PA S S I O N ATE A B O U T S U S TA I N A B L E C O N S T R U C T I O N S P E C I A L I S T

D E S I G N ,

M A N U F A C T U R E ,

S U P P L Y

&

E R E C T I O N

KLH UK Ltd is part of KLH Massivholz GmbH, Austria

O F

C R O S S

L A M I N A T E D

S T R U C T U R A L

T I M B E R

P A N E L S

KLH UK •

Design, Manufacture, Supply and Erection services



Factory capacity exceeding 750,000m² at two plants.



First manufacturer to introduce a high pressure physical press into manufacturing process, which has yet to be surpassed.



p y solvent and formaldehyde y free PUR adhesive Completely



Close relationship between KLH UK and KLH Massivholz



Unique UK office set up



C ll b t working Collaborative k approachh



Wide range of project experience

Working with numerous architects and engineers KLH UK assist in the development of sustainable and cost effective structural solutions - seeking to optimise the design and buildability of a project from the outset. KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH = KreuzLagenHolz Engl. = Cross Laminated Solid Timber Panels

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH = KreuzLagenHolz Engl. = Cross Laminated Solid Timber Panels

90 degrees

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PRODUCTION METHOD Pressure 5 to 7 kg/cm2 - equivalent 500 kN/m2

16.55mm Maximum length

500mm

Maximum size after cutting = 2 95m (2 2.95m (2.98) 98) x 16 16.5m 5m KLH UK

PRODUCTION METHOD

3.0m Maximum width/height BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PRODUCTION METHOD Pressure 5 to 7 kg/cm2 - equivalent 500 kN/m2

16.55mm Maximum length

500mm

Maximum size after cutting = 2 95m (2 2.95m (2.98) 98) x 16 16.5m 5m KLH UK

PRODUCTION METHOD

3.0m Maximum width/height BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PRODUCTION METHOD Pressure 5 to 7 kg/cm2 - equivalent 500 kN/m2

16.55mm Maximum length

500mm

Maximum size after cutting = 2 95m (2 2.95m (2.98) 98) x 16 16.5m 5m KLH UK

PRODUCTION METHOD

3.0m Maximum width/height BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PRODUCTION METHOD Pressure 5 to 7 kg/cm2 - equivalent 500 kN/m2

16.55mm Maximum length

500mm

Maximum size after cutting = 2 95m (2 2.95m (2.98) 98) x 16 16.5m 5m KLH UK

PRODUCTION METHOD

3.0m Maximum width/height BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PRODUCTION METHOD Pressure 5 to 7 kg/cm2 - equivalent 500 kN/m2

16.55mm Maximum length

500mm

Maximum size after cutting = 2 95m (2 2.95m (2.98) 98) x 16 16.5m 5m KLH UK

PRODUCTION METHOD

3.0m Maximum width/height BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PRODUCTION METHOD Pressure 5 to 7 kg/cm2 - equivalent 500 kN/m2

16.55mm Maximum length

500mm

Maximum size after cutting = 2 95m (2 2.95m (2.98) 98) x 16 16.5m 5m KLH UK

PRODUCTION METHOD

3.0m Maximum width/height BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PRODUCTION METHOD Boards for floors ceilings etc.: DL (top layer longitudinal)

Boards for walls: DQ (Top layer vertical)

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PRODUCTION METHOD •

Production process is zero-waste – all off-cuts, wood shavings, sawdust are manufactured into biomass pellets, & used to generate heat / power for the factory (excess is sold to local CHP plant)



Factory capacity approx 4000m2 per day (depending on thickness) – average f il house family h approx 300 - 400m2; 400 2 can bbe iimprovedd upon with ith iimplementation l t ti of 3rd shift



KLH UK

Panels cut & processed using state state-of-the-art of the art CNC technologies

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

BUILDING WITH TIMBER •

Timber is the only renewable structural building material



Timber has the lowest energy consumption of any building material across its lifecycle



Using solid timber will reduce carbon emissions, when used in place of concrete, steel brick & block etc steel,



KLH UK

Forests act as a carbon “sink” , storing carbon

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

BUILDING WITH TIMBER •

Forests sequester carbon i.e. remove carbon dioxide from the atmosphere (and turn it into plant material)



Using one cubic metre – approx 500kg - of timber instead of other materials results in 0.8Tonnes of stored / sequestered CO2 (Wood for Good – “the role of wood in reducing climate change change”)). Therefore structure at Norwich Academy has approx 2,750 tonnes of sequestered CO2

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

TIMBER AS AN ALTERNATIVE…. •

The production of Portland Cement results in around 870kg of CO2 emissions per tonne of cement (“The cement industry’s role in climate change”, Dr Robert McCaffrey, Global Cement & Lime Magazine)



Substituting GGBS Cement - ground granulated blastfurnace slag - (typical mix 40 – 50 ) may reduce d CO2 emissions i i in i concrete, t bbutt only l bby aroundd 100 100-130kg 130k per tonne (Ecocem)



The production of steel results in around 1.75 1 75 tonnes of CO2 emissions per tonne steel (The Carbon Trust)

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

TECHNICAL •

KLH – Full European Technical Approval (ETA 06/138)



KLH – Boards + manufacturing process PEFC (Programme for the Endorsement of Forest Certification schemes) Certified



KLH – Manufactured with formaldehyde-free adhesive (Collano Purbond 110)



KLH - Europe’s largest supplier of cross-laminated structural timber panels



BRE Durability Report – 60 year lifespan



Zurich System Approval

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

FIRE PERFORMANCE •

Calculated on charring rate



Top layer burns at 0.67mm / min; subsequent layers at 0.76mm / min



Performance can be improved with additional layers of plasterboard



Generally 3-layers boards can achieve REI 30; 5-layer boards REI 60

ACOUSTICS •

KLH UK

A variety of different solutions...dependent upon exposed timber

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

AIR TIGHTNESS •

Panels are classed as airtight



All joints are taped to create seal between panels



Therefore, critical areas are windows, doors, service penetrations etc



KLH structures have been built to passivhaus standards on large-scale developments



Air permeability of 1.0 (m3/hr.m2 @ 50 Pascals) can be achieved – dependent on quality lit off following f ll i workmanship k hi (rather ( th th than superstructure) t t )



KLH UK

Test results on UK building have resulted in rates of 1.6 – 5.0

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH PANELS – STRUCTURAL ADVANTAGES o

Dead weight helps resisting overturning forces.

o

High thermal and fire performances.

o

High dimensional stability , no need for complicated movement joints.

o

Cladding can be fixed directly to the walls.

o

Platform construction sequence is used to limit the use of temporary structure: walls are temporarily braced until floor panels are installed.

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH PANELS – STRUCTURAL ADVANTAGES o

Fixings used to connect panels to each other also transfer shear forces, giving robustness to the building.

o

Solid panels ensure all fixings can be flexible position wise.

o

Lateral loads (wind) can be transferred through diaphragm action of the floors t allll walls to ll

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH PANELS – DETAILS

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH PANELS – DETAILS

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH PANELS – TYPICAL CONNECTIONS External Wall to Slab

KLH UK

PRODUCTION METHOD

Internal Wall to Slab

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH PANELS – TYPICAL CONNECTIONS Panel to Panel

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KLH PANELS – TYPICAL CONNECTIONS Wall/Floor/Wall

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PROJECTS RESIDENTIAL EDUCATION ARTS & EXHIBTION CIVIC/PUBLIC COMMERICAL

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PRIVATE HILL SIDE HOUSE, AUSTRIA

RESIDENTIAL BUILDING, FRAUENGASSE

STADTHAUS, MURRAY GROVE Waugh Thistleton, London

Winner of Structural Wood Award; Offsite Construction Wood Award

STADTHAUS, Murray Grove, London FAST CONSTRUCTION •

Programme saving of approx 18 weeks (versus concrete frame)



4 carpenters + mobile crane = 28 working days for timber superstructure

BENEFITS FOR FOLLOWING TRADES •

Very precise structural openings – windows can be pre pre-ordered ordered, and fixing / detailing for airtightness simplified



Solid timber elements to fix back to: first-fix M&E / cladding contractors very happy!



Dimensional stability, precision, plumbness – e.g. no shimming of cladding rails

CLEAN, QUIET, RELATIVELY DUST-FREE WORKING ENVIRONMENT NO NEED FOR TOWER CRANE & THEREFORE SEPARATE FOUNDATIONS KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

STADTHAUS, - Sustainability CARBON •

Energy produced during construction (i.e. production of construction materials etc) is rarely l considered, d d BUT, BUT th this can accountt for f aroundd a 1/3 off the th overallll “carbon b cost” t off a building over it’s lifetime (although expended over a very short period of time)



The proposed potential option of a reinforced concrete frame would have resulted in a production process creating upwards of 125 tonnes of carbon......*



KLH superstructure actually stores approx 185 tonnes*



Therefore, the usual requirement of 10 percent carbon reduction through renewables would equate to the same saving only after 200 years of the building’s constant use*



KLH UK

*figures from Michael Popper Associates PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

STADTHAUS, - Sustainability CARBON •

Ultimately offered savings to the contractor / developer – only viable source of renewables was via GSHP GSHP, which h h would ld hhave requiredd a basement b t to t be b built.... b lt



KLH UK

Roof area was also freed up as an amenity space (no photovoltaics)

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PROJECTS RESIDENTIAL EDUCATION ARTS & EXHIBITION CIVIC/PUBLIC COMMERCIAL

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

PROJECTS

EDUCATION Archway Early Years Centre

Parish Church School

Bessemer Grange School

Rye Oak School

Birkbeck College

Sandal Magna Primary

Cola Islington

St Benedicts School

Colfes School

St Charles Sixth Form College

Cranleigh School

St John Fisher RC School

Falmouth College

Thomas School Clapham

Heartsease Academy, Norwich

West Buckland School

HTG Primary

West Kent College

Lauriston School Phases 1-3 Marylebone School Northbury School KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

KINGSDALE SCHOOL SPORTS FACILITY dRMM Architects, London

Finalist in Building Awards; Short-listed for World Architecture Festival Awards

FALMOUTH COLLEGE Urban Salon Architects, London

Winner of International Green Apple Award, Built Environment; RIBA Award for Architecture; LABC South West; Timber in Construction Award; Best Educational Project at Off Site Construction Awards

THOMAS’S SCHOOL Claridge Architects

OPEN ACADEMY, NORWICH Sheppard Robson, London

Largest cross laminated structure in the UK

ST. JOHN FISHER SCHOOL GSS Architects

NORTHBURY SCHOOL Greenhill Jenner Architects, London

PROJECTS RESIDENTIAL EDUCATION ARTS & EXHIBITION CIVIC/PUBLIC COMMERCIAL

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

TERMITE PAVILION, PESTIVAL 2009 Softroom Architects, London

MK 40 Tower dRMM Architects, London

PROJECTS RESIDENTIAL EDUCATION ARTS & EXHIBITION CIVIC/PUBLIC COMMERCIAL

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

BEDFONT LAKES Archer Architects, London

PROJECTS RESIDENTIAL EDUCATION ARTS & EXHIBTION CIVIC/PUBLIC COMMERICAL

KLH UK

PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

THE OFFICE David Grindley Architects, London

Won the RIBA Ibstock Downland Prize – Live/Work Category

CLIENTS & AWARDS Cl t include: Clients l d Adams Kara Taylor Amin Taha Architects Architype Bennetts Associaties Claridge Architects dRMM Dyer Feilden Clegg Bradley Architects Gotch Saunders & Surridge Architects Kier Neilcott Construction Pringle Richard Sharratt Architects Sheppard Robson Studio E Techniker Urban Salon KLH UK

PRODUCTION METHOD

Allies & Morrison Archer Architects atelier one Bere Architects David Grindley Architects DSDHA Edward Cullinan Architects Galliford Try Hudson Architects MRJ Rundell Architects Price & Myers Ramboll Softroom Tasou Architects Telford Homes Waugh Thistleton BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

CL;IENTS & AWARDS A d include: Awards l d 2009 • Falmouth College Project – International Green Apple Award for the Built Environment • Falmouth College Project – RIBA Award for Architecture • Falmouth College Project – LABC South West Award, Best Education Building • Murray Grove Project – Short listed for RIBA London Region Award • Murray Grove Project – Innovation Award, Daily Mail Newspaper 2008

• • • • • KLH UK

Falmouth College Project – Timber in Construction Award

- Schools that Inspire

100% Detail 2008 – KLH wins Best Contribution Show Award Falmouth College Project - Falmouth Design & Technology block - Wins Best Education Project at Off Site Construction Awards. Murray Grove Project – KLH is the winner of the Structural Wood Award and the Offsite Construction Wood Award for 2008 Kingsdale g School Project j - A finalist in Buildingg Magazine g Awards, Project j of the Year category, g y and shortlisted in the World Architecture Festival Awards, in the Learning category PRODUCTION METHOD

BUILDING WITH TIMBER

TECHNICAL

KLH PANELS

PROJECTS

Related Documents

S U N I O N
November 2019 44
N At I O N A L I N S
June 2020 30
N At I O N A L I N S
June 2020 24
S O S Summary
June 2020 5
B I M B O S
October 2019 21