ANALISIS DE PRECIOS UNITARIOS PARTIDA: DIMENSIONES: UNIDAD DE MEDIDA: ELABORADO POR: UNIDAD DE PRODUCCIÓN: INCLUYE: FECHA DE ELABORACIÓN: APROBADO POR:

EXCAVACIÓN DE RAMPA POSITIVA 4.00 X 3.50 ML Jimenez Payta Denninson UNIVERSIDAD CONTINENTAL Equipos, Bombeo, Limpieza hasta los 100mt. Oct-18 J.P.D.

ITEM

DESCRIPCIÓN

1.00

MANO DE OBRA Jumbero Ayudante de Jumbero Operador de Scoop Cargadores disparadores Bombero Lider Boguedero Personal de supervisión y apoyo

6.0000 6.0000 4.0000 12.0000 8.0000 2.0000 2.0000 4.0000

h/h h/h h/h h/h h/h h/h h/h h/h

MATERIALES Barras de perforación Brocas de 45mm Shank Adapter Coopling Rimadora de 89mm Adapter piloto Copas de Aflado Aguzadora de copas Barrenos integrales Mangas de Ventilación 24" Cancamos Manguera de 2" (100m) Manguera de 1" (100m)

0.0800 0.4000 0.0800 0.0800 0.0300 0.0300 0.0480 0.0096 14.0000 1.0000 6.0000 0.1250 0.1250

unid unid unid unid unid unio jgo unid pp ml unid ml ml

333.0000

unid Kgr unid unid unid mt mt mt

2.10

2.20

2.30

EXPLOSIVOS Senexa 65% 11/2" x 12" Anfo Fulminante corriente No 6 Fanel Conectores Guia de seguridad Mecha rapida Cordon detonante IMPLEMENTOS Y HERRAMIENTAS

Cantidad

2.0000 37.0000 2.0000 8.0000 2.0000 18.5000

Unidad

3.00

Implemento de seguridad Normal Implemento de seguridad Agua Herramientas

0.0500 0.0000 0.0500

%mo %mo %mo

EQUIPOS Jumbo EH Scoop 3.5 y 3 Perforadora Jackleg Ventilador 30,000CFM Bomba sumergible Cargador de lamparas

4.0 3.5 14.0000 8.0000 0.5000 40.0000

h-m h-m pp h-m h-m h-m

COSTO DIRECTO GASTOS GENERALES Y UTILIDADES COSTO TOTAL US$/ ML

25%

TARIOS RENDIMIENTO: DISPAROS/GUARDIA NO TALADROS PERFORADOS: NO TALADROS DISPARADOS: LONGUITUD DEL TALADRO: VOLUMEN ROTO: HORAS POR GUARDIA: DENSIDAD DEL MINERAL: P.U.(U$$)

Parcial

2.85 1.00 40.00 37.00 12.00 39.90 8.00

ml/disparo diap/guardia tal/frente tal/frente pie/taladro m3/diaparo Hr/guardia

3.20

Ton/m3

Sub Total

TOTAL(U$$)

4.32 2.88 3.96 2.88 2.88 7.88 2.52 22.07

25.92 17.28 15.84 34.56 23.04 15.76 5.04 88.28

9.09 6.06 5.56 12.13 8.08 5.53 1.77 30.98

230.00 85.00 250.00 60.00 250.00 230.00 150.00 2500.00 0.12 4.60 1.50 4.50 2.30

18.40 34.00 20.00 4.80 7.50 6.90 7.20 24.00 1.68 4.60 9.00 0.56 0.29

6.46 11.93 7.02 1.68 2.63 2.42 2.53 8.42 0.59 1.61 3.16 0.20 0.10

48.75

0.53 0.55 0.09 1.15 0.09 0.09 0.40 0.16

176.49 0.00 0.18 42.55 0.18 0.72 0.80 2.96

61.93 0.00 0.06 14.93 0.06 0.25 0.28 1.04

78.55

79.20

79.20 79.20 79.20

3.96 0.00 3.96

3.96 0.00 3.96

7.92

56.78 48.70 0.11 1.60 6.67 0.17

227.12 170.45 1.54 12.80 3.34 6.80

79.69 59.81 0.54 4.49 1.17 2.39

148.09

362.51 90.63 453.14