Select The Blank Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Single Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

True/False Question

Production Management - 1

The ________ breakdowns usually cost more, partly due to damage don adjustment components and partly due to emergency actions. Unexpected

Which of the following schedules are recommended to prepare and follo part of preventive maintenance system? Preventive inspection schedule , Cleaning and upkeep schedule , Lubric schedule

One of the characterstic of layout is about the flow of material / personne good layout the flow should be Unidirectional

Which kind of natural delays and interruptions are considered during est of activity time? Shop efficiency , Breakdowns , Absenteeism

Which of the following aspects are essential to ensure quality of purchas items? Defining right quality for the job , Vendor performance evaluation , Makin that suppliers understand the requirements

Correct Answer

An activity should represent an operation or set of operations which can performed using a particular kind of equipment or a special skill. TRUE

Multiple Choice Single Answer Question Correct Answer

Which characteristics are verified in cent percent sampling? All important characteristics

Multiple Choice Multiple Answer

Question Correct Answer

Select The Blank Question

Which of the following symbols are used in flow process chart but not us operation process chart? Storage , Delay , Transport

Correct Answer

OC curve of ideal sampling plan suggests that all lots less than 3% defec have the probability of acceptance of ________. One

Multiple Choice Single Answer Question Correct Answer

Where the ignorance towards the degradation of machine leads to? Eventual breakdown

Multiple Choice Multiple Answer Question Correct Answer

Which are three different bases to establish an activity time? Past experience , Judgement , Historical data

Multiple Choice Multiple Answer Question Correct Answer

Select The Blank Question Correct Answer

Multiple Choice Single Answer Question Correct Answer

Select The Blank Question

Correct Answer

Select The Blank Question Correct Answer

What are the uses of failure statistics analysis? To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection

One detachable ticket is prepared for each ________. Operation

What do you mean by the study of repetitive short cycle operations whic involve quick hand / feet motions? Micromotion study

The ________ is necessary when the job requires detailed of one or mo the job characteristics with the help of special equipment which is not av at the producing company. Inspection order

The ________ is the maintenance work initiated on a result of knowledg condition of an item from routine or continuous checking. Condition monitoring

True/False Question Correct Answer

Multiple Choice Single Answer Question Correct Answer

Select The Blank Question

In case of backward pass computation, the latest event time of the end e equals to the earliest event time minus duration of that activity. FALSE

What do you mean by a single event which represents the joint completi more than one activities? Merge event

The ________ is the watch dog which ensures that every element of pro and activities which could affect the quality of end product are regulated extent desirable.

Correct Answer

Quality control

Multiple Choice Single Answer Question Correct Answer

Which of the following is a cause of plant breakdown? Overloading of machines

Multiple Choice Single Answer Question Correct Answer

Who prepares the daily production report? Shop Supervisor

Multiple Choice Multiple Answer Question Correct Answer

Select The Blank Question Correct Answer

Select The Blank Question Correct Answer

Why graphical method of recording is preferred over the descriptive meth during method study? It segregates effective part form ineffective parts , It reduces effort involv writing , Critical examinations easier and more effective

Capacity decisions have a direct influence on performance of production in respect of ________ Delivery performance

An Ideal OC curve is ________ shaped curve that accpets all the lots wi quality equal to or better than AQL . Rectangular

True/False Question Correct Answer

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Multiple Choice Single Answer Question

Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Single Answer Question Correct Answer

True/False Question Correct Answer

True/False Question Correct Answer

Match The Following

With a general OC curve, probability of acceptance of lots of good qualit never unity. TRUE

Correct Answer Cc Tn Tc Cn

What do you understand by identification of defects in materials, compon machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives? Preventive function

Which of the following situations demand the technical consideration wh selecting a job for method study? Jobs having inconsistent quality , Operations inviting frequent requests f supervisors for relaxation in allowed time because of variations in materi tool performance , Jobs in which too many man-hours are spend in chec and rechecking work

What is the nature of the sampling plan for critical defects? Tight

The steeper the OC curve, the better is the discrimination between good bad lots. TRUE

Systematic maintenance system can completely eliminate the wear and machines. FALSE

Question Scheduling of interrelated activities of small projects with consideration of uncertainty of duration of activities.

Correct Answer Critical Path Analysis

Two machines & processing time depends on sequence of job loading Sufficient orders and resonable choice of machines

Johnson's Two Machine Algorithm

Time relationship between when a product is required and when it can be made available

Critical Ratio Scheduling

True/False Question Correct Answer

True/False Question Correct Answer

Select The Blank Question Correct Answer

Select The Blank Question

Index Method

Operation Process Chart provides information on time and distances FALSE

The event numbers as far as possible reflect the logical relationships of t activities. TRUE

The ________ is a set of tools and techniques by which products are ma comply with the specifications at minimum cost to the firm. Quality control system

Correct Answer

Production control work is ________ in case of floor inspection as comp with the centralised inspection. easier

Multiple Choice Single Answer Question Correct Answer

What is the relation between duration of an activity and length of an arro No relation

True/False Question Correct Answer

True/False

Process Sheets for parts in batch production are not maintained as stand process sheet FALSE

Question Correct Answer

Select The Blank Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Single Answer Question Correct Answer

Multiple Choice Single Answer Question

Three time estimates are transformed into expected time before using it network. TRUE

The ________ are the definitions of the measurable as well as nonmeas characteristics of the product. Specifications

Which of the following situations demand that the human consideration s be given preference over other considerations? Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents an health hazards

Which of the following are examples of specifications? Commercial standards , Assembly and testing instructions , Bill of materi

What does the additional cost incurred to reduce the duration of an activ one unit of time represent? Activity cost slope

Correct Answer

Document raised by Sales department for goods manufactured to stock called Shipment order

Multiple Choice Multiple Answer Question Correct Answer

How many of the following are types of specification? Material specifications , Dimensional specifications , Performance specif

Multiple Choice Multiple Answer Question Correct Answer

Which of the following are activities of corrective maintenance? Modifications and improvements , Overhauling , Emergency repairs

True/False

Question Correct Answer

Scrap allowance is added to net requirement of material while ordering f material TRUE

Production Management - 2 True/False Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Single Answer Question Correct Answer

Multiple Choice Single Answer Question

A properly designed sampling plan can control sampling errors and comp eliminate them. FALSE

Which of the following cases indicated that the operation has occurred? Movement of components to assembly section , Raw material movemen worker's trip to grinder to sharpen the tools

Which manufacturing method is ideal for the use of air gauges as inspec device? Mass

Out of two basic criteria for the selection of a manufacturing method, one must be able to meet the specifications of final product and the other is, be

Correct Answer

Cost effective method

Multiple Choice Single Answer Question Correct Answer

Which characteristics are verified in cent percent sampling? All important characteristics

Multiple Choice Single Answer Question Correct Answer

True/False Question Correct Answer

Any premise in which persons are employed for purpose of making any product/s is called Factory

Cent percent inspection does not mean inspection of component for 100 quality characteristics. TRUE

Select The Blank Question Correct Answer

Select The Blank Question Correct Answer

Multiple Choice Single Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots wi quality equal to or better than AQL . Rectangular

The ________ breakdowns usually cost more, partly due to damage don adjustment components and partly due to emergency actions. Unexpected

How to reveal the capability of the sampling plan to discriminate between lots and bad lots? Operating characteristics curve ( OC )

Which of the following may be the objectives of project crashing? To achieve uniformity in requirement of resources , To complete the proje the least possible time , To reduce project cost below it's normal cost

Match The Following Question Forcasting requirement for indirect material

Correct Answer Past consumption analysis technique

Inventory control by classification Structure of the product Material Planning for dependent demand

ABC Analysis BOM MRP

Match The Following Question First off inspection Critical operation inspection Patrolling inspection Key operation inspection

Correct Answer First piece produced after tool change After whose no rework is possible Inspection at the place of actual production Costlier operation

Select The Blank Question Correct Answer

The ________ is the maximum percentage defective that for the purpose sampling inspection can be considered satisfactory as a process averag Acceptable quality level

Multiple Choice Multiple Answer Question Correct Answer

Which are the different methods of recording actual progress of work? Display boards , Progress cards , Network updating

Multiple Choice Single Answer Question Correct Answer

Provision of drainage facilities is important for the following type of indus Chemical Process

True/False Question Correct Answer

Under MRP system for common items order for procurement is placed b requirement for each product FALSE

True/False Question Correct Answer

Originating process of raw material influence Process Planning TRUE

True/False Question Correct Answer

Lubrication survey should never be done for a new machine. FALSE

Multiple Choice Multiple Answer Question Correct Answer

Which are the subtasks of the maintenance phase of the method study? Monitoring and control , Performance appraisal , Audit on savings

Multiple Choice Single Answer Question Correct Answer

Multiple Choice Single Answer Question

What do you understand by the metallergical aspects of product which fo the vital part of engineering function? Material specifications

Correct Answer

Document raised by Sales department for goods manufactured to stock called Shipment order

Multiple Choice Single Answer Question Correct Answer

Who is responsible for return of surplus material? Dispatcher

Select The Blank Question Correct Answer

Production control work is ________ in case of floor inspection as comp with the centralised inspection. easier

Multiple Choice Single Answer Question Correct Answer

The ratio of output to input of a production system is commonly known a Productivity

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Which of the following information is available in summary of part in a ch during methods study? Frequency of each symbol , Total time for each symbol , Total distance tr by the object

Which of the following are examples of consumption of physical effort du recording for method study? Bending , Positioning , Unloading

Which of the following causes can be responsible for derailing the produ schedule in a factory? Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism

Multiple Choice Single Answer Question Correct Answer

Which is the ideal place to write a description of an activity in a network? Above the arrow

Multiple Choice Multiple Answer Question Correct Answer

Which of the following cases indicates change in physical characteristic? Turning , Grinding , Drilling

True/False Question Correct Answer

Objective of Work Study is to improve Productivity TRUE

Multiple Choice Multiple Answer Question

Which are the major types of defects?

Correct Answer

Minor , Major , Critical

Select The Blank Question Correct Answer

A ________ is another form of subcontracting. Hiring capacity

Select The Blank Question Correct Answer

Select The Blank Question

Correct Answer

Multiple Choice Single Answer Question Correct Answer

Multiple Choice Single Answer Question

The ________ is the maintenance work initiated on a result of knowledg condition of an item from routine or continuous checking. Condition monitoring

An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of se Equipment history card

What do you understand by the measurement of work to establish allowe for a job for the defined method? Work measurement

Correct Answer

Which kind of relationship exists between those activities which can be c out simultaneously and both activities require definite time to finish? Concurrent activities

Multiple Choice Multiple Answer Question

Which of the following products should be produced by using mass prod

Correct Answer

Refrigerator , Tyre for automobile , Television Set

Select The Blank Question Correct Answer

A ________helps to avoid crowding of jobs at a particular machine by ch route of some of the jobs or by diverting work to other machine. Control board

Select The Blank Question Correct Answer

A good maintenance system is not a luxary but a ________. Necessity

Select The Blank Question Correct Answer

Multiple Choice Single Answer Question Correct Answer

True/False Question

Production Planning is a centralised activity which includes functions suc ________ Scheduling

The process of changing inputs into outputs thereby adding some value can be defined as Operation

Correct Answer

The problems concerning movements can be better visualized by drawin diagram, either, flow diagram or string diagram. TRUE

Multiple Choice Multiple Answer Question Correct Answer

How many of the following are types of specification? Material specifications , Dimensional specifications , Performance specif

True/False Question Correct Answer

Multiple Choice Multiple Answer Question

As a general rule, the number of tail event of an activity is more than tha head event. FALSE

Correct Answer

Which of the following concepts must be understood for the achievemen quality? Quality of conformance , Purpose of product , Quality of design

Multiple Choice Multiple Answer Question Correct Answer

Which of the following factors affect the quality control function? Quality of workmanship , Production aids , Manufacturing facilities

Production Management - 3 Multiple Choice Single Answer Question Correct Answer

Which portion of the perforated route sheet should be signed by the ope supervisor? Lower portion

Select The Blank Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Single Answer Question Correct Answer

True/False Question

Work study is also called ________ study Time and Motion

Which are the factors on which the structure of the transportation cost depends? Average distance of shipment , Characteristics of the commodity , Mediu shipment

What do you understand by the difference between the specification limi which manufacturing process is expected to produce? Design tolerance

Correct Answer

Quality can not be inspected into a product, it must be manufactured into the supplier. TRUE

Multiple Choice Single Answer Question Correct Answer

A good plant layout helps in Reducing handling costs

True/False Question Correct Answer

Select The Blank Question Correct Answer

True/False Question Correct Answer

Floor inspection delays the identification of faults which can not be rectifi immediately before large lots are spoiled. FALSE

Goods after final inspection should accompany ________to enable dispa department to identify and draw correct reference. Forwarding note

In case of two handed process chart, inspection symbol is used when ch touch or feel is involved. TRUE

Multiple Choice Multiple Answer Question

Which of the following are characteristics of an operating characteristics

Correct Answer

Producer risk , Consumer Risk , Acceptable Quality Level

Multiple Choice Single Answer Question Correct Answer

Technique of Value Engineering can be effectively employed in design of product to To meet the intended function at lowest cost

Multiple Choice Single Answer Question Correct Answer

Technique which can help an organization to reduce inventory is called MRP

True/False Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Single Answer Question

Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero." TRUE

Which of the following schedules are recommended to prepare and follo part of preventive maintenance system? Preventive inspection schedule , Cleaning and upkeep schedule , Lubric schedule

Correct Answer

What do you mean by the study of repetitive short cycle operations whic involve quick hand / feet motions? Micromotion study

True/False Question Correct Answer

A sampling plan which perfectly discriminates will have vertical OC curve TRUE

Multiple Choice Multiple Answer Question Correct Answer

Which of the following are examples of gross materials? Timber , Iron ore , Sugar cane

True/False Question

The time chart, if necessary, may be modified considering the limitations resource.

Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Select The Blank Question Correct Answer

True/False Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Select The Blank Question

Correct Answer

Select The Blank Question

TRUE

Why graphical method of recording is preferred over the descriptive meth during method study? It segregates effective part form ineffective parts , It reduces effort involv writing , Critical examinations easier and more effective

The ________ is the probability that a good lot will be rejected by the sa plan. Producer's risk

Systematic maintenance system can completely eliminate the wear and machines. FALSE

What are the benefits of inspection and quality control? Adequate maintenance of quality , Ensures parts are within specified lim accuracy , Gives economy in production through reduction of defective w

The ________ advocates maintenance procedures whereby the conditio plant is constantly watched through systematic inspection to unearth unh conditions and preventive Preventive Maintenance

Correct Answer

Capacity decisions have a direct influence on performance of production in respect of ________ Delivery performance

Multiple Choice Single Answer Question Correct Answer

Inadequate production capacity ultimately leads to Poor Customer Service

Match The Following Question Template

Correct Answer Two dimensional cutouts

REL chart Flow diagram Travel chart

Degree of closeness Tracing movements Distance and frequency of movements

Select The Blank Question Correct Answer

One detachable ticket is prepared for each ________. Operation

Select The Blank Question Correct Answer

The ________ is the probability that a bad lot will be accepted by the sam plan. Consumer's risk

Multiple Choice Single Answer Question Correct Answer

Which document is used for returning the surplus material? Stores Return Note

Select The Blank Question Correct Answer

The ________ is specified to indicate the maximum permissible variabili dimensions product or parts. Tolerance

Multiple Choice Single Answer Question Correct Answer

How should a dummy activity be represented in a network? By dotted line

Multiple Choice Single Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

When should operator or supervisor is supposed to sign the perforated r sheet? After completion of operation

Which of the following observations are expected from the preventive maintenance person? Wrong allignments , Overheating defects , Excessive play

Which of the following symbols are used in flow process chart but not us operation process chart? Storage , Delay , Transport

Multiple Choice Multiple Answer Question Correct Answer

True/False Question

Route Sheet generally contains following information Material Specification , Sequence of operation , Skill of Labour

In case of forward pass computation, the earliest event time of a plain ev equals the earliest event time of the preceding event plus duration of act emanating from the preceding event.

Correct Answer

Multiple Choice Single Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

Multiple Choice Multiple Answer Question Correct Answer

TRUE

In case of Batch Production which kind of labour is expected? Skilled in one specific Manufacturing Process

Following are some of the factors considered for evaluation of alternative layouts Flow of Material , Equipment utilization , Ease of supervision

Which of the following situations demand that the human consideration s be given preference over other considerations? Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents an health hazards

Multiple Choice Single Answer Question Correct Answer

Material Planning is an integral part of Production Planning

Match The Following Question Toung Eye Nose Ear

Correct Answer Sweet Crack Burnout Impact

Multiple Choice Single Answer Question Correct Answer

What is the meaning of surplus material in context with stores issue orde Materials issued are not fully consumed

Multiple Choice Multiple Answer Question Correct Answer

Select The Blank Question Correct Answer

Multiple Choice Single Answer Question

Which are the subfactors of community facilities or social infrastructure? Accomodation , Educational , Entertainment

The ________ pertain to the climatic conditions which the component , p or material should withstand. Environmental specifications

Correct Answer

Which is the alternative way of indicating the load other than numerical w case of Gantt chart ? Graphical approach

True/False Question Correct Answer

Shop order is one of the subsidiary order TRUE

Select The Blank Question Correct Answer

The easiest way to bring the delayed job within the promised delivery tim using extra shift or weekly holiday is ________. Overtime working

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Your Answer

Cracks , Burrs , Texture

Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective more than AQL but less than LPTD Multiple Choice Single Answer Question In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of Correct Answer Sales Programme Your Answer

Sales Order

Match The Following Question

Correct Answer

Your Answer

Fixed Position Layout

Project Layout

Functional Layout

Product Layout

Line Layout

Project Layout

Process Layout

Functional Layout

job layout

Combined Layout

Mixed Layout

Mixed Layout

Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement Your Answer

Work measurement

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer

0.01 to 10%

True/False Question

Objective of Work Study is to improve Productivity

Correct Answer True Your Answer

False

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Correct Answer Poor Customer Service Your Answer

Poor Machine Utilization

Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Your Answer

Random variability

True/False Question

Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations. Correct Answer True Your Answer

True

Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer

Operation process chart

Multiple Choice Single Answer Question Plant Layout decisions are considered to be Correct Answer Strategic Your Answer

Strategic

Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Correct Answer False Your Answer

True

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer

Quality of design

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer

Bakeries , Ice factories , Woolen

Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer

Specifications

Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer

Suitability of land

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer

Producer's risk

Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Select The Blank Question The ________ includes preventive maintenance activities whose

ASSIGNMENT Q.1) What is “Operations Management”? What are the objectives of Operations Management? Enlist key elements of Operations Management. Answer.1) An operation may be defined “as the process of changing inputs into outputs thereby adding value to some entity”.Right quality, right quantity, right time and right price are the four basic requirements of the customers and as such they determine the extent of customer satisfaction. And if these can be provided at a minimum cost, then the value of goods produced or services rendered increases. Thus the objectives of production management are “to produce goods and services of the right quality, in the right quantities, according to the time schedule and a minimum cost”. Objectives of production management may be amplified as under: •

Producing the right kind of goods and services that satisfy customers’ needs (effectiveness objective).



Maximizing output of goods and services with minimum resource inputs (efficiency objective).



Ensuring that goods and services produced conform to pre-set quality specifications (quality objective).



Minimizing throughput-time- the time that elapses in the conversion process- by reducing delays, waiting time and idle time (lead time objective).



Maximizing utilization of manpower, machines, etc. (Capacity utilization objective).



Minimizing cost of producing goods or rendering a service (Cost objective).

Key elements of Operations Management 1. Product selection and design The right kind of products and good designs of the products are crucial for the success of an organizing. A wrong selection of the product and/or poor design of the products can render the company’s operation ineffective and non-competitive. Products/services, therefore, must be chosen after detailed evaluation of the product/services alternatives in conformity with the organization’s objectives. Techniques like value engineering may be employed in creating alternate designs, which are free from unnecessary features and meet the intended functions at the lowest cost. 2. Process selection and planning

Selection of the optimal “conversion system” is as important as choice of products/services and their design. Process selection decisions include decisions concerning choice of technology, Equipment, machines, material handling systems, mechanization and automation. Process planning involves detailing of processes if resource conversion required and their sequence. 3 Facilities (Plant) location Plant location decisions are strategic decisions and once plant is set up at a location, it is comparatively immobile and can be shifted later only at a considerable cost and interruption of production. Although problem of location choice does not fall within preview the production function and it occurs infrequently, yet it is of crucial importance because of its major effect on the performance of every department including production. Therefore, it is important to choose the right location, which will minimize total “delivered customer” cost (Production and distribution cost). Locational decisions involve evaluation of locational alternatives against multiplicity of relevant factors considering their relative importance to the organization and selecting those, which are operationally advantageous to the organization. 4. Facilities (Plant) layout and materials handling Plant layout is concerned with relative location of one department (Work centre) with another in order to facilitate material flow and processing of a product in the most efficient manner through the shortest possible time. A good layout reduces material handling cost, eliminates delays and congestion, improves co-ordination, provide good housekeeping etc. while a poor layout results in congestion, waste, frustration, inefficiency and loss of profit. 5. Capacity Planning Capacity planning concerns determination and acquisition of productive resource to ensure that their availability matches the demand. Capacity decisions have a direct Influence on performance of production system in respect of both resource productivity and customer service (i.e. delivery performance). Excess capacity results in low resource productivity while inadequate capacity leads to poor customer service. Capacity planning decisions can be short-term decisions. Long-term capacity planning decisions concern expansion/contraction of major facilities required in the conversion process, economics of multiple shift operation, development of vendors for major components etc. Short term capacity planning decisions concern issues like overtime working, sub-contracting, shift adjustments etc. Break even analysis is a valuable tool for capacity planning. 6. Production Planning and Control (PPC) Production planning is the system for specifying the production procedure to obtain the desired output in a given time at optimum cost in conformance with specified standard of quality, and control is essential to ensure that manufacturing takes place in the manner stated in the plan. 7.

Inventory control

Inventory control deals with determination of optimal inventory levels of raw materials, components, parts, tools; finished goods, spares and supplies to ensure their availability with minimum capital lock up. Material requirement planning (MRP) and just-in-Time (JIT) are the latest techniques that can help the firm to reduce inventory.

8. Quality assurance and control Quality is an important aspect of production system and it must ensure that services and products produced by the company conform to the declared quality standards at the minimum cost A total quality assurance system includes such aspects as setting standards of quality, inspection of purchased and sub-contracted parts, control of quality during manufacture and inspection of finished product including performance testing etc. 9. Work study and job design Work-study, also called time and motion study, is concerned with improvement of productivity in the existing jobs and the maximization of productivity in the design of new jobs. Two principal component of work-study are: (i) (ii)

Method study Work measurement

Method study has been defined (BS 3138) as the systematic recording and critical examination of the existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method study when applied to production methods yields one or more of the following benefits: • • • • • • • •

Improved work environment Improved facility layout Better utilization of facilities Greater safety Lesser materials handling Smooth production flow Lower work-in-process Higher earnings for the workmen

10. Maintenance and replacement Maintenance and replacement involve selection of optimal maintenance Preventive and/or breakdown) policy to ensure higher equipment availability at minimum maintenance and repair cost. Preventive maintenance, which includes preventive inspection, planned lubrication, periodic cleaning and upkeep, planned replacement of parts, condition monitoring of the equipment and machines, etc. is most appropriate for critical machines.

11. Cost reduction and cost control Effective production management must ensure minimum cost of production and in this context cost reduction and cost control acquires significant importance. There are large number of tools and techniques available that can help to make a heavy dent on the production cost.

Q.2) What is batch Production? What are its key characteristics? Compare these characteristics with those of project production. Answer.2) Batch production is characterized by the manufacture of a limited number of a product (but many such quantities of different products) produced at periodic intervals and stocked in warehouses as finished goods (or finished parts) awaiting sales (or withdrawal for assembly). Typical examples of batch production are: process industries such as pharmaceuticals, paints, chemicals; medium and heavy engineering industry engaged in the manufacture of electric motors, switch gears, heavy motor vehicles, internal combustion engines; manufacture of ready made garments; manufacture of assembly shops such as machine tools; sub contractors which take on machining of batches of components to the drawings of a large manufacture etc. Characteristics of batch production (a)

Short runs: Short production runs and frequent changes of set also characterize batch production up. The equipment and the assembly set up is used for a limited number of parts or assemblies and is then changed to make a different product. The production is generally made to stock.

(b) Skilled labour in specific trades: The labour force is expected to posses skill in one specific manufacturing process, Turning, milling, drilling, welding, grinding, hobbing, fitting etc. The operator may perform simpler machine set-ups but the separate machine tool setter performs those involving complex operations. (c) Supervision to possess knowledge of a specific process The supervision has considerable knowledge of a specific process. Supervisor in the grinding section for example, may not expert in turning and drilling work but s expected to possess a find of knowledge of different types of grinding operations. Similarly a supervisor in the gear shop is expected to have sound knowledge in working of different types of gear cutting machines. (d) Limited span of control: The amount of supervision required in batch production is lower than that of jobbing production. The ration of direct workmen to supervisors is more or less a function of batch size. The smaller the batches, the lower are the ratio of direct workers to supervisors, and vice versa. This is because smaller lots require each supervisor to spend a great deal of his time in allocating new work, giving instructions, follow up on the shop floor for proper movement of materials from and to the machines, identifying delays and interruptions, and arranging, in consultation with planning, work load in his section to keep his men busy. (e) General purpose machines and process type of layout Plant and equipment is procured and arranged to obtain maximum flexibility. General purpose machines and handling equipment capable of performing variety of operations

with minimum set –up times are installed in lieu of variety of products. The machines are arranged to give process layout-layout by function. Similar machines capable of doing similar types of operations are grouped together and kept at one place. Presses for example, are put together and kept at one place milling machines are placed together at another place, drilling machines are kept at the third place, gear cutting machines are located at the fourth place and so on. Each Group of machines is usually designated as a work centre or a section or a shop. (f) Manual materials handling: Materials handling in batch production as compared to jobbing production are small. Individual components and parts are placed in trolleys and trays and are transported as unit loads. Materials handling may be mechanized by deploying power driven trucks. (g) Manufacturing cycle time affected due to queues: The manufacture cycle time is comparatively smaller than jobbing production but is much more than mass and flow production. The batches of work tend to queue up at different machines due to differing cycles times, batch sizes and sequence of operations. (h) Large work-in-progress: Work in progress is comparatively large due to varying work content of different components, imbalance in manufacturing times, formation of queues between the machines. (i) Flexibility of production schedules: Disruptions due to machine breakdown or absenteeism do not seriously affect production as job can be shifted to another machine or another operator from another machine can be shifted. (j) Need to have production planning and control: Functions of production planning and control in a batch production unit are more complex than those in jobbing production or mass and flow production: •

Materials control and tools control functions are important. Some kind of replenishment system needs to be used to ensure routine replenishment



Detailed operational layout and route sheets are prepared for each part of the product.



Loading and scheduling needs to be more detailed and more sophisticated since every machine requires to be individually scheduled.



Progressing function is very important to collect information on progress of work. A separate progress card needs to be maintained to record progress of each component.



Expediting is generally necessary since quite often jobs, due to imbalances in work content, tend to lag behind

Q.3) (a) Why are locational decisions important? What factors should be taken into account while deciding location of a unit to manufacture washing machines? Answer.3a) Locational decisions generally arise when: • • •

A new manufacturing (or servicing) unit is to be set up. Existing plant operations are difficult to expand due to poor selection of site earlier. The growth of the business makes it advisable to establish additional facilities in new territories. There is emergence of new social (chronic labour problems) political (political instability or economic conditions that suggest a change in the location of the existing plant. The product development has over weighted the advantages of the existing plant. The changes in the industrial Policy of the Government, favoring decentralizing and dispersal of industries to achieve overall development of the country, do not permit expansion of the existing plant

• • •

FACTORS GOVERNING PLANT LOCATION Plant location studies are conducted in three phases: (i) (ii) (iii) 1.

General territory selection Community selection, and Site selection

Proximity to market:

Every company is in business to market and it can survive only if their product reaches the consumers on time and at the competitive price. The ratio of selling costs to sales generally increases with distance. Therefore, in the choice of location o the plant, the factor of “proximity to the market” is given the highest priority. Locating a plant nearer to the market is preferred if: • • • •

The product is fragile. The product is susceptible to spoilage. The promptness of service is required. The product is relatively inexpensive and transportation costs add significantly to the cost.

Bread, soap factories, etc. require the market to be nearby. If factory cannot be started in Bombay, it may be started in Thane, Kalyan or Poona. If the product is exported, location near ports is desirable. This is particularly important for producers who sell bulky commodities, which incur high transportation costs

Nearness to market not only lowers transportation costs but also gives many other benefits namely: • • • •

A good many administrative problems, which cause perpetual headaches and add to costs, are avoided. Liaison with dealers or whole sellers can be maintained economically and easily Other costs such as commission to middlemen, which at times run as high as 20 to 50 percent can be reduced significantly. Customer’s accounts do not remain outstanding for settlement. This recovery is easy and less time saving which itself reduces selling costs.

2. Proximity to source of raw materials: Since raw materials usually constitute 50 to 60 percent of the total product cost, it is important that the firm gets its requirements of raw materials at the right time and at the reasonable price for which the plant must be located in the neighborhood of some source which can meet the raw materials requirement of the unit “Proximity to supply of raw materials” factor assumes still greater importance if raw materials are of perishable nature or if they are expensive to transport, or if their weight is substantially reduced by processing. Proximity to sources of raw materials is equally important for small units. This is because usually small units are not considered important customers. They get least priority and in the event of scarcity are the one to be struck off first from the list. The availability of materials to small units to a large extent thus depends on their follow up and personal visits to the supplier’s plant which is possible only if the buyer’s plant is close by. 3. Infrastructural facilities: Infrastructural facilities consider availability of utilities like power water, disposal of waste etc. These form the life-blood of many types of industries without which there facilities may come to a stand still. Underestimating the need of any one of the utilities can be extremely costly and inconvenient. Certain industries, for example, aluminium, steel, etc are power intensive and must be located close to the sites of power generation failing which the shortage of, or increase in cost of generating power may spell problems for their survival. Similarly, chemical process industries like paper and pulp, cement, steel, sugar laundries, metal plating, food preparation etc. requires perennial source of water. Mineral content of water may also be an important factor. Treatment of water is an expense to be considered while comparing economics of different locations. Drainage facilities are important for process industries otherwise disposal of process waster can create lot of difficulties. 4. Transport facilities:

Transportation cost to the value added is a key determinant of the plant location. The structure of the transportation cost depends on (i) Characteristics of the commodity (ii) average distance of shipment (iii) medium of shipment: rail, road, and air sea. The need for transport arises because raw materials and fuel are to be moved to factory site and finished goods are to be transported from factory to markets. Other things being equal since transport cost has a major effect on product cost, the regions well served by transport facilities are most suitable for industrial locations. 5. Labour and wages: Plant location should be such that required labour is easily available in the neighbourhood. Importing labour from outside is usually costly and it causes lot of administrative problems. Availability of required labour locally is better since problem of arranging accommodation and other related problems do not arise. Since normally workers with specific skills are required, some sort of training facility should also be available in the neighborhood. Skilled employees are easily available if ITI’s, or Engineering colleges are there in the neighbourhood. 6. Legislation and taxation: The policies of the state Government and Local Bodies relating to issue of licenses, building codes, labour laws, etc. are the factors in selecting/rejecting a particular community/site. In order to disperse industries and ensure balanced economic growth, both Central and State government offer a package of incentives for setting up industries in particular locations. Exemption from excise duty, sales tax and octroi, soft loans from financial institutions, subsidy in electricity charges, etc. are some of the incentives offered. Since taxes and duties levied by the State Government and Local bodies substantially influence product cost, the incidence of such taxes/levies must be taken into account while selecting a community/site. 7. Climatic conditions: Climatic factors may not have a major influence these days because of modern air conditioning facilities available today. However, it may be important factor for certain industries like textile mills, which require high humidity. 8. Industrial and labour attitudes: Community attitudes towards supporting hostile trade union activities are an important factor. Locating facilities in a certain region/community may not be desirable as frequent labour problems and interruptions are harmful to the plant in the long run. Political situation in the state and attitude of the government towards labour activities also influences selection of the site for the plant. 9. Safety requirement: Safety factor may be important for certain industries such as:

Nuclear power plants Explosive factories Location of such industries close to border areas is undesirable.

10. Community facilities (or social infrastructure): Community facilities imply accommodation, educational, entertainment and transport facilities. Accommodation is needed unless the employees are local residents. Accommodation should be easily available, comparatively cheap and near some public transport stop. The locational area should be fully developed, be accessible by road and should have a convenient and efficient public transport system operating between the area and the township to enable employees, officials, customers and suppliers to make easy trips for their work 11. Community attitudes: Community attitudes towards work (i.e. whether the people in the location are hard working or otherwise) as well as their attitudes towards the incoming entrepreneurs (helpful and cooperative or otherwise) can make or mar an industry. Locational decisions, therefore, must take such factors also into account particularly while setting up labour intensive units. 12. Supporting industries and services: Locational factors should also include proximity of services needed by the firm. A firm desirous of getting some or all parts made from outside or some of the operations done from outside must see that such sub-contractors are located in the neighbourhood. Getting a job done from units located at far off places will mean not only additional transportation cost but also time consuming and costly. Also if units are too far off, the control on quality of work done by them cannot be exercised. 13. Suitability of the land: Site selection should also take into account topography and soil structure of the land. The soil structure must be capable of bearing loads of foundations. Though modern building techniques can overcome the limitations of the soil, but if considerable improvement is required then selection of a low cost and may ultimately turn out to be expensive. 14. Availability and cost of the land: Site size (Plot size) must be large enough to accommodate the present production facilities, parking and access facilities but also leave sufficient room for future expansion. As a general rule, a site five times the actual plant size is considered minimum for all these things including future expansion.

ECONOMY SURVEY OF THE SITE SELECTION: An ideal location is one where the cost of obtaining materials and processing them into finished product plus the cost of distributing the finished product to customers is minimum. One of the most commonly used approaches consists of following steps: Step 1: Prepare a list of all relevant factors. Step 2:

Estimate expenses on materials, transport, wages, power etc for each location on each of the above factors.

Step 3: Collect data on intangible factors like community facilities, community attitudes etc. Step 4:

Analyse the tangible data for each location and calculate rate of return on investment.

Step 5:

Select provisionally a locational based on financial data.

Step 6:

Compare the intangible data for the different locations and select the optimal location considering intangible data.

Q.3) (b) What are objectives of a good layout? Discuss any six principles of a good layout? Answer.3)(b) OBJECTIVE OF A GOOD PLANT LAYOUT Only through an efficient layout, the organization can attain the following objectives: (i)

Economy in handling of materials, work-in-process and finished goods.

(ii)

Minimization of product delays.

(iii)

Lesser work-in-progress and minimum manufacturing cycle time.

(iv)

Efficient utilization of available space.

(v)

Easy supervision and better production control.

(vi)

Greater flexibility for changes in product design and for future expansion.

(vii)

Better working conditions by eliminating causes of excessive noise, objectionable odor smoke etc.

PRINCIPLES OF A GOOD LAYOUT (i)

Overall integration of factors: A good layout is one that integrates men, materials, machines and supporting activities and others in a way that the best compromise is obtained No layout can satisfy each and every principle of a good layout. Some criterion may conflict with some other criterion and as a result no layout can be ideal it has to integrate all factors into the best possible compromise.

(ii)

Minimum movement: A good layout is one that permits the minimum movement between the operations. The plant and machinery in case of product layout and departments in case of process layout should be arranged as per sequence of operations of most of the products. 

Since straight line is the shortest distance between any two points, men and materials as far as possible should be made to move along the straight path

A door may be made in a wall or a hole may be drilled in a ceiling if that eliminates or reduces material handling in place of stairs or a distant door.

(iii)

(iv)

Uni-direction flow: A good layout is one that makes the materials move only in the forward direction, towards stage of completion, with any backtracking. 

Since straight line is the shortest distance between any two, points, materials as far as possible should be made to move on the principle of straight line flow. And when straight line flow is not possible, other flows like U-shaped flow, circular flow or zig zag flow may be adopted, but the layout may ensure that materials move in the forward direction (Fig 4.1)



To ensure forward flow, equipment if necessary may be duplicated.

Effective use of available space: A good layout is one that makes effective use of available space both horizontal and vertical



Backtracking and duplicated movements consume more time, involve un-necessary materials handling, add to cost and lead to inefficiency.



Raw materials, work-in-progress and finished goods should be piled vertically one above another rather than being strewn on the floor.



Pallets or equivalents should be made use of to pile up several layers one above another



Area below the work tables or in the cupboards built into the wall are welcome since they reduce requirement of space

(v)

Maximum visibility: A good layout is one that makes men, machines and materials ready observable at all times. •

All departments should be smoothly integrated, convenient to service and easy to supervise



Every piece of positioning or screening or partitioning should be scrutinized and carefully planned.



Special cupboards, enclosures, offices, partitions etc. should be avoided except when their utility is established beyond doubt.

(vi)

Maximum accessibility: A good layout is one that makes all servicing and maintenance point readily accessible.



Machines should be kept sufficiently apart and with reasonable clearance from

The wall so that lubrication, adjustment and replacement of belts, removal of parts at the time of repairs etc can be done conveniently by the maintenance staff. Area in front of electrical panels and fire extinguishers should be kept free from obstructions.

Q.4) How does production planning differ from production control? What are the key functions of production planning and control? Answer.4) Production planning versus production control. Planning (Planning the work)

Control (Working the Plan)

Planning involves collection and maintenance of data regarding time standards, materials and their specifications, machines and their quantities, tools and their process capabilities, drawings and operational layouts etc.

Control involves dissemination of data preparation of reports regarding output, machine and labour efficiency, percent defectives etc.

Planning is seeing that requirements tool, machines, men, instructions, authorization and the like-will be available at the right time and Control is seeing the requirements are actually in the right quantities and are of proper quality. made available at the right place and in the right quantities. Planning involves preparations of load charts and fitting various work orders into uncommitted time available on the company’s facilities (men or machines). Control involves actual seeing that the jobs are started and completed as per schedule prepared Planning involves preparation of all necessary by the scheduling cell of the PPC. forms and paper work. Control involves actual issue of forms and Planning involves designing suitable feed back paper work. as to what may happen. Control involves keeping track of what is happening and collecting information as to Planning involves forwarding thinking what has happened. regarding the remedial action to be taken if the job falls behind schedule. Control involves suggesting remedial action when the job is falling behind schedule. Planning therefore is a centralized Activity (in the office) and includes such Control is thus a diffused activity (in the shops) functions as materials control, tools control, and includes functions such as dispatching, process planning and scheduling. progressing and expediting.

FUNCTIONS OF PRODUCTION PLANNING AND CONTROL: Production planning and control is normally assigned two sets of functions: (I)Regular functions and (ii) Optional functions. (i)

Regular functions are those, which are generally assigned to PPC in most of the organizations through the importance of the function, may vary from industry to industry.

(ii)

Optional functions are those, which may be assigned to PPC depending upon policy of the management of the firm.

Common (or Regular Functions)

Optional Functions

Order Preparation includes activities like making of work orders, converting work orders to shop orders, preparing auxiliary orders and releasing such orders to those concerned to authorize their activities

Cost Estimation concerns preparations of Preproduction cost estimates to be used by sales department for quotation purposes (Alternatively this may be assigned to Costing Department Or Industrial Engineering Department)

Materials control concerns preparations of materials estimates, indenting non-stock materials, ascertaining availability of materials purchased to stock, continual follow-up with purchase and stores for timely receipt of materials, and advising stores to allocate required quantities or available materials (alternatively on their receipt) against specific shop orders.

Work measurement concern fixation of time to be allowed to a qualified workman to carry out a specific task, under specified conditions and at the defined level of performance. Work measurement employs scientific, well-known techniques like time study, work sampling standard data, production study, analytical estimating etc. (Alternatively, work measurement function may be assigned to Industrial Engineering department. Sub-Contract concerns offloading of certain Process planning or Routing concerns fixation work on outside vendors for economic reasons of method of manufacture: operations and their or to augment the existing manufacturing sequence, machine tool for each operation, jigs facilities (Sub-contract work alternatively) be and fixtures, measuring instruments and gauges handled by Materials/purchase Department) etc. to enable shops to produce goods of the right quality at the lowest cost. Capacity planning concerns estimation of Tools control concerns preparations of requirements of men and machines as the basis estimates of cutting tools (Standards as week of decision making to meet the firm’s increased As non-standards tools), gauges and measuring volume of business (Some companies prefer to instruments, jigs and fixtures etc indenting non- assign this function to Engineering department. stick tooling: follow up with tool room for timely manufacture of jigs and fixtures;

periodical replenishment of worn-out-nonconsumable tooling (e.g. work arbors, collets, copying masters, Allen keys, spanners, etc. Scheduling concerns preparation of machine loads, fixation of calendar dates of various operations to be performed on a job, coordination with sales to confirm delivery dates of new items and periodical preparation of dispatch schedules of regular items. Dispatching concerns preparation and distribution of shop orders and manufacturing instructions to the concerned department as their authority to perform the work according to the predetermined schedule. Progressing concerns collection of data from manufacturing shops, recording of progress of work, and comparing progress against the plan. Expediting concerns intensive progress chasing to identify delays and interruptions which may hold up production, devising cures from time to time to keep rate of production in line with the schedule, communicating possible failure in delivery commitments to Sales Department.

Demand forecasting concerns making projection of company’s product market. Though, long term forecasts are given by Sales Department but short term forecasts required for materials planning, machine loading, sub contracting etc may be prepared by PPC department

Q.12 (a) What is critical path? What does it signify? How is it identified? Answer.2)(a) Critical path analysis, an important aid to planning, scheduling and coordinating the activities if large scale projects. Is a synthesis of two independent techniques: Programme Evaluation and Review Technique (PERT) and Critical Path Method (CPM). Though the two techniques were developed independently, they are only superficially different. The two method have many features in common and are now combined into a technique called Critical Path Analysis (CPA) or Network Analysis. There are three basic different between a PERT network and CPM network: •

PERT is event oriented while CPM is activity oriented (i.e. PERT prepares network from events while CPM builds if from activities)



PERT provides for an allowance for uncertainty while CPM does not (i.e. PERT makes three time estimates for each activity while CPM makes one time estimate)



Activity time in CPM technique are related to costs while it is not so in PERT since it is event oriented

Significance of critical path Critical path analysis offers several advantages. It (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix)

Forces through pre-planning. Each and every activity compromising the project is identified and recorded. Nothing is left to memory or chance which prevents crises in scheduling Increases coordination of tasks as technological relationship between the activities suggests which activities can run simultaneously and which should succeed others. Helps computations of different project duration’s for different level of resources and thereby select a plan that minimizes total project cost. Indicates optimal start and finish times of each activity of the project. Defines areas of responsibility of different departmental heads for timely execution of the project. Facilitates progress reporting and limits unnecessary discussion at the progress meetings. Identifies troubles spot often in advance and apply remedial measures. Enables the plan to be revised in accordance with changes/changing circumstances. Helps to exercise “control by exception” and prevents cost overruns.

A Project comprises a series of activities and the identification of the individual activities requires knowledge and experience of the men responsible for the planning of the project. Even the preliminaries-mere listing of the activities-make the operating personnel: •

Think of details about the project well in advance.



Observe critically the way in which the various activities interact or compete for scarce resources



Improve upon the original plans even before network is formally drawn and analyzed.

A project, therefore, must be torn into a set of identifiable activities. There are no set rules but general guidelines are as under: •

An activity should represent the smallest unit of the operation or set of operations over which management desires control.



An activity should represent an operation or set of operations, which can be performed using a particular kind of equipment or a special skill. For example in construction project, plumbing is considered as one activity while wiring can be considered as another activity since the first activity requires plumbers and the second activity needs electricians.

Q.12) (b) Activity 1-2 1-3 1-4 2-5 3-5 4-5 4-6 5-6

Optimistic 02 02 02 01 04 02 02 03

Most Likely 03 04 06 01 05 03 05 05

Pessimistic 10 06 10 01 12 04 08 13

Answer: (a) Expected time of an activity can be obtained from the three time estimates using the formula: te = a + 4m +b 6 where

a m b

= = =

Optimistic time most likely time pessimistic time

a m b

= = =

2 3 10

For activity (1-2)

te

=

2 + 4 x 3 + 10 6

te

=

24 6

=

4

Expected times of all activities of the network, calculated on above lines, are tabulated below. Activity 1-2 1-3

Three time estimates 02-03-10 02-04-06

Expected time 4 4

1-4 2-5 3-5 4-5 4-6 5-6

02-06-10 01-01-01 04-05-12 02-03-04 02-05-08 03-05-13

6 1 6 3 5 6

4

5

6

6

3 6

3 4

6

4

1

2

1

5

Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks (4+6+6) Variance is Vi

=

(b –a) X (b – a) 6 6

V1-3

=

4 9

V3-5

=

16 9

V5-6

=

25 9

V

=

V1-3 + V3-5 + V5-6

V

=

5

Standard deviation Z

=

T - Tcp σ

=

19 -16 √5

=

3 2.236

=

1.34

The approximate probability value when Z = 1.34 is 0.9099 ∴The probability of completion of critical path by the schedule time of 19 weeks = 91%

Q.5) What is preventive maintenance? Why it is better than Breakdown Maintenance? What are the key activities of Preventive Maintenance? Answer.5) Preventive maintenance anticipates failures and adopts necessary actions to check failures before they occur. It includes activities like inspection, lubrication cleaning and unkeeps, minor adjustments and replacements found necessary at the time of inspection etc. Preventive maintenance can be either: running maintenance or “shut down maintenance”. Running maintenance includes maintenance activities (e.g. minor adjustments In machines revealed through inspections, lubrication, cleaning and unkeep etc.) Which are carried out when the machine is still running. Shutdown maintenance includes preventive maintenance activities such as minor component replacement whose needs are identified through inspections, which require stoppage of Machines. Preventive inspection is one of the key activities of preventive maintenance which is usually performed by making use of human senses – watch) eye), listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) – but the trend is Changing towards use of condition monitoring instruments. Such maintenance. Practice is known as predictive maintenance or condition based maintenance.

Q.10) (a) What are X-R Charts? How are they made and used in controlling a process? Answer.10) X-R chart is a pair of chart consisting of a average (called X chart) and a range Chart (called R chart) placed one below another on a piece of graph paper. The X chart is used to control the mean value of the characteristic an R-chart is used to restrict the range of variations in the values. X-R charts are drawn when the characteristics are measurable. Each chart consists of three values: a central line, upper control limit and lower control limit. The central line represents the arithmetic average of the sample means which equals the mean of the population, u. The upper and lower control limits are located at three standard deviation on either side of the central line. Samples of fixed size are drawn at regular intervals and measurements are taken. The samples wise values of the mean and range are plotted in their respective X and R charts. The spread of sample points in the charts is studied to decide the remedial action (if any) to be taken. The X chart analyses whether or not the mean of the quality Characteristics is within control while R-chart analyses whether or not the variability is within control. STEPS TO PREPARE X-R CHART A pre-requisite to the preparation of the chart is the decision on the following aspects: • •

• •

Quality Characteristics refer to the property of the product, which is to be assessed. The quality characteristics must be capable of being measured. In case of more than quality characteristics, separate chart is made for each quality characteristic. Sample size refers to number of pieces comprising each sample. Sample size is an important decision. It is a common practice to use sample of n = 4 or 5 to have low appraisal cost. Large samples such as n = 15 or 20 are used if the process standard deviation is large. Sample Population refers to the number of samples to be collected to construct a control chart. The number of samples must be sufficient. Usually, 20 samples each of size 4 or 5 are enough to have good estimates of the process average (X) and dispersion (R). Time Interval measures the time gap between consecutive samples. Time interval, as a genera rule, should be proportional to the average frequency of out-of-control conditions. It is a fairly complex decision since a number of factors such as cost economy, susceptibility of the process to disturbances; convenience of the inspector etc. requires to be considered.

The making of X-R Charts involves the following Steps: Step 1: Collect Data (a) (b) (c) Step 2:

Collect sufficient samples spread over a reasonable period. Each sample must be of equal size. Measure each component comprising the sample for the given quality characteristic Record individual measurements on a work data sheet. Calculate mean (X) and Range (R) of each sample

A B C

Step 3: A B

Step 4:

The mean which is written as X (X bar) is average of each sample and is Obtained by totaling the individual measurements of the units comprising the sample and dividing the total by the sample size (number of units in each sample) The range, which is written as R, is obtained as the difference between the highest and the lowest measurement of a sample. The values of X and R are recorded sample wise either on the extreme right of the individual measurements on the data sheet or in a separate table. Calculate grand Average (X) and mean Range (R) The grand average, which is written as, X (X double bar) is the average of the sample averages and is obtained by dividing the total of the averages of all the samples by the total number of samples. The mean range, which is written as, R (R bar) is the average of the ranges and is obtained by dividing the total of the ranges of the samples by the total number of samples. Set up Control chart for the average

A

Set up a control chart with the central line drawn at X (X double bar), upper control limit located X + A2R (R bar) and the lower control limit set up at X-A 2R.

B

Plot the averages to see whether the process was under control when samples were drawn. If all points fall within the control limits, the process is said to be under control If process is not under control (indicated by some points falling outside the control limits), eliminate points outside the control limits and compute new trial control limits for the remaining points. Repeat step 4 (d) until all points fall within the control limits Control limits in a particular situation should be revised from time to time as additional data is accumulated.

C D E F

Step 5: Calculate control limits of the range chart A B C D E F

The control chart for range chart is set up with central line as R, upper control limit (UCLR) located at D4R above the central line and lower control limit (LCL) at D3R below the central line Plot the value of the range of each sample. If all points fall within the control limits no modification is necessary unless it is desired to reduce the process dispersion if range chart exhibits lack of control indicated by some points falling outside the control limits, eliminate those points out of control and compute new trial control limits Repeat step 5 (d) until all points fall within the control limits. Control limits in a practical situation should be revised time to time as additional data is accumulated.

Step 6: Use control chart A B

Collect samples of fixed size at specified intervals of time. Measure each unit of the sample for the quality characteristics, calculate mean and the range of each sample.

C D

Plot the values of X and R of each sample in their respective charts Study the trend of the points to interpret and suggest remedial action

Q10 (b) ABC company produces a solvent, which must contain 3 percent of alcohol. It tries to maintain the actual percentage at 3 + 0.3 percent. It tests hourly in samples of five. The following table shows the results of last five samples. Set up a control chart for mean and examine whether the process is under control. A) Solution: (i) Collect data (ii) Calculate mean (X bar) and range(R bar)

(iii)

Sample No.

Arithmetic Mean (X bar)

Range(R)

1 2 3 4 5

2.92 2.98 3.06 3 3

0.3 0.1 0.1 0 0.2

Calculate grand average and the mean range X(X bar)

R

=

2.92 + 2.98 + 3.06 + 3 + 3 5

=

2.992

=

0.3 + 0.1 + 0.1 + 0 + 0.2

5 =

(iv)

0.14

Set Up control chart for the average Central Line = CLx = X(X bar) =

2.992

Upper Control Limit

UCLx = X (X bar) + A2.R(R bar)

Lower Control Limit

= =

2.992 + 0.5768 x 0.14

=

3.476

=

UCLx = X (X bar) - A2.R(R bar) = =

(v)

2.992 - 0.5768 x 0.14 2.507

Set up a range chart Central line CLR

=

R(R bar)

=

Lower control limit

=

LCLR =

D3.R (R bar)

=

0 x 0.14

=

0

=

UCLR =

=

2.114 x 0.14

=

0.29596

Lower control limit

0.14

D4.R (R bar)

Q.6) What is method study? Describe the procedural steps to develop easier and effective methods. Answer.6) Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method study is an organized approach and its investigation rests on the following six basic steps outlined in the block diagram • Select the work to be analyzed. • Record all facts relating to the existing method. • Examine the recorded facts critically but impartially. • Develop the most economical method commensurate with plant Requirements • Install the new method as standard practice. • Maintain the new method. Selection of the job Selections of the jobs to be studied for methods improvement by the method study practioner is a managerial responsibility and it (selection) may be based on economic technical or human consideration. Economic consideration justifies selection based on the economic worth (i.e. money saving potential) of the job. Technical consideration identifies jobs, which require studies to overcome manufacturing difficulties (excessive rejection, relaxation in prefixed performance standards, inability if the shops to stick to specified machining parameters such as speeds, feeds, depth of cut etc., inconsistent quality etc.) Human consideration in job selection is usually given weightage while introducing method study practices for the first time. Recording of facts Systematic recording is the most crucial step in method improvement. Since recording by long hand (or by descriptive method) has its limitations, it is not recommended for use in method study. Instead, five symbols and eight charting conventions are used to record facts relating to the job under study. Five typical symbols are O, ||, , D and V and eight charting conventions concern composition of the chart, reject, rework, repletion, change of state, introducing of new material, combined events and numbering of events. The document on which details of the process are recorded by the above referred symbols and conventions is called chart. There are four basic types of chart: (i) operation process chart (ii) Flow process chart (iii) multiple activity charts and (iv) two handed process chart. Besides charts, two types of diagrams-flow diagram and string diagram are drawn when recording details of an existing layout. Travel chart is another typical chart, which is used to record frequency of movements (weight x distance) between work centres/departments.

Repetitive short cycle operation which involves quick hand/feel motions (i.e. microscopic motions) may be studied with micro motion study. Glibreth, founder father of micro motion study, also developed photographic techniques called cyclograph and chronocylegraph to record path of the motions of the members of the body. Critical examination Critical examination aims to analyze the facts critically and thereby give rise to alternatives, which form the basis of selection and development of easier, and effective methods. Critical examination is conducted through a systematic and methodical questioning process. Each activity recorded on the chart, whether it relates to processing or inspection, or material handling, or to any other aspect, is picked up one at a time and is examined minutely. The questioning process is considered under five major heads, namely the purpose, the place, the sequence, the person and the means. These five aspects in critical examination are referred to as five governing considerations. Development and selection: Development and selection stage concerns short listing of ideas generated at the critical examination stage, testing each short listed idea for its technical and economic feasibility, and making selection among the alternatives wherever choice exists. To develop ideas and to ascertain their technical and economical feasibility, the method study practioner needs to solicit the cooperation of personnel from different departments of the company. Various techniques available for the development and selection purpose are: cost benefit analysis, break even analysis, investment analysis and critical path analysis. Installation ‘Installation’ (or implementation) of the proposed method involves preparation of project report on recommendations making oral presentation to the top management, securing approval of the decision maker, assisting line management during implementation, arranging training of workmen, and getting jobs (operations) retime after implementation, arranging training of workmen, and getting jobs (operations) retimed after implementation. Maintenance “ Maintenance” phase is the follow up phase after implementation, which serves as a monitoring and control mechanism. It helps to ensure that the revised methods are set into concrete and workmen do not revert back to old methods. It also provides an opportunity to the practitioner to assess the effectiveness of the approach followed by him and makes changes in the methodology (if required).

Q.9) (a) What desirable conditions need to be present to be present to guarantee success of an incentive scheme? Answer.9) A good wage incentive plan should have the following characteristics. • Administrative simplicity: The incentive system should be simple and must be easily understood by the workers and their representatives. An incentives scheme, which can be understood, only by engineers and mathematicians or a scheme which involves the use of complex formulate or references and cross-references is sure to fail. The incentive scheme should be such that workmen can calculate their own earnings easily and quickly. • Minimum clerical work: The system should fit into existing system of production and cost control. It should not involve any significant addition to the clerical work. • Maximum coverage: The system should cover as many workmen as possible. A scheme if applied to a few workmen creates a demoralizing effect on the morale of those not covered by the scheme.



Direct Incentive payments should increase at least in direct proportion to the increase in output by the operator. There are two reasons: Firstly because it is more difficult to producer extra units and secondly because saving in the overheads are far greater at higher levels of production. • Period of Payment The period of payment should be as short as possible • Adequate guaranteed minimum hourly rate The scheme must ensure adequate guaranteed minimum hourly rate to all incentive workers regardless of their output. Such an hourly guaranteed rate is normally referred to as the guaranteed base rate. The guaranteed base rate must be realistic and should be at least equal to the hourly rate payable to a non-incentive worker doing similar job in the industry. Incentive earnings of the workers should never be regarded as a substitute for poor wages. • Accurate and yet attainable performance standards Performance standards should be set through systematic work measurement studies. The experts to that there is no dispute or malpractice and yet the standards are attainable so that a worker working at normal pace can attain them should base the standards of measurement on the assessment.

Further the incentive plan should be such that it provides an opportunity to all average workers to earn reasonable earnings. • Consistency of the standards Standards once fixed should not be changed unless there is a permanent change in methods, or change in equipment, or change in material and plan should provide for the provisions to modify the performance standards. • Inbuilt check on process rejections A good incentive scheme should exercise a check on the operator against achieving higher bonus by poor workmanship. Payment should be made only for pieces declared acceptable by the inspection department and a workman constantly producing substandard pieces should be liable for disciplinary action. • Payment of partially completed jobs The problem of payment for the incomplete work arises only in case of long cycle jobs. Situations do arise when the jobs are of very long cycle duration and cannot be finished within the bonus period. Similarly, a semi-finished job may require to be handed over by one operator to another at the end of shift, or prior to having a holiday. The scheme should clearly spell out as how assessment of work done by the workmen on the same job will be carried out and how disputes arising out of such assessment would be resolved. • Payment of Idle Time Adequate safeguards must be provided to compensate the operator for the time lost due to reasons beyond his control. A good incentive scheme should ensure that an operator does not suffer financial loss for reasons attributable to the managerial weakness, e.g.: lack of material due to bad buying, breakdowns of the machines due to poor maintenance practices, nonavailability of work etc. Thus an operator rendered idle because of factors attributable to the management should be given a lieu bonus. • Safeguards The scheme should be fair not only to the employees but also to the employer. Safeguarding clauses as under should be incorporated to protect. a. Management’s right to change a standard when there are changes in methods. Materials and machines b. Management’s right to withdraw or discontinue temporarily a scheme during bad period. c. Management’s right to initiate disciplinary action against operators who continually produce sub-standard articles. d. Management’s right to initiate disciplinary action against employees who, time and again, do not achieve minimum standard of production even in the presence of fair and accurate standards. e. Management’s right to initiate disciplinary action against employees who, time and again are found using speeds and feeds higher than those recommended in the process sheet (or operational layouts) •

Maximum ceiling on the earnings

The system should have built-in-control against higher earnings beyond a certain limit. Firstly, the system should discourage workers to work beyond a certain limit otherwise too attractive an incentive scheme may induce the worker to work more and more and thereby adversely affect his health. Secondly, the system should ensure that in case of loose standards the company does not lose financially. • Consistency of Plan The plan should be consistent over a period of time. Frequent changes in the plan make it’s functioning difficult. Faith in plan is lost if there are frequent revisions. • Acceptance of Labour Body The scheme should finally have acceptance of the labour body. The body of workers’ representatives to prevent any misunderstanding and ill-feeling later on must accept the basic incentive plan and its provisions. • Continuous Use The scheme should be in continuous use. The temporary use of the scheme in good times and its discontinuation in bad times makes it’s functioning difficult. • Define End Results The plan must result in reduction in per unit labor cost.

Q 13) Answer 13) i) Average Cycle time

=

0.22 + 0.24 + 0.28 + 0.26 + 0.25 5 =

Normal Time

=

0.25

Observed time x Rating 100 =

0.25 x 80 100

=

0.2

Similarly, average cycle time and normal time for all the elements are calculated and tabulated as below Element A B C D E

ii)

Avg. cycle time 0.25 0.15 0.35 0.102 0.12

Rating 80 100 120 90 100

Normal time 0.2 0.15 0.42 0.0918 0.12

Total Normal time

=

0.2 + 0.15 + 0.42 + 0.0918 + 0.12

Total Normal time

=

0.9818

Relaxation Allowance =

15 100

x

=

0.1473

Contingency Allowance =

5 100

x

∴Standard time

=

0.0491

0.9818

0.9818

Normal time + Relaxation Allowance + Contingency Allowance

= ∴Standard time

=

0.9818 + 0.1473 + 0.0491

1.1782

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Your Answer

Condition monitoring

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer

Operation

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer

PERT & CPM

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer

Necessity

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer

Operation

True/False Question

An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill. Correct Answer True Your Answer

False

Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan True/False

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

which is not available at the producing company. Correct Answer Inspection order Your Answer

Job card

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Deifinite , Undesrstandable , Economically viable True/False Question

In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up , Due to purposely done mistakes by unsatisfied worker True/False Question

A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer

True

Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

produce defectives. Correct Answer False Your Answer

False

True/False Question

A sampling plan which perfectly discriminates will have vertical OC curve.

Correct Answer True Your Answer

True

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer

Manufacturing

Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer

Control plans , Charts , Templates or models

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer

Unexpected

Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Both forecast and pending orders Your Answer

Past sales

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer

Acceptable quality level

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Correct Answer Delay , Operation , Inspection Your Answer

Operation , Inspection , Production

True/False Question

In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer

True

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer

Preventive Maintenance

True/False Question

The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. Correct Answer False Your Answer

False

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer

Quality

True/False Question

Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Your Answer

True

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer

Idle wages

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost True/False Question As a general rule, the number of tail event of an activity is more than that of it's head event. Correct Answer False Your Answer False Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts

Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Ease of supervision , Delivery performance Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Availability of labour Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Move order Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan

Wage Payment Wage Payment

Craft

Facilities Planning

Facilities Planning

Work Sampling Machine utilization Gantt Chart

Machine utilization

Production Scheduling Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time True/False Question Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Multiple Choice Single Answer Question Which of the following technique is event oriented ?

Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Match The Following Question Correct Answer Your Answer Crash cost of an activityCc

Cc

Normal time of an activity

Tn

Crash time of activity

Tc

Tc

Normal cost of an activity

Cn

Tn

Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. True/False Question A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour True/False Question Cellular layout is based on the concept of Group Technology Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Standard deviation Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer time consuming Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working True/False Question In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True

Your Answer True Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity True/False Question As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. Correct Answer True Your Answer True True/False Question Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. Correct Answer False

Your Answer False Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation Your Answer Backward pass computation True/False Question Complexity and difficulty of Planning is influenced by types of layout Correct Answer True Your Answer False True/False Question For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives. Correct Answer False Your Answer True Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Your Answer Master production schedule , Lead time for procurement/manufacturing , list of machines

Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory True/False Question Systematic maintenance system can completely eliminate the wear and tear of machines. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing? Correct Answer Visual Testing , Eddy current , Magnetic flow detectors Your Answer Visual Testing , Eddy current , Magnetic flow detectors Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion Multiple Choice Single Answer Question Providing flexibility in plant layout means Correct Answer Layout can be changed without much cost if required Your Answer Layout can be changed without much cost if required Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements

Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Multiple Choice Multiple Answer Question Which of the following are scheduling techniques? Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Inspection order Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Shop order Multiple Choice Single Answer Question What do you understand by the selection of the job for the method study on the basis of money saving potential of the job? Correct Answer Economic consideration

Your Answer Economic consideration Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Multiple Choice Single Answer Question Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit? Correct Answer Separate inspection room Your Answer Separate inspection room Multiple Choice Single Answer Question How to reveal the capability of the sampling plan to discriminate between good lots and bad lots? Correct Answer Operating characteristics curve ( OC ) Your Answer Operating characteristics curve ( OC ) True/False Question It would not affect the project completion time if non-critical activities take little loner time than planned. Correct Answer True Your Answer True Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance Match The Following Question Correct Answer Your Answer Forcasting requirement for indirect material consumption analysis technique

Past consumption analysis technique

Past

Inventory control by classification

ABC Analysis ABC Analysis

Structure of the product BOM BOM Material Planning for dependent demand

MRP

MRP

True/False Question The dispatching function is of very importance in flow and mass production units. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Cost of material Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Operation Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation

Your Answer Operation True/False Question An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan True/False Question In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which of the following are ideal situations for the preventive inspection? Correct Answer Weekly off and holidays , Non-production hours , Stand-up equipment Your Answer Weekly off and holidays , Non-production hours , Stand-up equipment Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Flow Process chart Match The Following Question Correct Answer Your Answer Fixation of inventory level

Reorder level

Reorder level

Symptom of ill planned purchasing

Over ordering Over ordering

Factor influencing material planning

Lead time

Lead time

Net requirement of material under MRP Stock on hand Stock on hand

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Product cost Multiple Choice Single Answer Question Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize? Correct Answer Multiple gauging Your Answer Multiple gauging Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Open purchase order True/False Question An ideal OC curve is never possible only with cent percent inspection. Correct Answer False Your Answer True Match The Following Question Correct Answer Your Answer Table lubrication

Weekly Six monthly

Draining and refilling of oil reserviors of plunger pump Yearly Yearly Parts lubricated with oil nipple Daily

Weekly

Tools and slideways

two to three times a day Daily

True/False Question The operator should not stop production if first piece is not approved by the inspector. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Move order

Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by using symbols while recording in method study? Correct Answer Transport , Delay , Storage Your Answer Transport , Rejection , Storage Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection Your Answer Zone of rejection True/False Question A properly designed sampling plan can control sampling errors and completely eliminate them. Correct Answer False Your Answer True Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications True/False Question Grouping of machines gives a lot of flexibility in loading and scheduling Correct Answer True Your Answer True True/False

Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Economically viable True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Modifications and improvements , Overhauling , Emergency repairs Your Answer Modifications and improvements , Overhauling , Lubrication as per schedule Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Product Planning Your Answer Order Processing Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By experience Your Answer By vendor plant surveys , By the perofrmance of first lot , By experience Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control Match The Following Question Correct Answer Your Answer Pessimistic timeb

p

Expected time Te

Te

Optimistic time a

o

Most likely time

m

m

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Job cards , Progress cards Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Part Sketch , Standard Time , Jigs and fixtures Your Answer Sequence of operations , Standard Time , Jigs and fixtures Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Flow chart Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On manufacturing process Multiple Choice Single Answer

Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Pictograph Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Bell True/False Question In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres. Correct Answer True Your Answer True Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Quality True/False Question Floor inspection promotes tendency of machines to drift out of limits and produce defectives. Correct Answer False Your Answer False True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer True Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation

Your Answer Manufacturing Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Control plans , Charts , Templates or models Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Both forecast and pending orders Your Answer Past sales Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Acceptable quality level Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Total cost

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of design Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Open purchase order True/False Question An ideal OC curve is never possible only with cent percent inspection. Correct Answer False Your Answer True Match The Following Question Correct Answer Your Answer Table lubrication

Weekly Six monthly

Draining and refilling of oil reserviors of plunger pump Yearly Yearly Parts lubricated with oil nipple Daily Tools and slideways

Weekly

two to three times a day Daily

True/False Question The operator should not stop production if first piece is not approved by the inspector. Correct Answer False Your Answer False Multiple Choice Multiple Answer

Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Move order Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by using symbols while recording in method study? Correct Answer Transport , Delay , Storage

Your Answer Transport , Rejection , Storage Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection Your Answer Zone of rejection True/False Question A properly designed sampling plan can control sampling errors and completely eliminate them. Correct Answer False Your Answer True Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications True/False Question Grouping of machines gives a lot of flexibility in loading and scheduling Correct Answer True Your Answer True True/False Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Economically viable True/False

Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Modifications and improvements , Overhauling , Emergency repairs Your Answer Modifications and improvements , Overhauling , Lubrication as per schedule Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Product Planning Your Answer Order Processing Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By experience Your Answer By vendor plant surveys , By the perofrmance of first lot , By experience Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control Match The Following Question Correct Answer Your Answer Pessimistic timeb

p

Expected time Te

Te

Optimistic time a

o

Most likely time

m

m

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Job cards , Progress cards Multiple Choice Single Answer

Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Part Sketch , Standard Time , Jigs and fixtures Your Answer Sequence of operations , Standard Time , Jigs and fixtures Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Flow chart Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On manufacturing process Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Pictograph Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Bell True/False

Question In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres. Correct Answer True Your Answer True Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Quality True/False Question Floor inspection promotes tendency of machines to drift out of limits and produce defectives. Correct Answer False Your Answer False True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer True Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Control plans , Charts , Templates or models Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected

Your Answer Unexpected Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Both forecast and pending orders Your Answer Past sales Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Acceptable quality level Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Total cost Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of design Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question One of the sophisticated operations research techniques used in material planning is Correct Answer Dynamic programming Your Answer Dynamic programming True/False Question Job life is one of the factors that influence Process Planning Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Multiple Choice Single Answer Question Product layout is employed for manufacturing following products Correct Answer refrigirators Your Answer ships Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Job Multiple Choice Multiple Answer Question Which of the following situations demand the technical consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Your Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work True/False Question Quality control determines what, when, and how much to inspect while inspection actually conducts examination of goods.

Correct Answer Your Answer True

True

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Producer's risk Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False True/False Question F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To achieve uniformity in requirement of resources , To complete the project in the least possible time , To reduce project cost below it's normal cost Your Answer To complete the project in the least possible time , To achieve uniformity in requirement of resources , To improve the labour efficiency Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Recording done without actual measurements , Improper selection of samples Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP

Your Answer MRP Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional True/False Question The event numbers as far as possible reflect the logical relationships of the activities. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Your Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle True/False Question Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of conformance True/False Question Both, preventive and breakdown maintenance work must be assigned to the same team. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Following is one of the tasks of Production Control Correct Answer Actual issue of forms and documents Your Answer Actual issue of forms and documents Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Your Answer Capacity Planning , Production Planning , Manpower Planning Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity Multiple Choice Single Answer Question What is the specific name for the Gantt chart when it shows at a glance the scheduling of various operations involved in a job? Correct Answer Job Schedule Your Answer Load Chart Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance

Your Answer Maintenance Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which of the following factors decide the choice between the cent percent and sampling inspection? Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating Your Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Cracks , Burrs , Texture Your Answer Cracks , Burrs , Texture Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective more than AQL but less than LPTD Multiple Choice Single Answer Question In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of Correct Answer Sales Programme Your Answer Sales Order Match The Following Question Correct Answer Your Answer Fixed Position Layout Project Layout Functional Layout

Product Layout Line Layout

Project Layout

Process Layout Functional Layout Combined Layout

job layout

Mixed Layout Mixed Layout

Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement Your Answer Work measurement Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question Objective of Work Study is to improve Productivity Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function Your Answer Acceptance function , Feedback function , Preventive function Match The Following Question Correct Answer Your Answer Interruption for machine utilisation Input for scheduling Technique of scheduling Scheduling Device

Preventive maintenance Preventive maintenance

Overlapping of operations Critical Path Analysis

Strings Critical Path Analysis

Strings Blackboard

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular

Your Answer Rectangular True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True True/False Question Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero." Correct Answer True Your Answer True Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Worker True/False Question The dispatching function is of very importance in flow and mass production units. Correct Answer False Your Answer True Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". Your Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It helps to exercise "control by exception". LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected True/False Question After goods have been manufactured, route sheets and operation layouts should not be collected back. Correct Answer False Your Answer False True/False Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Your Answer Capacity Planning , Job Design , Production Planning Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective more than AQL but less than LPTD Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting

Your Answer Brazing , Welding , Riveting Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Rectangular Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Multiple Choice Multiple Answer Question Which of the following situations demand the economic consideration while selecting a job for method study? Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section Your Answer Unorderly movement of men and materials , Excessive process defectives , Inconsistent quality True/False Question During set up of X bar-R control chart, control limts should be practically revised from time to time as additional data is accumulated. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Economically viable Match The Following Question Correct Answer Your Answer

Toung Sweet Sweet Eye

Crack Crack

Nose

Burnout

Ear

Impact Roughness

Burnout

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Acceptable quality level True/False Question Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. Correct Answer False Your Answer False True/False Question Cent percent inspection is required on WIP prior to the key, critical or costly operation. Correct Answer True Your Answer True Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called Correct Answer Route Sheet Your Answer Route Sheet True/False Question Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. Correct Answer False Your Answer True Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM Multiple Choice Single Answer

Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Breakdown Multiple Choice Single Answer Question What is the relation between duration of an activity and length of an arrow? Correct Answer No relation Your Answer No relation Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Tight Your Answer Tight Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies Your Answer Break Even Analysis Multiple Choice Multiple Answer

Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Building codes , Policies regarding issue of licences Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of physical effort , Movement of material True/False Question An activity can share the same tail event and same head event with any other activity. Correct Answer False Your Answer True Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Woolen Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan.

Correct Answer Producer's risk Your Answer Producer's risk Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Working Maintenance True/False Question Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Over ordering , under ordering , stockouts Your Answer Over ordering , under ordering , stockouts True/False Question F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer False Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion Match The Following Question Correct Answer Your Answer Factor Analysis Method to evaluate layouts Minimization of production delays layout

Technique for evolving and analysis of layouts

Objective of good layout

Objective

of

good

Maximum visibility Scale model

Principles of good layout

Principles of good layout

Layout analysis Method to evaluate layouts

Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP Your Answer MRP Multiple Choice Single Answer Question What do you understand by totality of features and characteristics of a product or service that bears on it's ability to satisfy the customer? Correct Answer Quality Your Answer Quality Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question Cent percent inspection is required on WIP prior to the key, critical or costly operation. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Vendor performance evaluation , Making sure that suppliers understand the requirements , Defining right quality for the job Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of conformance , Purpose of product , Quality of design Your Answer Quality of conformance , Quality of design Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Equipment utilization , Ease of supervision Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye

Crack Crack

Nose

Burnout

Ear

Impact Impact

Burnout

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method study? Correct Answer Monitoring and control , Performance appraisal , Audit on savings Your Answer Monitoring and control , Performance appraisal , Audit on savings Multiple Choice Multiple Answer Question Which of the following are characteristics of an operating characteristics curve? Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level Your Answer Producer risk , Consumer Risk , Acceptable Quality Level Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Partial Multiple Choice Single Answer Question Why stores issue order should not be issued as soon as it is prepared? Correct Answer Material may or may not be available at the time of preparation Your Answer Inventory investment will increase Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Tight Your Answer Tight Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Shortest processing time , Minimum movement True/False Question After goods have been manufactured, route sheets and operation layouts should not be collected back. Correct Answer False

Your Answer False Multiple Choice Single Answer Question Process planning is the process of Correct Answer establishing shortest and most economic path of production Your Answer establishing shortest and most economic path of production Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance True/False Question A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer True Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question Under MRP system for common items order for procurement is placed based on requirement for each product Correct Answer False Your Answer True Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of conformance Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Job card Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Deifinite , Undesrstandable , Economically viable True/False Question In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up , Due to purposely done mistakes by unsatisfied worker True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer True Multiple Choice Multiple Answer

Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders Your Answer Operational layouts , Rejection reports , Move orders , Pre-filled stores issue orders Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment history card True/False Question Specifications is the basic tool of inspection. Correct Answer True Your Answer True Match The Following Question Correct Answer Your Answer Forcasting requirement for indirect material Economic order quantity Inventory control by classification

Past

consumption

analysis

technique

ABC Analysis ABC Analysis

Structure of the product BOM BOM Material Planning for dependent demand

MRP

MRP

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Job Instructions Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Shop Supervisor True/False Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False

Your Answer True Multiple Choice Single Answer Question How is the probability of acceptance in case of Acceptable Quality Level (AQL )? Correct Answer Very high Your Answer Average Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Progress cards , Network updating True/False Question The dispatching function is of very importance in flow and mass production units. Correct Answer False Your Answer True True/False Question Proper care and storage is not an essential part of a well planned lubrication system. Correct Answer False Your Answer False Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Multiple Choice Single Answer

Question Which rule is used for numbering of events? Correct Answer Fulkerson's Rule Your Answer Fulkerson's Rule LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment warranty card Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Part Sketch , Standard Time , Jigs and fixtures Your Answer Sequence of operations , Part Sketch , Standard Time Multiple Choice Single Answer Question How to reveal the capability of the sampling plan to discriminate between good lots and bad lots? Correct Answer Operating characteristics curve ( OC ) Your Answer Operating characteristics curve ( OC ) True/False Question Shape od an OC curve is a function of sample size and the acceptance number. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are scheduling techniques? Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Multiple Choice Multiple Answer Question Which of the following cases indicated that the operation has occurred? Correct Answer Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools

Your Answer Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools Multiple Choice Single Answer Question Process type layout is suitable when Correct Answer there is wide variation in processing time of operations Your Answer there is wide variation in processing time of operations True/False Question In case of backward pass computation, the latest event time of the burst event equals the smallest of the difference between the latest event time of the head event less duration of the activity converging on the head event. Correct Answer True Your Answer True Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Drawings Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of conformance Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Collaboration Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of conformance , Purpose of product , Quality of design Your Answer Quality of conformance , Quality of design Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Effective Capacity per work centre , Performance standards

Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance Multiple Choice Multiple Answer Question Which of the following activities can become a part of a preventive maintenance system? Correct Answer Condition monitoring , Planned Lubrication , Preventive inspection Your Answer Condition monitoring , Planned Lubrication , Preventive inspection True/False Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Your Answer False True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer True Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Match The Following Question Correct Answer Your Answer When to inspectStages of inspection What to inspect Specification

Stages of inspection

Stages of inspection

How to inspect Inspection devices

Specification

How much to inspect

Sampling or cent percent inspection

Inspection devices

Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Match The Following Question Correct Answer Your Answer Combined Layout

Mixed Layout Mixed Layout

Fixed Position Layout Project Layout Project Layout Product Layout Line Layout

Line Layout

Process Layout Functional Layout

Functional Layout

Multiple Choice Multiple Answer Question Which are the major types of defects? Correct Answer Minor , Major , Critical Your Answer Minor , Major , Critical Multiple Choice Multiple Answer Question Which of the following factors related to the labour and wages are considered while deciding the plant location? Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations Your Answer Prevailing wage pattern , Productivity of labour Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Low Productivity Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Cost of material Multiple Choice Multiple Answer Question Which of the following method can be adopted to overcome the problem of rushing up a job for it's timely completion? Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting Your Answer Use of optimum speeds and feeds , Use alternative materials , Job splitting True/False Question Kanban system is essentially a computer based system for production scheduling and control Correct Answer False Your Answer False True/False Question The event numbers as far as possible reflect the logical relationships of the activities. Correct Answer True Your Answer True Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection Your Answer Zone of rejection Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference.

Correct Answer Forwarding note Your Answer Forwarding note Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications True/False Question In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small. Correct Answer False Your Answer False True/False Question The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. Correct Answer True Your Answer True True/False Question In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart. Correct Answer True Your Answer True Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Operation Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question What is the relation between duration of an activity and length of an arrow? Correct Answer No relation

Your Answer Directly proportional Multiple Choice Single Answer Question Which characteristics are verified in cent percent sampling? Correct Answer All important characteristics Your Answer All important characteristics Multiple Choice Single Answer Question How to calculate float? Correct Answer Parallel critical path time minus Non-critical path time Your Answer Parallel critical path time plus Non-critical path time Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity Multiple Choice Single Answer Question What is the meaning of surplus material in context with stores issue order? Correct Answer Materials issued are not fully consumed Your Answer Materials issued are not fully consumed Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

2nd Attempt LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question What is the cause of inherent variation or internal variation? Correct Answer Cumulative effect of number of chance causes Your Answer Worker's efficiency Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost

Your Answer Total cost Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection Your Answer Zone of acceptance Multiple Choice Multiple Answer Question Which of the following cases indicates change in physical characteristic? Correct Answer Turning , Grinding , Drilling Your Answer Chemical reaction , Grinding , Drilling True/False Question Originating process of raw material influence Process Planning Correct Answer True Your Answer True Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question Skill of labour force in a product type layout is usually higher than in the process type of layout Correct Answer False Your Answer False True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following can be termed as operation while recording for method study? Correct Answer Information received , Addition or subtraction , Information given Your Answer Information received , Addition or subtraction , Information given Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan.

Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set Multiple Choice Single Answer Question Which industry out of the following industries require maximum consideration for safety factor while selecting plant location? Correct Answer Nuclear power plant Your Answer Nuclear power plant Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system True/False Question Operation process charts though indicates the sequence of events but do not show movements. Correct Answer True Your Answer False True/False Question Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better functioning. Correct Answer False Your Answer False Match The Following Question Correct Answer Your Answer When to inspectStages of inspection What to inspect Specification

Stages of inspection

Specification

How to inspect Inspection devices How much to inspect inspection

Inspection devices

Sampling or cent percent inspection

Sampling

or

cent

percent

True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery. Correct Answer True Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Highly Skilled Your Answer Contract Labour only Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Job cards , Progress cards Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory?

Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working Multiple Choice Multiple Answer Question Which are the major types of defects? Correct Answer Critical , Minor , Major Your Answer Minor , Major , Critical Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Control board Multiple Choice Single Answer Question Process planning is the process of Correct Answer establishing shortest and most economic path of production Your Answer Planning of business processes Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective Multiple Choice Multiple Answer Question Which of the following are scheduling techniques? Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines Your Answer Overloading of machines

Multiple Choice Single Answer Question Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit? Correct Answer Separate inspection room Your Answer Separate inspection room Multiple Choice Single Answer Question Who is responsible for return of surplus material? Correct Answer Dispatcher Your Answer Supervisor Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of its usage. Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which are reason due to which the progress of work is rarely in line with its plan? Correct Answer Absenteeism , Machine breakdowns , Substandard performance against prefixed production standards Your Answer Absenteeism , Change in operation sequence , Machine breakdowns True/False Question While numbering as per Fulkerson's rule, arrows emerging from the initial event are deleted so as to create one or more initial events. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication True/False Question Any proposed change must not be intimated to workers in advance. Correct Answer False Your Answer True

True/False Question Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting customer demand Correct Answer False Your Answer False Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Defect in materials , Recording done without actual measurements , Improper selection of samples Multiple Choice Single Answer Question How industry has responded to the fact of existence of inherant variability of the manufacturing process? Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called Correct Answer Route Sheet Your Answer Route Sheet True/False Question The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. Correct Answer True Your Answer True Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost

Match The Following Question Correct Answer Your Answer Combined Layout

Mixed Layout Mixed Layout

Fixed Position Layout Project Layout Project Layout Product Layout Line Layout

Line Layout

Process Layout Functional Layout

Functional Layout

Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance Also check these 1. Shop interdepartmental transport

1. Tool order

2. Issue of tools for production

2. Stores return note

3. Return of surplus material

3. Move order

4. Release of manufacturing orders

4. Job card

5. Inspection report 6. Rejection note 1. Craft 1. Charting technique 2. Work Sampling 2. Sampling Inspection 3. Gantt Chart 3. Machine utilization 4. Emerson Efficiency Plan 4. Wage Payment 5. Facilities Planning 6. Production Scheduling 1. Proximity to market

1. Productivity of labour 2. Industrial and labour attitude 2. Fragile product 3. Legislation and taxation 3. Safety factor 4. Community Facilities 4. Transport facility 5. Licenses 6. Educational facility 1. Minimization of production delays 1. Objective of good layout 2. Maximum visibility 2. Principles of good layout 3. Scale model 3. Method to evaluate layouts 4. Factor Analysis 4. Modelling approach to layouts 5. Technique for evolving and analysis of layouts 6. Layout analysis 1. Symptom of ill planned purchasing 1. Single source of supply 2. Factor influencing material planning 2. Over ordering 3. Net requirement of material under MRP 3. Price of material 4. Fixation of inventory level 4. Stock on hand 5. Lead time 6. Reorder level 1. Interruption for machine utilisation 1. Overlapping of operations 2. Input for scheduling

2. JIT 3. Technique of scheduling 3. Blackboard 4. Scheduling Device 4. Strings 5. Preventive maintenance 6. Critical Path Analysis 1. Control board 1. Work order of item currently being worked on the machine 2. Top compartment of control board 2. Pictorial view of machine loading activity 3. Middle compartment of control board 3. Work order which requires maximum lead time to complete 4. Bottom compartment of control board 4. Bunch of work orders which can be processed on other machines 5. Bunch of work orders arranged in a sequence in which they are to be processed. 6. Work order of item to be processed next on the machine 1. Critical operation inspection 1. First piece produced after tool change 2. Patrolling inspection 2. Inspection done remotely 3. Key operation inspection 3. After whose no rework is possible 4. First off inspection 4. Inspection at the place of actual production 5. Costlier operation 6. Last operation 1. High production volume low variety 1. Group layout 2. Low production volume high variety 2. Process Layout

3. Grouping into families of similar product 3. Cellular Layout 4. unit production of very large product 4. Product Layout 5. Space layout 6. Fixed Position Layout 1. Consumption of effort 1. Giving directions or instructions 2. Information given 2. Chemical reaction 3. Subtraction 3. Welding 4. Change in chemical characteristic 4. Removal of worn-out part from a machine 5. Press shop operation 6. Posting a ledger Cellular layout is based on the concept of Group Technology ……… True/False What is the reason of fluctuations, if the control chart evaluates that the process is not in a state of statistical control? Planned variability, Nonassingnable variability, Assignable variability Random variability A good layout results in Lower costs, High employee motivation , Better forecasts Better production planning Multiple Answers Which of the following method can be used to record the facts during the method study? Micro motion study Photograph Cyclograph Cyclograph Which of the following situations demand that the human consideration should be given preference over other considerations? Inconsistent earnings where the earnings are tied to output Poor morale evidenced by petty or trivial complaints Repeated cases of accidents and health hazards Major contributors in the development of Control Charts, Sampling plan are F H Dodge H G Roming Walter Schewhart

L H C Tippet The document raised by PPC which authorises different functions to take action as per instruction is called Work Order Work Instructions Production Order Job Orientation LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question It pays in the long run to inform the customer regarding expected delays in the deliveries. Correct Answer True Your Answer True Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity

Your Answer Necessity Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Delivery Dates Your Answer Order Quantity , Delivery Dates , Plant layout True/False Question Availability of training schools, colleges and management institutes reduces the company's internal training needs. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Lime stone Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan

Wage Payment Wage Payment

Craft

Production Scheduling

Facilities Planning

Work Sampling Machine utilization Gantt Chart

Sampling Inspection

Production Scheduling Charting technique

Match The Following Question Correct Answer Your Answer Fixation of inventory level

Reorder level

Stock on hand

Symptom of ill planned purchasing

Over ordering Over ordering

Factor influencing material planning

Lead time

Lead time

Net requirement of material under MRP Stock on hand Price of material

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network?

Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question Tool breakage has got nearly zero chances in case of eventual breakdown. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Total float , Independent float , Free float Your Answer Total float , Dependent float , Free float Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective Select The Blank

Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Overhauling Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time ) Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time ) Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time True/False Question In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small. Correct Answer False Your Answer True Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer labourious Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Predetermination of manufacturing requirements Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops

Your Answer Reduces chances of rejections Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Reduced salvage value of machine Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Performance specifications Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines Your Answer Overloading of machines Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the waiting time and thereby reduce production losses Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Operation , Inspection , Production True/False

Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. Correct Answer False Your Answer False Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Quality True/False Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Your Answer True Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Idle wages Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Order procurement Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis?

Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection Your Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection True/False Question Shop order is one of the subsidiary order Correct Answer True Your Answer True Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Lot Tolerance Percentage Defective True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences , Productivity of labour LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Site selection should also take into account topography and soil structure of the land. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which manufacturing method is ideal for the use of air gauges as inspection device? Correct Answer Mass Your Answer Batch True/False Question Kanban system is essentially a computer based system for production scheduling and control Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which are three different bases to establish an activity time? Correct Answer Past experience , Judgement , Historical data Your Answer Past experience , Judgement , Historical data True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Semiskilled Labour & General Purpose Machines Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Delivery performance True/False

Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Job card Match The Following Question Correct Answer Your Answer Crash cost of an activityCc

Cc

Normal time of an activity

Tn

Crash time of activity

Tc

Tc

Normal cost of an activity

Cn

Cn

Tn

True/False Question Lubrication survey should never be done for a new machine. Correct Answer False Your Answer False Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs Multiple Choice Single Answer Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be Correct Answer Cost effective method

Your Answer Cost effective method Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders Your Answer Operational layouts , Move orders , Pre-filled stores issue orders Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity Multiple Choice Multiple Answer Question Which are the major types of defects? Correct Answer Minor , Major , Critical Your Answer Minor , Critical , General Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Highly Skilled Your Answer Highly Skilled Multiple Choice Multiple Answer Question Which are the sources of information to update the progress card daily? Correct Answer Detachable ticket , Daily production report , Job Card Your Answer Detachable ticket , Daily production report , Job Card True/False Question In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function Your Answer Acceptance function , Preventive function , Assurance function Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material

Your Answer Production schedule , Commercial standards , Bill of material Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer MRP Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Your Answer Semiskilled Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan are Correct Answer F H Dodge , H G Roming , Walter Schewhart Your Answer F H Dodge , H G Roming , Walter Schewhart Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Event True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation Your Answer Backward pass computation True/False Question Operation process charts though indicates the sequence of events but do not show movements. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish?

Correct Answer Concurrent activities Your Answer Concurrent activities True/False Question One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Poor Machine Utilization Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Your Answer Random variability True/False Question Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations. Correct Answer True Your Answer True Multiple Choice Single Answer

Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Operation process chart Multiple Choice Single Answer Question Plant Layout decisions are considered to be Correct Answer Strategic Your Answer Strategic Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation Multiple Choice Multiple Answer Question Which of the following situations demand that the human consideration should be given preference over other considerations? Correct Answer Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards Your Answer Excessive rejections , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards True/False Question A network can have more than one starting event but completion event must be only one. Correct Answer False Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Any heat treatment if required Match The Following Question Correct Answer Your Answer When to inspectStages of inspection What to inspect Specification

Specification

How to inspect Inspection devices How much to inspect inspection

Stages of inspection

Inspection devices

Sampling or cent percent inspection

Sampling

or

cent

percent

Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? Correct Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question It pays in the long run to inform the customer regarding expected delays in the deliveries. Correct Answer True Your Answer True Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots.

Correct Answer Your Answer

Lot Tolerance Percentage Defective Lot Tolerance Percentage Defective

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Delivery Dates Your Answer Order Quantity , Delivery Dates , Plant layout True/False Question Availability of training schools, colleges and management institutes reduces the company's internal training needs. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Lime stone Match The Following Question Correct Answer

Your Answer

Emerson Efficiency Plan

Wage Payment

Craft Facilities Planning

Production Scheduling

Work Sampling Gantt Chart

Machine utilization

Production Scheduling

Match The Following Question Correct Answer Fixation of inventory level

Wage Payment

Sampling Inspection Charting technique

Your Answer

Reorder level Stock on hand

Symptom of ill planned purchasing Over ordering Over ordering Factor influencing material planning Lead time Net requirement of material under MRP

Lead time

Stock on hand Price of material

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question Tool breakage has got nearly zero chances in case of eventual breakdown. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Total float , Independent float , Free float

Your Answer

Total float , Dependent float , Free float

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Overhauling Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time ) Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time ) Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design?

Correct Answer Your Answer

Resonable cost , Resonable procurement time , Resonable manufacturing time Resonable cost , Resonable procurement time , Resonable manufacturing time

True/False Question In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small. Correct Answer False Your Answer True Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer labourious Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Predetermination of manufacturing requirements Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Reduces chances of rejections Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Reduced salvage value of machine Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Performance specifications Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines

Your Answer

Overloading of machines

Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the waiting time and thereby reduce production losses Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Operation , Inspection , Production True/False Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False

Question The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. Correct Answer False Your Answer False Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Quality True/False Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Your Answer True Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Idle wages Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Order procurement Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis? Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection Your Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection True/False Question Shop order is one of the subsidiary order Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Lot Tolerance Percentage Defective True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences , Productivity of labour

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Single Answer Question The product layout has following disadvantage Correct Answer Layout is not flexible Your Answer Layout is not flexible

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called Correct Answer Route Sheet Your Answer Route Sheet Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing? Correct Answer Visual Testing , Eddy current , Magnetic flow detectors Your Answer Visual Testing , Eddy current , Magnetic flow detectors Multiple Choice Single Answer Question What do you understand by the difference between the specification limits within which manufacturing process is expected to produce? Correct Answer Design tolerance Your Answer Design tolerance Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

True/False Question Inspection Order can be a verbal order Correct Answer True Your Answer False Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer False Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout

Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance

Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Multiple Choice Single Answer Question How non-critical activities are shown in the time chart during project scheduling? Correct Answer Thin lines Your Answer Thin lines Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory True/False Question Fixed cost is lower in case of continuous production than intermittent production. Correct Answer False Your Answer False Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Low Productivity True/False Question Floor inspection promotes tendency of machines to drift out of limits and produce defectives. Correct Answer False Your Answer False Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Delivery performance Multiple Choice Single Answer Question Technique which can help an organization to reduce

inventory is called Correct Answer MRP Your Answer MRP Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control Match The Following Question Correct Answer Your Answer Temperature of motor Body Body Exhaust gas Smell Smell Air leakage Listen Listen Corrosion Watch Watch

Multiple Choice Single Answer Question Which characteristics are verified in cent percent sampling? Correct Answer All important characteristics Your Answer All important characteristics Multiple Choice Multiple Answer Question What are the benefits of inspection and quality control? Correct Answer Gives economy in production through reduction of defective work , Adequate maintenance of quality , Ensures parts are within specified limits of accuracy Your Answer Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work Multiple Choice Single Answer Question In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of Correct Answer Sales Programme Your Answer Sales Programme

True/False Question While making X bar-R-chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet. Correct Answer True Your Answer False Multiple Choice Single Answer Question What is the meaning of surplus material in context with stores issue order? Correct Answer Materials issued are not fully consumed Your Answer Materials issued are not fully consumed True/False Question Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer False Select The Blank

Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM Multiple Choice Multiple Answer Question Which of the following are the most suitable cases where we can use CPA as effective technique of scheduling? Correct Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. Your Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. True/False Question Sample sizes for the construction of p-chart are typicaly larger that for Xbar-R-charts. Correct Answer True Your Answer True Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question

It would not affect the project completion time if

non-critical activities take little loner time than planned. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Deifinite , Undesrstandable , Economically viable Multiple Choice Single Answer Question What is the location of lower control limit in the X bar-R control chart? Correct Answer 3 standard deviations below central line Your Answer 3 standard deviations below central line Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Your Answer

requirement of resources To decide priorities in allocation of resources , To minimize the requirement of resources

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer

Operation

Multiple Choice Single Answer Question Which kind of defect can be called as minor defect? Correct Answer Which does not reduce the usability of the product for its intended use Your Answer Which does not reduce the usability of the product for its intended use Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer

Tolerance

True/False Question

Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the acceptance of a defective part. Correct Answer True Your Answer

False

Multiple Choice Single Answer Question Which element of a network represents a task which has got a definite beginning and definite end? Correct Answer Activity Your Answer

Activity

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer

Flow of material , Equipment utilization , Working condition

Select The Blank

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

transportation and communication facilities Multiple Choice Multiple Answer Question Which utilities are considered as infrastructural requirements? Correct Answer Disposal of waste , Power , Water Your Answer

Power , Labour , Water

Multiple Choice Single Answer Question What do you understand by the timeframe for the maintenance needs of the equipment? Correct Answer Maintenance inspection schedule Your Answer

Maintenance inspection schedule

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer

Low Skilled Labour & Special Purpose Machines

Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer

Critical examination

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer

Collaboration

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage.

Related Documents