Sectiune Longitudinala Podet
C
C
A
B
8.00
270
25 25
56
1.00
3.00
3.00
2.5%
2.5%
←
4%
56
25 25
1.60
15
BA16 4cm BAD20 6cm AB31,5 8cm Piatra sparta 15cm Balast 25cm
3.00
Hidroizolatie
Geotextil
L2
1.60
Dren
Dala D5
2.80
1.60
2.70
Timpan T5 Dala D5 Aripa A2
4%
40
←
1.00
←
15
←
3.00
Sectiune Transversala A-A
3.10
4%
4%
←
90
30
←
162
50
Terasamente
A
Piatra sparta 20cm Balast 15cm
B
Vedere plana C-C
Vedere Laterala B-B Timpan T5 Dala D5
←
2.5%
4%
←
2.5%
←
←
2:3
←
4%
2:3
←
Aripa A2 25
1.00
3.00
3.00
1.00
25
2.90
20
3.00
L2 4%
4%
← Fundatie A2
1.20
290
Fundatie L2 10
20
←
300
Universitatea Tehnică "Gh. Asachi" Iași Facultatea de Construcții si Instalații
Data: Exec: Verif:
15.06.2017 COJUHARI VADIM ș.l. BOACĂ GHEORGHIȚĂ
Scara: 1:100
Grinda de capat
PROIECT:
Planșa nr:
PODURI DIN BETON ȘI BETON ARMAT
4
PODEȚ DREPTUNGHIULAR D5 L2 A2 CU STRUCTURA RUTIERĂ DIRECT PE PODEȚ