PROJECT :
Project name
FLOOR :
6th
ZONE :
-
COLUMN :
3/J
Y
LOCATION TYPE (I, E, C)
E
A
D Cx
Dimension : t
(Slab thickness)
350 mm
Cx
(Column width in X dir.)
843 mm
Cy
(Column width in Y dir.)
422 mm
Hx
(Opening width in X dir)
0 mm
Hy
(Opening width in Y dir)
0 mm
bB
(RC beam width)
0 mm
DB
(RC beam depth)
0 mm
Material properties : f'c
(Cylinder concrete strength)
fy
(Yield strength of shear steel)
400 MPa
Vu
(Factor Shear)
764 kN
Mux
(Factor Moment for X-axis)
698 kN.m
Muy
(Factor Moment for Y-axis)
160 kN.m
32 MPa
Loads :
Shear capacity : φ
0.85
bo
2323 mm
d
318 mm
AC
738714 mm2
Vp
0 kN
fpc
0 MPa
αs
30
βc
1.998
βp
0.29
φVc
1183.99 kN
φvc
1.60 MPa
Max. Shear stress : bX
1161 mm
bY
581 mm
CAB
581 mm
CCD
581 mm
CBC
436 mm
CAD
145 mm
γVX
0.485
γVY
0.320
JX/C
291303423 mm4
JY/C
200213221.26 mm4
v (due to Mux)
1.163 MPa
v (due to Muy)
0.256 MPa
Max. vu
2.225 MPa
Check :
Shear reinforcement is required
Shear reinforcement required : Require Vs
1236.92 kN
Av/S (240MPa)
16.207 mm2/mm
Av/S (400MPa)
9.724 mm2/mm
Shear reinforcement provided : 159 mm
Min. spacing (limit) Min. Av (limit)
212.94 mm2
Bar Daimeter.
12 mm
No. of legs of shear stirrup S
12 Nos.
(Spacing)
110 mm
Av
1357.17 mm2
Shear capacity (with shear reinforcement) : Vs
1569.38 kN
CHECK Distance from column face to edge stirrup, LS Ls , Required
O.K.
: 385 mm
Hx
Hy
Cy
B
C CCD
CAB
X
PUNCHING SHEAR CHECK AT COLUMN 3/J