Proposal For National Energy Development Scoping Study

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Proposal For National Energy Development Scoping Study as PDF for free.

More details

  • Words: 476
  • Pages: 3
TERMS

OF

REFERENCE

FOR

NATIONAL

ENERGY

DEVELOPMENT

SCOPING STUDY 1. Introduction G10

Executive Solutions ( G10 E)

National

Planning

to

submit

was invited by the Office of

a

proposal

to

carry

out

a

comprehensive scoping study to determine the potential and the feasibility of producing electric power throughout PNG on a national scale. The proposal and its subsequent energy generation works forms

part

of

development

a

long

plan

by

term the

(20

years

Government

from of

2010

Papua

2030)

to

New

Guinea

(GoPNG). G10 Executive Solutions is focused on mapping Papua New Guinea to

determine

and

produce

a

general

reference

document

that

defines the potential of energy production in the country. The document

will

in

time

be

utilized

as

a

reference

for

energy

development by developers and the government as the basis to derive relevant policies to manage such a development. 2. DEFINED SCOPE OF STUDY The summary of the defined scope of works is to nominate a firm with technical capability comprising largely on multi skilled technical professional persons that are capable of undertaking a thorough scoping study on energy production potential by any means, both renewable and exhaustible sources. The outcome of this study will br furbished to the government to guide its energy policies. The study is required to include the following specification:

2.1 Identify

and

document

the

potential

sources

of

energy

development by scale and size throughout PNG. The energy

development should be at proximity that is more cost efficient /economical. ie. Closer to any proposed Grid Super Highway.

2.2For

the

indicators

type

of

must

energy

be

sources

specified

in

being terms

identified, of

energy

the

scale

generation

capacity in Mega Watts and the cost estimates and operational cost estimates for each source.

2.3Geological structure of the area being scoped is required for design phase. The scoped area must be plotted using GPS or other

mapping

technology

in

such

that

it

should

be

easily

identified with satellite technology.

2.4Cost of transmission infrastructure from the developed energy sources to the nearest proposed Super Grid Highway.

2.5Provide

the

total

construction

cost

estimates,

including

recommendation of appropriate technology, for the Super Grid Highway.

2.6Other vital information that is required for effective intervention and investment in the National Energy Development Strategy for PNG.

3. Study Methodology

4. Key Persons 4.1

Dr. Arnold Waine ( Project Director)

4.2

Anthony ..? Sil ( Project Liasion Director)

4.3

Samson S. Wena ( Technical Director)

4.4

Sigl

S.

Dorugl

( Consultant



/ Project

Documentation/ Hydro Electricity) 4.5

……………………………… ( Consultant – Project Finance and

modeling) 4.6

……………………………….( Consultant – Wind power)

4.7

………………………………….( Consultant – Geothermal Power)

4.7

…………………………………

– ex PNG Power) 5. Project Execution Structure Insert xls file here 6. Financial Proposal 7. Appendices 7.1 Letter of Invitation 7.2 Cv of Key Person A 7.3 CV of Key Person B etc 8.

( Consultant –

Quantity Surveyor

Related Documents