Pf-1 Bill May 2008

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Pf-1 Bill May 2008 as PDF for free.

More details

  • Words: 1,996
  • Pages: 10
IRCON International Limited (A Govt. Of India Undertaking) Qazigund-Baramulla New Rail Line Project, Srinagar SUB CONTRACTORS RUNNING ACCOUNT BILL/CC

RA Bill/CC No.24 rd, Date: 31-05-2008 Name of work: Construction of Platform etc. at various Railway Stations In Zone PF-1 between Km 0.00 to km 45.00 (Package PF-01) on Qazigund - Baramulla section of new BG Rail Line Project (J&K) Name of Contractor: A.M. Contractors, Gaziabad, Anchidora, Anantanag J&K Contract agreement / work Order No.IRCON/ 1008/ J&K -DLI/ Platform/ PF-1/ 6762 date: 05.01.2006 Contract Value: Rs 5,22,08,012.14 Date of commencement of Work: 05.01.2006 Date of completion of work:SCHEDULED: 04.01.2007; Time extension Granted upto: 31-05-2008. Ref & Date of Measurement: 31-05-2008:- Ref: Qazigund MB no 487// Anantanag MB no 468, // Bijbehera MB no 497, // Sadura MB-547, & Abtract MB No 469, 1039 Sl no./ MB no.

BOQ Item

1 487 547 468 497 541

1.1

2

1.2

Description of Item

E/W in Excavation Qazigund Sadura Anantanag Bijbehera Awantipura Total:

Unit

BOQ Qty.

Qty upto this bill

Qty executed upto last bill

Qty executed Rate since last bill (in Rs.)

Amount upto this bill Amount upto last bill

Amount since last bill

m3

10,188

1474.076 1329.748 5047.095 2557.593 1042.401 11450.913

1373.126 1329.748 5033.359 2519.577 1042.401 11298.211

100.950 0.000 13.736 38.016 0.000 152.702

720.000

720.000

0.000

93.55

1,071,232.91

1,056,947.68

14,285.23

30.25

124,366.04

124,366.04

0.00

Filling with available m3 excaveted earth.

487

Qazigund

547

Sadura

468

Anantanag

497

Bijbehera

541

Awantipura Total:

8,164

0.000

0.000

0.000

3391.274

3391.274

0.000

0.000

0.000

0.000

0.000

0.000

0.000

4111.274

4111.274

0.000

Page 1 of 10

3

1.3

Filling with fine sand.

m3

487

Qazigund

0.000

0.000

0.000

547

Sadura

0.000

0.000

0.000

468

Anantanag

2141.9575

2141.9575

0.000

497

Bijbehera

193.812

193.812

0.000

541

Awantipura

825.000

825.000

0.000

3160.770

3160.770

0.000

113.906 10.500 924.214 106.036 61.250

113.906 10.500 908.446 106.036 61.250

0.000 0.000 15.768 0.000 0.000

1215.906

1200.138

15.768

374.805 95.943 147.656 222.144 306.771

361.643 95.943 147.656 222.144 306.771

13.162 0.000 0.000 0.000 0.000

1147.319

1134.157

13.162

Total:

4 487 547 468 497 541

3,840

487 547 468 497 541

674,192.13

674,192.13

0.00

1,404.70

1,707,983.16

1,685,833.85

22,149.31

1,289.15

1,479,066.68

1,462,098.88

16,967.79

1:4:8 PCC with 40 2.1.1 mm Nominal size m3 aggregate. Qazigund Sadura Anantanag Bijbehera Awantipura Total:

5

213.30

1:5:10 PCC with 2.1.2 40 mm Nominal size aggregate.

2,954

m3

Qazigund Sadura Anantanag Bijbehera Awantipura Total:

1,626.00

Page 2 of 10

6

3.1.1

487 547 468 497 541

P/L M20 concrete.

m3

Qazigund Sadura Anantanag Bijbehera Awantipura Total:

7 487 547 468 497 541

3.2.1

Centering and Shuttering.

1,715.00

487 547 468 497 541

0.000 13.227 224.670 54.747 52.226

0.000 0.000 43.281 13.975 0.000

402.126

344.870

57.2560

0.000 96.120 1627.469 438.163 328.899

0.000 96.120 1389.3286 314.936 328.899

0.000 0.000 238.1404 123.227 0.000

2490.651

2129.284

361.3674

0.000 13.227 267.951 68.722 52.226

0.000 13.227 224.670 54.747 52.226

0.000 0.000 43.281 13.975 0.000

402.126

344.870

57.256

2,284.05

918,475.89

787,700.32

130,775.57

87.95

219,052.76

187,270.49

31,782.26

84.00

33,778.58

28,969.08

4,809.50

m2

Qazigund Sadura Anantanag Bijbehera Awantipura Total:

8

0.000 13.227 267.951 68.722 52.226

5,548.00

P/L M25 Grade 3.3.1 concrete in stead m3 of M20 concrete. Qazigund Sadura Anantanag Bijbehera Awantipura Total:

1,715.00

Page 3 of 10

9

4.1

487 547 468 497 541

Brick work in 1:6 m3 mortar. Qazigund Sadura Anantanag Bijbehera Awantipura

4184.567 838.025 4257.7830 1832.455 2436.130

4059.567 838.025 4251.1145 1832.455 2436.130

125.000 0.000 6.669 0.000 0.000

Total:

13548.960

13417.292

131.669

10728.75

10728.75

0.000

1028.658 211.139 1638.632 110.400 0.000

342.888 211.139 1638.632 110.400 0.000

685.770 0.000 0.0000 0.000 0.000

2988.829

2303.059

685.7700

0.000 0.000 284.826 148.350 0.000

0.000 0.000 100.000 107.500 0.000

0.000 0.000 184.8260 40.850 0.000

433.176

207.500

225.6760

125% of BOQ 10 487 547 468 497 541

4.2

8,583

1,384.50

14,853,954.38

14,853,954.38

0.00

206.40

616,894.20

475,351.27

141,542.93

493.10

213,599.09

102,318.25

111,280.84

Brick work in 1:6 mortar. Above m3 plinth Qazigund Sadura Anantanag Bijbehera Awantipura Total:

11

6.6.1 Kota stone

487 547 468 497 541

Qazigund Sadura Anantanag Bijbehera Awantipura Total:

141 m2

1,524.00

Page 4 of 10

12

6.5

Hardcret 62mm thk

m2

487

Qazigund

0.000

0.000

547

Sadura

0.000

0.000

0.000

468

Anantanag

4522.025

2668.000

1854.025

497

Bijbehera

635.250

452.375

182.875

541

Awantipura

0.000

0.000

0.000

5157.275

3120.375

2036.900

0.000 0.000 600.000 250.000 0.000

0.000 0.000 600.000 250.000 0.000

0.000 0.000 0.0000 0.000 0.000

5,042.00

850.000

850.000

3,118.00

1061.910 386.950 1212.680 457.240 321.560 3440.340

40.00

0 0 30 0 0 30

Total: 13

7.4.1

487 547 468 497 541

24,309.00

Qazigund Sadura Anantanag Bijbehera Awantipura

8.3

487 547 468 497 541

15 487 547 468 497 541

P/f 75 mm PVC Pipe

982,460.89

594,431.44

388,029.45

0.0000

23.10

19,635.0000

19,635.00

0.00

593.560 386.950 1212.680 457.240 321.560 2971.990

468.350 0.000 0.000 0.000 0.000 468.350

56.35

193,863.16

167,471.64

26,391.52

0 0 0 0 0 0

0 0 30 0 0 30

117.75

3,532.50

0.00

3,532.50

m

Qazigund Sadura Anantanag Bijbehera Awantipura Total: 9.2.1

190.50

Finishing wall with m2 water proofing cement paint

Total: 14

0.000

GI Distribution branch Qazigund Sadura Anantanag Bijbehera Awantipura Total:

no

Page 5 of 10

16

10.1

487 547 468 497 541

Supply..Boulder filling.

m3

Qazigund Sadura Anantanag Bijbehera Awantipura Total:

2,586

1378.800 155.425 1283.1195 163.419 560.071 3540.835

1378.800 155.425 1283.1195 163.419 560.071 3540.835

0.000 0.000 0.000 0.000 0.000 0.000

374.65

1,326,573.65

1,326,573.65

0.00

24,438,661.00

23,547,114.10

891,546.91

18.00% above (quoted rate)

4,398,958.98

4,238,480.54

160,478.44

Total of Schedule "A"

28,837,619.98

27,785,594.63

1,052,025.35

Schedule "A"

17

"B" 2 Railing

487 547 468 497 541

18 487 547 468 497 541

m

Qazigund Sadura Anantanag Bijbehera Awantipura Total: "B" 1

3027

0.000 0.000 365.000 100.000 0.000 465.000

0.000 0.000 330.000 100.000 0.000 430.000

0.000 0.000 35.0000 0.000 0.000 35.000

7,560

28983.390 1540.000 19418.146 3725.607 14788.252 68455.395 9450.000

28983.390 1540.000 19418.146 3616.722 14788.252 68346.510 9450.000

0.000 0.000 0.000 108.885 0.000 108.885 0.000

-

943.00

438,495.00

405,490.00

33,005.00

Supply and filling m3 earth. Qazigund Sadura Anantanag Bijbehera Awantipura Total: 125% of BOQ

-

90.00

850,500.00

850,500.00

0.00

Total of Schedule "B"

1,456,564.35

1,419,268.70

37,295.65

Page 6 of 10

19

"C" 1

487 547 468 497 541

20

Qazigund Sadura Anantanag Bijbehera Awantipura Total: NS-1

468 541 21

Providing, Kg cutting,TMT bar.

RRM in 1:6 morter Sadura Anantnag Awantipura Total:

NS-2 40mm GI pipe

m3 m3 m3 m3

182,602

0.000 1712.688 13760.429 4944.5480 3242.457 23660.122

0.000 1712.688 12428.040 3369.9530 3242.457 20753.138

0.000 0.000 1332.389 1574.595 0.000 2906.984

38.00

899,084.64

788,619.24

110,465.39

1,000

77.322 668.874 29.301 775.497

77.322 668.874 29.301 775.497

0.000 0.000 0.000 0.000

1,911.88

1,482,657.20

1,482,657.20

0.00

mtr

487

Qazigund

0.000

0.000

0.000

547

Sadura

0.000

0.000

0.000

468

Anantanag

1010.300

1010.300

0.000

497

Bijbehera

195.000

195.000

0.000

541

Awantipura

400.000

400.000

0.000

2750

1605.300

1605.300

0.000

292.00

468,747.60

468,747.60

0.00

Total: Bill of Quantity above 125% of BOQ 22

4.1

Brick work in 1:6 m3 mortar.

3,531.25

2820.210

2688.542

131.669

3,097.00

8,734,190.37

8,326,413.03

407,777.34

23

"B" 1

Supply and filling m3 earth.

62,200

59005.395

58896.510

108.885

113.280

6,684,131.10

6,671,796.61

12,334.49

GRAND TOTAL

48,562,995.24

46,943,097.01

1,619,898.23

Rs 50,000/- at Bizbehera yard Amount heldup for incomplete kota stone work Rs 10,000/- at anantnag Yard Contractor

AM/ Civil

Say:

1,619,898.00

Amount payable in this bill

1,559,898.00

Total Amount payable in this 24 rd RA bill is Rupees Fifteen Lakhs Fifty Nine Thousand Eight Hundred and Ninety Eight Only Checklist

Page 7 of 10

Station no 1 2 3 4 5

Name of Station Qazigund Sadura Anantanag Bijbehera Awantipura Grand Total: Say:

Amount for the Month

0.00 1,619,898.00

Everything is on formula, do not disturb the sheet OK

Certified that the forgoing claim is correct. The necessary measurement were taken and recorded as follows Sl no. Name of Engineer

Date of measurement:

1 2 3 4

Sri OP Chouhan, AM/ Civil Sri Anil Barma, AM/ Civil Sri Surajit Ghosh, AM/ Civil Sri Tanbir Hussain DM/ Civil

30-04-2008 30-04-2009 30-04-2010 -

5

Sri Sarvash Kumar, DM/Civil

-

Measurement No 19 -

Date:

MB no

Page

487 547 468 497

21-25 74-78 47-51

541

-

JGM/ Civil

Certified that, Measurements Recorded in MB as above and 469(Abs.) are fully accepted by me and I do not have any other claim against 1 this bill. 2

The labour employed by me have been paid minimum wages as fixed in similar type of work in the area.

3

All taxes including Royalty charges. Cess, etc. due to the govt. on the materials used for this work have been fully paid and no payment is due to them.

4

All the insurance polices as per previous of the contract has been taken by me and are valid as on date.

5

I have extended the provident fund benefits to the staff engaged by me and requisites amount of providend fund has been remitted to the providend fund commissioner.

6

The statury formalities and guidelines has been complied with.

Date:

Contractor

Certified that, 1

The quantity billed is not more than the quantity actually executed at site.

2

No material has been issued to the contractor, for which the cost was to be recovered except such as specially provided in the agreement/ work order.

3

No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill.

4

In case of lump sum payment, approximate quantity billed is not more than the quantity actually at site.

5

The work has been executed as per approved drawing and specifications and the method of measurement is correct.

6

That the statury formalities and guidelines has been complied with.

AM / Civil

DGM / Civil

Chargeble to ........................................................................ and to be included in the account for the month of ................... To be paid at …………................... in presence of ............................................................. by Cheque on or before................

Date:

Manager/ Finance

Certified that the forgoing claim is correct. The necessary measurement were taken and recorded as follows

Sl no. Name of Engineer 1 2 3 4 5

Date of measurement:

Sri Ben Bahadur Soni, AM/ Civil

31/08/206

Sri Surajit Ghosh, AM/ Civil

31/08/208

Sri Debendra Sohai AM/ Civil

31/08/210 Date:

Measurement No 5th 5th 3rd

MB no 487 547 468 497 541

Page 17 to 21 13 to 16 6 to 8

Mgr/ Civil

Certified that, 1

Measurements Recorded in MB 487, 468,541, 469(Abs.) are fully accepted by me and I do not have any other claim against this bill.

2

The labour employed by me have been paid minimum wages as fixed in similar type of work in the area.

3

All taxes including Royalty charges. Cess, etc. due to the govt. on the materials used for this work have been fully paid and no payment is due to them.

4 5 6 7

All the insurance polices as per previous of the contract has been taken by me and are valid as on date. I have extended the provident fund benefits to the staff engaged by me and requisites amount of providend fund has been remitted to the providend fund commissioner. The statury formalities and guidelines has been complied with. The measurementmade for well steining upto this bill, the Tilt & Shift of well are within permissible limit, as per specification and contract agreement.

Date: Contractor Certified that, 1 The quantity billed is not more than the quantity actually executed at site. No material has been issued to the contractor, for which the cost was to be recovered except such as specially provided in the 2 agreement/ work order. No departmental tools & plants have been issued to the contractor other than those for which hire charges have been 3 recovered in this bill. 4 In case of lump sum payment, approximate quantity billed is not more than the quantity actually at site. 5 The work has been executed as per approved drawing and specifications and the method of measurement is correct. 6 That the statury formalities and guidelines has been complied with. B.B.Soni AM / civil Chargeble to ........................................................................ and to be included in the account for the month of ................... To be paid at …………................... in presence of ............................................................. by Cheque on or before................ Date:

Manager/ Finance

Related Documents

Pf1
November 2019 8
Pf-1 Bill May 2008
November 2019 2
Bill Fob-1ra May 2008
November 2019 6
May-2008
October 2019 35
May 2008
November 2019 35
May 2008
April 2020 23