Pedestrian Circulation Plan 02.06.08 (a0134736)

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Pedestrian Circulation Plan 02.06.08 (a0134736) as PDF for free.

More details

  • Words: 466
  • Pages: 1
Clarendon Center County Submission

M metro

Legend

9’ - 10”

North Bound Lane 1 North Bound Lane 2 Parking Lane

7’-0” 9’ - 2”

9’ - 10”

Sidewalk Closed Ahead Cross at 11th Street

South Bound Lane 1 South Bound Lane 2

North Highland Street

Covered Pedestrian Walkway

165’ L.F. North Bound Lane 2 See Note D

14’-

e

Loading Zone

2.

Sediment Tank

3.

Office Trailers

4.

Signage

5.

Covered Pedestrian Walkway

6. M Metro Station

tB es W

e ag or St

metro

e

on gZ

din

a Lo

1

ATA T WM SHAF AIR

Temporay Power

NORTH BLOCK Proposed Office

2 e a n ne a gL dL 1 in ne r k un La Pa t Bo nd es W ou

ial er at

r

6’ 10’ 10’

M

ile Tra

Material Storage

Loading Zone

e iler Lan e 2 Tra n nd ou d La e n n tB y) Eas st Bou Bike La iler wa Tra Ea ned (o Blv

r

don ren Cla

ile Tra

Concrete Staging

11th Street, North

d Blv



11 11’

Proposed Residential

Hoist

on

r

4’

SOUTH BLOCK

Virginia Dominion Power

eter

ils

rM Wate

W

an

.F. 0’ L 25

eL

ile Tra

Proposed Office

Sidewalk Closed Ahead Cross N. Garfield St.

Underwood Building

Bik

Leadership Building

Sidewalk Closed

1.

Covered Pedestrian Walkway

Loading Zone

Temporary Clarendon Grill Trash Enclosure

6’10’ 10’

Arlington, Virginia South & North Block

Sidewalk Closed Cross at North Garfield

Sidewalk Closed Cross at North Garfield

Virginia Dominion Power

Sediment Tank

North Garfield Street

Concrete Staging

North Garfield Street

Sidewalk Closed Ahead Cross at 11th Street

7.

Dumpster

8.

Temporary Construction Fence

9.

Pedestrian Path

10.

Virginia Dominion Power

11.

Material Hoist

12.

Jersey Barrier

13.

Material Storage

NOTES: A. CLARENDON BLVD AND WILSON BLVD TRAFFIC LANES WILL REMAIN OPEN FOR THE DURATION OF CONSTRUCTION ACTIVITES AS SHOWN ABOBE.

February 5, 2008

B. TRUCK ROUTE -TRUCKS WILL HAUL IN EQUIPMENT AND MATERIAL USING NORTH HIGHLAND STREET, WASHINGTON BLVD CLARENDON BLVD., NORTH GARFIELD STREET, WILSON BLVD AND 11TH STREET. TRUCKS WILL NOT ENTER INTO RESIDENTIAL NEIGHBORHOODS C. SIDEWALKS AT NORTH HIGHLAND ST. AND CLARENDON BLVD. CLOSED DURING DEMOLITION ACTIVITIES. THE COVERED WALKWAY WILL BE INSTALLED WHEN NEW CONSTRUCTION REACHES THE HEIGHT LIMITS INDICATED PER IBC CODE SECTION 3104 AND SECTION 3201. D. NORTH BOUND LANE 2 ON NORTH HIGHLAND STREET TO BE OPEN DAILY, EXCEPT DURING HOURS OF CONSTRUCTION (9:00 AM TO 3:00 PM) FOR LOADING AND UNLOADING. LANE CLOSURE WILL BEGIN 25’ SOUTH OF CLARENDON BLVD. E. NO CHANGES IN THE LANE STRIPING WILL BE REQUIRED ON NORTH HIGHLAND ST. OR CLARENDON BLVD. DURING CONSTRUCTION. F. PARKING METERS HI1109-HI1117, CL3002-CL3012, AND GA1102-GA1120 WILL BE OUT OF SERVICE AND METER HEADS WILL BE REMOVED FOR DURATION OF PROJECT.

N

Related Documents

Circulation
October 2019 43
Circulation+
June 2020 20
020608 Expo
August 2019 9
Circulation
May 2020 14