LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Your Answer
Due to wrong machine set up Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up
Match The Following Question
Correct Answer
Your Answer
Forcasting requirement for indirect material Inventory control by classification Structure of the product
Past consumption analysis Past consumption analysis technique technique ABC Analysis ABC Analysis BOM
BOM
Material Planning for dependent demand
MRP
MRP
Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer
Operation
True/False Question
Specifications is the basic tool of inspection.
Correct Answer True Your Answer
True
Multiple Choice Single Answer Question How critical activities are shown in the time chart during project scheduling? Correct Answer Solid lines Your Answer
Thin lines
Multiple Choice Multiple Answer Question Which of the following situations demand the economic consideration while selecting a job for method study? Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section Your Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section True/False Question
Three time estimates are transformed into expected time before using it into a network. Correct Answer True