REPLY TO QUERIES RECEIVED FOR KVIC VIDEO CONFERENCING RFP Sr.No.
Section
Stated Condition Company should have minimum following certifications
Query This criteria should be relaxed as CMMi level 5 certification os required for software development and scope of work does not include any application development.
1
3.14/Pg 13/pt no 6
2
The bidder should have implemented The criteria should be relxed, the videoconferencing /MPLS VPN solution details of video conferencing projects in at least 3 organizations (preferable with implementation across 10 and above locations should be considered 3.14/Pg 13/pt no one govt. organization) with the implementation being udnertaken for qualifying criteria 5 across 20 locations or more in india during the last five years as on march 31, 2009
3
The SI will size the amount of bandwidth and network required for videoconferencing and will coordinate,procure and establish the 5.3/pg no 28/pt required link and bandwidht with no 2 internet service provider. The SLAs defined for the bandwidht will be applicable to the SI
4
7.4/pg no 43/
5
7.4/pg no 43/
6
7.4/pg no 43/
7.4/pg no 43/
8
7.4/pg no 43/
The criteria should be relaxed as it would not restrict Telecom companies to participate in the bid who have capability to deliver on scope of work.
Reply Follow two certifications are mandatory :1). CMM level 3 or above. 2). ISO (9001:2000) certification.
As per RFP
As per understanding bandwidth has to be quoted along with FMS charges please confirm. Please mention the MPLS port size at each of the locations of KVIC. Also please mention the MPLS port size required at the central location.
Please refer the corrigendum dated 09.02.2009
Technical Specification - Indicative
Is the KVIC looking for serial network module *V.35) and module T1/PRI module for VC End points?
As per RFP
Technical Specification - Indicative
IS the KVIC looking for 3+1 MCU license for all VC end point sites?
Yes.
Technical Specification - Indicative
Whether Plasma display to be mounted on wall or to be kept on table? Is the KVIC looking for external gatekeeper for register H.323 endpoints (VC/VoIP) with names and alias numbers? IS the KVIC looking fr external recording & streaming services for Video session?
Wall Mounted
Technical Specification - Indicative 7
Suggestion
Technical Specification - Indicative
No. " It should be possible to register H.323 endpoints (VC/VoIP) with names and alias numbers. " This point stands. The requirement is of Recording and recorded streaming. No live streaming is envisaged in the scope of this project
9
10
11
12
Technical Specification - Indicative
Below points ned to be addd in the Technical specifications of Video Conferencing equipments 1). Distance between plasma and codec must be less than 1 mts. 2). Distance between codec and laptop will not be more than 1.5 mtrs for content sharing. 3). KVIC will provide all necessary Rack space for mountng the MCU. 4). KVIC will provide all necessary power supply for video conferencing equipments. 5). KVIC will provide all necessary Air Condition for video conferencing equipments. 6). KVIC will provide required IP addresses for video conferencing equipments.
Depends on site conditions
Multi Party Control Unit (MCU)
Please clarify on below end points systems would use 384/512kpbs for MCU connectivity from different mode of connectivity. (IP/ISDN)
Please read 7.4.2 pt 2 / pg 45 as " Capacity: The MCU shall support at least 40 participants on IP & SIP @ 2Mbps on a single chassis. The system shall support both H.323 & H.320 directly without any protocol conversions "
Technical Specification - Indicative
Please clarify on below points 1. Audio Cable is of 1.5 meter 2. Video Cable is of 1.5 meter 3. P+C cable is of 3 meter. 4. LAN Cable is of 6 meter 5. Power Cable is of 1.5 meter 6. Mic Cable of 2.5 meter
Depends on site conditions
7.4/pg no 43/
7.4.2/pg no 45
7.4.2/pg no 45
Access switch- minimum of 24 port Why CWDM required on the 10/100 Mbps Fast Ethernet switches? autosensing ports with two uplink slots 7.4.4/pg no 52/pt supporting gigabit ports such as no 3 1000Base-Sz, 1000Base-Lx, and 1000Base-T,CWDM
The requirement is of Layer 2 switch supporting all layer 2 datalink layer protocols
13
14
15
Acess Cable- Switch should be Since there will be only a Video stackable in nature with dedicated fail- Conferencing equipment connected to 7.4.4/pg no 52/pt safe bi-directional stacking ports for the switch, Is stacking required? no 3 each switch
3.18.2/pg no 17
Criteria Table - 4.2 Marks gicen is 10.
Should be 15 as Maximum Marks is shown as 15
As per RFP
One month for implementation
Should be 12 weekes taking into account time to procure communication links.
As per RFP
Bandwidth (b/w) to be given by SI
Later sections have given b/w. which is to take precedence
Badnwidth to be given by SI
Videoconference Room
Please provide details of facilities available in room
Please refer the corrigendum dated 09.02.2009
Please explain "other routine uses"
Please refer the corrigendum dated 09.02.2009
Spares
Pelase list out spares required
Bidder should calculate and provide the spares list to achieve the mentioned SLA's
Spares
Will spares from a part of commercial evaluation
No
Integration
Please list out equipment to be intergrated
All the proposed VC equipments
Should be 3 years
Please refer the corrigendum dated 09.02.2009
Training
Please elaborate on trining required
Training for the user's at the field and central Office of KVIC.
OSAT mentions 4 hrs run for 2 days
Please clarify
Onsite Acceptence testing will be done for 8 hours ( 4 hours per day continous). There should not be any gap between Network billing and OSAT.
5.3.1/pg no 28
16
5.3.2/pg no 28
17
5.3.2/ pg no 28
18
Bandwidth should be available for 5.3.2/ pg no 28 other routine usses
19
5.3.2/ pg no 29
20
5.3.2/ pg no 29
21
5.3.2/ pg no 29
22
The contract is for 3 years, why does 5.3.2/ pg no 29 FMS mention 2.5 years
23
5.3.2/ pg no 29
24
25
Yes,
Network will be commissioned prior to Network billing to start as soon as 5.4.2.1/pg no 32 OSAT network is installed
Network billing will be taken into the account when the OSAT is complete.
26
5.5/pg no 33
Delivery and installations is 2.5 months This is in variance with earlier mention timeframe of 1 month. Please reationalise to 12 weeks
27
5.5/pg no 34
Payment terms does not have section Payment terms should have separate for bandwidth mention for bandwidth
28
As per RFP
Please refer the corrigendum dated 09.02.2009
VC Schedule mentions both 1 hour and Please Clarify 5.6.2.10/pg no 39 3 hours notice
Please refer the corrigendum dated 09.02.2009
29
6.1/pg no 40
SI Staff to be available on demand basis
48 hrs notice to be given
Please refer the corrigendum dated 09.02.2009
30
7.1/pg no 41
Sites to be connected on b/w of 384 kbps (ISDN/IP)
Please clarify whether ISDN links will suffice at central site.
Proposed solution should be IP based and the proposed equipments should support ISDN.
7.1/pg no 41
Sites to be connected on b/w of 384 kbps (ISDN/IP)
Please clarify whether ISDN links will suffice at remote location.
Proposed solution should be IP based and the proposed equipments should support ISDN.
Sites to be connected on b/w of 384 kbps (ISDN/IP)
If ISDN is used, on average, for each location for how many hours per week will it be used
Proposed solution should be IP based and the proposed equipments should support ISDN.
31
32
7.1/pg no 41
7.1/pg no 41
Sites to be connected on b/w of 384 kbps (ISDN/IP)
If ISDN is used, will KVIC bear costs
33
Proposed solution should be IP based and the proposed equipments should support ISDN.
34
7.3/pg no 43
Backbone
Is an MPLS backbone mandatory
Yes.
Network supposrt mentions H.323/SIP/V.35, etc as 2 Mbps
Please clarify whether this refers to the equipment only or for the network as well
Please read 7.4.1 / pg 43 as " H.323 2 Mbps SIP 2 Mbps ISDN BRI 512 Kbps PRI 2Mbps V.35 2Mbps
Multiple language support
Foreign languages may be substituted with indian languages
Yes
AES Encryption
This may be deleted as private n/w are being used
As per RFP
IP Qos Features
If the network is on ISDN, how will the QoS be implemented. This clause may be deleted.
As per RFP refers to IP QoS
35
7.4.1/pg no 43
36
7.4.1/pg no 43
37
7.4.1/pg no 44
38
7.4.1/pg no 45
IP Qos Features- Downloading etc
Pelase clarify that these are features required only for the VC equipment and not for the network
As per RFP
Start Stop recording at will
Predecide which calls to record
39
7.4.1/pg no 45
40
7.4.2/pg no 46
41
7.4.3/pg no 46 Dynamic allocation
Predefine b/w
The Start Stop recording should be at the will of KVIC officials. As per RFP
42
7.4.10/pg no 46 Rate matching
Predefine b/w
As per RFP
43
8.8.4/pg no 62 CV date of birth
Change to number of years of exp.
Please refer the RFP
44
8.8.4/pg no 62 CV Countires of experience
Please delete
Please refer the RFP
Please separate and be made payable in advance
SI will arrange for Bandwidth and Bandwidth cost will be paid to the service provider directly(if required) on a quarterly basis but the non adherence of SLA's will be passed on The corrigendum is already uploaded to the SI. on the KVIC website. Please refer the corrigendum dated 09.02.2009
B/w cost as part of FM cost 45
8.9.1/pg no 64
The list of locations are not mentioned Please give a list of all locations with contact details Routers are not mentioned Please clarify whether routers are required, and if a specific make or model are required, how will MPLS links be terminated at all the KVIC locations,. Class of service for b/w is not Please clarify whether Real Time or mentioned Non Real Time is required
46
47
48
Topology
49
VC-SD or HD equipment 50
51
11/pg no 5
Please clarify whether an any-to-any or a hub and -spoke topology is required Please Clarify
As pre RFP Any-to Any topology is required VC -HD equipments . Appropriate interfaces are to be supported on ENDPOINTS to support high definition calls.
Is EMD in form of Bank Gaurntee OK Can we submit EMD of 3 Accepted with KVIC lac in a form of Bank Guarantee
Liquidity Damages
52
53
54
4.8/pg no 22
Should be applicable for As per RFP late delivery of the equipment, with plenalty of 0.5% of the value per week only for the delay portion of the equipment value; and max. upto 5% of the value for the delay portion of the equipment value.
Entry Taxes, Octroi should be Quoted The prices shall be As per RFP as extra inclusive of CST/ LST, Freight, Insurance but exclusive of octroi/entry tax. Some of the sites are in areas which require way bills, road permits for despatch of the equipments. These documents are to be provided by the end user, for the SI to despatch the equipments. the same should be provided to the SI by the KVIC. The Entry Tax/ Octroi as applicable at certain sites should be reimberused by KVIC to the SI against Original receipts. Presence of Video Controller and Please Clarify Please refer the corrigendum dated 6.1 &6.2/ pg no Assistant - 3 months and on call basis 09.02.2009 39
55
56
Way Bills/ Road Permits/ Entry Permits/ Forms for Despatch of the equipment
As some of the sites are SI is responsible. in states which requre way bills, road permits for despatch of the equipments. These documents are to be provided by the END user fo the SI to despatch the equipments. The Same should be provided to the SI by the KVIC.
Delievery of Six sites within 6 weeks and installation within 2 weeks thereafter. Total 8 weeks
We request KVIC to Please refer the RFP extedn this delivery time period to within six weeks and installation, precommissioning and site acceptance test and implementation within 2 weeks from the date of receipt of the equipment at site, readness of the site etc. the delay in the above, not attributable to the above will not constitute as a late deliver/installation. i.e. Total 8 weeks for entire implemenation at each site. This schedule does not exceed your total time lines planned for the project. Balance 34 sites will also be implement in total 8 weeks from the day of the recipet of confirmation from KVIC.
5.1.3/pg no 27
5.3.1/pg no 28
Bandwidth by SI, SLA with SI for bandwidth. 57
Procurement of bandwidth, establishing the required link and bandwidth is with ISP? SLA should be with the ISP not with SI?
5.3.2/pg np 28
Please refer the corrigendum dated 09.02.2009
Please refer the RFP
7.4.1/pg no 43
Payment terms - payment of 100% of installation and commissioning payment on completion and pre commissioning against BG to be kept vaid for period of 2 months for 40% of the installation Acessories - Please clarify number of mics required to be supplied with the system?
Yes
60
7.4.1/pg no 43
Accessories - Since external MCU is already asked in the next category, embedded MCU in the endpoint required from day one or optional?
61
1/pg no 45
Request you to please clarify future expansion road map.
Please refer the RFP
Please Clarify if the MCU is to be equipped with the redundant power supply?
" The MCU should have an option for a redundant power supply " This point stand deleted
Is Client based solution for Its recommended to have conference management acceptable? a client based application for conference management for better security. Please clarify the number of registrations required on the gatekeeper?
As per RFP
65
Please clarify the number of PRIs required to be used?
The MCU should have support for handling 4 PRI for future use.
66
40 participants on IP & SIP - Please clarify if 384 kbps per users bandwidth okay with KVIC?
As all the participants are on HD so minimum bandwidth requirement is 1 Mbps
58
59
62
63
64
5.5/pg no 34
pg no 46
pg no 46
pg no 48
2/pg no 45
3 mic at locations mentioned in priority 1 and 1 one mic at remaining 34 locations.
" It should be possible to register H.323 endpoints (VC/VoIP) with names and alias numbers. " This point stands Deleted
67
1.a &1.b/ pg no 53
MCU with 40 IP Port and MCU 40 ISDN ports
The MCU has different modules/interfaces for the IP ports and ISDN ports in the single Chasis.
Refer point 1. b stands deleted
What are the No. of participants on IP and on ISDN?
Connectivity is IP based
68
69
Do u want us to quote only the PRI modules in the Price item 1.b?
Refer point 1. b stands deleted
70
SI will ensure smooth integration of the proposed equipment with any existing network at KVIC,
71
72 73
5.3.7/pg no 29
6.1 & 6.2 pg no 39
Remote locations have small networks & in central office there is a LAN which Kindly mention the existing network of KVIC have 200+ PC in LAN.
Is it for only three months As per RFP or for entire contract period, as it would be difficult to meet 100% SLA, for on demand calls. If SLA is needed for on-demand basis FMS also, then the Setup For HO and Locations, it is asked for Intimation Period for such 100 % SLA minimum case (on demand basis) practically ( 8 working hours minimum) to be made sufficient for the person at MCU and CODEC point to reach to the designated KVIC office . Same as VC components How is the uptime calculated for harware How is the SLA calculated for harware
Same as VC components
74
7.4.1/pg no 43
As mentioned in Point no. 2, ISDN BRI backup has been asked for 512 Kbps
For the same 3 BRI cards would be required,. We assume the ISDN feature is asked for in the from of redundancy. Instead, we suggest MPLS network from a different ISP as redundancy would be better as ISDN do not provide MPLS feature.
Only ISDN Support is required
Please refer the corrigendum dated 09.02.2009
76
7.4.5/Pg no 53, BOM and Technical Specifications
No specficaton has been given for networking & Security components(Except Access Switch).Request you to standardize (explicit sepcification) the requirement like BOM does not include any networking and security networking/ Security (except Access components should be Switch) components.Does Networking from the top 3 OEM who equipments (such as Routers,Security has the largest market ) required for implementing the VC share in order to have solution is also under scope of SI or reliability as Routing ans KVIC will povide the same ? Security are the heart of Core Network. Further, Stacking at L2 Switching is specific to some OEMs like 3COM only. This deprives level playing ground , which is essence of an Open Tender Practices.
Scalable solution is required. Stackable is not required.
77
78
79
7.4.4/ pg no 51 Access Switch specification
5.6.2.10/pg no 39
5.6.2.10/pg no 39
Point no. e) says switch should be stackable in nature ?
Any Particular reason behind stacking L2 Switches ? As per the requirement study stacking of the L2 switches is not required, same can be achived by cascading the switches if required and thus can be a cost ffective as well as performance affective solution.Industry Leaders like CISCO do not offer stacking on simple L2 switches. This deprives level playing ground , which is essence of an Open Tender Practices
Please refer the corrigendum dated Does it mean 1 hour after 09.02.2009 Notice period given is 1 hour from the the schedule has commencement of schedule started?
What about the schedules with less then Schedule will contain VC with three hours? As there minimum of three hours and only won't be any schedules those schedules will be given to VCO like that, there won't be any VCO for such schedules
Please refer the corrigendum dated 09.02.2009
As per RFP
80
Considering the importance and scale of a 40 location MPLS connectivity, provision of a full time Network Provision of Network Administrator Administrator @ 8 X 5 for not mentioned in the tender invitation. 3 Years deputed at Central Location is very important suggession which may kindly be considered,
81
What are the Working Hours ?
Kindly clarify on Service Window
working hours are 0930 hours to 1800 hours. Please refer the corrigendum dated 09.02.2009
82
6.1 & 6.2/pg no 39
If SLA is needed for ondemand basis FMS also, then the Setup Intimation Period for such case (on demand basis) practically For on demand basis calls, sufficient ( 8 working hours Notice Period has to be provided minimum) to be made sufficient for the person at MCU and CODEC point to reach to the designated KVIC office .
As pr RFP
83
5.5/pg no 33
Milestones and Payment Terms
Delivery Period mentioned (1 Month) is very very less considering the Industry standard delivery times for MCU, CODECs,UPS and other items. Kindly make it as 45 to 60 days. Further Timilines mentioned in the table of this clause is difficult to understnad and hence see more clarity.
It will be responsibility of SI
84
5.6.2.10/pg no 39
As per the standard labour rules, Shift Hours need to be obeyed VC Schedule is specified as minimum properly. Multiple shift of 3 Hours. Will the VC schedule of 3 operators need to be Hours and more go beyond standard employed to meet the working hours ( 5Pm / 6PM) ? requirement of VC schedule going beyond standard working hours.
85
7.4.2/pg no 45
Chasis based MCU is mentioned in the tender docs. Any specific reason to be achieved thru Chassis based MCU.
Please read 7.4.2 pt 1 / pg 45 as Features:- It should be a standalone multi point conferencing unit with support for 40 HD ports on 720p @30fps from the day without Scalability is there in MCU with the provision of cascading. adding more capacity as As the MCU is standalone so " The desired.Hence chasis modules should be hot swappable. based MCU is not required.Chassis based Any module should be able to fit in any slot. " stands deleted MCU is specific to an OEM and it deprives many of the other OEM's opportunity without any major gain to KVIC.
or equivalent are acceptable
86
BOM Sr.No. 3/pg no 53
As per Tender document you have specified brand for Plasma …ie.. Sony/Panasonic
We are requesting you to add more Plasma brand like LG or only mention required specifications of Plasma as per its application .Mentioning Brand names deprive other quality conscious OEMs a the opportunity to particpate in an open tender system. This is incorporated in CVC guidelines .One such CVC guideline is 98/ORD/1.
As per RFP
87
88
3.14.5/pg no 13
7.3/pg no 43
We would suggest to evaluate on the basis of one reference with the Reference has been asked for the 3 80% of the estimated organizations with the implementation project cost as per the being undertaken across 20 locations 12-02-1-CTE-6 of CVC or more. guidelines. This will increase the number of qualified bidders and is in the intereset of KVIC.
Network Backbone MPLS/ISDN ?
Kindly clarify MPLS or ISDN ? Which is prefered?
Only MPLS is required but proposed equipments shouls support ISDN connectivity.
SLA need to be maintained
Redundancy at the MPLS backbone level has not been mentioned.
89
90
3.17.4c/pg np 16
The bidder will also submit equated quarterly based annuity fee as the part of the commercial quote
We would suggest you to have 2 backbones Primary and secondary from two different MPLS service Proviers to have high availability of the network. (ISDN do not provide MPLS feature.)
Please clarify in detail as provision is not provided in the commercial format (Form 9) given in the RFP.
Please refer the corrigendum dated 09.02.2009
91
3.11/pg no 10
92
BOM Sr.No. 6a/Pg no 53
93
94
7.4.1 Video conferencing endpoints (CODEC)
Exclusive Is it incuded in the Note : the Penalties will be capp upto Liquidity damages a maximum of 10 % of the total mentioned n Page No. 22 contract price clause No. 4.8 ? Or Is it exclusive of it ? 1).Non-rack mountable UPS is acceptable 2). Mentioned brand or equivalent is Details equipment wise acceptable Specification given in RFP does not mention about the Rack mounting 1KVA Rack Mountable with 30 min. feature for UPS,. Does backup it’s a typo error ? If not, Racks at the Locaions for the same are not mentioned in the BOM.Kindly Clarify
Please read 7.4.1 / pg 43 as " 1) From the clause 7 on H.323 2 Mbps Technical specifications Network Supported – H.323 -2Mbps , SIP 2 Mbps on page 41 of tender SIP -2Mbps , ISDN BRI 512Kbps, ISDN document, it is mentioned ISDN PRI -2Mbps, V.35 2Mbps on BRI 512 Kbps that all remotes sites will page 41 PRI 2Mbps be connected on ISDN/IP V.35 2Mbps bandwidth of 384kbps.
Please read 7.4.1 / pg 43 as " H.323 2 Mbps SIP 2 Mbps We request KVIC to ISDN please confirm the BRI 512 Kbps requirement for support PRI 2Mbps of ISDN PRI 2Mbps and V.35 2Mbps V.35 2Mbps on the Video endpoint
95
7.4.1 Video conferencing endpoints (CODEC)
Video specifications - IP (H.323 and SIP) data rates up to 2Mbps
Please read 7.4.1 / pg 43 as " H.323 2 Mbps SIP 2 Mbps 1) From the clause 7 on ISDN Technical specifications BRI 512 Kbps PRI 2Mbps on page 41 of tender document, it is mentioned V.35 2Mbps that all remotes sites will be connected on ISDN/IP bandwidth of 384kbps.
As per RFP We request KVIC to ISDN data rates up to 2Mbps of page please confirm the 43 requirement for support of ISDN PRI 2Mbps
96
97
7.4.2 Multi Party Control Unit (MCU) point 1 of Features on page 45
Please read 7.4.2 pt 1 / pg 45 as Features:- It should be a standalone KVIC has asked a 40 port multi point conferencing unit with MCU on IP/SIP @ support for 40 HD ports on 720p 384kbps/512kbps. We @30fps from the day without Features: The Multi conferencing unit request KVIC to please cascading. should be a modular with minimum confirm the requirement 15- slot chassis in the current for a 15 slot chassis as As the MCU is standalone so " The configuration. The system shall be a there are MCU’s modules should be hot swappable. chassis based. available in the market Any module should be able to fit in any which can support 40 slot. " stands deleted ports on 1U MCU platform.
Please read 7.4.2 pt 1 / pg 45 as Features:- It should be a standalone multi point conferencing unit with support for 40 HD ports on 720p Moreover, 15 slot chassis @30fps from the day without is proprietary to one OEM cascading. MCU with provision of adding more and is not available with capacity as desired from time to time As the MCU is standalone so " The any other OEM in the modules should be hot swappable. industry. Any module should be able to fit in any slot. " stands deleted
98
The participant will get connected on Ip network only.
99
7.4.2 Multi Party Control Unit (MCU) point 2 of Capacity on page 45
384/512 kbps on a single chassis. The system shall support both H.323 & H.320 directly without any protocol conversions
100
101
102
KVIC to confirm if any participant needs to be The MCU shall support at least 40 connected on the MCU in participants on IP & SIP @ a multipoint call on ISDN network.
7.4.2 Multi Party Control Unit (MCU) point 3 of Networks on page 46
Please read 7.4.2 pt 2 / pg 45 as " Capacity: The MCU shall support at least 40 participants on IP & SIP @ 2Mbps on a single chassis. The system shall support both H.323 & H.320 directly without any protocol conversions "
Please read 7.4.2 pt 2 / pg 45 as " Capacity: The MCU shall support at least 40 participants on IP & SIP @ 2Mbps on a single chassis. The system shall support both H.323 & H.320 directly without any protocol conversions "
From the tender document capacity page V.35 is not required to be directly 45, KVIC has asked a 40 terminated on MCU. Rest of the clause remain same The Multi conferencing unit should port MCU @ have the ability to be upgraded to 384kbps/512kbps on support ISDN PRI lines to be IP /SIP network. We terminated directly on the unit. request KVIC to clarify if V.35 is required to be terminated directly on the MCU. v.35 is not required to be directly terminated on MCU If required, it must support V.35 also directly to be added to the chassis
Yes transcoding is required at all ports.
103
7.4.2 Multi Party Control Unit (MCU) point 9 of Transcoding on page 47
Should support complete audio and video transcoding so as to
KVIC to confirm if transcoding is required to be supported on all 40 ports of the MCU As per RFP
104
105
7.4.2 Multi Party Control Unit (MCU) point 11 of Security on page 47
5.3.2 Requirement of Bandwidth on Page 28.
The MCU should be capable of supporting AES Encryption at conference level and individual participant level.
SI will size the amount of bandwidth and network required for videoconferencing and will coordinate, procure and establish the required link and bandwidth with ISP The bidder should have implemented The point is to be clear ther the videoconferencing /MPLS VPN solution intranet, routing and wireless in at least 3 organizations (preferable connectivity are the similar type of one govt. organization) with the solution in the market. implementation being udnertaken across 20 locations or more in india during the last five years as on march 31
106
Network supported H.323 2 Mbps, SIP IS the ISDN PRI support required 2 Mbps, ISDN, BRI 512 kbps, PRI 2 from the day one? Mbps, v.35 2 Mbps 107
7.4.1/pg no 43
KVIC to confirm if AES encryption is required to be supported for all participants/MCU ports
KVIC to confirm and elaborate the same as the same is not mentioned in the Bill of Material.
Please refer the corrigendum dated 09.02.2009
Request you to correct as Accepted. Preference will be given to "The bidder should have Wireline implemented videoconferencing/WAN either in wireline or in wireless solution in at leat 3 organizations
Please read 7.4.1 / pg 43 as " H.323 2 Mbps SIP 2 Mbps ISDN BRI 512 Kbps PRI 2Mbps V.35 2Mbps
Accessories: Omni directional Microphone with mute button Remote Control Multiple embedded 4 site MCU (1+3)
108
Since external MCU is already asked in the next category, embedded MCU in the endpoint required from day one or optional?
Embedded MCU ( 1+ 3 ) is required for six location. Rest location should have the option of MCU license
3.14 point 2
The firm should be in the business of The firm should be in the business of providing IT related services for at least providing IT/TELECOM related 5 years as of 31-3-2009. services for at least 5 years as of 313-2009.
Accepted
3.14 point 3
The firm has to be profitable and should not have incurred loss in the last 3 Financial Years (FY 08-09, FY 07-08, FY 06-07)
As oer RFP
3.14 point 5
The bidder should have implemented The bidder or its Group videoconferencing/ MPLS VPN solution company/subsidary should in at least 3 organizations (preferably have implemented videoconferencing/ one Govt. organization) with the MPLS VPN solution in at least 3 implementation being undertaken organizations (preferably one Govt. across 20 locations or more in India organization) with the implementation during the last five years as on March being undertaken across 20 locations 31, 2009 or more in India during the last five years as on March 31, 2009
109
110
111
The firm has to be profitable and should not have incurred loss in the last 2 Financial Years (FY 0809, FY 07-08)
As per RfP
YES , endpoint should support 720p resolution with 12x optical zoom .
112
Video Conferencing End Point
Please Confirm following: 1. The Resolution capability of the end point whether 1280x720p, optical zoom of 12x required? 2. The FPS required at 720p? 3. The Bandwidth required for HD Solution?
Endpoint should support 720p at 30 fps and 1 Mbps of bandwidth for HD calls. Accordingly the MCU should also support 720p @ 30fps
113
Please read 7.4.2 pt 1 / pg 45 as Features:- It should be a standalone multi point conferencing unit with support for 40 HD ports from the day one on single chassis ( without cascading )
Please clarify : 1. The minimum HD ports required from day one and the scalibility for future roadmap. 2. Please confirm on conference data rates? 3. The capability of reservation and scheduling tools?
Video Conferencing MCU
The bridge is required to have Support for conferences up to 6Mbps data rates The capability of reservation and scheduling tools should be native to the MCU
114
Request you to accept EMD DD or EMD BG
Accepted
115
Request you to extend the due date to 22/12/2009.
As per RFP
116
PQ # 4: Average Annual Turn Over for It should be INR 10 Crore (INR Ten last three years Crore)
It should be INR 10 Crore As per RFP (INR Ten Crore)
PQ # 5:
Please allow even those companies have implemented IT Solution Projects in at least 3 organizations (preferable one Govt. Organization)
Please allow even those As per RFP companies have implemented IT Solution Projects in at least 3 organizations (preferable one Govt. Organization)
Should allow even those companies having CMM Level 4 and ISO certifications.
Should allow even those Please refer the corrigendum dated companies having CMM 09.02.2009 Level 4 and ISO certifications.
Extend the bid submission date by two weeks.
Extend the bid submission date by two weeks.
117
118
Work Experience PQ # 6:
119 120 Bid submission date 121
As per RFP
HCL INFOSYSTEMS
S/N
Page No.
Clause No.
Query
1
29
5.3, Point 7
SI will ensure smooth integration of the proposed equipment with any existing network at KVIC,
2
29
5.3, Point 9
FMS duration is asked for 2.5 years from the date of system acceptance also timeline of system acceptance mentioned on Pg. 33 Clause 5.5 is 2 months after contract signing for priority one locations
3
39
6, Point 1,2
For HO and Locations, it is asked for 100 % SLA minimum
4 5
How is the uptime calculated for harware How is the SLA calculated for harware
43
7.4.1
As mentioned in Point no. 2, ISDN BRI backup has been asked for 512 Kbps
7
53
7.4.5, BOM and Technical Specifications
BOM does not include any networking/ Security (except Access Switch) components.Does Networking equipments (such as Routers,Security ) required for implementing the VC solution is also under scope of SI or KVIC will povide the same ?
8
51
7.4.4 Access Switch specification
Point no. e) says switch should be stackable in nature ?
9
39
5.6.2 Point 10
Notice period given is 1 hour from the commencement of schedule
6
10
39
5.6.2 Point 10
Schedule will contain VC with minimum of three hours and only those schedules will be given to VCO
11
Provision of Network Administrator not mentioned in the tender invitation.
12
What are the Working Hours ?
13
39
6, Point 1,2
For on demand basis calls, sufficient Notice Period has to be provided
14
33
5.5
Milestones and Payment Terms
15
13
3.14
CMMI level 5
16
39
5.6.2 Point 10
VC Schedule is specified as minimum of 3 Hours. Will the VC schedule of 3 Hours and more go beyond standard working hours ( 5Pm / 6PM) ?
17
45
7.4.2
Chasis based MCU is mentioned in the tender docs. Any specific reason to be achieved thru Chassis based MCU.
18
53
BOM Sr. No. 3
As per Tender document you have specified brand for Plasma …ie.. Sony/Panasonic
19
72
9.1
Annexure-I List of Locations.
20
13
3.14 Point no. 5
Reference has been asked for the 3 organizations with the implementation being undertaken across 20 locations or more.
21
43
7.3
Network Backbone MPLS/ISDN ? Redundancy at the MPLS backbone level has not been mentioned.
22
23
16
3.17 Point No. 4 c
The bidder will also submit equated quarterly based annuity fee as the part of the commercial quote
24
10
3.11
EMD has been asked in form of DD/Bankers Cheque.
25
40
6
Note : the Penalties will be capp upto a maximum of 10 % of the total contract price
26
53
BOM Sr. No. 6.a
1KVA Rack Mountable with 30 min. backup
7.4.1 Video conferencing endpoints (CODEC)
Network Supported – H.323 -2Mbps , SIP -2Mbps , ISDN BRI 512Kbps, ISDN PRI -2Mbps, V.35 2Mbps on page 41
27
28
29
30
Video specifications - IP (H.323 and SIP) data rates up to 2Mbps ISDN data rates up to 2Mbps of page 43
7.4.2 Multi Party Control Unit Features: The Multi conferencing unit should be a (MCU) point 1 of modular with minimum 15- slot chassis in the current Features on page configuration. The system shall be a chassis based. 45 MCU with provision of adding more capacity as desired from time to time
31
7.4.2 Multi Party The MCU shall support at least 40 participants Control Unit on IP & SIP @ 384/512 kbps on a single chassis. (MCU) point 2 of The system shall support both H.323 & H.320 Capacity on page directly without any protocol conversions 45
32
7.4.2 Multi Party The Multi conferencing unit should have the Control Unit ability to be upgraded to support ISDN PRI lines to (MCU) point 3 of be terminated directly on the unit. If required, it must Networks on page support V.35 also directly to be added to the chassis 46
33
7.4.2 Multi Party Control Unit (MCU) point 9 of Transcoding on page 47
Should support complete audio and video transcoding so as to allow sites with different audio and video protocols to join a conference
34
7.4.2 Multi Party Control Unit (MCU) point 11 of Security on page 47
The MCU should be capable of supporting AES Encryption at conference level and individual participant level.
35 36
5.3.2 SI will size the amount of bandwidth and network Requirement of required for videoconferencing and will coordinate, Bandwidth on procure and establish the required link and bandwidth Page 28. with ISP
FOSYSTEMS
Suggestion Kindly mention the existing network of KVIC
Please clarify the period of FMS, as per RFP it should be 2 Years and 10 Months from the date of contract signing. There is a gap of 4 months
Is it for only three months or for entire contract period, as it would be difficult to meet 100% SLA, for on demand calls. If SLA is needed for on-demand basis FMS also, then the Setup Intimation Period for such case (on demand basis) practically ( 8 working hours minimum) to be made sufficient for the person at MCU and CODEC point to reach to the designated KVIC office .
For the same 3 BRI cards would be required,. We assume the ISDN feature is asked for in the from of redundancy. Instead, we suggest MPLS network from a different ISP as redundancy would be better as ISDN do not provide MPLS feature. No specficaton has been given for networking & Security components(Except Access Switch).Request you to standardize (explicit sepcification) the requirement like networking and security components should be from the top 3 OEM who has the largest market share in order to have reliability as Routing ans Security are the heart of Core Network. Further, Stacking at L2 Switching is specific to some OEMs like 3COM only. This deprives level playing ground , which is essence of an Open Tender Practices.
Any Particular reason behind stacking L2 Switches ? As per the requirement study stacking of the L2 switches is not required, same can be achived by cascading the switches if required and thus can be a cost ffective as well as performance affective solution.Industry Leaders like CISCO do not offer stacking on simple L2 switches. This deprives level playing ground , which is essence of an Open Tender Practices Does it mean 1 hour after the schedule has started?
Reply
What about the schedules with less then three hours? As there won't be any schedules like that, there won't be any VCO for such schedules Considering the importance and scale of a 40 location MPLS connectivity, provision of a full time Network Administrator @ 8 X 5 for 3 Years deputed at Central Location is very important suggession which may kindly be considered, Kindly clarify on Service Window
If SLA is needed for on-demand basis FMS also, then the Setup Intimation Period for such case (on demand basis) practically ( 8 working hours minimum) to be made sufficient for the person at MCU and CODEC point to reach to the designated KVIC office .
Delivery Period mentioned (1 Month) is very very less considering the Industry standard delivery times for MCU, CODECs,UPS and other items. Kindly make it as 45 to 60 days. Further Timilines mentioned in the table of this clause is difficult to understnad and hence see more clarity. CMMI level 5 certification is relevent for software development related projects. This particular SI project is for Video Conferencing, thus we request you to remove this clause or Preferably keep the CMMI certification only regadless of mentioning level. As per the standard labour rules, Shift Hours need to be obeyed properly. Multiple shift operators need to be employed to meet the requirement of VC schedule going beyond standard working hours. Scalability is there in MCU with the provision of adding more capacity as desired.Hence chasis based MCU is not required.Chassis based MCU is specific to an OEM and it deprives many of the other OEM's opportunity without any major gain to KVIC. We are requesting you to add more Plasma brand like LG or only mention required specifications of Plasma as per its application .Mentioning Brand names deprive other quality conscious OEMs a the opportunity to particpate in an open tender system. This is incorporated in CVC guidelines .One such CVC guideline is 98/ORD/1. List is not attached in Tender please provide the same.
We would suggest to evaluate on the basis of one reference with the 80% of the estimated project cost as per the 12-02-1-CTE-6 of CVC guidelines. This will increase the number of qualified bidders and is in the intereset of KVIC. Kindly clarify MPLS or ISDN ? Which is prefered? We would suggest you to have 2 backbones Primary and secondary from two different MPLS service Proviers to have high availability of the network. (ISDN do not provide MPLS feature.) Please clarify in detail as provision is not provided in the commercial format (Form 9) given in the RFP. Request you to consider BankGuarantee keeping iin mind the cash crunch situation resulted due to series of global meltdown Is it incuded in the Liquidity damages mentioned n Page No. 22 clause No. 4.8 ? Or Is it exclusive of it ? Details equipment wise Specification given in RFP does not mention about the Rack mounting feature for UPS,. Does it’s a typo error ? If not, Racks at the Locaions for the same are not mentioned in the BOM.Kindly Clarify 1) From the clause 7 on Technical specifications on page 41 of tender document, it is mentioned that all remotes sites will be connected on ISDN/IP bandwidth of 384kbps. We request KVIC to please confirm the requirement for support of ISDN PRI 2Mbps and V.35 2Mbps on the Video endpoint
1) From the clause 7 on Technical specifications on page 41 of tender document, it is mentioned that all remotes sites will be connected on ISDN/IP bandwidth of 384kbps. We request KVIC to please confirm the requirement for support of ISDN PRI 2Mbps KVIC has asked a 40 port MCU on IP/SIP @ 384kbps/512kbps. We request KVIC to please confirm the requirement for a 15 slot chassis as there are MCU’s available in the market which can support 40 ports on 1U MCU platform. Moreover, 15 slot chassis is proprietary to one OEM and is not available with any other OEM in the industry.
KVIC to confirm if any participant needs to be connected on the MCU in a multipoint call on ISDN network.
From the tender document capacity page 45, KVIC has asked a 40 port MCU @ 384kbps/512kbps on IP /SIP network. We request KVIC to clarify if V.35 is required to be terminated directly on the MCU.
KVIC to confirm if transcoding is required to be supported on all 40 ports of the MCU
KVIC to confirm if AES encryption is required to be supported for all participants/MCU ports
KVIC to confirm and elaborate the same as the same is not mentioned in the Bill of Material.
SIEMENS S. No
Page No.
1
11/pg no 5
Clause No.
Query Is EMD in form of Bank Gaurntee OK with KVIC Liquidity Damages
2
4.8/pg no 22 Entry Taxes, Octroi should be Quoted as extra
3
4
5
Presence of Video Controller and Assistant 6.1 &6.2/ - 3 months and on call pg no 39 basis
5.1.3/pg no 27
Way Bills/ Road Permits/ Entry Permits/ Forms for Despatch of the equipment
Delievery of Six sites within 6 weeks and installation within 2 weeks thereafter. Total 8 weeks 6
5.3.1/pg no 28
7
5.3.2/pg Bandwidth by SI, SLA np 28 with SI for bandwidth.
8
5.5/pg no 34
9
7.4.1/pg no 43
10
7.4.1/pg no 43
Payment terms - payment of 100% of installation and commissioning payment on completion and pre commissioning against BG to be kept vaid for period of 2 months for 40% of the installation Acessories - Please clarify number of mics required to be supplied with the system? Accessories - Since external MCU is already asked in the next category, embedded MCU in the endpoint required from day one or optional?
11
1/pg no 45
12
pg no 46
13
pg no 46
14
pg no 48
15 16
2/pg no 45
17
1.a &1.b/ pg no 53
Request you to please clarify future expansion road map. Please Clarify if the MCU is to be equipped with the redundant power supply? Is Client based solution for conference management acceptable? Please clarify the number of registrations required on the gatekeeper? Please clarify the number of PRIs required to be used? 40 participants on IP & SIP - Please clarify if 384 kbps per users bandwidth okay with KVIC? MCU with 40 IP Port and MCU 40 ISDN ports
SIEMENS Suggestion Can we submit EMD of 3 lac in a form of Bank Guarantee Should be applicable for late delivery of the equipment, with plenalty of 0.5% of the value per week only for the delay portion of the equipment value; and max. upto 5% of the value for the delay portion of the equpment value. The prices shall be inclusive of CST/ LST, Freight, Insurance but exclusive of octroi/entry tax. Some of the sites are in areas which require way bills, road permits for despatch of the equipments. These documents are to be provided by the end user, for the SI to despatch the equipments. the same should be provided to the SI by the KVIC. The Entry Tax/ Octroi as applicable at certain sites should be reimberused by KVIC to the SI against Original receipts. Please Clarify
As some of the sites are in states which requre way bills, road permits for despatch of the equipments. These documents are to be provided by the END user fo the SI to despatch the equipments. The Same should be provided to the SI by the KVIC. We request KVIC to extedn this delivery time period to within six weeks and installation, precommissioning and site acceptance test and implementation within 2 weeks from the date of receipt of the equipment at site, readness of the site etc. the delay in the above, not attributable to the above will not constitute as a late deliver/installation. i.e. Total 8 weeks for entire implemenation at each site. This schedule does not exceed your total time lines planned for the project. Balance 34 sites will also be implement in total 8 weeks from the day of the recipet of confirmation from KVIC. Procurement of bandwidth, establishing the required link and bandwidth is with ISP? SLA should be with the ISP not with SI?
Reply
Its recommended to have a client based application for conference management for better security.
The MCU has different modules/interfaces for the IP ports and ISDN ports in the single Chasis.
RELIANCE COMMUNICATON Sr. No.Page No.Clause No. Query
1
2
3
4
12 3.14 point 2
The firm should be in the business of providing IT related services for at least 5 years as of 31-3-2009.
12 3.14 point 3
The firm has to be profitable and should not have incurred loss in the last 3 Financial Years (FY 0809, FY 07-08, FY 06-07)
13 3.14 point 5
The bidder should have implemented videoconferencing/ MPLS VPN solution in at least 3 organizations (preferably one Govt. organization) with the implementation being undertaken across 20 locations or more in India during the last five years as on March 31, 2009
13 3.14 point 6
Company/firm should have minimum following certification i. CMMi Level 5 ii. ISO Certification (9001:2000) or latest
MMUNICATON Suggestion The firm should be in the business of providing IT/TELECOM related services for at least 5 years as of 31-3-2009. The firm has to be profitable and should not have incurred loss in the last 2 Financial Years (FY 08-09, FY 07-08) The bidder or its Group company/subsidary should have implemented videoconferencing/ MPLS VPN solution in at least 3 organizations (preferably one Govt. organization) with the implementation being undertaken across 20 locations or more in India during the last five years as on March 31, 2009
Company/firm should have minimum following certification i. ISO Certification (9001:2000) or latest
Reply
GEMINI COMMUNICATION LTD. Sr.No.
1
2
Section
Stated Condition The bidder should have implementation of atleast 3 organisation on video conferencing or MPLS VPN.
Query The bidder should have implemented videoconferencing /WAN either in wireline or in wireless solution in at least 3 organizations with the implementation being udnertaken across 20 locations or more in india durin the last five years as on MARch 31, 2009. CMMi level 5 certification is completely depends for softwre quality level not for project implementation. So instead of that we request you to correct as "Company/Firm should have miniumum following certification 1). Minimum 5 CCNA Engineers 2). ISO (9001:2000) or latest"
Suggestion
Reply
SPANCO LTD. S. No
Page No.
1
43
Clause No. 7.4.1
2
43
7.4.1
Please clarify number of mics required to be supplied with the system?
3
43
7.4.1
Since external MCU is already asked in the next category, embedded MCU in the endpoint required from day one or optional?
4
45
7.4.2 -1
5
45
6
46
7
46
8
46
7.4.2 -2 Bullet Pt- This functionality is obtained by 7 deploying external gatekeeper only.Since the registrations are done on it for better security,management and simplified dialing, please clarify if the gatekeeper required is external?
9
46
7.4.2 -2 Bullet Pt- Pls. clarify the number of 8 registrations required if external gatekeeper is required?
10
46
11
41
7.4.2 -3 Bullet Pt-2 7.1, 5.2
42
Is the ISDN BRI or PRI support required from the day one? Or might require it in future.
Request you to please clarify future expansion road map. 7.4.2 -2 Bullet.Pt- Is it required to have external 3G 1 gateway support? Since its recommended always to have this functionality as external due to quality and scalability. 7.4.2 -2 Bullet Pt- Is this required from the day one or 3 a provision is required? 7.4.2 -2 Bullet Its recommended to have a client Pt-4 based application for such scenarios for better security, is client based solution acceptable?
12 13
Query
7.2.1
Pls. clarify the number of PRIs required to be used? Please provide the clarity on the number & capacity of the leased lines for remote connectivity. Do any mobile users connect to video conference over Internet? Need to have the detailed address of 40 location where the system is proposed to arrange the feasibility study
14
43
7.3
Please specify the exact bandwidth looking for each remote loaction
15
24
4.12
Please provide clarity on applicable taxes and exeptions for transfer of materials
16
53
6.a
1KVA ups should be 40 instead of 39 ,VC room may be not near the MCU at headquarter location or MCU cannot be fixed in vc room
17
37
5.6.1 13 (viii)
Archival of recording : Is it means Video call recording required ( page 37) clarification Required.
18
33
5.5 Sl no.1
Delivery & Procurement period is 1 Month then unable make live first 6 site in 1 month after singing contract . (Page 34 ) Clarification Required
19
13
3.14; sr.no.6
min. qualification CMMi5
D. Suggestion
Please provde with exact number of leased line required with carrier capacity.
Reply
Please provde with exact number of leased line required with carrier capacity.
We request you to please remove this creteria as this qualification is not the need for the Videoconferencing solution as there is not software implementation OR software development activity in this project.
BHARTI AIRTEL S. No
Page No.
1
3.14/Pg 13/pt no 6
2
3
Clause No. Company should have minimum following certifications
The bidder should have implemented videoconferencing /MPLS VPN solution in at least 3 organizations (preferable one govt. organization) with the 3.14/Pg 13/pt no 5 implementation being udnertaken across 20 locations or more in india during the last five years as on march 31, 2009 The SI will size the amount of bandwidth and network required for videoconferencing and will coordinate,procure and establish the 5.3/pg no 28/pt no 2 required link and bandwidht with internet service provider. The SLAs defined for the bandwidht will be applicable to the SI Technical Specification - Indicative
4
7.4/pg no 43/
5
7.4/pg no 43/
6
7.4/pg no 43/
7
7.4/pg no 43/
8
7.4/pg no 43/
Technical Specification - Indicative Technical Specification - Indicative Technical Specification - Indicative
Technical Specification - Indicative
Technical Specification - Indicative
9
7.4/pg no 43/
Multi Party Control Unit (MCU) 10
7.4.2/pg no 45 Technical Specification - Indicative
11
12
13
7.4.2/pg no 45
Access switch- minimum of 24 port 10/100 Mbps Fast Ethernet autosensing ports 7.4.4/pg no 52/pt no with two uplink slots supporting gigabit ports such as 1000Base-Sz, 1000Base3 Lx, and 1000Base-T,CWDM Acess Cable- Switch should be stackable 7.4.4/pg no 52/pt no in nature with dedicated fail-safe bidirectional stacking ports for each switch 3
14
3.18.2/pg no 17
15
5.3.1/pg no 28
16
5.3.2/pg no 28
17
5.3.2/ pg no 28
18
5.3.2/ pg no 28
19
5.3.2/ pg no 29
20
5.3.2/ pg no 29
Criteria Table - 4.2 Marks gicen is 10. One month for implementation Bandwidth (b/w) to be given by SI Videoconference Room Bandwidth should be available for other routine usses Spares Spares
21
5.3.2/ pg no 29
22
5.3.2/ pg no 29
23 24
5.3.2/ pg no 29
25
5.4.2.1/pg no 32
26
5.5/pg no 33
27 28 29
Integration The contract is for 3 years, why does FMS mention 2.5 years Training OSAT mentions 4 hrs run for 2 days Network will be commissioned prior to OSAT Delivery and installations is 2.5 months
Payment terms does not have section for bandwidth VC Schedule mentions both 1 hour and 3 5.6.2.10/pg no 39 hours notice SI Staff to be available on demand basis 6.1/pg no 40 5.5/pg no 34
30
7.1/pg no 41
31
7.1/pg no 41
32
7.1/pg no 41
33
7.1/pg no 41
34
7.3/pg no 43
35
7.4.1/pg no 43
36
7.4.1/pg no 43
37
7.4.1/pg no 44
38
7.4.1/pg no 45
39
7.4.1/pg no 45
40 41 42 43 44
7.4.2/pg no 46 7.4.3/pg no 46 7.4.10/pg no 46 8.8.4/pg no 62 8.8.4/pg no 62
45
8.9.1/pg no 64
Sites to be connected on b/w of 384 kbps (ISDN/IP) Sites to be connected on b/w of 384 kbps (ISDN/IP) Sites to be connected on b/w of 384 kbps (ISDN/IP) Sites to be connected on b/w of 384 kbps (ISDN/IP) Backbone Network supposrt mentions H.323/SIP/V.35, etc as 2 Mbps Multiple language support AES Encryption IP Qos Features
IP Qos Features- Downloading etc
46
Start Stop recording at will Dynamic allocation Rate matching CV date of birth CV Countires of experience B/w cost as par of FM cost The list of locations are not mentioned Routers are not mentioned
47
48 49 50
Class of service for b/w is not mentioned Topology VC-SD or HD equipment
BHARTI AIRTEL Query This criteria should be relaxed as CMMi level 5 certification os required for software development and scope of work does not include any application development. The criteria should be relxed, the details of video conferencing projects with implementation across 10 and above locations should be considered for qualifying criteria
As per understanding bandwidth has to be quoted along with FMS charges please confirm. Please mention the MPLS port size at each of the locations of KVIC. Also please mention the MPLS port size required at the central location.
Is the KVIC looking for serial network module *V.35) and module T1/PRI module for VC End points? IS the KVIC looking for 3+1 MCU license for all VC end point sites? Whether Plasma display to be mounted on wall or to be kept on table? Is the KVIC looking for external gatekeeper for register H.323 endpoints (VC/VoIP) with names and alias numbers? IS the KVIC looking fr external recording & streaming services for Video session?
Suggestion The criteria should be relaxed as it would not restrict Telecom companies to participate in the bid who have capability to deliver on scope of work.
Reply
Below points ned to be addd in the Technical specifications of Video Conferencing equipments 1). Distance between plasma and codec must be less than 1 mts. 2). Distance between codec and laptop will not be more than 1.5 mtrs for content sharing. 3). KVIC will provide all necessary Rack space for mountng the MCU. 4). KVIC will provide all necessary power supply for video conferencing equipments. 5). KVIC will provide all necessary Air Condition for video conferencing equipments. 6). KVIC will provide required IP addresses for video conferencing equipments.
Please clarify on below end points systems would use 384/512kpbs for MCU connectivity from different mode of connectivity. (IP/ISDN) Please clarify on below points 1. Audio Cable is of 1.5 meter 2. Video Cable is of 1.5 meter 3. P+C cable is of 3 meter. 4. LAN Cable is of 6 meter 5. Power Cable is of 1.5 meter 6. Mic Cable of 2.5 meter Why CWDM required on the switches?
Since there will be only a Video Conferencing equipment connected to the switch, Is stacking required? Should be 15 as Maximum Marks is shown as 15 Should be 12 weekes taking into account time to procure communication links. Later sections have given b/w. which is to take precedence Please provide details of facilities available in room Please explain "other routine uses" Pelase list out spares required Will spares from a part of commercial evaluation
Please list out equipment to be intergrated Should be 3 years Please elaborate on trining required Please clarify Network billing to start as soon as network is installed This is in variance with earlier mention timeframe of 1 month. Please reationalise to 12 weeks Payment terms should have separate mention for bandwidth Please Clarify 48 hrs notice to be given Please clarify whether ISDN links will suffice at central site. Please clarify whether ISDN links will suffice at remote location. If ISDN is used, on average, for each location for how many hours per week will it be used If ISDN is used, will KVIC bear costs Is an MPLS backbone mandatory Please clarify whether this refers to the equipment nly or for the network as well Foreign languages may be substituted with indian languages This may be deleted as private n/w are being used If the network is on ISDN, how will the QoS be implemented. This clause may be deleted. Pelase clarify that these are features required only for the VC equipoment and not for the network Predecide which calls to record Predefine b/w Predefine b/w Change to number of years of exp. Please delete Please separate and be made payable in advance Please give a list of all locations with contact details Please clarify whether routers are required, and if a specific make or model are required, how will MPLS links be terminated at all the KVIC locations,.
Please clarify whether Real Time or Non Real Time is required Please clarify whether an any-to-any or a hub and -spoke topology is required Please Clarify
TULIP S. No
Page No.
Clause No.
Query
Suggestion
1
Request you to accept EMD DD or EMD BG
2
Request you to extend the due date to 22/12/2009.
Reply
NAVAYUGA S. No Page No.
Clause No.
Query
Suggestion
1
12
3.14 PQ # 4: Average Annual Turn Over for last three years
It should be INR 10 Crore (INR Ten Crore)
2
13
3
13
3.14 PQ # 5: Work Experience 3.14 PQ # 6: Certifications
Please allow even those companies have implemented IT Solutionallow Projects at least 3 Should eveninthose companies having CMM Level 4 and ISO certifications.
4
Bid submission date
Extend the bid submission date by two weeks.
Reply
It should be INR 10 Crore (INR Ten Crore) Please allow even those companies have implemented IT Solution Should allow even those companies having CMM Level 4 and ISO certifications. Extend the bid submission date by two weeks.
PRESTO INFOSOLUTIONS PVT. LTD. Sr.No.
1
Section
Stated Condition
Network Supported H.323 2 Mbps SIP 2 Mbps 7.4 Technical specifications ISDN - Indicative BRI 512 kbps PRI 2 Mbps v.35 2 Mbps Accessories Omni directional Microphone with Mute button Remote Control Minimum embedded 4 site MCU(1+3)
2
3
Video Conferencing End Point
4
Video Conferencing MCU
OSOLUTIONS PVT. LTD. Query
Is ISDN PRI support required from the day one.
Since external MCU is already asked in the next category, embedded MCU in endpoint required from day one or optional? Please Confirm following: 1. The Resolution capability of the end point whether 1280x720p, optical zoom of 12x required? 2. The FPS required at 720p? 3. The Bandwidth required for HD Solution? Please clarify : 1. The minimum HD ports required from day one and the scalibility for future roadmap. 2. Please confirm on conference data rates? 3. The capability of reservation and scheduling tools?
Suggestion
Reply