Pending Work Mr Sonderman

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Pending Work Mr Sonderman as PDF for free.

More details

  • Words: 184
  • Pages: 1
1. Assembly tool holder fixing at iland. Still not receive all tool holders, so to do follow-up with Mr. Braun. 2. To make protection cage at 55 T. hydraulic press. 3. To do follow up for trolley’s for motor part picking with phonex. 4. To ask for quotation to phoenix and give requisition to purchase dept. 5. To give requisition for dust bins. 6. To give requisition for new trolleys at 40’s. 7. To ask Mr. Braun for sending openers for containers. 8. To arrange parts in the motor cell racks. 9. To give requisition for big size plastic bins for keeping part of motor cell rack, some big parts in the back side rack. 10. To discuss for small parts arrangement at 50’s. 11. To give requisition for stickers. 12. To give requisition for wastage oil drum arrangement. 13. To give requisition for the motor oil seal assembly tool at motor cell. 14. To give requisition for shaft protector for painting. 15. Follow up for bearing tool. 16. Lifting hooks follow up. 17. To check for sitting arrangement in the plant shop floor.

Related Documents

Pending Work Mr Sonderman
October 2019 13
Job Work Pending
October 2019 21
Project Pending Work
October 2019 13
Mr Hazem Work
October 2019 7
Pending Document
October 2019 16
Pending Subjects
June 2020 16