Gps Observation Schedule Re Measure Cpii -需要重新测测量2019.4.2-1.xlsx

  • Uploaded by: Muhammad Rafli Assidiq
  • 0
  • 0
  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Gps Observation Schedule Re Measure Cpii -需要重新测测量2019.4.2-1.xlsx as PDF for free.

More details

  • Words: 56
  • Pages: 3
need re measure of CPI 点名 No

点名 Point ID

日期 Date

时段 Session

天线高 Antena Height (Meter)

开始时间 Start-time

结束时间 End-time

e measure of CPII 量高方式Pattern of Antena Height

GPS序列号 GPS ID

GPS类型 Type of Reciever

测量人员 Name of Surveyor

6900000 253000 662800 244800 205790 543396 342174 509370 9661330

2000 4830.665

5000000

4661330

2000 2330.665

Related Documents


More Documents from "Roger Knight"

Gcp.pdf
November 2019 1
Gpb.pdf
November 2019 16
06011401.pdf
November 2019 11
06011401.pdf
October 2019 18