Qc Letter.docx

  • Uploaded by: surendra
  • 0
  • 0
  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Qc Letter.docx as PDF for free.

More details

  • Words: 251
  • Pages: 1
Government of Telangana Yadagirigutta Temple Development Authority Dt: 29.03.2019 From: M.Venkateshwar Reddy, Deputy Executive Engineer, Layout, Y.T.D.A.

To: The Executive Engineer, R&B Special Division Yadadri.

Sir, Sub: -

Development of Temple city Layout (250Acres) by providing Infrastructure Such as formation of Roads, Retaining walls, Water Supply, Sewerage, Storm,Water Drains, Utility Duct, Electrification etc at Yadadri ( Yadagirigutta) in Nalgonda District –Compliance Report Submitted-Reg

Ref: - 1) S.E (R&B) Nalgonda L.S. AGREEMENT NO: 65/2016-2017, DATE 02.06.2016 2) EE (R&B) , Bhongir Lr. No. DB/D1/2016-17/648 dt: 19.01.2017 3) Memo No: 1003170016/CE (Admn&QC) /EE (QC&MC) /DEE/AEE2/2017 dt:07.03.2019 Adverting to the reference cited above, I am here with submitting action taken report on the compliance report on the following paras of the QCR: 7.4: The disturbed Embankment was rectified on Road no.18 L/S & 19 L/S duly Compacting layer by layer with suitable earth compactors during the execution of the Gabion wall work. 7.11: The Contrartor has got permission from Vice Chairman &CEO YTDA to run the stone crusher unit , pugmill for WMM & Batch mix plant adjacent to the layout site vide Letter no 128/YTDA dt: 09/12/2016. 7.12 : The difference of Lead charges amount is withheld in Running Bills towards layout site blasting material to recover after getting the approval from the technical sanctioning authority. The above parawise replies already communicated to the Chief Engineer (R&B) Admin & QC and also the copies of letters is here with enclosed. Enclosures: 1) Earlier Compliance report 2)YTDA Permission letter Dy. Executive Engineer

Y.T.D.A Yadagirigutta

Related Documents

Qc
November 2019 29
Qc
July 2020 15
Qc Letter.docx
April 2020 11
Qc Tools.docx
December 2019 9
Qavs Qc
October 2019 22
Qc-tgo
April 2020 11

More Documents from "QUIMICO CLINICO WILLIANS SANCHEZ"

Test Instrument For Research
December 2019 24
For Print
December 2019 25
Cover
December 2019 33
Preliminary
December 2019 56