Plot

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Plot as PDF for free.

More details

  • Words: 343
  • Pages: 3
DATE

DISCRIPTIONS

CREDITS

6/7/2006 PROMOTER STOKEN ADVANCE 25/8/06

EXPENSES 5,000

PROMOTER

100,000

8/9/2006 PROMOTERS

100000

19/9/06

LIC LOAN PROCESS CHARGES

`

2500

22/9/06

PROMOTERS

28/9/06`

PLOT REGISTRATION CHARGES

4300

5/10/2006 ENCOMBERANCE CERTIFICATE

300

100000

7/10/2006 PANCHAYAT APPROVAL EXPENSES

3000

5/10/2006 PLOT DRAWING MAKING CHARGES

600

18/10/06

PANCHAYAT OFFICE EXPENSES

200

31/10/06

LIC AGENT PROCESS CHARGES

2500

12/11/2006 OPENING BOOMI POOJA EXPENSES

300

12/11/2006 WATER DIVINNER CHARGES

150

15/11/06

455 FT.BORWELL EXPENSES

29.12.06

MOULDING TIME POOJA/TEA/MEALS

1126

31-12-06

NEW PLOT PATTA EXPENSES

1500

13/01/2007 PROMOTERS 1ST INSTALMENT 29-01-07

27,200

250000

PEST CONTROL AID

3300

1/2/2007 KITCHEN MARBLES

6300

3/2/2007 MAIN ENTRANCE GATE

1000

12/2/2007 MAIN ENTRANCE GATE

3300

17-02-07

IIND INSTALMENT

100000

21-02-07

STONES CURVING

1000

22-02-07

ELEC ITEMS N HOSES

2000

22-02-07

HEATER MATERIALS

200

26-2-07

TILES

17000

26-02-07

TILES TRANSPORTATION

350

26-02-07

SUNGLASS

370

2/3/2007 LABOURS

200

2/3/2007 EXHAUST FAN

100

3/3/2007 ELEC N FANS

9200

3/3/2007 WESTERN TOILETS

7900

3/3/2007 READYMADE DOOR SHEETS

1200

3/3/2007 SIDE GATE AT FRONTSIDE WALL

1000

3/3/2007 ELEC FITTINGS 6/3/2007 BOREWELL LABOURS

200 6900

6/3/2007 MICA FITTINGS N FEVICOL EXP

420

6/3/2007 GLASS PURSHASES

550

7/3/2007 E B METERS

350

7/3/2007 FITTING CHARGES

100

8/3/2007 HARDWARE PURCHASE

2550

8/3/2007 TEMPO CHARGES

120

8/3/2007 DRAINAGE STONES

750

8/3/2007 PORTICO FLOORINGS 8/3/2007 GLASS TILES 12/3/2007 SAFETY GRILL FOR MOTOR

60 1000 1900

13-3-07

FIXING OF GRILL

200

13-3-07

GLASS TILES

1500

19-3-07

LOCKS FOR MAIN DOOR

1900

19-3-07

WINDOW DESIGN

2000

19-3-07

COMPOUND WALL N FLOORING

500

20-3-07

PROMOTERS IIIRD INSTALMENT

21-03-07

BACK PORTION COMPOUND WALL

12/2/2007 COMPRESSOR PURCHASING

100000 2000 9800

19-02-07

TRANSPORTATION CHARGES

120

27-03-07

LIFTING CHARGES

100

28-03-07

PAINTING EXP

28-03-07

FRONT COMPOUND WALL

28-03-07

GRILL GATE COMPOUND WALL

7/4/2007 GRILL GATE DESIGNS 10/4/2007 WORKING EXP FOR GRILL GATE

2000 500 2500 3600 2000

16-04-07

CLOTH WASHING STONE EXP

16-04-07

SUMP COVERS

175

16-04-07

TEMPO CHARGES

100

16-04-07

COMPOUND WALL

5000

16-04-07

COMPOUND GRILL

1000

13-04-07

WASH BASIN MIRROR

350

18-04-07

COMPOUND WALL NAMING

300

20-04-07

ELECTRICIAN

23-04-07

CHEQUE GIVEN TO MASON

8/5/2007 PAINTER CHARGES 27-04-07

GRILL WORKS TOTALS

90

9500 11500 1000 1000 926,731

Related Documents

Plot
November 2019 24
Plot
October 2019 29
Plot
June 2020 15
Plot
October 2019 37
Plot Clouds
November 2019 18
On Plot
October 2019 25