Ref:23877786-Summary CHECK LIST FOR INFRASTRUCTURE PLAN S.No

Heading

1 Product 2 Location

Sub-Heading 1.1 Name and Major Types 1.2 Annual Capacity

Address

3.1 Total Land: Area(Building) 3.2 Covered Uncovered Area(Garden,: 3.3 Road etc,): 3 Land(Sq. Metre) 3.4 Area for Expansion: 3.5 Ownership 4.1 Production Shop Floor 4.2 Material Stores 4 Building (Sq. Metre) 4.3 Testing and Inspection 4.4 Utilities,security,Toilet etc. 4.5 Office Floor 5.1 Source-I: 5.2 Source-II: 5.3 Source-III Contingency Water .5.4 Underground Tank Capacity. 5 (K.Litre/Month) .5.5 Over head Tank capacity .5.6 Water Treatment Plant ? 5.7 Water pipe Line 6.1 TNEB Sanctioned Load 6.2 Own generation 6 Electric Power Electrical Installations 6.3 Compressor 7.1 (CFM)&Accessories 7 Compressed Air 7.2 Air Pipe Line 8.1 Production Equipment 8.2 Tools and Jigs&Fixtures 8.3 Testing Equipment Plant and 8.4 Measuring Instrument 8 Equipment 8.5 Hand Tools/Small Tools 8.6 Stores &material Handling 8.7 Office Equipment& Furniture Telephone &Broad 9.1 9 band ### Server Name and Capacity ### No of Terminals ### UPS 10 IT Hardware V.Senthilkumar

Details

Est.Cos t (INR Lac) *** *** ***

### Open Issue

Remarks

0 0 Attach List Attach List Attach List Attach List Attach List Attach List

0

Attach List

Page

1/20

10/23/2009

Ref:23877786-Summary 10 IT Hardware

### Printers/Copier/Scanner ### Others

Server Operating System( No ### of Usage Licence)

Server ERP Oper Software(No. 11 IT Software

of Client) ### ERP Package ( No of Usage ### Licence) ### Office Package No of Licence ### Design Softwares ### Others-I ### Others-II ### Others-III Production ### Direct Non ### Production(Insp.,stores,)

0 *** ***

Indirect Production ### Maintenance/Supervisor.

12

Human Resource (No of Employee)

***

Indirect Non Production ### Workmen and staff Officers (Junior Officer-Deputy ### Manager) Managers(Manager-General ### manager) ### Total Casuals& Others ### (Loading,House keeping) ### Security

*** *** *** *** *** ***

13 Others-1 14 Others-2 15 Others-3

Total

V.Senthilkumar

0

Page

2/20

10/23/2009

Ref:23877786-Summary

V.Senthilkumar

Page

3/20

10/23/2009

Ref:23877786-Summary

V.Senthilkumar

Page

4/20

10/23/2009

Ref:23877786-1Product S.no Name of the Product

V.Senthilkumar

Part No

Customer

Y-1:

Annual Demand Y-2: Y-3:

Page

5/20

Annual Capacity Planned

10/23/2009

Ref:23877786-1Product

V.Senthilkumar

Page

6/20

10/23/2009

Ref:23877786-1Product Remarks

V.Senthilkumar

Page

7/20

10/23/2009

Ref:23877786-1Product

V.Senthilkumar

Page

8/20

10/23/2009

Ref:23877786-6Electric power Item S.N Stat o us

Type

Name

Estimate Specification d Cost (INR Lac)

Selected Supplier

Purchase Order Payment (INR LAC) Shipment Date Amoun Balanc Ref. Date Plan t (INR Paid e Lac)

Total

V.Senthilkumar

Page

9/20

10/23/2009

Ref:23877786-6Electric power

ipment Date Actual

V.Senthilkumar

Receipt Ref

Date

Date Of Installat Product ion ion

Page

10/20

10/23/2009

Ref:23877786-7Comprssed Air Item S.N Stat o us

Type

Name

Specificati Estimate d Cost on (INR Lac)

Selected Supplier

Purchase Order Payment (INR LAC)Shipment Date Amou Balanc Ref. Date nt (INR Paid Plan Actual e

Receipt Ref

Lac)

Total

V.Senthilkumar

Page

11/20

10/23/2009

Ref:23877786-7Comprssed Air Receipt Date

Date Of Installat Product ion ion

V.Senthilkumar

Page

12/20

10/23/2009

Ref:23877786-8Plant Equipment Equipment S.N Stat o us

V.Senthilkumar

Type

Name

Purchase Order Specification

Estimate d Cost (INR Lac)

Page

Selected Supplier

13/20

Ref.

Date

Payment

(INR LAC)Shipment

Amoun Balanc t (INR Paid e

Plan

Date

Actual

Lac)

10/23/2009

Ref:23877786-8Plant Equipment

Total

V.Senthilkumar

Page

14/20

10/23/2009

Ref:23877786-8Plant Equipment Receipt Ref

Date

V.Senthilkumar

Date Of

Installation ReferenceDimension Power Connections Floor space Serial Installat Product &Ht Founda Cable Air Water BY No & KW ion ion mmXmmX tion Size size-" size-" Date Htmm

Page

15/20

Oil Spec

Qty Litre

Other Consumables Spec

10/23/2009

Ref:23877786-8Plant Equipment

V.Senthilkumar

Page

16/20

10/23/2009

Ref:23877786-8Plant Equipment

r Consumables Input Material for Trial Operators Qty

Spec

V.Senthilkumar

Qty

Names

Remarks Remarks

Page

17/20

10/23/2009

Ref:23877786-8Plant Equipment

V.Senthilkumar

Page

18/20

10/23/2009

Ref:23877786-1011 IT HS ware Item S.N Stat o us

Type

Name

Purchase Order Specificat Estimat ed Cost ion (INR Lac)

Selected Supplier

Ref.

Date

Payment

(INR LAC) Shipment

Amoun Balanc t (INR Paid e

Plan

Date

Actual

Lac)

Total

V.Senthilkumar

Page

19/20

10/23/2009

Ref:23877786-1011 IT HS ware Receipt Ref

V.Senthilkumar

Date

Date Of Installat Product ion ion

Page

20/20

10/23/2009