toc section 1 introduction 1.1 scope 1.2 purpose 1.3 commissioning procedures section 2 facilities planning 2.1 objectives 2.2 requirements 2.3 problem definition and probable corrective actions 2.4 environmental deficiencies reporting 2.5 funding section 3 programming 3.1 prior approval and validation 3.2 requirements and management plan (ramp) 3.3 engineering studies 3.4 future air force requirements 3.5 evaluation of alternatives 3.6 environmental assessment (ea)/environment impact statement (eis) initiation. 3.7 support documentation 3.8 facility requirements 3.9 regulatory agency participation section 4 design 4.1 design initiation 4.2 design engineer selection and responsibilities. 4.3 project monitoring 4.4 references 4.5 project definition 4.6 construction documents 4.7 wwtp performance criteria 4.8 o&m manuals 4.9 operator training program 4.10 permit applications 4.11 operator participation during design 4.12 design reliability and maintainability (r&m). 4.13 project construction cost estimate 4.14 regulatory agency review section 5 construction 5.1 construction startup 5.2 permits and clearances 5.3 title ii construction services 5.4 operator involvement during construction 5.5 construction schedule 5.6 as-built documentation and record drawings. section 6 inspection commissioning 6.1 startup program
6.2 6.3 6.4 6.5 6.6
inspections (prefinal and final) liability for performance final operating permits dry and wet runs facility walk-through
section 7 performance commissioning 7.1 post-startup program 7.2 training 7.3 wwtp operation performance period 7.4 performance certification 7.5 sops 7.6 o&m service contract documentation (optional).