Per addendum #1, replace plaster with sheet rock per specifications and patch the walls as needed.
Per addendum #1, change this keynote to "Provide ductwork smoke detector and tie in its control wiring to the AHU relays".
The last Sprinkler Contractor that worked int he Building was Patriot, Co, per addendum #1 The dimming electrical lighting work is shown as cloud on this E101. This should be included in the project work, per addendum #1. The electrical drawing stated that the drawings are at 1/8" : 1' scale, The correct scale is 1/4" : 1' scale.