Presupuesto Presupuesto Subpresupuesto Cliente Lugar

1702011 CONSTRUCCION DE RESERVORIO LLIMPE, DISTRITO DE LAHUAYTAMBO, HUAROCHIRI - LIMA RESERVORIO LLIMPE (ADMINISTRACION DIRECTA) 001 Costo al MUNICIPALIDAD DISTRITAL DE LAHUAYTAMBO LIMA - HUAROCHIRI - LAHUAYTAMBO

Item

Descripción

01

OBRAS PRELIMINARES

Und.

Metrado

Precio S/.

15/07/2015 Parcial S/. 73,743.32

01.01

CARTEL DE OBRA

und

1.00

1,032.92

1,032.92

01.02

CAMPAMENTO PROVISIONAL DE OBRA

m2

144.00

137.85

19,850.40

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

glb

1.00

52,860.00

52,860.00

01.03 02 02.01

CANAL BY PASS, BOCATOMA E INGRESO A RESERVORIO

35,329.61

TRABAJOS PRELIMINARES

338.65

02.01.01

LIMPIEZA Y DESBROCE DE TERRENO S/EQ.

m2

870.00

0.09

78.30

02.01.02

TRAZO, NIVELES Y REPLANTEO

km

0.29

897.77

260.35

02.02

CANAL BY PASS L=290 m

12,180.40

02.02.01

EXCAVACION DE MATERIAL SUELTO CON MAQUINARIA

m3

1,186.05

3.16

02.02.02

RELLENO COMPACTADO CON MATERIAL PROPIO S/EQ.

m3

102.10

7.68

784.13

02.02.03

ELIMINACION DE MATERIAL CON MAQUINARIA

m3

1,300.74

5.88

7,648.35

02.03

ESTRUCTURA DE CAPTACION Y DESARENADOR

3,747.92

15,026.81

02.03.01

CONCRETO f'c=100 kg/cm2 PARA SOLADO

m2

20.04

100.76

2,019.23

02.03.02

ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS

m2

68.16

41.73

2,844.32

02.03.03

ACERO DE REFUERZO f'y=4200 kg/cm2 - ESTRUCTURAS

kg

943.94

4.99

4,710.26

02.03.04

CONCRETO f'c=210 kg/cm2 - ESTRUCTURAS

m3

8.58

523.66

4,493.00

02.03.05

ACCESORIOS EN CAPTACION

und

1.00

960.00

02.04

TUBERIA DE INGRESO A RESERVORIO

960.00 7,783.75

02.04.01

EXCAVACION DE MATERIAL SUELTO CON MAQUINARIA

m3

73.12

3.16

231.06

02.04.02

TUBERIA PVC ISO 4435 PN-5, 250 mm

m

116.00

57.77

6,701.32

02.04.03

CAMA DE APOYO PARA TUBERIAS, E=0.10 M

m

116.00

1.68

194.88

02.04.04

RELLENO COMPACTADO CON MATERIAL PROPIO S/EQ.

m3

85.48

7.68

03 03.01

RESERVORIO V=100,000 m3 TRABAJOS PRELIMINARES

11,880.00

03.01.01

LIMPIEZA Y DESBROCE DE TERRENO S/EQ.

m2

26,400.00

0.09

03.01.02

TRAZO, NIVELACION Y REPLANTEO

m2

26,400.00

0.36

03.02

656.49 1,623,707.28

MOVIMIENTO DE TIERRAS

2,376.00 9,504.00 1,089,472.61

03.02.01

EXCAVACION EN MATERIAL CONGLOMERADO PARA CONFORMAR EMBALSE

m3

86,008.20

4.57

393,057.47

03.02.02

HABILITACION DE MATERIAL SELECCIONADO PARA CUERPO DE DIQUE

m3

38,004.82

3.72

141,377.93

03.02.03

ELIMINACION DE MATERIAL CON MAQUINARIA

m3

40,001.00

5.88

235,205.88

03.02.04

RELLENO Y COMPACTACION DE TERRAPLEN CON MATERIAL SELECCIONADO m3

38,004.82

8.08

307,078.95

03.02.05

PERFILADO Y COMPACTADO DE TALUDES DE RESERVORIO

m2

7,772.00

1.41

10,958.52

m3

349.00

5.14

1,793.86

03.02.06 03.03

EXCAVACION DE ZANJA PARA CANAL DE CORONACION (EVACUACION DE ESCORRENTIA) SISTEMA DE DRENAJE

21,777.12

03.03.01

EXCAVACION DE ZANJA PARA SISTEMA DE DRENAJE

m

284.00

5.14

1,459.76

03.03.02

COLOCACION DE DRENAJE EN PISO DE RESERVORIO

m

284.00

71.54

20,317.36

21,057.50

6.60

138,979.50 297,331.90

03.04 03.04.01

REVESTIMIENTO DE RESERVORIO

446,208.43

SUMINISTRO E INSTALACION DE GEOTEXTIL NT 340 g/cm2 - TALUD DIQUE

m2

03.04.02

SUMINISTRO E INSTALACION DE GEOMEMBRANA DE HDPE E=1.5mm

m2

21,057.50

14.12

03.04.03

PRUEBA DE AIRE AL VACIO - GEOMEMBRANA

m2

21,057.50

0.47

03.05

OBRAS DE TOMA, ALIVIADERO Y ESR=TRUCTURAS DE IMPACTO

9,897.03 34,777.26

03.05.01

SUMINISTRO E INSTALACION DE TUBERIA DE DESCARGA

m

34.00

48.87

1,661.58

03.05.02

SUMINISTRO E INSTALACION DE TUBERIA ALIVIADERO

m

39.00

61.05

2,380.95

14.04

434.48

6,100.10

03.05.03

PROTECCION DE TUBERIA CON CONCRETO CICLOPEO f'c=175 kg/cm2 + 30% de m3 P.M.

03.05.04

CONCRETO f'c=100 kg/cm2 PARA SOLADO

m2

28.96

100.76

2,918.01

03.05.05

ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS

m2

122.88

41.73

5,127.78

03.05.06

ACERO DE REFUERZO f'y=4200 kg/cm2 - ESTRUCTURAS

kg

910.25

4.99

4,542.15

03.05.07

CONCRETO f'c=210 kg/cm2 - ESTRUCTURAS

m3

17.06

523.66

8,933.64

03.05.08

SUMINISTRO E INSTALACION DE VALVULA DE REGULACION

und

1.00

1,944.00

1,944.00

03.05.09

SUMINISTRO E INSTALACION DE PUERTA Y VENTANA EN CASETA

glb

1.00

1,169.05

1,169.05

03.06

CERCO PERIMETRICO DE SEGURIDAD DE RESERVORIO

19,591.86

03.06.01

EXCAVACION DE HOYOS PARA POSTES

und

200.00

3.50

700.00

03.06.02

SUMINISTRO E INSTALACION DE POSTES DE EUCALIPTO

und

200.00

23.97

4,794.00

03.06.03

CONCRETO CICLOPEO f'c=175 kg/cm2 + 30% de P.M.

m3

24.30

434.48

10,557.86

03.06.04

SUMINISTRO E INSTALACION DE ALAMBRE DE PUA

m

6,000.00

0.59

3,540.00

Página

S10

2

Presupuesto Presupuesto Subpresupuesto Cliente Lugar

1702011 CONSTRUCCION DE RESERVORIO LLIMPE, DISTRITO DE LAHUAYTAMBO, HUAROCHIRI - LIMA RESERVORIO LLIMPE (ADMINISTRACION DIRECTA) 001 Costo al MUNICIPALIDAD DISTRITAL DE LAHUAYTAMBO LIMA - HUAROCHIRI - LAHUAYTAMBO

Item

Descripción

04

CANAL DE CONDUCCION, L=2.28 KM

04.01

Und.

Metrado

Precio S/.

15/07/2015 Parcial S/. 68,161.18

TRABAJOS PRELIMINARES

2,457.32

04.01.01

LIMPIEZA Y DESBROCE DE TERRENO S/EQ.

m2

4,560.00

0.09

410.40

04.01.02

TRAZO, NIVELES Y REPLANTEO

km

2.28

897.77

2,046.92

2,280.00

18.31

41,746.80

04.02

CANAL DE CONDUCCION

45,177.36

04.02.01

TUBERIA HDPE ISO-4427 SDR 26, 110 mm

04.02.02

ACCESORIOS DE HDPE EN LINEA DE CONDUCCION

glb

04.02.03

PRUEBA HIDRAULICA EN TUBERIAS - FLUJO PRESURIZADO

m

04.03

m

1.00

1,013.76

1,013.76

2,280.00

1.06

2,416.80

CAMARAS ROMPEPRESION - 07 UNIDADES

20,526.50

04.03.01

EXCAVACION EN MATERIAL SUELTO MANUAL

m3

17.22

21.00

361.62

04.03.02

CONCRETO f'c=100 kg/cm2 PARA SOLADO

m2

15.02

100.76

1,513.42

04.03.03

ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS

m2

123.48

41.73

5,152.82

04.03.04

ACERO DE REFUERZO f'y=4200 kg/cm2 - ESTRUCTURAS

kg

763.98

4.99

3,812.26

04.03.05

CONCRETO f'c=210 kg/cm2 - ESTRUCTURAS

m3

11.38

523.66

5,959.25

04.03.06

CONCRETO CICLOPEO f'c=175 kg/cm2 + 30% de P.M.

m3

3.02

434.48

1,312.13

04.03.07

ACCESORIO EN ESTRUCTURA ROMPEPRESION

und

7.00

345.00

05 05.01 06

FLETE TERRESTRE FLETE TERRESTRE

2,415.00 16,898.65

glb

1.00

16,898.65

MITIGACION AMBIENTAL

16,898.65 11,346.76

06.01

INSTALACION Y DESINSTALACION DE LETRINAS

und

2.00

454.66

909.32

06.02

BOTADERO DE DESMONTE

m3

128.00

15.46

1,978.88 1,680.00

06.03

LIMPIEZA PERMANENTE DE OBRA

mes

4.00

420.00

06.04

RESTAURACION DE AREA DE BOTADERO

m2

64.00

5.01

320.64

06.05

RESTAURACION DE AREA DE CANTERA

m2

3,600.00

1.34

4,824.00

06.06

RESTAURACION DE AREA DE CAMPAMENTO

m2

144.00

6.68

961.92

06.07

LIMPIEZA FINAL DE OBRA

m2

240.00

2.80

07 07.01 07.02 08 08.01

CAPACITACION

672.00 20,000.00

CAPACITACION DE SEGURIDAD Y SALUD EN EL TRABAJO

mes

6.00

2,500.00

15,000.00

CAPACITACION EN OPERACION Y MANTENIMIENTO DE LA INFRAESTRUCTURA

taller

2.00

2,500.00

5,000.00

glb

1.00

4,550.00

4,550.00

VARIOS

6,750.00

IMPLEMENTOS DE SEGURIDAD EN OBRA

08.02

ENSAYO DE RESISTENCIA DE CONCRETO

und

20.00

35.00

700.00

08.03

ENSAYO DE COMPACTACION

und

30.00

50.00

1,500.00

Costo Directo SON :

UN MILLON OCHOCIENTOS CINCUENTICINCO MIL NOVECIENTOS TRENTISEIS Y 80/100 NUEVOS SOLES

1,855,936.80