To:

Carter Synergy

From: Mike Watson

‘e’

Graham.luzby

Pages: 1

Ref:

6992

Date:

Re:

Majestic Hotel, Cromwell Road

F.A.O: Graham Luzby

21st November 2007

Reference the above site. Quotation No. 6992 Attend site and remove UPS pump unit and replace with new, also install new electrical isolator. Remove the SK32 pump and replace with new unit and electrical isolator. Supply and install new electrical isolator for Omega pump unit. Isolate, lock off, and remove the existing ten way three phase fuse panel. Supply new circuit breaker distribution panel complete with ten circuit breakers. Reconnect all existing wiring to distribution panel. This panel work to be carried out in ‘out of hours’ period. All above work for the sum of :

£ 6980.00+ VAT

Availability:

15 days at time of order

Validity:

30 Days from date of quotation

We trust the above quotation is to your requirements, however for further assistance please contact me.

Regards

Mike Watson

Related Documents

Quote
June 2020 17
Quote
April 2020 22
Quote
November 2019 26
Quote
June 2020 15
Quote
June 2020 17
Quote-7240398
August 2019 26