FINCLA LA TRILLADORA

RAFAEL GIRALGO GAVIRIA

PRESUPUESTO DETALLADO OBRAS A REALIZAR

S.

1/1 UBICACION:

MUNICIPIO DE MANIZALES

CLIENTE:

FAMILIA

ITEM

INGENIERO MAT: FECHA:

DESCRIPCION DE LOS ITEMS

UN

% INC

CANT.

VLR/UNIT

1 1,1 1,2 1,3 1,4 1,4

OBRAS PREELIMINARES DEMOLICION DE MAMPOSTERIA DEMOLICION DE MAMPOSTERIA RETIRO DE ESCOMBROS SOBREACARREO VEHICULO NO AUTOMOTOR LOCALIZACION Y REPLANTEO

M2 M3 VJ M3 M2

4.06% 0.71% 0.61% 1.20% 1.12% 0.43%

2.15 27.19 10.00 60.00 150.00

220,000 15,000 80,000 12,500 1,900

2 2,1 2,2

MOVIMIENTO DE TIERRAS- EXCAVACIONES EXCAVACION MANUAL PERFORACION PARA DRENES EQUIPO MANUAL

M3 ML

4.63% 0.90% 3.74%

50.00 200.00

12,000 12,500

3 3,1 3,2

LLENOS COMPACTADOS- SUSTITUCIONES LLENO CON AFIRMADO COMPACTADO SISTEMA MECANICO M3 LLENO APISONADO CON MATERIAL DE SITIO M3

2.57% 2.33% 0.24%

24.00 20.00

65,000 8,000

4 4,1 4,2 4,2 4,3

CIMENTACIONES CONCRETO SOLADO DE LIMPIEZA e= 0.05 VIGA DE CIMENTACION (0.30 x 0.40) ZAPATA CANAL DE AGUAS RAPIDAS

M3 M3 M3 ML

4.79% 0.19% 1.08% 2.47% 1.05%

0.60 2.40 4.36 20.00

215,000 300,000 380,000 35,000

5 5,1 5,2 5,3 5,4 5,5 5,6

ESTRUCTURAS CONCRETO COLUMNAS (0.40 x 0.40) CONCRETO VIGAS (0.30 x 0.35) CONCRETO PANTALLA PASIVA ACERO ESTRUCTURAL REFUERZO MALLA ELECTROSOLDADA D 106 MURO DE CONTENCION

M3 M3 M2 KG M2 M3

58.06% 2.58% 2.89% 2.23% 33.17% 0.93% 16.25%

3.84 4.20 33.20 6,000 80.00 18.75

450,000 460,000 45,000 3,700 7,800 580,000

6 6,1

IYECCION INYECCION MORTERO 1:1 PARA ANCLAJES

M2

4.48% 4.48%

200.00

15,000

7 7,1 7,1

MAMPOSTERIA MAMPOSTERIA LADRILLO FAROL ARREGLO DE PISOS

M2 M2

5.72% 4.18% 1.53%

100.00 20.50

28,000 50,000

10 10,1 10,2

FIBRAS Y REFUERZOS FIBRAS DE CARBONO UNION DE ESTRUCTURA VIEJA CON NUEVA

M2 GL

15.69% 11.95% 3.74%

80.00 1.00

$100,000 $2,500,000

100.00% TOTAL COSTOS DIRECTOS

ADMINISTRACION IMPREVISTOS UTILIDAD I.VA. UTILIDAD 66,918,130 SUBTOTAL

66,918,130

12% 12% 6% 16%

RAFAEL GIRALGO GAVIRIA INGENIERO MAT: 2008-9-29 VLR/TOTAL 2,715,850 473,000 407,850 800,000 750,000 285,000 3,100,000 600,000 2,500,000 1,720,000 1,560,000 160,000 3,204,280 129,000 720,000 1,655,280 700,000 38,853,000 1,728,000 1,932,000 1,494,000 22,200,000 624,000 10,875,000 3,000,000 3,000,000 3,825,000 2,800,000 1,025,000 10,500,000 8,000,000 2,500,000

66,918,130

8,030,176 8,030,176 4,015,088 642,414

87,635,984

Related Documents

Presupuesto
May 2020 39
Presupuesto
June 2020 28
Presupuesto
May 2020 24
Presupuesto
November 2019 48
Presupuesto
October 2019 51
Presupuesto
November 2019 48