Postes Y Alambres.docx

  • Uploaded by: Carlos Mendoza
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Postes Y Alambres.docx as PDF for free.

More details

  • Words: 125
  • Pages: 2
LOTE: 01

LOTE 01: MATERIALES:      

N° de Bloques o Anclas: 134 Und. (de Cemento, de Fierro, etc.) Postes de 4”de 3m: 134 Und. Postes Centrales de 3” de 3m: 761 Und. Cruz de 90cm de 3”: 895 Und. (806m) Cruz de 120cm de 3”: 895 Und. (1074m) Metros Lineales de Alambre Galvanizado # 8: 510m. (60 Kg).

 Metros Lineales Alambre Galvanizado # 12 para formación y tutorado de la Vid: 25125m. (1191 Kg).  Metros Lineales Alambre Galvanizado #12 para el amarrado de Cruz en los 90cm y 120cm: 2148m. (102Kg).

 Templadores de alambres para los bloques o anclas: 134 Und  Gripple y Tenaza para templar los alambres para Central de formación de plantas: 67 Und.

Related Documents


More Documents from "MIGUEL"

May 2020 4
May 2020 14
May 2020 7
May 2020 12
May 2020 11
May 2020 5