YEAR ACHIEVEMENTS AND INITIATIVES OF Ministry of Power, Coal and New & Renewable Energy GOVERNMENT OF INDIA
2
A Year which started the journey towards ‘Year Round Power for All’
Record breaking progress towards fulfilling Hon’ble Prime Minister Shri Narendra Modi’s vision of...
24X7
POWER FOR ALL 3
ACHIEVEMENTS Power deficit reduced to
3.6%
the lowest ever
Highest ever generation capacity addition
22,566 MW 22,100 ckm Highest ever increase in Transmission lines
65,554 MVA 4
Highest ever increase in Sub-station capacity
A Year which surpassed past records
Highest coal production growth in 23 years
8.3%
Over
` 3.35 LAKH Cr.
of potential revenues to coal bearing states through transparent coal e-auctions & allotments
8.4%
Power Generation Growth (Highest in 20 years)
First time ever,
exceeded renewable capacity addition targets in solar, wind, small hydro etc.
5
TARGETS Doubling Coal India’s production to
100 Cr.
tonnes/year by 2020 Power Generation to increase by
50%
by 2020 6
5 Times
increase in renewable capacity to
1,75,000 MW by 2022
Energy saving to increase to
10%
of current consumption
7
MISSION
24X
POWER 8
BY 2
4X7
FOR ALL
2019
9
FROM DARKNESS
POWER IS DELIVERED THROUGH A CHAIN OF ACTIVITIES
TO LIGHT
A chain is only as strong as the weakest link
10
Annual production growth of Coal only 1.5% between 2010-14
>24,000 MW of power capacity idle due to lack of fuel
Loss of ` 1.86 lakh Cr. estimated by CAG in Coal allocation
Less than 1% of solar potential realized
FUEL
GENERATION
Highest coal production growth in 23 years
Power generation exceeds 1 lakh Cr. units for the first time
Increased coal & gas availability to revive stalled projects
Plans to increase solar capacity by > 30 times
28 Cr. people without access to power Largest power outage in history with 62 Cr. people in darkness in 2012
TRANSMISSION
Highest ever increase in Transmission lines & sub station capacity (22,100 ckm and 65,559 MVA respectively)
Discoms losing ` 70,000 Cr. annually and accumulated losses of > ` 2,50,000 Cr.
Spiralling consumer tariffs
DISTRIBUTION
CONSUMPTION
Approved new schemes for investment of ` 1.09 lakh Cr. in Discoms
Lack of focused energy conservation efforts
Overall energy deficit down to 3.6%, the lowest ever
Measures to build an exceptionally strong power delivery chain are on and are bearing results
11
12
CLEANING
COAL REMOVING THE
13
FUEL
TAINT
CLEANING
COAL REMOVING THE
TAINT
Cancellation of 204 coal blocks by Supreme Court presented a potential grave crisis of:
ENERGY EMPLOYMENT ECONOMY Shutdown of plants dependant on cancelled coal mines
Livelihood of thousands of workers endangered
Economic activity halts, NPAs mount
Crisis averted by focused action through implementation of transparent e-auction process in just four months 14
REGIONAL DEVELOPMENT Coal bearing states like Jharkhand, Chhattisgarh, Odisha, West Bengal, Madhya Pradesh, Maharashtra and Telangana to get potential revenue (including auction proceeds and royalties) of
` 3.35 lakh Cr.
From auction of 29 Coal blocks & allotments of 38 coal blocks to states/PSUs over the lifetime of the mines
REJUVENATED ECONOMY
Prevented NPAs, reduced import bill, generated momentum for ‘Make in India’ and raised resources for renewables & Ganga cleaning through coal cess.
Legislation Enabled 15
FUEL
Coal Mines (Special Provision) Act & Mines and Minerals (Development and Regulation) Amendment Act enacted to enable growth of coal sector and provide for the welfare of locals particularly tribals in the mineral bearing areas
INCREASING
PRODUCTION
THROUGH EFFICIENCY
IMPROVEMENT Reduction in coal theft using
RFID/GPS tagging Reduced Transportation Cost
Coal linkage rationalization to reduce transportation costs and save environment
Coal Project Monitoring Portal for quicker decision making, faster dispute resolution and accelerated removal of bottlenecks
Improved coal quality
using compulsory crushing, washing and third party sampling
16
DOUBLING COAL INDIA PRODUCTION IN 5 YEARS
100
Cr. Tonnes by 2020
Over 60 new mines to be opened Better evacuation of coal planned by investing massively in new railway rakes, expediting railway lines, modern equipment and mechanization Partnership between Railways, coal-bearing states and Coal India to strengthen infrastructure creation. Signed MoUs with Odisha and Jharkhand 17
FUEL
Double coal production to
Trebling exploration activities for enhancing coal production
SUPPLY RESUMED 18
7,900 Cr. units of power over the next two years from
24,150 MW of gas based capacity
Reviving these
Gas Based Power Plants
will reduce peak load shortages in summer and ensure grid stability.
First round of auction has resulted in power
Below ` 4.7/unit
Many of the stranded gas based power projects are located in the Southern region which is power deficit due to transmission constraints
19
FUEL
Innovative and transparent new scheme for making gas available for power generation and generating
RAPID INCREASE IN GENERATION CAPACITY
5 NEW 20,000 MW Ultra Mega Power Projects of
to be setup in plug-and-play mode attracting an investment of
> ` 1 LAKH Cr.
20
All clearances and linkages will be in place before the project is awarded by a transparent auction system
4,000 MW
Old plants to be upgraded to enhance capacity and reduce emission
GENERATION
21
FUEL > GENERATION
Agreement signed for expansion of Patratu Thermal Power Station, Jharkhand to
100,000 MW of Solar and 60,000 MW of Wind capacity
Increasing the overall renewable capacity target by
MORE THAN
5 TIMES
from
32,000 MW to 1,75,000 MW by 2022
Opportunity for unemployed graduates & farmers to become solar enterpreneures
22
Green Generation for Clean & Energy Secure India India is running the largest renewable capacity expansion program in the world Renewable Purchase Obligation (RPO) and Renewable Generation Obligation ( RGO) to boost renewable energy
GENERATION
World’s largest renewable energy financing meet.
Commitments of
118 exhibitors from 7 countries
2,73,000 MW 62,000 MW
of renewable manufacturing commitment
70,000 MW
of renewable financing commitment
Nearly
2500 delegates 202 speakers including International speakers from 29 countries
Financing Green Energy
RE-Invest 2015
23
FUEL > GENERATION
200 global investors & financiers
from 32 countries
RAPID GREEN PROGRESS
24
We are like tenant farmers chopping down the fence around our house for fuel when we should be using Nature's inexhaustible sources of energy — sun, wind and tide. – Thomas Edison
42%
1,112 MW
increase in solar capacity during 2014-15
17
solar parks in 14 states have already been approved
solar parks with capacity of
Accelerated depreciation restored for wind power from July 2014 to help increase wind capacity
Tender by NTPC to setup
25
~1000 MW each planned
Coal cess quadrupled from
2,170 MW ` 50 to ` 200/tonnes of Solar Projects
to help finance clean energy projects and Ganga rejuvenation 25
FUEL > GENERATION
Highest ever increase in solar capacity of
TRANSMITTING & DISTRIBUTING POWER POWERLESS TO POWERFUL
SMART GRID SMART
GRID
26
National Smart Grid Mission approved to bring efficiency in power supply network and facilitate reduction in losses & outages
Level playing field in transmission through seperation of
POSOCO and POWERGRID
` 38,000 Cr.
`to be1spent LAKH Cr. on transmission projects over the next year
CREATING COMPETITION
Electricity Act being amended to give consumers a choice to choose and change power service like a mobile connection. Competition will lead to lower tariffs & better service 27
FUEL > GENERATION >
project being rolled out to ensure evacuation from renewable energy plants
TRANSMISSION & DISTRIBUTION
GREEN ENERGY CORRIDOR
Total investment of Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY)
Total Govt. expenditure
` 63,027 Cr.
28
New transformers and upgradation
Feeder segregation for 24x7 power
of last mile infrastructure
to rural homes, micro small and cottage industries
to be covered: Off-grids and micro-grids
Now small hamlets also covered
Solar Installations
Adequate power to farmers
Remote Villages
by Discoms to promote clean and green energy
` 1.09 lakh Cr. Integrated Power Development Scheme (IPDS) Total Govt. expenditure
` 45,816 Cr. Smart-metering for large consumers and tamper-proof meters at homes Comprehensive sub-transmission & distribution
infrastructure upgradation in urban areas
Underground cabling and high tech GIS transformers in densely populated areas IT implementation for better customer service Solar installations like rooftop solar also covered 29
FUEL > GENERATION >
TRANSMISSION & DISTRIBUTION
An integrated scheme for urban areas covering:
ENERGY EFFICIENCY
PROGRAMMES NATIONWIDE CAMPAIGN
FOR ENERGY CONSERVATION LAUNCHED
ENERGY EFFICIENCY: ONE UNIT OF
POWER SAVED IS WORTH 1.33 UNITS PRODUCED
TARGET TO SAVE 10%
OF CURRENT ENERGY CONSUMPTION ALL INCANDESCENT BULBS TO BE CHANGE TO LED IN THREE YEARS 30
DOMESTIC EFFICIENT LIGHTING PROGRAMME (DELP) taken up in about 151 cities in 18 states to replace 20.45 Cr. bulbs in 6.3 Cr. households by 2016
Distribution of bulbs has already commenced in Andhra Pradesh where 45 Lakh LED bulbs have been distributed to about 22.5 Lakh consumers
` 204
` 149
Feb-14
Aug-14
Nov-14
` 104
Feb-15
` 82 Mar-15
Due to transparent procurement, price of LED has reduced by 74% from ` 310 in Feb 2014 to ` 82 in Mar 2015 Energy Efficient Street Lighting Programme to cover 251 municipalities across India to replace 90 lakh street lights by 2016
Installation of LED street lights has already been completed in Greater Vishakhapatnam Municipal Corporation and Jhalawar Municipal Corporation
CONSUMPTION
31
FUEL > GENERATION > TRANSMISSION & DISTRIBUTION > CONSUMPTION
` 310
LED PRICE 74% Reduction
SABKA SAATH, SABKA VIKAS
CO-OPERATIVE FEDERALISM Entire Coal auction revenue will go to coal bearing states especially under developed states of Eastern India like Jharkhand, Chhattisgarh, Odisha, West Bengal etc.
Massive thrust to expedite projects in North East to overcome power shortages and increase prosperity. Investment of ` 9,865 Cr. for upgrading power systems in 8 North Eastern States (Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura) For the first time, National State Power Ministers’ conference was held in Guwahati where Ministers & Officials from all over India converged in North East 24X7 power plans made for Andhra Pradesh and Rajasthan. Action plans for other states at advanced stage of finalization 32
BEYOND
ON ENVIRONMENT
Massive thrust on renewables to increase share of clean energy More than 1 lakh solar pumps sanctioned in the past year Solar pumps helped lakhs of farmers increase output, income and also provide drinking water. Drinking water problem will be solved for more than 7.6 lakh families through solar pumps for drinking water UNNAT CHULHA ABHIYAN provides improved cook stoves for clean cooking, thus saving the lives of our mothers and sisters. 3.5 lakh cook stoves were sanctioned last year. Compulsory crushing and washing of coal to reduce ash transport by linking plants to their closest mines
33
FUEL > GENERATION > TRANSMISSION & DISTRIBUTION > CONSUMPTION
ZERO EFFECT
34
o
Massive thrust for ‘MAKE IN INDIA’ program: Orders of more than ` 100,000 crores being placed from NTPC, Coal India, Energy Efficiency Services Ltd., Powergrid Corporation etc. to kickstart the economy
o
Domestic industry being encouraged to scale up and become more cost effective o 1000 MW of solar capacity to be setup by PSUs with solar cells made in India o Defence establishments will buy 300 MW solar plants o Similar initiatives across sectors
BEYOND
The PSUs under the three Ministries are committed to active involvement in this effort. As a first step, they are investing over
` 2,250 Cr. for
over 1,25,000 toilets separately for boys and girls by 15th August, 2015 particularly in the needy states such as Bihar, Odisha, West Bengal, Jharkhand, Chhattisgarh, Andhra Pradesh and Rajasthan. After construction, the PSUs will also maintain these toilets for a period of five years thus ensuring a complete sanitation programme. Awareness is being created in local communities to improve over all sanitation. 35
FUEL > GENERATION > TRANSMISSION & DISTRIBUTION > CONSUMPTION
Swachh Bharat
TRANSPARENCY & EFFICIENCY in USING TECHNOLOGY
DIGITAL National Transmission Asset Management Centre (NTAMC) to remotely monitor national power grid and help increase power availability
Optical fiber network to connect all high voltage substations thus reducing outages Reduction in coal theft using RFID/GPS tagging Coal project monitoring portal for quick decision making, faster dispute resolution and accelerated removal of bottlenecks Smart Grid & Smart Metering to improve power availability e-Office implemented in Ministries
36
BEYOND
Fully transparent and online process for coal auctions adopted Support for restarting stranded gas-based power plants on the basis of reverse e-bidding process to discover lowest customer tariff Reduced red-tape and paper-work through delegation of powers and expansion of online interface
37
FUEL > GENERATION > TRANSMISSION & DISTRIBUTION > CONSUMPTION
TRANSPARENCY
24 365 38
A GOVERNMENT
WHICH CARES
Emergency Response
Delhi: After transmission tower collapse in May 2014, central government worked day and night to restore power in 15 days which would have otherwise taken more than six months
Cyclone Hudhud: Central teams assigned to restore power in cyclone hit areas. Damaged streetlights converted to LED within six weeks to restore as well as improve lighting
J&K Floods: Special teams rushed to the state to restore power on war footing
Nepal: Helped Nepal's electricity grid come online after the earthquake and is now working towards rebuilding the distribution network
39
FUEL > GENERATION > TRANSMISSION & DISTRIBUTION > CONSUMPTION
BEYOND
Rapid
India has now graduated from megawatts to gigawatts in terms of renewable energy production. Ministry of Power, Coal and New & Renewable Energy