Clarendon Center County Submission
M metro
Legend
9’ - 10”
North Bound Lane 1 North Bound Lane 2 Parking Lane
7’-0” 9’ - 2”
9’ - 10”
Sidewalk Closed Ahead Cross at 11th Street
South Bound Lane 1 South Bound Lane 2
North Highland Street
Covered Pedestrian Walkway
165’ L.F. North Bound Lane 2 See Note D
14’-
e
Loading Zone
2.
Sediment Tank
3.
Office Trailers
4.
Signage
5.
Covered Pedestrian Walkway
6. M Metro Station
tB es W
e ag or St
metro
e
on gZ
din
a Lo
1
ATA T WM SHAF AIR
Temporay Power
NORTH BLOCK Proposed Office
2 e a n ne a gL dL 1 in ne r k un La Pa t Bo nd es W ou
ial er at
r
6’ 10’ 10’
M
ile Tra
Material Storage
Loading Zone
e iler Lan e 2 Tra n nd ou d La e n n tB y) Eas st Bou Bike La iler wa Tra Ea ned (o Blv
r
don ren Cla
ile Tra
Concrete Staging
11th Street, North
d Blv
’
11 11’
Proposed Residential
Hoist
on
r
4’
SOUTH BLOCK
Virginia Dominion Power
eter
ils
rM Wate
W
an
.F. 0’ L 25
eL
ile Tra
Proposed Office
Sidewalk Closed Ahead Cross N. Garfield St.
Underwood Building
Bik
Leadership Building
Sidewalk Closed
1.
Covered Pedestrian Walkway
Loading Zone
Temporary Clarendon Grill Trash Enclosure
6’10’ 10’
Arlington, Virginia South & North Block
Sidewalk Closed Cross at North Garfield
Sidewalk Closed Cross at North Garfield
Virginia Dominion Power
Sediment Tank
North Garfield Street
Concrete Staging
North Garfield Street
Sidewalk Closed Ahead Cross at 11th Street
7.
Dumpster
8.
Temporary Construction Fence
9.
Pedestrian Path
10.
Virginia Dominion Power
11.
Material Hoist
12.
Jersey Barrier
13.
Material Storage
NOTES: A. CLARENDON BLVD AND WILSON BLVD TRAFFIC LANES WILL REMAIN OPEN FOR THE DURATION OF CONSTRUCTION ACTIVITES AS SHOWN ABOBE.
February 5, 2008
B. TRUCK ROUTE -TRUCKS WILL HAUL IN EQUIPMENT AND MATERIAL USING NORTH HIGHLAND STREET, WASHINGTON BLVD CLARENDON BLVD., NORTH GARFIELD STREET, WILSON BLVD AND 11TH STREET. TRUCKS WILL NOT ENTER INTO RESIDENTIAL NEIGHBORHOODS C. SIDEWALKS AT NORTH HIGHLAND ST. AND CLARENDON BLVD. CLOSED DURING DEMOLITION ACTIVITIES. THE COVERED WALKWAY WILL BE INSTALLED WHEN NEW CONSTRUCTION REACHES THE HEIGHT LIMITS INDICATED PER IBC CODE SECTION 3104 AND SECTION 3201. D. NORTH BOUND LANE 2 ON NORTH HIGHLAND STREET TO BE OPEN DAILY, EXCEPT DURING HOURS OF CONSTRUCTION (9:00 AM TO 3:00 PM) FOR LOADING AND UNLOADING. LANE CLOSURE WILL BEGIN 25’ SOUTH OF CLARENDON BLVD. E. NO CHANGES IN THE LANE STRIPING WILL BE REQUIRED ON NORTH HIGHLAND ST. OR CLARENDON BLVD. DURING CONSTRUCTION. F. PARKING METERS HI1109-HI1117, CL3002-CL3012, AND GA1102-GA1120 WILL BE OUT OF SERVICE AND METER HEADS WILL BE REMOVED FOR DURATION OF PROJECT.
N