Installation date (date of final inspection by CORE or installation by certified installer): Equipment Information Module Manufacturer:
Model number:
Listing agency:
Number of modules:
PTC power rating per module in Watts:
1. Total module output in Watts (multiply number of modules by PTC* power rating per module): Inverter Manufacturer:
Model number:
Listing agency:
Battery Storage (if applicable) (NOTE system must be Grid Tied to be eligible for rebate) Battery bank voltage:
Rated capacity in amphrs:
System 2.
System rated output in Watts (multiply line 1 by 0.9. If battery storage is used, multiply result again by 0.9 to account for charge/discharge efficiency): Installer Information
Certifying installer: Company name:
Phone:
Company mailing address: City:
10/31/2005
State:
Zip
Continued on next page
Page 1
Installer Information (Cont.) Qualifications
Solar license
COSEIA certification
Manufacturer/supplier letter (attach copy)
Nonsolar license(s) required Þ Jurisdiction(s)
Þ
License holder(s)
Þ
Certifying installer
Certifying installer
Certifying installer
Subcontractor
Subcontractor
Subcontractor
Installation Information Panel orientation Panels are not shaded between 9:00 am and 3:00 MST on March 21 and September 23 (equinoxes). Tilt (degrees from horizontal):
Azimuth (degrees from true south):
3. Orientation (Tilt & Azimuth) adjustment factor, percentage (%) (see table on page 4): Code information System installation meets applicable state, county, or local building codes and regulations, and is installed in conformance with manufacturer’s specifications. Permit required and attached.
Inspection jurisdiction:
Utility information Name of local electric utility: System complies with local electric utility interconnection requirements. Metering arrangement with utility: Net metered
other
Warranties and documentation System has a total production meter. Manuals and documents specifying system installation, maintenance, service and replacement parts, potential system hazards, and system component warranty coverage and claims procedures have been provided to the applicant. System includes means for an observer to readily determine if it is operating properly. Rebate Calculation 4. System rated output in Watts (from line 2):
Watts
5. Orientation (Tilt & Azimuth) adjustment factor, percentage (%) (from line 3):
%
6. Estimated Peak Power, Multiply line 4 by line 5:
Watts
7. Multiply the result from line 6 by $2.00:
$
8. Estimated Solar Rebate Amount, The result in line 7, or $6,000, whichever is less:
$
10/31/2005
Continued on next page
Page 2
Installer Certifications This system meets the requirements of the SUN POWER PIONEERS solar incentive program. I have supplied the required consumer information and have estimated the value of the incentive to be paid to the consumer . I understand that the system will be inspected by CORE, and if it is determined by the CORE board that I have deliberately misrepresented information in this application, I will be considered ineligible to certify future applications. By signing below I certify that the system described in this application is installed and that the information provided in this application is accurate and true. Certifying installer (print name): Signature:
Date: Applicant Certifications
I understand that CORE does not make any warranty concerning the performance, operation, installation or any other characteristic or feature of this system. CORE approval of this application is only for the purpose of obtaining an incentive. By signing below I certify that the system described in this application is installed and that the information provided in this application is accurate and true. Initial each item below:
¾ I understand that the CORE SUN POWER PIONEERS program is offered on a firstcome, first served basis.
¾ I understand that CORE may inspect my system, free of charge, at a mutually agreed upon time within ten days of receipt of this application. I understand that refusing reasonable access for inspection will result in application denial.
¾ I understand that if my system fails inspection by CORE it must be reinspected and approved before I can receive a rebate. CORE will issue an inspection report indicating any problems and suggesting remedies.
¾ I have received an owner’s manual and documents specifying system installation, maintenance, service and replacement parts, potential system hazards, and system component warranty coverage and claims procedures.
¾ I have attached a copy of the building permit after final inspection. ¾ I have attached proof of payment for this installation: an itemized contract, invoice or receipt marked “paid” by the certifying installer and dated.
¾ I certify that this system is not being installed to offset (all or part) of Pitkin County's REMP fees. Applicant (print name): Signature:
10/31/2005
Date:
Continued on next page
Page 3
Orientation Adjustment Factor Table Collector Tilt, Degrees From Horizontal 0 10 Collector 20 Azimuth, 30 Degrees 40 50 From 60 True 70 South 80 90
0 10 20 30 40 50 60 70 87.0% 93.2% 97.6% 99.9% 100% 98.0% 93.9% 87.8% 87.0% 93.1% 97.4% 99.7% 99.8% 97.7% 93.6% 87.6% 87.0% 92.8% 96.9% 99.0% 99.1% 97.1% 93.0% 87.1% 87.0% 92.4% 96.1% 98.0% 97.9% 95.9% 92.0% 86.2% 87.0% 91.8% 95.0% 96.6% 96.4% 94.3% 90.5% 85.0% 87.0% 91.0% 93.7% 94.8% 94.3% 92.2% 88.5% 83.2% 87.0% 90.0% 92.0% 92.7% 91.9% 89.6% 86.0% 80.9% 87.0% 89.0% 90.1% 90.2% 89.0% 86.6% 82.9% 78.1% 87.0% 87.9% 88.1% 87.4% 85.7% 83.0% 79.3% 74.6% 87.0% 86.7% 85.8% 84.3% 82.1% 79.1% 75.2% 70.6% Tracking Collectors: Orientation Adjustment Factor = 125.00%
80 80.0% 79.9% 79.6% 79.0% 78.1% 76.7% 74.7% 72.2% 69.1% 65.3%
90 70.7% 70.7% 70.7% 70.5% 70.0% 69.1% 67.6% 65.5% 62.8% 59.5%
Note: Interpolate for collector tilt and azimuth values between those listed on the table.
*The electricity output of a given PV module varies depending upon many factors. The PTC (PVUSA Test Conditions) were created to make it easier to compare the output of different PV systems. The standardized test conditions are defined as 40°C (104°F) temperature, 1000 W/m2 solar irradiance, and 1 m/s wind speed.