Processing Information  For  CORE  Office Use Only  File number: 

SUN POWER PIONEERS 

Date received: 

Grid­Tied Photovoltaic System 

Amount: $

P.O. Box 9707, Aspen, Colorado 81612  Ph: (970) 544­9808 Fax: (970) 963­5691  Applicant Information  Name: 

Daytime Phone: 

Address of system (street):  City: 

State: 

Zip: 

State: 

Zip: 

Applicant mailing address:  City: 

Installation date (date of final inspection by CORE or installation by certified installer):  Equipment Information  Module  Manufacturer: 

Model number: 

Listing agency: 

Number of modules: 

PTC power rating per module in Watts: 

1.  Total module output in Watts (multiply number of modules by PTC* power rating per module):  Inverter  Manufacturer: 

Model number: 

Listing agency: 

Battery Storage (if applicable) (NOTE system must be Grid Tied to be eligible for rebate)  Battery bank voltage: 

Rated capacity in amp­hrs: 

System  2. 

System rated output in Watts (multiply line 1 by 0.9.  If battery storage is  used, multiply result again by 0.9 to account for charge/discharge efficiency):  Installer Information 

Certifying installer:  Company name: 

Phone: 

Company mailing address:  City: 

10/31/2005 

State: 

Zip 

Continued on next page 

Page 1 

Installer Information (Cont.)  Qualifications 

Solar license 

COSEIA certification 

Manufacturer/supplier letter (attach copy) 

Non­solar  license(s) required Þ  Jurisdiction(s)

Þ 

License holder(s)

Þ 

Certifying installer 

Certifying installer 

Certifying installer 

Subcontractor 

Subcontractor 

Subcontractor 

Installation Information  Panel orientation  Panels are not shaded between 9:00 am and 3:00 MST on March 21 and September 23 (equinoxes).  Tilt (degrees from horizontal): 

Azimuth (degrees from true south): 

3.  Orientation (Tilt & Azimuth) adjustment factor, percentage (%) (see table on page 4):  Code information  System installation meets applicable state, county, or local building codes and regulations, and is installed  in conformance with manufacturer’s specifications.  Permit required and attached. 

Inspection jurisdiction: 

Utility information  Name of local electric utility:  System complies with local electric utility interconnection requirements.  Metering arrangement with utility:  Net metered 

other 

Warranties and documentation  System has a total production meter.  Manuals and documents specifying system installation, maintenance, service and replacement parts,  potential system hazards, and system component warranty coverage and claims procedures have been  provided to the applicant.  System includes means for an observer to readily determine if it is operating properly.  Rebate Calculation  4.  System rated output in Watts (from line 2): 

Watts 

5.  Orientation (Tilt & Azimuth) adjustment factor, percentage (%) (from line 3): 



6.  Estimated Peak Power, Multiply line 4 by line 5: 

Watts 

7.  Multiply the result from line 6 by $2.00: 



8. Estimated Solar Rebate Amount, The result in line 7, or $6,000, whichever is less: 

$

10/31/2005 

Continued on next page 

Page 2 

Installer Certifications  This system meets the requirements of the SUN POWER PIONEERS solar incentive program.  I have  supplied the required consumer information and have estimated the value of the incentive to be paid to the  consumer . I understand that the system will be inspected by CORE, and if it is determined by the CORE  board that I have deliberately misrepresented information in this application, I will be considered ineligible to  certify future applications.  By signing below I certify that the system described in this application is installed  and that the information provided in this application is accurate and true.  Certifying installer (print name):  Signature: 

Date:  Applicant Certifications 

I understand that CORE does not make any warranty concerning the performance, operation, installation or  any other characteristic or feature of this system.  CORE approval of this application is only for the purpose  of obtaining an incentive.  By signing below I certify that the system described in this application is installed  and that the information provided in this application is accurate and true.  Initial each item below:

¾  I understand that the CORE SUN POWER PIONEERS program is offered on a first­come, first­  served basis.

¾  I understand that CORE may inspect my system, free of charge, at a mutually agreed upon time  within ten days of receipt of this application.  I understand that refusing reasonable access for  inspection will result in application denial.

¾  I understand that if my system fails inspection by CORE it must be re­inspected and approved before  I can receive a rebate.  CORE will issue an inspection report indicating any problems and suggesting  remedies.

¾  I have received an owner’s manual and documents specifying system installation, maintenance,  service and replacement parts, potential system hazards, and system component warranty coverage  and claims procedures.

¾  I have attached a copy of the building permit after final inspection. ¾  I have attached proof of payment for this installation:  an itemized contract, invoice or receipt  marked “paid” by the certifying installer and dated. 

¾  I certify that this system is not being installed to offset (all or part) of Pitkin County's REMP fees.   Applicant (print name):  Signature: 

10/31/2005 

Date:

Continued on next page 

Page 3 

Orientation Adjustment Factor Table  Collector Tilt, Degrees From Horizontal  0  10  Collector  20  Azimuth,  30  Degrees  40  50  From  60  True  70  South  80  90 

0  10  20  30  40  50  60  70  87.0%  93.2%  97.6%  99.9%  100%  98.0%  93.9%  87.8%  87.0%  93.1%  97.4%  99.7%  99.8%  97.7%  93.6%  87.6%  87.0%  92.8%  96.9%  99.0%  99.1%  97.1%  93.0%  87.1%  87.0%  92.4%  96.1%  98.0%  97.9%  95.9%  92.0%  86.2%  87.0%  91.8%  95.0%  96.6%  96.4%  94.3%  90.5%  85.0%  87.0%  91.0%  93.7%  94.8%  94.3%  92.2%  88.5%  83.2%  87.0%  90.0%  92.0%  92.7%  91.9%  89.6%  86.0%  80.9%  87.0%  89.0%  90.1%  90.2%  89.0%  86.6%  82.9%  78.1%  87.0%  87.9%  88.1%  87.4%  85.7%  83.0%  79.3%  74.6%  87.0%  86.7%  85.8%  84.3%  82.1%  79.1%  75.2%  70.6%  Tracking Collectors:  Orientation Adjustment Factor = 125.00% 

80  80.0%  79.9%  79.6%  79.0%  78.1%  76.7%  74.7%  72.2%  69.1%  65.3% 

90  70.7%  70.7%  70.7%  70.5%  70.0%  69.1%  67.6%  65.5%  62.8%  59.5% 

Note:  Interpolate for collector tilt and azimuth values between those listed on the table. 

*The electricity output of a given PV module varies depending upon many factors. The PTC (PVUSA Test  Conditions) were created to make it easier to compare the output of different PV systems. The standardized test  conditions are defined as 40°C (104°F) temperature, 1000 W/m2 solar irradiance, and 1 m/s wind speed.

10/31/2005 

Page 4