PEKULURAN MICRO-HYDRO ELECTRIC POWER PLANT By Sudargana & Karnoto Energy & Natural Resources Research Centre Diponegoro University Central Java Indonesia
BACKGROUND: 1. 2. 3.
4. 5.
6.
LACK IN ENERGY GLOBAL WARMING, CO2 FROM COMBUSTION NATIONAL MEAN ELECTRICITY PROGRAM: UP TO 2020 MOST 5 % NATIONAL ENERGY WAS SUPLIED BY NEW/RENEWABLE ENERGY SOROSIDO RIVER: ENERGY POTENTIAL, 1.4 M3/S FLOW RATE, 23 DEG SLOPE PEKULURAN IS THE ISOLATED AND UNELECTRIFIED VILLAGE, 62 FARMER FAMILIES AND LOW EDUCATED INHABITANCE GOVERNMENT FUNDING
OBJECTIVES: PUSH THE NATIONAL MEAN ELECTRIVICATION PROGRAM (RUKN) EXPAND THE NEW AND RENEWABLE ENERGY SUPPLY. PUSH RURAL/PEKULURAN EDUCATION & SOCIAL ECONOMIC DEVELOPMENT.
EXISTING DATA: 1.4 M3/S SOROSIDO WATER FLOW RATE 23o RIVER SLOPING 62 FRAMILIES UN-ELECTRIFIED BY PLN ABOUT 5 PICO-HYDRO @ 100 Watt, FOR 10 FAMILIES, THERE WAS VERRY LOW PEKULURAN ELECTRIFICATION
PRE ACTIVITY: SURVEY ON HYDRO POTENTIAL ENERGY IN WHOLE CENTRAL JAVA. FEASIBILITY STUDY ON MICRO-HYDRO ELECTRIC POWER PLANT IN BATANG AND PEKALONGAN REGENCY, ESPECIALY THE ISOLATED VILLAGE. DESIGN MICRO-HYDRO POWER PLANT ON SIJERAH (BATANG) AND PEKULURAN (PEKALONGAN)
WISHFULL: BUILD 37.5 KVA MICRO-HYDRO ELECTRIC POWER PLANT ELECTRIFY PEKULURAN INHABITANCE WITH 200 Watts/FAMILY TO PUSH SOCIAL-ECONOMIC AND EDUCATION DEVELOPMENT OF 62 PEKULURAN FAMILY
PROJECT ACTIVITY: TO BUILD: 50 M WIDE DAM ON SOROSIDO RIVER 126 M LONG, 0.4 M3 FLOW RATE WATER CANAL 2 X 3 X 13 M FORE-BAY 12 M HEAD, 14” PENSTOCK DIAMETER BANKI MITCHEL CROSS FLOW TURBIN 2 WAYS MECHANICAL TRANSMISSION FROM 188 TO 1500 RPM 37.5 KVA ELECTRIC INDUCTION GENERATOR WITH DUMMY LOAD POWER HOUSE 750 M ELECTRIC DISTRIBUTION CABLE ETC.
SUSTAINABILITY: TO OPERATE THIS PLANT PEKULURAN INHABITANT MAKE SOCIAL COOPERATION TO MANAGE TGE FUNDING, OPERATING, MAINTENANCE AND DEVELOPMENT. DIPONEGORO UNIVERSITY RESEARCH CENTRE OF ENERGY AND NATURAL RESOURCES WILL BE ASISTANCE ON SUSTAIN ACTIVITY.
. TOPOGRAPHY MAP.