Prakash Mehta

  • Uploaded by: dhruvpsd
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Prakash Mehta as PDF for free.

More details

  • Words: 588
  • Pages: 9
Prakash Mehta ► ►



Mr.Prakash Mehta , MLA , Ghatkopar area. Mr.Mehta belongs to the BJP Party , his head office is located in the M.G.Road area , he is well known and respected in the area as well as the party circles , as he is a hard-working , efficient and honest leader of the masses of Ghatkopar . Mr. Mehta in his election manifesto has spoken about the problems of the hutments and slum dwellers and also about the travelling facilites present in Ghatkopar and how they can be improved upon , he has also touched upon the

The Slum Rehabilitation Scheme ►



The proposed project of rehabilitation of the hutments , has been completed , it has provided proper housing facilities to around 1000 , slum dwelling families , The buildings built under the S.R.S are provided with round the clock water , light , and various other facilities . However some discrepancies have been noted in the builder’s work as the space between the buildings is not as per the required F.S.I any builder is normally supposed to follow . There is also a issue of space for shops and other activities being provided on

Link Roads , Railways Services , & New Roads . ►







The proposed project of the link roads , railway services and the building of new roads has met with a mixed fate .Only 50 % work has been completed . 1). The link roads connecting the VidyaVihar East and West have been completed , so has the link road connecting the Ghatkopar East and West been completed . 2). The proposed additional local trains from ghatkopar have not been started due to some difficulty. 3).The Ghatkopar-Andheri link road is currently under consrtuction and is

Parks , Playgrounds ,Gardens . ► The

proposed parks , playgrounds , jogging tracks , and gardens all have been completed as promised in the manifesto . ► They have provided for the much needed recreational spaces in Ghatkopar .

Unveiling Of The Statues Of Historical Leaders . ►



The proposed unveiling of the statues of historical leaders has not been completed as yet , but work on the same is bound to begin very soon . The statue of Dr. Babasaheb Ambedkar is to be unveiled in Ghatkopar in the RamaBai Nagar Area , and the statue of Sardar Vallabhai Patel will be unveiled in

Building Of Playground And State Hospital ►



Work on the proposed hospital and the playground in sector 236-A has hit a road – block because permission for utilization of the plot is not being granted , and hence it has resulted in the stalling of the any work possible on that plot of land . However efforts are being made to obtain permission for the

Afzalpurkar Committee Reports. ►



The Hon . Afzalpurkar committee was formed to give suggestions regarding the Old rental buildings . The suggestions of the committee were approved . However while their implementation has not been possible as it has encountered some red tape . However the said authorities are still trying to get the

Rebuilding Of The Mhada Buildings And Housing Of Police Staff . ►



The proposed rebuilding of the Mhada housing colonies has been completed as said in the manifesto . The issue of providing the police staff with houses on their names has also been addressed properly , by providing the police staff with housing in the Mhada housing colonies .

Related Documents

Prakash Mehta
May 2020 9
Prakash
November 2019 17
Prakash
April 2020 14
Prakash
November 2019 20
Prakash
June 2020 11
Prakash
October 2019 25

More Documents from ""

Prakash Mehta
May 2020 9