

5 1.000 Rp 0.1 x A per - unit

Kode

Satuan

3 0

4 0

Koefisien 5 1.000 Rp 0.1 x A per - ls

Kode

Satuan

3 A.5.1.1.26.

4 m¹

Koefisien 5 1.000 Rp 0.1 x A per - m¹

Kode

Satuan

3 A.5.1.1.19.

4 m¹

Koefisien 5 1.000 Rp 0.1 x A per - bh

6 308,245.00 Rp Rp Rp Rp

6 82,950.00 Rp Rp Rp Rp

Harga Satuan 6 2,000,000.00 Rp Rp Rp Rp

Harga Satuan 6 15,260.00 Rp Rp Rp Rp

Harga Satuan 6 77,210.00 Rp Rp Rp Rp

Jumlah Harga 7 308,245.00 308,245.00 30,824.50 339,069.50

Jumlah Harga 7 82,950.00 82,950.00 8,295.00 91,245.00

Jumlah Harga 7 2,000,000.00 2,000,000.00 200,000.00 2,200,000.00

Jumlah Harga 7 15,260.00 15,260.00 1,526.00 16,786.00

Jumlah Harga 7 77,210.00 77,210.00 7,721.00 84,931.00

Kode

Satuan

3 A.5.1.1.14.

4 buah

Koefisien 5 1.000 Rp 0.1 x A per - bh

Kode

Satuan

3 A.5.1.1.2.

4 buah

Koefisien 5 1.000 Rp 0.1 x A per - bh

Kode

Satuan

3 A.5.1.1.31.

4 m¹

Koefisien 5 1.000 Rp 0.1 x A per - m¹

Kode

Satuan

3 A.5.1.1.32.

4 m¹

Koefisien 5 1.000 Rp 0.1 x A per - m¹

Kode

Satuan

3 A.2.3.1.2. A.2.3.1.11.

4 m³ m³

Koefisien 5 1.988 Rp 0.129 Rp

Harga Satuan 6 30,575.00 Rp Rp Rp Rp

Harga Satuan 6 588,750.00 Rp Rp Rp Rp

Harga Satuan 6 37,155.00 Rp Rp Rp Rp

Harga Satuan 6 47,075.00 Rp Rp Rp Rp

Harga Satuan 6 76,275.00 Rp 177,950.00 Rp

Jumlah Harga 7 30,575.00 30,575.00 3,057.50 33,632.50

Jumlah Harga 7 588,750.00 588,750.00 58,875.00 647,625.00

Jumlah Harga 7 37,155.00 37,155.00 3,715.50 40,870.50

Jumlah Harga 7 47,075.00 47,075.00 4,707.50 51,782.50

Jumlah Harga 7 151,614.11 22,991.50

Err:509 A.2.3.1.9. 0 A.4.1.1.5. A.4.1.1.17. A.4.1.1.24. A.5.1.1.31.

Err:509 m³ m¹ m³ kg m² m¹

0.124 1.000 4.000 1.000 15.255 2.000 4.000

Err:509 Rp 44,750.00 Rp Rp 357,150.00 Rp Rp 856,575.49 Rp Rp 14,305.00 Rp Rp 335,237.50 Rp Rp 37,155.00 Rp

0.1 x A per - unit

Kode

Satuan

3 0

4 Err:509

Koefisien 5 1.000 Rp 0.1 x A per - ls

Kode

Satuan

3 A.2.2.1.4.

4 m¹

Koefisien 5 1.000 Rp 0.1 x A per - m¹

Kode

Satuan

3 A.2.3.1.1.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.4.1.1.21.

4 m²

Koefisien 5 1.000 Rp 0.1 x A

Harga Satuan 6 1,750,000.00 Rp Rp Rp Rp

Harga Satuan 6 51,599.50 Rp Rp Rp Rp

Harga Satuan 6 62,375.00 Rp Rp Rp Rp

Harga Satuan 6 159,747.50 Rp Rp Rp

Err:509 44,750.00 1,428,600.00 856,575.49 218,222.78 670,475.00 148,620.00 Err:509 Err:509 Err:509

Jumlah Harga 7 1,750,000.00 1,750,000.00 175,000.00 1,925,000.00

Jumlah Harga 7 51,599.50 51,599.50 5,159.95 56,759.45

Jumlah Harga 7 62,375.00 62,375.00 6,237.50 68,612.50

Jumlah Harga 7 159,747.50 159,747.50 15,974.75

per - m³

Kode

Satuan

3 A.4.1.1.4.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 0

4 m²

Koefisien 5 1.000 Rp

Rp

Harga Satuan 6 685,812.64 Rp Rp Rp Rp

Satuan

3 A.4.1.1.17.

4 kg

Koefisien 5 1.000 Rp 0.1 x A per - kg

Kode

Satuan

3 A.4.1.1.7.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Jumlah Harga 7 685,812.64 685,812.64 68,581.26 754,393.90

Harga Satuan

Jumlah Harga

6

7 6,398.00 Rp Rp Rp Rp

0.1 x A per - m²

Kode

175,722.25

Harga Satuan 6 14,305.00 Rp Rp Rp Rp

Harga Satuan 6 915,647.59 Rp Rp Rp Rp

6,398.00 6,398.00 639.80 7,037.80

Jumlah Harga 7 14,305.00 14,305.00 1,430.50 15,735.50

Jumlah Harga 7 915,647.59 915,647.59 91,564.76 1,007,212.35

Kode

Satuan

Koefisien

Harga Satuan

Jumlah Harga

3

4

5

6

7

0



1.000 Rp 0.1 x A per - m¹

Kode

Satuan

3 A.2.3.1.1.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.2.3.1.11.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.3.2.1.2.

4 m³

Koefisien 5 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.4.4.2.3.

4 m²

Koefisien 5 1.000 Rp 0.1 x A per - m²

13,092.27 Rp Rp Rp Rp

Harga Satuan 6 62,375.00 Rp Rp Rp Rp

Harga Satuan 6 177,950.00 Rp Rp Rp Rp

Harga Satuan 6 684,275.00 Rp Rp Rp Rp

Harga Satuan 6 55,166.40 Rp Rp Rp Rp

13,092.27 13,092.27 1,309.23 14,401.50

Jumlah Harga 7 62,375.00 62,375.00 6,237.50 68,612.50

Jumlah Harga 7 177,950.00 177,950.00 17,795.00 195,745.00

Jumlah Harga 7 684,275.00 684,275.00 68,427.50 752,702.50

Jumlah Harga 7 55,166.40 55,166.40 5,516.64 60,683.04

Kode

Satuan

3 A.4.1.1.5. A.4.1.1.17. A.4.1.1.24.

4 m³ kg m²

Koefisien 5 1.000 Rp 1.000 Rp 1.000 Rp 0.1 x A per - m³

Kode

Satuan

3 A.4.1.1.5. A.4.1.1.17. A.4.1.1.24.

4 m³ kg m²

Koefisien 5 1.000 Rp 1.000 Rp 1.000 Rp 0.1 x A per - m³

Harga Satuan 6 856,575.49 Rp 14,305.00 Rp 335,237.50 Rp Rp Rp Rp

Harga Satuan 6 856,575.49 Rp 14,305.00 Rp 335,237.50 Rp Rp Rp Rp

Jumlah Harga 7 856,575.49 14,305.00 335,237.50 1,206,117.99 120,611.80 1,326,729.79

Jumlah Harga 7 856,575.49 14,305.00 335,237.50 1,206,117.99 120,611.80 1,326,729.79

JADWAL PELAKSANAAN PEKERJAAN NAMA PEKERJAAN Pekerjaan Lokasi Tahun Anggaran

: Nama Pekerjaan : Nama Lokasi : 2018

Jangka W No.

1 I. 2. 1. 2. Err:509 II.

Uraian Pekerjaan

2 PEKERJAAN PERSIAPAN Pengukuran dan pemasangan bouwplank Papan Informasi Kegiatan Administrasi dan Dokumentasi Err:509

1. 2. 3. Err:509 Err:509 Err:509

PEKERJAAN TANAH Penggalian tanah biasa sedalam 2 m Pengurugan kembali galian tanah Pengurugan dengan pasir urug Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

III. Err:509 Err:509 Err:509 Err:509

PEKERJAAN BETON Err:509 Err:509 Err:509 Err:509 Membuat beton mutu f’c = 19,3 Mpa (K225) Pembesian dengan besi polos atau besi ulir Pemasangan bekisting untuk pondasi Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Volume

0

0

Harga Satuan

0

0

Err:509

3

Bobot (%)

Bulan I 2

3

4

5

6

7

8

9

10

11

12

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

4 Err:509 Err:509 Err:509 Err:509 Err:509

5.38 2.24 0.26 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

m³ m³ m³ Err:509 Err:509 Err:509 Total Sub

Rp 83,902.50 Rp 49,225.00 Rp 195,745.00 Err:509 Err:509 Err:509 Pekerjaan Tanah

Rp Rp Rp Err:509 Err:509 Err:509 Rp

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

2.88 m³ 509.76 kg 38.40 m²

Err:509 Err:509 Err:509 Rp Rp Rp

915,647.59 Rp 15,735.50 Rp 166,441.00 Rp

611,434.56

2,637,065.06 8,021,328.48 6,391,334.40

Bulan III

1

Rp 1,280,493.19 Rp 826,773.75 Rp 1,000,000.00 Err:509 Rp 2,107,266.94 451,059.84 110,264.00 50,110.72

Bulan II

hari

22.56 m¹ Rp 56,759.45 1.00 ls Rp 826,773.75 1.00 ls Rp 1,000,000.00 Err:509 Err:509 Err:509 Total Sub Pekerjaan Persiapan

Err:509

Err:509

Jumlah Harga

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Jangka W No.

Uraian Pekerjaan

1

0

Harga Satuan

Jumlah Harga

0 Err:509 Err:509

0 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

4 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Total Sub

Err:509 Err:509 Err:509 Pekerjaan Beton

Err:509 Err:509 Err:509 Rp 17,049,727.94

Err:509 Err:509 Err:509 Err:509

1. 2. Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

PEKERJAAN BESI Pemasangan besi profil Pengerjaan pekerjaan perakitan Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

2,073.19 2,073.19 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

kg Rp 29,031.75 kg Rp 1,028.56 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Total Sub Pekerjaan Besi

Rp 60,188,188.62 Rp 2,132,395.16 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Rp 62,320,583.79

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp 7,422,561.08 Err:509 Err:509 Err:509 Rp 7,422,561.08

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Err:509

IV.

2

Volume

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

0

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

V. 1. Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

PEKERJAAN PENGECATAN Pengecatan permukaan baja galvanis secara manual 4 lapis 111.20 m² Rp 66,749.65 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Total Sub Pekerjaan Pengecatan Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

3

Bobot (%)

Bulan I

Bulan II

Bulan III

1

2

3

4

5

6

7

8

9

10

11

12

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

Err:509 Err:509 Err:509

Err:509

Err:509 Err:509

Err:509

Err:509

Jangka W No.

Uraian Pekerjaan

1 Err:509 Err:509 Err:509 Err:509

2 Err:509 Err:509 Err:509 Err:509

Volume

0 Err:509 Err:509 Err:509 Err:509

0

0 Err:509 Err:509 Err:509 Err:509

Harga Satuan

0 Err:509 Err:509 Err:509 Err:509 Err:509

VI. 5. 6. Err:509 8. 9. Err:509 Err:509 Err:509 VII.

Err:509 Err:509 Err:509 Err:509 Err:509 Rp Rp Err:509 Rp Rp Err:509 Err:509 Err:509 Rp

3,600,000.00 5,044,500.00 3,600,000.00 1,354,000.00

24,263,982.00

Bulan III

2

3

4

5

6

7

8

9

10

11

12

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

4 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

0

% 00 0.

Err:509 Err:509 Err:509

% 00 0.

1.00 ls Rp 750,000.00 Rp 750,000.00 Total Sub Pekerjaan Lain-Lain Rp 1,750,000.00 Total Pekerjaan Nama Pekerjaan Err:509 Kemajuan Pekerjaan Mingguan (%) Kemajuan Pekerjaan Kumulatif (%)

Bulan II

1

% 00 0.

PEKERJAAN LAIN-LAIN Pembersihan Akhir

4.00 unit Rp 900,000.00 57.00 m¹ Rp 88,500.00 Err:509 Err:509 Err:509 4.00 ttk Rp 900,000.00 4.00 unit Rp 338,500.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Total Sub Pekerjaan Elektrikal

3

% 00 0.

1.

PEKERJAAN ELEKTRIKAL Pemasangan jarum penangkal petir elektrostatik (main rod) Pemasangan kabel BCC 1 x 50 mm + conduite Err:509 Pemasangan pentanahan (copper rod ø 5/8") P = 3 m¹ Pemasangan bak kontrol (beton) Err:509 Err:509 Err:509

Jumlah Harga

Bulan I

Bobot (%)

LAKSANAAN PEKERJAAN AMA PEKERJAAN

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Puluh) Hari Kalender Bulan IV Bulan V

Bulan VI

Bulan VII

Bulan VIII

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

91-97

98-105

106-112

113-120

121-127

128-135

136-142

143-150

151-157

158-165

166-172

173-180

181-187

188-195

196-202

203-210

211-217

218-225

226-232

233-240

5

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

6

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509 Err:509

Keterangan

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509

Err:509

Err:509

Err:509

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Puluh) Hari Kalender Bulan IV Bulan V

Bulan VI

Bulan VII

Bulan VIII

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

91-97

98-105

106-112

113-120

121-127

128-135

136-142

143-150

151-157

158-165

166-172

173-180

181-187

188-195

196-202

203-210

211-217

218-225

226-232

233-240

5

Err:509

6

Err:509 Err:509

Keterangan

Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Puluh) Hari Kalender Bulan IV Bulan V

Bulan VI

Bulan VII

Bulan VIII

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

91-97

98-105

106-112

113-120

121-127

128-135

136-142

143-150

151-157

158-165

166-172

173-180

181-187

188-195

196-202

203-210

211-217

218-225

226-232

233-240

Keterangan

5

6 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

% 00 0.

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

% 00 0.

Err:509

JADWAL PELAKSANAAN PEKERJAAN PEMBANGUNAN RUMAH OPERATOR Pekerjaan Lokasi Tahun Anggaran

: Pembangunan Rumah Operator : PP. Kolonodale, Kab. Morowali Utara : 2018

Jangka W No.

Uraian Pekerjaan

1 I.

2 1.

PEKERJAAN PERSIAPAN Pengukuran dan pemasangan bouwplank

1. 2. 3. 4. 5. 6.

PEKERJAAN TANAH DAN PASIR Galian tanah biasa Urugan tanah bekas galian Urugan sirtu bawah lantai Urugan pasir bawah lantai Urugan pasir bawah pondasi Pemadatan Urugan Tanah dan Sirtu

1. 2. 3.

PEKERJAAN PASANGAN Pas. Batu kosong Pas. Pondasi batu kali 1 : 4 Pas. Batu bata 1 : 5

1. 2. 3. 3. 4. 5. 6.

PEKERJAAN PLESTERAN DAN LANTAI Plesteran dinding 1 : 5 Plesteran kaki pondasi 1 : 5 Acian dinding Pas. Lantai keramik 40 x 40 cm Ubin keramik 20 x 20 cm (KM/WC) Keramik dinding 20 x 25 cm Plesteran kolom teras

II.

III.

IV.

V. 1. 2. 3. 4.

5.

6.

PEKERJAAN BETON Rabat beton keliling bangunan 1 : 3 : 5; t = 5 cm Pas. Cor alas keramik 1 : 3 : 5, t = 8 cm Kolom Beton Bertulang Praktis 11/11 Sloof beton 15/20 Beton 1 : 2 : 3 Besi Bekisting Kolom Beton Bertulang 11/20 Beton 1 : 2 : 3 Besi Bekisting Kolom Beton Bertulang 25/25 Beton 1 : 2 : 3 Besi

Volume

0

0

Harga Satuan

0

Jumlah Harga

0

3

33.00 m¹ Rp 56,759.45 Rp Total Sub Pekerjaan Persiapan Rp

Bobot (%)

Bulan I

Bulan II

Bulan III

1

2

3

4

5

6

7

8

9

10

11

12

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

4

1,873,061.85 1,873,061.85

0.76% 0.76%

0.76%

37.29 m³ Rp 68,612.50 12.43 m³ Rp 49,225.00 14.72 m³ Rp 173,112.50 5.26 m³ Rp 195,745.00 2.78 m³ Rp 195,745.00 27.15 m³ Rp 49,225.00 Total Sub Pekerjaan Tanah Dan Pasir

Rp Rp Rp Rp Rp Rp Rp

2,558,560.13 611,866.75 2,548,216.00 1,029,618.70 544,171.10 1,336,458.75 8,628,891.43

1.04% 0.25% 1.03% 0.42% 0.22% 0.54% 3.49%

1.04%

8.28 m³ Rp 262,663.50 22.17 m³ Rp 752,702.50 115.52 m² Rp 153,552.00 Total Sub Pekerjaan Pasangan

Rp Rp Rp Rp

2,174,853.78 16,687,414.43 17,738,327.04 36,600,595.25

0.88% 6.75% 7.18% 14.81%

0.88%

231.04 m² Rp 51,942.60 9.90 m² Rp 51,942.60 245.74 m² Rp 32,000.00 50.76 m² Rp 249,707.70 1.82 m² Rp 220,264.00 8.97 m² Rp 310,286.90 4.80 m² Rp 60,683.04 Total Sub Pekerjaan Plesteran Dan Lantai

Rp Rp Rp Rp Rp Rp Rp Rp

12,000,818.30 514,231.74 7,863,680.00 12,675,162.85 400,880.48 2,783,273.49 291,278.59 36,529,325.46

4.86% 0.21% 3.18% 5.13% 0.16% 1.13% 0.12% 14.78%

1.20 m³ 4.21 m³ 44.20 m¹

Rp Rp Rp

685,812.64 Rp 685,812.64 Rp 80,165.20 Rp

822,975.17 2,887,271.21 3,543,301.84

0.33% 1.17% 1.43%

1.53 m³ 213.02 kg 20.40 m²

Rp Rp Rp

915,647.59 Rp 15,735.50 Rp 159,747.50 Rp

1,400,940.81 3,351,976.21 3,258,849.00

0.57% 1.36% 1.32%

0.61 m³ 83.99 kg 81.60 m²

Rp Rp Rp

915,647.59 Rp 15,735.50 Rp 309,361.25 Rp

558,545.03 1,321,624.65 25,243,878.00

0.23% 0.53% 10.21%

0.38 m³ 27.43 kg

Rp Rp

915,647.59 Rp 15,735.50 Rp

347,946.08 431,624.77

0.14% 0.17%

0.25% 1.03% 0.42% 0.22% 0.54%

2.25%

2.25%

2.25% 2.39%

0.48% 0.57% 1.36% 1.32% 0.23% 0.53% 10.21% 0.14% 0.17%

Jangka W No.

Uraian Pekerjaan

1

2 7.

8.

9.

VI. 1. 2. 3. 4. 5. VII. 1. 2. 3. 4. 5. 6. 7. VIII. 1. 2. 3. 4. 5. 6. 7. IX. 1. 2. 3. 4. X.

Bekisting Ring balk 11/20 Beton 1 : 2 : 3 Besi Bekisting Ring balk 15/15 Beton 1 : 2 : 3 Besi Bekisting Balok Sunscreen Beton 1 : 2 : 3 Besi Bekisting

Volume

0

0 0 24.00 m²

Harga Satuan

Jumlah Harga

Bobot (%)

Rp

0 309,361.25 Rp

3 7,424,670.00

4 3.00%

1.12 m³ 208.47 kg 20.40 m²

Rp Rp Rp

915,647.59 Rp 15,735.50 Rp 316,167.50 Rp

1,025,525.30 3,280,379.69 6,449,817.00

0.41% 1.33% 2.61%

0.14 m³ 24.58 kg 2.70 m²

Rp Rp Rp

915,647.59 Rp 15,735.50 Rp 316,167.50 Rp

128,190.66 386,778.59 853,652.25

0.05% 0.16% 0.35%

Rp Rp Rp Rp

238,068.37 337,683.83 7,167,377.75 70,461,076.21

0.10% 0.14% 2.90% 28.51%

Rp Rp Rp Rp Rp Rp

3,631,217.43 3,292,223.55 655,039.00 1,345,726.38 364,157.20 9,288,363.56

1.47% 1.33% 0.27% 0.54% 0.15% 3.76%

Rp Rp Rp Rp Rp Rp Rp Rp

18,066,062.13 2,805,876.98 19,619,007.71 2,610,333.00 8,426,967.15 3,850,877.26 2,044,195.56 57,423,319.79

7.31% 1.14% 7.94% 1.06% 3.41% 1.56% 0.83% 23.24%

Rp Rp Rp Rp Rp Rp Rp Rp

1,017,912.50 446,193.00 311,058.00 129,464.50 93,522.00 96,822.00 88,462.00 2,183,434.00

0.41% 0.18% 0.13% 0.05% 0.04% 0.04% 0.04% 0.88%

Rp Rp Rp Rp Rp

5,344,107.78 1,961,796.87 2,227,372.84 474,825.12 10,008,102.61

2.16% 0.79% 0.90% 0.19% 4.05%

0.26 m³ Rp 915,647.59 21.46 kg Rp 15,735.50 21.38 m² Rp 335,237.50 Total Sub Pekerjaan Beton

PEKERJAAN PINTU, JENDELA DAN VENTILASI Kosen pintu, jendela dan ventilasi 0.67 m³ Rp 5,419,727.50 Pintu panil 6.09 m² Rp 540,595.00 Kosen dan Pintu KM/WC Aluminium 1.00 ls Rp 655,039.00 Jendela kaca 5 mm (Bingkai kayu) 8.13 m² Rp 165,526.00 Kosen Pas Kaca Mati 5 mm Aluminium pada atap 2.00 ls Rp 182,078.60 Total Sub PEKERJAAN PINTU, JENDELA DAN VENTILASI PEKERJAAN KAP, ATAP DAN PLAFOND Rangka Atap Baja Ringan (SNI) 123.51 m² Rp 146,272.06 Lisplank Kalsiboard 8,00 mm 65.73 m¹ Rp 42,687.92 Pek. Atap Multi Roof t = 0,30 mm 123.51 m² Rp 158,845.50 Bubungan Metal 23.97 m¹ Rp 108,900.00 Rangka Plafond Baja Ringan SNI (Metal Furring) 90.21 m² Rp 93,415.00 Penutup Plafond Kalsiboard 3,50 mm 90.21 m² Rp 42,687.92 List Plafond Kayu Profil 1 107.60 m² Rp 18,998.10 Total Sub PEKERJAAN KAP, ATAP DAN PLAFOND PEKERJAAN PENGGANTUNG DAN PENGUNCI Kunci tanam 2 slaag 5.00 buah Rp 203,582.50 Engsel pintu ring nylon 5.00 buah Rp 89,238.60 Engsel jendela ring nylon 8.00 buah Rp 38,882.25 Grendel pintu 1.00 buah Rp 129,464.50 Grendel jendela 2.00 buah Rp 46,761.00 Hak angin 2.00 buah Rp 48,411.00 Handel jendela 2.00 buah Rp 44,231.00 Total Sub PEKERJAAN PENGGANTUNG DAN PENGUNCI PEKERJAAN PENGECATAN Pengecatan dinding 245.74 m² Rp 21,747.00 Pengecatan plafond 90.21 m² Rp 21,747.00 Pengecatan kosen, jalusi dan listplank 44.66 m² Rp 49,874.00 Pelitur/vernis pintu 12.18 m² Rp 38,984.00 Total Sub PEKERJAAN PENGECATAN PEKERJAAN INSTALASI LISTRIK

Bulan I

Bulan II

Bulan III

1

2

3

4

5

6

7

8

9

10

11

12

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

3.00%

0.49%

Jangka W No.

Uraian Pekerjaan

1

2 1. 2. 3. 4. 5. 6. 7.

XI. 1. 2. 3. 4. 5. XII. 1.

Pasangan titik lampu Pas. Stop kontak Pas. Saklar tunggal Pas. Saklar double TKO Kisi-kisi Stainless 2 x 18 watt Down light 5" + Lampu SL 23 watt Panel MCB dan Accsesories

Volume

0

Harga Satuan

0 0 0 11.00 titik Rp 386,595.00 5.00 buah Rp 133,039.50 2.00 buah Rp 125,559.50 3.00 buah Rp 128,859.50 4.00 buah Rp 220,825.00 7.00 buah Rp 103,675.00 1.00 buah Rp 339,069.50 Total Sub PEKERJAAN INSTALASI LISTRIK

Jumlah Harga

Rp Rp Rp Rp Rp Rp Rp Rp

3 4,252,545.00 665,197.50 251,119.00 386,578.50 883,300.00 725,725.00 339,069.50 7,503,534.50

PEKERJAAN INSTALASI AIR BERSIH/AIR KOTOR Pas. Kloset jongkok Lokal 1.00 buah Rp 647,625.00 Rp 647,625.00 Pas. Kran Air Ø 0,5" 1.00 buah Rp 84,931.00 Rp 84,931.00 Bak Mandi 1.00 buah Rp 2,117,445.00 Rp 2,117,445.00 Septick tank dan peresapan 1.00 unit Rp 2,999,301.86 Rp 2,999,301.86 Floor drain 1.00 buah Rp 33,632.50 Rp 33,632.50 Total Sub PEKERJAAN INSTALASI AIR BERSIH/AIR KOTOR Rp 5,882,935.36 PEKERJAAN LAIN-LAIN Pembersihan Akhir 1.00 ls Rp 750,000.00 Rp 750,000.00 Total Sub PEKERJAAN LAIN-LAIN Rp 750,000.00 Total Pekerjaan Pembangunan Rumah Operator Rp 247,132,640.00 Kemajuan Pekerjaan Mingguan (%) Kemajuan Pekerjaan Kumulatif (%)

Bulan I

Bobot (%)

Bulan II

Bulan III

1

2

3

4

5

6

7

8

9

10

11

12

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

4 1.72% 0.27% 0.10% 0.16% 0.36% 0.29% 0.14% 3.04% 0.26% 0.03% 0.86% 1.21% 0.01% 2.38% 0.30% 0.30% 100.00% 0

0.00%

0.76%

2.14%

2.25%

2.25%

2.25%

0.25%

1.99%

0.00%

3.24%

10.98%

6.68%

0.00%

0.76%

2.89%

5.14%

7.40%

9.65%

9.89%

11.88%

11.88%

15.12%

26.10%

32.78%

LAKSANAAN PEKERJAAN UNAN RUMAH OPERATOR

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Puluh) Hari Kalender Bulan IV Bulan V

Bulan VI

Bulan VII

Bulan VIII

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

91-97

98-105

106-112

113-120

121-127

128-135

136-142

143-150

151-157

158-165

166-172

173-180

181-187

188-195

196-202

203-210

211-217

218-225

226-232

233-240

5

2.39%

6

2.39%

2.43%

2.43% 0.21% 1.59%

1.59% 2.56%

2.56% 0.16% 1.13%

0.12%

0.33% 1.17% 0.48%

0.48%

Keterangan

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Puluh) Hari Kalender Bulan IV Bulan V

Bulan VI

Bulan VII

Bulan VIII

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

91-97

98-105

106-112

113-120

121-127

128-135

136-142

143-150

151-157

158-165

166-172

173-180

181-187

188-195

196-202

203-210

211-217

218-225

226-232

233-240

5

6

0.41% 1.33% 2.61% 0.05% 0.16% 0.35% 0.10% 0.14% 2.90%

0.49%

Keterangan

0.49% 1.33% 0.27% 0.54% 0.15%

7.31% 1.14% 7.94% 1.06% 3.41% 1.56% 0.83%

0.41% 0.18% 0.13% 0.05% 0.04% 0.04% 0.04%

2.16% 0.79% 0.90% 0.19%

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Puluh) Hari Kalender Bulan IV Bulan V

Bulan VI

Bulan VII

Bulan VIII

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

91-97

98-105

106-112

113-120

121-127

128-135

136-142

143-150

151-157

158-165

166-172

173-180

181-187

188-195

196-202

203-210

211-217

218-225

226-232

233-240

5

Keterangan

6 1.72% 0.27% 0.10% 0.16% 0.36% 0.29% 0.14%

0.26% 0.03% 0.86% 1.21% 0.01%

0.30%

3.36%

3.36%

4.91%

3.13%

2.43%

4.34%

1.59%

7.31%

10.28%

5.20%

3.85%

5.80%

2.14%

4.05%

3.04%

2.10%

0.03%

0.30%

0.00%

0.00%

36.14%

39.50%

44.41%

47.54%

49.97%

54.31%

55.90%

63.21%

73.49%

78.69%

82.54%

88.34%

90.48%

94.53%

97.57%

99.66%

99.70%

100.00%

100.00%

100.00%

JADWAL PELAKSANAAN PEKERJAAN PENGEMBANGAN SARANA DAN PRASARANA PP. KOLONODALE Pekerjaan Lokasi Tahun Anggaran

: Pengembangan Sarana dan Prasarana PP. Kolonodale : PP. Kolonodale, Kab. Morowali Utara : 2018

No.

1 A. I. II. Err:509

Uraian Pekerjaan

Jumlah Harga

2 PEKERJAAN NAMA PEKERJAAN PEKERJAAN PERSIAPAN

3

IV.

PEKERJAAN BESI

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

4

121-127

5

2,107,266.94

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Rp

611,434.56

Err:509

0.00%

Err:509

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

Err:509

Err:509

Err:509

0.00%

0.00%

0.00%

Err:509

Err:509

Err:509

Err:509

0.00%

Err:509

Err:509

Err:509

0.00%

0.00%

Rp

17,049,727.94

Err:509

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

Err:509

Err:509

Err:509

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

Rp

62,320,583.79

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509 Err:509 PEKERJAAN PENGECATAN Rp

Err:509

Err:509

Err:509

Err:509

VI.

PEKERJAAN ELEKTRIKAL

VII.

PEKERJAAN LAIN-LAIN

A. I.

PEKERJAAN PEMBANGUNAN RUMAH OPERATOR PEKERJAAN PERSIAPAN

II.

PEKERJAAN TANAH DAN PASIR

7,422,561.08

Rp

24,263,982.00

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Rp

1,750,000.00

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Rp

1,873,061.85

Err:509

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Rp

8,628,891.43

Err:509

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Rp

36,600,595.25

Err:509

0.00%

0.00%

Err:509

Err:509

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

Err:509

0.00%

0.00%

0.00%

Rp

36,529,325.46

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Rp

70,461,076.21

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

0.00%

Rp

9,288,363.56

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

Err:509

0.00%

0.00%

0.00%

Rp

57,423,319.79

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Rp

2,183,434.00

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

PEKERJAAN PASANGAN

IV.

PEKERJAAN PLESTERAN DAN LANTAI

V.

PEKERJAAN BETON

VI.

PEKERJAAN PINTU, JENDELA DAN VENTILASI

VII.

PEKERJAAN KAP, ATAP DAN PLAFOND

VIII.

Bulan III

Rp

Err:509

III.

Bulan II

Err:509 PEKERJAAN BETON

V.

Bulan I

PEKERJAAN TANAH

III.

Err:509

Bobot (%)

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Bulan IV B

PEKERJAAN PENGGANTUNG DAN PENGUNCI

No.

Uraian Pekerjaan

1 IX.

PEKERJAAN PENGECATAN

X.

PEKERJAAN INSTALASI LISTRIK

XI. XII.

Jumlah Harga

2

3

Bulan I

Bobot (%)

Bulan II

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Bulan IV B

Bulan III

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

4

121-127

5

Rp

10,008,102.61

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Rp

7,503,534.50

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Rp

5,882,935.36

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

750,000.00 Err:509 Kemajuan Pekerjaan Mingguan (%) Kemajuan Pekerjaan Kumulatif (%)

Err:509 Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

PEKERJAAN INSTALASI AIR BERSIH/AIR KOTOR PEKERJAAN LAIN-LAIN Rp

0

AKSANAAN PEKERJAAN A DAN PRASARANA PP. KOLONODALE

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Puluh) Hari Kalender Bulan V

Bulan VI

Bulan VII

Bulan VIII

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

128-135

136-142

143-150

151-157

158-165

166-172

173-180

181-187

188-195

196-202

203-210

211-217

218-225

226-232

233-240

5

Keterangan

6

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

Jangka Waktu Pelaksanaan 240 (Dua Ratus Empat Puluh) Hari Kalender Bulan V

Bulan VI

Bulan VII

Bulan VIII

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

128-135

136-142

143-150

151-157

158-165

166-172

173-180

181-187

188-195

196-202

203-210

211-217

218-225

226-232

233-240

5

Keterangan

6 0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

Err:509

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Err:509

0.00%

0.00%

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

TABEL 1. IDENTIFIKASI BAHAYA, PENILAIAN RESIKO, PENGENDALIAN RISIKO K3, PROGRAM K3 DAN BIAYA

Nama Perusahaan Pekerjaan Lokasi Tahun Anggaran

No .

: PT. MEGAH MANDIRI MAKMUR : Pengembangan Sarana dan Prasarana PP. Kolonodale : PP. Kolonodale, Kab. Morowali Utara : 2018.00

Uraian Pekerjaan

1

2

Identifikasi Bahaya 3

Sasaran K3 Proyek 4

Pengendalian Risiko K3 5

Program Sumber Daya 6

1.

Pekerjaan Struktur

Tertimpa bahan bangunan, terjatuh, tertusuk dan terluka

Nihil Kecelakaan fatal

Memakai Peralatan APD lengkap, Memberi Peringatan/instruksi Kerja, Melakukan Pelatihan K3

Bahan / Peralatan K3 1 set, Pelaksana K3 1 org

2.

Pekerjaan Arsitektur

Tertimpa bahan bangunan, terjatuh, tertusuk dan terluka

Nihil Kecelakaan fatal

Memakai Peralatan APD lengkap, Memberi Peringatan/instruksi Kerja, Melakukan Pelatihan K3

Bahan / Peralatan K3 1 set, Pelaksana K3 1 org

3.

Pekerjaan MEP

Terjatuh dan tersengat listrik

Nihil Kecelakaan fatal

Memakai Peralatan APD lengkap, Memberi Peringatan/instruksi Kerja, Melakukan Pelatihan K3

Bahan / Peralatan K3 1 set, Pelaksana K3 1 org

4.

Pekerjaan PSU

Terjatuh dan tertusuk

Nihil Kecelakaan fatal

Memakai Peralatan APD lengkap, Memberi Peringatan/instruksi Kerja, Melakukan Pelatihan K3

Bahan / Peralatan K3 1 set, Pelaksana K3 1 org

-

Air Ampelas Armature Lampu Bata Berongga Bata Merah Batu Belah Baut (10 x 16) mm Besi Beton (Polos/Ulir) C-75 0,6 C-75 0,8 Cat Minyak Dasar (Solvent Based) Cat Minyak Menie (Solvent Based) Cat Minyak Penutup (Solvent Based) Cat Tembok Dasar (Water Based) Cat Tembok penutup Closet Jongkok Cutter concrete Dolken Kayu, Ø 8 - 10 cm, Panjang 4 m¹ Dynabolt (8 × 65) mm Floor Drain Frame + Saklar Ganda Frame + Saklar Tunggal Frame + Stop Kontak 13A Genteng Metal Gypsum Board 3,5 mm Ukuran 120 cm x 240 cm Inbouwdoos Joint Sealant Kabel NYM 3 x 2,5 mm Kalsiboard 3,5 mm Ukuran 120 cm x 240 cm Kalsiplank 0,8 mm Ukuran 30 cm x 300 cm Kawat Beton Kayu Kelas II Kayu Kelas III Kerikil Kerikil (Maks 30 mm) Klem Pipa Listrik ⅝” PVC Kran Air Kuas Kusen Dan Daun Pintu PVC L Bow Pipa Listrik ⅝” PVC Lampu 15 Watt Lasdop 2,5 - 4 mm Lem Kayu MCB (Miniature Circuit Breakers) Minyak Bekisting Nok Genteng Metal Paku 1 cm - 2,5 cm Paku 10 cm Paku 5 cm - 10 cm Paku 5 cm - 12 cm

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

93,564.95 79.80 350.00 1,000.00 11,249.00 217.46 78,491.00 26,736.60 6,256.85 4,171.24 70.23 79.80 103.74 1,088.06 2,828.95 50.00 3.99 15.00 4,485.20 50.00 100.00 150.00 150.00 3,644.23 424.54 950.00 11.39 8,250.00 245.59 1,573.00 1.06 16.25 22.95 0.60 339.45 11,850.00 50.00 3.99 50.00 2,100.00 350.00 1,500.00 11.75 50.00 7.97 409.75 579.28 14.69 23.92 3.60

ltr lbr bh bh bh m³ bh kg m¹ m¹ kg kg kg kg kg unit jam/m btg bh unit bh bh bh bh lbr bh kg m lbr orang kg m³ m³ m³ m³ bh bh bh bh bh bh bh kg bh ltr bh kg kg kg kg

-

Paku 5 cm - 7 cm Paku skrup Pasir Beton Pasir Urug Pipa Listrik ⅝” Pipa PVC ½” Pipa PVC 3” Pipa PVC 4” Plamuur Kayu Plamuur Tembok Plywood 4 mm, (120 x 240) cm Plywood 6 mm, (120 x 240) cm Profil Alluminium Reng Sealant Sealtape Sekrup Fixer Semen Portland Semen Warna Seng Gelombang Ukuran 80 cm x 180 cm BJLS 0,30 T Dus Tanah Urug Thinner Ubin Keramik (20 x 20) cm, 11 bh Ubin Keramik (20 x 25) cm Ubin Keramik (30 x 30) cm, 11 bh

= = = = = = = = = = = = = = = = = = = = = = = = = =

19.16 335.51 246.97 552.97 7,950.00 360.00 180.00 120.00 59.85 1,088.06 16.20 0.96 55.00 15,137.55 3.00 1.25 100.00 279,953.56 1,666.25 18.00 1,550.00 460.07 11.97 418.95 5,220.50 1,452.54

kg kg m³ m³ btg m¹ m¹ m¹ kg kg lbr lbr m¹ m¹ tube bh bh kg kg lbr bh m³ ltr dos bh Doos

JADWAL TENAGA BAHAN DAN PERALATAN

Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : 2018 Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan II Bulan III Bulan IV Bulan V

Bulan I No.

1 A. 1. 2. 3. 4. B. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34.

Uraian Pekerjaan

2 Tenaga Pekerja Tukang Kepala tukang Mandor Bahan Air Ampelas Armature Lampu Bata Berongga Bata Merah Batu Belah Baut (10 x 16) mm Besi Beton (Polos/Ulir) C-75 0,6 C-75 0,8 Cat Minyak Dasar (Solvent Based) Cat Minyak Menie (Solvent Based) Cat Minyak Penutup (Solvent Based) Cat Tembok Dasar (Water Based) Cat Tembok penutup Closet Jongkok Cutter concrete Dolken Kayu, Ø 8 - 10 cm, Panjang 4 m¹ Dynabolt (8 × 65) mm Floor Drain Frame + Saklar Ganda Frame + Saklar Tunggal Frame + Stop Kontak 13A Genteng Metal Gypsum Board 3,5 mm Ukuran 120 cm x 240 cm Inbouwdoos Joint Sealant Kabel NYM 3 x 2,5 mm Kalsiboard 3,5 mm Ukuran 120 cm x 240 cm Kalsiplank 0,8 mm Ukuran 30 cm x 300 cm Kawat Beton Kayu Kelas II Kayu Kelas III Kerikil

Jumlah

3

Satuan

93,564.95 79.80 350.00 1,000.00 11,249.00 217.46 78,491.00 26,736.60 6,256.85 4,171.24 70.23 79.80 103.74 1,088.06 2,828.95 50.00 3.99 15.00 4,485.20 50.00 100.00 150.00 150.00 3,644.23 424.54 950.00 11.39 8,250.00 245.59 1,573.00 1.06 16.25 22.95 0.60

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

121-127

128-135

136-142

143-150

151-157

158-165

166-172

173-180

4 Org Org Org Org ltr lbr bh bh bh m³ bh kg m¹ m¹ kg kg kg kg kg unit jam/m btg bh unit bh bh bh bh lbr bh kg m lbr orang kg m³ m³ m³

Bulan VI

5 X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X X

X X X

X

X

X X

X X

X X

X X

X

X

X

X

X X X

X

X X X X X X X X X X

X X X X X X X X X X

X X X X X X X X X

X

X

X X X X X X

X X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X X

X X

X X

X X

X

X X X

X

X X

X

X

X

X

X X X

X X X

X X X X

X X X X

X X

X X X X

X X X X

X X X X

X

X

X

X

X X

X X

X X

X X

X

X X

X

X X

X

X X

X X

X X

X

X

X X

X X

X X X

X X

X X

X X

X X

X X

X X

X X

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan II Bulan III Bulan IV Bulan V

Bulan I No.

1 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63. 64. 65. 66. 67. 68. 69. 70. 71. 72. C. 1. 2. 3. 4. 5. 6.

Uraian Pekerjaan

2 Kerikil (Maks 30 mm) Klem Pipa Listrik ⅝” PVC Kran Air Kuas Kusen Dan Daun Pintu PVC L Bow Pipa Listrik ⅝” PVC Lampu 15 Watt Lasdop 2,5 - 4 mm Lem Kayu MCB (Miniature Circuit Breakers) Minyak Bekisting Nok Genteng Metal Paku Biasa Paku skrup Pasir Beton Pasir Urug Pipa Listrik ⅝” Pipa PVC ½” Pipa PVC 3” Pipa PVC 4” Plamuur Kayu Plamuur Tembok Plywood 4 mm, (120 x 240) cm Plywood 6 mm, (120 x 240) cm Profil Alluminium Reng Sealant Sealtape Sekrup Fixer Semen Portland Semen Warna Seng Gelombang Ukuran 80 cm x 180 cm BJLS 0,30 T Dus Tanah Urug Thinner Ubin Keramik (20 x 20) cm, 11 bh Ubin Keramik (20 x 25) cm Ubin Keramik (30 x 30) cm, 11 bh Bahan Concrete Mixer Vibrator Dump Truck Genset Pompa Air Barcutter

Jumlah

Satuan

3

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

121-127

128-135

136-142

143-150

151-157

158-165

166-172

173-180

X

X

X

X

X

X

X

X X

X

X

X

X X X X

X X X X

X X X X

X X X X X

X

X

X X X

X

X

X

X X X

X X X

X X X

X

X

X

X

X X X

X X

X X

X X X

X

X

X

X

X

X X X X X X

X X X X X X

X X X X X X

4

339.45 11,850.00 50.00 3.99 50.00 2,100.00 350.00 1,500.00 11.75 50.00 7.97 409.75 640.64 335.51 246.97 552.97 7,950.00 360.00 180.00 120.00 59.85 1,088.06 16.20 0.96 55.00 15,137.55 3.00 1.25 100.00 279,953.56 1,666.25 18.00 1,550.00 460.07 11.97 418.95 5,220.50 1,452.54 3.00 1.00 2.00 2.00 2.00 2.00

m³ bh bh bh bh bh bh bh kg bh ltr bh kg kg m³ m³ btg m¹ m¹ m¹ kg kg lbr lbr m¹ m¹ tube bh bh kg kg lbr bh m³ ltr dos bh Doos unit unit unit unit unit unit

Bulan VI

5 X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X

X

X

X

X

X X

X X

X X

X X

X X

X

X X

X

X

X

X

X

X X

X

X

X X

X

X

X X

X

X X X X X

X

X X X

X

X X X X X

X X

X X

X X

X X X

X X

X

X

X

X

X

X

X

X X

X X

X X

X

X

X X X X X X

X X X X X X

X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

X X X

X X X

X X X

X X X

X X X X X X

X X X X X X

X X X X X X

X X X X X X

BAHAN DAN PERALATAN

Keterangan

6

Keterangan

6

-

Air Air Air Air Air Air Air Air Air Air Ampelas Armature Lampu Bata Berongga Bata Merah Bata Merah Batu Belah Batu Belah Baut (10 x 16) mm Besi Beton (Polos/Ulir) C-75 0,6 C-75 0,8 Cat Minyak Dasar (Solvent Based) Cat Minyak Dasar (Solvent Based) Cat Minyak Menie (Solvent Based) Cat Minyak Penutup (Solvent Based) Cat Tembok Dasar (Water Based) Cat Tembok Dasar (Water Based) Cat Tembok penutup Cat Tembok penutup Closet Jongkok Cutter concrete Dolken Kayu, Ø 8 - 10 cm, Panjang 4 m¹ Dynabolt (8 × 65) mm Floor Drain Frame + Saklar Ganda Frame + Saklar Tunggal Frame + Stop Kontak 13A Genteng Metal Gypsum Board 3,5 mm Ukuran 120 cm x 240 cm Inbouwdoos Inbouwdoos Inbouwdoos Inbouwdoos Inbouwdoos Joint Sealant Kabel NYM 3 x 2,5 mm Kabel NYM 3 x 2,5 mm Kabel NYM 3 x 2,5 mm Kalsiboard 3,5 mm Ukuran 120 cm x 240 cm Kalsiplank 0,8 mm Ukuran 30 cm x 300 cm Kalsiplank 0,8 mm Ukuran 30 cm x 300 cm

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

10,955.33 7,153.31 21,500.00 2,004.88 2,217.73 15,706.45 7,974.00 25,716.15 309.60 27.52 79.80 350.00 1,000.00 4,249.00 7,000.00 116.76 100.70 78,491.00 74.30 6,256.85 4,171.24 2.40 67.83 79.80 103.74 903.95 184.10 2,350.28 478.67 50.00 3.99 15.00 4,485.20 50.00 100.00 150.00 150.00 3,644.23 424.54 350.00 150.00 150.00 150.00 150.00 11.39 5,250.00 2,250.00 750.00 245.59 1,463.00 110.00

ltr ltr ltr ltr ltr ltr ltr ltr ltr ltr lbr bh bh bh bh m³ m³ bh kg m¹ m¹ kg kg kg kg kg kg kg kg unit jam/m btg bh unit bh bh bh bh lbr bh bh bh bh bh kg m m m lbr m¹ orang

-

Kawat Beton Kayu Kelas II Kayu Kelas II Kayu Kelas II Kayu Kelas II Kayu Kelas III Kayu Kelas III Kayu Kelas III Kayu Kelas III Kayu Kelas III Kerikil Kerikil (Maks 30 mm) Kerikil (Maks 30 mm) Kerikil (Maks 30 mm) Kerikil (Maks 30 mm) Kerikil (Maks 30 mm) Kerikil (Maks 30 mm) Kerikil (Maks 30 mm) Kerikil (Maks 30 mm) Kerikil (Maks 30 mm) Kerikil (Maks 30 mm) Klem Pipa Listrik ⅝” PVC Klem Pipa Listrik ⅝” PVC Klem Pipa Listrik ⅝” PVC Kran Air Kuas Kusen Dan Daun Pintu PVC L Bow Pipa Listrik ⅝” PVC L Bow Pipa Listrik ⅝” PVC L Bow Pipa Listrik ⅝” PVC Lampu 15 Watt Lasdop 2,5 - 4 mm Lasdop 2,5 - 4 mm Lem Kayu Lem Kayu Lem Kayu Lem Kayu MCB (Miniature Circuit Breakers) Minyak Bekisting Nok Genteng Metal Paku 1 cm - 2,5 cm Paku 1 cm - 2,5 cm Paku 10 cm Paku 10 cm Paku 10 cm Paku 10 cm Paku 5 cm - 10 cm Paku 5 cm - 12 cm Paku 5 cm - 7 cm Paku 5 cm - 7 cm Paku 5 cm - 7 cm Paku Sekrup Paku Sekrup

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

1.06 4.33 2.15 4.30 5.47 2.23 0.07 12.01 5.05 3.59 0.60 38.84 25.36 76.22 7.11 7.86 59.74 30.33 92.76 1.12 0.10 8,400.00 2,250.00 1,200.00 50.00 3.99 50.00 1,400.00 600.00 100.00 350.00 1,050.00 450.00 3.61 1.79 1.79 4.56 50.00 7.97 409.75 560.65 18.63 4.51 2.24 2.24 5.70 23.92 3.60 1.20 12.64 5.32 74.22 133.00

kg m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ bh bh bh bh bh bh bh bh bh bh bh bh kg kg kg kg bh ltr bh kg kg kg kg kg kg kg kg kg kg kg kg kg

-

Paku skrup Pasir Beton Pasir Beton Pasir Beton Pasir Beton Pasir Beton Pasir Beton Pasir Beton Pasir Beton Pasir Beton Pasir Beton Pasir Beton Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Pasir Pasang Pasir Urug Pasir Urug Pasir Urug Perlengkapan Perlengkapan Perlengkapan Pipa Listrik ⅝” Pipa Listrik ⅝” Pipa Listrik ⅝” Pipa PVC ½” Pipa PVC 3” Pipa PVC 4” Plamuur Kayu Plamuur Tembok Plamuur Tembok Plastik Cor Plywood 4 mm, (120 x 240) cm Plywood 6 mm, (120 x 240) cm Profil Alluminium Reng Sealant Sealtape Sekrup Fixer Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

128.30 0.36 27.66 18.06 54.29 5.06 5.60 50.09 25.43 59.63 0.72 0.06 50.59 3.89 4.30 1.00 62.25 17.96 7.18 1.75 216.95 0.50 43.64 1.93 14.76 94.24 31.97 10,500.00 5,250.00 3,500.00 5,250.00 2,250.00 450.00 360.00 180.00 120.00 59.85 903.95 184.10 797.40 16.20 0.96 55.00 15,137.55 3.00 1.25 100.00 216.00 15,859.39 16,611.33 1,398.16 10,846.41 1,150.00

kg m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ orang M3 m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ % % % btg btg btg m¹ m¹ m¹ kg kg kg m² lbr lbr m¹ m¹ tube bh bh kg kg kg kg kg kg

-

Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Portland Semen Warna Semen Warna Semen Warna Semen Warna Seng Gelombang Ukuran 80 cm x 180 cm BJLS 0,30 T Dus T Dus T Dus Tanah Urug Thinner Tukang Tukang Tukang Tukang Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu Tukang batu

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

32,600.00 3,039.95 3,362.69 18,062.42 20.00 13,833.70 4,149.60 3,710.70 550.00 56,406.73 29,378.51 300.00 9,170.10 44,375.31 13,678.31 652.53 534.24 47.49 1.00 691.69 199.50 774.06 18.00 1,050.00 450.00 50.00 460.07 11.97 10.00 20.00 10.00 2.00 10.00 4.00 7.00 4.00 7.00 4.00 4.00 4.00 4.00 10.00 10.00 7.00 10.00 10.00 30.00 200.00 20.00 10.00 34.00 34.00 4.00

kg kg kg kg orang Kg kg kg kg kg kg kg kg kg kg kg kg kg orang Kg kg kg lbr bh bh bh m³ ltr orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang

- Tukang batu - Tukang batu - Tukang batu - Tukang batu - Tukang batu - Tukang besi - Tukang cat - Tukang cat - Tukang cat - Tukang Cat & Tulis - Tukang kayu - Tukang Kayu - Tukang kayu - Tukang kayu - Tukang kayu - Tukang kayu - Tukang kayu - Tukang Kayu - Tukang kayu - Tukang kayu - Tukang kayu - Tukang kayu - Tukang kayu - Tukang kayu - Tukang khususalumunium - Tukang Listrik - Tukang Listrik - Tukang Listrik - Tukang Listrik - Tukang Listrik - Tukang Listrik - Tukang Listrik - Ubin Keramik (20 x 20) cm, 11 bh - Ubin Keramik (20 x 25) cm - Ubin Keramik (30 x 30) cm, 11 bh - Ubin Keramik (30 x 30) cm, 11 bh 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = =

4.00 10.00 10.00 4.00 4.00 18.00 21.00 21.00 3.00 15.00 40.00 10.00 20.00 10.00 10.00 100.00 12.00 40.00 60.00 60.00 60.00 60.00 20.00 10.00 21.00 10.00 15.00 750.00 750.00 750.00 750.00 2.00 418.95 5,220.50 3.00 1,452.54 7.00 2.86 12.00 20.00 1.00 7.00 1.43 0.96 10.00 1.00 7.00 2.86 72.00 20.00 4.00 7.00 28.57

orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang dos bh orang Doos jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m¹/jam

1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

632.00 200.00 4.00 7.00 5.71 198.45 40.00 5.00 7.00 14.29 12.30 100.00 1.00 7.00 1.90 97.30 13.33 8.00 7.00 1.72 50.96 12.05 5.00 7.00 2.86 66.15 20.00 4.00 7.00 9.52 60.70 66.67 1.00 7.00 1.72 33.27 12.05 3.00 7.00 9.52 100.00 66.67 2.00 7.00 1.72 22.66 12.05 2.00 7.00 1.72 9.33 12.05 1.00

m¹ m¹/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m¹/jam m³ m³/hari hari jam m¹/jam m³ m³/hari hari jam m²/jam m² m²/hari hari jam m³/jam m³ m³/hari hari jam m²/jam m² m²/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari

1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

7.00 1.72 10.32 12.05 1.00 7.00 2.38 78.53 16.67 5.00 7.00 14.29 78.53 100.00 1.00 7.00 5.71 383.39 40.00 10.00 7.00 0.29 1,383.37 2.00 692.00 7.00 4.08 399.00 28.57 14.00 7.00 3.17 197.00 22.22 9.00 7.00 28.57 674.70 200.00 4.00 7.00 28.57 1,166.32 200.00 6.00 7.00 142.86 2,803.25 1,000.00 3.00 7.00 28.57 2,803.25

jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m²

2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari

: ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = = =

200.00 15.00 7.00 10.99 372.50 76.92 5.00 7.00 28.57 1,330.00 200.00 7.00 7.00 0.48 3.61 3.33 2.00 7.00 0.48 1.79 3.33 1.00 7.00 0.48 3.59 3.33 2.00 7.00 0.48 4.56 3.33 2.00 7.00 6.49 50.00 45.45 2.00 7.00 68.03 50.00 476.19 1.00 7.00 9.52 40.00 66.67 1.00 7.00 9.52 9,039.54 66.67 136.00 7.00

m²/hari hari jam m¹/jam m¹ m¹/hari hari jam m¹/jam m¹ m¹/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam bh/jam bh bh/hari hari jam m¹/jam m¹ m¹/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam

2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

14.29 9,039.54 100.00 91.00 7.00 47.62 9,039.54 333.33 28.00 7.00 47.62 1,841.02 333.33 6.00 7.00 47.62 399.00 333.33 2.00 7.00 2.86 350.00 20.00 18.00 7.00 2.86 150.00 20.00 8.00 7.00 142.86 150.00 1,000.00 1.00 7.00 142.86 100.00 1,000.00 1.00 7.00 142.86 150.00 1,000.00 1.00 7.00 142.86 50.00 1,000.00 1.00 7.00 14.29 350.00 100.00

m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam titik/jam titik titik/hari hari jam titik/jam titik titik/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari

3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

4.00 7.00 0.13 100.00 7.00 71.43 300.00 500.00 1.00 7.00 28.57 50.00 600.00 1.00 7.00 28.57 50.00 200.00 1.00 7.00 0.89 50.00 6.25 8.00 7.00 35.71 150.00 250.00 1.00 7.00 35.71 100.00 250.00 1.00 7.00 3.17 99.39 22.22 5.00 7.00 5.71 50.00 40.00 2.00 7.00 28.57 265.80 200.00 2.00 7.00 5.71

hari jam buah/jam buah buah/hari hari jam m¹/jam m¹ m¹/hari hari jam m¹/jam m¹ m¹/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari hari jam m¹/jam m¹ m¹/hari hari jam m¹/jam m¹ m¹/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m¹/jam m¹ m¹/hari hari jam m³/jam

1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

: ) x (b) x (c)

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

159.48 40.00 4.00 7.00 5.49 79.74 38.46 3.00 7.00 2.38 39.87 16.67 3.00 7.00 357.14 797.40 2,500.00 1.00 7.00 357.14 70.76 2,500.00 1.00 7.00 1.72 119.61 12.05 10.00 7.00 17.86 79.74 125.00 1.00 7.00 5.71 186.48 40.00 5.00 7.00 14.29 26.64 100.00 1.00 7.00 1.90 83.92 13.33 7.00 7.00 9.52 799.20 66.67 12.00

m³ m³/hari hari jam m²/jam m² m²/hari hari jam m³/jam m³ m³/hari hari jam m²/jam m² m²/hari hari jam kg/jam kg kg/hari hari jam m³/jam m³ m³/hari hari jam m¹/jam m¹ m¹/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m²/jam m² m²/hari hari

1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = : ) x (b) x (c) = = = = = : ) x (b) x (c) = =

7.00 1.72 1.44 12.05 1.00 7.00 1.72 0.13 12.05 1.00

jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari

93,564.95 79.80 350.00 1,000.00 11,249.00 217.46 78,491.00 74.30 6,256.85 4,171.24 70.23 79.80 103.74 1,088.06 2,828.95 50.00 3.99 15.00 4,485.20 50.00 100.00 150.00 150.00 3,644.23 424.54

950.00 11.39

8,250.00 245.59 1,573.00

ltr ltr ltr ltr ltr ltr ltr ltr ltr ltr lbr bh bh bh bh m³ m³ bh kg m¹ m¹ kg kg kg kg kg kg kg kg unit jam/m btg bh unit bh bh bh bh lbr bh bh bh bh bh kg m m m lbr m¹ orang

(c)

1.06 kg m³ m³ m³ 16.25 m³ m³ m³ m³ m³ 22.95 m³ 0.60 m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ 339.45 m³ bh bh 11,850.00 bh 50.00 bh 3.99 bh 50.00 bh bh bh 2,100.00 bh 350.00 bh bh 1,500.00 bh kg kg kg 11.75 kg 50.00 bh 7.97 ltr 409.75 bh kg 579.28 kg kg kg kg 14.69 kg 23.92 kg 3.60 kg kg kg 19.16 kg kg kg

335.51 kg m³ m³ m³ m³ m³ m³ m³ m³ m³ m³ 246.97 m³ m³ m³ m³ orang M3 m³ m³ m³ m³ m³ m³ m³ m³ m³ 552.97 m³ % % % btg btg 7,950.00 btg 360.00 m¹ 180.00 m¹ 120.00 m¹ 59.85 kg kg 1,088.06 kg m² 16.20 lbr 0.96 lbr 55.00 m¹ 15,137.55 m¹ 3.00 tube 1.25 bh 100.00 bh kg kg kg kg kg kg

279,953.56

1,666.25 18.00

1,550.00 460.07 11.97

kg kg kg kg orang Kg kg kg kg kg kg kg kg kg kg kg kg kg orang Kg kg kg lbr bh bh bh m³ ltr orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang

(c)

orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang orang 418.95 dos 5,220.50 bh orang 1,452.54 Doos jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m¹/jam

(a) (b)

(a) (b)

(a) (b)

(a) (b)

m¹ m¹/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m¹/jam m³ m³/hari hari jam m¹/jam m³ m³/hari hari jam m²/jam m² m²/hari hari jam m³/jam m³ m³/hari hari jam m²/jam m² m²/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m²

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

m²/hari hari jam m¹/jam m¹ m¹/hari hari jam m¹/jam m¹ m¹/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam bh/jam bh bh/hari hari jam m¹/jam m¹ m¹/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a)

m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam m²/jam m² m²/hari hari jam titik/jam titik titik/hari hari jam titik/jam titik titik/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari

(b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

hari jam buah/jam buah buah/hari hari jam m¹/jam m¹ m¹/hari hari jam m¹/jam m¹ m¹/hari hari jam buah/jam buah buah/hari hari jam buah/jam buah buah/hari hari jam m¹/jam m¹ m¹/hari hari jam m¹/jam m¹ m¹/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m¹/jam m¹ m¹/hari hari jam m³/jam

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

m³ m³/hari hari jam m²/jam m² m²/hari hari jam m³/jam m³ m³/hari hari jam m²/jam m² m²/hari hari jam kg/jam kg kg/hari hari jam m³/jam m³ m³/hari hari jam m¹/jam m¹ m¹/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari jam m²/jam m² m²/hari hari

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

(a) (b)

jam m³/jam m³ m³/hari hari jam m³/jam m³ m³/hari hari

(a) (b)

(a) (b)

JADWAL PELAKSANAAN PEKERJAAN PEKERJAAN PERSIAPAN Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : 2018 Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan II Bulan III Bulan IV Bulan V

Bulan I ###

1 ### ### ### ### 3. 4.

#REF!

2 ### ### ### ### Direksi Keet Papan Nama

#REF!

3

#REF! Err:509 Rp 793,702.80 #REF! #REF! #REF! #REF! #REF! Kemajuan Pekerjaan Mingguan (%) Kemajuan Pekerjaan Kumulatif (%)

Bobot

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

121-127

128-135

4

5

#REF! #REF! Err:509 ### #REF! #REF! #REF!#REF! #REF! #REF!

0

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

AKSANAAN PEKERJAAN RJAAN PERSIAPAN

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan V

Bulan VI Keterangan

19

20

21

22

23

24

hari

hari

hari

hari

hari

hari

136-142

143-150

151-157

158-165

166-172

173-180

5

-

-

-

-

-

-

-

-

6

-

-

-

-

-

-

-

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

-

#REF!

JADWAL PELAKSANAAN PEKERJAAN PEKERJAAN RUMAH Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : 2018 Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan II Bulan III Bulan IV Bulan V

Bulan I No.

Uraian Pekerjaan

1 509 Err:509 A. 1. 2.

Err:509 Err:509 PEKERJAAN PERSIAPAN Pek. Pembersihan Lapangan Pek. Pemasangan Bouwplank

Err:509 A 1. 2. 3. 4. 5. 6.

Err:509 PEKERJAAN TANAH DAN PASIR Pek. Galian Pondasi Pek. Urugan Pasir Bawah Pondasi Pek. Pondasi Umpak Batu Kali, Spesi 1 PC : 4 Ps Pek. Pasang Sloof 15/20 Pek. Urugan Tanah kembali yang dipadatkan Pek. Rollag Bata

Jumlah Harga

2

3

Err:509

B 1. 2. 3. 4. 5.

PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI Pek. Pasang Kolom 12 x 12 Pek. Pasang Dinding ½ Bata Merah Pek. Pasang Ringbalk 10/10 Pek. Pasang Balok Sopi-sopi Pek. Kanopi Beton Err:509

Err:509 A 1. 2. 3. 4. 5. 6. B 1. 2. 3. 4. 5. 6.

Err:509 PEKERJAAN BETON Pek. Rabat Beton Lantai tebal 5 cm Pek. Urugan pasir di bawah lantai Pek. Urugan Tanah di bawah lantai Pek. Lantai Keramik 30 x 30 Pek. Keramik 20 x 20 untuk KM Pek. Keramik 20 x 25 untuk Dinding KM PEKERJAAN RANGKA ATAP, ATAP DAN PLAFOND Pek. Plafond Kalsiboard 3.5 mm dan assesoris + Rangka Hollow 40.40 2 mm (luar + KM) Pek. Plafond Gypsum dan assesoris + Rangka Hollow 40.40 2 mm (dalam) Pas. Atap Metal Rangka Baja Ringan Pas. Bubungan metal Pas. Listplank Kalsiboard

Bobot

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

121-127

128-135

4

5

Rp 25,245,000.00 Rp 35,871,972.40 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509

### ###

### ###

### ###

### ###

Rp Rp Rp Rp Rp Rp Rp

13,616,150.63 2,407,908.18 73,235,601.05 227,320,334.87 6,512,467.50 10,646,009.11 33,182,535.42

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

###

### ### ###

### ### ### ### ###

### ### ### ### ### ###

Rp 314,816,977.40 Rp 889,340,782.30 Rp 278,380,687.64 Rp 114,583,973.17 Rp 13,685,217.80 Rp 2,758,062,031.83 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp

59,244,250.69 15,372,295.28 85,242,252.05 #VALUE! 14,801,740.80 61,126,519.30 #VALUE!

Err:509 Err:509 Err:509 #VALUE! Err:509 Err:509 #VALUE!

150,561,949.82 264,515,194.50 445,283,647.88 410,037,152.20 40,565,250.00 67,319,945.00

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

### ### ### ### ###

### ### ###

###

### ###

### ###

### ###

### ### ###

### ### ### ###

### ### ### ###

### ### ### ###

### ### ### ###

### ### ###

### ### ###

###

### ### ###

### ### ### ### ### ###

### ### ### ### ### ###

###

### ### ### ### ###

### ### ###

### ### ###

### ### ### ### ### ###

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan II Bulan III Bulan IV Bulan V

Bulan I No.

1

Uraian Pekerjaan

Jumlah Harga

2

C 1. 2. 3. 4. 5. 6. 7. Err:509 1. 2. E 1. 2. 3.

PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI Pek. Pasang 1 set Kusen Kayu Pintu Panel dan Jendela Tipe PJ1 plus aksesoris Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P1 plus aksesoris Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P2 plus aksesoris Pek. Pasang 1 set Jendela Kayu Tipe J1 dan aksesoris Pek. Pasang 1 set Pintu (P3)/pintu KM PVC incl. accessories Pek. Pasang 1 set Bovenlight Alumunium Pek. Pasang Jendela Roster Err:509 Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm Pekerjaan Acian Dinding PEKERJAAN PENGECATAN Pek. Cat Tembok Luar dan Dalam (Cat Dasar, Cat Penutup dan Plamur) Pek. Cat Plafond (Cat Dasar, Car Penutup dan Plamur) Pek. Cat Kayu (Lisplank) (Cat Dasar, Cat Penutup, Cat Meni dan Plamur) Err:509

Err:509 A 1. 2. 3. 4. 5. 6. 7. 8. B 1. 2. 3. 4. 5. 6. 7. 8.

Err:509 PEKERJAAN ELEKTRIKAL Pek. Instalasi Penerangan Pek. Instalasi Stop Kontak Pek. Pasang Saklar tunggal Pek. Pasang Saklar Ganda Pek. Pasang Stop kontak Pek. Pasang Box Sekring 2 Group + MCB 1 unit Pek. Pasang Lampu 15 W Biaya Pemasangan Listrik 1300V + SLO PEKERJAAN SANITAIR Instalasi air bersih pipa PVC dia 3/4" AW+ assesories Kran air Floor Drain Stainless Pas. Closet Jongkok Instalasi air kotor pipa PVC dia 3" AW+ Assesories Instalasi air kotoran pipa PVC dia 4" AW+ Assesories Pek. Pembuatan Septik Tank + Sumur Resapan Pek. Sumur bor dangkal + Jet Pump

Bobot

3 Rp 1,378,283,139.40

4 Err:509

Rp Rp Rp Rp Rp Rp Rp Rp

125,981,806.77 128,002,837.53 158,680,247.69 114,602,971.03 27,009,125.00 13,298,367.50 14,236,200.00 581,811,555.52

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp 528,506,649.59 Rp 318,191,808.00 Err:509

Err:509 Err:509 Err:509

Rp 196,582,876.38 Rp 40,036,661.94 Rp 19,899,726.00 Rp 256,519,264.32 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp Rp Rp Rp Rp Rp Rp Rp

135,308,250.00 56,380,500.00 18,833,925.00 12,885,950.00 19,955,925.00 16,953,475.00 31,935,750.00 110,000,000.00 402,253,775.00

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp Rp Rp Rp Rp

5,035,800.00 4,246,550.00 1,681,625.00 32,381,250.00 6,130,575.00 5,178,250.00 Err:509 96,250,000.00 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509Err:509 Err:509 Err:509 Err:509

Rp

Err:509 Err:509 Err:509 Err:509 Kemajuan Pekerjaan Mingguan (%) Kemajuan Pekerjaan Kumulatif (%)

0

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

121-127

128-135

5

### ### ### ### ### ### ###

### ### ### ### ### ### ###

### ### ### ### ### ### ###

### ### ### ### ### ### ###

### ### ### ### ### ### ###

### ###

###

###

###

###

### ###

-

-

-

-

-

### ###

### ###

### ### ### ###

###

### ### -

### ###

-

-

-

-

-

-

-

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

### ### ### ###

### ###

### ###

-

-

-

-

Err:509

Err:509

Err:509

Err:509 #VALUE!

Err:509

Err:509

Err:509

Err:509 #VALUE!

-

AKSANAAN PEKERJAAN ERJAAN RUMAH

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan V

Bulan VI

19

20

21

22

23

24

hari

hari

hari

hari

hari

hari

136-142

143-150

151-157

158-165

166-172

173-180

5

Keterangan

6

### ### ### ### ### ###

### ### ### ### ###

### ###

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan V

Bulan VI Keterangan

19

20

21

22

23

24

hari

hari

hari

hari

hari

hari

136-142

143-150

151-157

158-165

166-172

173-180

5

6

### ### ###

### ### ###

### ### ###

### ### ### ### ### ### ### ###

### ### ### ### ### ### ### ###

###

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

### ###

### ###

### ###

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

-

-

Err:509

JADWAL PELAKSANAAN PEKERJAAN PEKERJAAN JALAN DAN SALURAN Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : 2018 Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan II Bulan III Bulan IV Bulan V

Bulan I No.

1 III. i. A. 1.

Uraian Pekerjaan

Jumlah Harga

2

3

Pekerjaan Jalan dan Saluran Pekerjaan Fasilitas Umum Pekerjaan Persiapan Patok dan Pengukuran

Bobot

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

121-127

128-135

4.55

4.55 0.34 0.07 7.30 0.07

0.34 0.07 7.30 0.07

4

5

Rp Rp

15,086,661.81 15,086,661.81

4.57% 4.57%

4.57

Rp Rp Rp Rp Rp Rp Rp Rp

10,942,321.50 14,012,092.22 30,077,684.96 5,611,941.72 1,113,418.89 120,472,668.71 1,148,375.37 183,378,503.36

3.31% 4.24% 9.11% 1.70% 0.34% 36.48% 0.35% 55.53%

1.66

Rp Rp Rp Rp Rp

12,794,859.00 5,214,646.80 63,163,782.99 48,497,885.57 129,671,174.36

3.87% 1.58% 19.13% 14.69% 39.27%

Rp 1,910,490.90 Rp 169,821.41 Rp 2,080,312.31 Total Sub Pekerjaan Fasilitas Umum Rp 330,216,651.84 Total Pekerjaan Jalan dan Saluran Rp 330,216,651.84 Kemajuan Pekerjaan Mingguan (%) Kemajuan Pekerjaan Kumulatif (%)

0.58% 0.05% 0.63% 100.00% 100.00%

B. 1. 2. 3. 4. 5. 6. 7.

Pekerjaan Perkerasan Pekerjaan Galian Badan Jalan Pek. Bekisting Pek. Lantai Kerja B0 K-100 Penghamparan Bond Breaker Pekerjaan Penulangan Ruji dowel d = 12mm Penghamparan Lapisan Beton K-225 Pemasangan Joint cutter & joint sealent

C. 1. 2. 3. 4.

Pekerjaan Drainase Galian Tanah Urugan Pasir Pas. Batu Belah/Kali Plester

D. 1. 2.

Pelat Deuiker Pek. Pengecoran Pelat Deuiker K-175 Untuk Saluran Pek. Pengecoran Pelat Deuiker K-175 Tiap Rumah

0

1.66 4.24 0.34 0.07 7.30 0.07

0.34 0.07 7.30 0.07

4.78 3.67

4.78 3.67

3.87 1.58

-

-

-

-

-

-

-

-

-

-

6.23

5.90

4.55

4.55

11.65

9.35

16.23

16.23

-

-

-

-

-

-

-

-

-

-

6.23

12.13

16.68

21.23

32.88

42.23

58.46

74.69

AKSANAAN PEKERJAAN N JALAN DAN SALURAN

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan V

Bulan VI Keterangan

19

20

21

22

23

24

hari

hari

hari

hari

hari

hari

136-142

143-150

151-157

158-165

166-172

173-180

5

6

0.34 0.07 7.30 0.07

4.78 3.67

4.78 3.67

0.29 0.03

0.29 0.03

16.23

8.45

0.31

0.31

90.92

99.37

99.69

100.00

100.00

100.00

PENAWARAN TEKNIS URAIAN TEKNIS METODE PELAKSANAAN Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : ### No.

Uraian Metode Pelaksanaan

1 ### ### ### ### 3.

2 ### ### ### ### Direksi Keet ### ### A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

4.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Err:509 - Err:509 - Err:509 - Err:509 2. Bahan - Err:509 - Err:509 - Err:509 - Err:509 - Err:509 - Err:509 - Err:509 - Err:509 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Papan Nama ### Pembuatan Papan Nama Proyek A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan

= = = = = = = = = = = = =

:

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 1. Tenaga - Pekerja - Tukang Kayu - Tukang Cat & Tulis - Kepala Tukang Kayu - Mandor 2. Bahan - Plywood 6 mm, (120 x 240) cm - Kayu Kelas III - Paku 5 cm - 7 cm - Cat Minyak Dasar (Solvent Based) 3. Alat -

509 Err:509 A. 1.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = = = =

:

Err:509 Err:509 PEKERJAAN PERSIAPAN Pek. Pembersihan Lapangan ### (K3) Pembersihan lapangan dan perataan A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= (a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 2.

Pek. Pemasangan Bouwplank ### Pengukuran dan pemasangan Bouwplank A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor

= = = =

2. Bahan - Kayu Kelas III - Paku 5 cm - 7 cm 3. Alat -

Err:509 A. 1.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Err:509 PEKERJAAN TANAH DAN PASIR Pek. Galian Pondasi ### Penggalian tanah biasa sedalam 1 m A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan

= = =

:

= (a) x (b) x (c) = =

= =

= = = =

=

No.

Uraian Metode Pelaksanaan

1

2 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 2.

Pek. Urugan Pasir Bawah Pondasi ### Pengurugan dengan pasir urug A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

:

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pondasi Umpak Batu Kali, Spesi 1 PC : 4 Ps ### Pemasangan pondasi batu belah campuran 1 SP : 4 PP A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

D

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan - Pasir Urug 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Batu Belah - Semen Portland - Pasir Pasang 3. Alat Urutan Kerja 1. Pelaksanaan Pekerjaan

(a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 4.

Pek. Pasang Sloof 15/20 ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

5.

:

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Urugan Tanah kembali yang dipadatkan ### Pengurugan kembali galian tanah A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat Urutan Kerja 1.

= (a) x (b) x (c) = =

= =

= = = = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = =

No.

Uraian Metode Pelaksanaan

1

2 D

6.

:

Pek. Rollag Bata ### Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 3 PP A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

B. 1.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Bata Merah - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland

= =

= = = = = = = =

:

PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI Pek. Pasang Kolom 12 x 12 ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

= = = = =

No.

Uraian Metode Pelaksanaan

1

2 - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

2.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

=

:

Pek. Pasang Dinding ½ Bata Merah ### Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 4 PP A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

= = =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Bata Merah - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga

= =

= = = = = = = =

:

Pek. Pasang Ringbalk 10/10 ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

4.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = =

:

Pek. Pasang Balok Sopi-sopi ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

5.

= = = =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Kanopi Beton

= (a) x (b) x (c) = =

= =

= = = = = = = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Err:509 A. 1.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = = =

:

Err:509 PEKERJAAN BETON Pek. Rabat Beton Lantai tebal 5 cm ### Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

= =

= (a) x (b) x (c) = =

= =

= = = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2

2.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Urugan pasir di bawah lantai ### Pengurugan dengan pasir urug A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

:

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Urugan Tanah di bawah lantai ### Pengurugan Tanah A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan - Pasir Urug 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan - Tanah Urug 3. Alat Urutan Kerja 1.

= (a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

= =

= = = =

No.

Uraian Metode Pelaksanaan

1

2 D

4.

:

Pek. Lantai Keramik 30 x 30 ### Pemasangan lantai keramik ukuran 30 cm x 30 cm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

5.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Keramik 20 x 20 untuk KM ### Pemasangan lantai keramik ukuran 20 cm x 20 cm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Ubin Keramik (30 x 30) cm, 11 bh - Semen Portland - Pasir Pasang - Semen Warna 2. Bahan - Ubin Keramik (30 x 30) cm, 11 bh - Semen Portland - Pasir Pasang - Semen Warna 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Ubin Keramik (20 x 20) cm, 11 bh - Semen Portland - Pasir Pasang

= (a) x (b) x (c) = =

= = = = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 - Semen Warna 3. Alat -

6.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

=

:

Pek. Keramik 20 x 25 untuk Dinding KM ### Pemasangan dinding keramik 20 cm x 25 cm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

B. 1.

=

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Ubin Keramik (20 x 25) cm - Semen Portland - Pasir Pasang - Semen Warna 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = = =

:

PEKERJAAN RANGKA ATAP, ATAP DAN PLAFOND Pek. Plafond Kalsiboard 3.5 mm dan assesoris + Rangka Hollow 40.40 2 mm (luar + KM) ### Pemasangan Plafon Kalsiboard 3,5 mm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kalsiboard 3,5 mm Ukuran 120 cm x 240 cm - Paku Sekrup 3. Alat -

2.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = =

:

Pek. Plafond Gypsum dan assesoris + Rangka Hollow 40.40 2 mm (dalam) ### Pemasangan langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

= = = =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Gypsum Board 3,5 mm Ukuran 120 cm x 240 cm - Paku skrup 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pas. Atap Metal ### Pemasangan genteng metal ukuran 80 x 100 atap pelana A Asumsi 1. Jam kerja efektif per hari

= (a) x (b) x (c) = =

= =

= = = = = = =

:

= (a) x (b) x (c) = =

=

No.

Uraian Metode Pelaksanaan

1

2 2. Kapasitas produksi/jam B

4.

=

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Genteng Metal - Paku 1 cm - 2,5 cm 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = =

:

Rangka Baja Ringan ### Memasang Kuda-kuda Baja Ringan + Reng Untuk Atap Genteng Metal A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang - Kepala tukang - Mandor 2. Bahan - C-75 0,8 - C-75 0,6 - Reng - Baut (10 x 16) mm - Dynabolt (8 × 65) mm 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah

= (a) x (b) x (c) = =

= =

= = = = = = = = = =

:

= (a) x (b) x (c) =

No.

Uraian Metode Pelaksanaan

1

2 3. Waktu pelaksanaan yang dibutuhkan 5.

Pas. Bubungan metal ### Pemasangan nok genteng metal A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

6.

=

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Nok Genteng Metal - Paku 1 cm - 2,5 cm 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pas. Listplank Kalsiboard ### Pemasangan Lisplank Kalsiboard A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Kayu - Kepala Tukang - Mandor 2. Bahan - Kalsiplank 0,8 mm Ukuran 20 cm x 300 cm - Paku Sekrup 3. Alat Urutan Kerja 1.

= = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 D

C. 1.

:

PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI Pek. Pasang 1 set Kusen Kayu Pintu Panel dan Jendela Tipe PJ1 plus aksesoris ### Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas II - Paku 10 cm - Lem Kayu 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas II - Paku 10 cm

= =

= = = = = = = =

:

Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P1 plus aksesoris ### Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

= = = = = =

No.

Uraian Metode Pelaksanaan

1

2 - Lem Kayu 3. Alat -

3.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

=

:

Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P2 plus aksesoris ### Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

4.

=

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas II - Paku 10 cm - Lem Kayu 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu

= =

= = = = = = = =

:

Pek. Pasang 1 set Jendela Kayu Tipe J1 dan aksesoris ### Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

= =

No.

Uraian Metode Pelaksanaan

1

2 - Kepala tukang - Mandor 2. Bahan - Kayu Kelas II - Paku 10 cm - Lem Kayu 3. Alat -

5.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = =

:

Pek. Pasang 1 set Pintu (P3)/pintu KM PVC incl. accessories ### Pemasangan Kusen dan Daun pintu PVC A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

6.

= =

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pasang 1 set Bovenlight Alumunium ### Pemasangan kusen pintu alluminium A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang - Kepala tukang - Mandor 2. Bahan - Kusen Dan Daun Pintu PVC 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan

= (a) x (b) x (c) = =

= = = = = =

:

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 1. Tenaga - Pekerja - Tukang khususalumunium - Kepala tukang - Mandor 2. Bahan - Profil Alluminium - Sekrup Fixer - Sealant 3. Alat -

7.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = =

:

Pek. Pasang Jendela Roster ### Pemasangan dinding terawang (rooster) 20 x 11 x 20 campuran 1 SP : 4 PP A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Err:509

= = = =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Bata Berongga - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Err:509

= (a) x (b) x (c) = =

= =

= = = = = = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 1.

Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm ### Pemasangan plesteran 1 SP : 4 PP tebal 15 mm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = =

:

Pekerjaan Acian Dinding ### Pemasangan acian A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah

= (a) x (b) x (c) = =

= = = = = =

:

= (a) x (b) x (c) =

No.

Uraian Metode Pelaksanaan

1

2 3. Waktu pelaksanaan yang dibutuhkan

E. 1.

PEKERJAAN PENGECATAN Pek. Cat Tembok Luar dan Dalam (Cat Dasar, Cat Penutup dan Plamur) ### Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

=

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang cat - Kepala tukang - Mandor 2. Bahan - Plamuur Tembok - Cat Tembok Dasar (Water Based) - Cat Tembok penutup 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = =

:

Pek. Cat Plafond (Cat Dasar, Car Penutup dan Plamur) ### Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang cat - Kepala tukang - Mandor 2. Bahan - Plamuur Tembok - Cat Tembok Dasar (Water Based) - Cat Tembok penutup 3. Alat -

= =

= (a) x (b) x (c) = =

= =

= = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2

3.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Cat Kayu (Lisplank) (Cat Dasar, Cat Penutup, Cat Meni dan Plamur) ### Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Err:509 A. 1.

:

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang cat - Kepala tukang - Mandor 2. Bahan - Cat Minyak Menie (Solvent Based) - Plamuur Kayu - Cat Minyak Dasar (Solvent Based) - Cat Minyak Penutup (Solvent Based) - Kuas - Thinner - Ampelas 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Err:509 PEKERJAAN ELEKTRIKAL Pek. Instalasi Penerangan ### Pemasangan Instalasi Penerangan A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan

= (a) x (b) x (c) = =

= =

= = = = = = = = = = = =

:

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Pipa Listrik ⅝” - Kabel NYM 3 x 2,5 mm - T Dus - L Bow Pipa Listrik ⅝” PVC - Lasdop 2,5 - 4 mm - Klem Pipa Listrik ⅝” PVC - Inbouwdoos 3. Alat -

2.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Instalasi Stop Kontak ### Pemasangan Instalasi Stop Kontak A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Pipa Listrik ⅝” - Kabel NYM 3 x 2,5 mm - T Dus - L Bow Pipa Listrik ⅝” PVC - Lasdop 2,5 - 4 mm - Klem Pipa Listrik ⅝” PVC - Inbouwdoos 3. Alat Urutan Kerja 1.

= = = = = = = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 D

3.

:

Pek. Pasang Saklar tunggal ### Pemasangan Saklar Tunggal A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

4.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pasang Saklar Ganda ### Pemasangan Saklar Ganda A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Frame + Saklar Tunggal - Inbouwdoos 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Frame + Saklar Ganda - Inbouwdoos 3. Alat -

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = =

No.

Uraian Metode Pelaksanaan

1

2

5.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pasang Stop kontak ### Pemasangan Stop Kontak A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

6.

:

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pasang Box Sekring 2 Group + MCB 1 unit ### (K3) Pemasangan MCB A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Frame + Stop Kontak 13A - Inbouwdoos 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Pipa Listrik ⅝”

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = =

No.

Uraian Metode Pelaksanaan

1

2 - Kabel NYM 3 x 2,5 mm - T Dus - L Bow Pipa Listrik ⅝” PVC - Klem Pipa Listrik ⅝” PVC - MCB (Miniature Circuit Breakers) 3. Alat -

7.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

=

:

Pek. Pasang Lampu 15 W ### Pemasangan Lampu 18 Watt A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

8.

= = = = =

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Biaya Pemasangan Listrik 1300V + SLO ### ### A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Lampu SL 18 Watt - Armature Down Light Ǿ4" 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 1. Tenaga - Mandor - Kalsiplank 0,8 mm Ukuran 20 cm x 300 cm 2. Bahan 3. Alat -

B. 1.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = =

0 0

= = =

:

PEKERJAAN SANITAIR Instalasi air bersih pipa PVC dia 3/4" AW+ assesories ### Pemasangan pipa PVC tipe AW diameter ¾ ” A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

0 0

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Pipa PVC ¾” - Perlengkapan 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kran air ### Pemasangan kran diameter ½” atau ¾ ”

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 A

B

3.

Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Kran Air - Sealtape 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = =

:

Floor Drain Stainless ### Pemasangan floor drain A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Floor Drain 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= (a) x (b) x (c) = =

= = = = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 4.

Pas. Closet Jongkok ### Pemasangan closet jongkok porselen A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

5.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Closet Jongkok - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Instalasi air kotor pipa PVC dia 3" AW+ Assesories ### Pemasangan pipa PVC tipe AW diameter 3” A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

D

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Pipa PVC 3” - Perlengkapan 3. Alat Urutan Kerja 1. Pelaksanaan Pekerjaan

= = = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 6.

Instalasi air kotoran pipa PVC dia 4" AW+ Assesories ### Pemasangan pipa PVC tipe AW diameter 4” A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

7.

:

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pembuatan Septik Tank + Sumur Resapan ### Penggalian tanah biasa sedalam 2 m A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

D

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Pipa PVC 4” - Perlengkapan 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat Urutan Kerja 1. Pelaksanaan Pekerjaan

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = =

No.

Uraian Metode Pelaksanaan

1

2 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 8.

:

Pek. Sumur bor dangkal + Jet Pump ### Penggalian tanah biasa sedalam 1 m A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan -

= = =

3. Alat -

III. i. A. 1.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pekerjaan Jalan dan Saluran Pekerjaan Fasilitas Umum Pekerjaan Persiapan Patok dan Pengukuran ### Pengukuran dan pemasangan Bouwplank A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas III - Paku 5 cm - 7 cm 3. Alat -

= (a) x (b) x (c) = =

=

:

= (a) x (b) x (c) = =

= =

= = = = = = =

No.

Uraian Metode Pelaksanaan

1

2

B. 1.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pekerjaan Perkerasan Pekerjaan Galian Badan Jalan ### Penggalian tanah biasa sedalam 1 m A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

:

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Bekisting ### (K3) Pemasangan bekisting untuk sloof A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas III - Paku 5 cm - 10 cm

= (a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

= =

= = = = = =

No.

Uraian Metode Pelaksanaan

1

2 - Minyak Bekisting 3. Alat -

3.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

=

:

Pek. Lantai Kerja B0 K-100 ### Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

4.

=

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Penghamparan Bond Breaker ### Pemasangan Plastik Bond Breaker A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja

= (a) x (b) x (c) = =

= =

= = = = = = = = =

:

= (a) x (b) x (c) = =

= =

=

No.

Uraian Metode Pelaksanaan

1

2 - Tukang - Kepala Tukang - Mandor 2. Bahan - Plastik Cor 3. Alat -

5.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= =

:

Pekerjaan Penulangan Ruji dowel d = 12mm ### Pembesian dengan besi polos atau besi ulir A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

6.

= = =

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Penghamparan Lapisan Beton K-225 ### Membuat beton mutu f’c = 19,3 Mpa (K225) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang besi - Kepala tukang - Mandor 2. Bahan - Besi Beton (Polos/Ulir) - Kawat Beton 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

7.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = =

:

Pemasangan Joint cutter & joint sealent ### Pemasangan Joint Cutter & Joint Sealent A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C. 1.

= = = =

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang - Kepala Tukang - Mandor 2. Bahan - Joint Sealant 3. Alat - Cutter concrete

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pekerjaan Drainase Galian Tanah

= (a) x (b) x (c) = =

= = = = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 ### Penggalian tanah biasa sedalam 1 m A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = =

:

Urugan Pasir ### Pengurugan dengan pasir urug A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

= =

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan - Pasir Urug 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pas. Batu Belah/Kali ### Pemasangan pondasi batu belah campuran 1 SP : 4 PP A Asumsi 1. Jam kerja efektif per hari

= (a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

=

No.

Uraian Metode Pelaksanaan

1

2 2. Kapasitas produksi/jam B

4.

=

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Batu Belah - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = =

:

Plester ### Pemasangan plesteran 1 SP : 3 PP tebal 15 mm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2

D. 1.

Pelat Deuiker Pek. Pengecoran Pelat Deuiker K-175 Untuk Saluran ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = = =

:

Pek. Pengecoran Pelat Deuiker K-175 Tiap Rumah ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

= =

= (a) x (b) x (c) = =

= =

= = = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

:

= (a) x (b) x (c) = =

ENAWARAN TEKNIS KNIS METODE PELAKSANAAN

aian Metode Pelaksanaan 2

7.00 jam Err:509 Err:509

(a) (b)

Err:509 orang Err:509 orang Err:509 orang Err:509 orang

(c)

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

12.00 Err:509 Err:509 Err:509 Err:509 hari

7.00 jam 1.43 m²/jam

(a) (b)

aian Metode Pelaksanaan 2 10.00 10.00 15.00 1.00 1.00 0.96 0.07 1.20 2.40

orang orang orang orang orang

(c)

lbr m³ kg kg

0.96 m² 10.00 m²/hari 1.00 hari

7.00 jam 2.86 m²/jam

(a) (b)

2.00 orang 1.00 orang

(c)

-

72.00 m² 20.00 m²/hari 4.00 hari

aian Metode Pelaksanaan 2

7.00 jam 28.57 m¹/jam

(a) (b)

20.00 20.00 2.00 1.00

(c)

orang orang orang orang

12.01 m³ 12.64 kg

632.00 m¹ 200.00 m¹/hari 4.00 hari

7.00 jam 5.71 m³/jam

30.00 orang 1.00 orang

198.45 m³

(a) (b)

(c)

aian Metode Pelaksanaan 2 40.00 m³/hari 5.00 hari

7.00 jam 14.29 m³/jam

(a) (b)

30.00 orang 1.00 orang

(c)

14.76 m³

12.30 m³ 100.00 m³/hari 1.00 hari

7.00 jam 1.90 m³/jam

20.00 10.00 1.00 1.00

orang orang orang orang

116.76 m³ 15,859.39 kg 50.59 m³

(a) (b)

(c)

aian Metode Pelaksanaan 2 97.30 m³ 13.33 m³/hari 8.00 hari

7.00 jam 1.72 m¹/jam

20.00 4.00 1.00 1.00 16,611.33 27.66 38.84 10,955.33

orang orang orang orang

(a) (b)

(c)

kg m³ m³ ltr

50.96 m³ 12.05 m³/hari 5.00 hari

7.00 jam 2.86 m¹/jam

10.00 orang 1.00 orang

(a) (b)

(c)

aian Metode Pelaksanaan 2

66.15 m³ 20.00 m³/hari 4.00 hari

7.00 jam 9.52 m²/jam

20.00 7.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

4,249.00 bh 1,398.16 kg 3.89 m³

60.70 m² 66.67 m²/hari 1.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00

orang orang orang orang

10,846.41 kg

(a) (b)

(c)

aian Metode Pelaksanaan 2 18.06 m³ 25.36 m³ 7,153.31 ltr

33.27 m³ 12.05 m³/hari 3.00 hari

7.00 jam 9.52 m²/jam

20.00 7.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

7,000.00 bh 1,150.00 kg 4.30 m³

100.00 m² 66.67 m²/hari 2.00 hari

7.00 jam 1.72 m³/jam

(a) (b)

aian Metode Pelaksanaan 2 20.00 4.00 1.00 1.00 32,600.00 54.29 76.22 21,500.00

orang orang orang orang

(c)

kg m³ m³ ltr

22.66 m³ 12.05 m³/hari 2.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00 3,039.95 5.06 7.11 2,004.88

orang orang orang orang kg m³ m³ ltr

9.33 m³ 12.05 m³/hari 1.00 hari

(a) (b)

(c)

aian Metode Pelaksanaan 2

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00 3,362.69 5.60 7.86 2,217.73

orang orang orang orang

(a) (b)

(c)

kg m³ m³ ltr

10.32 m³ 12.05 m³/hari 1.00 hari

7.00 jam 2.38 m³/jam

20.00 4.00 1.00 1.00 18,062.42 50.09 59.74 15,706.45

orang orang orang orang kg m³ m³ ltr

(a) (b)

(c)

aian Metode Pelaksanaan 2

78.53 m³ 16.67 m³/hari 5.00 hari

7.00 jam 14.29 m³/jam

(a) (b)

30.00 orang 1.00 orang

(c)

94.24 m³

78.53 m³ 100.00 m³/hari 1.00 hari

7.00 jam 5.71 m³/jam

10.00 orang 1.00 orang 460.07 m³

(a) (b)

(c)

aian Metode Pelaksanaan 2 383.39 m³ 40.00 m³/hari 10.00 hari

7.00 jam 0.29 m²/jam

3.00 20.00 1.00 1.00

orang orang orang orang

1,452.54 13,833.70 62.25 691.69

Doos Kg M3 Kg

(a) (b)

(c)

1,383.37 m² 2.00 m²/hari 692.00 hari

7.00 jam 4.08 m²/jam

20.00 10.00 1.00 1.00

orang orang orang orang

418.95 dos 4,149.60 kg 17.96 m³

(a) (b)

(c)

aian Metode Pelaksanaan 2 199.50 kg

399.00 m² 28.57 m²/hari 14.00 hari

7.00 jam 3.17 m²/jam

20.00 10.00 1.00 1.00 5,220.50 3,710.70 7.18 774.06

orang orang orang orang

(a) (b)

(c)

bh kg m³ kg

197.00 m² 22.22 m²/hari 9.00 hari

7.00 jam 28.57 m²/jam

(a) (b)

aian Metode Pelaksanaan 2 20.00 10.00 1.00 1.00

orang orang orang orang

(c)

245.59 lbr 74.22 kg

674.70 m² 200.00 m²/hari 4.00 hari

7.00 jam 28.57 m²/jam

(a) (b)

20.00 10.00 1.00 1.00

(c)

orang orang orang orang

424.54 lbr 128.30 kg

1,166.32 m² 200.00 m²/hari 6.00 hari

7.00 jam

(a)

aian Metode Pelaksanaan 2 142.86 m²/jam

(b)

200.00 100.00 10.00 1.00

(c)

orang orang orang orang

3,644.23 bh 560.65 kg

2,803.25 m² 1,000.00 m²/hari 3.00 hari

7.00 jam 28.57 m²/jam

(a) (b)

20.00 10.00 1.00 1.00

(c)

4,171.24 6,256.85 15,137.55 78,491.00 4,485.20

orang orang orang orang m¹ m¹ m¹ bh bh

2,803.25 m² 200.00 m²/hari

aian Metode Pelaksanaan 2 15.00 hari

7.00 jam 10.99 m¹/jam

(a) (b)

20.00 12.00 2.00 1.00

(c)

orang orang orang orang

409.75 bh 18.63 kg

372.50 m¹ 76.92 m¹/hari 5.00 hari

7.00 jam 28.57 m¹/jam

(a) (b)

20.00 40.00 4.00 1.00

(c)

orang orang orang orang

1,463.00 m¹ 133.00 kg

aian Metode Pelaksanaan 2 1,330.00 m¹ 200.00 m¹/hari 7.00 hari

7.00 jam 0.48 m³/jam

20.00 60.00 6.00 1.00

orang orang orang orang

(a) (b)

(c)

4.33 m³ 4.51 kg 3.61 kg

3.61 m³ 3.33 m³/hari 2.00 hari

7.00 jam 0.48 m³/jam

20.00 60.00 6.00 1.00

orang orang orang orang

2.57 m³ 2.67 kg

(a) (b)

(c)

aian Metode Pelaksanaan 2 2.14 kg

2.14 m³ 3.33 m³/hari 1.00 hari

7.00 jam 0.48 m³/jam

20.00 60.00 6.00 1.00

orang orang orang orang

(a) (b)

(c)

4.59 m³ 2.67 kg 2.14 kg

3.83 m³ 3.33 m³/hari 2.00 hari

7.00 jam 0.48 m³/jam

20.00 orang 60.00 orang

(a) (b)

aian Metode Pelaksanaan 2 6.00 orang 1.00 orang

(c)

5.47 m³ 5.70 kg 4.56 kg

4.56 m³ 3.33 m³/hari 2.00 hari

7.00 jam 6.49 bh/jam

20.00 20.00 2.00 1.00

orang orang orang orang

(a) (b)

(c)

50.00 bh

50.00 bh 45.45 bh/hari 2.00 hari

7.00 jam 68.03 m¹/jam

(a) (b)

aian Metode Pelaksanaan 2 21.00 21.00 3.00 1.00

orang orang orang orang

(c)

55.00 m¹ 100.00 bh 3.00 tube

50.00 m¹ 476.19 m¹/hari 1.00 hari

7.00 jam 9.52 m²/jam

20.00 7.00 1.00 1.00

orang orang orang orang

1,000.00 bh 550.00 kg 1.75 m³

40.00 m² 66.67 m²/hari 1.00 hari

(a) (b)

(c)

aian Metode Pelaksanaan 2

7.00 jam 9.52 m²/jam

20.00 10.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

56,406.73 kg 216.95 m³

9,039.54 m² 66.67 m²/hari 136.00 hari

7.00 jam 14.29 m²/jam

(a) (b)

20.00 10.00 1.00 1.00

(c)

orang orang orang orang

29,378.51 kg

9,039.54 m² 100.00 m²/hari

aian Metode Pelaksanaan 2 91.00 hari

7.00 jam 47.62 m²/jam

(a) (b)

7.00 21.00 3.00 1.00

(c)

orang orang orang orang

903.95 kg 903.95 kg 2,350.28 kg

9,039.54 m² 333.33 m²/hari 28.00 hari

7.00 jam 47.62 m²/jam

(a) (b)

7.00 21.00 3.00 1.00

(c)

orang orang orang orang

184.10 kg 184.10 kg 478.67 kg

aian Metode Pelaksanaan 2

1,841.02 m² 333.33 m²/hari 6.00 hari

7.00 jam 47.62 m²/jam

(a) (b)

24.00 3.00 2.00 1.00

(c)

79.80 59.85 67.83 103.74 3.99 11.97 79.80

orang orang orang orang kg kg kg kg bh ltr lbr

399.00 m² 333.33 m²/hari 2.00 hari

7.00 jam 2.86 titik/jam

(a) (b)

aian Metode Pelaksanaan 2 15.00 10.00 1.00 1.00 5,250.00 5,250.00 1,050.00 1,400.00 1,050.00 8,400.00 350.00

orang orang orang orang

(c)

btg m bh bh bh bh bh

350.00 titik 20.00 titik/hari 18.00 hari

7.00 jam 2.86 titik/jam

10.00 15.00 1.00 1.00 2,250.00 2,250.00 450.00 600.00 450.00 2,250.00 150.00

orang orang orang orang btg m bh bh bh bh bh

(a) (b)

(c)

aian Metode Pelaksanaan 2

150.00 titik 20.00 titik/hari 8.00 hari

7.00 jam 142.86 buah/jam

(a) (b)

15.00 750.00 15.00 1.00

(c)

orang orang orang orang

150.00 bh 150.00 bh

150.00 buah 1,000.00 buah/hari 1.00 hari

7.00 jam 142.86 buah/jam

(a) (b)

15.00 750.00 15.00 1.00

(c)

orang orang orang orang

100.00 bh 150.00 bh

aian Metode Pelaksanaan 2

100.00 buah 1,000.00 buah/hari 1.00 hari

7.00 jam 142.86 buah/jam

(a) (b)

15.00 750.00 15.00 1.00

(c)

orang orang orang orang

150.00 bh 150.00 bh

150.00 buah 1,000.00 buah/hari 1.00 hari

7.00 jam 142.86 buah/jam

(a) (b)

15.00 750.00 15.00 1.00

(c)

orang orang orang orang

450.00 btg

aian Metode Pelaksanaan 2 750.00 50.00 100.00 1,200.00 50.00

m bh bh bh bh

50.00 buah 1,000.00 buah/hari 1.00 hari

7.00 jam 14.29 buah/jam

(a) (b)

20.00 2.00 2.00 1.00

(c)

orang orang orang orang

350.00 bh 350.00 bh

350.00 buah 100.00 buah/hari 4.00 hari

7.00 jam 0.13 buah/jam

(a) (b)

aian Metode Pelaksanaan 2 1.00 110.00

orang orang orang orang

(c)

- 0 - 0

- buah 100.00 buah/hari - hari

7.00 jam 71.43 m¹/jam

(a) (b)

18.00 30.00 3.00 1.00

(c)

orang orang orang orang

360.00 m¹ 10,500.00 %

300.00 m¹ 500.00 m¹/hari 1.00 hari

aian Metode Pelaksanaan 2 7.00 jam 28.57 m¹/jam

2.00 200.00 20.00 3.00

orang orang orang orang

(a) (b)

(c)

50.00 bh 1.25 bh

50.00 m¹ 600.00 m¹/hari 1.00 hari

7.00 jam 28.57 buah/jam

(a) (b)

2.00 20.00 2.00 1.00

(c)

orang orang orang orang

50.00 unit

50.00 buah 200.00 buah/hari 1.00 hari

aian Metode Pelaksanaan 2

7.00 jam 0.89 buah/jam

7.00 10.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

50.00 unit 300.00 kg 0.50 m³

50.00 buah 6.25 buah/hari 8.00 hari

7.00 jam 35.71 m¹/jam

(a) (b)

21.00 34.00 4.00 1.00

(c)

orang orang orang orang

180.00 m¹ 5,250.00 %

aian Metode Pelaksanaan 2 150.00 m¹ 250.00 m¹/hari 1.00 hari

7.00 jam 35.71 m¹/jam

(a) (b)

21.00 34.00 4.00 1.00

(c)

orang orang orang orang

120.00 m¹ 3,500.00 %

100.00 m¹ 250.00 m¹/hari 1.00 hari

7.00 jam 3.17 m³/jam

20.00 orang 1.00 orang

(a) (b)

aian Metode Pelaksanaan 2 99.39 m³ 22.22 m³/hari 5.00 hari

7.00 jam 5.71 m³/jam

(a) (b)

30.00 orang 1.00 orang

50.00 m³ 40.00 m³/hari 2.00 hari

7.00 jam 28.57 m¹/jam

(a) (b)

20.00 20.00 2.00 1.00

(c)

orang orang orang orang

5.05 m³ 5.32 kg

aian Metode Pelaksanaan 2

265.80 m¹ 200.00 m¹/hari 2.00 hari

7.00 jam 5.71 m³/jam

30.00 orang 1.00 orang

(a) (b)

(c)

159.48 m³ 40.00 m³/hari 4.00 hari

7.00 jam 5.49 m²/jam

20.00 10.00 1.00 1.00

orang orang orang orang

3.59 m³ 23.92 kg

(a) (b)

(c)

aian Metode Pelaksanaan 2 7.97 ltr

79.74 m² 38.46 m²/hari 3.00 hari

7.00 jam 2.38 m³/jam

20.00 4.00 1.00 1.00 9,170.10 25.43 30.33 7,974.00

orang orang orang orang

(a) (b)

(c)

kg m³ m³ ltr

39.87 m³ 16.67 m³/hari 3.00 hari

7.00 jam 357.14 m²/jam

33.00 orang

(a) (b)

aian Metode Pelaksanaan 2 10.00 orang 1.00 orang 1.00 orang

(c)

797.40 m²

797.40 m² 2,500.00 m²/hari 1.00 hari

7.00 jam 357.14 kg/jam

18.00 18.00 2.00 1.00

orang orang orang orang

(a) (b)

(c)

74.30 kg 1.06 kg

70.76 kg 2,500.00 kg/hari 1.00 hari

7.00 jam 1.72 m³/jam

(a) (b)

aian Metode Pelaksanaan 2 20.00 4.00 1.00 1.00 44,375.31 59.63 92.76 25,716.15

orang orang orang orang

(c)

kg m³ m³ ltr

119.61 m³ 12.05 m³/hari 10.00 hari

7.00 jam 17.86 m¹/jam

1.00 2.00 1.00 1.00

orang orang orang orang

11.39 kg 3.99 jam/m

79.74 m¹ 125.00 m¹/hari 1.00 hari

(a) (b)

(c)

aian Metode Pelaksanaan 2

7.00 jam 5.71 m³/jam

30.00 orang 1.00 orang

(a) (b)

(c)

186.48 m³ 40.00 m³/hari 5.00 hari

7.00 jam 14.29 m³/jam

(a) (b)

30.00 orang 1.00 orang

(c)

31.97 m³

26.64 m³ 100.00 m³/hari 1.00 hari

7.00 jam

(a)

aian Metode Pelaksanaan 2 1.90 m³/jam

20.00 10.00 1.00 1.00

orang orang orang orang

(b)

(c)

100.70 m³ 13,678.31 kg 43.64 m³

83.92 m³ 13.33 m³/hari 7.00 hari

7.00 jam 9.52 m²/jam

20.00 10.00 1.00 1.00

orang orang orang orang

652.53 kg 1.93 m³

799.20 m² 66.67 m²/hari 12.00 hari

(a) (b)

(c)

aian Metode Pelaksanaan 2

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00 534.24 0.72 1.12 309.60

orang orang orang orang

(a) (b)

(c)

kg m³ m³ ltr

1.44 m³ 12.05 m³/hari 1.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00

orang orang orang orang

47.49 0.06 0.10 27.52

kg m³ m³ ltr

(a) (b)

(c)

aian Metode Pelaksanaan 2

0.13 m³ 12.05 m³/hari 1.00 hari

JADWAL PELAKSANAAN PEKERJAAN PEMBANGUNAN RUMAH KHUSUS KABUPATEN MOROWALI UTARA Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : 2018 Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan II Bulan III Bulan IV Bulan V

Bulan I No.

1 ### ### ### ### 3. 4.

Uraian Pekerjaan

2

Err:509 Err:509 PEKERJAAN PERSIAPAN Pek. Pembersihan Lapangan Pek. Pemasangan Bouwplank

Err:509 A 1. 2. 3. 4. 5. 6.

Err:509 PEKERJAAN TANAH DAN PASIR Pek. Galian Pondasi Pek. Urugan Pasir Bawah Pondasi Pek. Pondasi Umpak Batu Kali, Spesi 1 PC : 4 Ps Pek. Pasang Sloof 15/20 Pek. Urugan Tanah kembali yang dipadatkan Pek. Rollag Bata

1. 2. 3. 4. 5.

3

### ### ### ### Direksi Keet Papan Nama

509 Err:509 A. 1. 2.

B

Jumlah Harga

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

121-127

128-135

4

5

#REF! #REF!

Err:509 Err:509 Err:509 Err:509

### ###

### ###

### ###

### ###

Err:509

Rp 25,245,000.00 Rp 35,871,972.40 Err:509 Err:509

Rp Rp Rp Rp Rp Rp Rp

13,616,150.63 2,407,908.18 73,235,601.05 227,320,334.87 6,512,467.50 10,646,009.11 33,182,535.42

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

###

### ### ###

### ### ### ### ###

### ### ### ### ### ###

Rp 314,816,977.40 Rp 889,340,782.30 Rp 278,380,687.64 Rp 114,583,973.17 Rp 13,685,217.80 Rp 2,758,062,031.83 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp

PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI Pek. Pasang Kolom 12 x 12 Pek. Pasang Dinding ½ Bata Merah Pek. Pasang Ringbalk 10/10 Pek. Pasang Balok Sopi-sopi Pek. Kanopi Beton

Err:509 PEKERJAAN BETON Pek. Rabat Beton Lantai tebal 5 cm Pek. Urugan pasir di bawah lantai Pek. Urugan Tanah di bawah lantai Pek. Lantai Keramik 30 x 30 Pek. Keramik 20 x 20 untuk KM

1 hari

#REF! Err:509 793,702.80 #REF! #REF! #REF!

Err:509 Err:509 A 1. 2. 3. 4. 5.

Bobot

Rp Rp Rp Rp

59,244,250.69 15,372,295.28 85,242,252.05 #VALUE! 14,801,740.80

#REF! #REF! Err:509 ### Err:509 ### #REF! #REF! #REF!

Err:509 Err:509 Err:509 #VALUE! Err:509

### ### ### ### ###

### ### ###

###

### ###

### ###

### ###

### ### ###

### ### ### ###

### ### ### ###

### ### ### ###

### ### ### ###

### ### ###

### ### ###

###

### ### ###

### ### ### ### ###

### ### ### ### ###

### ### ### ###

### ###

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan II Bulan III Bulan IV Bulan V

Bulan I No.

Uraian Pekerjaan

1

Jumlah Harga

2 6.

Pek. Keramik 20 x 25 untuk Dinding KM

1. 2. 3. 4. 5. 6.

PEKERJAAN RANGKA ATAP, ATAP DAN PLAFOND Pek. Plafond Kalsiboard 3.5 mm dan assesoris + Rangka Hollow 40.40 2 mm (luar + KM) Pek. Plafond Gypsum dan assesoris + Rangka Hollow 40.40 2 mm (dalam) Pas. Atap Metal Rangka Baja Ringan Pas. Bubungan metal Pas. Listplank Kalsiboard

1. 2. 3. 4. 5. 6. 7.

PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI Pek. Pasang 1 set Kusen Kayu Pintu Panel dan Jendela Tipe PJ1 plus aksesoris Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P1 plus aksesoris Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P2 plus aksesoris Pek. Pasang 1 set Jendela Kayu Tipe J1 dan aksesoris Pek. Pasang 1 set Pintu (P3)/pintu KM PVC incl. accessories Pek. Pasang 1 set Bovenlight Alumunium Pek. Pasang Jendela Roster

B

C

Err:509 1. 2. E 1. 2. 3.

PEKERJAAN PENGECATAN Pek. Cat Tembok Luar dan Dalam (Cat Dasar, Cat Penutup dan Plamur) Pek. Cat Plafond (Cat Dasar, Car Penutup dan Plamur) Pek. Cat Kayu (Lisplank) (Cat Dasar, Cat Penutup, Cat Meni dan Plamur) Err:509

Err:509 A 1. 2. 3. 4. 5. 6. 7. 8. B 1. 2. 3. 4. 5.

Err:509 PEKERJAAN ELEKTRIKAL Pek. Instalasi Penerangan Pek. Instalasi Stop Kontak Pek. Pasang Saklar tunggal Pek. Pasang Saklar Ganda Pek. Pasang Stop kontak Pek. Pasang Box Sekring 2 Group + MCB 1 unit Pek. Pasang Lampu 15 W Biaya Pemasangan Listrik 1300V + SLO PEKERJAAN SANITAIR Instalasi air bersih pipa PVC dia 3/4" AW+ assesories Kran air Floor Drain Stainless Pas. Closet Jongkok Instalasi air kotor pipa PVC dia 3" AW+ Assesories

3 61,126,519.30 #VALUE!

4 Err:509 #VALUE!

Rp 150,561,949.82 Rp 264,515,194.50 Rp 445,283,647.88 Rp 410,037,152.20 Rp 40,565,250.00 Rp 67,319,945.00 Rp 1,378,283,139.40

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp Rp Rp Rp Rp Rp Rp

125,981,806.77 128,002,837.53 158,680,247.69 114,602,971.03 27,009,125.00 13,298,367.50 14,236,200.00 581,811,555.52

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp 528,506,649.59 Rp 318,191,808.00 Err:509

Err:509 Err:509 Err:509

Rp 196,582,876.38 Rp 40,036,661.94 Rp 19,899,726.00 Rp 256,519,264.32 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp Rp Rp Rp Rp Rp Rp Rp

135,308,250.00 56,380,500.00 18,833,925.00 12,885,950.00 19,955,925.00 16,953,475.00 31,935,750.00 110,000,000.00 402,253,775.00

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp Rp Rp Rp

5,035,800.00 4,246,550.00 1,681,625.00 32,381,250.00 6,130,575.00

Err:509 Err:509 Err:509 Err:509 Err:509

Rp

Err:509 Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm Pekerjaan Acian Dinding

Bobot

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

121-127

128-135

5 ###

###

###

### ### ### ### ### ### ###

### ### ### ### ### ### ###

### ### ### ### ### ### ###

### ### ### ### ### ### ###

###

###

###

### ### ###

###

### ### ### ### ### ###

### ### ### ### ### ### ###

### ###

###

###

### ###

### ###

### ###

###

### ### ###

###

###

### ### ###

### ###

### ###

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan II Bulan III Bulan IV Bulan V

Bulan I No.

1 6. 7. 8.

Uraian Pekerjaan

Jumlah Harga

2 Instalasi air kotoran pipa PVC dia 4" AW+ Assesories Pek. Pembuatan Septik Tank + Sumur Resapan Pek. Sumur bor dangkal + Jet Pump

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

hari

1-7

8-15

16-22

23-30

31-37

38-45

46-52

53-60

61-67

68-75

76-82

83-90

91-97

98-105

106-112

113-120

121-127

128-135

3 5,178,250.00 Err:509 96,250,000.00 Err:509

4 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp

15,086,661.81 15,086,661.81

Err:509 Err:509

###

Rp Rp Rp Rp Rp Rp Rp Rp

10,942,321.50 14,012,092.22 30,077,684.96 5,611,941.72 1,113,418.89 120,472,668.71 1,148,375.37 183,378,503.36

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

###

Rp Rp Rp Rp Rp

12,794,859.00 5,214,646.80 63,163,782.99 48,497,885.57 129,671,174.36

Err:509 Err:509 Err:509 Err:509 Err:509

1,910,490.90 169,821.41 2,080,312.31 Total Sub Pekerjaan Fasilitas Umum 330,216,651.84 Total Pekerjaan Jalan dan Saluran 330,216,651.84 Total Pekerjaan Pembangunan Rumah Khusus Err:509 Kemajuan Pekerjaan Mingguan (%) Kemajuan Pekerjaan Kumulatif (%)

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Rp Rp Err:509 Err:509

III. i. A. 1.

Bobot

Pekerjaan Jalan dan Saluran Pekerjaan Fasilitas Umum Pekerjaan Persiapan Patok dan Pengukuran

B. 1. 2. 3. 4. 5. 6. 7.

Pekerjaan Perkerasan Pekerjaan Galian Badan Jalan Pek. Bekisting Pek. Lantai Kerja B0 K-100 Penghamparan Bond Breaker Pekerjaan Penulangan Ruji dowel d = 12mm Penghamparan Lapisan Beton K-225 Pemasangan Joint cutter & joint sealent

C. 1. 2. 3. 4.

Pekerjaan Drainase Galian Tanah Urugan Pasir Pas. Batu Belah/Kali Plester

D. 1. 2.

Pelat Deuiker Pek. Pengecoran Pelat Deuiker K-175 Untuk Saluran Pek. Pengecoran Pelat Deuiker K-175 Tiap Rumah

Err:509 Err:509

Rp Rp Rp Rp Rp

0

5 ###

###

###

###

###

###

### ### ### ###

### ### ### ###

### ### ### ### ### ###

### ### ### ###

### ###

### ###

### ###

#REF!

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

#REF!

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

AKSANAAN PEKERJAAN HUSUS KABUPATEN MOROWALI UTARA

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan V

5

Bulan VI

19

20

21

22

23

24

hari

hari

hari

hari

hari

hari

136-142

143-150

151-157

158-165

166-172

173-180

Keterangan

6

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan V

Bulan VI

19

20

21

22

23

24

hari

hari

hari

hari

hari

hari

136-142

143-150

151-157

158-165

166-172

173-180

5

Keterangan

6

### ### ### ### ### ###

### ### ###

### ###

### ### ###

### ### ###

### ### ###

### ### ### ### ### ### ### ###

### ### ### ### ### ### ### ###

### ###

###

Jangka Waktu Pelaksanaan 180 (Seratus Delapan Puluh ) Hari Kalender Bulan V

Bulan VI Keterangan

19

20

21

22

23

24

hari

hari

hari

hari

hari

hari

136-142

143-150

151-157

158-165

166-172

173-180

5

6 ### ###

### ###

### ###

### ###

### ###

### ### ### ###

### ###

### ###

-

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

-

Err:509

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BASIC FLOW PENYERAPAN TENAGA KERJA

No. 1 I. II.

III.

#REF!

Err:509

Err:509

Err:509

2

3

4

5

Bobot Uraian Pekerjaan 1. #REF! 2. 3. 4. 5. 6. Jumlah Pekerja 1. Pekerja 2. Tukang 3. Kepala Tukang 4. Mandor Total Tenaga Kerja

:

20 40 4 1 65

Bobot Uraian Pekerjaan 1. PEKERJAAN TANAH DAN PASIR 2. PEKERJAAN PASANGAN, PLESTER 3. 4. 5. 6. Jumlah Pekerja 1. Pekerja 20 2. Tukang 40 3. Kepala Tukang 4 4. Mandor 1 Total Tenaga Kerja : 65

Bobot Uraian Pekerjaan 1. PEKERJAAN BETON 2. PEKERJAAN RANGKA ATAP, ATAP 3. PEKERJAAN KUSEN PINTU, JENDE 4. Err:509 5. PEKERJAAN PENGECATAN 6. PEKERJAAN PENGECATAN Jumlah Pekerja 1. Pekerja 20 2. Tukang 40 3. Kepala Tukang 4 4. Mandor 1 Total Tenaga Kerja : 65

Bobot Uraian Pekerjaan 1. PEKERJAAN ELEKTRIKAL 2. PEKERJAAN SANITAIR 3. 4. 5. 6. Jumlah Pekerja 1. Pekerja 2. Tukang 3. Kepala Tukang 4. Mandor Total Tenaga Kerja :

Pe

20 40 4 1 65

Bobot Uraian 1. 2. 3. 4. 5. 6. Jumlah 1. 2. 3. 4. Total Te

ASIC FLOW AN TENAGA KERJA

Pekerjaan Fasilitas Umum 6 Bobot Uraian Pekerjaan Pekerjaan Persiapan Pekerjaan Perkerasan Pekerjaan Drainase Pelat Deuiker

Jumlah Pekerja Pekerja Tukang Kepala Tukang Mandor Total Tenaga Kerja

:

20 40 4 1 65

PENAWARAN TEKNIS URAIAN TEKNIS METODE PELAKSANAAN Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : ### No.

Uraian Metode Pelaksanaan

1 ### ### ### ### 3.

2 ### ### ### ### Direksi Keet ### ### A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Err:509 - Err:509 - Err:509 - Err:509 D Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= =

B

4.

Papan Nama ### Pembuatan Papan Nama Proyek A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Kayu - Tukang Cat & Tulis - Kepala Tukang Kayu - Mandor 2. Bahan - Plywood 6 mm, (120 x 240) cm - Kayu Kelas III - Paku 5 cm - 7 cm - Cat Minyak Dasar (Solvent Based) 3. Alat Urutan Kerja

= = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 1. D

509 Err:509 A. 1.

:

Err:509 Err:509 PEKERJAAN PERSIAPAN Pek. Pembersihan Lapangan ### (K3) Pembersihan lapangan dan perataan A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pemasangan Bouwplank ### Pengukuran dan pemasangan Bouwplank A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat -

C

= (a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor

= = = =

2. Bahan - Kayu Kelas III

=

No.

Uraian Metode Pelaksanaan

1

2 - Paku 5 cm - 7 cm 3. Alat -

Err:509 A. 1.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

=

:

Err:509 PEKERJAAN TANAH DAN PASIR Pek. Galian Pondasi ### Penggalian tanah biasa sedalam 1 m A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

=

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Urugan Pasir Bawah Pondasi ### Pengurugan dengan pasir urug A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan - Pasir Urug

= (a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

= =

= = =

No.

Uraian Metode Pelaksanaan

1

2 3. Alat -

3.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

:

Pek. Pondasi Umpak Batu Kali, Spesi 1 PC : 4 Ps ### Pemasangan pondasi batu belah campuran 1 SP : 4 PP A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

4.

=

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Batu Belah - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = =

:

Pek. Pasang Sloof 15/20 ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

= = =

No.

Uraian Metode Pelaksanaan

1

2 - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

5.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = =

:

Pek. Urugan Tanah kembali yang dipadatkan ### Pengurugan kembali galian tanah A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

6.

=

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = =

:

Pek. Rollag Bata ### Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 3 PP A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

=

No.

Uraian Metode Pelaksanaan

1

2 - Tukang batu - Kepala tukang - Mandor 2. Bahan - Bata Merah - Semen Portland - Pasir Pasang 3. Alat -

B. 1.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = =

:

PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI Pek. Pasang Kolom 12 x 12 ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

= = =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pasang Dinding ½ Bata Merah

= (a) x (b) x (c) = =

= =

= = = = = = = = =

:

= (a) x (b) x (c) = =

No. 1

Uraian Metode Pelaksanaan 2 ### Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 4 PP A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Bata Merah - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = =

:

Pek. Pasang Ringbalk 10/10 ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat Urutan Kerja 1.

= =

= (a) x (b) x (c) = =

= =

= = = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 D

4.

:

Pek. Pasang Balok Sopi-sopi ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

5.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm)

= =

= = = = = = = = =

:

Pek. Kanopi Beton ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

= = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 - Air 3. Alat -

Err:509 A. 1.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

=

:

Err:509 PEKERJAAN BETON Pek. Rabat Beton Lantai tebal 5 cm ### Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

=

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Urugan pasir di bawah lantai ### Pengurugan dengan pasir urug A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan

= (a) x (b) x (c) = =

= =

= = = = = = = = =

:

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 1. Tenaga - Pekerja - Mandor 2. Bahan - Pasir Urug 3. Alat -

3.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= =

:

Pek. Urugan Tanah di bawah lantai ### Pengurugan Tanah A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

4.

= =

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Lantai Keramik 30 x 30 ### Pemasangan lantai keramik ukuran 30 cm x 30 cm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan - Tanah Urug 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Ubin Keramik (30 x 30) cm, 11 bh - Semen Portland

= (a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

= =

= =

No.

Uraian Metode Pelaksanaan

1

2 - Pasir Pasang - Semen Warna 2. Bahan - Ubin Keramik (30 x 30) cm, 11 bh - Semen Portland - Pasir Pasang - Semen Warna 3. Alat -

5.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = =

:

Pek. Keramik 20 x 20 untuk KM ### Pemasangan lantai keramik ukuran 20 cm x 20 cm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

6.

= =

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Ubin Keramik (20 x 20) cm, 11 bh - Semen Portland - Pasir Pasang - Semen Warna 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Keramik 20 x 25 untuk Dinding KM ### Pemasangan dinding keramik 20 cm x 25 cm A Asumsi

= (a) x (b) x (c) = =

= = = = = = = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

B. 1.

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Ubin Keramik (20 x 25) cm - Semen Portland - Pasir Pasang - Semen Warna 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = = =

:

PEKERJAAN RANGKA ATAP, ATAP DAN PLAFOND Pek. Plafond Kalsiboard 3.5 mm dan assesoris + Rangka Hollow 40.40 2 mm (luar + KM) ### Pemasangan Plafon Kalsiboard 3,5 mm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

D

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kalsiboard 3,5 mm Ukuran 120 cm x 240 cm - Paku Sekrup 3. Alat Urutan Kerja 1. Pelaksanaan Pekerjaan

= (a) x (b) x (c) = =

= =

= = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan 2.

Pek. Plafond Gypsum dan assesoris + Rangka Hollow 40.40 2 mm (dalam) ### Pemasangan langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

:

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Gypsum Board 3,5 mm Ukuran 120 cm x 240 cm - Paku skrup 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pas. Atap Metal ### Pemasangan genteng metal ukuran 80 x 100 atap pelana A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Genteng Metal - Paku 1 cm - 2,5 cm 3. Alat Urutan Kerja

= (a) x (b) x (c) = =

= =

= = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 1. D

4.

:

Rangka Baja Ringan ### Memasang Kuda-kuda Baja Ringan + Reng Untuk Atap Genteng Metal A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

5.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang - Kepala tukang - Mandor 2. Bahan - C-75 0,8 - C-75 0,6 - Reng - Baut (10 x 16) mm - Dynabolt (8 × 65) mm 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pas. Bubungan metal ### Pemasangan nok genteng metal A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan

= (a) x (b) x (c) = =

= =

= = = = = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = =

No.

Uraian Metode Pelaksanaan

1

2 - Nok Genteng Metal - Paku 1 cm - 2,5 cm 3. Alat -

6.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

=

:

Pas. Listplank Kalsiboard ### Pemasangan Lisplank Kalsiboard A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C. 1.

= =

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Kayu - Kepala Tukang - Mandor 2. Bahan - Kalsiplank 0,8 mm Ukuran 20 cm x 300 cm - Paku Sekrup 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = =

:

PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI Pek. Pasang 1 set Kusen Kayu Pintu Panel dan Jendela Tipe PJ1 plus aksesoris ### Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas II - Paku 10 cm - Lem Kayu 3. Alat -

2.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = =

:

Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P1 plus aksesoris ### Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

= = = =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas II - Paku 10 cm - Lem Kayu 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= (a) x (b) x (c) = =

= =

= = = = = = = =

:

Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P2 plus aksesoris ### Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III A Asumsi

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

4.

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas II - Paku 10 cm - Lem Kayu 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = =

:

Pek. Pasang 1 set Jendela Kayu Tipe J1 dan aksesoris ### Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas II - Paku 10 cm - Lem Kayu 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah

= (a) x (b) x (c) = =

= =

= = = = = = = =

:

= (a) x (b) x (c) =

No.

Uraian Metode Pelaksanaan

1

2 3. Waktu pelaksanaan yang dibutuhkan 5.

Pek. Pasang 1 set Pintu (P3)/pintu KM PVC incl. accessories ### Pemasangan Kusen dan Daun pintu PVC A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

6.

=

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang - Kepala tukang - Mandor 2. Bahan - Kusen Dan Daun Pintu PVC 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pasang 1 set Bovenlight Alumunium ### Pemasangan kusen pintu alluminium A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang khususalumunium - Kepala tukang - Mandor 2. Bahan - Profil Alluminium - Sekrup Fixer - Sealant 3. Alat Urutan Kerja 1.

= = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 D

7.

:

Pek. Pasang Jendela Roster ### Pemasangan dinding terawang (rooster) 20 x 11 x 20 campuran 1 SP : 4 PP A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Err:509 1.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Bata Berongga - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Err:509 Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm ### Pemasangan plesteran 1 SP : 4 PP tebal 15 mm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Pasang

= (a) x (b) x (c) = =

= =

= = = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = =

No.

Uraian Metode Pelaksanaan

1

2 3. Alat -

2.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

:

Pekerjaan Acian Dinding ### Pemasangan acian A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

E. 1.

=

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = =

:

PEKERJAAN PENGECATAN Pek. Cat Tembok Luar dan Dalam (Cat Dasar, Cat Penutup dan Plamur) ### Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang cat - Kepala tukang

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

= = =

No.

Uraian Metode Pelaksanaan

1

2 - Mandor 2. Bahan - Plamuur Tembok - Cat Tembok Dasar (Water Based) - Cat Tembok penutup 3. Alat -

2.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = =

:

Pek. Cat Plafond (Cat Dasar, Car Penutup dan Plamur) ### Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

=

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang cat - Kepala tukang - Mandor 2. Bahan - Plamuur Tembok - Cat Tembok Dasar (Water Based) - Cat Tembok penutup 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= (a) x (b) x (c) = =

= =

= = = = = = = =

:

Pek. Cat Kayu (Lisplank) (Cat Dasar, Cat Penutup, Cat Meni dan Plamur) ### Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 B

Err:509 A. 1.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang cat - Kepala tukang - Mandor 2. Bahan - Cat Minyak Menie (Solvent Based) - Plamuur Kayu - Cat Minyak Dasar (Solvent Based) - Cat Minyak Penutup (Solvent Based) - Kuas - Thinner - Ampelas 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Err:509 PEKERJAAN ELEKTRIKAL Pek. Instalasi Penerangan ### Pemasangan Instalasi Penerangan A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Pipa Listrik ⅝” - Kabel NYM 3 x 2,5 mm - T Dus - L Bow Pipa Listrik ⅝” PVC - Lasdop 2,5 - 4 mm - Klem Pipa Listrik ⅝” PVC - Inbouwdoos 3. Alat -

= = = = = = = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2

2.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Instalasi Stop Kontak ### Pemasangan Instalasi Stop Kontak A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

:

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pasang Saklar tunggal ### Pemasangan Saklar Tunggal A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Pipa Listrik ⅝” - Kabel NYM 3 x 2,5 mm - T Dus - L Bow Pipa Listrik ⅝” PVC - Lasdop 2,5 - 4 mm - Klem Pipa Listrik ⅝” PVC - Inbouwdoos 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja

= (a) x (b) x (c) = =

= = = = = = = = = = = =

:

= (a) x (b) x (c) = =

= =

=

No.

Uraian Metode Pelaksanaan

1

2 - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Frame + Saklar Tunggal - Inbouwdoos 3. Alat -

4.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = =

:

Pek. Pasang Saklar Ganda ### Pemasangan Saklar Ganda A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

5.

= = =

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Frame + Saklar Ganda - Inbouwdoos 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Pasang Stop kontak ### Pemasangan Stop Kontak A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

= =

No.

Uraian Metode Pelaksanaan

1

2 B

6.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Frame + Stop Kontak 13A - Inbouwdoos 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = =

:

Pek. Pasang Box Sekring 2 Group + MCB 1 unit ### (K3) Pemasangan MCB A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Pipa Listrik ⅝” - Kabel NYM 3 x 2,5 mm - T Dus - L Bow Pipa Listrik ⅝” PVC - Klem Pipa Listrik ⅝” PVC - MCB (Miniature Circuit Breakers) 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= (a) x (b) x (c) = =

= = = = = = = = = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 7.

Pek. Pasang Lampu 15 W ### Pemasangan Lampu 18 Watt A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

8.

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang Listrik - Kepala Tukang Listrik - Mandor 2. Bahan - Lampu SL 18 Watt - Armature Down Light Ǿ4" 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = =

:

Biaya Pemasangan Listrik 1300V + SLO ### ### A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

D

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Mandor - Kalsiplank 0,8 mm Ukuran 20 cm x 300 cm 2. Bahan 3. Alat Urutan Kerja 1. Pelaksanaan Pekerjaan

= (a) x (b) x (c) = =

= =

0 0

= = = =

0 0

= = =

No.

Uraian Metode Pelaksanaan

1

2 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

B. 1.

PEKERJAAN SANITAIR Instalasi air bersih pipa PVC dia 3/4" AW+ assesories ### Pemasangan pipa PVC tipe AW diameter ¾ ” A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

2.

:

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Kran air ### Pemasangan kran diameter ½” atau ¾ ” A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Pipa PVC ¾” - Perlengkapan 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Kran Air - Sealtape 3. Alat -

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = =

No.

Uraian Metode Pelaksanaan

1

2

3.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Floor Drain Stainless ### Pemasangan floor drain A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

4.

:

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pas. Closet Jongkok ### Pemasangan closet jongkok porselen A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Floor Drain 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Closet Jongkok - Semen Portland

= (a) x (b) x (c) = =

= = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = =

No.

Uraian Metode Pelaksanaan

1

2 - Pasir Pasang 3. Alat -

5.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

=

:

Instalasi air kotor pipa PVC dia 3" AW+ Assesories ### Pemasangan pipa PVC tipe AW diameter 3” A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

6.

=

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Instalasi air kotoran pipa PVC dia 4" AW+ Assesories ### Pemasangan pipa PVC tipe AW diameter 4” A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Pipa PVC 3” - Perlengkapan 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

= =

= = =

No.

Uraian Metode Pelaksanaan

1

2 - Mandor 2. Bahan - Pipa PVC 4” - Perlengkapan 3. Alat -

7.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = =

:

Pek. Pembuatan Septik Tank + Sumur Resapan ### Penggalian tanah biasa sedalam 2 m A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

8.

=

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pek. Sumur bor dangkal + Jet Pump ### Penggalian tanah biasa sedalam 1 m A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan

= (a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

= =

= =

No.

Uraian Metode Pelaksanaan

1

2

III. i. A. 1.

=

3. Alat -

=

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

:

Pekerjaan Jalan dan Saluran Pekerjaan Fasilitas Umum Pekerjaan Persiapan Patok dan Pengukuran ### Pengukuran dan pemasangan Bouwplank A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

B. 1.

-

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas III - Paku 5 cm - 7 cm 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pekerjaan Perkerasan Pekerjaan Galian Badan Jalan ### Penggalian tanah biasa sedalam 1 m A Asumsi 1. Jam kerja efektif per hari

= (a) x (b) x (c) = =

= = = = = = =

:

= (a) x (b) x (c) = =

=

No.

Uraian Metode Pelaksanaan

1

2 2. Kapasitas produksi/jam B

2.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = =

:

Pek. Bekisting ### (K3) Pemasangan bekisting untuk sloof A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

=

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang kayu - Kepala tukang - Mandor 2. Bahan - Kayu Kelas III - Paku 5 cm - 10 cm - Minyak Bekisting 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= (a) x (b) x (c) = =

= = = = = = = =

:

Pek. Lantai Kerja B0 K-100 ### Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) A Asumsi

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

4.

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = = = =

:

Penghamparan Bond Breaker ### Pemasangan Plastik Bond Breaker A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang - Kepala Tukang - Mandor 2. Bahan - Plastik Cor 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= (a) x (b) x (c) = =

= = = = = =

:

= (a) x (b) x (c) = =

No.

Uraian Metode Pelaksanaan

1

2 5.

Pekerjaan Penulangan Ruji dowel d = 12mm ### Pembesian dengan besi polos atau besi ulir A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

6.

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang besi - Kepala tukang - Mandor 2. Bahan - Besi Beton (Polos/Ulir) - Kawat Beton 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Penghamparan Lapisan Beton K-225 ### Membuat beton mutu f’c = 19,3 Mpa (K225) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat Urutan Kerja 1.

= = = = = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2 D

7.

:

Pemasangan Joint cutter & joint sealent ### Pemasangan Joint Cutter & Joint Sealent A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C. 1.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pekerjaan Drainase Galian Tanah ### Penggalian tanah biasa sedalam 1 m A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

C

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang - Kepala Tukang - Mandor 2. Bahan - Joint Sealant 3. Alat - Cutter concrete

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan 3. Alat Urutan Kerja

= (a) x (b) x (c) = =

= = = = = =

:

= (a) x (b) x (c) = =

= =

= = = =

No.

Uraian Metode Pelaksanaan

1

2 1. D

2.

:

Urugan Pasir ### Pengurugan dengan pasir urug A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

3.

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Pas. Batu Belah/Kali ### Pemasangan pondasi batu belah campuran 1 SP : 4 PP A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Mandor 2. Bahan - Pasir Urug 3. Alat -

C

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Batu Belah - Semen Portland - Pasir Pasang 3. Alat -

= (a) x (b) x (c) = =

= = = =

:

= (a) x (b) x (c) = =

= =

= = = = = = = =

No.

Uraian Metode Pelaksanaan

1

2

4.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

Plester ### Pemasangan plesteran 1 SP : 3 PP tebal 15 mm A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

D. 1.

:

= =

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Pasang 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = = = =

:

Pelat Deuiker Pek. Pengecoran Pelat Deuiker K-175 Untuk Saluran ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan

= (a) x (b) x (c) = =

= (a) x (b) x (c) = =

= =

= = = =

No.

Uraian Metode Pelaksanaan

1

2 - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

2.

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= = = = =

:

Pek. Pengecoran Pelat Deuiker K-175 Tiap Rumah ### Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) A Asumsi 1. Jam kerja efektif per hari 2. Kapasitas produksi/jam B

Kebutuhan Tenaga, Bahan dan Peralatan 1. Tenaga - Pekerja - Tukang batu - Kepala tukang - Mandor 2. Bahan - Semen Portland - Pasir Beton - Kerikil (Maks 30 mm) - Air 3. Alat -

C

Urutan Kerja 1.

D

Pelaksanaan Pekerjaan 1. Volume pekerjaan 2. Kapasitas produksi dalam sehari adalah 3. Waktu pelaksanaan yang dibutuhkan

= (a) x (b) x (c) = =

= =

= = = = = = = = =

:

= (a) x (b) x (c) = =

ENAWARAN TEKNIS KNIS METODE PELAKSANAAN

aian Metode Pelaksanaan 2

7.00 jam Err:509 Err:509

(a) (b)

Err:509 orang Err:509 orang Err:509 orang Err:509 orang

(c)

12.00 Err:509 Err:509 Err:509 Err:509 hari

7.00 jam 1.43 m²/jam

10.00 10.00 15.00 1.00 1.00 0.96 0.07 1.20 2.40

orang orang orang orang orang lbr m³ kg kg

(a) (b)

(c)

aian Metode Pelaksanaan 2

0.96 m² 10.00 m²/hari 1.00 hari

7.00 jam 2.86 m²/jam

(a) (b)

2.00 orang 1.00 orang

(c)

-

72.00 m² 20.00 m²/hari 4.00 hari

7.00 jam 28.57 m¹/jam

(a) (b)

20.00 20.00 2.00 1.00

(c)

orang orang orang orang

12.01 m³

aian Metode Pelaksanaan 2 12.64 kg

632.00 m¹ 200.00 m¹/hari 4.00 hari

7.00 jam 5.71 m³/jam

30.00 orang 1.00 orang

(a) (b)

(c)

198.45 m³ 40.00 m³/hari 5.00 hari

7.00 jam 14.29 m³/jam

(a) (b)

30.00 orang 1.00 orang

(c)

14.76 m³

aian Metode Pelaksanaan 2

12.30 m³ 100.00 m³/hari 1.00 hari

7.00 jam 1.90 m³/jam

20.00 10.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

116.76 m³ 15,859.39 kg 50.59 m³

97.30 m³ 13.33 m³/hari 8.00 hari

7.00 jam 1.72 m¹/jam

20.00 orang 4.00 orang 1.00 orang

(a) (b)

aian Metode Pelaksanaan 2 1.00 orang 16,611.33 27.66 38.84 10,955.33

(c)

kg m³ m³ ltr

50.96 m³ 12.05 m³/hari 5.00 hari

7.00 jam 2.86 m¹/jam

10.00 orang 1.00 orang

(a) (b)

(c)

66.15 m³ 20.00 m³/hari 4.00 hari

7.00 jam 9.52 m²/jam

20.00 orang

(a) (b)

aian Metode Pelaksanaan 2 7.00 orang 1.00 orang 1.00 orang

(c)

4,249.00 bh 1,398.16 kg 3.89 m³

60.70 m² 66.67 m²/hari 1.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00 10,846.41 18.06 25.36 7,153.31

orang orang orang orang kg m³ m³ ltr

33.27 m³ 12.05 m³/hari 3.00 hari

(a) (b)

(c)

aian Metode Pelaksanaan 2

7.00 jam 9.52 m²/jam

20.00 7.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

7,000.00 bh 1,150.00 kg 4.30 m³

100.00 m² 66.67 m²/hari 2.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00 32,600.00 54.29 76.22 21,500.00

orang orang orang orang kg m³ m³ ltr

(a) (b)

(c)

aian Metode Pelaksanaan 2 22.66 m³ 12.05 m³/hari 2.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00 3,039.95 5.06 7.11 2,004.88

orang orang orang orang

(a) (b)

(c)

kg m³ m³ ltr

9.33 m³ 12.05 m³/hari 1.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00

orang orang orang orang

3,362.69 kg 5.60 m³ 7.86 m³

(a) (b)

(c)

aian Metode Pelaksanaan 2 2,217.73 ltr

10.32 m³ 12.05 m³/hari 1.00 hari

7.00 jam 2.38 m³/jam

20.00 4.00 1.00 1.00 18,062.42 50.09 59.74 15,706.45

orang orang orang orang

(a) (b)

(c)

kg m³ m³ ltr

78.53 m³ 16.67 m³/hari 5.00 hari

7.00 jam 14.29 m³/jam

(a) (b)

aian Metode Pelaksanaan 2 30.00 orang 1.00 orang

(c)

94.24 m³

78.53 m³ 100.00 m³/hari 1.00 hari

7.00 jam 5.71 m³/jam

10.00 orang 1.00 orang

(a) (b)

(c)

460.07 m³

383.39 m³ 40.00 m³/hari 10.00 hari

7.00 jam 0.29 m²/jam

3.00 orang 20.00 orang

(a) (b)

aian Metode Pelaksanaan 2 1.00 orang 1.00 orang 1,452.54 13,833.70 62.25 691.69

(c)

Doos Kg M3 Kg

1,383.37 m² 2.00 m²/hari 692.00 hari

7.00 jam 4.08 m²/jam

20.00 10.00 1.00 1.00 418.95 4,149.60 17.96 199.50

orang orang orang orang dos kg m³ kg

399.00 m² 28.57 m²/hari 14.00 hari

(a) (b)

(c)

aian Metode Pelaksanaan 2 7.00 jam 3.17 m²/jam

20.00 10.00 1.00 1.00 5,220.50 3,710.70 7.18 774.06

orang orang orang orang

(a) (b)

(c)

bh kg m³ kg

197.00 m² 22.22 m²/hari 9.00 hari

7.00 jam 28.57 m²/jam

(a) (b)

20.00 10.00 1.00 1.00

(c)

orang orang orang orang

245.59 lbr 74.22 kg

aian Metode Pelaksanaan 2 674.70 m² 200.00 m²/hari 4.00 hari

7.00 jam 28.57 m²/jam

(a) (b)

20.00 10.00 1.00 1.00

(c)

orang orang orang orang

424.54 lbr 128.30 kg

1,166.32 m² 200.00 m²/hari 6.00 hari

7.00 jam 142.86 m²/jam

(a) (b)

200.00 100.00 10.00 1.00

(c)

orang orang orang orang

3,644.23 bh 560.65 kg

aian Metode Pelaksanaan 2

2,803.25 m² 1,000.00 m²/hari 3.00 hari

7.00 jam 28.57 m²/jam

(a) (b)

20.00 10.00 1.00 1.00

(c)

4,171.24 6,256.85 15,137.55 78,491.00 4,485.20

orang orang orang orang m¹ m¹ m¹ bh bh

2,803.25 m² 200.00 m²/hari 15.00 hari

7.00 jam 10.99 m¹/jam

(a) (b)

20.00 12.00 2.00 1.00

(c)

orang orang orang orang

aian Metode Pelaksanaan 2 409.75 bh 18.63 kg

372.50 m¹ 76.92 m¹/hari 5.00 hari

7.00 jam 28.57 m¹/jam

(a) (b)

20.00 40.00 4.00 1.00

(c)

orang orang orang orang

1,463.00 m¹ 133.00 kg

1,330.00 m¹ 200.00 m¹/hari 7.00 hari

7.00 jam 0.48 m³/jam

(a) (b)

aian Metode Pelaksanaan 2 20.00 60.00 6.00 1.00

orang orang orang orang

(c)

4.33 m³ 4.51 kg 3.61 kg

3.61 m³ 3.33 m³/hari 2.00 hari

7.00 jam 0.48 m³/jam

20.00 60.00 6.00 1.00

orang orang orang orang

2.57 m³ 2.67 kg 2.14 kg

2.14 m³ 3.33 m³/hari 1.00 hari

(a) (b)

(c)

aian Metode Pelaksanaan 2 7.00 jam 0.48 m³/jam

20.00 60.00 6.00 1.00

orang orang orang orang

(a) (b)

(c)

4.59 m³ 2.67 kg 2.14 kg

3.83 m³ 3.33 m³/hari 2.00 hari

7.00 jam 0.48 m³/jam

20.00 60.00 6.00 1.00

orang orang orang orang

5.47 m³ 5.70 kg 4.56 kg

4.56 m³ 3.33 m³/hari

(a) (b)

(c)

aian Metode Pelaksanaan 2 2.00 hari

7.00 jam 6.49 bh/jam

20.00 20.00 2.00 1.00

orang orang orang orang

(a) (b)

(c)

50.00 bh

50.00 bh 45.45 bh/hari 2.00 hari

7.00 jam 68.03 m¹/jam

(a) (b)

21.00 21.00 3.00 1.00

(c)

orang orang orang orang

55.00 m¹ 100.00 bh 3.00 tube

aian Metode Pelaksanaan 2 50.00 m¹ 476.19 m¹/hari 1.00 hari

7.00 jam 9.52 m²/jam

20.00 7.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

1,000.00 bh 550.00 kg 1.75 m³

40.00 m² 66.67 m²/hari 1.00 hari

7.00 jam 9.52 m²/jam

20.00 10.00 1.00 1.00

orang orang orang orang

56,406.73 kg 216.95 m³

(a) (b)

(c)

aian Metode Pelaksanaan 2

9,039.54 m² 66.67 m²/hari 136.00 hari

7.00 jam 14.29 m²/jam

(a) (b)

20.00 10.00 1.00 1.00

(c)

orang orang orang orang

29,378.51 kg

9,039.54 m² 100.00 m²/hari 91.00 hari

7.00 jam 47.62 m²/jam

7.00 orang 21.00 orang 3.00 orang

(a) (b)

aian Metode Pelaksanaan 2 1.00 orang

(c)

903.95 kg 903.95 kg 2,350.28 kg

9,039.54 m² 333.33 m²/hari 28.00 hari

7.00 jam 47.62 m²/jam

(a) (b)

7.00 21.00 3.00 1.00

(c)

orang orang orang orang

184.10 kg 184.10 kg 478.67 kg

1,841.02 m² 333.33 m²/hari 6.00 hari

7.00 jam 47.62 m²/jam

(a) (b)

aian Metode Pelaksanaan 2

24.00 3.00 2.00 1.00 79.80 59.85 67.83 103.74 3.99 11.97 79.80

orang orang orang orang

(c)

kg kg kg kg bh ltr lbr

399.00 m² 333.33 m²/hari 2.00 hari

7.00 jam 2.86 titik/jam

15.00 10.00 1.00 1.00 5,250.00 5,250.00 1,050.00 1,400.00 1,050.00 8,400.00 350.00

orang orang orang orang btg m bh bh bh bh bh

(a) (b)

(c)

aian Metode Pelaksanaan 2

350.00 titik 20.00 titik/hari 18.00 hari

7.00 jam 2.86 titik/jam

10.00 15.00 1.00 1.00 2,250.00 2,250.00 450.00 600.00 450.00 2,250.00 150.00

orang orang orang orang

(a) (b)

(c)

btg m bh bh bh bh bh

150.00 titik 20.00 titik/hari 8.00 hari

7.00 jam 142.86 buah/jam

15.00 orang

(a) (b)

aian Metode Pelaksanaan 2 750.00 orang 15.00 orang 1.00 orang

(c)

150.00 bh 150.00 bh

150.00 buah 1,000.00 buah/hari 1.00 hari

7.00 jam 142.86 buah/jam

(a) (b)

15.00 750.00 15.00 1.00

(c)

orang orang orang orang

100.00 bh 150.00 bh

100.00 buah 1,000.00 buah/hari 1.00 hari

7.00 jam 142.86 buah/jam

(a) (b)

aian Metode Pelaksanaan 2

15.00 750.00 15.00 1.00

orang orang orang orang

(c)

150.00 bh 150.00 bh

150.00 buah 1,000.00 buah/hari 1.00 hari

7.00 jam 142.86 buah/jam

(a) (b)

15.00 750.00 15.00 1.00

(c)

450.00 750.00 50.00 100.00 1,200.00 50.00

orang orang orang orang btg m bh bh bh bh

50.00 buah 1,000.00 buah/hari 1.00 hari

aian Metode Pelaksanaan 2

7.00 jam 14.29 buah/jam

(a) (b)

20.00 2.00 2.00 1.00

(c)

orang orang orang orang

350.00 bh 350.00 bh

350.00 buah 100.00 buah/hari 4.00 hari

7.00 jam 0.13 buah/jam

1.00 110.00

orang orang orang orang

- 0 - 0

(a) (b)

(c)

aian Metode Pelaksanaan 2 - buah 100.00 buah/hari - hari

7.00 jam 71.43 m¹/jam

(a) (b)

18.00 30.00 3.00 1.00

(c)

orang orang orang orang

360.00 m¹ 10,500.00 %

300.00 m¹ 500.00 m¹/hari 1.00 hari

7.00 jam 28.57 m¹/jam

2.00 200.00 20.00 3.00

orang orang orang orang

50.00 bh 1.25 bh

(a) (b)

(c)

aian Metode Pelaksanaan 2

50.00 m¹ 600.00 m¹/hari 1.00 hari

7.00 jam 28.57 buah/jam

(a) (b)

2.00 20.00 2.00 1.00

(c)

orang orang orang orang

50.00 unit

50.00 buah 200.00 buah/hari 1.00 hari

7.00 jam 0.89 buah/jam

7.00 10.00 1.00 1.00

orang orang orang orang

50.00 unit 300.00 kg

(a) (b)

(c)

aian Metode Pelaksanaan 2 0.50 m³

50.00 buah 6.25 buah/hari 8.00 hari

7.00 jam 35.71 m¹/jam

(a) (b)

21.00 34.00 4.00 1.00

(c)

orang orang orang orang

180.00 m¹ 5,250.00 %

150.00 m¹ 250.00 m¹/hari 1.00 hari

7.00 jam 35.71 m¹/jam

21.00 orang 34.00 orang 4.00 orang

(a) (b)

aian Metode Pelaksanaan 2 1.00 orang

(c)

120.00 m¹ 3,500.00 %

100.00 m¹ 250.00 m¹/hari 1.00 hari

7.00 jam 3.17 m³/jam

(a) (b)

20.00 orang 1.00 orang

99.39 m³ 22.22 m³/hari 5.00 hari

7.00 jam 5.71 m³/jam

30.00 orang 1.00 orang

(a) (b)

aian Metode Pelaksanaan 2

50.00 m³ 40.00 m³/hari 2.00 hari

7.00 jam 28.57 m¹/jam

(a) (b)

20.00 20.00 2.00 1.00

(c)

orang orang orang orang

5.05 m³ 5.32 kg

265.80 m¹ 200.00 m¹/hari 2.00 hari

7.00 jam

(a)

aian Metode Pelaksanaan 2 5.71 m³/jam

30.00 orang 1.00 orang

(b)

(c)

159.48 m³ 40.00 m³/hari 4.00 hari

7.00 jam 5.49 m²/jam

20.00 10.00 1.00 1.00

orang orang orang orang

3.59 m³ 23.92 kg 7.97 ltr

79.74 m² 38.46 m²/hari 3.00 hari

(a) (b)

(c)

aian Metode Pelaksanaan 2 7.00 jam 2.38 m³/jam

20.00 4.00 1.00 1.00 9,170.10 25.43 30.33 7,974.00

orang orang orang orang

(a) (b)

(c)

kg m³ m³ ltr

39.87 m³ 16.67 m³/hari 3.00 hari

7.00 jam 357.14 m²/jam

33.00 10.00 1.00 1.00

orang orang orang orang

797.40 m²

797.40 m² 2,500.00 m²/hari 1.00 hari

(a) (b)

(c)

aian Metode Pelaksanaan 2

7.00 jam 357.14 kg/jam

18.00 18.00 2.00 1.00

orang orang orang orang

(a) (b)

(c)

74.30 kg 1.06 kg

70.76 kg 2,500.00 kg/hari 1.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00 44,375.31 59.63 92.76 25,716.15

orang orang orang orang kg m³ m³ ltr

(a) (b)

(c)

aian Metode Pelaksanaan 2

119.61 m³ 12.05 m³/hari 10.00 hari

7.00 jam 17.86 m¹/jam

1.00 2.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

11.39 kg 3.99 jam/m

79.74 m¹ 125.00 m¹/hari 1.00 hari

7.00 jam 5.71 m³/jam

30.00 orang 1.00 orang

(a) (b)

(c)

aian Metode Pelaksanaan 2

186.48 m³ 40.00 m³/hari 5.00 hari

7.00 jam 14.29 m³/jam

(a) (b)

30.00 orang 1.00 orang

(c)

31.97 m³

26.64 m³ 100.00 m³/hari 1.00 hari

7.00 jam 1.90 m³/jam

20.00 10.00 1.00 1.00

orang orang orang orang

100.70 m³ 13,678.31 kg 43.64 m³

(a) (b)

(c)

aian Metode Pelaksanaan 2

83.92 m³ 13.33 m³/hari 7.00 hari

7.00 jam 9.52 m²/jam

20.00 10.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

652.53 kg 1.93 m³

799.20 m² 66.67 m²/hari 12.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00

orang orang orang orang

(a) (b)

(c)

aian Metode Pelaksanaan 2 534.24 0.72 1.12 309.60

kg m³ m³ ltr

1.44 m³ 12.05 m³/hari 1.00 hari

7.00 jam 1.72 m³/jam

20.00 4.00 1.00 1.00

orang orang orang orang

47.49 0.06 0.10 27.52

kg m³ m³ ltr

0.13 m³ 12.05 m³/hari 1.00 hari

(a) (b)

(c)

RENCANA ANGGARAN BIAYA DAFTAR KUANTITAS DAN HARGA Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : 2018 No.

Uraian Pekerjaan

Volume

2

3

1 A. 1. 2. 3. 4.

PEKERJAAN PERSIAPAN Pek. Pembersihan Lapangan Pek. Pemasangan Bouwplank Direksi Keet Papan Nama

A. 1. 2. 5. 6.

PEKERJAAN TANAH DAN PASIR Pek. Galian Pondasi Pek. Urugan Pasir Bawah Pondasi Pek. Urugan Tanah kembali yang dipadatkan Pek. Rollag Bata

B. 3. 4. 1. 2. 1. 2. 3. 4. 5.

PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI Pek. Pondasi Umpak Batu Kali, Spesi 1 PC : 4 Ps Pek. Pasang Sloof 15/20 Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm Pekerjaan Acian Dinding Pek. Pasang Kolom 12 x 12 Pek. Pasang Dinding ½ Bata Merah Pek. Pasang Ringbalk 10/10 Pek. Pasang Balok Sopi-sopi Pek. Kanopi Beton

A. 1. 2. 3. 4. 5. 6.

PEKERJAAN BETON Pek. Rabat Beton Lantai tebal 5 cm Pek. Urugan pasir di bawah lantai Pek. Urugan Tanah di bawah lantai Pek. Lantai Keramik 30 x 30 Pek. Keramik 20 x 20 untuk KM Pek. Keramik 20 x 25 untuk Dinding KM

B. 1. 2. 3. 4. 5. 6.

PEKERJAAN RANGKA ATAP, ATAP DAN PLAFOND Pek. Plafond Kalsiboard 3.5 mm dan assesoris + Rangka Hollow 40.40 2 mm (luar + KM) 26.99 m² Pek. Plafond Gypsum dan assesoris + Rangka Hollow 40.40 2 mm (dalam) 46.65 m² Pas. Atap Metal 112.13 m² Rangka Baja Ringan 112.13 m² Pas. Bubungan metal 14.90 m¹ Pas. Listplank Kalsiboard 53.20 m¹ Total Sub PEKERJAAN RANGKA ATAP, ATAP DAN PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI Pek. Pasang 1 set Kusen Kayu Pintu Panel dan Jendela Tipe PJ1 plus aksesoris 2.00 bh Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P1 plus aksesoris 2.00 bh Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P2 plus aksesoris 4.00 bh

C. 1. 2. 3.

1.00 ls 25.28 m¹ 1.00 ls 1.00 unit Total Sub PEKERJAAN P

7.94 m³ 0.49 m³ 2.65 m³ 2.43 m² Total Sub PEKERJAAN TANAH D

3.89 m³ 2.04 m³ 361.58 m² 361.58 m² 1.33 m³ 207.53 m² 90.62 m¹ 37.30 m¹ 0.41 m³ Total Sub PEKERJAAN PASANGAN, PLESTERAN DA

3.14 m³ 3.14 m³ 15.34 m³ 55.33 m² 2.69 m² 7.88 m² Total Sub PEKERJA

No. 1 4. 5. 6. 7.

Uraian Pekerjaan 2 Pek. Pasang 1 set Jendela Kayu Tipe J1 dan aksesoris Pek. Pasang 1 set Pintu (P3)/pintu KM PVC incl. accessories Pek. Pasang 1 set Bovenlight Alumunium Pek. Pasang Jendela Roster

Volume 3 4.00 bh 2.00 bh 2.00 bh 1.60 m² Total Sub PEKERJAAN KUSEN PINTU, JENDELA DAN

E. 1. 2. 3.

PEKERJAAN PENGECATAN Pek. Cat Tembok Luar dan Dalam (Cat Dasar, Cat Penutup dan Plamur) Pek. Cat Plafond (Cat Dasar, Car Penutup dan Plamur) Pek. Cat Kayu (Lisplank) (Cat Dasar, Cat Penutup, Cat Meni dan Plamur)

A. 1. 2. 3. 4. 5. 6. 7. 8.

PEKERJAAN KUNCI DAN ALAT PENGGANTUNG Pek. Instalasi Penerangan Pek. Instalasi Stop Kontak Pek. Pasang Saklar tunggal Pek. Pasang Saklar Ganda Pek. Pasang Stop kontak Pek. Pasang Box Sekring 2 Group + MCB 1 unit Pek. Pasang Lampu 15 W Biaya Pemasangan Listrik 1300V + SLO

B. 1. 2. 3. 4. 5. 6. 7. 8.

PEKERJAAN SANITAIR Instalasi air bersih pipa PVC dia 3/4" AW+ assesories Kran air Floor Drain Stainless Pas. Closet Jongkok Instalasi air kotor pipa PVC dia 3" AW+ Assesories Instalasi air kotoran pipa PVC dia 4" AW+ Assesories Pek. Pembuatan Septik Tank + Sumur Resapan Pek. Sumur bor dangkal + Jet Pump

A. 1. 2. 3. 4. 5. 6. 7. 8.

PEKERJAAN ELEKTRIKAL Pek. Instalasi Penerangan Pek. Instalasi Stop Kontak Pek. Pasang Saklar tunggal Pek. Pasang Saklar Ganda Pek. Pasang Stop kontak Pek. Pasang Box Sekring 2 Group + MCB 1 unit Pek. Pasang Lampu 15 W Biaya Pemasangan Listrik 1300V + SLO

A. 1.

PEKERJAAN LAIN-LAIN Pembersihan Akhir

361.58 m² 73.64 m² 15.96 m² Total Sub PEKERJAAN PEN

14.00 ttk 6.00 ttk 6.00 ttk 4.00 ttk 6.00 ttk 2.00 unit 14.00 unit 2.00 ls Total Sub PEKERJAAN KUNCI DAN ALAT PENG

12.00 m¹ 2.00 bh 2.00 bh 2.00 bh 6.00 m¹ 4.00 m¹ 2.00 unit 2.00 ls Total Sub PEKERJAAN

14.00 ttk 6.00 ttk 6.00 ttk 4.00 ttk 6.00 ttk 2.00 unit 14.00 unit 2.00 ls Total Sub PEKERJAAN E

1.00 ls Total Sub PEKERJAAN

NA ANGGARAN BIAYA KUANTITAS DAN HARGA

Harga Satuan

Jumlah Harga

4

5

Rp Rp

1,009,800.00 Rp 56,759.45 Rp Err:509 Rp 793,702.80 Rp Total Sub PEKERJAAN PERSIAPAN

1,009,800.00 1,434,878.90 Err:509 793,702.80 Err:509

Rp 68,612.50 Rp 195,745.00 Rp 98,450.00 Rp 175,387.30 Total Sub PEKERJAAN TANAH DAN PASIR

Rp Rp Rp Rp Rp

544,646.03 96,316.33 260,498.70 425,840.36 1,327,301.42

Rp 752,702.50 Rp 4,461,197.82 Rp 58,466.10 Rp 35,200.00 Rp 9,462,146.76 Rp 171,413.00 Rp 122,878.26 Rp 122,878.26 Rp 1,326,729.79 Total Sub PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

2,929,424.04 9,092,813.39 21,140,265.98 12,727,672.32 12,592,679.10 35,573,631.29 11,135,227.51 4,583,358.93 547,408.71 110,322,481.27

754,393.90 195,745.00 222,337.50 #VALUE! Rp 220,264.00 Rp 310,286.90 Total Sub PEKERJAAN BETON

Rp Rp Rp

2,369,770.03 614,891.81 3,409,690.08 #VALUE! 592,069.63 2,445,060.77 #VALUE!

Rp 223,153.92 Rp 226,794.70 Rp 158,845.50 Rp 146,272.06 Rp 108,900.00 Rp 50,616.50 Total Sub PEKERJAAN RANGKA ATAP, ATAP DAN PLAFOND

Rp Rp Rp Rp Rp Rp Rp

6,022,477.99 10,580,607.78 17,811,345.92 16,401,486.09 1,622,610.00 2,692,797.80 55,131,325.58

2,519,636.14 Rp 2,560,056.75 Rp 1,586,802.48 Rp

5,039,272.27 5,120,113.50 6,347,209.91

Rp Rp Rp

Rp Rp Rp

Rp Rp

Harga Satuan

Jumlah Harga

4 Rp 1,146,029.71 Rp 540,182.50 Rp 265,967.35 Rp 355,905.00 Total Sub PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI

Rp Rp Rp Rp Rp

5 4,584,118.84 1,080,365.00 531,934.70 569,448.00 23,272,462.22

Rp 21,747.00 Rp 21,747.00 Rp 49,874.00 Total Sub PEKERJAAN PENGECATAN

Rp Rp Rp Rp

7,863,315.06 1,601,466.48 795,989.04 10,260,770.57

Rp Rp Rp Rp Rp Rp Rp Rp Total Sub PEKERJAAN KUNCI DAN ALAT PENGGANTUNG

-

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp Rp Rp

-

16,786.00 84,931.00 33,632.50 647,625.00 40,870.50 51,782.50 Err:509 Rp 1,925,000.00 Total Sub PEKERJAAN SANITAIR

Rp Rp Rp Rp Rp Rp

Rp 386,595.00 Rp 375,870.00 Rp 125,559.50 Rp 128,859.50 Rp 133,039.50 Rp 339,069.50 Rp 91,245.00 Rp 2,200,000.00 Total Sub PEKERJAAN ELEKTRIKAL

Rp Rp Rp Rp Rp Rp Rp Rp Rp

5,412,330.00 2,255,220.00 753,357.00 515,438.00 798,237.00 678,139.00 1,277,430.00 4,400,000.00 16,090,151.00

Rp 16,786.00 Rp Total Sub PEKERJAAN LAIN-LAIN Rp

16,786.00 16,786.00

Rp

201,432.00 169,862.00 67,265.00 1,295,250.00 245,223.00 207,130.00 Err:509 3,850,000.00 Err:509

RENCANA ANGGARAN BIAYA DAFTAR KUANTITAS DAN HARGA Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : 2018 No.

Uraian Pekerjaan

Volume

2

3

1 A. 1. 2. 3. 4.

PEKERJAAN PERSIAPAN Pek. Pembersihan Lapangan Pek. Pemasangan Bouwplank Direksi Keet Papan Nama

A. 1. 2. 5. 6.

PEKERJAAN TANAH DAN PASIR Pek. Galian Pondasi Pek. Urugan Pasir Bawah Pondasi Pek. Urugan Tanah kembali yang dipadatkan Pek. Rollag Bata

B. 3. 4. 1. 2. 1. 2. 3. 4. 5.

PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI Pek. Pondasi Umpak Batu Kali, Spesi 1 PC : 4 Ps Pek. Pasang Sloof 15/20 Pekerjaan Plesteran Dinding 1 PC : 4 Ps, tebal 15 mm Pekerjaan Acian Dinding Pek. Pasang Kolom 12 x 12 Pek. Pasang Dinding ½ Bata Merah Pek. Pasang Ringbalk 10/10 Pek. Pasang Balok Sopi-sopi Pek. Kanopi Beton

A. 1. 2. 3. 4. 5. 6.

PEKERJAAN BETON Pek. Rabat Beton Lantai tebal 5 cm Pek. Urugan pasir di bawah lantai Pek. Urugan Tanah di bawah lantai Pek. Lantai Keramik 30 x 30 Pek. Keramik 20 x 20 untuk KM Pek. Keramik 20 x 25 untuk Dinding KM

B. 1. 2. 3. 4. 5. 6.

PEKERJAAN RANGKA ATAP, ATAP DAN PLAFOND Pek. Plafond Kalsiboard 3.5 mm dan assesoris + Rangka Hollow 40.40 2 mm (luar + KM) 26.99 m² Pek. Plafond Gypsum dan assesoris + Rangka Hollow 40.40 2 mm (dalam) 46.65 m² Pas. Atap Metal 112.13 m² Rangka Baja Ringan 112.13 m² Pas. Bubungan metal 14.90 m¹ Pas. Listplank Kalsiboard 53.20 m¹ Total Sub PEKERJAAN RANGKA ATAP, ATAP DAN PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI Pek. Pasang 1 set Kusen Kayu Pintu Panel dan Jendela Tipe PJ1 plus aksesoris 2.00 bh Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P1 plus aksesoris 2.00 bh Pek. Pasang 1 set Kusen Kayu Pintu Panel Tipe P2 plus aksesoris 4.00 bh

C. 1. 2. 3.

1.00 ls 25.28 m¹ 1.00 ls 1.00 unit Total Sub PEKERJAAN P

7.94 m³ 0.49 m³ 2.65 m³ 2.43 m² Total Sub PEKERJAAN TANAH D

3.89 m³ 2.04 m³ 361.58 m² 361.58 m² 1.33 m³ 207.53 m² 90.62 m¹ 37.30 m¹ 0.41 m³ Total Sub PEKERJAAN PASANGAN, PLESTERAN DA

3.14 m³ 3.14 m³ 15.34 m³ 55.33 m² 2.69 m² 7.88 m² Total Sub PEKERJA

No. 1 4. 5. 6. 7.

Uraian Pekerjaan 2 Pek. Pasang 1 set Jendela Kayu Tipe J1 dan aksesoris Pek. Pasang 1 set Pintu (P3)/pintu KM PVC incl. accessories Pek. Pasang 1 set Bovenlight Alumunium Pek. Pasang Jendela Roster

Volume 3 4.00 bh 2.00 bh 2.00 bh 1.60 m² Total Sub PEKERJAAN KUSEN PINTU, JENDELA DAN

E. 1. 2. 3.

PEKERJAAN PENGECATAN Pek. Cat Tembok Luar dan Dalam (Cat Dasar, Cat Penutup dan Plamur) Pek. Cat Plafond (Cat Dasar, Car Penutup dan Plamur) Pek. Cat Kayu (Lisplank) (Cat Dasar, Cat Penutup, Cat Meni dan Plamur)

A. 1. 2. 3. 4. 5. 6. 7. 8.

PEKERJAAN KUNCI DAN ALAT PENGGANTUNG Pek. Instalasi Penerangan Pek. Instalasi Stop Kontak Pek. Pasang Saklar tunggal Pek. Pasang Saklar Ganda Pek. Pasang Stop kontak Pek. Pasang Box Sekring 2 Group + MCB 1 unit Pek. Pasang Lampu 15 W Biaya Pemasangan Listrik 1300V + SLO

B. 1. 2. 3. 4. 5. 6. 7. 8.

PEKERJAAN SANITAIR Instalasi air bersih pipa PVC dia 3/4" AW+ assesories Kran air Floor Drain Stainless Pas. Closet Jongkok Instalasi air kotor pipa PVC dia 3" AW+ Assesories Instalasi air kotoran pipa PVC dia 4" AW+ Assesories Pek. Pembuatan Septik Tank + Sumur Resapan Pek. Sumur bor dangkal + Jet Pump

A. 1. 2. 3. 4. 5. 6. 7. 8.

PEKERJAAN ELEKTRIKAL Pek. Instalasi Penerangan Pek. Instalasi Stop Kontak Pek. Pasang Saklar tunggal Pek. Pasang Saklar Ganda Pek. Pasang Stop kontak Pek. Pasang Box Sekring 2 Group + MCB 1 unit Pek. Pasang Lampu 15 W Biaya Pemasangan Listrik 1300V + SLO

A. 1.

PEKERJAAN LAIN-LAIN Pembersihan Akhir

361.58 m² 73.64 m² 15.96 m² Total Sub PEKERJAAN PEN

14.00 ttk 6.00 ttk 6.00 ttk 4.00 ttk 6.00 ttk 2.00 unit 14.00 unit 2.00 ls Total Sub PEKERJAAN KUNCI DAN ALAT PENG

12.00 m¹ 2.00 bh 2.00 bh 2.00 bh 6.00 m¹ 4.00 m¹ 2.00 unit 2.00 ls Total Sub PEKERJAAN

14.00 ttk 6.00 ttk 6.00 ttk 4.00 ttk 6.00 ttk 2.00 unit 14.00 unit 2.00 ls Total Sub PEKERJAAN E

1.00 ls Total Sub PEKERJAAN

NA ANGGARAN BIAYA KUANTITAS DAN HARGA

Harga Satuan

Jumlah Harga

4

5

Rp Rp

1,009,800.00 Rp 56,759.45 Rp Err:509 Rp 793,702.80 Rp Total Sub PEKERJAAN PERSIAPAN

1,009,800.00 1,434,878.90 Err:509 793,702.80 Err:509

Rp 68,612.50 Rp 195,745.00 Rp 98,450.00 Rp 175,387.30 Total Sub PEKERJAAN TANAH DAN PASIR

Rp Rp Rp Rp Rp

544,646.03 96,316.33 260,498.70 425,840.36 1,327,301.42

Rp 752,702.50 Rp 4,461,197.82 Rp 58,466.10 Rp 35,200.00 Rp 9,462,146.76 Rp 171,413.00 Rp 122,878.26 Rp 122,878.26 Rp 1,326,729.79 Total Sub PEKERJAAN PASANGAN, PLESTERAN DAN LANTAI

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

2,929,424.04 9,092,813.39 21,140,265.98 12,727,672.32 12,592,679.10 35,573,631.29 11,135,227.51 4,583,358.93 547,408.71 110,322,481.27

754,393.90 195,745.00 222,337.50 #VALUE! Rp 220,264.00 Rp 310,286.90 Total Sub PEKERJAAN BETON

Rp Rp Rp

2,369,770.03 614,891.81 3,409,690.08 #VALUE! 592,069.63 2,445,060.77 #VALUE!

Rp 223,153.92 Rp 226,794.70 Rp 158,845.50 Rp 146,272.06 Rp 108,900.00 Rp 50,616.50 Total Sub PEKERJAAN RANGKA ATAP, ATAP DAN PLAFOND

Rp Rp Rp Rp Rp Rp Rp

6,022,477.99 10,580,607.78 17,811,345.92 16,401,486.09 1,622,610.00 2,692,797.80 55,131,325.58

2,519,636.14 Rp 2,560,056.75 Rp 1,586,802.48 Rp

5,039,272.27 5,120,113.50 6,347,209.91

Rp Rp Rp

Rp Rp Rp

Rp Rp

Harga Satuan

Jumlah Harga

4 Rp 1,146,029.71 Rp 540,182.50 Rp 265,967.35 Rp 355,905.00 Total Sub PEKERJAAN KUSEN PINTU, JENDELA DAN VENTILASI

Rp Rp Rp Rp Rp

5 4,584,118.84 1,080,365.00 531,934.70 569,448.00 23,272,462.22

Rp 21,747.00 Rp 21,747.00 Rp 49,874.00 Total Sub PEKERJAAN PENGECATAN

Rp Rp Rp Rp

7,863,315.06 1,601,466.48 795,989.04 10,260,770.57

Rp Rp Rp Rp Rp Rp Rp Rp Total Sub PEKERJAAN KUNCI DAN ALAT PENGGANTUNG

-

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp Rp Rp

-

16,786.00 84,931.00 33,632.50 647,625.00 40,870.50 51,782.50 Err:509 Rp 1,925,000.00 Total Sub PEKERJAAN SANITAIR

Rp Rp Rp Rp Rp Rp

Rp 386,595.00 Rp 375,870.00 Rp 125,559.50 Rp 128,859.50 Rp 133,039.50 Rp 339,069.50 Rp 91,245.00 Rp 2,200,000.00 Total Sub PEKERJAAN ELEKTRIKAL

Rp Rp Rp Rp Rp Rp Rp Rp Rp

5,412,330.00 2,255,220.00 753,357.00 515,438.00 798,237.00 678,139.00 1,277,430.00 4,400,000.00 16,090,151.00

Rp 16,786.00 Rp Total Sub PEKERJAAN LAIN-LAIN Rp

16,786.00 16,786.00

Rp

201,432.00 169,862.00 67,265.00 1,295,250.00 245,223.00 207,130.00 Err:509 3,850,000.00 Err:509

RENCANA ANGGARAN BIAYA DAFTAR KUANTITAS DAN HARGA Pekerjaan : Pengembangan Sarana dan Prasarana PP. Kolonodale Lokasi : PP. Kolonodale, Kab. Morowali Utara Tahun Anggara : 2018 No.

Uraian Pekerjaan

Volume

Satuan

1 III. i. A. 1.

2

3

4

Pekerjaan Jalan dan Saluran Pekerjaan Fasilitas Umum Pekerjaan Persiapan Patok dan Pengukuran

265.80



B. 1. 2. 3. 4. 5. 6. 7.

Pekerjaan Perkerasan Pekerjaan Galian Badan Jalan Pek. Bekisting Pek. Lantai Kerja B0 K-100 Penghamparan Bond Breaker Pekerjaan Penulangan Ruji dowel d = 12mm Penghamparan Lapisan Beton K-225 Pemasangan Joint cutter & joint sealent

159.48 79.74 39.87 797.40 70.76 119.61 79.74

m³ m³ m³ m² kg m³ m¹

C. 1. 2. 3. 4.

Pekerjaan Drainase Galian Tanah Urugan Pasir Pas. Batu Belah/Kali Plester

186.48 26.64 83.92 799.20

m³ m³ m³ m²

D. 1. 2.

Pelat Deuiker Pek. Pengecoran Pelat Deuiker K-175 Untuk Saluran Pek. Pengecoran Pelat Deuiker K-175 Tiap Rumah

1.44 0.13

m³ m³

Total Sub Pekerjaan Fasili Total Pekerjaan Jalan d

NA ANGGARAN BIAYA KUANTITAS DAN HARGA

Rp

Harga Satuan

Jumlah Harga

5

6

56,759.45 Rp Rp

15,086,661.81 15,086,661.81

Rp Rp Rp Rp Rp Rp Rp

68,612.50 175,722.25 754,393.90 7,037.80 15,735.50 1,007,212.35 14,401.50

Rp Rp Rp Rp Rp Rp Rp Rp

10,942,321.50 14,012,092.22 30,077,684.96 5,611,941.72 1,113,418.89 120,472,668.71 1,148,375.37 183,378,503.36

Rp Rp Rp Rp

68,612.50 195,745.00 752,702.50 60,683.04

Rp Rp Rp Rp Rp

12,794,859.00 5,214,646.80 63,163,782.99 48,497,885.57 129,671,174.36

1,326,729.79 Rp 1,326,729.79 Rp Rp Total Sub Pekerjaan Fasilitas Umum Rp Total Pekerjaan Jalan dan Saluran Rp

1,910,490.90 169,821.41 2,080,312.31 330,216,651.84 330,216,651.84

Rp Rp

(K3) Pembuatan pagar sementara dari kayu tinggi 2 meter No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.400 0.200 0.020 0.020

Batang Kg m3 m3 m3 Kg Liter

1.250 5.000 0.005 0.009 0.072 0.060 0.400

BAHAN Dolken kayu �8-10/400 cm Semen portland Pasir beton Koral beton Kayu 5/7 Paku 5 cm - 12 cm Residu ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pembuatan pagar sementara dari seng gelombang tinggi 2 meter No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.02 Kepala tukang L.03 Mandor L.04 B

C

D E F

Koefisien

BAHAN Dolken kayu� 8-10/400 cm Semen portland Seng gelombang Pasir beton Koral beton Kayu 5/7 Paku 5 cm - 12 cm Meni besi

0.150

Satuan

Koefisien

OH OH OH OH

0.200 0.400 0.020 0.020

Batang Kg Lbr m3 m3 m3 Kg Liter

1.250 2.500 1.200 0.005 0.009 0.072 0.060 0.450

ALAT

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

0.150

(K3) Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Dolken kayu �8-10/400 cm Semen portland Kawat duri Pasir beton Koral beton Paku 5 cm - 12 cm

C

Koefisien 0.200 0.300 0.020 0.020

Batang Kg M’ m3 m3 Kg

1.000 2.000 25.000 0.005 0.009 0.060

ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pengukuran dan pemasangan Bouwplank No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.100 0.100 0.010 0.005 JUMLAH TENAGA KERJA

m3 Kg m3

0.012 0.020 0.007 JUMLAH HARGA BAHAN

BAHAN Kayu balok 5/7 Paku 5 cm - 7 cm Kayu papan 3/20

Koefisien

ALAT Paku 5 cm - 7 cm JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

(K3) Pembuatan kantor sementara lantai plesteran No Uraian A TENAGA

10.00%

Kode

Satuan

Koefisien

Pekerja Tukang kayu Tukang batu Kepala tukang Mandor B

C

BAHAN Dolken kayu diameter 8- 10/400 cm Kayu Paku biasa Besi strip Semen Portland Pasir pasang Pasir beton Koral beton Bata merah Seng pelat Jendela naco Kaca polos Kunci tanam Plywood 4mm

C

OH OH OH OH OH

Batang m3 Kg Kg Kg m3 m3 m3 Bh Lbr Bh m2 Bh Lbr

2.000 2.000 1.000 0.300 0.050

1.250 0.180 0.080 1.100 35.000 0.150 0.100 0.150 30.000 0.250 0.200 0.080 0.150 0.060

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pembuatan rumah jaga (konstruksi kayu) No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

L.01 L.02 L.02 L.03 L.04

BAHAN Dolken kayu �8-10/400 cm Kayu Paku biasa Seng gelombang ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1.000 1.500 0.150 0.050

Batang m3 Kg Kg

3.000 0.276 0.700 1.500

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pembuatan gudang semen dan peralatan No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Dolken kayu diameter 8-10/400cm Kayu Paku biasa Semen Portland Pasir beton Koral beton Seng gelombang Seng pelat

Batang m3 Kg Kg m3 m3 Lbr Lbr

Koefisien 1.000 2.000 0.200 0.050

1.700 0.210 0.300 10.500 0.030 0.050 1.500 0.250

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pembuatan bedeng pekerja No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

BAHAN Dolken kayu diameter 8-10/400cm Kayu Paku biasa Semen Portland Pasir beton Koral beton Seng gelombang Plywood 4mm ALAT

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Batang m3 Kg Kg m3 m3 Lbr Lbr

Koefisien 1.000 2.000 0.200 0.050

1.250 0.186 0.300 18.000 0.030 0.050 1.500 1.350

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

(K3) Pembersihan lapangan dan perataan No Uraian A TENAGA Pekerja Mandor B

0.150

Kode

Satuan

L.01 L.04

OH OH

Koefisien 0.100 0.050 JUMLAH TENAGA KERJA

BAHAN JUMLAH HARGA BAHAN

C

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

(K3) Pembuatan steger/perancah dari bambu No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

10.00%

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.000 2.000 0.200 0.050

Batang m3

1.250 0.186

BAHAN Bambu diameter6-8/600 cm Tali ijuk

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pembuatan kotak adukan ukuran 40 cm x 50 cm x 25 cm No Uraian A TENAGA Tukang kayu Kepala tukang

0.150

Kode

Satuan

L.02 L.03

OH OH

Koefisien 0.300 0.030

B

C

BAHAN Kayu papan kelasIII Kayu balok 5/7kelas III Paku biasa

C

0.150

Kode

Satuan

L.01 L.04

OH OH

1.000 0.005

m3 m3 m3

0.150 0.090 0.010

BAHAN Batu belah Batu pecah Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pembongkaran beton bertulang No Uraian A TENAGA Pekerja Mandor B

BAHAN

C

ALAT

D E

0.036 0.014 0.080

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pembuatan jalan sementara No Uraian A TENAGA Pekerja Mandor B

m3 m3 kg

Jumlah (A+B+C) Overhead & Profit

0.150

Kode

Satuan

L.01 L.04

OH OH

Koefisien 13.334 0.666

0.150

F Harga Satuan Pekerjaan (D+E) Pembongkaran dinding tembok bata No Uraian A TENAGA Pekerja Mandor B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan pagar kawat jaring galvanis panjang 240 cm No Uraian A TENAGA Pekerja Tukang Kepala Tukang Mandor B

C

Satuan

L.01 L.04

OH OH

Koefisien 6.667 0.333

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

BAHAN Kawat jaring

Koefisien 0.042 0.004 0.002 0.042

Lbr

0.143

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan panel beton pracetak 5 x 50 x 240 cm untuk pagar No Uraian A TENAGA Pekerja Tukang Kepala tukang Mandor B

Kode

BAHAN Panel betonpracetak

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.375 0.125 0.012 0.019

Lbr

0.986

Kolom betonpracetak Semen PC Pasir beton Koral C

Batang Kg m3 m3

0.525 45.000 0.074 0.146

ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Penggalian tanah biasa sedalam 1 m No Uraian A TENAGA Pekerja Mandor B

0.150

Kode

Satuan

L.01 L.04

OH OH

Koefisien 0.750 0.025 JUMLAH TENAGA KERJA

BAHAN JUMLAH HARGA BAHAN

C

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Penggalian tanah biasa sedalam 2 m No Uraian A TENAGA Pekerja Mandor B

BAHAN

C

ALAT

D E F

10.00%

Kode

Satuan

L.01 L.04

OH OH

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E)

Menggali tanah biasa sedalam 3 m No Uraian

Koefisien 0.900 0.045

0.150

Kode

Satuan

Koefisien

A

TENAGA Pekerja Mandor

B

BAHAN

C

ALAT

D E F

OH OH

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Menggali tanah keras sedalam 1 m No Uraian A TENAGA Pekerja Mandor B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Menggali tanah cadas sedalam 1 m No Uraian A TENAGA Pekerja Mandor B

BAHAN

C

ALAT

D E F

L.01 L.04

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

1.050 0.067

0.150

Kode

Satuan

L.01 L.04

OH OH

Koefisien 1.000 0.032

0.150

Kode

Satuan

L.01 L.04

OH OH

Koefisien 1.500 0.060

0.150

Menggali tanah lumpur sedalam 1 m No Uraian A TENAGA Pekerja Mandor B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pengerjaan stripping tanah tebing setinggi 1 meter No Uraian A TENAGA Pekerja Mandor B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pembuangan tanah sejauh 30 meter No Uraian A TENAGA Pekerja Mandor B

BAHAN

C

ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Kode

Satuan

L.01 L.04

OH OH

Koefisien 1.200 0.045

0.150

Kode

Satuan

L.01 L.04

OH OH

Koefisien 0.050 0.005

0.150

Kode

Satuan

L.01 L.04

OH OH

Koefisien 0.330 0.010

0.150

Pengurugan kembali galian tanah No A TENAGA Pekerja Mandor B

Uraian

Kode

Satuan

L.01 L.04

OH OH

Koefisien 0.500 0.050 JUMLAH TENAGA KERJA

BAHAN JUMLAH HARGA BAHAN

C

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

(K3) Pemadatan tanah tanah (per 20 cm) No Uraian A TENAGA Pekerja Mandor B

10.00%

Kode

Satuan

L.01 L.04

OH OH

Koefisien 0.500 0.050 JUMLAH TENAGA KERJA

BAHAN JUMLAH HARGA BAHAN

C

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pengurugan dengan pasir urug No A TENAGA Pekerja Mandor B

C

Uraian

BAHAN Pasir urug

10.00%

Kode

Satuan

L.01 L.04

OH OH

Koefisien 0.300 0.010 JUMLAH TENAGA KERJA 1.200 JUMLAH HARGA BAHAN

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10.00%

Pemasangan lapisan pu campuran 1 KP : 3 PP : 7 TL No Uraian A TENAGA Pekerja Tukang Kepala Tukang Mandor B

C

C

C

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.800 0.400 0.040 0.080

m3 m3 m3

0.135 0.400 0.948

ALAT

0.150

Kode

Satuan

L.01 L.04

OH OH

0.150 0.015

m3

6.000

BAHAN Ijuk

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pengurugan sirtu padat No Uraian A TENAGA Pekerja Mandor B

Satuan

BAHAN Kapur Padam Pasir Pasang Tanah Liat

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan No Uraian A TENAGA Pekerja Mandor B

Kode

BAHAN Sirtu ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.04

OH OH

0.250 0.025

m3

1.200

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan pondasi batu belah campuran 1 SP : 3 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.500 0.750 0.075 0.075

m3 Kg m3

1.200 202.000 0.485

BAHAN Batu belah Semen Portland Pasir pasang

C

Koefisien

ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pemasangan pondasi batu belah campuran 1 SP : 4 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.500 0.750 0.075 0.075 JUMLAH TENAGA KERJA

m3 Kg m3

1.200 163.000 0.520 JUMLAH HARGA BAHAN

BAHAN Batu belah Semen Portland Pasir pasang

Koefisien

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pemasangan pondasi batu belah campuran 1 SP : 5 PP No Uraian

10.00%

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN Batu belah Semen Portland Pasir pasang

C

1.500 0.750 0.075 0.075

m3 Kg m3

1.200 136.000 0.544

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.500 0.750 0.075 0.075

m3 Kg m3

1.200 117.000 0.561

BAHAN Batu belah Semen Portland Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan pondasi batu belah campuran 1 SP : 8 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan pondasi batu belah campuran 1 SP : 6 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

BAHAN Batu belah

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1.500 0.750 0.075 0.075

m3

1.200

Semen Portland Pasir pasang C

C

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.500 0.750 0.075 0.075

m3 m3 Kg m3

1.200 0.170 0.170 0.340

BAHAN Batu belah Kapur padam Semen Portland Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

91.000 0.584

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan pondasi batu belah campuran 1 SP : 1 KP : 2 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Kg m3

BAHAN Batu belah Semen Portland Kapur padam Pasir pasang ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1.500 0.750 0.075 0.075

m3 Kg m3 m3

1.200 61.000 0.147 0.492

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.500 0.750 0.075 0.075

m3 Kg m3 m3

1.200 41.000 0.131 0.523

BAHAN Batu belah Semen Portland Kapur padam Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan batu kosong (anstamping) No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN Batu belah Pasir urug

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.780 0.390 0.039 0.039

m3 m3

1.200 0.432

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan pondasi siklop, 60% beton campuran 1 SP : 2 PB : 3 Kr dan 40% batu belah No Uraian Kode Satuan

0.150

Koefisien

A

B

C

TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN Batu belah Semen Portland Pasir beton Kerikil Besi beton Kawat beton

C

OH OH OH OH

3.400 0.850 0.085 0.170

m3 Kg m3 m3 Kg Kg

0.480 194.000 0.312 0.468 126.000 1.800

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan pondasi sumuran, diameter 100 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

2.400 0.800 0.080 0.119

m3 Kg m3 m3

0.450 194.000 0.312 0.468

BAHAN Batu belah Semen Portland Pasir beton Kerikil

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 7,4 MPa No Uraian A TENAGA Pekerja Tukang batu

0.150

Kode

Satuan

L.01 L.02

OH OH

Koefisien 1.650 0.275

Kepala tukang Mandor B

C

BAHAN Semen Portland Pasir beton Kerikil (Maks 30mm) Air

C

kg kg kg Liter

0.028 0.083

247.000 869.000 999.000 215.000

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Semen Portland Pasir beton Kerikil (Maks 30mm) Air

kg kg kg Liter

Koefisien 1.650 0.275 0.028 0.083

276.000 828.000 1,012.000 215.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 12,2 MPa No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 9,8 MPa No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.03 L.04

BAHAN Semen portland

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

kg

Koefisien 1.650 0.275 0.028 0.083

299.000

Pasir beton Kerikil (Maks 30 mm) Air C

kg kg Liter

799.000 1,017.000 215.000

ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

0.150

Membuat lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K100) No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Semen Portland Pasir beton Kerikil(Maks 30 mm) Air

kg kg kg Liter

Koefisien 1.200 0.200 0.020 0.060 JUMLAH TENAGA KERJA 230.000 893.000 1,027.000 200.000 JUMLAH HARGA BAHAN

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Membuat beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175) No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

BAHAN Semen Portland Pasir beton Kerikil(Maks 30mm) Air

10.00%

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

1.650 0.275 0.028 0.083 JUMLAH TENAGA KERJA

kg kg kg Liter

326.000 760.000 1,029.000 215.000 JUMLAH HARGA BAHAN

C

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Membuat beton mutu f’c = 16,9 MPa No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Semen Portland Pasir beton Kerikil (Maks 30mm) Air

kg kg kg Liter

Koefisien 1.650 0.275 0.028 0.083

352.000 731.000 1,031.000 215.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 19,3 MPa No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

10.00%

BAHAN Semen Portland Pasir beton Kerikil (Maks30mm) Air ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

kg kg kg Liter

Koefisien 1.650 0.275 0.028 0.083

371.000 698.000 1,047.000 215.000

E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 21,7 MPa No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Semen Portland Pasir beton Kerikil (Maksimum30mm) Air

kg kg kg Liter

Koefisien 1.650 0.275 0.028 0.083

384.000 692.000 1,039.000 215.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 24,0 MPa No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Semen Portland Pasir beton Kerikil (Maks30mm) Air

kg kg kg Liter

Koefisien 1.650 0.275 0.028 0.083

406.000 684.000 1,026.000 215.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 26,4 MPa No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang batu Kepala tukang Mandor B

C

BAHAN Semen Portland Pasir beton Kerikil (Maks 30mm) Air

C

OH OH OH OH

kg m3 m3 Liter

1.650 0.275 0.028 0.083

413.000 681.000 1,021.000 215.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 28,8 MPa No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Semen Portland Pasir beton Kerikil (Maks 30mm) Air

kg kg kg Liter

Koefisien 2.100 0.350 0.035 0.105

439.000 670.000 1,006.000 215.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 2.100 0.350 0.035 0.105

B

C

BAHAN Semen Portland Pasir beton Kerikil (Maks30mm) Air

kg kg kg Liter

448.000 667.000 1,000.000 215.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit 0.150 F Harga Satuan Pekerjaan (D+E) Membuat beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan p No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01 OH 2.100 Tukang batu L.02 OH 0.350 Kepala tukang L.03 OH 0.035 Mandor L.04 OH 0.105 B

C

BAHAN Semen Portland Pasir beton Kerikil (maksimum 30 mm) Bahan tambahan kimia Air

448.000 667.000 1,000.000 4.500 200.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat beton kedap air dengan strorox - 100 No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

kg kg kg Liter Liter

BAHAN Semen Portland Pasir beton Kerikil (2cm/3cm) Strorox – 100

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

2.100 0.350 0.035 0.105

kg m3 m3 kg

400.000 0.480 0.800 1.200

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan PVC Waterstop lebar 150 mm No Uraian A TENAGA Pekerja Tukang Batu/Pipa Kepala Tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.060 0.030 0.003 0.003

m

1.050

BAHAN Waterstop lebar 150 mm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan PVC Waterstop lebar 200 mm No Uraian A TENAGA Pekerja Tukang Batu/Pipa Kepala Tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.070 0.035 0.004 0.007

m

1.050

BAHAN Waterstop lebar200 mm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat PVC Waterstop lebar 230 mm - 320 mm No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang Batu Kepala Tukang Mandor B

C

BAHAN Waterstop lebar230 mm - 320 mm

C

C

0.080 0.040 0.004 0.004

m

1.050

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.070 0.070 0.007 0.004

kg kg

10.500 0.150

BAHAN Besi beton(polos/ulir) Kawat beton

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan 10 kg kabel prategang (prestressed) polos/strands No Uraian A TENAGA Pekerja Tukang besi Kepala tukang Mandor B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pembesian 10 kg dengan besi polos atau besi ulir No Uraian A TENAGA Pekerja Tukang besi Kepala tukang Mandor B

L.01 L.02 L.03 L.04

BAHAN Besi beton(polos/ulir) Kawat beton ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.050 0.050 0.005 0.003

kg kg

10.500 0.100

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan 10 kg jaring kawat baja (wiremesh) No Uraian A TENAGA Pekerja Tukang besi Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.025 0.025 0.025 0.001

kg kg

10.200 0.050

BAHAN Jaring kawatbaja dilas Kawat beton

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bekisting untuk pondasi No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.520 0.260 0.026 0.026

m3 kg Liter

0.040 0.300 0.100

BAHAN Kayu kelas III Paku 5 cm - 10 cm Minyak bekisting

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bekisting untuk sloof No Uraian

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang kayu Kepala tukang Mandor BAHAN Kayu kelas III Paku 5 cm – 10 cm Minyak bekisting

C

OH OH OH OH

0.520 0.260 0.026 0.026

m3 kg Liter

0.045 0.300 0.100

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bekisting untuk kolom No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.660 0.330 0.033 0.033

m3 kg Liter m3 Lbr Batang

0.040 0.400 0.200 0.015 0.350 2.000

BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9mm Dolken kayu � 8-10cm –panj 4 m

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bekisting untuk balok No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang

0.150

Kode

Satuan

L.01 L.02 L.03

OH OH OH

Koefisien 0.660 0.330 0.033

Mandor B

C

BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu� (8–10) cmpanjang 4 m

C

0.033

m3 kg Liter m3 Lbr Batang

0.040 0.400 0.200 0.018 0.350 2.000

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.660 0.330 0.033 0.033

m3 kg Liter m3 Lbr Batang

0.040 0.400 0.200 0.015 0.350 6.000

BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu galam,(8–10) cm panjang 4m

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bekisting untuk dinding No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bekisting untuk lantai No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

L.04

BAHAN Kayu kelas III

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.660 0.330 0.033 0.033

m3

0.030

Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu , � 8–10 cm, panj4 m Penjaga jarak bekisting/spacer C

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.660 0.330 0.033 0.033

m3 kg Liter m3 Lbr Batang

0.030 0.400 0.150 0.015 0.350 2.000

BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Balok kayu kelas II Plywood tebal 9 mm Dolken kayu, � 8–10 cm,panjang 4 m

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Pemasangan jembatan untuk pengecoran beton No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.400 0.200 0.020 0.350 3.000 4.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bekisting untuk tangga No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

kg Liter m3 Lbr Batang Buah

BAHAN Kayu kelas III (papan) Paku 5 cm – 12 cm Dolken kayu , � 8–10 panjang 4m

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.150 0.050 0.005 0.008

m3 kg Batang

0.026 0.600 0.500

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) Membuat kolom praktis beton bertulang (11 x 11) cm No Uraian A TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor B

C

Kode

Satuan

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

0.180 0.020 0.020 0.020 0.006 0.009

m3 kg Liter kg kg kg m3 m3

0.002 0.010

BAHAN Kayu kelas III Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir Beton Kerikil

Koefisien

3.000 0.450 4.000 0.006 0.009

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Membuat ring balok beton bertulang (10 x 15) cm No Uraian A TENAGA Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor B

0.150

BAHAN Kayu kelas III

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.02 L.02 L.03 L.04

OH OH OH OH OH OH

0.297 0.033 0.033 0.033 0.010 0.015

m3

0.003

Paku 5 cm – 12 cm Minyak bekisting Besi beton polos Kawat beton Semen Portland Pasir beton Kerikil C

kg Liter kg kg kg m3 m3

C

BAHAN Semen PC Pasir beton Kerikil (maks 30 mm) Air

Kg Kg Kg L

0.150

Koefisien 0.132 0.022 0.002 0.007

26.080 60.800 82.320 17.200

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

3.600 0.050 5.500 0.009 0.015

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pembuatan lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

0.020

BAHAN Semen PC Pasir beton Kerikil (maks 30mm) Air

Kg Kg Kg L

0.150

Koefisien 0.165 0.028 0.003 0.008

32.600 76.000 102.900 21.500

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Semen PC Pasir beton Kerikil (maks 30mm) Air

Kg Kg Kg L

C D E F

Koefisien 0.198 0.033 0.003 0.010

39.120 91.200 123.480 25.800

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

0.150

BAHAN Semen PC Pasir beton Kerikil (maks 30 mm) Air

Kg Kg Kg L

0.150

Koefisien 0.248 0.041 0.004 0.013

48.900 114.000 154.350 32.250

ALAT Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E)

0.150

Pembuatan bekisting untuk pelat beton pracetak (5 kali pakai) No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.007 0.076 0.008 0.001

m3 Kg m3 Lbr L buah

0.008 9.394 0.005 0.080 0.200 3.882

BAHAN Lantai kerja t=10cm Besi hollow (50 x 50x 3) mm Kayu kaso 5/7 (lebar 5 cm, tinggi 7cm) Phenol film 12 mm Minyak cetakan(bekisting) Dinabolt Ø 12mm(10 s.d.15 cm)

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan bekisting untuk balok beton pracetak (10-12 kali pakai) No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Kode

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.004 0.038 0.004 0.001

m3 Lbr L kg buah

0.005 0.043 0.200 0.046 0.693

BAHAN Kayu kaso 5/7 (lebar 5 cm, tinggi 7 cm) Phenol film 12 mm Minyak cetakan(bekisting) Paku 5 cm - 7 cm Dinabolt Ø 12 mm(10 s.d.15 cm)

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pakai) No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang

0.150

Kode

Satuan

L.01 L.02 L.03

OH OH OH

Koefisien 0.004 0.038 0.004

Mandor B

C

L.04

BAHAN Kayu kaso 5/7 (lebar 5cm, tinggi 7 cm) Phenol film 12 mm Minyak cetakan(bekisting) Paku 5 cm - 7 cm Dinabolt Ø 12 mm(10-15cm)

OH

0.001

m3 Lbr L Kg buah

0.004 0.048 0.200 0.046 0.693

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dan membuka bekisting komponen pelat beton pracetak No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.02 Mandor L.04 B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dan membuka bekisting komponen balok beton pracetak No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.02 Mandor L.04 B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dan membuka bekisting komponen kolom beton pracetak No Uraian Kode A TENAGA

0.150

Satuan OH OH OH

Koefisien 0.053 0.018 0.005

0.150

Satuan OH OH OH

Koefisien 0.089 0.030 0.005

0.150

Satuan

Koefisien

Pekerja Tukang kayu Mandor B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Penuangan/menebar beton komponen untuk pelat pracetak No Uraian A TENAGA Pekerja Tukang batu Tukang vibrator Kepala tukang Mandor B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Penuangan/menebar beton komponen untuk balok pracetak No Uraian A TENAGA Pekerja Tukang batu Tukang vibrator Kepala tukang Mandor B

BAHAN

C

ALAT

D E

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

L.01 L.02 L.04

OH OH OH

0.071 0.024 0.005

0.150

Kode

Satuan

L.01 L.02 L.02 L.03 L.04

OH OH OH OH OH

Koefisien 0.064 0.244 0.128 0.034 0.073

0.150

Kode

Satuan

L.01 L.02 L.02 L.03 L.04

OH OH OH OH OH

Koefisien 0.069 0.242 0.138 0.037 0.073

0.150

F Harga Satuan Pekerjaan (D+E) Penuangan/menebar beton komponen kolom pracetak No Uraian A TENAGA Pekerja Tukang batu Tukang vibrator Kepala tukang Mandor/Supervisor/Penyelia B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Ereksi komponen untuk pelat pracetak No Uraian A TENAGA Operator crane Pembantu operatorcrane Pekerja Tukang batu Tukang ereksi Kepala tukang Mandor B

C

D E F

Satuan

L.01 L.02 L.02 L.03 L.04

OH OH OH OH OH

Koefisien 0.061 0.213 0.122 0.033 0.073

0.150

Kode

Satuan

L.08 L.09 L.01 L.02 L.02 L.03 L.04

OH OH OH OH OH OH OH

0.067 0.067 0.067 0.067 0.134 0.067 0.067

BAHAN Solar

L

6.676

ALAT Sewa crane Sewa pipe support

unit buahhari hari

0.067 1.100

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E) 1 2 3 4 5

Kode

Koefisien

0.150

6 7 8 9 1 11 12 13 14 15 16 17 18 19 2 21 22 23 24 Ereksi komponen untuk balok pracetak No Uraian A TENAGA Operator crane Pembantu operator crane Pekerja Tukang batu Tukang ereksi Kepala tukang Mandor B

C

D E F

Kode

Satuan

L.08 L.09 L.01 L.02 L.02 L.03 L.04

OH OH OH OH OH OH OH

0.061 0.061 0.061 0.061 0.122 0.061 0.061

BAHAN Solar

L

6.110

ALAT Sewa crane Sewa scaffolding

unit hari unit hari

0.061 1.100

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E) 1 2 3 4

Koefisien

0.150

5 6 7 8 9 1 11 12 13 14 15 16 17 18 19 2 21 22 23 24 Ereksi komponen untuk kolom pracetak No Uraian A TENAGA Operator crane Pembantu operatorcrane Pekerja Tukang batu Tukang ereksi Kepala tukang Mandor B

C

D E F

Kode

Satuan

L.08 L.09 L.01 L.02 L.02 L.03 L.04

OH OH OH OH OH OH OH

0.083 0.083 0.083 0.083 0.166 0.083 0.083

BAHAN Solar

L

8.277

ALAT Sewa crane Sewa pipe support

unit hari buah hari

0.083 2.200

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E) 1 2 3

Koefisien

0.150

4 5 6 7 8 9 1 11 12 13 14 15 16 17 18 19 2 21 22 23 24 Langsir komponen untuk pelat pracetak (± 20 m) No Uraian A TENAGA Operator crane Pembantu operatorcrane Pekerja Tukang batu B

C

Kode

Satuan

L.08 L.09 L.01 L.02

OH OH OH OH

0.019 0.019 0.019 0.038

BAHAN Solar

L

1.897

ALAT Sewa crane

unit hari

0.019

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Langsir komponen untuk balok pracetak (± 20 m) No Uraian A TENAGA Operator crane Pembantu operatorcrane Pekerja Tukang batu

Koefisien

0.150

Kode

Satuan

L.08 L.09 L.01 L.02

OH OH OH OH

Koefisien 0.019 0.019 0.019 0.038

B

C

BAHAN Solar

L

1.897

ALAT Sewa crane

unit hari

0.019

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Langsir komponen untuk kolom pracetak (± 20 m) No Uraian A TENAGA Operator crane Pembantu operatorcrane Pekerja Tukang batu B

C

Kode

Satuan

L.08 L.09 L.01 L.02

OH OH OH OH

0.019 0.019 0.019 0.038

BAHAN Solar

L

1.897

ALAT Sewa crane

unit hari

0.019

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Bahan grout campuran No Uraian A TENAGA B

C

0.150

Koefisien

0.150

Kode

BAHAN Semen grout Screening Air

Satuan

Kg Kg L

Koefisien

1,200.000 650.000 350.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Bahan grout (tidak campuran) No Uraian

0.150

Kode

Satuan

Koefisien

A

TENAGA

B

BAHAN Semen grout Air

C

B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bekisting joint pracetak No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor

C

D E F

1,850.000 400.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Upah pekerjaan grout pada joint beton pracetak No Uraian A TENAGA Tukang batu Kepala tukang Mandor

B

Kg L

BAHAN Kayu kaso 5/7 (lebar 5 cm, tinggi 7 cm) Papan cor Paku 5 cm - 7 cm

0.150

Kode

Satuan

L.02 L.03 L.04

OH OH OH

Koefisien 0.367 0.074 0.037

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.147 0.147 0.015 0.005

m3 m3 Kg

0.012 0.004 0.264

ALAT

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

0.150

Upah joint dengan sling No Uraian A TENAGA Pekerja Tukang kayu Tukang besi Mandor B

BAHAN

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan besi profil No Uraian A TENAGA Pekerja Tukang laskonstruksi Kepala tukang Mandor B

C

C

Satuan

L.01 L.02 L.02 L.04

OH OH OH OH

Koefisien 0.220 0.022 0.220 0.011

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.060 0.060 0.006 0.003

Kg

1.150

BAHAN Besi Profil

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rangka kuda-kuda baja IWF No Uraian A TENAGA Pekerja Tukang laskonstruksi Kepala tukang Mandor B

Kode

BAHAN Besi baja IWF ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.060 0.060 0.006 0.003

Kg

1.150

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengerjaan 100 kg pekerjaan perakitan No Uraian A TENAGA Pekerja Tukang besikonstruksi Kepala tukang Mandor B

C

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.100 0.100 0.001 0.005

BAHAN Solar Minyak pelumas

Liter Liter

1.000 0.100

ALAT Sewa alat

Jam

0.800

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku No Uraian Kode A TENAGA Pekerja L.01 Tukang las biasa L.03 Kepala tukang L.03 Mandor L.04 B

C

BAHAN Besi siku L 30.30.3 Besi pelat baja Kawat las

Koefisien

0.150

Satuan

Koefisien

OH OH OH OH

1.050 1.050 0.105 0.052

Kg Kg Kg

15.000 32.800 0.050

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengerjaan 10 cm pengelasan dengan las listrik No Uraian

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang besikonstruksi Kepala tukang Mandor

OH OH OH OH

0.040 0.020 0.002 0.002

BAHAN Kawat las listrik Solar Minyak pelumas

Kg Liter Liter

0.400 0.300 0.040

ALAT Sewa alat Las Listrik

Jam

0.170

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan rangka jendela besi scuare tube No Uraian A TENAGA Pekerja Tukang las biasa Kepala tukang Mandor B

C

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.650 0.650 0.065 0.032

m m cm

4.760 4.522 20.000

BAHAN Besi scuare tube Besi lis kaca (1 x 1)cm Pengelasan

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pintu rolling door besi No Uraian A TENAGA Pekerja Tukang las biasa Kepala tukang Mandor B

L.01 L.03 L.03 L.04

BAHAN

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

Koefisien 1.200 1.200 0.120 0.006

Pintu gulung besi C

C

C

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.440 0.440 0.044 0.022

m2

1.000

BAHAN Pintu lipat

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan sunscreen alluminium No Uraian A TENAGA Pekerja Tukang Kepala tukang Mandor B

1.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pintu lipat (folding door) bahan plastik/PVC No Uraian A TENAGA Pekerja Tukang Kepala tukang Mandor B

m2

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.080 0.800 0.080 0.004

m2

1.000

BAHAN Sunscreenalluminium

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rolling door alluminium No Uraian

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang khususalumunium Kepala tukang Mandor BAHAN Rolling dooralluminium

C

1.000 1.000 0.100 0.050

m2

1.000

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.043 0.043 0.004 0.002

m buah Tube

1.100 2.000 0.060

BAHAN Profil alluminium Skrup fixer Sealant

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pintu alluminium strip lebar 8 cm No Uraian A TENAGA Pekerja Tukang khususallumunium Kepala tukang Mandor B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kusen pintu alluminium No Uraian A TENAGA Pekerja Tukang khususalumunium Kepala tukang Mandor B

L.01 L.03 L.03 L.04

BAHAN Profil alluminium Alluminium strip

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.085 0.085 0.009 0.004

m m

4.400 14.600

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pintu kaca rangka alluminium No Uraian A TENAGA Pekerja Tukangallumunium/kaca Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.085 0.085 0.009 0.005

m m Tube

4.400 4.500 0.270

BAHAN Pintu alluminium Profil kaca Sealant

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan venetions blinds dan vertical blinds No Uraian A TENAGA Pekerja Tukang Kepala tukang Mandor B

0.150

BAHAN Venetions blinds danvertical blinds (tirai)

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.350 0.350 0.035 0.018

m2

1.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan terali besi strip (2 x 3) mm

0.150

No A

B

C

Uraian TENAGA Pekerja Tukang las Kepala tukang Mandor

C

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

1.670 1,670.000 0.167 0.083

kg cm

6.177 27.080

ALAT

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.100 0.100 0.010 0.005

m2 cm kg

1.100 11.110 1.716

BAHAN Kawat nyamuk Pengelasan Baja strip (0,2 x 2) cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan jena nako & tralis No Uraian A TENAGA Pekerja Tukang Kepala tukang Mandor B

Satuan

BAHAN Besi strip Pengelasan

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kawat nyamuk No Uraian A TENAGA Pekerja Tukang Kepala tukang Mandor B

Kode

BAHAN

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

Koefisien 0.200 0.200 0.020 0.001

Jendela nako(rangka + kaca 5 mm) Paku skrup1 cm – 2,5 cm Besi strip C

C

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.200 0.200 0.020 0.001

m kg m3

1.050 0.015 0.019

BAHAN Seng pelat Paku 1 cm - 2,5 cm Papan kayu kelas IIatau III

C

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm No Uraian Kode A TENAGA Pekerja L.01 Tukang L.03 Kepala tukang L.03 Mandor L.04 B

1.100 10.000 7.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan talang datar/jurai seng bjls 28 lebar 90 cm No Uraian A TENAGA Pekerja Tukang Kepala tukang Mandor B

m2 buah m

BAHAN Seng pelat Paku 1 cm – 2,5 cm Besi strip ALAT

0.150

Satuan

Koefisien

OH OH OH OH

0.150 0.300 0.030 0.008

m kg kg

1.050 0.010 0.500

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rangka besi hollow 1 x 40.40.2mm, modul 60 x 120 cm, untuk partisi No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang besi L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

BAHAN Rangka metal hollow 40.40.2mm Assesoris (perkuatan, las dll)

C

C

Koefisien 0.250 0.250 0.025 0.013

M1 Ls

3.500 100% x rangka

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rangka besi hollow 1 x 40.40.2mm, modul 60 x 60 cm, untuk plafon No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang besi L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

0.150

BAHAN Rangka metalhollow 40.40.2 mm Assesoris (perkuatan, lasdll)

M1 Ls

0.150

Koefisien 0.350 0.350 0.035 0.018

4.000 100%xrangka

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan atap pelana rangka atap baja canai dingin profil C75 No Uraian Kode A TENAGA

0.150

Satuan

Koefisien

Pekerja Tukang besi Kepala tukang Mandor B

C

OH OH OH OH

0.734 0.734 0.073 0.037

BAHAN Baja ringan canai dingin C75

kg

3.065

ALAT ALAT

%

10.000

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan atap jurai rangka atap baja canai dingin profil C75 No Uraian A TENAGA Pekerja Tukang besi Kepala tukang Mandor B

C

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

C

0.760 7,604.000 0.076 0.038

BAHAN Baja ringan canaidingin C75

kg

4.050

ALAT ALAT

%

10.000

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal 1 batu campuran 1 SP : 2 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

Koefisien

BAHAN Bata merah Semen Portland Pasir pasang ALAT

buah Kg m3

0.150

Koefisien 0.600 0.200 0.020 0.030

140.000 43.500 0.080

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal 1 batu campuran 1 SP : 3 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Bata merah Semen Portland Pasir pasang

buah Kg m3

C

Koefisien 0.600 0.200 0.020 0.030

140.000 32.950 0.091

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal 1 batu campuran 1 SP : 4 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala bukang L.03 OH Mandor L.04 OH B

0.150

BAHAN Bata merah SemenPortland Pasir Pasang

buah Kg m3

0.150

Koefisien 0.600 0.200 0.020 0.030

140.000 26.550 0.093

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal 1 batu campuran 1 SP : 5 PP

0.150

No A

B

C

Uraian TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN Bata merah Semen Portland Pasir pasang

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

buah Kg m3

C

0.600 0.200 0.020 0.030

140.000 22.200 0.102

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan Dinding Bata Merah (5 x 11 x 22) cm tebal 1 batu campuran 1 SP : 6 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

Koefisien

BAHAN Bata merah Semen Portland Pasir pasang

buah Kg m3

0.150

Koefisien 0.600 0.200 0.020 0.030

140.000 18.500 0.122

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal 1 batu campuran 1 SP : 3 KP : 10 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH

0.150

Koefisien 0.600 0.200 0.020 0.030

B

BAHAN Bata merah Semen Portland Kapur padam Pasir pasang

C

buah Kg m3 m3

140.000 10.080 0.028 0.093

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 2 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

BAHAN Bata merah Semen Portland Pasir pasang

C

buah Kg m3

0.150

Koefisien 0.300 0.100 0.010 0.015

70.000 18.950 0.038

ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

0.150

Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 3 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Bata merah Semen Portland Pasir pasang ALAT

buah Kg m3

Koefisien 0.300 0.100 0.010 0.015 JUMLAH TENAGA KERJA 70.000 14.370 0.040 JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E)

10.00%

Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 4 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Bata merah Semen Portland Pasir pasang

buah Kg m3

Koefisien 0.300 0.100 0.010 0.015 JUMLAH TENAGA KERJA 70.000 11.500 0.043 JUMLAH HARGA BAHAN

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E)

15.00%

Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 5 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Bata merah Semen Portland Pasir pasang

buah Kg m3

Koefisien 0.300 0.100 0.010 0.015

70.000 9.680 0.045

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 6 PP

0.150

No A

B

C

Uraian TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN Bata merah Semen Portland Pasir pasang

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

buah Kg m3

C

0.300 0.100 0.010 0.015

70.000 8.320 0.049

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 8 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

Koefisien

BAHAN Bata merah Semen Portland Pasir pasang

buah Kg m3

0.150

Koefisien 0.300 0.100 0.010 0.015

70.000 6.500 0.050

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) 0.150 F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1 SP : 3 KP : 10 PP No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01 OH 0.300 Tukang batu L.02 OH 0.100 Kepala tukang L.03 OH 0.010 Mandor L.04 OH 0.015

B

C

BAHAN Bata merah Semen Portland Kapur padam Pasir pasang

buah Kg m3 m3

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1SM : 1 KP : 1 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Bata merah Semen merah Kapur padam Pasir pasang

buah Kg m3 m3

0.150

Koefisien 0.300 0.100 0.010 0.015

70.000 0.018 0.018 0.018

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata merah (5 x 11 x 22) cm tebal ½ batu campuran 1SM : 1 KP : 2 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

70.000 4.500 0.015 0.050

BAHAN Bata merah Semen merah Kapur padam Pasir pasang

buah Kg m3 m3

0.150

Koefisien 0.300 0.100 0.010 0.015

70.000 0.014 0.014 0.028

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding conblock HB20 campuran 1 SP : 3 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.350 0.150 0.015 0.018

m3 Kg m3 Kg

12.500 30.320 0.728 0.280

BAHAN HB-20 Semen Portland Pasir pasang Besi angker diameter 8

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding conblock HB20 campuran 1 SP : 4 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN HB-20 Semen Portland Pasir pasang Besi angker diameter 8 ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.350 0.150 0.015 0.018

m3 Kg m3 Kg

12.500 24.260 0.772 0.280

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding conblock HB15 campuran 1 SP : 3 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.320 0.120 0.012 0.016

m3 Kg m3 Kg

12.500 22.740 0.550 0.280

BAHAN HB-15 Semen Portland Pasir pasang Besi angkerdiameter 8

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan 1 cm2 dinding conblock HB15 campuran 1 SP : 4 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.320 0.120 0.012 0.016

m3 Kg m3 Kg

12.500 18.200 0.582 0.280

BAHAN HB-15 Semen Portland Pasir pasang Besi angkerdiameter 8

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan 1 cm2 dinding conblock HB10 campuran 1 SP : 3 PP No Uraian

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN HB-10 Semen Portland Pasir pasang Besi angkerdiameter 8

C

OH OH OH OH

0.300 0.100 0.010 0.015

m3 Kg m3 Kg

12.500 15.160 0.364 0.280

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan 1 cm2 dinding conblock HB10 campuran 1 SP : 4 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

BAHAN HB-10 Semen Portland Pasir pasang Besi angkerdiameter 8

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.300 0.100 0.010 0.015

m3 Kg m3 Kg

12.500 12.130 0.388 0.280

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan 1 cm2 dinding terawang (rooster) 12 x 11 x 24 campuran 1 SP : 3 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH

0.150

Koefisien 0.300 0.100 0.010 0.015

B

C

BAHAN Bata rooster Semen Portland Pasir pasang

m3 Kg m3

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan 1 cm2 dinding terawang (rooster) 12 x 11 x 24 campuran 1 SP : 4 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Bata berongga Semen Portland Pasir pasang

m3 Kg m3

C

0.150

Koefisien 0.300 0.100 0.010 0.015

30.000 11.000 0.035

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan 1 cm2 dinding bata berongga ekspose 12 x 11 x 24 campuran 1 SP : 3 PP No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang batu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

30.000 11.000 0.035

BAHAN Bata rooster Semen Portland Pasir pasang ALAT

m3 Kg m3

0.150

Koefisien 0.300 0.150 0.015 0.015

70.000 14.000 0.032

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata ringan tebal 7,5 cm dengan mortar siap pakai No Uraian Kode A TENAGA Pekerja L.01 Tukang batu L.02 Kepala tukang L.03 Mandor L.04 B

C

C

Satuan

Koefisien

OH OH OH OH

0.670 1,300.000 0.130 0.003

BAHAN Bata ringan tebal7,5cm Mortar siap pakai

m3 Kg

8.400 0.473

ALAT ALAT

%

10.000

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap pakai No Uraian Kode A TENAGA Pekerja L.01 Tukang batu L.02 Kepala tukang L.03 Mandor L.04 B

0.150

0.150

Satuan

Koefisien

OH OH OH OH

0.671 1,300.000 0.130 0.003

BAHAN Bata ringan tebal10cm Mortar siap pakai

m3 Kg

8.400 0.063

ALAT ALAT

%

10.000

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 1 PP tebal 15 mm No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang batu Kepala tukang Mandor B

C

BAHAN PC PP

C

0.300 0.150 0.015 0.015

Kg m3

15.504 0.016

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.300 0.150 0.015 0.015

Kg m3

10.224 0.020

BAHAN PC PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 3 PP tebal 15mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 2 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.03 L.03 L.04

BAHAN PC PP

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.300 0.150 0.015 0.015

Kg m3

7.776 0.023

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 4 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.300 0.150 0.015 0.015

Kg m3

6.240 0.024

BAHAN PC PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 5 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.300 0.150 0.015 0.015

Kg m3

5.184 0.026

BAHAN PC PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 6 PP tebal 15 mm No Uraian

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN PC PP

C

0.300 0.150 0.015 0.015

Kg m3

4.416 0.027

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.300 0.150 0.015 0.015

Kg m3

3.936 0.028

BAHAN PC PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 8 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 7 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.03 L.03 L.04

BAHAN PC PP

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.300 0.150 0.015 0.015

Kg m3

3.456 0.029

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 1/2 KP : 3 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

D E

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.360 0.120 0.012 0.018

Kg m3 m3

5.760 0.003 0.013

BAHAN PC KP PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 2 KP : 8 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN PC KP PP

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.360 0.120 0.012 0.018

Kg m3 m3

3.000 0.005 0.020

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

0.150

F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1SM : 1 KP : 1 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.360 0.120 0.012 0.018

m3 m3 m3

0.009 0.009 0.009

BAHAN SM KP PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1SM : 1 KP : 2 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Kode

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.360 0.120 0.012 0.018

m3 m3 m3

0.007 0.007 0.015

BAHAN SM KP PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 1 PP tebal 20 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang

0.150

Kode

Satuan

L.01 L.03 L.03

OH OH OH

Koefisien 0.400 0.200 0.020

Mandor B

C

BAHAN PC PP

C

C

0.022

Kg m3

13.632 0.027

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.260 0.200 0.020 0.013

Kg m3

10.368 0.031

BAHAN PC PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 4 PP tebal 20 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 3 PP tebal 20 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.04

BAHAN PC PP ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.400 0.200 0.020 0.022

Kg m3

8.320 0.032

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 5 PP tebal 20 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.400 0.200 0.020 0.022

Kg m3

6.912 0.035

BAHAN PC PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1 SP : 6 PP tebal 20 mm No Uraian A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.400 0.200 0.020 0.022

Kg m3

5.888 0.036

BAHAN PC PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran 1SM : 1 KP : 2 PP tebal 20 mm No Uraian A TENAGA Pekerja Tukang batu

0.150

Kode

Satuan

L.01 L.03

OH OH

Koefisien 0.440 0.220

Kepala tukang Mandor B

C

BAHAN SM KP PP

C

C

0.022 0.022

m3 m3 m3

0.009 0.009 0.018

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.150 0.075 0.008 0.008

Kg m3

5.184 0.026

BAHAN PC PP

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran skoning 1 SP : 3 PP lebar 10 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan berapen 1 SP : 5 PP tebal 15 mm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.03 L.04

BAHAN Semen PC Pasir pasang ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.080 0.400 0.040 0.004

Kg m3

0.500 0.013

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran granit 1 SP : 2 granit tebal 1 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.450 0.225 0.023 0.023

Kg Kg

10.000 15.000

BAHAN Semen PC Batu granit

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran traso 1 SP : 2 traso tebal 1 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.450 0.225 0.023 0.023

Kg Kg

10.000 15.000

BAHAN Semen PC Batu traso

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran ciprat 1 SP : 2 PP No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang batu Kepala tukang Mandor B

C

BAHAN Semen PC Pasir pasang

C

C

0.300 0.100 0.010 0.015

Kg Kg

4.320 0.006

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.150 0.075 0.008 0.008

Kg

3.108

BAHAN Semen PC

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan finishing siar pasangan conblock ekspose No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan finishing siar pasangan bata merah No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.03 L.03 L.04

BAHAN Semen PC ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.070 0.035 0.004 0.004

Kg

1.600

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan finishing siar pasangan batu kali, campuran 1 SP : 2 PP No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.300 0.150 0.015 0.015

Kg m3

6.340 0.012

BAHAN Semen PC Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan acian No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.200 0.100 0.010 0.010

Kg

3.250

BAHAN Semen PC

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran dengan mortar siap pakai (MSP) No Uraian A TENAGA Pekerja Tukang batu

0.150

Kode

Satuan

L.01 L.03

OH OH

Koefisien

Kepala tukang Mandor B

C

BAHAN MSP

C

C

Kg

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

BAHAN MSP

Koefisien

Kg

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin PC abu-abu ukuran 40 cm x 40 cm No Uraian A TENAGA Pekerja Tukang atu Kepala tukang Mandor B

OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plesteran acian mortar siap pakai (MSP) No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.03 L.04

BAHAN Ubin abu-abu Semen Portland Pasir pasang ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.250 0.125 0.013 0.013

buah kg M3

6.630 9.800 0.045

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin PC abu-abu ukuran 30 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.250 0.125 0.013 0.013

Bh kg M3

11.870 10.000 0.045

BAHAN Ubin abu-abu Semen Portland Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin PC abu-abu ukuran 20 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Ubin abu-abu Semen Portland Pasir pasang

buah kg M3

Koefisien 0.270 0.135 0.014 0.014

26.500 10.400 0.045

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin warna ukuran 40 cm x 40 cm No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang datu Kepala tukang Mandor B

C

BAHAN Ubin warna Semen Portland Semen warna Pasir pasang

C

OH OH OH OH

0.250 0.125 0.013 0.013

Bh kg Kg M3

6.630 9.800 0.600 0.045

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin warna ukuran 30 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.260 0.130 0.013 0.013

Bh kg Kg M3

11.870 10.000 0.600 0.045

BAHAN Ubin warna Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin warna ukuran 20 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.270 0.135 0.014 0.014

B

C

BAHAN Ubin warna Semen Portland Semen warna Pasir pasang

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.250 0.125 0.013 0.013

Bh kg Kg M3

6.630 9.800 1.300 0.045

BAHAN Ubin teraso Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin teraso ukuran 30 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

26.500 10.400 1.000 0.045

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin teraso ukuran 40 cm x 40 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Bh kg Kg M3

BAHAN Ubin teraso Semen Portland Semen warna Pasir pasang

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.260 0.130 0.013 0.013

Bh kg Kg M3

11.870 10.000 1.500 0.045

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin granit ukuran 40 cm x 40 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.250 0.125 0.013 0.013

Bh kg Kg M3

6.630 9.800 1.300 0.045

BAHAN Ubin granit Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin granit ukuran 30 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN Ubin granit Semen Portland Semen warna Pasir pasang ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.260 0.130 0.013 0.013

Bh kg Kg M3

11.870 10.000 1.500 0.045

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin teralux marmer ukuran 40 cm x 40 cm No Uraian A TENAGA Pekerja Tukang Batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.250 0.125 0.013 0.013

Bh kg Kg M3

6.630 9.800 1.300 0.045

BAHAN Ubin teralux Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin teralux ukuran 30 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.260 0.130 0.013 0.013

Bh kg Kg M3

11.870 10.000 1.500 0.045

BAHAN Ubin teralux Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin teralux marmer ukuran 60 cm x 60 cm No Uraian

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang batu Kepala tukang Mandor BAHAN Ubin teraluxmarmer Semen Portland Semen warna Pasir pasang

C

OH OH OH OH

0.240 0.120 0.012 0.012

Bh kg Kg M3

3.100 9.600 1.500 0.045

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin teralux marmer ukuran 40 cm x 40 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.250 0.125 0.013 0.013

Bh kg Kg M3

6.630 9.800 1.300 0.045

BAHAN Ubin teraluxmarmer Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai ubin teralux marmer ukuran 30 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.260 0.130 0.013 0.013

B

C

BAHAN Ubin teraluxmarmer Semen Portland Semen warna Pasir pasang

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg M3

5.300 1.650 0.004

BAHAN Plint ubin PC Semen Portland Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin PC abu-abu ukuran 10 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

11.870 10.000 1.500 0.045

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin PC abu-abu ukuran 15 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Bh kg Kg M3

BAHAN Plint ubin PC Semen Portland Pasir pasang

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg M3

3.530 1.240 0.003

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin PC abu-abu ukuran 10 cm x 40 cm No Uraian A TENAGA Pekerja Tukang Batu Kepala tukang Mandor B

C

C

D E

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg M3

2.650 1.240 0.003

BAHAN Plint ubin PC Semen Portland Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin warna ukuran 10 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN Plint ubin warna Semen Portland Semen warna Pasir pasang

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

2.650 1.140 0.150 0.003

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

0.150

F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin warna ukuran 10 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

3.530 1.140 0.100 0.003

BAHAN Plint ubin warna Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin warna ukuran 10 cm x 40 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Kode

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

2.650 1.140 0.100 0.003

BAHAN Plint ubin warna Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin teraso ukuran 10 cm x 30 cm No Uraian A TENAGA Pekerja

0.150

Kode

Satuan

L.01

OH

Koefisien 0.090

Tukang batu Kepala tukang Mandor B

C

BAHAN Plint ubin teraso Semen Portlan Semen warna Pasir pasang

C

0.090 0.009 0.005

Bh kg Kg M3

3.530 1.140 0.100 0.003

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

2.650 1.140 0.100 0.003

BAHAN Plint ubin teraso Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin granit ukuran 10 cm x 40 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin teraso ukuran 10 cm x 40 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.02 L.03 L.04

BAHAN

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.090 0.090 0.009 0.005

Plint ubin granit Semen Portland Semen warna Pasir pasang C

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

3.530 1.140 0.100 0.003

BAHAN Plint ubin granit Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin teralux kerang ukuran 10 cm x 40 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

2.650 1.140 0.100 0.003

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin granit ukuran 10 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Bh kg Kg M3

BAHAN Plint teralux kerang Semen Portland Semen warna Pasir pasang

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

2.630 1.140 0.100 0.003

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin teralux kerang ukuran 10 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

3.530 1.140 0.100 0.003

BAHAN Plint teralux kerang Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin teralux marmer ukuran 10 cm x 60 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN Plint teraluxmarmer Semen Portland Semen warna Pasir pasang ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

1.700 1.140 0.100 0.003

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin teralux marmer ukuran 10 cm x 40 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

2.650 1.140 0.100 0.003

BAHAN Plint teraluxmarmer Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint ubin teralux marmer ukuran 10 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.009 0.005

Bh kg Kg M3

3.530 1.140 0.100 0.003

BAHAN Plint teraluxmarmer Semen Portland Semen warna Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai teraso cor di tempat, tebal 3 cm No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang batu Kepala tukang Mandor B

C

BAHAN Teraso cor Semen warna

C

0.360 0.180 0.018 0.018

M3 Kg

0.036 0.100

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.700 0.350 0.035 0.035

Bh Kg M3 Kg

53.000 8.190 0.045 2.750

BAHAN Ubin keramik Semen Portland Pasir pasang Semen warna

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai keramik artistik 10 cm x 10 cm atau 5 cm x 20 cm No Uraian Kode A TENAGA Pekerja L.01 Tukang batu L.02 Kepala tukang L.03 Mandor L.04 B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai keramik artistik 10 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

BAHAN Ubin keramik

0.150

Satuan

Koefisien

OH OH OH OH

0.700 0.350 0.035 0.035

Bh

106.000

Semen Portland Pasir pasang Semen warna C

Kg M3 Kg

8.190 0.045 3.200

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai keramik ukuran 33 cm x 33 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.700 0.350 0.035 0.035

doos Kg M3 Kg

1.050 8.190 0.045 0.500

BAHAN Ubin keramik Semen Portland Pasir pasang Semen warna

C

Koefisien

ALAT

D E F

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E)

Pemasangan lantai keramik ukuran 30 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

BAHAN Ubin keramik Semen Portland Pasir pasang Semen warna

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.700 0.350 0.035 0.035 JUMLAH TENAGA KERJA

Doos Kg M3 Kg

1.050 10.000 0.045 0.500 JUMLAH HARGA BAHAN

C

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pemasangan lantai keramik ukuran 20 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

10.00%

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.700 0.350 0.035 0.035 JUMLAH TENAGA KERJA

Doos Kg M3 Kg

1.050 10.400 0.045 0.500 JUMLAH HARGA BAHAN

BAHAN Ubin keramik Semen Portland Pasir pasang Semen warna

Koefisien

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pemasangan lantai keramik ukuran 10 cm x 33 cm untuk variasi/border No Uraian Kode A TENAGA Pekerja L.01 Tukang batu L.02 Kepala tukang L.03 Mandor L.04 B

C

D

BAHAN Ubin keramik Semen Portland Pasir pasang Semen warna ALAT

Jumlah (A+B+C)

10.00%

Satuan

Koefisien

OH OH OH OH

1.050 0.525 0.053 0.053

Bh Kg M3 Kg

33.000 9.800 0.045 4.370

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai keramik mozaik ukuran 30 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.700 0.350 0.035 0.035

Bh Kg M3 Kg

11.870 14.150 0.039 2.000

BAHAN Ubin keramik Semen Portland Pasir pasang Semen warna

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint keramik ukuran 10 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.035 0.005

Bh Kg M3 Kg

5.300 1.140 0.003 0.025

BAHAN Plint keramik Semen Portland Pasir pasang Semen warna

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint keramik ukuran 10 cm x 10 cm No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang batu Kepala tukang Mandor B

C

BAHAN Plint keramik Semen Portland Pasir pasang Semen warna

C

OH OH OH OH

0.090 0.090 0.035 0.005

Bh Kg M3 Kg

10.600 1.140 0.003 0.050

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint keramik ukuran 5 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.090 0.090 0.035 0.005

Bh Kg M3 Kg

5.300 0.570 0.002 0.013

BAHAN Plint keramik Semen Portland Pasir pasang Semen warna

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint internal cove artistik 5 cm x 5 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.750 0.750 0.075 0.038

B

C

BAHAN Internal cove Semen Portland Pasir pasang Semen warna

C

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.700 0.350 0.035 0.035

Bh Kg M3 Kg

1.060 8.190 0.045 0.134

BAHAN Marmer Semen Portland Pasir pasang Semen warna

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai karpet No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

5.300 1.140 0.003 0.100

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai marmer ukuran 100 cm x 100 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Bh Kg M3 Kg

BAHAN Karpet Lem ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.170 0.170 0.017 0.009

m2 Kg

1.050 0.350

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan underlayer (pelapis bawah karpet) No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.120 0.120 0.012 0.006

m2 Kg

1.050 0.350

BAHAN Underlayer Lem

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai parquet kayu No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.700 0.350 0.035 0.035

m2 Kg

1.050 0.600

BAHAN Parquet Lem

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai kayu gymfloor No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang kayu Kepala tukang Mandor B

C

BAHAN Parquet Lem

C

0.700 0.350 0.035 0.035

m2 Kg

1.050 0.600

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.000 0.500 0.050 0.050

Doos Kg M3 Kg

1.050 9.300 0.018 0.500

BAHAN Porslen Semen Portland Pasir pasang Semen warna

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding porselen 10 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding porselen 11 cm x 11 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

BAHAN Porslen

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

buah

Koefisien 0.900 0.450 0.045 0.045

53.000

Semen Portland Pasir pasang Semen warna C

C

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Porslen Semen Portland Pasir pasang Semen warna

buah Kg M3 Kg

Koefisien 0.900 0.450 0.045 0.045

26.000 9.300 0.018 1.940

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding keramik artistik 10 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

9.300 0.018 2.750

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding porselen 20 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Kg M3 Kg

BAHAN Keramik artistik Semen Portland Pasir pasang Semen warna ALAT

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

buah Kg M3 Kg

Koefisien 0.900 0.450 0.045 0.045

53.000 9.300 0.018 2.750

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding keramik artistik 5 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

D E

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Keramik artistik Semen Portland Pasir pasang Semen warna

buah Kg M3 Kg

Koefisien 0.900 0.450 0.045 0.045

106.000 9.300 0.018 2.900

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding keramik 10 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN Keramik artistik Semen Portland Pasir pasang Semen warna

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

buah Kg M3 Kg

Koefisien 0.900 0.450 0.045 0.045

53.000 9.300 0.018 2.750

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

0.150

F

Harga Satuan Pekerjaan (D+E)

Pemasangan dinding keramik 20 cm x 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Keramik artistik Semen Portland Pasir pasang Semen warna

C

Koefisien 0.900 0.450 0.045 0.045

buah Kg M3 Kg

26.500 9.300 0.018 1.940

ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pemasangan dinding keramik 20 cm x 25 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.900 0.450 0.045 0.045 JUMLAH TENAGA KERJA

buah Kg M3 Kg

26.500 9.300 0.018 1.940 JUMLAH HARGA BAHAN

BAHAN Keramik artistik Semen Portland Pasir pasang Semen warna

Koefisien

ALAT JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Pemasangan dinding marmer 100 cm x 100 cm No Uraian A TENAGA

10.00%

Kode

Satuan

Koefisien

Pekerja Tukang batu Kepala tukang Mandor B

C

BAHAN Marmer Semen Portland Pasir pasang Semen warna Paku 12 cm

C

OH OH OH OH

buah Kg M3 Kg buah

1.300 0.650 0.065 0.065

1.060 12.440 0.025 0.650 3.030

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bata pelapis 3 cm x 7 cm x 24 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Bata pelapis Semen Portland Pasir pasang Semen warna

buah Kg M3 Kg

Koefisien 1.000 0.500 0.050 0.050

63.000 12.440 0.025 2.750

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding batu paras No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.700 0.350 0.035 0.035

B

C

BAHAN Batu paras Semen Portland Pasir pasang

C

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Batu tempel hitam Semen Portland Pasir pasang

Buah Kg M3

Koefisien 0.700 0.350 0.035 0.035

1.100 11.750 0.035

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lantai vynil ukuran 30 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

1.100 11.750 0.035

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding batu tempel hitam No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

buah Kg M3

BAHAN Vynil Lem ALAT

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

buah Kg

Koefisien 0.150 0.150 0.015 0.008

11.870 0.350

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan wallpaper lebar 50 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.350 0.175 0.017 0.002

m Kg

2.200 0.250

BAHAN Wallpaper Lem

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan floor harderner No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.120 0.120 0.012 0.006

Kg

5.000

BAHAN Floor harderner

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint vynil 15 cm x 30 cm No Uraian A TENAGA Pekerja Tukang batu

0.150

Kode

Satuan

L.01 L.02

OH OH

Koefisien 0.080 0.080

Kepala tukang Mandor B

C

BAHAN Vynil Lem

C

C

0.008 0.004

buah Kg

1.760 0.080

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.120 0.120 0.012 0.006

M3 Kg

0.003 0.050

BAHAN Papan kayu kelas I Paku/skrup 5 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan paving block natural tebal 6 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan plint kayu tebal 2 cm lebar 10 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.03 L.04

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.250 0.500 0.050 0.001

BAHAN Paving block 6 cm Pasir beton

M2 M3

1.010 0.050

ALAT ALAT

%

10.000

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) Pemasangan paving block natural tebal 8 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.500 0.500 0.050 0.001

BAHAN Paving block 8 cmnatural Pasir beton

M2 M3

1.010 2.070

ALAT ALAT

%

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) Pemasangan paving block berwarna tebal 6 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

0.150 Koefisien

10.000

0.150 Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.250 0.500 0.050 0.001

BAHAN Paving block 6cmberwarna Pasir beton

M2 M3

1.010 0.050

ALAT ALAT

%

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) Pemasangan paving block berwarna tebal 8 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor

Koefisien

10.000

0.150 Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.500 0.500 0.050 0.001

B

C

BAHAN Paving block 8 cmberwarna Pasir beton

M2 M3

ALAT ALAT

%

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.02 Kepala tukang L.03 Mandor L.04 B

C

BAHAN Asbes semen Paku tripleks

C

D

10.000

0.150 Satuan

Koefisien

OH OH OH OH

0.030 0.070 0.007 0.004

m2 kg

1.100 0.010

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan langit-langit akustik ukuran (30 x 30) cm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

1.010 2.070

BAHAN Akustik Paku tripleks ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Lembar kg

Koefisien 0.120 0.120 0.012 0.006

12.000 0.050

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan langit-langit akustik ukuran (30 x 60) cm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.120 0.120 0.012 0.006

Lembar kg

5.800 0.050

BAHAN Akustik Paku tripleks

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan langit-langit akustik ukuran (60 x 120) cm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

BAHAN Akustik Paku tripleks

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.100 0.100 0.010 0.005

Lembar kg

1.500 0.050

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang kayu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH

0.150

Koefisien 0.100 0.100 0.010 0.005

B

C

BAHAN Tripleks Paku tripleks

C

BAHAN Kayu papan Paku tripleks

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.800 0.800 0.080 0.040

m3 kg

0.015 0.010

C

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang kayu L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

0.375 0.030

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan langit-langit lambrisering kayu, tebal 9 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Lembar kg

BAHAN Gypsum board Paku skrup ALAT

Lembar kg

0.150

Koefisien 0.100 0.050 0.005 0.005

0.364 0.110

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang besi L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Profil Allum "T" Kawat Ø 4 mm Ramset Akustik 60 x 120

C

Koefisien 0.500 0.500 0.050 0.025

3.600 0.150 1.050 1.500

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan list langit-langit kayu profil No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

m kg Buah Lembar

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.050 0.050 0.005 0.003

m kg

1.050 0.010

BAHAN List kayu profil Paku

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap genteng palentong kecil No Uraian A TENAGA Pekerja

0.150

Kode

Satuan

L.01

OH

Koefisien 0.150

Tukang kayu Kepala tukang Mandor B

C

BAHAN Genteng palentong

C

C

buah

0.075 0.008 0.008

25.000

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

BAHAN Genteng kodok

buah

Koefisien 0.150 0.075 0.008 0.008

25.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap genteng palentong besar/super No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap genteng kodok glazuur No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

L.03 L.11 L.15

BAHAN Genteng kodok ALAT

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

buah

Koefisien 0.150 0.075 0.008 0.008

12.000

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bubung genteng palentong No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.400 0.200 0.020 0.002

Buah Kg M3

5.000 8.000 0.032

BAHAN Genteng bubung Semen Portland Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bubung genteng kodok glazuur No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.400 0.200 0.020 0.002

buah Kg M3

5.000 8.000 0.032

BAHAN Genteng bubung Semen Portland Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bubung genteng palentong besar No Uraian A TENAGA Pekerja

0.150

Kode

Satuan

L.01

OH

Koefisien 0.400

Tukang kayu Kepala tukang Mandor B

C

BAHAN Genteng bubung Semen Portland Pasir pasang

C

0.200 0.020 0.002

buah Kg M3

4.000 8.000 0.032

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.067 0.007 0.007

Lbr Kg

0.600 0.050

BAHAN Rooflight 90 x 180 Paku 1 cm - 2,5 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 0,92 m x 2,5 m x 5 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan roof light fibreglass 90 x 180 No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

L.03 L.11 L.15

BAHAN Asbes gel 92 x 250 Paku pancing 6 x 23

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.075 0.008 0.008

Lbr Kg

0.500 0.120

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 0,92 m x 2,25 m x 5 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.075 0.008 0.008

Lbr Kg

0.600 0.120

BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 0,92 m x 2,00 m x 5 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.600 0.120

BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 0,92 m x 1,80 m x 5 mm No Uraian

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang kayu Kepala tukang Mandor BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

C

0.140 0.070 0.007 0.007

Lbr Kg

0.750 0.120

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.350 0.120

BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 1,05 m x 2,70 m x 4 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 1,05 m x 3,00 m x 4 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

L.01 L.03 L.11 L.15

BAHAN Asbes gel 92 x 250 Paku pancing 6 x 23

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.420 0.120

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 1,05 m x 2,40 m x 4 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.440 0.120

BAHAN Asbes gel 92 x 250 Paku pancing 6 x 23

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 1,05 m x 2,10 m x 4 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.510 0.120

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 1,05 m x 1,50 m x 4 mm

0.150

No A

B

C

Uraian TENAGA Pekerja Tukang kayu Kepala tukang Mandor

C

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.800 0.120

ALAT

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.370 0.120

BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 1,08 m x 2,70 m x 6 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Satuan

BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 1,08 m x 3,00 m x 6 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Kode

BAHAN Asbes gel 92 x 250

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr

0.380

Paku pancing 6 x23 C

C

C

D E F

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.460 0.120

BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 1,08 m x 2,10 m x 6 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.120

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap asbes gelombang 1,08 m x 2,40 m x 6 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Kg

BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.490 0.120

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E)

0.150

Pemasangan atap asbes gelombang 1,08 m x 1,80 m x 6 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.140 0.070 0.007 0.007

Lbr Kg

0.570 0.120

ALAT

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.084 0.125 0.013 0.004

Lbr buah

2.400 6.000

BAHAN Bubung stel gel. Paku skrup 3,5”

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bubung stel gelombang 1,05 m No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Satuan

BAHAN Asbes gel 92 x 250 Paku pancing 6 x23

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bubung stel gelombang 0,92 m No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Kode

BAHAN

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

Koefisien 0.084 0.125 0.013 0.004

Bubung stel gel. Paku skrup 3,5” C

C

C

D E

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.084 0.125 0.013 0.004

Lbr buah

2.050 6.000

BAHAN Bubung stel gel. Paku skrup 3,5”

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan nok paten 0,92 m No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

2.100 6.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bubung stel gelombang 1,08 m No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Lbr buah

BAHAN Nok paten 92 cm Paku skrup 3,5”

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.084 0.125 0.013 0.004

Lbr buah

1.200 6.000

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

0.150

F Harga Satuan Pekerjaan (D+E) Pemasangan nok paten 1,05 m No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.084 0.125 0.013 0.004

Lbr buah

1.200 6.000

BAHAN Nok paten 92 cm Paku skrup 3,5”

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan nok paten 1,08 m No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Kode

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.084 0.125 0.013 0.004

Lbr buah

1.200 6.000

BAHAN Nok paten 92 cm Paku skrup 3,5”

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan nok stel rata 0,92 m No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

Koefisien 0.100 0.150 0.013 0.004

B

C

BAHAN Nok paten 92 cm Paku skrup 3,5”

C

C

D

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.084 0.125 0.013 0.004

Lbr buah

1.100 6.000

BAHAN Nok paten 92 cm Paku skrup 3,5”

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan genteng beton No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

1.100 6.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan nok stel rata 1,05 m No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Lbr buah

BAHAN Genteng beton Paku biasa 2”-5” ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

buah Kg

Koefisien 0.200 0.100 0.010 0.010

11.000 0.030

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan genteng aspal No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.200 0.300 0.003 0.010

Buah Lbr Kg buah

6.900 0.350 0.030 0.500

BAHAN Genteng aspal Plywood 6 mm Paku 1 cm - 2,5 cm Plastic aerator

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan genteng metal ukuran 80 x 100 atap pelana No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.200 0.100 0.010 0.001

buah Kg

1.300 0.200

BAHAN Genteng metal Paku 1 cm - 2,5 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan genteng metal ukuran 80 x 100 atap jurai No Uraian A TENAGA Pekerja Tukang kayu

0.150

Kode

Satuan

L.01 L.03

OH OH

Koefisien 0.200 0.100

Kepala tukang Mandor B

C

BAHAN Genteng metal Paku 1 cm - 2,5 cm

C

0.010 0.001

buah Kg

2.000 0.200

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

BAHAN Sirap kayu Paku 1 cm - 2,5 cm

buah Kg

Koefisien 0.166 0.250 0.025 0.008

30.000 0.200

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan nok genteng beton No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap sirap kayu No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

L.11 L.15

BAHAN Nok genteng beton Paku 1 cm - 2,5 cm Semen PC Pasir pasang Semen warna

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

buah Kg Kg M3 Kg

Koefisien 0.400 0.200 0.020 0.020

3.500 0.050 10.800 0.032 1.000

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan nok genteng aspal No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

D E F

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.125 0.250 0.025 0.006

buah Kg M3

2.000 0.050 0.004

BAHAN Nok genteng aspal Paku 1 cm - 2,5 cm Kayu balok borneo

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan nok genteng metal No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

BAHAN Nok genteng metal Paku 1 cm - 2,5 cm

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.250 0.150 0.015 0.013

buah Kg

1.100 0.050

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E)

0.150

Pemasangan nok sirap No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.125 0.250 0.025 0.006

Lbr Kg Kg

0.400 0.050 0.050

BAHAN Seng pelat 3" x 6” Paku 1 cm - 2,5 cm Paku biasa 2”-5”

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap seng gelombang No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Kode

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.120 0.060 0.006 0.006

Lbr Kg

0.700 0.020

BAHAN Seng gel 3”x6” Paku 1 cm - 2,5 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan nok atap seng No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

Koefisien 0.150 0.070 0.007 0.006

B

C

BAHAN Seng pelat 3”x6” bjls28 Paku 1 cm - 2,5 cm

C

C

D

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.150 0.750 0.080 0.006

Lbr Kg

1.050 0.020

BAHAN Aluminium geltebal 0,55 Paku hak panjang15 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan nok alumunium No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.300 0.040

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan atap alumunium No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Lbr Kg

BAHAN Nok standar 40 x 18 Paku hak panjang15 cm ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.11 L.15

OH OH OH OH

0.100 1.000 0.100 0.050

buah Kg

1.200 0.040

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan alumunium foil/sisalation No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

0.150

Kode

Satuan

L.01 L.03 L.11 L.15

OH OH OH OH

0.150 0.050 0.005 0.008

M2

1.050

BAHAN Aluminium foil ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan dan pemasangan kusen pintu dan kusen jena, kayu kelas I No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.03 Kepala tukang L.03 Mandor L.04 B

C

Koefisien

BAHAN Balok kayu Paku 10 cm Lem kayu

0.150

Satuan

Koefisien

OH OH OH OH

7.000 21.000 2.100 0.350

m3 Kg Kg

1.100 1.250 1.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan dan pemasangan kusen pintu dan kusen jena, kayu kelas II atau III No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.03 Kepala tukang L.03 Mandor L.04

0.150

Satuan OH OH OH OH

Koefisien 6.000 18.000 1.800 0.300

B

C

BAHAN Balok kayu Paku 10 cm Lem kayu

C

C

D

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.350 1.050 0.105 0.018

m3 Kg

0.040 0.050

BAHAN Papan kayu Paku 5 cm - 7 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas III No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

1.200 1.250 1.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan dan pemasangan pintu klamp standar, kayu kelas II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

m3 Kg Kg

BAHAN Papan kayu Paku 5 cm - 7 cm ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.350 1.050 0.105 0.018

m3 Kg

0.040 0.050

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

1.000 3.000 0.300 0.050

m3 Kg

0.040 0.500

BAHAN Papan kayu Lem kayu ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan dan pemasangan pintu dan jena kaca, kayu kelas I atau II No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.03 Kepala tukang L.03 Mandor L.04 B

C

Koefisien

BAHAN Papan kayu Lem kayu

0.150

Satuan

Koefisien

OH OH OH OH

0.800 2.400 0.240 0.040

m3 Kg

0.024 0.300

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan dan pemasangan pintu dan jena jalusi kayu kelas I atau II No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.03 Kepala tukang L.03 Mandor L.04

0.150

Satuan OH OH OH OH

Koefisien 1.000 3.000 0.300 0.050

B

C

BAHAN Papan kayu Lem kayu

m3 Kg

0.064 0.500

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) 0.150 F Harga Satuan Pekerjaan (D+E) Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) No Uraian Kode Satuan Koefisien A TENAGA Pekerja L.01 OH 0.700 Tukang kayu L.03 OH 2.100 Kepala tukang L.03 OH 0.210 Mandor L.04 OH 0.035 B

C

BAHAN Papan kayu Paku 1 cm – 2,5 cm Lem kayu Plywood tebal 4 mmUkuran (90 x 220) cm

C

0.025 0.030 0.500 1.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pembuatan pintu plywood rangkap, rangka expose kayu kelas I atau II No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.03 Kepala tukang L.03 Mandor L.04 B

m3 kg kg Lembar

BAHAN Papan kayu Paku 1 cm – 2,5cm Lem kayu Plywood 4 mm(90 x 220) cm ALAT

0.150

Satuan

Koefisien

OH OH OH OH

0.800 2.400 0.240 0.040

m3 kg kg Lembar

0.026 0.030 0.500 1.000

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan jalusi kusen, kayu kelas I atau II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.670 2.000 0.200 0.335

m3 kg

0.060 0.150

BAHAN Papan kayu Paku 1 cm - 2,5 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan teakwood rangkap, rangka expose kayu kelas I No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.800 2.400 0.240 0.040

m3 kg kg Lembar

0.025 0.030 0.300 1.000

BAHAN Papan kayu Paku 1 cm - 2,5 cm Lem kayu Teakwood 4 mm90 x 220 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan teakwood rangkap lapis formika, rangka expose kayu kelas II No Uraian Kode A TENAGA

0.150

Satuan

Koefisien

Pekerja Tukang kayu Kepala tukang Mandor B

C

L.01 L.03 L.03 L.04

BAHAN Papan kayu Paku 1 cm - 2,5 cm Lem kayu Teakwood 4 mm90 x 220 cm Formika

OH OH OH OH

0.850 2.550 0.255 0.043

m3 kg kg Lembar Lembar

0.025 0.030 0.800 1.000 0.500

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang kayu L.03 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Balok kayu Besi strip tebal 5mm Paku 12 cm

Koefisien 4.000 12.000 1.200 0.200

1.100 15.000 5.600

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan konstruksi kuda-kuda expose, kayu kelas I No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

m3 kg kg

0.150

BAHAN Balok kayu Besi strip tebal 5mm

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

6.700 20.100 2.010 0.335

m3 kg

1.200 15.000

Paku 12 cm C

C

C

D E

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

6.700 20.100 2.010 0.335

m3 kg kg

1.100 15.000 3.000

BAHAN Balok kayu Besi strip tebal 5 mm Paku 12 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rangka atap genteng keramik, kayu kelas II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

5.600

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan konstruksi gordeng, kayu kelas II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

kg

BAHAN Kaso-kaso 5 x 7cm Reng 2 x 3 cm Paku 5 cm - 10 cm

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.100 0.100 0.010 0.005

m3 m3 kg

0.014 0.036 0.250

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

0.150

F Harga Satuan Pekerjaan (D+E) Pemasangan rangka atap genteng beton, kayu kelas II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.100 0.100 0.010 0.005

m3 m3 kg

0.014 0.057 0.250

BAHAN Kaso-kaso 5 x 7cm Reng (3 x 4) cm Paku 5 cm - 10 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rangka atap sirap, kayu kelas II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Kode

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.120 0.120 0.012 0.006

m3 m3

0.014 0.057

BAHAN Kayu kelas II Paku 5 cm - 10 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau III No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

Koefisien 0.150 0.300 0.030 0.075

B

C

BAHAN Kaso-kaso 5 x 7cm Paku 7 cm - 10 cm

C

C

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.200 0.300 0.030 0.010

m3 kg

0.016 0.250

BAHAN Kaso-kaso5 x 7 cm Paku 7 cm - 10 cm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.015 0.200

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau III No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

m3 kg

BAHAN Papan kayu Paku 5 dan 7cm ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.03 L.03 L.04

OH OH OH OH

0.100 0.200 0.020 0.005

m3 kg

0.011 0.100

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.100 0.200 0.020 0.005

m3 kg

0.011 0.050

BAHAN Papan kayu Paku 5 cm - 7 cm ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II atau III No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.03 Kepala tukang L.03 Mandor L.04 B

C

Koefisien

BAHAN Balok kayu Paku 5 cm - 7 cm

0.150

Satuan

Koefisien

OH OH OH OH

0.150 0.450 0.045 0.008

m3 kg

0.028 0.150

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding pemisah plywood rangkap, rangka kayu kelas II No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

Koefisien 0.200 0.600 0.060 0.010

B

C

BAHAN Balok kayu, 6 x 12 Paku 5 cm - 10 cm Plywood 4 mm,120 x 240 Lem kayu

C

0.150

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.600 1.800 0.180 0.030

m3 kg kg

0.007 0.100 0.150

BAHAN Papan kayu Paku 5 cm - 10 cm Paku skrup 10 cm

C

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm No Uraian Kode A TENAGA Pekerja L.01 Tukang kayu L.03 Kepala tukang L.03 Mandor L.04 B

0.028 0.150 0.860 0.560

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding lambrisering dari papan kayu kelas I No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

m3 kg Lembar kg

BAHAN Plywood 4 mm Paku 1 cm - 2,5 cm ALAT

0.150

Satuan

Koefisien

OH OH OH OH

0.025 0.075 0.008 0.001

m3 kg

0.400 0.050

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan dinding bilik, rangka kayu kelas III atau IV No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.03 L.03 L.04

OH OH OH OH

0.100 0.050 0.005 0.005

m2 m3 kg m3

1.500 0.014 0.012 0.003

BAHAN Bilik bambu Kaso-kaso 5 x 7 Paku List kayu 2/4

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kunci tanam antik No Uraian A KERJA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.060 0.600 0.060 0.003

buah

1.000

BAHAN Kunci tanam antik

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kunci tanam biasa No Uraian A KERJA Pekerja Tukang kayu Kepala tukang

0.150

Kode

Satuan

L.01 L.02 L.03

OH OH OH

Koefisien 0.010 0.500 0.050

Mandor B

C

BAHAN Kunci tanam biasa

C

C

D E

0.005

buah

1.000

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.005 0.500 0.050 0.003

buah

1.000

BAHAN Kunci tanam KM

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kunci silinder No Uraian A KERJA Pekerja Tukang kayu Kepala tukang Mandor B

OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kunci kamar mandi No Uraian A KERJA Pekerja Tukang kayu Kepala tukang Mandor B

L.04

BAHAN Kunci silinder

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.005 0.500 0.050 0.003

buah

1.000

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

0.150

F Harga Satuan Pekerjaan (D+E) Pemasangan engsel pintu No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.015 0.150 0.015 0.001

buah

1.000

ALAT

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.010 0.100 0.010 0.001

buah

1.000

BAHAN Engsel kupu-kupu

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan engsel angin No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Satuan

BAHAN Engsel pintu

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan engsel jena kupu-kupu No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Kode

BAHAN Engsel angin

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.100 0.200 0.020 0.001

buah

1.000

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan spring knip No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.015 0.150 0.015 0.008

buah

1.000

BAHAN Spring knip

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kait angin No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.015 0.150 0.015 0.008

buah

1.000

BAHAN Kait angin

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan door closer No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang kayu Kepala tukang Mandor B

C

BAHAN Door closer

C

C

0.050 0.500 0.050 0.003

set

1.000

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.020 0.200 0.020 0.001

buah

1.000

BAHAN Kunci slot

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan door holder No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

OH OH OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kunci slot No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

BAHAN Door holder ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.050 0.500 0.050 0.003

buah

1.000

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan door stop No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.010 0.100 0.010 0.005

buah

1.000

BAHAN Door stop

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan rel pintu sorong No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.060 0.600 0.060 0.003

Set

1.000

BAHAN Rel pintu sorong

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kunci lemari No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.025 0.250 0.025 0.001

B

C

BAHAN Kunci lemari

C

C

D

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.015 0.150 0.015 0.001

m2 Kg

1.100 0.050

BAHAN Kaca tebal 3 mm Sealant

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kaca tebal 5 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

1.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kaca tebal 3 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

Set

BAHAN Kaca tebal 5 mm Sealant ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.015 0.150 0.015 0.001

m2 Kg

1.100 0.050

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kaca tebal 8 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.017 0.170 0.017 0.001

m2 Kg

1.100 0.070

BAHAN Kaca tebal 8 mm Sealant

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kaca buram tebal 12 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.025 0.250 0.025 0.001

m2 Kg

1.100 0.070

BAHAN Kaca buram 12 mm Sealant

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kaca cermin tebal 5 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.015 0.150 0.015 0.008

B

C

BAHAN Kaca cermin 5 mm

C

C

D E

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.017 0.170 0.017 0.009

m2

1.100

BAHAN Kaca cermin 8 mm

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kaca wireglassed tebal 5 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

1.100

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kaca cermin tebal 8 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

m2

BAHAN Kaca wireglassed 5mm

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.015 0.150 0.015 0.008

m2

1.100

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

0.150

F Harga Satuan Pekerjaan (D+E) Pemasangan kaca patri tebal 5 mm No Uraian A TENAGA Pekerja Tukang kayu Kepala tukang Mandor B

C

C

C

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.075 0.150 0.015 0.004

m2 Kg

1.100 0.050

ALAT

0.150

Kode

Satuan

L.01 L.04

OH OH

0.150 0.003

Kg

0.050

BAHAN Soda api

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pencucian bidang permukaan tembok yang pernah dicat No Uraian A TENAGA Pekerja Mandor B

Satuan

BAHAN Kaca patri 5mm Sealant

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengikisan/pengerokan permukaan cat lama No Uraian A TENAGA Pekerja Mandor B

Kode

BAHAN Sabun ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.04

OH OH

0.150 0.003

Kg

0.050

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengerokan karat pada permukaan baja cara manual No Uraian A TENAGA Pekerja Mandor B

C

BAHAN Sabun

0.150

Kode

Satuan

L.01 L.04

OH OH

0.150 0.008

Kg

0.050

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang cat L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

Koefisien

BAHAN Cat menie Plamuur Cat dasar Cat penutup Kuas Pengencer Ampelas

Kg Kg Kg Kg buah Kg Lbr

0.150

Koefisien 0.070 0.009 0.006 0.003

0.200 0.150 0.170 0.260 0.010 0.030 0.200

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) No Uraian Kode Satuan

0.150

Koefisien

A

B

C

TENAGA Pekerja Tukang cat Kepala tukang Mandor BAHAN Cat menie Plamuur Cat dasar Cat penutup Kuas Pengencer Ampelas

C

OH OH OH OH

0.070 0.105 0.004 0.003

Kg Kg Kg Kg buah Kg Lbr

0.200 0.150 0.170 0.350 0.010 0.030 0.200

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pelaburan bidang kayu dengan teak oil No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.040 0.063 0.063 0.003

L

0.360

BAHAN Teak oil

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pelaburan bidang kayu dengan politur No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.040 0.060 0.016 0.003

B

C

BAHAN Politur Politur jadi Ampelas

C

C

D E

0.150

Kode

Satuan

L.01 L.04

OH OH

0.100 0.006

L

0.350

BAHAN Residu atau ter

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pelaburan bidang kayu dengan vernis No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

0.150 0.372 2.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pelaburan bidang kayu dengan cat residu dan ter No Uraian A TENAGA Pekerja Mandor B

L L Lbr

BAHAN Vernis Dempul Ampelas

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.160 0.160 0.016 0.003

L Kg Lbr

0.150 0.050 0.100

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

0.150

F Harga Satuan Pekerjaan (D+E) Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang cat L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

C

BAHAN Plamuur Cat dasar Cat penutup

C

0.020 0.063 0.006 0.003

0.100 0.100 0.260

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

Kg Kg Kg

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.028 0.042 0.004 0.003

Kg Kg

0.120 0.180

BAHAN Cat dasar Cat penutup

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pelaburan tembok dengan kalkarium No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.028 0.042 0.004 0.003

B

C

BAHAN Kalkarium

C

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.150 0.001 0.000 0.003

Kg Lbr Ikat

0.150 0.100 0.250

BAHAN Kapur sirih Ampelas Alang-alang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pelaburan tembok lama dengan kapur sirih (pemeliharaan) No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

0.100

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pelaburan tembok dengan kapur sirih No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

Kg

BAHAN Kapur sirih Ampelas Alang-alang ALAT

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.040 0.005 0.001 0.003

Kg Lbr Ikat

0.300 0.200 0.250

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan wallpaper No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.020 0.200 0.020 0.003

m2 Kg

1.200 0.200

BAHAN Wall paper Lem

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengecatan permukaan baja dengan menie besi No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.020 0.200 0.020 0.003

Kg buah

0.100 0.010

BAHAN Menie besi Kwas

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengecatan permukaan baja dengan menie besi dengan perancah No Uraian A TENAGA Pekerja Tukang cat

0.150

Kode

Satuan

L.01 L.02

OH OH

Koefisien 0.250 0.225

Kepala tukang Mandor B

C

BAHAN Menie besi Pengencer Kwas Perancah kayu

C

0.023 0.008

Kg L buah m3

0.100 0.010 0.010 0.002

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.250 0.250 0.025 0.001

Kg Kg Kg buah L

0.100 0.100 0.080 0.010 0.010

BAHAN Menie A Menie B Cat Kwas Pengencer

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir No Uraian Kode A TENAGA Pekerja L.01 Tukang cat L.02 Kepala tukang L.03 Mandor L.04 B

OH OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengecatan permukaan baja galvanis secara manual 4 lapis No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

L.02 L.04

BAHAN

0.150

Satuan OH OH OH OH

Koefisien 0.060 0.060 0.012 0.003

Cat Kwas Pengencer C

C

BAHAN Cat dasar Cat antara Cat penutup Kwas Pengencer

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.400 0.800 0.080 0.020

Kg Kg Kg buah L

0.110 0.170 0.080 0.010 0.010

C

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir No Uraian Kode Satuan A TENAGA Pekerja L.01 OH Tukang cat L.02 OH Kepala tukang L.03 OH Mandor L.04 OH B

0.300 0.010 0.010

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pengecatan permukaan baja galvanis secara manual sistem 3 lapis No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

Kg buah L

BAHAN Cat dasar Pengencer ALAT

Kg L

0.150

Koefisien 0.400 0.700 0.070 0.020

0.300 0.010

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Plituran 10 m2 dengan plitur melamic No Uraian A TENAGA Pekerja Tukang cat Kepala tukang Mandor B

C

C

D E F

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

2.000 12.000 1.200 0.100

kg kg kg kg L Lbr Lbr

1.500 1.500 1.500 2.400 2.000 6.000

BAHAN Wood filler Woodstain Sanding Melamic Thinner Ampelas ALAT Compressor

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan closet duduk/monoblock No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN Closet duduk Perlengkapan

Koefisien

jam

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Unit Ls

Koefisien 3.300 1.100 0.010 0.160

1.000 6% x closet

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E)

0.150

Pemasangan closet jongkok porselen No Uraian TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.000 1.500 0.150 0.160

Unit Kg M3

1.000 6.000 0.010

BAHAN Closet jongkok Semen Portland Pasir pasang

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan closet jongkok teraso No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Kode

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.000 1.500 0.150 0.050

Unit Kg M3 buah

1.000 6.000 0.010 7.000

BAHAN Closet jongkok Semen Portland Pasir pasang Bata merah

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan urinoir No Uraian A TENAGA Pekerja Tukang batu Kepala tukang

0.150

Kode

Satuan

L.01 L.02 L.03

OH OH OH

Koefisien 1.000 1.000 0.100

Mandor B

C

BAHAN Urinoir Semen Portland Pasir pasang Perlengkapan

C

0.050

Unit Kg M3 %

1.000 6.000 0.010 30.000

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

1.200 1.450 0.150 0.060

Unit Kg M3 %

1.200 6.000 0.010 12.000

BAHAN Wastafel Semen Portland Pasir pasang Perlengkapan

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bathcuip porselen No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

OH

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan wastafel No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.04

BAHAN Bathcuip Perlengkapan

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.075 0.750 0.075 0.003

Unit %

1.000 20.000

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bak mandi fiberglass vol 1 m³ No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Bak fiberglass Perlengkapan

Unit Ls

Koefisien 3.000 4.500 0.050 0.900

1.000 12%xbak

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bak mandi batu bata vol 0,30 m³ No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN Bata merah Semen portlan Pasir pasang Porselen 11x11 Semen warna ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

6.000 3.000 0.300 0.030

M3 Kg M3 bh Kg

150.000 120.000 0.300 360.000 6.000

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bak mandi teraso vol 0,30 m³ No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Bak fiberglass Perlengkapan

Unit Ls

Koefisien 3.000 4.500 0.050 0.900

1.000 12% x bak

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bak air fiberglass vol 1 m³ No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.300 0.450 0.045 0.015

Unit %

1.000 12.000

BAHAN Bak air fiberglass Perlengkapan

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan bak beton volume 1 m³ No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 3.500 4.500 0.050 0.018

B

C

BAHAN Beton 1:2:3 Baja tulangan Kayu bekisting Ubin porselen Perlengkapan

C

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.030 0.300 0.030 0.015

Unit buah

1.000 1.000

BAHAN Bak cuci piring Waterdrain

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bak cuci piring teraso No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.900 180.000 8.000 500.000 10.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bak cuci piring stainlessteel No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

M3 Kg M2 buah %

BAHAN Bak cuci piring Waterdrain Semen portland Pasir pasang

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Unit buah Kg M3

Koefisien 0.050 0.500 0.050 0.025

1.000 1.000 20.000 0.050

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan floor drain No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

D

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.010 0.100 0.010 0.005

Unit

1.000

BAHAN Floor drain

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bak kontrol pasangan bata 30 x 30 tinggi 35 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN Bata merah Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

buah Kg M3 M3 M3 Kg

Koefisien 2.160 0.720 0.072 0.011

40.000 44.000 0.070 0.060 0.070 1.600

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bak kontrol pasangan bata 45 cm x 45 cm tinggi 50 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Bata merah Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan

buah Kg M3 M3 M3 Kg

Koefisien 3.200 1.150 0.011 0.016

70.000 77.000 0.130 0.090 0.020 2.600

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

BAHAN Bata merah Semen portland Pasir pasang Pasir beton Kerikil Baja tulangan

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

buah Kg M3 M3 M3 Kg

Koefisien 3.200 1.150 0.011 0.016

123.000 114.000 0.184 0.120 0.033 4.850

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa galvanis diameter ½”

0.150

No A

B

C

Uraian TENAGA Pekerja Tukang batu Kepala tukang Mandor

C

L.01 L.02 L.03 L.04

OH OH OH OH

M Ls

Koefisien 0.054 0.090 0.009 0.027

1.200 35% x pipa

ALAT

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.010 0.400 0.040 0.005

M Buah

1.000 0.025

BAHAN Kran air Sealtape

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa galvanis diameter ¾ ” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Satuan

BAHAN Pipa galvanis ½” Perlengkapan

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan kran diameter ½” atau ¾ ” No Uraian A KERJA Pekerja Tukang batu Kepala tukang Mandor B

Kode

BAHAN Pipa galvanis 3/4”

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.054 0.090 0.009 0.027

M

1.200

Perlengkapan C

C

C

D E F

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.054 0.090 0.009 0.027

M %

1.200 35.000

BAHAN Pipa galvanis 1” Perlengkapan

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa galvanis diameter 1 ½” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

35.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa galvanis diameter 1” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

%

BAHAN Pipa galvanis11/2” Perlengkapan

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.108 0.180 0.018 0.005

M %

1.200 35.000

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%) Harga Satuan Pekerjaan (D+E)

0.150

Pemasangan pipa galvanis diameter 3” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.135 0.225 0.023 0.007

M %

1.200 35.000

ALAT

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.135 0.225 0.023 0.007

M %

1.200 35.000

BAHAN Pipa galvanis 4” Perlengkapan

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa PVC tipe AW diameter ½ ” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Satuan

BAHAN Pipa galvanis 3” Perlengkapan

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa galvanis diameter 4” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Kode

BAHAN

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.036 0.060 0.006 0.002

Pipa PVC 1/2” Perlengkapan C

C

C

D E

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.036 0.060 0.006 0.002

M %

1.200 35.000

BAHAN Pipa PVC 1/2” Perlengkapan

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa PVC tipe AW diameter 1” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

1.200 35.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa PVC tipe AW diameter ¾ ” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

M %

BAHAN Pipa PVC 1” Perlengkapan

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.036 0.060 0.006 0.002

M %

1.200 35.000

ALAT

Jumlah (A+B+C) Overhead & Profit (Contoh 15%)

0.150

F Harga Satuan Pekerjaan (D+E) Pemasangan pipa PVC tipe AW diameter 1 ½ ” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.054 0.090 0.009 0.003

M %

1.200 35.000

BAHAN Pipa PVC 11/2” Perlengkapan

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa PVC tipe AW diameter 2” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

Kode

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.054 0.090 0.009 0.003

M %

1.200 35.000

BAHAN Pipa PVC 2” Perlengkapan

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa PVC tipe AW diameter 2 ½ ” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

Koefisien 0.081 0.135 0.014 0.004

B

C

BAHAN Pipa PVC 21/2” Perlengkapan

C

C

D

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.081 0.135 0.014 0.004

M %

1.200 35.000

BAHAN Pipa PVC 3” Perlengkapan

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa PVC tipe AW diameter 4” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

1.200 35.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa PVC tipe AW diameter 3” No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

M %

BAHAN Pipa PVC 3” Perlengkapan ALAT

Jumlah (A+B+C)

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.03 L.04

OH OH OH OH

0.081 0.135 0.014 0.004

M %

1.200 35.000

E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa air limbah jenis pipa tanah Ǿ 20 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

C

C

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Pipa tanah Semen portlan Pasir pasang Pasir urug

buah Kg M3 M3

Koefisien 0.080 0.040 0.004 0.004

1.600 35.000 0.014 0.014

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

0.150

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

0.060 0.030 0.003 0.003

buah Kg M3 M3

1.600 0.680 0.013 0.011

BAHAN Pipa tanah dia 15 Semen portlan Pasir pasang Pasir urug

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa beton diameter 15 - 20 cm No Uraian A TENAGA

0.150

Kode

Satuan

Koefisien

Pekerja Tukang batu Kepala tukang Mandor B

C

BAHAN Pipa tanah dia 15 Bata merah Semen portlan Pasir pasang Pasir urug

C

OH OH OH OH

0.140 0.070 0.007 0.007

buah M3 Kg M3 M3

1.100 0.027 3.920 0.056 0.024

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) Pemasangan pipa beton diameter 30 - 100 cm No Uraian A TENAGA Pekerja Tukang batu Kepala tukang Mandor B

L.01 L.02 L.03 L.04

0.150

Kode

Satuan

L.01 L.02 L.03 L.04

OH OH OH OH

BAHAN Pipa tanah dia 15 Bata merah Semen portlan Pasir pasang Pasir urug

buah M3 Kg M3 M3

Koefisien 0.380 0.190 0.019 0.019

1.100 0.550 10.300 0.061 0.069

ALAT

D Jumlah (A+B+C) E Overhead & Profit (Contoh 15%) F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 63 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.081 0.041 0.008

B

C

BAHAN Pipa PVC Ø 63 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.006

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 90 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.094 0.047 0.009

BAHAN Pipa PVC Ø 90 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.008

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 110 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.105 0.053 0.011

BAHAN Pipa PVC Ø 110 mm

m

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.010

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 150 mm

Koefisien

0.150

No A

B

C

Uraian TENAGA Pekerja Tukang pipa Mandor

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.118 0.059 0.012

BAHAN Pipa PVC Ø 150mm

m

1.000

ALAT Sewa Tripot/Tackel &handle crane 2 T

hari

0.012

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.189 0.095 0.019

BAHAN Pipa PVC Ø 200 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.024

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

Koefisien

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

0.256 0.128 0.026

BAHAN Pipa PVC Ø 250 mm

m

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.034

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.294 0.147 0.029

BAHAN Pipa PVC Ø 300 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.040

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.544 0.272 0.054

BAHAN Pipa PVC Ø 400 mm

m

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.080

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

0.150

BAHAN

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.669 0.335 0.067

Pipa PVC Ø 450 mm C

ALAT Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

1.000

hari

0.100

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.809 0.405 0.081

BAHAN Pipa PVC Ø 500 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.122

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

m

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.957 0.479 0.096

BAHAN Pipa PVC Ø 600 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.145

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 800 mm No Uraian A TENAGA Pekerja

Koefisien

0.150

Kode

Satuan

L.01

OH

Koefisien 1.618

Tukang pipa Mandor B

C

OH OH

0.809 0.162

BAHAN Pipa PVC Ø 800 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.250

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.691 0.846 0.169

BAHAN Pipa PVC Ø 900 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.262

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

L.02 L.04

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.895 0.948 0.190

BAHAN Pipa PVC Ø 1000mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.294

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 1100 mm No Uraian A TENAGA

Koefisien

0.150

Kode

Satuan

Koefisien

Pekerja Tukang pipa Mandor B

C

OH OH OH

2.099 1.050 0.210

BAHAN Pipa PVC Ø 1100mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.327

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa PVC Ø 1200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

D E

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.303 1.152 0.230

BAHAN Pipa PVC Ø 1200mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.359

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 63 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

L.01 L.02 L.04

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.035 0.017 0.003

BAHAN Pipa HDPE Ø 63mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.019

Jumlah (A+B+C) Overhead & Profit

Koefisien

0.150

F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.040 0.020 0.004

BAHAN Pipa HDPE Ø 100mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.019

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 125 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.045 0.023 0.005

BAHAN Pipa HDPE Ø 125mm

m

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.019

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

Koefisien

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

0.062 0.031 0.006

BAHAN Pipa HDPE Ø 150mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.019

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.102 0.051 0.010

BAHAN Pipa HDPE Ø 200mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.019

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.133 0.067 0.013

BAHAN Pipa HDPE Ø 250mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.042

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

0.150

BAHAN

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.170 0.085 0.017

Pipa HDPE Ø 300mm C

ALAT Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

1.000

hari

0.065

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.290 0.145 0.029

BAHAN Pipa HDPE Ø 400mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.152

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

m

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.359 0.180 0.036

BAHAN Pipa HDPE Ø 450mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.200

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 500 mm No Uraian A TENAGA Pekerja

Koefisien

0.150

Kode

Satuan

L.01

OH

Koefisien 0.433

Tukang pipa Mandor B

C

OH OH

0.216 0.043

BAHAN Pipa HDPE Ø 500mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.251

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

D E F

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.512 0.256 0.051

BAHAN Pipa HDPE Ø 500mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.307

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

L.02 L.04

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.893 0.446 0.089

BAHAN Pipa HDPE Ø 800mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.573

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Koefisien

0.150

(K3) Pemasangan pipa HDPE Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.353 0.677 0.135

BAHAN Pipa HDPE Ø 900mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.883

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.659 0.830 0.166

BAHAN Pipa HDPE Ø 1000mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

1.093

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

Koefisien

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

1.818 0.909 0.182

BAHAN Pipa HDPE Ø 1100mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

1.205

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa HDPE Ø 1200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.370 1.185 0.237

BAHAN Pipa HDPE Ø 1200mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

1.584

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 63 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.345 0.172 0.034

BAHAN Pipa GIP Ø 63 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

0.150

BAHAN Pipa GIP Ø 100 mm

Koefisien

-

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

0.400 0.200 0.040

m

1.000

C

ALAT Sewa Tripot/Tackel & handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 125 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.448 0.224 0.045

BAHAN Pipa GIP Ø 125 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

hari

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.506 0.253 0.051

BAHAN Pipa GIP Ø 150 mm

m

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.796 0.398 0.080

B

C

BAHAN Pipa GIP Ø 200 mm

m

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.949 0.475 0.095

BAHAN Pipa GIP Ø 250 mm

m

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

1.000

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.958 0.479 0.096

BAHAN Pipa GIP Ø 300 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 400 mm No Uraian

Koefisien

-

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang pipa Mandor

OH OH OH

1.212 0.606 0.121

BAHAN Pipa GIP Ø 400 mm

m

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

D

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.353 0.676 0.135

BAHAN Pipa GIP Ø 450 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

L.01 L.02 L.04

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.469 0.735 0.147

BAHAN Pipa GIP Ø 500 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

Jumlah (A+B+C)

Koefisien

-

E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.327 0.664 0.133

BAHAN Pipa GIP Ø 600 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.327 1.163 0.233

BAHAN Pipa GIP Ø 800 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

0.150

BAHAN Pipa GIP Ø 900 mm ALAT

Koefisien

-

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

2.623 1.312 0.262

m

1.000

Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.911 1.456 0.291

BAHAN Pipa GIP Ø 1000mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

hari

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

3.200 1.600 0.320

BAHAN Pipa GIP Ø 1100mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa GIP Ø 1200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 3.488 1.744 0.349

B

C

BAHAN Pipa GIP Ø 1200mm

m

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.489 0.098 0.049

BAHAN Pipa DCI Ø 100 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.380

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 125 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

1.000

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.547 0.109 0.055

BAHAN Pipa DCI Ø 125 mm

m

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.380

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 150 mm No Uraian A TENAGA

Koefisien

0.150

Kode

Satuan

Koefisien

Pekerja Tukang pipa Mandor B

C

OH OH OH

0.613 0.123 0.061

BAHAN Pipa DCI Ø 150 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.380

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

D E

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.855 0.171 0.085

BAHAN Pipa DCI Ø 200 mm

M

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.380

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

L.01 L.02 L.04

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.951 0.190 0.095

BAHAN Pipa DCI Ø 250 mm

M

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.050

Jumlah (A+B+C) Overhead & Profit

Koefisien

0.150

F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.973 0.195 0.097

BAHAN Pipa DCI Ø 300 mm

m

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.071

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Operator alat berat Mandor JUMLAH KERJA B BAHAN Pipa DCI Ø 400 mm C

0.150

Kode

Satuan

L.01 L.02 L.08 L.04

OH OH OH OH

1.545 0.309 0.093 0.154

m

1.000

hari hari

0.023 0.031

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Operator alat berat Mandor JUMLAH KERJA B BAHAN Pipa DCI Ø 450 mm

Koefisien

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.08 L.04

OH OH OH OH

1.813 0.363 0.143 0.181

m

1.000

C

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Operator alat berat Mandor JUMLAH KERJA B BAHAN Pipa DCI Ø 500 mm C

Kode

Satuan

L.01 L.02 L.08 L.04

OH OH OH OH

2.047 0.409 0.193 0.205

m

1.000

hari hari

0.034 0.045

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.08 L.04

OH OH OH OH

2.011 0.402 0.293 0.201

m

1.000

hari hari

0.058 0.077

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 800 mm No Uraian A TENAGA

0.029 0.039

0.150

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Operator alat berat Mandor JUMLAH KERJA B BAHAN Pipa DCI Ø 600 mm C

hari hari

Koefisien

0.150

Kode

Satuan

Koefisien

B

C

Pekerja Tukang pipa Operator alat berat Mandor JUMLAH KERJA BAHAN Pipa DCI Ø 800 mm ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø900 mm No Uraian A TENAGA Pekerja Tukang pipa Operator alat berat Mandor JUMLAH KERJA B BAHAN Pipa DCI Ø 900 mm C

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

OH OH OH OH

3.859 0.772 0.493 0.386

m

1.000

hari hari

0.084 0.225

0.150

Kode

Satuan

L.01 L.02 L.08 L.04

OH OH OH OH

4.995 0.999 0.593 0.499

m

1.000

hari hari

0.093 0.248

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø1000 mm No Uraian A TENAGA Pekerja Tukang pipa Operator alat berat Mandor JUMLAH KERJA B BAHAN Pipa DCI Ø 1000mm C

L.01 L.02 L.08 L.04

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.08 L.04

OH OH OH OH

5.931 1.186 0.793 0.693

m

1.000

hari hari

0.112 0.298

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø1100 mm No Uraian A TENAGA Pekerja Tukang pipa Operator alat berat Mandor JUMLAH KERJA B BAHAN Pipa DCI Ø 1100mm C

Kode

Satuan

L.01 L.02 L.08 L.04

OH OH OH OH

6.949 1.390 0.793 0.695

m

1.000

hari hari

0.152 0.304

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa DCI Ø1200 mm No Uraian A TENAGA Pekerja Tukang pipa Operator alat berat Mandor JUMLAH KERJA B BAHAN Pipa DCI Ø 1200mm C

0.150

0.150

Kode

Satuan

L.01 L.02 L.08 L.04

OH OH OH OH

8.056 1.611 0.893 0.806

m

1.000

hari hari

0.180 0.360

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Pipa baja Ø 63 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA

Koefisien

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.499 0.100 0.050

B

C

BAHAN Pipa baja Ø 63 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.004

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 100 mm C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.579 0.116 0.058

m

1.000

hari

0.004

ALAT Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 125 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 125 mm C

0.150

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.648 0.130 0.065

m

1.000

hari

0.004

ALAT Sewa Tripot/Tackel & handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.708 0.142 0.071

B

C

JUMLAH KERJA BAHAN Pipa baja Ø 150 mm

m

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.004

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 200 mm C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.113 0.223 0.111

m

1.000

hari

0.004

ALAT Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 250 mm C

0.150

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.325 0.265 0.133

m

1.000

hari

0.004

ALAT Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa

Koefisien

Koefisien

0.150

Kode

Satuan

L.01 L.02

OH OH

Koefisien 1.415 0.283

B

C

Mandor JUMLAH KERJA BAHAN Pipa baja Ø 300 mm ALAT Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 400 mm C

0.141

m

1.000

hari

0.004

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.366 0.473 0.237

m

1.000

hari hari

0.027 0.039

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.231 0.446 0.223

m

1.000

hari hari

0.026 0.037

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 500 mm No Uraian

OH

0.150

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 450 mm C

L.04

Koefisien

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA BAHAN Pipa baja Ø 500 mm ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 600 mm C

D

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T Jumlah (A+B+C)

OH OH OH

2.432 0.486 0.243

m

1.000

hari hari

0.029 0.045

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.208 0.442 0.221

m

1.000

hari hari

0.027 0.039

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 800 mm C

L.01 L.02 L.04

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

3.897 0.779 0.390

m

1.000

hari hari

0.046 0.098

E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 900 mm C

Satuan

L.01 L.02 L.04

OH OH OH

4.403 0.081 0.440

m

1.000

hari hari

0.052 0.115

ALAT

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

4.895 0.979 0.489

m

1.000

hari hari

0.058 0.133

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 1100mm C

Kode

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 1000mm C

0.150

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

5.387 1.077 0.539

m

1.000

Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan pipa baja Ø 1200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor JUMLAH KERJA B BAHAN Pipa baja Ø 1200mm C

C

0.064 0.150

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

5.897 1.176 0.588

m

1.000

hari hari

0.070 0.167

ALAT Sewa excavator type225 kapasitas 0,5 -1,0 m3 Sewa Tripot/Tackel& handle crane 2 T

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 63 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

hari hari

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.005 0.002 0.001

BAHAN Pipa PVC Ø 63 mm

buah

1.000

ALAT Peralatan potong pipa T1/manual (gergaji) /saw

hari

0.003

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 90 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.014 0.007 0.001

B

C

BAHAN Pipa PVC Ø 90 mm

buah

1.000

ALAT Peralatan potongpipa T1/manual (gergaji) /saw

hari

0.003

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 110 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.022 0.011 0.002

BAHAN Pipa PVC Ø 110mm

buah

1.000

ALAT Peralatan potongpipa T1/manual (gergaji) /saw

hari

0.003

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.031 0.015 0.003

BAHAN Pipa PVC Ø 150 mm

buah

1.000

ALAT Peralatan potongpipa T1/manual (gergaji) /saw

hari

0.003

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 200 mm No Uraian A TENAGA Pekerja

Koefisien

0.150

Kode

Satuan

L.01

OH

Koefisien 0.081

Tukang pipa Mandor B

C

OH OH

0.040 0.008

BAHAN Pipa PVC Ø 200 mm

buah

1.000

ALAT Peralatan potongpipa T1/manual (gergaji) /saw

hari

0.017

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

D E F

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.128 0.064 0.013

BAHAN Pipa PVC Ø 250 mm

buah

1.000

ALAT Peralatan potongpipa T1/manual (gergaji) /saw

hari

0.030

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

L.02 L.04

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.155 0.077 0.015

BAHAN Pipa PVC Ø 300 mm

buah

1.000

ALAT Peralatan potongpipa T1/manual (gergaji) /saw

hari

0.037

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Koefisien

0.150

(K3) Pemotongan pipa PVC Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.331 0.166 0.033

BAHAN Pipa PVC Ø 400 mm

buah

1.000

ALAT Peralatan potongpipa T1/manual (gergaji) /saw

hari

0.086

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.420 0.210 0.042

BAHAN Pipa PVC Ø 450 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.054

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

Koefisien

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

0.518 0.259 0.052

BAHAN Pipa PVC Ø 500 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.069

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.623 0.311 0.062

BAHAN Pipa PVC Ø 600 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.086

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.089 0.545 0.109

BAHAN Pipa PVC Ø 800 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.160

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

0.150

BAHAN Pipa PVC Ø 900 mm

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

1.141 0.571 0.114

buah

1.000

C

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

0.168

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.285 0.643 0.129

BAHAN Pipa PVC Ø 1000mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.191

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

hari

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.429 0.715 0.143

BAHAN Pipa PVC Ø 1100mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.213

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa PVC Ø 1200 mm No Uraian A TENAGA Pekerja Tukang pipa

Koefisien

0.150

Kode

Satuan

L.01 L.02

OH OH

Koefisien 1.573 0.787

Mandor B

C

OH

0.157

BAHAN Pipa PVC Ø 1200mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.236

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 63 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

C

C

D E

0.150

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

0.002 0.001 0.000 0.034

BAHAN Pipa HDPE Ø 63mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.004

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

L.04

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

0.006 0.003 0.001 0.071

BAHAN Pipa HDPE Ø 100mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.005

Jumlah (A+B+C) Overhead & Profit

Koefisien

0.150

F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 125 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

C

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

0.009 0.005 0.001 0.096

BAHAN Pipa HDPE Ø 125mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.006

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

C

0.150

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

0.016 0.008 0.002 0.121

BAHAN Pipa HDPE Ø 150mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.009

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

Koefisien

BAHAN Pipa HDPE Ø 200mm

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04 L.08

OH OH OH OH

0.044 0.022 0.004 0.171

buah

1.000

C

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipaHDPE Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

C

C

0.017

0.150

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

0.067 0.033 0.007 0.221

BAHAN Pipa HDPE Ø 250mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.023

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

hari

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

0.090 0.045 0.009 0.271

BAHAN Pipa HDPE Ø 300mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.030

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 400 mm No Uraian A TENAGA

Koefisien

0.150

Kode

Satuan

Koefisien

Pekerja Tukang pipa Mandor Operator B

C

OH OH OH OH

0.177 0.088 0.018 0.371

BAHAN Pipa HDPE Ø 400mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.055

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

0.225 0.113 0.023 0.421

BAHAN Pipa HDPE Ø 450mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.070

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

L.01 L.02 L.04 L.08

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04 L.08

OH OH OH OH

0.277 0.139 0.028 0.471

BAHAN Pipa HDPE Ø 500mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.085

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

C

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

0.333 0.167 0.033 0.571

BAHAN Pipa HDPE Ø 600mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.101

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

0.601 0.301 0.060 0.771

BAHAN Pipa HDPE Ø 800mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.179

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

Koefisien 0.913 0.456 0.091 0.871

B

C

BAHAN Pipa HDPE Ø 900mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.270

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

C

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

1.125 0.562 0.112 0.971

BAHAN Pipa HDPE Ø 1000mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.332

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor Operator B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

1.238 0.619 0.124 1.071

BAHAN Pipa HDPE Ø 1100mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilindersaw

hari

0.365

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa HDPE Ø 1200 mm

Koefisien

0.150

No A

B

C

Uraian TENAGA Pekerja Tukang pipa Mandor Operator

Kode

Satuan

L.01 L.02 L.04 L.08

OH OH OH OH

1.619 0.809 0.162 1.171

BAHAN Pipa HDPE Ø 1200mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

0.477

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 63 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.019 0.010 0.002

BAHAN Pipa GIP Ø 63 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

Koefisien

Koefisien

-

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

0.058 0.029 0.006

BAHAN Pipa GIP Ø 100 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

-

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 125 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.092 0.046 0.009

BAHAN Pipa GIP Ø 125 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.131 0.066 0.013

BAHAN Pipa GIP Ø 150 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.340 0.170 0.034

B

C

BAHAN Pipa GIP Ø 200 mm

buah

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

D E F

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.475 0.237 0.047

BAHAN Pipa GIP Ø 250 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

1.000

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.504 0.252 0.050

BAHAN Pipa GIP Ø 300 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Koefisien

-

0.150

(K3) Pemotongan pipa GIP Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.738 0.369 0.074

BAHAN Pipa GIP Ø 400 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.848 0.424 0.085

BAHAN Pipa GIP Ø 450 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

Koefisien

BAHAN Pipa GIP Ø 500 mm

Koefisien

-

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

0.941 0.471 0.094

buah

1.000

C

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan1 buah pipa GIP Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.864 0.432 0.086

BAHAN Pipa GIP Ø 600 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

hari

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.567 0.783 0.157

BAHAN Pipa GIP Ø 800 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 900 mm No Uraian A TENAGA Pekerja

Koefisien

-

0.150

Kode

Satuan

L.01

OH

Koefisien 1.770

Tukang pipa Mandor

B

C

OH OH

0.885 0.177

BAHAN Pipa GIP Ø 900 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.974 0.987 0.197

BAHAN Pipa GIP Ø 1000mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

L.02 L.04

Koefisien

-

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

2.178 1.089 0.218

BAHAN Pipa GIP Ø 1100mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

-

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa GIP Ø 1200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.382 1.191 0.238

BAHAN Pipa GIP Ø 1200mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Koefisien

-

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.071 0.014 0.007

BAHAN Pipa DCI Ø 100 mm

buah

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.003

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 125 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.112 0.022 0.011

B

C

BAHAN Pipa DCI Ø 125 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.010

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.159 0.032 0.016

BAHAN Pipa DCI Ø 150 mm

buah

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.018

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.366 0.073 0.037

BAHAN Pipa DCI Ø 200 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.054

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 250 mm

Koefisien

0.150

No A

B

C

Uraian TENAGA Pekerja Tukang pipa Mandor

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.476 0.095 0.048

BAHAN Pipa DCI Ø 250 mm

buah

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.073

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.512 0.102 0.051

BAHAN Pipa DCI Ø 300 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.079

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

Koefisien

BAHAN Pipa DCI Ø 400 mm ALAT

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

0.941 0.188 0.094

buah

1.000

Peralatan potong pipa T2/mekanik / cilinder saw

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

0.158

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.137 0.227 0.114

BAHAN Pipa DCI Ø 450 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

0.176

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

hari

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.312 0.262 0.131

BAHAN Pipa DCI Ø 500 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

0.192

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa

Koefisien

0.150

Kode

Satuan

L.01 L.02

OH OH

Koefisien 1.309 0.262

Mandor

B

C

OH

0.131

BAHAN Pipa DCI Ø 600 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.192

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

D

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.598 0.520 0.260

BAHAN Pipa DCI Ø 800 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

0.310

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

L.04

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

3.370 0.674 0.337

BAHAN Pipa DCI Ø 900 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.381

Jumlah (A+B+C)

Koefisien

E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

4.021 0.804 0.402

BAHAN Pipa DCI Ø 1000mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.441

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

4.731 0.946 0.473

BAHAN Pipa DCI Ø 1100mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.506

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa DCI Ø 1200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

0.150

BAHAN

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 5.502 1.100 0.550

Pipa DCI Ø 1200mm C

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 63 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

1.000

hari

0.576

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.028 0.006 0.003

BAHAN Pipa baja Ø 63 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.037

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

buah

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.085 0.017 0.008

BAHAN Pipa baja Ø 100 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

0.040

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 125 mm No Uraian

Koefisien

0.150

Kode

Satuan

Koefisien

A

B

C

TENAGA Pekerja Tukang pipa Mandor

OH OH OH

0.133 0.027 0.013

BAHAN Pipa baja Ø 125 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.042

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.184 0.037 0.018

BAHAN Pipa baja Ø 150 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.045

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

L.01 L.02 L.04

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

0.476 0.095 0.048

BAHAN Pipa baja Ø 200 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.060

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.663 0.133 0.066

BAHAN Pipa baja Ø 250 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

hari

0.068

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.745 0.149 0.074

BAHAN Pipa baja Ø 300 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.072

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 1.440 0.288 0.144

B

C

BAHAN Pipa baja Ø 400 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.105

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.399 0.280 0.140

BAHAN Pipa baja Ø 450 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.107

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

D E

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.558 0.312 0.156

BAHAN Pipa baja Ø 500 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.107

Jumlah (A+B+C) Overhead & Profit

Koefisien

0.150

F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.437 0.287 0.144

BAHAN Pipa baja Ø 600 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.113

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.624 0.525 0.262

BAHAN Pipa baja Ø 800 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.166

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

Koefisien

BAHAN Pipa baja Ø 900 mm

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

2.971 0.594 0.297

buah

1.000

C

ALAT Peralatan potong pipa T2/mekanik / cilinder saw

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

0.183

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

3.319 0.664 0.332

BAHAN Pipa baja Ø 1000 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.201

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

hari

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

3.667 0.733 0.367

BAHAN Pipa baja Ø 1100mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.218

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemotongan pipa baja Ø 1200 mm No Uraian A TENAGA

Koefisien

0.150

Kode

Satuan

Koefisien

Pekerja Tukang pipa Mandor

B

C

OH OH OH

4.015 0.803 0.402

BAHAN Pipa baja Ø 1100 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw

hari

0.236

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.429 0.715 0.143

BAHAN Valve Ø 150 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.100

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

L.01 L.02 L.04

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

1.714 0.857 0.171

BAHAN Valve Ø 200 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.300

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.714 0.857 0.171

BAHAN Valve Ø 250 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.400

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.000 1.000 0.200

BAHAN Valve Ø 300 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.500

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 3.429 1.715 0.343

B

C

BAHAN Valve Ø 400 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

1.000

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

3.429 1.715 0.343

BAHAN Valve Ø 450 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

1.000

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

D E F

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

4.000 2.000 0.400

BAHAN Valve Ø 500 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

1.000

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

Koefisien

0.150

(K3) Pemasangan Valve Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.421 0.711 0.142

BAHAN Valve Ø 600 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

0.600 0.300

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 700 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.429 0.715 0.143

BAHAN Valve Ø 700 mm

buah

1.000

ALAT Sewa Tripot/Tackel &handle crane 2 T Mobile crane  3 ton

hari hari

0.500 0.500

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

Koefisien

BAHAN

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 1.786 0.893 0.179

Valve Ø 800 mm C

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

D E

1.000

hari hari

0.500 0.500

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.714 0.857 0.171

BAHAN Valve Ø 900 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

0.750 0.750

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

buah

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.571 1.286 0.257

BAHAN Valve Ø 1000 mm

buah

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T Mobile crane  3 ton

hari hari

1.000 1.000

Jumlah (A+B+C) Overhead & Profit

Koefisien

0.150

F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

3.000 1.500 0.300

BAHAN Valve Ø 1100 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

1.000 1.000

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Valve Ø 1200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

3.000 1.500 0.300

BAHAN Valve Ø 1200 mm

buah

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T Mobile crane  3 ton

hari hari

1.000 1.000

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.106 0.053 0.011

B

C

BAHAN Tee Ø 150 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.028

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.216 0.108 0.022

BAHAN Tee Ø 200 mm

buah

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.029

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

D E

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.326 0.163 0.033

BAHAN Tee Ø 250 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.039

Jumlah (A+B+C) Overhead & Profit

Koefisien

0.150

F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.436 0.218 0.044

BAHAN Tee Ø 300 mm

buah

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.500

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 400 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.656 0.328 0.066

BAHAN Tee Ø 400 mm

buah

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.500

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 0.766 0.383 0.077

B

C

BAHAN Tee Ø 450 mm

buah

1.000

ALAT Sewa Tripot/Tackel & handle crane 2 T

hari

0.500

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

0.876 0.438 0.088

BAHAN Tee Ø 500 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T

hari

0.600

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

D

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.096 0.548 0.110

BAHAN Tee Ø 600 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

0.193 0.096

Jumlah (A+B+C)

Koefisien

E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 700 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.316 0.658 0.132

BAHAN Tee Ø 700 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

0.225 0.113

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 800 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.536 0.768 0.154

BAHAN Tee Ø 800 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

0.257 0.129

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 900 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 1.756 0.878 0.176

B

C

BAHAN Tee Ø 900 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

0.321 0.161

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 1000 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.976 0.988 0.198

BAHAN Tee Ø 1000 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

0.366 0.183

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 1100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

0.150

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

2.196 1.098 0.220

BAHAN Tee Ø 1100 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

0.386 0.193

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan Tee Ø 1200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.416 1.208 0.242

BAHAN Tee Ø 1200 mm

buah

1.000

ALAT Sewa Tripot/Tackel& handle crane 2 T Mobile crane  3 ton

hari hari

0.450 0.225

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 80 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

1.466 0.733 0.147

BAHAN Pipa Ø 80 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

0.606 0.075 0.968 0.865

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 100 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

Koefisien 1.646 0.823 0.165

B

C

BAHAN Pipa Ø 100 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

0.650 0.159 1.078 0.911

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 150 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.096 1.048 0.210

BAHAN Pipa Ø 150 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

0.760 0.369 1.353 1.026

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 200 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

0.150

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

2.546 1.273 0.255

BAHAN Pipa Ø 200 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

0.870 0.579 1.628 1.141

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 250 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

Kode

Satuan

L.01 L.02 L.04

OH OH OH

2.996 1.498 0.300

BAHAN Pipa Ø 250 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

0.980 0.789 1.903 1.256

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 300 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

0.150

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

3.446 1.723 0.345

BAHAN Pipa Ø 300 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

1.090 0.999 2.178 1.371

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 400 mm No Uraian A TENAGA Pekerja

Koefisien

0.150

Kode

Satuan

L.01

OH

Koefisien 4.346

Tukang pipa Mandor

B

C

OH OH

2.173 0.435

BAHAN Pipa Ø 400 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik / cilinder saw Sewa Genset 1500watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

1.310 1.419 2.728 1.601

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 450 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor

B

C

C

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

4.796 2.398 0.480

BAHAN Pipa Ø 450 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

1.420 1.629 3.003 1.716

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 500 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

L.02 L.04

BAHAN Pipa Ø 500 mm ALAT

Koefisien

0.150

Kode

Satuan

Koefisien

L.01 L.02 L.04

OH OH OH

5.246 2.623 0.525

buah

1.000

Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 600 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

C

C

1.530 1.839 3.278 1.831

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

6.146 3.073 0.615

BAHAN Pipa Ø 600 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500 watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

1.750 2.259 3.828 2.061

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 700 mm No Uraian A TENAGA Pekerja Tukang pipa Mandor B

hari hari hari hari

Koefisien

0.150

Kode

Satuan

L.01 L.02 L.04

OH OH OH

7.046 3.523 0.705

BAHAN Pipa Ø 700 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500 watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

1.970 2.679 4.378 2.291

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Penyambungan pipa baru ke pipa yang ada Ø 800 mm

Koefisien

0.150

No A

B

C

Uraian TENAGA Pekerja Tukang pipa Mandor

Kode

Satuan

L.01 L.02 L.04

OH OH OH

7.946 3.973 0.795

BAHAN Pipa Ø 800 mm

buah

1.000

ALAT Peralatan potong pipa T2/mekanik /cilinder saw Sewa Genset 1500 watt Sewa PompaSubmersible 3m3/h Sewa Tripot/Tackel& handle crane 2 T

hari hari hari hari

2.190 3.099 4.928 2.521

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pengetesan pipa Ø 50 mm No Uraian A TENAGA Pekerja Mandor B

C

0.150

Kode

Satuan

L.01 L.04

OH OH

0.008 0.001

m3 liter liter

0.002 0.060 0.002

BAHAN Air test (air bersih) Bahan bakar Oli

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pengetesan pipa Ø 75 mm No Uraian A TENAGA Pekerja Mandor B

Koefisien

BAHAN Air test (air bersih) Bahan bakar Oli

0.150

Kode

Satuan

Koefisien

L.01 L.04

OH OH

0.008 0.001

m3 liter liter

0.004 0.060 0.002

C

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pengetesan pipa Ø 100 mm No Uraian A TENAGA Pekerja Mandor B

C

C

D E F

Kode

Satuan

L.01 L.04

OH OH

0.008 0.001

m3 liter liter

0.008 0.060 0.002

BAHAN Air test (air bersih) Bahan bakar Oli

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pengetesan pipa Ø 150 mm No Uraian A TENAGA Pekerja Mandor B

0.150

BAHAN Air test (air bersih) Bahan bakar Oli

0.150

Kode

Satuan

Koefisien

L.01 L.04

OH OH

0.008 0.001

m3 liter liter

0.018 0.060 0.002

ALAT

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

0.150

(K3) Pengetesan pipa Ø 200 mm No Uraian A TENAGA Pekerja Mandor B

C

C

Koefisien

L.01 L.04

OH OH

0.008 0.001

m3 liter liter

0.031 0.060 0.002

ALAT

0.150

Kode

Satuan

L.01 L.04

OH OH

0.008 0.001

m3 liter liter

0.049 0.060 0.002

BAHAN Air test (air bersih) Bahan bakar Oli

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pengetesan pipa Ø 300 mm No Uraian A TENAGA Pekerja Mandor B

Satuan

BAHAN Air test (air bersih) Bahan bakar Oli

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pengetesan pipa Ø 250 mm No Uraian A TENAGA Pekerja Mandor B

Kode

BAHAN Air test (air bersih) Bahan bakar

0.150

Kode

Satuan

Koefisien

L.01 L.04

OH OH

0.008 0.001

m3 liter

0.071 0.060

Oli

C

C

C

D E

0.150

Kode

Satuan

L.01 L.04

OH OH

0.008 0.001

m3 liter liter

0.126 0.060 0.002

BAHAN Air test (air bersih) Bahan bakar Oli

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pengetesan pipa Ø 500 mm No Uraian A TENAGA Pekerja Mandor B

0.002

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pengetesan pipa Ø 400 mm No Uraian A TENAGA Pekerja Mandor B

liter

BAHAN Air test (air bersih) Bahan bakar Oli

0.150

Kode

Satuan

Koefisien

L.01 L.04

OH OH

0.008 0.001

m3 liter liter

0.158 0.060 0.002

ALAT

Jumlah (A+B+C) Overhead & Profit

0.150

F Harga Satuan Pekerjaan (D+E) (K3) Pengetesan pipa Ø 600 mm No Uraian A TENAGA Pekerja Mandor B

C

C

Satuan

L.01 L.04

OH OH

0.008 0.001

m3 liter liter

0.283 0.060 0.002

BAHAN Air test (air bersih) Bahan bakar Oli

Koefisien

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan titik lampu No Uraian A TENAGA Upah B

Kode

0.150

Kode

Satuan %

BAHAN Pipa listrik 5/8” Kabel T Dus L Bow Las Dop Klem Mongkok Saklar Fitting

btg m buah buah buah buah buah buah buah

Koefisien 100.000

3.000 24.000 3.000 4.000 3.000 24.000 1.000 1.000 1.000

ALAT

D Jumlah (A+B+C) E Overhead & Profit F Harga Satuan Pekerjaan (D+E) (K3) Pemasangan MCB No Uraian A TENAGA Upah

0.150

Kode

Satuan %

Koefisien 100.000

B

C

D E F xxxx

BAHAN Pipa listrik 5/8” Kabel T Dus L Bow Klem biasa MCB

btg m buah buah buah buah

3.000 15.000 1.000 2.000 24.000 1.000

ALAT

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E) xxxx

0.150 xxxx

xxxx

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

.

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

. JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp) 80000 95000 100000 95000 JUMLAH TENAGA KERJA

Jumlah Harga (Rp) Rp Rp Rp Rp Rp

8,000.00 9,500.00 1,000.00 475.00 18,975.00

Rp Rp Rp

-

Rp

-

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Rp Rp Rp

18,975.00 1,897.50 20,872.50

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD

a Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

7.777 Rp 5.5555 Rp JUMLAH TENAGA KERJA Rp

0.78 0.28 1.06

JUMLAH HARGA BAHAN

Rp

-

JUMLAH HARGA ALAT

Rp Rp Rp Rp

1.06 0.11 1.16

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

.

. JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

80000 Rp 95000 Rp JUMLAH TENAGA KERJA Rp

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Rp Rp Rp Rp Rp Rp Rp

62,375.00 6,237.50 68,612.50

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

60,000.00 2,375.00 62,375.00

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

80000 Rp 95000 Rp JUMLAH TENAGA KERJA Rp

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Rp Rp Rp Rp Rp Rp Rp

Harga Satuan (Rp)

JUMLAH HARGA ALAT xD

Rp Rp Rp Rp Rp

xD

40,000.00 4,750.00 44,750.00 44,750.00 4,475.00 49,225.00 Jumlah Harga (Rp)

80000 Rp 95000 Rp JUMLAH TENAGA KERJA Rp

JUMLAH HARGA ALAT

44,750.00 4,475.00 49,225.00

Rp Rp

Harga Satuan (Rp)

JUMLAH HARGA BAHAN

-

Jumlah Harga (Rp)

80000 Rp 95000 Rp JUMLAH TENAGA KERJA Rp

JUMLAH HARGA BAHAN

40,000.00 4,750.00 44,750.00

Rp Rp Rp Rp Rp Rp Rp

24,000.00 950.00 24,950.00 24,950.00 2,495.00 27,445.00

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

80000 95000 100000 95000 JUMLAH TENAGA KERJA

Rp Rp Rp Rp Rp

JUMLAH HARGA BAHAN

Rp Rp Rp Rp

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Rp Rp Rp Rp Rp

120,000.00 71,250.00 7,500.00 7,125.00 205,875.00 205,875.00 20,587.50 226,462.50

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

80000 95000 100000 95000 JUMLAH TENAGA KERJA

Rp Rp Rp Rp Rp

JUMLAH HARGA BAHAN

Rp Rp Rp Rp Rp

JUMLAH HARGA ALAT xD

Rp Rp Rp Rp

Harga Satuan (Rp)

96,000.00 19,000.00 2,000.00 5,700.00 122,700.00 -

122,700.00 12,270.00 134,970.00 Jumlah Harga (Rp)

80000 95000 100000 95000 JUMLAH TENAGA KERJA

Rp Rp Rp Rp Rp

JUMLAH HARGA BAHAN

Rp Rp Rp Rp Rp

132,000.00 26,125.00 2,800.00 7,885.00 168,810.00 -

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Rp Rp Rp Rp Rp

168,810.00 16,881.00 185,691.00

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

ng bisa diangkat Harga24 jam diperlukan penambahan Jumlah bahan tambah) Satuan (Rp) Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

x rangka JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

xrangka JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

80000 95000 100000 95000 JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp) 80000 95000 100000 95000 JUMLAH TENAGA KERJA

Jumlah Harga (Rp) Rp Rp Rp Rp

Rp Rp Rp JUMLAH HARGA BAHAN

24,000.00 9,500.00 1,000.00 1,425.00

-

Rp

-

Rp Rp Rp

-

JUMLAH HARGA ALAT xD

Harga Satuan (Rp) 80000 95000 100000 95000 JUMLAH TENAGA KERJA

Jumlah Harga (Rp) Rp Rp Rp Rp

24,000.00 9,500.00 1,000.00 1,425.00

Rp Rp Rp

-

Rp

-

xD

Rp Rp Rp

-

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

x D (maksimmum)

Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

. . . JUMLAH TENAGA KERJA . . JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

. . . JUMLAH TENAGA KERJA . JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA . JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

80000 95000 100000 95000 JUMLAH TENAGA KERJA

Rp Rp Rp Rp Rp

JUMLAH HARGA BAHAN

Rp Rp Rp Rp Rp

56,000.00 33,250.00 3,500.00 3,325.00 96,075.00 -

JUMLAH HARGA ALAT xD

Rp Rp Rp Rp Rp

Harga Satuan (Rp)

Jumlah Harga (Rp)

80000 95000 100000 95000 JUMLAH TENAGA KERJA

Rp Rp Rp Rp Rp

JUMLAH HARGA BAHAN

Rp Rp Rp Rp Rp

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

96,075.00 9,607.50 105,682.50

Rp Rp Rp Rp Rp

56,000.00 33,250.00 3,500.00 3,325.00 96,075.00 96,075.00 9,607.50 105,682.50

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

. JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

80000 95000 100000 95000 JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Jumlah Harga (Rp)

80000 95000 100000 95000 JUMLAH TENAGA KERJA

Rp Rp Rp Rp Rp

JUMLAH HARGA BAHAN

Rp Rp Rp Rp Rp

JUMLAH HARGA ALAT xD

Harga Satuan (Rp)

Rp Rp Rp Rp Rp

72,000.00 42,750.00 4,500.00 4,275.00 123,525.00 123,525.00 12,352.50 135,877.50

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

. JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp) . . . .

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

. JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

. . . . JUMLAH TENAGA KERJA . . . . . . JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

x closet JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

xbak JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

x bak JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

x pipa JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN .

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN -

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

Jumlah Harga (Rp)

xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

Jumlah Harga (Rp)

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

Jumlah Harga (Rp)

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD

Jumlah Harga (Rp)

Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD Harga Satuan (Rp)

Jumlah Harga (Rp)

JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT xD xxxx

xxxx

Related Documents

Rab Gudang Cokelat.xlsx
April 2020 13
Rab
June 2020 33
Gudang Data.docx
June 2020 14
Rab Mess.xlsx
November 2019 44
Rab Material.xlsx
October 2019 47