To:
Carter Synergy
From: Mike Watson
‘e’
Graham.luzby
Pages: 1
Ref:
6992
Date:
Re:
Majestic Hotel, Cromwell Road
F.A.O: Graham Luzby
21st November 2007
Reference the above site. Quotation No. 6992 Attend site and remove UPS pump unit and replace with new, also install new electrical isolator. Remove the SK32 pump and replace with new unit and electrical isolator. Supply and install new electrical isolator for Omega pump unit. Isolate, lock off, and remove the existing ten way three phase fuse panel. Supply new circuit breaker distribution panel complete with ten circuit breakers. Reconnect all existing wiring to distribution panel. This panel work to be carried out in ‘out of hours’ period. All above work for the sum of :
£ 6980.00+ VAT
Availability:
15 days at time of order
Validity:
30 Days from date of quotation
We trust the above quotation is to your requirements, however for further assistance please contact me.
Regards
Mike Watson