Project Status Report

  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Project Status Report as PDF for free.

More details

  • Words: 318
  • Pages: 13
Project Status Report

Template Information

Project Level Information

Document # QLTY\QMS\FRM\PRJ_STS

Project Code

Version #

Prepared By

1.7

Release DateApr_28_2003 Please do not change the Template information

Maintained By Prepared On Modified On

General Information Project Name

Project Code

Project Manager

Period Start Date

Period End Date

Date of Preparation

Size,Schedule & Effort Details Size S No

CI Name

W.C./N.O.P Planned

W.C./N.O.P Actual

Planned Start

End

Actual Start

End

Project Manager Date of Preparation

s Schedule Effort (Person-Hours) Effort Variance Variance (Days) (Hours) Planned Actual

A

B

Defects RevieTracker w Rewor C (Hrs) k (Hrs)

Defects No of CR

Changes (Hrs)

Change Other (specify) Defect Classification

IN SE PE MN SE MI US RE LO RE GR DS RE TS CU TY ST CA S C R T R G E L G Q P N F T S P D P

No. of Defects Weighted Defects

OT H

Metrics

Planned Effort Weighted (Hrs)

Size

Components No. Of Pages Team Strength

Actual

Reason/ Comments

Comments

Overall Project Statistics Measure Total Effort Till date

Overall Planned

Planned Till Date

Actual Till Date

%

Comments

W.Comp.

Total Size N.Of Pages Others (Specify)

Defect Classification A

GeneratedOpenRework (Hrs)

No. of Defects Defect Classificati on

INS

B

C

SE MN SE MI US RE LO RE GR DS RE CU TY ST C PER T R G E L G Q P N F TST S P D

Change Request R Change Request Change Request(Major)

Change Request (Minor)

A

I

Planned Actual Change Change Effort Effort

Remarks

Comments

Remarks

C OT CAP H

Sl#

Tasks planned for the next period (ending MMM_DD_YYYY) Activity Description Target

Sl#

Issues for Escalation. Description

Sl#

Risks during the week Description

Customer Complaint Details Customer Complaint ID Complaint Details

Solution

Raised Date

Planned Closure Dt.

Milestone Status (List all Milestones for the Project, add more lines if required) Sl#

Milestones

Target

Current Status

lines if required) Status

Related Documents

Project Status Report
April 2020 10
Status Report
July 2020 10
Status Report
June 2020 9
Erp Status Report
July 2020 9