Operations Flow Analysis

  • April 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Operations Flow Analysis as PDF for free.

More details

  • Words: 32,890
  • Pages: 162
Application: Operations Process Flow Analysis About ModelSheet This Excel workbook was generated using ModelSheet, a revolutionary new spreadsheet technology. ModelSheet allows you to develop business models using readable formulas, while avoiding the details of cell addresses and hardto-change sheet layouts. The end result is a conventional Excel workbook just like this one. We built ModelSheet because we believe that spreadsheets are a great way of communicating results but we think it's just too hard to use them to develop reliable, maintainable, expressive and collaborative models.

You'll be able to get a glimpse of ModelSheet's advantages when you take a look at the "Formulas" tab and realize how few separate, readable formulas are needed to produce all of the other worksheets. In addition to formulas, ModelSheet knows about the "dimensions" in your model (e.g., products, locations, departments) as well as the time series that you're using (e.g., 5 years in quarters.) ModelSheet raises the level of thinking and acting from individual cells to natural modeling concepts. It enhances model reliabilty, auditability and maintainability; it enables you to build models that better reflect your intentions; it allows easier collaboration between modelers, developers, and report users; and it improves productivity, especially when making changes to a model. ModelSheet will be available in several forms. ModelSheet Authoring is a SaaS application for developing and maintaining business models and delivering them in conventional spreadsheets. With this product you can build models from scratch or explore and modify existing models. ModelSheet Templates provides a simple interface that allows you to pick an existing model and easily specify time frames, dimensions and layout parameters and produce an Excel template like this one to your exact specifications. ModelSheet also offers pre-built models and consulting services. We have a lot more to tell you about ModelSheet and we'd really like to hear from you about your needs for modeling and templates. Please visit our website at www.modelsheetsoft.com or contact us at [email protected]. Description of the Model The model is a dynamic (time dependent) simulation of the (manufacturing or business) process flow below. Process Flow

Process 1

Process 2

Rework 2

Process 3

Process 4

ModelSheet is a trademark of ModelSheet Software, LLC

Finshed Goods A

Finshed Goods B

Market Deman d

Sales Goods A

Sales Goods B

page 1 of 162

• The process flow is described by a transition rates between processes that can vary with time. – The model tracks yield units and percent and scrap units and percent for each process stage. – Each process has capacity limits determined by the number of pieces of processing equipment. – Transition rates can vary with time. This particular model has transition rates that are constant over time. • You can insert outsourced units into any stage in the flow. – This model inserts outsourced units only in Process 1 and in finished goods inventory at the first time step. • Costs – Reports costs per unit in/processing/out and aggregate costs in/processing/out for each stage. – Allocate cost less salvage value of scrapped units to good output units at each processing stage. – Separate worksheets show costs with and without breakout of material/labor/captial expense/overhead. • Sales – Sales of Products A and B are driven by market demand and limited by available finished units. – You can sell the output of any process stage. (In this particular model, only output of two stages are sold.) • Financial results: Model include prices, revenue COGS, and gross margin for units sold. • Scenarios – Handles multiple scenarios to compare alternative processes. – This model has two scenarios in which Scenario 2 raises yields and increases input costs in Process 3. • The model includes Excel charts that provide graphical views of key variables. These charts are part of the model, and they are included by default in exported Excel workbooks. You can add more charts, import them, and the new charts will be included in exported Excel workbooks. As you explore the model, we suggest that you • Read some of the Excel comments that are attached to Analysis Variables throughout the workbook. These comments also appear in ModelSheet in convenient places. • View worksheet "Formulas" which shows the named variables and symbolic formulas of the model in a compact and readable form. The symbolic formulas are not active in this Excel workbook, but they give you some idea how the model works, and how it looks in ModelSheet. Suggestions for using this model 1. Use this workbook as-is to model business or manufacturing process flows. You can change the data in the dark blue input cells. You can change the display names of dimension items and variables in dark blue cells on the worksheet "Labels." 2. Customize this Excel workbook to make the model fit your process flow. For example: – Add or remove process stages, and change which stages yield finished goods. – Change the transition matrix or make it depend on time or any process parameters. 3. Use ModelSheet to edit the formulas in this model, using named variables, symbolic formulas (and far fewer formulas), segmentation dimensions and time series, without ever touching a cell address -- and end up with a conventional Excel workbook. To obtain a trial account for ModelSheet, go the the ModelSheet website below and request a trial account.

Technical notes These facts should help you understand how production units flow through the model. • At each process stage, units available for processing (UNITS AVAILABLE IN) are either sent for processing (UNITS IN) or, if processing capacity is exceeded, sent to buffer inventory storage (UNITS BUFFER STOCK). ModelSheet is a trademark of ModelSheet Software, LLC

page 2 of 162

• The Processing capacity (UNITS CAPACITY) of each stage is determined by the number of PROCESSING STATIONS times the CAPACITY/STATION. • The units that enter each processing stage either emerge as good output units (UNITS OUT), or as scrap (SCRAP UNITS). YIELD % of the units come out good and SCRAP % units come out as scrap. • At the end of each time period, good units are either sold (UNITS SOLD), or routed by the stage transition matrix (TRANSITION %) to other processing stages for use in the next time period (UNITS AVAILABLE IN). • The number of units sold is the minimum of the units available for sale at the end of each time period (UNITS OUT), and the amount of market demand (UNITS DEMAND). • The operation can purchase work-in-process units for any processing stage at the start of any time period (PURCHASED UNITS IN). In this model, the operation purchases material inputs for stage one in each time period, and it purchases finished goods in the first time period to fill the distribution channel. • The model has two scenarios (SCENARIO) that have different scrap rates and different processing costs in process stage 3. These facts should help you understand how the costs flow through the model. • The value of work in process inventory that enters each stage (WIP IN) plus the PROCESS COST equals the value of good units out (WIP OUT) plus the value of scrap (SCRAP COST). • Worksheet UNIT COSTS shows cost allocated per production unit for each unit stock or unit flow in the model. • The costs are presented in two levels of detail. – Worksheet COST FLOW shows the flow of costs with costs of all types aggregated together. – Worksheet COST FLOW DETAIL shows the flow of costs with material, labor, overhead, and allocations of fixed expense broken out for each cost variable. This Excel workbook was generated by ModelSheet on March 20, 2009, except for this worksheet of comments. Copyright © 2009 ModelSheet Software, LLC ModelSheet and the ModelSheet logo are registered trademarks of ModelSheet Software, LLC.

ModelSheet is a trademark of ModelSheet Software, LLC

page 3 of 162

Good Units Out, by Process 1 0.9 0.8 0.7 0.6 0.5

Column A

0.4 0.3 0.2 0.1 0 Row 1 Time Period

Demand, Production and Sales, Units by Product 1 0.9 0.8 0.7 0.6 0.5

Column A

0.4 0.3 0.2 0.1 0 Row 1 Time Period

Yield %, by Process 100% 90% 80% 70% 60% Column A

50% 40% 30% 20% 10% 0% Row 1

Units Scrap, by Process 1 0.9 0.8 0.7 0.6 0.5

Column A

0.4 0.3 0.2 0.1 0 Row 1 Time Period

Revenue, by Product 1 0.9 0.8 0.7 0.6 0.5

Column A

0.4 0.3 0.2 0.1 0 Row 1 Time Period

Gross Margin, by Product 1 0.9 0.8 0.7 0.6 0.5

Column A

0.4 0.3 0.2 0.1 0 Row 1 Time Period

Gross Margin %, by Product 1 0.9 0.8 0.7 0.6 0.5

Column A

0.4 0.3 0.2 0.1 0 Row 1 Time Period

Cost by Process, by Time 1 0.9 0.8 0.7 0.6 0.5

Column A

0.4 0.3 0.2 0.1 0 Row 1 Time Period

Cost per Unit by Process, by Time $1 $1 $1 $1 $1 $0

Column A

$0 $0 $0 $0 $0 Row 1 Time Period

Cost of Scrap by Process, by Time $1 $1 $1 $1 $1 $0

Column A

$0 $0 $0 $0 $0 Row 1 Time Period

Cost per Unit for Process 2, by Time $1 $1 $1 $1 $1 $0

Column A

$0 $0 $0 $0 $0 Row 1 Time Period

Process Flow Analysis, Scenario 1 Input Data Scenario (1 or 2)

1

Transition Rates Process 1

Process 2

Rework 2

Process 3

Process 4

Finished Goods A

Transition % Scenario 1 Process 1

0.0%

100.0%

0.0%

0.0%

0.0%

0.0%

Process 2

0.0%

0.0%

5.0%

95.0%

0.0%

0.0%

Rework 2

0.0%

0.0%

0.0%

100.0%

0.0%

0.0%

Process 3

0.0%

0.0%

0.0%

0.0%

40.0%

60.0%

Process 4

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Finished Goods A

0.0%

0.0%

0.0%

0.0%

0.0%

100.0%

Finished Goods B

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Total

0.0%

100.0%

5.0%

195.0%

40.0%

160.0%

Process 1

0.0%

100.0%

0.0%

0.0%

0.0%

0.0%

Process 2

0.0%

0.0%

5.0%

95.0%

0.0%

0.0%

Rework 2

0.0%

0.0%

0.0%

100.0%

0.0%

0.0%

Process 3

0.0%

0.0%

0.0%

0.0%

40.0%

60.0%

Process 4

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Finished Goods A

0.0%

0.0%

0.0%

0.0%

0.0%

100.0%

Finished Goods B

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Total

0.0%

100.0%

5.0%

195.0%

40.0%

160.0%

Transition % Scenario 2

0001

0002

0003

0004

0005

0006

Yield % Scenario 1 Process 1

96.0%

96.0%

96.0%

96.0%

96.0%

96.0%

Process 2

92.0%

92.0%

92.0%

88.0%

84.0%

84.0%

Rework 2

94.0%

94.0%

94.0%

94.0%

94.0%

94.0%

Process 3

90.0%

90.0%

90.0%

90.0%

90.0%

90.0%

Process 4

97.0%

97.0%

97.0%

97.0%

97.0%

97.0%

Finished Goods A

98.5%

98.5%

98.5%

98.5%

98.5%

98.5%

Finished Goods B

99.0%

99.0%

99.0%

99.0%

99.0%

99.0%

Total

70.7%

70.7%

70.7%

67.6%

64.5%

64.5%

Process 1

96.0%

96.0%

96.0%

96.0%

96.0%

96.0%

Process 2

92.0%

92.0%

92.0%

88.0%

84.0%

84.0%

Rework 2

94.0%

94.0%

94.0%

94.0%

94.0%

94.0%

Process 3

98.0%

98.0%

98.0%

98.0%

98.0%

98.0%

Process 4

97.0%

97.0%

97.0%

97.0%

97.0%

97.0%

Finished Goods A

98.5%

98.5%

98.5%

98.5%

98.5%

98.5%

Finished Goods B

99.0%

99.0%

99.0%

99.0%

99.0%

99.0%

Total

77.0%

77.0%

77.0%

73.6%

70.3%

70.3%

Yield % Scenario 2

Units and Capacity FG Inventory Target Periods

2.00 0001

0002

0003

0004

0005

0006

Purch'd Units In Process 1

4,000

3,450

2,920

4,658

5,757

5,827

Process 2

0

0

0

0

0

0

Rework 2

0

0

0

0

0

0

Process 3

0

0

0

0

0

0

Process 4

0

0

0

0

0

0

Finished Goods A

4,000

0

0

0

0

0

Finished Goods B

950

0

0

0

0

0

8,950

3,450

2,920

4,658

5,757

5,827

Process 1

2.00

2.00

2.00

2.00

2.00

2.00

Process 2

2.00

2.00

2.00

2.00

2.00

2.00

Rework 2

1.00

1.00

1.00

1.00

1.00

1.00

Process 3

2.00

2.00

2.00

2.00

2.00

2.00

Process 4

1.00

1.00

1.00

1.00

1.00

1.00

Finished Goods A

1.00

1.00

1.00

1.00

1.00

1.00

Finished Goods B

1.00

1.00

1.00

1.00

1.00

2.00

10.00

10.00

10.00

10.00

10.00

11.00

Process 1

3,000

3,000

3,000

3,000

3,000

3,000

Process 2

3,000

3,000

3,000

3,000

3,000

3,000

Rework 2

500

500

500

500

500

500

Process 3

3,000

3,000

3,000

3,000

3,000

3,000

Process 4

3,000

3,000

3,000

3,000

3,000

3,000

Finished Goods A

6,000

6,000

6,000

6,000

6,000

6,000

Finished Goods B

3,000

3,000

3,000

3,000

3,000

3,000

Total

3,071

3,071

3,071

3,071

3,071

3,071

Total Processing Stations

Total Capacity/Station

Processing Costs Process Cost/U Scenario 1 Process 1 Material

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Labor

$7.00

$7.00

$7.00

$7.00

$7.00

$7.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$2.80

$2.80

$2.80

$2.80

$2.80

$2.80

$19.80

$19.80

$19.80

$19.80

$19.80

$19.80

Material

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

Labor

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$65.20

$65.20

$65.20

$65.20

$65.20

$65.20

Material

$12.00

$12.00

$12.00

$12.00

$12.00

$12.00

Labor

$25.00

$25.00

$25.00

$25.00

$25.00

$25.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Total

$47.00

$47.00

$47.00

$47.00

$47.00

$47.00

Total Process 2

Total Rework 2

Fixed Exp

Process 3 Material

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

$27.00

$27.00

$27.00

$27.00

$27.00

$27.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$10.80

$10.80

$10.80

$10.80

$10.80

$10.80

Total

$41.80

$41.80

$41.80

$41.80

$41.80

$41.80

Labor Fixed Exp

Process 4 Material

$20.00

$20.00

$20.00

$20.00

$20.00

$20.00

Labor

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$45.20

$45.20

$45.20

$45.20

$45.20

$45.20

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

Total

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

Total

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

Total Finished Goods A

Finished Goods B

Total

$9.62

$29.34

$35.42

$32.93

$32.98

$34.85

Material

$4.47

$17.04

$14.75

$13.86

$15.63

$16.01

Labor

$3.68

$8.79

$14.76

$13.62

$12.40

$13.46

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$1.47

$3.52

$5.91

$5.45

$4.96

$5.38

Total

$9.62

$29.34

$35.42

$32.93

$32.98

$34.85

Process Cost/U Scenario 2 Process 1 Material

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Labor

$7.00

$7.00

$7.00

$7.00

$7.00

$7.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$2.80

$2.80

$2.80

$2.80

$2.80

$2.80

$19.80

$19.80

$19.80

$19.80

$19.80

$19.80

Material

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

Labor

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$65.20

$65.20

$65.20

$65.20

$65.20

$65.20

Material

$12.00

$12.00

$12.00

$12.00

$12.00

$12.00

Labor

$25.00

$25.00

$25.00

$25.00

$25.00

$25.00

Total Process 2

Total Rework 2

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Total

$47.00

$47.00

$47.00

$47.00

$47.00

$47.00

$8.00

$8.00

$8.00

$8.00

$8.00

$8.00

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$16.00

$16.00

$16.00

$16.00

$16.00

$16.00

Total

$64.00

$64.00

$64.00

$64.00

$64.00

$64.00

Material

$20.00

$20.00

$20.00

$20.00

$20.00

$20.00

Labor

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Process 3 Material Labor Fixed Exp

Process 4

Fixed Exp

OH

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$45.20

$45.20

$45.20

$45.20

$45.20

$45.20

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

Total

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

Total

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$9.62

$29.34

$35.42

$32.93

$32.98

$34.85

Material

$4.47

$17.04

$14.75

$13.86

$15.63

$16.01

Labor

$3.68

$8.79

$14.76

$13.62

$12.40

$13.46

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$1.47

$3.52

$5.91

$5.45

$4.96

$5.38

Total

$9.62

$29.34

$35.42

$32.93

$32.98

$34.85

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Total Finished Goods A

Finished Goods B

Total

Cost/Unit Purch'd In Process 1 Process 2

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

Rework 2

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

Process 3

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

Process 4

$160.00

$160.00

$160.00

$160.00

$160.00

$160.00

Finished Goods A

$220.00

$220.00

$220.00

$220.00

$220.00

$220.00

Finished Goods B

$310.00

$310.00

$310.00

$310.00

$310.00

$310.00

Total

$135.70

$10.00

$10.00

$10.00

$10.00

$10.00

Scrap Salvage $/Unit Process 1

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

Process 2

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

Rework 2

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

Process 3

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

Process 4

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

Finished Goods A

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

Finished Goods B

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

$4.00

$14.74

$14.40

$13.70

$13.97

$14.17

Total Fixed Expense/Station Process 1

$10,000

$10,000

$10,000

$10,000

$10,000

$10,000

Process 2

$105,000

$105,000

$105,000

$105,000

$105,000

$105,000

Rework 2

$2,000

$2,000

$2,000

$2,000

$2,000

$2,000

Process 3

$9,700

$9,700

$9,700

$9,700

$9,700

$9,700

Process 4

$11,000

$11,000

$11,000

$11,000

$11,000

$11,000

Finished Goods A

$1,000

$1,000

$1,000

$1,000

$1,000

$1,000

Finished Goods B

$1,000

$1,000

$1,000

$1,000

$1,000

$1,000

$19,957

$19,957

$19,957

$19,957

$19,957

$19,957

Total Labor Overhead %

Sales Input Data

40%

40%

40%

40%

40%

40%

Units Demand Process 1

0

0

0

0

0

0

Process 2

0

0

0

0

0

0

Rework 2

0

0

0

0

0

0

Process 3

0

0

0

0

0

0

Process 4

0

0

0

0

0

0

Finished Goods A

1,000

1,200

1,400

1,600

1,800

2,000

Finished Goods B

200

250

300

350

400

450

1,200

1,450

1,700

1,950

2,200

2,450

Process 1

$60.00

$60.00

$60.00

$60.00

$60.00

$60.00

Process 2

$190.00

$190.00

$190.00

$190.00

$190.00

$190.00

Rework 2

$385.00

$385.00

$385.00

$385.00

$385.00

$385.00

Process 3

$300.00

$300.00

$300.00

$300.00

$300.00

$300.00

Process 4

$400.00

$400.00

$400.00

$400.00

$400.00

$400.00

Finished Goods A

$380.00

$380.00

$380.00

$380.00

$380.00

$380.00

Finished Goods B

$450.00

$450.00

$450.00

$450.00

$450.00

$450.00

Total

$391.67

$392.07

$392.35

$387.28

$392.73

$395.02

Total Selling Price

Finished Goods B

Total

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

100.0%

100.0%

0.0%

100.0%

100.0%

100.0%

200.0%

700.0%

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

100.0%

100.0%

0.0%

100.0%

100.0%

100.0%

200.0%

700.0%

0007

0008

0009

0010

96.0%

96.0%

96.0%

96.0%

87.0%

92.0%

94.0%

94.0%

94.0%

94.0%

94.0%

94.0%

90.0%

90.0%

90.0%

90.0%

97.0%

97.0%

97.0%

97.0%

98.5%

98.5%

98.5%

98.5%

99.0%

99.0%

99.0%

99.0%

66.8%

70.7%

72.2%

72.2%

96.0%

96.0%

96.0%

96.0%

87.0%

92.0%

94.0%

94.0%

94.0%

94.0%

94.0%

94.0%

98.0%

98.0%

98.0%

98.0%

97.0%

97.0%

97.0%

97.0%

98.5%

98.5%

98.5%

98.5%

99.0%

99.0%

99.0%

99.0%

72.8%

77.0%

78.6%

78.6%

0007

0008 5,663

5,645

0009 5,801

0010 6,102

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

5,663

5,645

5,801

6,102

2.00

2.00

2.00

3.00

2.00

2.00

2.00

3.00

1.00

1.00

1.00

1.00

2.00

2.00

2.00

2.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

2.00

2.00

2.00

3.00

11.00

11.00

11.00

14.00

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

500

500

500

500

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

6,000

6,000

6,000

6,000

3,000

3,000

3,000

3,000

3,071

3,071

3,071

3,071

$10.00

$10.00

$10.00

$10.00

$7.00

$7.00

$7.00

$7.00

$0.00

$0.00

$0.00

$0.00

$2.80

$2.80

$2.80

$2.80

$19.80

$19.80

$19.80

$19.80

$40.00

$40.00

$40.00

$40.00

$18.00

$18.00

$18.00

$18.00

$0.00

$0.00

$0.00

$0.00

$7.20

$7.20

$7.20

$7.20

$65.20

$65.20

$65.20

$65.20

$12.00

$12.00

$12.00

$12.00

$25.00

$25.00

$25.00

$25.00

$0.00

$0.00

$0.00

$0.00

$10.00

$10.00

$10.00

$10.00

$47.00

$47.00

$47.00

$47.00

$4.00

$4.00

$4.00

$4.00

$27.00

$27.00

$27.00

$27.00

$0.00

$0.00

$0.00

$0.00

$10.80

$10.80

$10.80

$10.80

$41.80

$41.80

$41.80

$41.80

$20.00

$20.00

$20.00

$20.00

$18.00

$18.00

$18.00

$18.00

$0.00

$0.00

$0.00

$0.00

$7.20

$7.20

$7.20

$7.20

$45.20

$45.20

$45.20

$45.20

$0.00

$0.00

$0.00

$0.00

$1.00

$1.00

$1.00

$1.00

$0.00

$0.00

$0.00

$0.00

$0.40

$0.40

$0.40

$0.40

$1.40

$1.40

$1.40

$1.40

$0.00

$0.00

$0.00

$0.00

$1.00

$1.00

$1.00

$1.00

$0.00

$0.00

$0.00

$0.00

$0.40

$0.40

$0.40

$0.40

$1.40

$1.40

$1.40

$1.40

$34.47

$32.73

$31.22

$30.12

$15.17

$14.14

$13.38

$12.91

$13.79

$13.28

$12.75

$12.29

$0.00

$0.00

$0.00

$0.00

$5.51

$5.31

$5.10

$4.92

$34.47

$32.73

$31.22

$30.12

$10.00

$10.00

$10.00

$10.00

$7.00

$7.00

$7.00

$7.00

$0.00

$0.00

$0.00

$0.00

$2.80

$2.80

$2.80

$2.80

$19.80

$19.80

$19.80

$19.80

$40.00

$40.00

$40.00

$40.00

$18.00

$18.00

$18.00

$18.00

$0.00

$0.00

$0.00

$0.00

$7.20

$7.20

$7.20

$7.20

$65.20

$65.20

$65.20

$65.20

$12.00

$12.00

$12.00

$12.00

$25.00

$25.00

$25.00

$25.00

$0.00

$0.00

$0.00

$0.00

$10.00

$10.00

$10.00

$10.00

$47.00

$47.00

$47.00

$47.00

$8.00

$8.00

$8.00

$8.00

$40.00

$40.00

$40.00

$40.00

$0.00

$0.00

$0.00

$0.00

$16.00

$16.00

$16.00

$16.00

$64.00

$64.00

$64.00

$64.00

$20.00

$20.00

$20.00

$20.00

$18.00

$18.00

$18.00

$18.00

$0.00

$0.00

$0.00

$0.00

$7.20

$7.20

$7.20

$7.20

$45.20

$45.20

$45.20

$45.20

$0.00

$0.00

$0.00

$0.00

$1.00

$1.00

$1.00

$1.00

$0.00

$0.00

$0.00

$0.00

$0.40

$0.40

$0.40

$0.40

$1.40

$1.40

$1.40

$1.40

$0.00

$0.00

$0.00

$0.00

$1.00

$1.00

$1.00

$1.00

$0.00

$0.00

$0.00

$0.00

$0.40

$0.40

$0.40

$0.40

$1.40

$1.40

$1.40

$1.40

$34.47

$32.73

$31.22

$30.12

$15.17

$14.14

$13.38

$12.91

$13.79

$13.28

$12.75

$12.29

$0.00

$0.00

$0.00

$0.00

$5.51

$5.31

$5.10

$4.92

$34.47

$32.73

$31.22

$30.12

$10.00

$10.00

$10.00

$10.00

$50.00

$50.00

$50.00

$50.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$160.00

$160.00

$160.00

$160.00

$220.00

$220.00

$220.00

$220.00

$310.00

$310.00

$310.00

$310.00

$10.00

$10.00

$10.00

$10.00

$4.00

$4.00

$4.00

$4.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$40.00

$40.00

$40.00

$40.00

$50.00

$50.00

$50.00

$50.00

$14.36

$14.60

$14.87

$15.08

$10,000

$10,000

$10,000

$10,000

$105,000

$105,000

$105,000

$105,000

$2,000

$2,000

$2,000

$2,000

$9,700

$9,700

$9,700

$9,700

$11,000

$11,000

$11,000

$11,000

$1,000

$1,000

$1,000

$1,000

$1,000

$1,000

$1,000

$1,000

$19,957

$19,957

$19,957

$19,957

40%

40%

40%

40%

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

2,200

2,400

2,600

2,800

500

550

600

650

2,700

2,950

3,200

3,450

$60.00

$60.00

$60.00

$60.00

$190.00

$190.00

$190.00

$190.00

$385.00

$385.00

$385.00

$385.00

$300.00

$300.00

$300.00

$300.00

$400.00

$400.00

$400.00

$400.00

$380.00

$380.00

$380.00

$380.00

$450.00

$450.00

$450.00

$450.00

$394.23

$393.05

$393.13

$393.74

Process Flow Analysis, Scenario 1 Transitions Transition Matrix Process 1

Process 2

Rework 2

Process 3

Process 4

Finished Goods A

Transition % Process 1

0.0%

100.0%

0.0%

0.0%

0.0%

0.0%

Process 2

0.0%

0.0%

5.0%

95.0%

0.0%

0.0%

Rework 2

0.0%

0.0%

0.0%

100.0%

0.0%

0.0%

Process 3

0.0%

0.0%

0.0%

0.0%

40.0%

60.0%

Process 4

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Finished Goods A

0.0%

0.0%

0.0%

0.0%

0.0%

100.0%

Finished Goods B

0.0%

0.0%

0.0%

0.0%

0.0%

0.0%

Total

0.0%

100.0%

5.0%

195.0%

40.0%

160.0%

Process Yields 0001

0002

0003

0004

0005

0006

Yield % Process 1

96.0%

96.0%

96.0%

96.0%

96.0%

96.0%

Process 2

95.0%

92.0%

92.0%

88.0%

84.0%

84.0%

Rework 2

90.0%

94.0%

94.0%

94.0%

94.0%

94.0%

Process 3

98.0%

90.0%

90.0%

90.0%

90.0%

90.0%

Process 4

97.0%

97.0%

97.0%

97.0%

97.0%

97.0%

Finished Goods A

100.0%

98.5%

98.5%

98.5%

98.5%

98.5%

Finished Goods B

100.0%

99.0%

99.0%

99.0%

99.0%

99.0%

78.0%

70.7%

70.7%

67.6%

64.5%

64.5%

4.0%

4.0%

4.0%

4.0%

4.0%

4.0%

Process 2

5.0%

8.0%

8.0%

12.0%

16.0%

16.0%

Rework 2

10.0%

6.0%

6.0%

6.0%

6.0%

6.0%

Process 3

2.0%

10.0%

10.0%

10.0%

10.0%

10.0%

Process 4

3.0%

3.0%

3.0%

3.0%

3.0%

3.0%

Finished Goods A

0.0%

1.5%

1.5%

1.5%

1.5%

1.5%

Finished Goods B

0.0%

1.0%

1.0%

1.0%

1.0%

1.0%

22.0%

29.3%

29.3%

32.4%

35.5%

35.5%

Total Scrap % Process 1

Total

Finished Goods B

Total

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

100.0%

100.0%

0.0%

100.0%

100.0%

100.0%

200.0%

700.0%

0007

0008

0009

0010

96.0%

96.0%

96.0%

96.0%

87.0%

92.0%

94.0%

94.0%

94.0%

94.0%

94.0%

94.0%

90.0%

90.0%

90.0%

90.0%

97.0%

97.0%

97.0%

97.0%

98.5%

98.5%

98.5%

98.5%

99.0%

99.0%

99.0%

99.0%

66.8%

70.7%

72.2%

72.2%

4.0%

4.0%

4.0%

4.0%

13.0%

8.0%

6.0%

6.0%

6.0%

6.0%

6.0%

6.0%

10.0%

10.0%

10.0%

10.0%

3.0%

3.0%

3.0%

3.0%

1.5%

1.5%

1.5%

1.5%

1.0%

1.0%

1.0%

1.0%

33.2%

29.3%

27.8%

27.8%

Process Flow Analysis, Scenario 1 Units Good Units In 0001

0002

0003

0004

0005

0006

0007

0008

0009

0010

Purch'd Units In Process 1

4,000

3,450

2,920

4,658

5,757

5,827

5,663

5,645

5,801

6,102

Process 2

0

0

0

0

0

0

0

0

0

0

Rework 2

0

0

0

0

0

0

0

0

0

0

Process 3

0

0

0

0

0

0

0

0

0

0

Process 4

0

0

0

0

0

0

0

0

0

0

4,000

0

0

0

0

0

0

0

0

0

Finished Goods A Finished Goods B

950

0

0

0

0

0

0

0

0

0

8,950

3,450

2,920

4,658

5,757

5,827

5,663

5,645

5,801

6,102

Process 1

4,000

3,450

2,920

4,658

5,757

5,827

5,663

5,645

5,801

6,102

Process 2

0

3,840

3,312

2,803

4,472

5,526

5,594

5,436

5,419

5,569

Rework 2

0

0

177

152

123

188

232

243

250

255

Process 3

0

0

3,356

3,061

2,486

3,685

4,587

4,841

4,980

5,075

Total Units Available In

Process 4

0

0

0

1,208

1,102

895

1,326

1,651

1,743

1,793

Finished Goods A

4,000

3,000

1,755

2,141

2,162

1,672

1,990

2,477

2,654

2,703

Finished Goods B

950

750

493

188

1,172

1,829

2,229

2,993

4,015

5,065

8,950

11,040

12,012

14,211

17,274

19,621

21,620

23,287

24,862

26,562

Process 1

4,000

3,450

2,920

4,658

5,757

5,827

5,663

5,645

5,801

6,102

Process 2

0

3,840

3,312

2,803

4,472

5,526

5,594

5,436

5,419

5,569

Rework 2

0

0

177

152

123

188

232

243

250

255

Process 3

0

0

3,356

3,061

2,486

3,685

4,587

4,841

4,980

5,075

Process 4

0

0

0

1,208

1,102

895

1,326

1,651

1,743

1,793

Finished Goods A

4,000

3,000

1,755

2,141

2,162

1,672

1,990

2,477

2,654

2,703

Finished Goods B

950

750

493

188

1,172

1,829

2,229

2,993

4,015

5,065

8,950

11,040

12,012

14,211

17,274

19,621

21,620

23,287

24,862

26,562

Process 1

3,840

3,312

2,803

4,472

5,526

5,594

5,436

5,419

5,569

5,858

Process 2

0

3,533

3,047

2,467

3,756

4,642

4,866

5,001

5,094

5,235

Rework 2

0

0

166

143

116

177

218

229

235

239

Process 3

0

0

3,021

2,755

2,238

3,316

4,128

4,357

4,482

4,567

Total Units In

Total

Good Units Out Units Out

Process 4

0

0

0

1,172

1,069

868

1,287

1,602

1,691

1,739

Finished Goods A

4,000

2,955

1,729

2,109

2,129

1,647

1,960

2,440

2,614

2,663

Finished Goods B

950

743

488

186

1,160

1,811

2,207

2,963

3,975

5,015

8,790

10,542

11,253

13,303

15,995

18,054

20,102

22,011

23,660

25,316

Process 1

160

138

117

186

230

233

227

226

232

244

Process 2

0

307

265

336

716

884

727

435

325

334

Rework 2

0

0

11

9

7

11

14

15

15

15

Process 3

0

0

336

306

249

368

459

484

498

507

Process 4

0

0

0

36

33

27

40

50

52

54

Finished Goods A

0

45

26

32

32

25

30

37

40

41

Total

Other Units Processed Units Scrap

Finished Goods B

0

8

5

2

12

18

22

30

40

51

160

498

759

908

1,279

1,567

1,518

1,276

1,202

1,246

Process 1

0

0

0

0

0

0

0

0

0

0

Process 2

0

0

0

0

0

0

0

0

0

0

Rework 2

0

0

0

0

0

0

0

0

0

0

Process 3

0

0

0

0

0

0

0

0

0

0

Process 4

0

0

0

0

0

0

0

0

0

0

Finished Goods A

0

0

0

0

0

0

0

0

0

0

Finished Goods B

0

0

0

0

0

0

0

0

0

0

Total

0

0

0

0

0

0

0

0

0

0

Process 1

0

0

0

0

0

0

0

0

0

0

Process 2

0

0

0

0

0

0

0

0

0

0

Rework 2

0

0

0

0

0

0

0

0

0

0

Process 3

0

0

0

0

0

0

0

0

0

0

Process 4

0

0

0

0

0

0

0

0

0

0

1,000

1,200

1,400

1,600

1,800

1,647

1,960

2,400

2,600

2,663

Total Units Buffer Stock

Sales and Demand Units Sold

Finished Goods A Finished Goods B

200

250

300

186

400

450

500

550

600

650

1,200

1,450

1,700

1,786

2,200

2,097

2,460

2,950

3,200

3,313

Process 1

0

0

0

0

0

0

0

0

0

0

Process 2

0

0

0

0

0

0

0

0

0

0

Rework 2

0

0

0

0

0

0

0

0

0

0

Process 3

0

0

0

0

0

0

0

0

0

0

Total Units Demand

Process 4 Finished Goods A Finished Goods B Total

0

0

0

0

0

0

0

0

0

0

1,000

1,200

1,400

1,600

1,800

2,000

2,200

2,400

2,600

2,800

200

250

300

350

400

450

500

550

600

650

1,200

1,450

1,700

1,950

2,200

2,450

2,700

2,950

3,200

3,450

Process Flow Analysis, Scenario 1 Utilization 0001

0002

0003

0004

0005

0006

0007

0008

0009

0010

Capacity Utilization % Process 1

67%

58%

49%

78%

96%

97%

94%

94%

97%

68%

Process 2

0%

64%

55%

47%

75%

92%

93%

91%

90%

62%

Rework 2

0%

0%

35%

30%

25%

38%

46%

49%

50%

51%

Process 3

0%

0%

56%

51%

41%

61%

76%

81%

83%

85%

Process 4

0%

0%

0%

40%

37%

30%

44%

55%

58%

60%

Finished Goods A

67%

50%

29%

36%

36%

28%

33%

41%

44%

45%

Finished Goods B

32%

25%

16%

6%

39%

30%

37%

50%

67%

56%

Total

29%

36%

39%

47%

57%

59%

65%

70%

74%

62%

Process 1

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

9,000

Process 2

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

9,000

Rework 2

500

500

500

500

500

500

500

500

500

500

Process 3

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

Process 4

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

Finished Goods A

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

Finished Goods B

3,000

3,000

3,000

3,000

3,000

6,000

6,000

6,000

6,000

9,000

30,500

30,500

30,500

30,500

30,500

33,500

33,500

33,500

33,500

42,500

Process 1

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

Process 2

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

Rework 2

500

500

500

500

500

500

500

500

500

500

Process 3

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

Process 4

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

Finished Goods A

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

6,000

Finished Goods B

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

3,000

Total

3,071

3,071

3,071

3,071

3,071

3,071

3,071

3,071

3,071

3,071

Process 1

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

3.00

Process 2

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

3.00

Rework 2

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Process 3

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

Process 4

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Finished Goods A

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

Units Capacity

Total Capacity/Station

Processing Stations

Finished Goods B Total

1.00

1.00

1.00

1.00

1.00

2.00

2.00

2.00

2.00

3.00

10.00

10.00

10.00

10.00

10.00

11.00

11.00

11.00

11.00

14.00

Process Flow Analysis, Scenario 1 Unit Cost Cost/Input Unit 0001

0002

0003

0004

0005

0006

0007

0008

Process 1

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Process 2

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

Rework 2

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

Process 3

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

Process 4

$160.00

$160.00

$160.00

$160.00

$160.00

$160.00

$160.00

$160.00

Finished Goods A

$220.00

$220.00

$220.00

$220.00

$220.00

$220.00

$220.00

$220.00

Finished Goods B

$310.00

$310.00

$310.00

$310.00

$310.00

$310.00

$310.00

$310.00

Total

$135.70

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Cost/Unit Purch'd In $10.00

WIP/Unit In Process 1

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Process 2

$0.00

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

Rework 2

$0.00

$0.00

$91.80

$91.80

$95.29

$99.12

$99.12

$96.22

Process 3

$0.00

$0.00

$91.80

$94.78

$98.25

$100.73

$101.25

$98.84

Process 4

$0.00

$0.00

$0.00

$146.78

$150.09

$153.95

$156.70

$157.28

Finished Goods A

$0.00

$1.40

$2.23

$124.72

$144.76

$152.73

$156.70

$157.28

Finished Goods B

$0.00

$1.40

$2.32

$3.26

$197.45

$200.65

$204.08

$207.32

Total

$0.00

$7.59

$33.06

$56.74

$61.21

$64.37

$72.91

$80.86

$0.00

$7.59

$33.06

$56.74

$61.21

$64.37

$72.91

$80.86

Process 1

$19.80

$19.80

$19.80

$19.80

$19.80

$19.80

$19.80

$19.80

Process 2

$65.20

$65.20

$65.20

$65.20

$65.20

$65.20

$65.20

$65.20

Rework 2

$47.00

$47.00

$47.00

$47.00

$47.00

$47.00

$47.00

$47.00

Process 3

$41.80

$41.80

$41.80

$41.80

$41.80

$41.80

$41.80

$41.80

Process 4

$45.20

$45.20

$45.20

$45.20

$45.20

$45.20

$45.20

$45.20

Finished Goods A

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

Finished Goods B

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

Total

$9.62

$29.34

$35.42

$32.93

$32.98

$34.85

$34.47

$32.73

$9.62

$29.34

$35.42

$32.93

$32.98

$34.85

$34.47

$32.73

Process 1

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

Process 2

$0.00

$91.80

$91.80

$95.29

$99.12

$99.12

$96.22

$91.80

Rework 2

$0.00

$0.00

$146.70

$146.70

$150.42

$154.49

$154.49

$151.40

Process 3

$0.00

$0.00

$146.78

$150.09

$153.95

$156.70

$157.28

$154.60

Process 4

$0.00

$0.00

$0.00

$197.45

$200.87

$204.84

$207.68

$208.27

Finished Goods A

$1.40

$2.23

$3.08

$127.43

$147.77

$155.87

$159.90

$160.48

Finished Goods B

$1.40

$2.32

$3.26

$4.20

$200.36

$203.59

$207.05

$210.32

Total

$9.73

$37.98

$72.13

$94.86

$100.60

$106.61

$114.41

$119.33

$9.73

$37.98

$72.13

$94.86

$100.60

$106.61

$114.41

$119.33

Process 1

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Process 2

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Rework 2

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Processing Cost/Unit Process Cost/Unit

Cost/Output Unit WIP/Unit Out

COGS/Unit

Process 3

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Process 4

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Finished Goods A

$1.40

$2.23

$3.08

$127.43

$147.77

$155.87

$159.90

$160.48

Finished Goods B

$1.40

$2.32

$3.26

$4.20

$200.36

$203.59

$207.05

$210.32

Total

$1.40

$2.25

$3.11

$114.62

$157.33

$166.11

$169.48

$169.78

$1.40

$2.25

$3.11

$114.62

$157.33

$166.11

$169.48

$169.78

Scrap Process 1 Scrap Cost/Unit

$118.80

$165.83

$165.83

$185.63

$205.43

$205.43

$190.58

$165.83

Scrap Salvage $/Unit

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

Scrap Net Cost/Unit

$115

$162

$162

$182

$201

$201

$187

$162

Process 2 Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$358.69

$358.69

$267.68

$222.18

$222.18

$253.68

$358.69

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

($15)

$344

$344

$253

$207

$207

$239

$344

$0.00

$0.00

$774.98

$867.52

$984.20

$1,010.64

$937.58

$799.63

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

($15)

($15)

$760

$853

$969

$996

$923

$785

Rework 2 Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit Process 3 Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$0.00

$447.57

$512.18

$581.23

$591.50

$550.74

$471.15

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

($15)

($15)

$433

$497

$566

$577

$536

$456

Process 4 Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$0.00

$0.00

$2,399.76

$2,701.51

$2,754.90

$2,591.07

$2,260.98

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

($15)

($15)

($15)

$2,385

$2,687

$2,740

$2,576

$2,246

Finished Goods A Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$62.53

$81.15

$3,153.01

$4,043.65

$4,264.35

$4,057.93

$3,543.77

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

($40)

$23

$41

$3,113

$4,004

$4,224

$4,018

$3,504

Finished Goods B Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$93.80

$124.73

$174.59

$8,252.45

$8,385.27

$7,910.95

$6,992.17

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

($50)

$44

$75

$125

$8,202

$8,335

$7,861

$6,942

$129.20

$274.45

$362.98

$526.23

$527.91

$515.53

$588.76

$694.46

$4.00

$14.74

$14.40

$13.70

$13.97

$14.17

$14.36

$14.60

($5)

$75

$257

$1,058

$2,405

$2,469

$2,334

$2,063

Total Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

0009 $10.00

0010 $10.00

$50.00

$50.00

$150.00

$150.00

$150.00

$150.00

$160.00

$160.00

$220.00

$220.00

$310.00

$310.00

$10.00

$10.00

$0.00

$0.00

$20.46

$20.46

$91.80

$90.17

$94.54

$92.79

$154.60

$149.82

$154.69

$149.86

$209.51

$210.19

$85.50

$88.33

$85.50

$88.33

$19.80

$19.80

$65.20

$65.20

$47.00

$47.00

$41.80

$41.80

$45.20

$45.20

$1.40

$1.40

$1.40

$1.40

$31.22

$30.12

$31.22

$30.12

$20.46

$20.46

$90.17

$90.17

$146.70

$144.97

$149.82

$147.87

$205.52

$200.59

$157.86

$152.96

$212.53

$213.22

$121.90

$123.53

$121.90

$123.53

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$157.86

$152.96

$212.53

$213.22

$168.11

$164.78

$168.11

$164.78

$155.93

$155.93

$4.00

$4.00

$152

$152

$449.71

$449.71

$15.00

$15.00

$435

$435

$728.71

$720.13

$15.00

$15.00

$714

$705

$429.47

$423.95

$15.00

$15.00

$414

$409

$2,097.93

$2,047.73

$15.00

$15.00

$2,083

$2,033

$3,277.90

$3,176.54

$40.00

$40.00

$3,238

$3,137

$6,643.56

$6,665.13

$50.00

$50.00

$6,594

$6,615

$760.23

$795.39

$14.87

$15.08

$1,947

$1,926

Process Flow Analysis, Scenario 1 Cost Flow Cost of Input Units 0001

0002

0003

0004

0005

0006

0007

Cost Purch'd Units In Process 1

$40,000

$34,500

$29,197

$46,583

$57,566

$58,266

$56,626

Process 2

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$880,000

$0

$0

$0

$0

$0

$0

Finished Goods A Finished Goods B Total

$294,500

$0

$0

$0

$0

$0

$0

$1,214,500

$34,500

$29,197

$46,583

$57,566

$58,266

$56,626

WIP Available In Process 1

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$78,560

$67,758

$57,343

$91,490

$113,059

$114,434

Rework 2

$0

$0

$16,216

$13,986

$11,752

$18,617

$23,006

Process 3

$0

$0

$308,104

$290,099

$244,305

$371,153

$464,381

Process 4

$0

$0

$0

$177,343

$165,378

$137,803

$207,857

Finished Goods A

$0

$4,200

$3,920

$267,027

$312,916

$255,360

$311,785

Finished Goods B

$0

$1,050

$1,144

$611

$231,411

$367,009

$454,900

Total

$0

$83,810

$397,142

$806,408

$1,057,252

$1,263,002

$1,576,363

$0

$83,810

$397,142

$806,408

$1,057,252

$1,263,002

$1,576,363

WIP In Process 1

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$78,560

$67,758

$57,343

$91,490

$113,059

$114,434

Rework 2

$0

$0

$16,216

$13,986

$11,752

$18,617

$23,006

Process 3

$0

$0

$308,104

$290,099

$244,305

$371,153

$464,381

Process 4

$0

$0

$0

$177,343

$165,378

$137,803

$207,857

Finished Goods A

$0

$4,200

$3,920

$267,027

$312,916

$255,360

$311,785

Finished Goods B

$0

$1,050

$1,144

$611

$231,411

$367,009

$454,900

Total

$0

$83,810

$397,142

$806,408

$1,057,252

$1,263,002

$1,576,363

$0

$83,810

$397,142

$806,408

$1,057,252

$1,263,002

$1,576,363

Processing Costs Process Cost Process 1

$79,200

$68,310

$57,810

$92,235

$113,980

$115,366

$112,120

Process 2

$0

$250,368

$215,942

$182,750

$291,575

$360,316

$364,698

Rework 2

$0

$0

$8,302

$7,161

$5,796

$8,828

$10,909

Process 3

$0

$0

$140,287

$127,938

$103,933

$154,016

$191,718

Process 4

$0

$0

$0

$54,611

$49,804

$40,459

$59,956

Finished Goods A

$5,600

$4,200

$2,457

$2,997

$3,026

$2,341

$2,786

Finished Goods B

$1,330

$1,050

$690

$263

$1,641

$2,561

$3,121

$86,130

$323,928

$425,489

$467,956

$569,756

$683,887

$745,307

$86,130

$323,928

$425,489

$467,956

$569,756

$683,887

$745,307

Process 1

$78,560

$67,758

$57,343

$91,490

$113,059

$114,434

$111,214

Process 2

$0

$324,320

$279,726

$235,048

$372,332

$460,112

$468,225

Rework 2

$0

$0

$24,359

$21,010

$17,438

$27,275

$33,706

Total

Cost of Output Units WIP Out

Process 3 Process 4

$0

$0

$443,357

$413,446

$344,509

$519,642

$649,219

$0

$0

$0

$231,411

$214,687

$177,860

$267,216

Finished Goods A

$5,600

$6,600

$5,324

$268,739

$314,645

$256,698

$313,377

Finished Goods B

$1,330

$1,725

$1,587

$780

$232,465

$368,655

$456,906

$85,490

$400,403

$811,696

$1,261,923

$1,609,135

$1,924,676

$2,299,862

$85,490

$400,403

$811,696

$1,261,923

$1,609,135

$1,924,676

$2,299,862

Process 1

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

Total

Cost of Goods

Process 4 Finished Goods A Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$1,400

$2,680

$4,312

$203,891

$265,991

$256,698

$313,377

$280

$581

$977

$780

$80,143

$91,616

$103,525

$1,680

$3,261

$5,288

$204,671

$346,134

$348,313

$416,902

$1,680

$3,261

$5,288

$204,671

$346,134

$348,313

$416,902

$19,008

$22,884

$19,366

$34,588

$47,302

$47,877

$43,166

$640

$552

$467

$745

$921

$932

$906

$18,368

$22,332

$18,899

$33,843

$46,381

$46,945

$42,260

Scrap Cost

$0

$110,191

$95,040

$90,035

$158,972

$196,450

$184,466

Scrap Salvage Value

$0

$4,608

$3,974

$5,045

$10,733

$13,263

$10,907

Scrap Net Cost

$0

$105,583

$91,065

$84,990

$148,239

$183,187

$173,559

Scrap Cost

$0

$0

$8,214

$7,930

$7,283

$11,389

$13,057

Scrap Salvage Value

$0

$0

$159

$137

$111

$169

$209

Scrap Net Cost

$0

$0

$8,055

$7,793

$7,172

$11,220

$12,848

Scrap Cost

$0

$0

$150,211

$156,764

$144,519

$217,945

$252,598

Scrap Salvage Value

$0

$0

$5,034

$4,591

$3,730

$5,527

$6,880

Scrap Net Cost

$0

$0

$145,177

$152,173

$140,789

$212,418

$245,718

Scrap Cost

$0

$0

$0

$86,983

$89,301

$73,979

$103,108

Scrap Salvage Value

$0

$0

$0

$544

$496

$403

$597

Scrap Net Cost

$0

$0

$0

$86,439

$88,805

$73,576

$102,511

$1,344

$2,814

$2,136

$101,259

$131,116

$106,946

$121,110

Total

Scrap Process 1 Scrap Cost Scrap Salvage Value Scrap Net Cost Process 2

Rework 2

Process 3

Process 4

Finished Goods A Scrap Cost Scrap Salvage Value Scrap Net Cost

$0

$1,800

$1,053

$1,285

$1,297

$1,003

$1,194

$1,344

$1,014

$1,083

$99,974

$129,819

$105,943

$119,916

$319

$704

$614

$327

$96,716

$153,371

$176,338

$0

$375

$246

$94

$586

$915

$1,115

$319

$329

$368

$234

$96,130

$152,457

$175,223

$20,671

$136,592

$275,581

$477,886

$675,209

$807,959

$893,843

$640

$7,335

$10,934

$12,441

$17,873

$22,212

$21,807

$20,031

$129,257

$264,647

$465,446

$657,335

$785,747

$872,035

Finished Goods B Scrap Cost Scrap Salvage Value Scrap Net Cost Total Scrap Cost Scrap Salvage Value Scrap Net Cost

0008

0009

0010

$56,453

$58,011

$61,019

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$56,453

$58,011

$61,019

$0

$0

$0

$111,214

$110,874

$113,934

$23,411

$22,956

$22,967

$478,519

$470,798

$470,864

$259,688

$269,448

$268,595

$389,532

$410,525

$405,109

$620,596

$841,189

$1,064,724

$1,882,960

$2,125,791

$2,346,194

$1,882,960

$2,125,791

$2,346,194

$0

$0

$0

$111,214

$110,874

$113,934

$23,411

$22,956

$22,967

$478,519

$470,798

$470,864

$259,688

$269,448

$268,595

$389,532

$410,525

$405,109

$620,596

$841,189

$1,064,724

$1,882,960

$2,125,791

$2,346,194

$1,882,960

$2,125,791

$2,346,194

$111,777

$114,862

$120,818

$354,435

$353,351

$363,103

$11,436

$11,753

$11,972

$202,363

$208,159

$212,121

$74,632

$78,776

$81,033

$3,467

$3,715

$3,784

$4,191

$5,621

$7,092

$762,302

$776,239

$799,923

$762,302

$776,239

$799,923

$110,874

$113,934

$119,842

$459,126

$459,348

$472,024

$34,628

$34,484

$34,710

$673,621

$671,488

$675,374

$333,577

$347,440

$348,821

$391,513

$412,649

$407,272

$623,291

$844,803

$1,069,283

$2,626,629

$2,884,145

$3,127,325

$2,626,629

$2,884,145

$3,127,325

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$385,160

$410,432

$407,272

$115,679

$127,519

$138,595

$500,838

$537,951

$545,867

$500,838

$537,951

$545,867

$37,445

$36,181

$38,058

$903

$928

$976

$36,542

$35,253

$37,081

$155,993

$146,231

$150,266

$6,523

$4,878

$5,012

$149,469

$141,353

$145,254

$11,674

$10,933

$11,006

$219

$225

$229

$11,455

$10,708

$10,777

$228,096

$213,872

$215,140

$7,262

$7,470

$7,612

$220,834

$206,402

$207,528

$111,997

$109,691

$110,133

$743

$784

$807

$111,254

$108,907

$109,326

$131,655

$130,486

$128,802

$1,486

$1,592

$1,622

$130,169

$128,894

$127,180

$209,304

$266,745

$337,622

$1,497

$2,008

$2,533

$207,807

$264,738

$335,089

$886,163

$914,139

$991,027

$18,633

$17,885

$18,791

$867,530

$896,255

$972,236

Process Flow Analysis, Scenario 1 Unit Cost Detail Cost/Input Unit 0001

0002

0003

0004

0005

0006

0007

0008

Process 1

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Process 2

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

Rework 2

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

Process 3

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

$150.00

Process 4

$160.00

$160.00

$160.00

$160.00

$160.00

$160.00

$160.00

$160.00

Finished Goods A

$220.00

$220.00

$220.00

$220.00

$220.00

$220.00

$220.00

$220.00

Finished Goods B

$310.00

$310.00

$310.00

$310.00

$310.00

$310.00

$310.00

$310.00

Total

$135.70

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$10.33

$10.33

$10.33

$10.33

$10.33

$10.33

$10.33

Labor

$0.00

$7.23

$7.23

$7.23

$7.23

$7.23

$7.23

$7.23

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$2.89

$2.89

$2.89

$2.89

$2.89

$2.89

$2.89

Total

$0.00

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

Material

$0.00

$0.00

$53.94

$53.94

$55.99

$58.24

$58.24

$56.54

Labor

$0.00

$0.00

$27.04

$27.04

$28.07

$29.20

$29.20

$28.34

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$10.82

$10.82

$11.23

$11.68

$11.68

$11.34

Total

$0.00

$0.00

$91.80

$91.80

$95.29

$99.12

$99.12

$96.22

Material

$0.00

$0.00

$53.94

$54.80

$56.78

$58.67

$58.86

$57.34

Labor

$0.00

$0.00

$27.04

$28.56

$29.62

$30.04

$30.28

$29.65

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$10.82

$11.42

$11.85

$12.02

$12.11

$11.86

Total

$0.00

$0.00

$91.80

$94.78

$98.25

$100.73

$101.25

$98.84

Material

$0.00

$0.00

$0.00

$63.66

$64.61

$66.81

$68.90

$69.11

Labor

$0.00

$0.00

$0.00

$59.37

$61.05

$62.24

$62.71

$62.98

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$23.75

$24.42

$24.90

$25.09

$25.19

Total

$0.00

$0.00

$0.00

$146.78

$150.09

$153.95

$156.70

$157.28

Material

$0.00

$0.00

$0.00

$53.89

$62.22

$66.04

$68.90

$69.11

Labor

$0.00

$1.00

$1.60

$50.60

$58.95

$61.92

$62.71

$62.98

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.40

$0.64

$20.24

$23.58

$24.77

$25.09

$25.19

Total

$0.00

$1.40

$2.23

$124.72

$144.76

$152.73

$156.70

$157.28

$0.00

$0.00

$0.00

$0.00

$86.04

$86.89

$88.23

$90.00

Cost/Unit Purch'd In $10.00

WIP/Unit In Process 1

Process 2

Rework 2

Process 3

Process 4

Finished Goods A

Finished Goods B Material

Labor

$0.00

$1.00

$1.66

$2.33

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.40

$0.66

$0.93

$31.83

$32.50

$33.10

$33.52

Total

$0.00

$1.40

$2.32

$3.26

$197.45

$200.65

$204.08

$207.32

$0.00

$7.59

$33.06

$56.74

$61.21

$64.37

$72.91

$80.86

Material

$0.00

$3.59

$18.71

$27.95

$28.99

$31.26

$35.45

$38.74

Labor

$0.00

$2.86

$10.25

$20.57

$23.01

$23.65

$26.76

$30.08

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$1.14

$4.10

$8.23

$9.20

$9.46

$10.70

$12.03

Total

$0.00

$7.59

$33.06

$56.74

$61.21

$64.37

$72.91

$80.86

Total

$79.58

$81.26

$82.75

$83.80

Processing Cost/Unit Process Cost/Unit Process 1 Material

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Labor

$7.00

$7.00

$7.00

$7.00

$7.00

$7.00

$7.00

$7.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$2.80

$2.80

$2.80

$2.80

$2.80

$2.80

$2.80

$2.80

$19.80

$19.80

$19.80

$19.80

$19.80

$19.80

$19.80

$19.80

Material

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

Labor

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total Process 2

Fixed Exp OH

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$65.20

$65.20

$65.20

$65.20

$65.20

$65.20

$65.20

$65.20

Material

$12.00

$12.00

$12.00

$12.00

$12.00

$12.00

$12.00

$12.00

Labor

$25.00

$25.00

$25.00

$25.00

$25.00

$25.00

$25.00

$25.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

$10.00

Total

$47.00

$47.00

$47.00

$47.00

$47.00

$47.00

$47.00

$47.00

Total Rework 2

Fixed Exp

Process 3 Material

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

$27.00

$27.00

$27.00

$27.00

$27.00

$27.00

$27.00

$27.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$10.80

$10.80

$10.80

$10.80

$10.80

$10.80

$10.80

$10.80

Total

$41.80

$41.80

$41.80

$41.80

$41.80

$41.80

$41.80

$41.80

Material

$20.00

$20.00

$20.00

$20.00

$20.00

$20.00

$20.00

$20.00

Labor

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

$18.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor Fixed Exp

Process 4

Fixed Exp OH

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$7.20

$45.20

$45.20

$45.20

$45.20

$45.20

$45.20

$45.20

$45.20

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

Total

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

$1.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

$0.40

Total Finished Goods A

Finished Goods B

Total Total

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$1.40

$9.62

$29.34

$35.42

$32.93

$32.98

$34.85

$34.47

$32.73

Material

$4.47

$17.04

$14.75

$13.86

$15.63

$16.01

$15.17

$14.14

Labor

$3.68

$8.79

$14.76

$13.62

$12.40

$13.46

$13.79

$13.28

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$1.47

$3.52

$5.91

$5.45

$4.96

$5.38

$5.51

$5.31

Total

$9.62

$29.34

$35.42

$32.93

$32.98

$34.85

$34.47

$32.73

$10.33

$10.33

$10.33

$10.33

$10.33

$10.33

$10.33

$10.33

Labor

$7.23

$7.23

$7.23

$7.23

$7.23

$7.23

$7.23

$7.23

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$2.89

$2.89

$2.89

$2.89

$2.89

$2.89

$2.89

$2.89

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

$20.46

Material

$0.00

$53.94

$53.94

$55.99

$58.24

$58.24

$56.54

$53.94

Labor

$0.00

$27.04

$27.04

$28.07

$29.20

$29.20

$28.34

$27.04

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$10.82

$10.82

$11.23

$11.68

$11.68

$11.34

$10.82

Total

$0.00

$91.80

$91.80

$95.29

$99.12

$99.12

$96.22

$91.80

Material

$0.00

$0.00

$69.70

$69.70

$71.88

$74.26

$74.26

$72.45

Labor

$0.00

$0.00

$55.01

$55.01

$56.10

$57.30

$57.30

$56.39

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$22.00

$22.00

$22.44

$22.92

$22.92

$22.56

Total

$0.00

$0.00

$146.70

$146.70

$150.42

$154.49

$154.49

$151.40

Material

$0.00

$0.00

$63.66

$64.61

$66.81

$68.90

$69.11

$67.42

Labor

$0.00

$0.00

$59.37

$61.05

$62.24

$62.71

$62.98

$62.27

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$23.75

$24.42

$24.90

$25.09

$25.19

$24.91

Total

$0.00

$0.00

$146.78

$150.09

$153.95

$156.70

$157.28

$154.60

Material

$0.00

$0.00

$0.00

$86.04

$87.03

$89.30

$91.45

$91.66

Labor

$0.00

$0.00

$0.00

$79.58

$81.31

$82.53

$83.03

$83.30

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$31.83

$32.52

$33.01

$33.21

$33.32

Total

$0.00

$0.00

$0.00

$197.45

$200.87

$204.84

$207.68

$208.27

Material

$0.00

$0.00

$0.00

$54.45

$62.91

$66.79

$69.68

$69.90

Labor

$1.00

$1.60

$2.20

$52.13

$60.62

$63.63

$64.44

$64.70

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.64

$0.88

$20.85

$24.25

$25.45

$25.78

$25.88

Total

$1.40

$2.23

$3.08

$127.43

$147.77

$155.87

$159.90

$160.48

Material

$0.00

$0.00

$0.00

$0.00

$86.69

$87.55

$88.90

$90.69

Labor

$1.00

$1.66

$2.33

$3.00

$81.19

$82.89

$84.39

$85.45

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.66

$0.93

$1.20

$32.48

$33.15

$33.76

$34.18

Total

$1.40

$2.32

$3.26

$4.20

$200.36

$203.59

$207.05

$210.32

$9.73

$37.98

$72.13

$94.86

$100.60

$106.61

$114.41

$119.33

$4.51

$21.32

$35.30

$44.20

$47.60

$50.73

$53.89

$55.53

Cost/Output Unit WIP/Unit Out Process 1 Material

Total Process 2

Rework 2

Process 3

Process 4

Finished Goods A

Finished Goods B

Total Material

Labor

$3.72

$11.90

$26.31

$36.19

$37.86

$39.91

$43.23

$45.58

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$1.49

$4.76

$10.52

$14.48

$15.15

$15.97

$17.29

$18.23

Total

$9.73

$37.98

$72.13

$94.86

$100.60

$106.61

$114.41

$119.33

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Labor

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Material

$0.00

$0.00

$0.00

$54.45

$62.91

$66.79

$69.68

$69.90

Labor

$1.00

$1.60

$2.20

$52.13

$60.62

$63.63

$64.44

$64.70

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.64

$0.88

$20.85

$24.25

$25.45

$25.78

$25.88

Total

$1.40

$2.23

$3.08

$127.43

$147.77

$155.87

$159.90

$160.48

Material

$0.00

$0.00

$0.00

$0.00

$86.69

$87.55

$88.90

$90.69

Labor

$1.00

$1.66

$2.33

$3.00

$81.19

$82.89

$84.39

$85.45

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.66

$0.93

$1.20

$32.48

$33.15

$33.76

$34.18

Total

$1.40

$2.32

$3.26

$4.20

$200.36

$203.59

$207.05

$210.32

COGS/Unit Process 1

Process 2

Rework 2

Process 3

Process 4

Finished Goods A

Finished Goods B

Total

$1.40

$2.25

$3.11

$114.62

$157.33

$166.11

$169.48

$169.78

Material

$0.00

$0.00

$0.00

$48.78

$67.23

$71.24

$73.59

$73.77

Labor

$1.00

$1.61

$2.22

$47.02

$64.36

$67.76

$68.49

$68.57

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.40

$0.64

$0.89

$18.81

$25.74

$27.10

$27.40

$27.43

Total

$1.40

$2.25

$3.11

$114.62

$157.33

$166.11

$169.48

$169.78

Scrap Process 1 Scrap Cost/Unit

$118.80

$165.83

$165.83

$185.63

$205.43

$205.43

$190.58

$165.83

Scrap Salvage $/Unit

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

$4.00

Scrap Net Cost/Unit

$115

$162

$162

$182

$201

$201

$187

$162

Process 2 Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$358.69

$358.69

$267.68

$222.18

$222.18

$253.68

$358.69

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

($15)

$344

$344

$253

$207

$207

$239

$344

$0.00

$0.00

$774.98

$867.52

$984.20

$1,010.64

$937.58

$799.63

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

($15)

($15)

$760

$853

$969

$996

$923

$785

Rework 2 Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit Process 3 Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$0.00

$447.57

$512.18

$581.23

$591.50

$550.74

$471.15

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

($15)

($15)

$433

$497

$566

$577

$536

$456

Process 4 Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$0.00

$0.00

$2,399.76

$2,701.51

$2,754.90

$2,591.07

$2,260.98

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

$15.00

($15)

($15)

($15)

$2,385

$2,687

$2,740

$2,576

$2,246

Finished Goods A Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$62.53

$81.15

$3,153.01

$4,043.65

$4,264.35

$4,057.93

$3,543.77

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

$40.00

($40)

$23

$41

$3,113

$4,004

$4,224

$4,018

$3,504

Finished Goods B Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

$0.00

$93.80

$124.73

$174.59

$8,252.45

$8,385.27

$7,910.95

$6,992.17

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

$50.00

($50)

$44

$75

$125

$8,202

$8,335

$7,861

$6,942

$129.20

$274.45

$362.98

$526.23

$527.91

$515.53

$588.76

$694.46

$4.00

$14.74

$14.40

$13.70

$13.97

$14.17

$14.36

$14.60

($5)

$75

$257

$1,058

$2,405

$2,469

$2,334

$2,063

Total Scrap Cost/Unit Scrap Salvage $/Unit Scrap Net Cost/Unit

0009 $10.00

0010 $10.00

$50.00

$50.00

$150.00

$150.00

$150.00

$150.00

$160.00

$160.00

$220.00

$220.00

$310.00

$310.00

$10.00

$10.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$10.33

$10.33

$7.23

$7.23

$0.00

$0.00

$2.89

$2.89

$20.46

$20.46

$53.94

$52.98

$27.04

$26.56

$0.00

$0.00

$10.82

$10.62

$91.80

$90.17

$54.79

$53.76

$28.39

$27.88

$0.00

$0.00

$11.36

$11.15

$94.54

$92.79

$67.42

$64.61

$62.27

$60.87

$0.00

$0.00

$24.91

$24.35

$154.60

$149.82

$67.46

$64.63

$62.31

$60.88

$0.00

$0.00

$24.92

$24.35

$154.69

$149.86

$91.08

$91.16

$84.59

$85.02

$0.00

$0.00

$33.84

$34.01

$209.51

$210.19

$85.50

$88.33

$40.41

$41.27

$32.21

$33.62

$0.00

$0.00

$12.88

$13.45

$85.50

$88.33

$10.00

$10.00

$7.00

$7.00

$0.00

$0.00

$2.80

$2.80

$19.80

$19.80

$40.00

$40.00

$18.00

$18.00

$0.00

$0.00

$7.20

$7.20

$65.20

$65.20

$12.00

$12.00

$25.00

$25.00

$0.00

$0.00

$10.00

$10.00

$47.00

$47.00

$4.00

$4.00

$27.00

$27.00

$0.00

$0.00

$10.80

$10.80

$41.80

$41.80

$20.00

$20.00

$18.00

$18.00

$0.00

$0.00

$7.20

$7.20

$45.20

$45.20

$0.00

$0.00

$1.00

$1.00

$0.00

$0.00

$0.40

$0.40

$1.40

$1.40

$0.00

$0.00

$1.00

$1.00

$0.00

$0.00

$0.40

$0.40

$1.40

$1.40

$31.22

$30.12

$13.38

$12.91

$12.75

$12.29

$0.00

$0.00

$5.10

$4.92

$31.22

$30.12

$10.33

$10.33

$7.23

$7.23

$0.00

$0.00

$2.89

$2.89

$20.46

$20.46

$52.98

$52.98

$26.56

$26.56

$0.00

$0.00

$10.62

$10.62

$90.17

$90.17

$69.70

$68.68

$55.01

$54.49

$0.00

$0.00

$22.00

$21.80

$146.70

$144.97

$64.61

$63.46

$60.87

$60.30

$0.00

$0.00

$24.35

$24.12

$149.82

$147.87

$89.92

$87.02

$82.57

$81.12

$0.00

$0.00

$33.03

$32.45

$205.52

$200.59

$68.22

$65.35

$64.02

$62.58

$0.00

$0.00

$25.61

$25.03

$157.86

$152.96

$91.78

$91.86

$86.25

$86.69

$0.00

$0.00

$34.50

$34.67

$212.53

$213.22

$121.90

$123.53

$56.15

$56.49

$46.96

$47.89

$0.00

$0.00

$18.78

$19.15

$121.90

$123.53

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$68.22

$65.35

$64.02

$62.58

$0.00

$0.00

$25.61

$25.03

$157.86

$152.96

$91.78

$91.86

$86.25

$86.69

$0.00

$0.00

$34.50

$34.67

$212.53

$213.22

$168.11

$164.78

$72.64

$70.55

$68.19

$67.31

$0.00

$0.00

$27.28

$26.92

$168.11

$164.78

$155.93

$155.93

$4.00

$4.00

$152

$152

$449.71

$449.71

$15.00

$15.00

$435

$435

$728.71

$720.13

$15.00

$15.00

$714

$705

$429.47

$423.95

$15.00

$15.00

$414

$409

$2,097.93

$2,047.73

$15.00

$15.00

$2,083

$2,033

$3,277.90

$3,176.54

$40.00

$40.00

$3,238

$3,137

$6,643.56

$6,665.13

$50.00

$50.00

$6,594

$6,615

$760.23

$795.39

$14.87

$15.08

$1,947

$1,926

Process Flow Analysis, Scenario 1 Cost Flow Detail Cost of Input Units 0001

0002

0003

0004

0005

0006

0007

Cost Purch'd Units In Process 1

$40,000

$34,500

$29,197

$46,583

$57,566

$58,266

$56,626

Process 2

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$880,000

$0

$0

$0

$0

$0

$0

Finished Goods A Finished Goods B

$294,500

$0

$0

$0

$0

$0

$0

$1,214,500

$34,500

$29,197

$46,583

$57,566

$58,266

$56,626

Material

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

Material

$0

$39,677

$34,221

$28,961

$46,207

$57,101

$57,795

Labor

$0

$27,774

$23,955

$20,273

$32,345

$39,970

$40,457

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$11,109

$9,582

$8,109

$12,938

$15,988

$16,183

Total

$0

$78,560

$67,758

$57,343

$91,490

$113,059

$114,434

Material

$0

$0

$9,528

$8,218

$6,906

$10,939

$13,518

Labor

$0

$0

$4,777

$4,120

$3,462

$5,484

$6,777

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$1,911

$1,648

$1,385

$2,194

$2,711

Total

$0

$0

$16,216

$13,986

$11,752

$18,617

$23,006

Material

$0

$0

$181,041

$167,720

$141,189

$216,174

$269,953

Labor

$0

$0

$90,760

$87,413

$73,654

$110,699

$138,877

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$36,304

$34,965

$29,462

$44,280

$55,551

Total

$0

$0

$308,104

$290,099

$244,305

$371,153

$464,381

Material

$0

$0

$0

$76,913

$71,195

$59,806

$91,393

Labor

$0

$0

$0

$71,736

$67,274

$55,712

$83,188

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$28,694

$26,910

$22,285

$33,275

Total

$0

$0

$0

$177,343

$165,378

$137,803

$207,857

Total WIP Available In Process 1

Process 2

Rework 2

Process 3

Process 4

Finished Goods A Material

$0

$0

$0

$115,369

$134,499

$110,422

$137,090

Labor

$0

$3,000

$2,800

$108,327

$127,441

$103,527

$124,783

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$1,200

$1,120

$43,331

$50,976

$41,411

$49,913

Total

$0

$4,200

$3,920

$267,027

$312,916

$255,360

$311,785

$0

$0

$0

$0

$100,840

$158,926

$196,669

Finished Goods B Material

Labor

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$300

$327

$174

$37,306

$59,452

$73,780

Total

$0

$1,050

$1,144

$611

$231,411

$367,009

$454,900

$0

$83,810

$397,142

$806,408

$1,057,252

$1,263,002

$1,576,363

Material

$0

$39,677

$224,790

$397,182

$500,835

$613,369

$766,417

Labor

$0

$31,524

$123,108

$292,305

$397,441

$464,024

$578,532

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$12,609

$49,243

$116,922

$158,976

$185,609

$231,413

Total

$0

$83,810

$397,142

$806,408

$1,057,252

$1,263,002

$1,576,363

Material

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

Material

$0

$39,677

$34,221

$28,961

$46,207

$57,101

$57,795

Labor

$0

$27,774

$23,955

$20,273

$32,345

$39,970

$40,457

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$11,109

$9,582

$8,109

$12,938

$15,988

$16,183

Total

$0

$78,560

$67,758

$57,343

$91,490

$113,059

$114,434

Material

$0

$0

$9,528

$8,218

$6,906

$10,939

$13,518

Labor

$0

$0

$4,777

$4,120

$3,462

$5,484

$6,777

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$1,911

$1,648

$1,385

$2,194

$2,711

Total

$0

$0

$16,216

$13,986

$11,752

$18,617

$23,006

Material

$0

$0

$181,041

$167,720

$141,189

$216,174

$269,953

Labor

$0

$0

$90,760

$87,413

$73,654

$110,699

$138,877

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$36,304

$34,965

$29,462

$44,280

$55,551

Total

$0

$0

$308,104

$290,099

$244,305

$371,153

$464,381

Material

$0

$0

$0

$76,913

$71,195

$59,806

$91,393

Labor

$0

$0

$0

$71,736

$67,274

$55,712

$83,188

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$28,694

$26,910

$22,285

$33,275

Total

$0

$0

$0

$177,343

$165,378

$137,803

$207,857

Total

$750

$817

$436

$93,265

$148,631

$184,451

WIP In Process 1

Process 2

Rework 2

Process 3

Process 4

Finished Goods A Material

$0

$0

$0

$115,369

$134,499

$110,422

$137,090

Labor

$0

$3,000

$2,800

$108,327

$127,441

$103,527

$124,783

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$1,200

$1,120

$43,331

$50,976

$41,411

$49,913

Total

$0

$4,200

$3,920

$267,027

$312,916

$255,360

$311,785

Finished Goods B Material

$0

$0

$0

$0

$100,840

$158,926

$196,669

Labor

$0

$750

$817

$436

$93,265

$148,631

$184,451

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$300

$327

$174

$37,306

$59,452

$73,780

Total

$0

$1,050

$1,144

$611

$231,411

$367,009

$454,900

Total

$0

$83,810

$397,142

$806,408

$1,057,252

$1,263,002

$1,576,363

Material

$0

$39,677

$224,790

$397,182

$500,835

$613,369

$766,417

Labor

$0

$31,524

$123,108

$292,305

$397,441

$464,024

$578,532

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$12,609

$49,243

$116,922

$158,976

$185,609

$231,413

Total

$0

$83,810

$397,142

$806,408

$1,057,252

$1,263,002

$1,576,363

Material

$40,000

$34,500

$29,197

$46,583

$57,566

$58,266

$56,626

Labor

$28,000

$24,150

$20,438

$32,608

$40,296

$40,786

$39,638

Processing Costs Process Cost Process 1

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$11,200

$9,660

$8,175

$13,043

$16,118

$16,314

$15,855

Total

$79,200

$68,310

$57,810

$92,235

$113,980

$115,366

$112,120

Material

$0

$153,600

$132,480

$112,116

$178,880

$221,052

$223,741

Labor

$0

$69,120

$59,616

$50,452

$80,496

$99,474

$100,683

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$27,648

$23,846

$20,181

$32,198

$39,789

$40,273

Total

$0

$250,368

$215,942

$182,750

$291,575

$360,316

$364,698

Material

$0

$0

$2,120

$1,828

$1,480

$2,254

$2,785

Labor

$0

$0

$4,416

$3,809

$3,083

$4,696

$5,803

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$1,766

$1,524

$1,233

$1,878

$2,321

Total

$0

$0

$8,302

$7,161

$5,796

$8,828

$10,909

Material

$0

$0

$13,425

$12,243

$9,946

$14,738

$18,346

Labor

$0

$0

$90,616

$82,640

$67,134

$99,484

$123,837

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$36,247

$33,056

$26,854

$39,794

$49,535

Total

$0

$0

$140,287

$127,938

$103,933

$154,016

$191,718

Material

$0

$0

$0

$24,164

$22,037

$17,902

$26,529

Labor

$0

$0

$0

$21,748

$19,834

$16,112

$23,876

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$8,699

$7,933

$6,445

$9,550

Total

$0

$0

$0

$54,611

$49,804

$40,459

$59,956

$0

$0

$0

$0

$0

$0

$0

$4,000

$3,000

$1,755

$2,141

$2,162

$1,672

$1,990

$0

$0

$0

$0

$0

$0

$0

OH

$1,600

$1,200

$702

$856

$865

$669

$796

Total

$5,600

$4,200

$2,457

$2,997

$3,026

$2,341

$2,786

Process 2

Rework 2

Process 3

Process 4

Finished Goods A Material Labor Fixed Exp

Finished Goods B Material Labor Fixed Exp OH Total

$0

$0

$0

$0

$0

$0

$0

$950

$750

$493

$188

$1,172

$1,829

$2,229

$0

$0

$0

$0

$0

$0

$0

$380

$300

$197

$75

$469

$732

$892

$1,330

$1,050

$690

$263

$1,641

$2,561

$3,121

$86,130

$323,928

$425,489

$467,956

$569,756

$683,887

$745,307

Material

$40,000

$188,100

$177,221

$196,935

$269,909

$314,213

$328,028

Labor

$32,950

$97,020

$177,334

$193,586

$214,177

$264,052

$298,056

Total

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$13,180

$38,808

$70,933

$77,434

$85,671

$105,621

$119,223

Total

$86,130

$323,928

$425,489

$467,956

$569,756

$683,887

$745,307

Process 1

$20,000

$20,000

$20,000

$20,000

$20,000

$20,000

$20,000

Process 2

$210,000

$210,000

$210,000

$210,000

$210,000

$210,000

$210,000

Rework 2

$2,000

$2,000

$2,000

$2,000

$2,000

$2,000

$2,000

Process 3

$19,400

$19,400

$19,400

$19,400

$19,400

$19,400

$19,400

Process 4

Fixed Expense

$11,000

$11,000

$11,000

$11,000

$11,000

$11,000

$11,000

Finished Goods A

$1,000

$1,000

$1,000

$1,000

$1,000

$1,000

$1,000

Finished Goods B

$1,000

$1,000

$1,000

$1,000

$1,000

$2,000

$2,000

$264,400

$264,400

$264,400

$264,400

$264,400

$265,400

$265,400

Material

$39,677

$34,221

$28,961

$46,207

$57,101

$57,795

$56,169

Labor

$27,774

$23,955

$20,273

$32,345

$39,970

$40,457

$39,318

$0

$0

$0

$0

$0

$0

$0

OH

$11,109

$9,582

$8,109

$12,938

$15,988

$16,183

$15,727

Total

$78,560

$67,758

$57,343

$91,490

$113,059

$114,434

$111,214

Material

$0

$190,569

$164,366

$138,113

$218,781

$270,360

$275,127

Labor

$0

$95,536

$82,400

$69,239

$109,679

$135,537

$137,927

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$38,215

$32,960

$27,696

$43,872

$54,215

$55,171

Total

$0

$324,320

$279,726

$235,048

$372,332

$460,112

$468,225

Material

$0

$0

$11,573

$9,981

$8,333

$13,112

$16,203

Labor

$0

$0

$9,133

$7,877

$6,504

$10,117

$12,502

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$3,653

$3,151

$2,602

$4,047

$5,001

Total

$0

$0

$24,359

$21,010

$17,438

$27,275

$33,706

Material

$0

$0

$192,282

$177,987

$149,516

$228,483

$285,276

Labor

$0

$0

$179,339

$168,185

$139,281

$207,971

$259,959

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$71,736

$67,274

$55,712

$83,188

$103,984

Total

$0

$0

$443,357

$413,446

$344,509

$519,642

$649,219

Material

$0

$0

$0

$100,840

$93,017

$77,533

$117,659

Labor

$0

$0

$0

$93,265

$86,907

$71,662

$106,826

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$37,306

$34,763

$28,665

$42,730

Total

$0

$0

$0

$231,411

$214,687

$177,860

$267,216

Total

Cost of Output Units WIP Out Process 1

Fixed Exp

Process 2

Rework 2

Process 3

Process 4

Finished Goods A Material

$0

$0

$0

$114,820

$133,947

$109,992

$136,569

$4,000

$4,714

$3,803

$109,942

$129,071

$104,789

$126,291

$0

$0

$0

$0

$0

$0

$0

OH

$1,600

$1,886

$1,521

$43,977

$51,628

$41,916

$50,517

Total

$5,600

$6,600

$5,324

$268,739

$314,645

$256,698

$313,377

$0

$0

$0

$0

$100,587

$158,533

$196,190

Labor Fixed Exp

Finished Goods B Material

Labor Fixed Exp OH Total

$950

$1,232

$1,134

$557

$94,199

$150,087

$186,226

$0

$0

$0

$0

$0

$0

$0

$380

$493

$454

$223

$37,680

$60,035

$74,490

$1,330

$1,725

$1,587

$780

$232,465

$368,655

$456,906

$85,490

$400,403

$811,696

$1,261,923

$1,609,135

$1,924,676

$2,299,862

Material

$39,677

$224,790

$397,182

$587,949

$761,280

$915,807

$1,083,193

Labor

$32,724

$125,438

$296,082

$481,410

$605,611

$720,621

$869,049

$0

$0

$0

$0

$0

$0

$0

OH

$13,089

$50,175

$118,433

$192,564

$242,244

$288,248

$347,620

Total

$85,490

$400,403

$811,696

$1,261,923

$1,609,135

$1,924,676

$2,299,862

Material

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

Material

$0

$0

$0

$0

$0

$0

$0

Labor

$0

$0

$0

$0

$0

$0

$0

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

Total

Fixed Exp

Cost of Goods Process 1

Process 2

Rework 2

Process 3

Process 4

Finished Goods A Material Labor Fixed Exp OH Total

$0

$0

$0

$87,114

$113,234

$109,992

$136,569

$1,000

$1,914

$3,080

$83,412

$109,112

$104,789

$126,291

$0

$0

$0

$0

$0

$0

$0

$400

$766

$1,232

$33,365

$43,645

$41,916

$50,517

$1,400

$2,680

$4,312

$203,891

$265,991

$256,698

$313,377

Finished Goods B Material Labor Fixed Exp OH Total

$0

$0

$0

$0

$34,678

$39,398

$44,452

$200

$415

$698

$557

$32,475

$37,299

$42,195

$0

$0

$0

$0

$0

$0

$0

$80

$166

$279

$223

$12,990

$14,919

$16,878

$280

$581

$977

$780

$80,143

$91,616

$103,525

Total Material

$1,680

$3,261

$5,288

$204,671

$346,134

$348,313

$416,902

$0

$0

$0

$87,114

$147,911

$149,390

$181,022

$1,200

$2,329

$3,777

$83,969

$141,587

$142,088

$168,486

$0

$0

$0

$0

$0

$0

$0

$480

$932

$1,511

$33,588

$56,635

$56,835

$67,394

$1,680

$3,261

$5,288

$204,671

$346,134

$348,313

$416,902

$19,008

$22,884

$19,366

$34,588

$47,302

$47,877

$43,166

$640

$552

$467

$745

$921

$932

$906

$18,368

$22,332

$18,899

$33,843

$46,381

$46,945

$42,260

Scrap Cost

$0

$110,191

$95,040

$90,035

$158,972

$196,450

$184,466

Scrap Salvage Value

$0

$4,608

$3,974

$5,045

$10,733

$13,263

$10,907

Scrap Net Cost

$0

$105,583

$91,065

$84,990

$148,239

$183,187

$173,559

Scrap Cost

$0

$0

$8,214

$7,930

$7,283

$11,389

$13,057

Scrap Salvage Value

$0

$0

$159

$137

$111

$169

$209

Scrap Net Cost

$0

$0

$8,055

$7,793

$7,172

$11,220

$12,848

Scrap Cost

$0

$0

$150,211

$156,764

$144,519

$217,945

$252,598

Scrap Salvage Value

$0

$0

$5,034

$4,591

$3,730

$5,527

$6,880

Scrap Net Cost

$0

$0

$145,177

$152,173

$140,789

$212,418

$245,718

Scrap Cost

$0

$0

$0

$86,983

$89,301

$73,979

$103,108

Scrap Salvage Value

$0

$0

$0

$544

$496

$403

$597

Scrap Net Cost

$0

$0

$0

$86,439

$88,805

$73,576

$102,511

$1,344

$2,814

$2,136

$101,259

$131,116

$106,946

$121,110

$0

$1,800

$1,053

$1,285

$1,297

$1,003

$1,194

$1,344

$1,014

$1,083

$99,974

$129,819

$105,943

$119,916

$319

$704

$614

$327

$96,716

$153,371

$176,338

$0

$375

$246

$94

$586

$915

$1,115

$319

$329

$368

$234

$96,130

$152,457

$175,223

$20,671

$136,592

$275,581

$477,886

$675,209

$807,959

$893,843

$640

$7,335

$10,934

$12,441

$17,873

$22,212

$21,807

$20,031

$129,257

$264,647

$465,446

$657,335

$785,747

$872,035

Material

$9,600

$11,558

$9,781

$17,469

$23,890

$24,180

$21,801

Labor

$6,720

$8,090

$6,847

$12,228

$16,723

$16,926

$15,261

$0

$0

$0

$0

$0

$0

$0

Labor Fixed Exp OH Total

Scrap Process 1 Scrap Cost Scrap Salvage Value Scrap Net Cost Process 2

Rework 2

Process 3

Process 4

Finished Goods A Scrap Cost Scrap Salvage Value Scrap Net Cost Finished Goods B Scrap Cost Scrap Salvage Value Scrap Net Cost Total Scrap Cost Scrap Salvage Value Scrap Net Cost Scrap Cost Process 1

Fixed Exp OH

$2,688

$3,236

$2,739

$4,891

$6,689

$6,770

$6,104

$19,008

$22,884

$19,366

$34,588

$47,302

$47,877

$43,166

Material

$0

$64,748

$55,845

$52,904

$93,411

$115,434

$108,391

Labor

$0

$32,459

$27,996

$26,522

$46,829

$57,869

$54,339

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$12,984

$11,198

$10,609

$18,732

$23,148

$21,736

Total

$0

$110,191

$95,040

$90,035

$158,972

$196,450

$184,466

Total Process 2

Rework 2 Material

$0

$0

$3,902

$3,767

$3,480

$5,475

$6,277

Labor

$0

$0

$3,080

$2,973

$2,716

$4,225

$4,843

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$1,232

$1,189

$1,086

$1,690

$1,937

Total

$0

$0

$8,214

$7,930

$7,283

$11,389

$13,057

Material

$0

$0

$65,146

$67,486

$62,721

$95,829

$110,995

Labor

$0

$0

$60,761

$63,770

$58,427

$87,226

$101,145

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$24,304

$25,508

$23,371

$34,890

$40,458

Total

$0

$0

$150,211

$156,764

$144,519

$217,945

$252,598

Material

$0

$0

$0

$37,904

$38,691

$32,249

$45,400

Labor

$0

$0

$0

$35,056

$36,150

$29,807

$41,220

Fixed Exp

$0

$0

$0

$0

$0

$0

$0

OH

$0

$0

$0

$14,023

$14,460

$11,923

$16,488

Total

$0

$0

$0

$86,983

$89,301

$73,979

$103,108

Process 3

Process 4

Finished Goods A Material Labor Fixed Exp OH Total

$0

$0

$0

$43,263

$55,817

$45,825

$52,779

$960

$2,010

$1,526

$41,425

$53,785

$43,658

$48,807

$0

$0

$0

$0

$0

$0

$0

$384

$804

$610

$16,570

$21,514

$17,463

$19,523

$1,344

$2,814

$2,136

$101,259

$131,116

$106,946

$121,110

Finished Goods B Material Labor Fixed Exp OH Total

$0

$0

$0

$0

$41,849

$65,954

$75,717

$228

$503

$439

$234

$39,191

$62,441

$71,872

$0

$0

$0

$0

$0

$0

$0

$91

$201

$176

$94

$15,676

$24,976

$28,749

$319

$704

$614

$327

$96,716

$153,371

$176,338

$20,671

$136,592

$275,581

$477,886

$675,209

$807,959

$893,843

Material

$9,600

$76,305

$134,674

$222,794

$319,859

$384,946

$421,361

Labor

$7,908

$43,062

$100,648

$182,209

$253,821

$302,152

$337,487

$0

$0

$0

$0

$0

$0

$0

$3,163

$17,225

$40,259

$72,884

$101,529

$120,861

$134,995

$20,671

$136,592

$275,581

$477,886

$675,209

$807,959

$893,843

Total

Fixed Exp OH Total

0008

0009

0010

$56,453

$58,011

$61,019

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$56,453

$58,011

$61,019

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$56,169

$55,997

$57,542

$39,318

$39,198

$40,280

$0

$0

$0

$15,727

$15,679

$16,112

$111,214

$110,874

$113,934

$13,756

$13,489

$13,496

$6,896

$6,762

$6,766

$0

$0

$0

$2,759

$2,705

$2,706

$23,411

$22,956

$22,967

$277,574

$272,863

$272,798

$143,533

$141,382

$141,476

$0

$0

$0

$57,413

$56,553

$56,590

$478,519

$470,798

$470,864

$114,111

$117,509

$115,825

$103,984

$108,528

$109,122

$0

$0

$0

$41,593

$43,411

$43,649

$259,688

$269,448

$268,595

$171,166

$179,030

$174,695

$155,975

$165,354

$164,582

$0

$0

$0

$62,390

$66,142

$65,833

$389,532

$410,525

$405,109

$269,397

$365,680

$461,768

$250,857

$339,650

$430,683

$0

$0

$0

$100,343

$135,860

$172,273

$620,596

$841,189

$1,064,724

$1,882,960

$2,125,791

$2,346,194

$902,172

$1,004,567

$1,096,124

$700,563

$800,874

$892,907

$0

$0

$0

$280,225

$320,350

$357,163

$1,882,960

$2,125,791

$2,346,194

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$56,169

$55,997

$57,542

$39,318

$39,198

$40,280

$0

$0

$0

$15,727

$15,679

$16,112

$111,214

$110,874

$113,934

$13,756

$13,489

$13,496

$6,896

$6,762

$6,766

$0

$0

$0

$2,759

$2,705

$2,706

$23,411

$22,956

$22,967

$277,574

$272,863

$272,798

$143,533

$141,382

$141,476

$0

$0

$0

$57,413

$56,553

$56,590

$478,519

$470,798

$470,864

$114,111

$117,509

$115,825

$103,984

$108,528

$109,122

$0

$0

$0

$41,593

$43,411

$43,649

$259,688

$269,448

$268,595

$171,166

$179,030

$174,695

$155,975

$165,354

$164,582

$0

$0

$0

$62,390

$66,142

$65,833

$389,532

$410,525

$405,109

$269,397

$365,680

$461,768

$250,857

$339,650

$430,683

$0

$0

$0

$100,343

$135,860

$172,273

$620,596

$841,189

$1,064,724

$1,882,960

$2,125,791

$2,346,194

$902,172

$1,004,567

$1,096,124

$700,563

$800,874

$892,907

$0

$0

$0

$280,225

$320,350

$357,163

$1,882,960

$2,125,791

$2,346,194

$56,453

$58,011

$61,019

$39,517

$40,608

$42,714

$0

$0

$0

$15,807

$16,243

$17,085

$111,777

$114,862

$120,818

$217,445

$216,780

$222,762

$97,850

$97,551

$100,243

$0

$0

$0

$39,140

$39,020

$40,097

$354,435

$353,351

$363,103

$2,920

$3,001

$3,057

$6,083

$6,252

$6,368

$0

$0

$0

$2,433

$2,501

$2,547

$11,436

$11,753

$11,972

$19,365

$19,920

$20,299

$130,713

$134,457

$137,016

$0

$0

$0

$52,285

$53,783

$54,806

$202,363

$208,159

$212,121

$33,023

$34,857

$35,855

$29,721

$31,371

$32,270

$0

$0

$0

$11,888

$12,548

$12,908

$74,632

$78,776

$81,033

$0

$0

$0

$2,477

$2,654

$2,703

$0

$0

$0

$991

$1,062

$1,081

$3,467

$3,715

$3,784

$0

$0

$0

$2,993

$4,015

$5,065

$0

$0

$0

$1,197

$1,606

$2,026

$4,191

$5,621

$7,092

$762,302

$776,239

$799,923

$329,206

$332,568

$342,992

$309,355

$316,907

$326,379

$0

$0

$0

$123,742

$126,763

$130,552

$762,302

$776,239

$799,923

$20,000

$20,000

$30,000

$210,000

$210,000

$315,000

$2,000

$2,000

$2,000

$19,400

$19,400

$19,400

$11,000

$11,000

$11,000

$1,000

$1,000

$1,000

$2,000

$2,000

$3,000

$265,400

$265,400

$381,400

$55,997

$57,542

$60,526

$39,198

$40,280

$42,368

$0

$0

$0

$15,679

$16,112

$16,947

$110,874

$113,934

$119,842

$269,781

$269,911

$277,359

$135,247

$135,312

$139,046

$0

$0

$0

$54,099

$54,125

$55,618

$459,126

$459,348

$472,024

$16,571

$16,383

$16,444

$12,898

$12,929

$13,047

$0

$0

$0

$5,159

$5,172

$5,219

$34,628

$34,484

$34,710

$293,771

$289,561

$289,830

$271,321

$272,804

$275,388

$0

$0

$0

$108,528

$109,122

$110,155

$673,621

$671,488

$675,374

$146,807

$152,022

$151,330

$133,407

$139,584

$141,065

$0

$0

$0

$53,363

$55,834

$56,426

$333,577

$347,440

$348,821

$170,519

$178,342

$174,002

$157,853

$167,362

$166,621

$0

$0

$0

$63,141

$66,945

$66,649

$391,513

$412,649

$407,272

$268,751

$364,813

$460,677

$253,242

$342,850

$434,718

$0

$0

$0

$101,297

$137,140

$173,887

$623,291

$844,803

$1,069,283

$2,626,629

$2,884,145

$3,127,325

$1,222,197

$1,328,574

$1,430,168

$1,003,166

$1,111,122

$1,212,255

$0

$0

$0

$401,266

$444,449

$484,902

$2,626,629

$2,884,145

$3,127,325

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$167,752

$177,384

$174,002

$155,292

$166,463

$166,621

$0

$0

$0

$62,117

$66,585

$66,649

$385,160

$410,432

$407,272

$49,878

$55,067

$59,711

$47,000

$51,752

$56,346

$0

$0

$0

$18,800

$20,701

$22,538

$115,679

$127,519

$138,595

$500,838

$537,951

$545,867

$217,630

$232,451

$233,713

$202,292

$218,215

$222,968

$0

$0

$0

$80,917

$87,286

$89,187

$500,838

$537,951

$545,867

$37,445

$36,181

$38,058

$903

$928

$976

$36,542

$35,253

$37,081

$155,993

$146,231

$150,266

$6,523

$4,878

$5,012

$149,469

$141,353

$145,254

$11,674

$10,933

$11,006

$219

$225

$229

$11,455

$10,708

$10,777

$228,096

$213,872

$215,140

$7,262

$7,470

$7,612

$220,834

$206,402

$207,528

$111,997

$109,691

$110,133

$743

$784

$807

$111,254

$108,907

$109,326

$131,655

$130,486

$128,802

$1,486

$1,592

$1,622

$130,169

$128,894

$127,180

$209,304

$266,745

$337,622

$1,497

$2,008

$2,533

$207,807

$264,738

$335,089

$886,163

$914,139

$991,027

$18,633

$17,885

$18,791

$867,530

$896,255

$972,236

$18,912

$18,273

$19,221

$13,238

$12,791

$13,455

$0

$0

$0

$5,295

$5,117

$5,382

$37,445

$36,181

$38,058

$91,661

$85,925

$88,296

$45,951

$43,076

$44,265

$0

$0

$0

$18,381

$17,230

$17,706

$155,993

$146,231

$150,266

$5,587

$5,194

$5,214

$4,348

$4,099

$4,137

$0

$0

$0

$1,739

$1,640

$1,655

$11,674

$10,933

$11,006

$99,474

$92,226

$92,326

$91,872

$86,889

$87,725

$0

$0

$0

$36,749

$34,756

$35,090

$228,096

$213,872

$215,140

$49,290

$47,995

$47,779

$44,791

$44,068

$44,538

$0

$0

$0

$17,916

$17,627

$17,815

$111,997

$109,691

$110,133

$57,341

$56,394

$55,029

$53,081

$52,922

$52,695

$0

$0

$0

$21,233

$21,169

$21,078

$131,655

$130,486

$128,802

$90,248

$115,189

$145,457

$85,040

$108,254

$137,261

$0

$0

$0

$34,016

$43,302

$54,904

$209,304

$266,745

$337,622

$886,163

$914,139

$991,027

$412,512

$421,198

$453,321

$338,322

$352,101

$384,075

$0

$0

$0

$135,329

$140,840

$153,630

$886,163

$914,139

$991,027

Process Flow Analysis, Scenario 1 Financials Revenue Model 0001

0002

0003

0004

0005

0006

0007

0008

Revenue Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

$380,000

$456,000

$532,000

$608,000

$684,000

$625,806

$744,737

$912,000

$90,000

$112,500

$135,000

$83,565

$180,000

$202,500

$225,000

$247,500

$470,000

$568,500

$667,000

$691,565

$864,000

$828,306

$969,737

$1,159,500

Finished Goods A Finished Goods B Total Units Sold Process 1

0

0

0

0

0

0

0

0

Process 2

0

0

0

0

0

0

0

0

Rework 2

0

0

0

0

0

0

0

0

Process 3

0

0

0

0

0

0

0

0

Process 4

0

0

0

0

0

0

0

0

Finished Goods A

1,000

1,200

1,400

1,600

1,800

1,647

1,960

2,400

Finished Goods B

200

250

300

186

400

450

500

550

1,200

1,450

1,700

1,786

2,200

2,097

2,460

2,950

Total Selling Price Process 1

$60.00

$60.00

$60.00

$60.00

$60.00

$60.00

$60.00

$60.00

Process 2

$190.00

$190.00

$190.00

$190.00

$190.00

$190.00

$190.00

$190.00

Rework 2

$385.00

$385.00

$385.00

$385.00

$385.00

$385.00

$385.00

$385.00

Process 3

$300.00

$300.00

$300.00

$300.00

$300.00

$300.00

$300.00

$300.00

Process 4

$400.00

$400.00

$400.00

$400.00

$400.00

$400.00

$400.00

$400.00

Finished Goods A

$380.00

$380.00

$380.00

$380.00

$380.00

$380.00

$380.00

$380.00

Finished Goods B

$450.00

$450.00

$450.00

$450.00

$450.00

$450.00

$450.00

$450.00

Total

$391.67

$392.07

$392.35

$387.28

$392.73

$395.02

$394.23

$393.05

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Costs Cost of Goods

Process 4 Finished Goods A Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

$1,400

$2,680

$4,312

$203,891

$265,991

$256,698

$313,377

$385,160

$280

$581

$977

$780

$80,143

$91,616

$103,525

$115,679

$1,680

$3,261

$5,288

$204,671

$346,134

$348,313

$416,902

$500,838

$1,680

$3,261

$5,288

$204,671

$346,134

$348,313

$416,902

$500,838

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Total

Contribution Margins Gross Margin

Finished Goods A Finished Goods B Total

$378,600

$453,320

$527,688

$89,720

$111,919

$134,023

$468,320

$565,239

$661,712

$404,109

$418,009

$369,108

$431,360

$526,840

$82,785

$99,857

$110,884

$121,475

$131,821

$486,894

$517,866

$479,992

$552,835

$658,662

Gross Margin % Process 1

0%

0%

0%

0%

0%

0%

0%

0%

Process 2

0%

0%

0%

0%

0%

0%

0%

0%

Rework 2

0%

0%

0%

0%

0%

0%

0%

0%

Process 3

0%

0%

0%

0%

0%

0%

0%

0%

Process 4

0%

0%

0%

0%

0%

0%

0%

0%

Finished Goods A

100%

99%

99%

66%

61%

59%

58%

58%

Finished Goods B

100%

99%

99%

99%

55%

55%

54%

53%

Total

100%

99%

99%

70%

60%

58%

57%

57%

0009

0010 $0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$988,000

$1,011,802

$270,000

$292,500

$1,258,000

$1,304,302

0

0

0

0

0

0

0

0

0

0

2,600

2,663

600

650

3,200

3,313

$60.00

$60.00

$190.00

$190.00

$385.00

$385.00

$300.00

$300.00

$400.00

$400.00

$380.00

$380.00

$450.00

$450.00

$393.13

$393.74

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$410,432

$407,272

$127,519

$138,595

$537,951

$545,867

$537,951

$545,867

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$577,568

$604,530

$142,481

$153,905

$720,049

$758,435

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

58%

60%

53%

53%

57%

58%

Process Flow Analysis, Scenario 1 Formulas Variable

Display As

Dimension Index

Capacity_per_Station

Capacity/Station

Process

Data:

Capacity_Util_pct

Capacity Utilization %

Process

Roll-up:

COGS

Cost of Goods

Process, Cost_Types

Data:

COGS_per_U

COGS/Unit

Process, Cost_Types

Roll-up:

Cost_per_U_Purchd_In

Cost/Unit Purch'd In

Process

Data: Roll-up:

Cost_Purchd_U_In

Cost Purch'd Units In

Process

Data:

FG_Inven_Targ_Periods

FG Inventory Target Periods

Fixed_Exp_per_Station

Fixed Expense/Station

Process

Data:

Fixed_Expense

Fixed Expense

Process

Data:

Gross_Margin

Gross Margin

Process

Data:

Gross_Margin_pct

Gross Margin %

Process

Roll-up:

Ident

Ident

ProcessY, Process

Data:

Labor_Overhead_pct

Labor Overhead %

Global

Data:

Proc_Cost_per_U

Process Cost/Unit

Process, Cost_Types

Roll-up:

Proc_Cost_per_U_Sc1

Process Cost/U Scenario 1

Process, Cost_Types.OH

@0001:

Process, Cost_Types

Data: Roll-up:

Proc_Cost_per_U_Sc2

Process Cost/U Scenario 2

Process, Cost_Types.OH Process, Cost_Types

@0001: Data: Roll-up:

Process_Cost

Process Cost

Process, Cost_Types

Data:

Process_Yield_pct

Yield %

ProcessX

Data:

Process_Yield_pct_Sc1

Yield % Scenario 1

ProcessX

Data:

Process_Yield_pct_Sc2

Yield % Scenario 2

ProcessX

Data:

Revenue

Revenue

Process

Data:

Scenario

Scenario (1 or 2)

Scrap_Cost

Scrap Cost

Process, Cost_Types

Data:

Scrap_Cost_per_U

Scrap Cost/Unit

Process, Cost_Types

Roll-up:

Scrap_Net_Cost

Scrap Net Cost

Process

Data:

Scrap_Net_Cost_per_U

Scrap Net Cost/Unit

Process

Data:

Scrap_pct

Scrap %

ProcessX

Scrap_Salvage_Value

Scrap Salvage Value

Process

Data:

Scrap_Salvage_Value_per_U

Scrap Salvage $/Unit

Process

Data:

Roll-up:

Roll-up: Selling_Price

Selling Price

Process

@0001: Data: Roll-up:

Stations

Processing Stations

Process

Data:

Transition_pct

Transition %

Process, ProcessX

Data:

Transition_pct_Sc1

Transition % Scenario 1

Transition_pct_Sc2

Transition % Scenario 2

Units_Avail_In

Units Available In

Process

Data:

Units_Buffer_Stock

Units Buffer Stock

Process

Data:

Units_Capacity

Units Capacity

Process

Data:

Units_Demand

Units Demand

Process.Finished_Goods_B

Data:

Process.Finished_Goods_A

Data:

Units_In

Units In

Process

Data:

Units_Out

Units Out

Process

Data:

Units_Purchd_In

Purch'd Units In

Process.Process_1

Data:

Process

Data:

Units_Scrap

Units Scrap

Process

Data:

Units_Sold

Units Sold

Process

Data:

WIP_Avail_In

WIP Available In

Process, Cost_Types

Data:

WIP_Buffer_Stock

WIP_Buffer Stock

Process

Data:

WIP_In

WIP In

Process, Cost_Types

Data:

WIP_Out

WIP Out

Process, Cost_Types

Data:

WIP_per_U_In

WIP/Unit In

Process, Cost_Types

Roll-up:

WIP_per_U_Out

WIP/Unit Out

Process, Cost_Types

Roll-up:

Formula / Data preve(1000) if(Units_Capacity=0, 0, Units_In/Units_Capacity) WIP_Out*if(Units_Out=0, 0, Units_Sold/Units_Out) if(Units_Sold=0, 0, COGS/Units_Sold) preve(0) if(Units_Purchd_In=0, 0, Cost_Purchd_U_In/Units_Purchd_In) Cost_per_U_Purchd_In*Units_Purchd_In

preve(0) Fixed_Exp_per_Station*Stations Revenue-COGS if(Revenue=0, 0, Gross_Margin/Revenue) if(dimitemnum("Process")=dimitemnum("ProcessY"), 1, 0) preve(0) if(Scenario=1, Proc_Cost_per_U_Sc1, if(Scenario=2, Proc_Cost_per_U_Sc2, "error")) Labor_Overhead_pct*Proc_Cost_per_U_Sc1["Cost_Types.Labor"] if(diminfo("Cost_Types", 4)="Fixed_Exp", if(Units_In=0, 0, Fixed_Expense/Units_In), preve(0)) ifm(isleafd("Process"), sum(rangedru("Cost_Types")), if(Units_In=0, 0, Process_Cost/Units_In)) Labor_Overhead_pct*Proc_Cost_per_U_Sc2["Cost_Types.Labor"] if(diminfo("Cost_Types", 4)="Fixed_Exp", if(Units_In=0, 0, Fixed_Expense/Units_In), preve(0)) ifm(isleafd("Process"), sum(rangedru("Cost_Types")), if(Units_In=0, 0, Process_Cost/Units_In)) if(diminfo("Cost_Types", 4)="Fixed_Exp", var(Fixed_Expense), Proc_Cost_per_U*Units_In) if(Scenario=1, Process_Yield_pct_Sc1, if(Scenario=2, Process_Yield_pct_Sc2, "error")) preve(1) preve(1) Selling_Price*Units_Sold

(WIP_In+Process_Cost)*Scrap_pct

if(Units_Scrap=0, 0, Scrap_Cost/Units_Scrap) Scrap_Cost-Scrap_Salvage_Value Scrap_Cost_per_U-Scrap_Salvage_Value_per_U 1-Process_Yield_pct Scrap_Salvage_Value_per_U*Units_Scrap preve(0) if(Units_Scrap=0, 0, Scrap_Salvage_Value/Units_Scrap) 2*last(WIP_per_U_Out) preve(1) if(Units_Sold=0, 0, Revenue/Units_Sold) preve(1) if(Scenario=1, Transition_pct_Sc1, if(Scenario=2, Transition_pct_Sc2, "error"))

preve(0, matmult(Units_Out-Units_Sold, Transition_pct, "Process", "ProcessX"))+preve(0, Units_Buffer_Stock)+Units_Purchd_In Units_Avail_In-Units_In+preve(0, Units_Buffer_Stock) Capacity_per_Station*Stations 2*preve(0)-preve(0, Units_Demand, 2) 2*preve(0)-preve(0, Units_Demand, 2) min(Units_Capacity, Units_Avail_In) matmult(Ident, Process_Yield_pct, "ProcessY", "ProcessX")*Units_In

max(0, FG_Inven_Targ_Periods*3*preve(0, Units_Demand["Process"])-Units_In["Process.Rework_2"]-Units_In["Process.Process_3"]-Units_In["Process.F preve(0) Units_In*matmult(Ident, Scrap_pct, "ProcessY", "ProcessX") max(0, min(Units_Out, Units_Demand))

preve(0, Matmult(Transition_pct, WIP_Out-COGS, "ProcessX", "Process"))+if(diminfo("Cost_Types", 0)="Material", var(Cost_per_U_Purchd_In*Units_Pu if(Units_Avail_In=0, 0, (Units_Avail_In-Units_In)/Units_Avail_In)*WIP_Avail_In+preve(0) WIP_Avail_In*if(Units_Avail_In=0, 0, Units_In/Units_Avail_In)

WIP_In+Process_Cost-if(WIP_Avail_In["Cost_Types"]+Process_Cost["Cost_Types"]=0, 0, (WIP_Avail_In+Process_Cost)/(WIP_Avail_In["Cost_Types"]+P

if(Units_In=0, 0, WIP_In/Units_In) If(Units_Out=0, 0, WIP_Out/Units_Out)

Process Flow Analysis, Scenario 1 Default Shadow Scrap_Cost_1 Lvl 1

0001

0002

0003

0004

0005

0006

0007

0008

Process 1 Material Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,587

$1,369

$1,158

$1,848

$2,284

$2,312

$2,247

Labor

Fixed Exp

OH

Total

Process 2 Material Process 1

Process 2

$0

$3,174

$2,738

$3,475

$7,393

$9,136

$7,513

$4,493

Rework 2

$0

$2,381

$2,053

$1,738

$2,772

$3,426

$3,468

$3,370

Process 3

$0

$3,968

$3,422

$2,896

$4,621

$5,710

$5,780

$5,617

Process 4

$0

$1,190

$1,027

$869

$1,386

$1,713

$1,734

$1,685

Finished Goods A

$0

$595

$513

$434

$693

$857

$867

$843

Finished Goods B

$0

$397

$342

$290

$462

$571

$578

$562

Total

$0

$13,292

$11,464

$10,860

$19,176

$23,697

$22,251

$18,817

Process 1

$0

$1,111

$958

$811

$1,294

$1,599

$1,618

$1,573

Process 2

$0

$2,222

$1,916

$2,433

$5,175

$6,395

$5,259

$3,145

Rework 2

$0

$1,666

$1,437

$1,216

$1,941

$2,398

$2,427

$2,359

Process 3

$0

$2,777

$2,395

$2,027

$3,234

$3,997

$4,046

$3,932

Process 4

$0

$833

$719

$608

$970

$1,199

$1,214

$1,180

Finished Goods A

$0

$417

$359

$304

$485

$600

$607

$590

Finished Goods B

$0

$278

$240

$203

$323

$400

$405

$393

Total

$0

$9,304

$8,025

$7,602

$13,423

$16,588

$15,576

$13,172

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$444

$383

$324

$518

$640

$647

$629

Process 2

$0

$889

$767

$973

$2,070

$2,558

$2,104

$1,258

Rework 2

$0

$667

$575

$487

$776

$959

$971

$944

Process 3

$0

$1,111

$958

$811

$1,294

$1,599

$1,618

$1,573

Process 4

$0

$333

$287

$243

$388

$480

$485

$472

Finished Goods A

$0

$167

$144

$122

$194

$240

$243

$236

Finished Goods B

$0

$111

$96

$81

$129

$160

$162

$157

Total

$0

$3,722

$3,210

$3,041

$5,369

$6,635

$6,230

$5,269

$0

$26,318

$22,699

$21,504

$37,968

$46,920

$44,057

$37,257

Process 1

$0

$3,142

$2,710

$2,294

$3,660

$4,522

$4,577

$4,449

Process 2

$0

$6,285

$5,421

$6,881

$14,638

$18,089

$14,876

$8,897

Rework 2

$0

$4,714

$4,065

$3,441

$5,489

$6,784

$6,866

$6,673

Process 3

$0

$7,856

$6,776

$5,734

$9,149

$11,306

$11,443

$11,121

Process 4

$0

$2,357

$2,033

$1,720

$2,745

$3,392

$3,433

$3,336

Finished Goods A

$0

$1,178

$1,016

$860

$1,372

$1,696

$1,717

$1,668

Finished Goods B

$0

$786

$678

$573

$915

$1,131

$1,144

$1,112

Total

$0

$26,318

$22,699

$21,504

$37,968

$46,920

$44,057

$37,257

Process 1

$0

$0

$381

$329

$276

$438

$541

$550

Process 2

$0

$0

$762

$986

$1,105

$1,750

$1,757

$1,101

Rework 2

$0

$0

$572

$493

$414

$656

$811

$825

Process 3

$0

$0

$953

$822

$691

$1,094

$1,352

$1,376

Process 4

$0

$0

$286

$247

$207

$328

$406

$413

Finished Goods A

$0

$0

$143

$123

$104

$164

$203

$206

Finished Goods B

$0

$0

$95

$82

$69

$109

$135

$138

Total

$0

$0

$3,192

$3,082

$2,866

$4,540

$5,204

$4,608

Labor

Fixed Exp

OH

Total

Rework 2 Material

Labor

Process 1

$0

$0

$191

$165

$138

$219

$271

$276

Process 2

$0

$0

$382

$494

$554

$877

$881

$552

Rework 2

$0

$0

$287

$247

$208

$329

$407

$414

Process 3

$0

$0

$478

$412

$346

$548

$678

$690

Process 4

$0

$0

$143

$124

$104

$165

$203

$207

Finished Goods A

$0

$0

$72

$62

$52

$82

$102

$103

Finished Goods B

$0

$0

$48

$41

$35

$55

$68

$69

Total

$0

$0

$1,600

$1,545

$1,437

$2,276

$2,609

$2,310

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$76

$66

$55

$88

$108

$110

Process 2

$0

$0

$153

$198

$222

$351

$352

$221

Rework 2

$0

$0

$115

$99

$83

$132

$163

$166

Process 3

$0

$0

$191

$165

$138

$219

$271

$276

Process 4

$0

$0

$57

$49

$42

$66

$81

$83

Finished Goods A

$0

$0

$29

$25

$21

$33

$41

$41

Finished Goods B

$0

$0

$19

$16

$14

$22

$27

$28

Total

$0

$0

$640

$618

$575

$910

$1,044

$924 $7,843

Fixed Exp

OH

Total

$0

$0

$5,432

$5,245

$4,877

$7,726

$8,857

Process 1

$0

$0

$649

$559

$470

$745

$920

$936

Process 2

$0

$0

$1,297

$1,678

$1,880

$2,979

$2,991

$1,873

Rework 2

$0

$0

$973

$839

$705

$1,117

$1,380

$1,405

Process 3

$0

$0

$1,622

$1,399

$1,175

$1,862

$2,301

$2,341

Process 4

$0

$0

$486

$420

$353

$558

$690

$702

Finished Goods A

$0

$0

$243

$210

$176

$279

$345

$351

Finished Goods B

$0

$0

$162

$140

$118

$186

$230

$234

Total

$0

$0

$5,432

$5,245

$4,877

$7,726

$8,857

$7,843

Process 1

$0

$0

$7,242

$6,709

$5,648

$8,647

$10,798

$11,103

Process 2

$0

$0

$14,483

$20,126

$22,590

$34,588

$35,094

$22,206

Rework 2

$0

$0

$10,862

$10,063

$8,471

$12,970

$16,197

$16,654

Process 3

$0

$0

$18,104

$16,772

$14,119

$21,617

$26,995

$27,757

Process 4

$0

$0

$5,431

$5,032

$4,236

$6,485

$8,099

$8,327

Finished Goods A

$0

$0

$2,716

$2,516

$2,118

$3,243

$4,049

$4,164

Finished Goods B

$0

$0

$1,810

$1,677

$1,412

$2,162

$2,700

$2,776

Total

$0

$0

$60,649

$62,895

$58,593

$89,712

$103,932

$92,987

Process 1

$0

$0

$3,630

$3,497

$2,946

$4,428

$5,555

$5,741

Process 2

$0

$0

$7,261

$10,490

$11,785

$17,712

$18,054

$11,483

Rework 2

$0

$0

$5,446

$5,245

$4,419

$6,642

$8,333

$8,612

Process 3

$0

$0

$9,076

$8,741

$7,365

$11,070

$13,888

$14,353

Process 4

$0

$0

$2,723

$2,622

$2,210

$3,321

$4,166

$4,306

Finished Goods A

$0

$0

$1,361

$1,311

$1,105

$1,660

$2,083

$2,153

Finished Goods B

$0

$0

$908

$874

$737

$1,107

$1,389

$1,435

Total

$0

$0

$30,404

$32,780

$30,567

$45,940

$53,468

$48,083

Process 3 Material

Labor

Fixed Exp Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$1,452

$1,399

$1,178

$1,771

$2,222

$2,297

Process 2

$0

$0

$2,904

$4,196

$4,714

$7,085

$7,222

$4,593

Rework 2

$0

$0

$2,178

$2,098

$1,768

$2,657

$3,333

$3,445

Process 3

$0

$0

$3,630

$3,497

$2,946

$4,428

$5,555

$5,741

Process 4

$0

$0

$1,089

$1,049

$884

$1,328

$1,667

$1,722

Finished Goods A

$0

$0

$545

$524

$442

$664

$833

$861

Finished Goods B

$0

$0

$363

$350

$295

$443

$556

$574

Total

$0

$0

$12,162

$13,112

$12,227

$18,376

$21,387

$19,233

OH

Total

$0

$0

$103,215

$108,787

$101,387

$154,029

$178,787

$160,304

Process 1

$0

$0

$12,324

$11,604

$9,772

$14,846

$18,575

$19,141

Process 2

$0

$0

$24,648

$34,812

$39,089

$59,385

$60,370

$38,282

Rework 2

$0

$0

$18,486

$17,406

$14,658

$22,269

$27,863

$28,711

Process 3

$0

$0

$30,810

$29,010

$24,430

$37,115

$46,438

$47,852

Process 4

$0

$0

$9,243

$8,703

$7,329

$11,135

$13,931

$14,356

Finished Goods A

$0

$0

$4,622

$4,351

$3,665

$5,567

$6,966

$7,178

Finished Goods B

$0

$0

$3,081

$2,901

$2,443

$3,712

$4,644

$4,785

Total

$0

$0

$103,215

$108,787

$101,387

$154,029

$178,787

$160,304

Process 1

$0

$0

$0

$3,077

$2,848

$2,392

$3,656

$4,564

Process 2

$0

$0

$0

$9,230

$11,391

$9,569

$11,881

$9,129

Rework 2

$0

$0

$0

$4,615

$4,272

$3,588

$5,484

$6,847

Process 3

$0

$0

$0

$7,691

$7,119

$5,981

$9,139

$11,411

Process 4

$0

$0

$0

$2,307

$2,136

$1,794

$2,742

$3,423

Finished Goods A

$0

$0

$0

$1,154

$1,068

$897

$1,371

$1,712

Finished Goods B

$0

$0

$0

$769

$712

$598

$914

$1,141

Total

$0

$0

$0

$28,842

$29,546

$24,820

$35,186

$38,227

Process 1

$0

$0

$0

$2,869

$2,691

$2,228

$3,328

$4,159

Process 2

$0

$0

$0

$8,608

$10,764

$8,914

$10,815

$8,319

Rework 2

$0

$0

$0

$4,304

$4,036

$3,343

$4,991

$6,239

Process 3

$0

$0

$0

$7,174

$6,727

$5,571

$8,319

$10,398

Process 4

$0

$0

$0

$2,152

$2,018

$1,671

$2,496

$3,120

Finished Goods A

$0

$0

$0

$1,076

$1,009

$836

$1,248

$1,560

Finished Goods B

$0

$0

$0

$717

$673

$557

$832

$1,040

Total

$0

$0

$0

$26,901

$27,919

$23,121

$32,028

$34,835

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Process 4 Material

Labor

Fixed Exp

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$0

$1,148

Process 2

$0

$0

$0

$3,443

$1,076

$891

$1,331

$1,664

$4,306

$3,566

$4,326

Rework 2

$0

$0

$0

$3,327

$1,722

$1,615

$1,337

$1,997

Process 3

$0

$0

$2,496

$0

$2,869

$2,691

$2,228

$3,328

$4,159

Process 4

$0

Finished Goods A

$0

$0

$0

$861

$807

$669

$998

$1,248

$0

$0

$430

$404

$334

$499

Finished Goods B

$624

$0

$0

$0

$287

$269

$223

$333

Total

$416

$0

$0

$0

$10,760

$11,168

$9,248

$12,811

$13,934

OH

Total

$0

$0

$0

$66,504

$68,632

$57,188

$80,025

$86,995

Process 1

$0

$0

$0

$7,094

$6,615

$5,512

$8,314

$10,388

Process 2

$0

$0

$0

$21,281

$26,461

$22,049

$27,021

$20,775

Rework 2

$0

$0

$0

$10,641

$9,923

$8,268

$12,471

$15,581

Process 3

$0

$0

$0

$17,734

$16,538

$13,780

$20,786

$25,969

Process 4

$0

$0

$0

$5,320

$4,961

$4,134

$6,236

$7,791

Finished Goods A

$0

$0

$0

$2,660

$2,481

$2,067

$3,118

$3,895

Finished Goods B

$0

$0

$0

$1,773

$1,654

$1,378

$2,079

$2,597

Total

$0

$0

$0

$66,504

$68,632

$57,188

$80,025

$86,995

Process 1

$0

$0

$0

$4,615

$5,380

$4,417

$5,484

$6,847

Process 2

$0

$0

$0

$13,844

$21,520

$17,668

$17,822

$13,693

Rework 2

$0

$0

$0

$6,922

$8,070

$6,625

$8,225

$10,270

Process 3

$0

$0

$0

$11,537

$13,450

$11,042

$13,709

$17,117

Process 4

$0

$0

$0

$3,461

$4,035

$3,313

$4,113

$5,135

Finished Goods A

$0

$0

$0

$1,731

$2,017

$1,656

$2,056

$2,567

Finished Goods B

$0

$0

$0

$1,154

$1,345

$1,104

$1,371

$1,712

Total

$0

$0

$0

$43,263

$55,817

$45,825

$52,779

$57,341

Process 1

$0

$120

$112

$4,333

$5,098

$4,141

$4,991

$6,239

Process 2

$0

$240

$224

$12,999

$20,391

$16,564

$16,222

$12,478

Rework 2

$0

$180

$168

$6,500

$7,646

$6,212

$7,487

$9,359

Process 3

$0

$300

$280

$10,833

$12,744

$10,353

$12,478

$15,598

Process 4

$0

$90

$84

$3,250

$3,823

$3,106

$3,743

$4,679

Finished Goods A

$0

$45

$42

$1,625

$1,912

$1,553

$1,872

$2,340

Finished Goods B

$0

$30

$28

$1,083

$1,274

$1,035

$1,248

$1,560

Total

$0

$1,005

$938

$40,623

$52,888

$42,964

$48,041

$52,252

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$48

$45

$1,733

$2,039

$1,656

$1,997

$2,496

Process 2

$0

$96

$90

$5,200

$8,156

$6,626

$6,489

$4,991

Rework 2

$0

$72

$67

$2,600

$3,059

$2,485

$2,995

$3,743

Process 3

$0

$120

$112

$4,333

$5,098

$4,141

$4,991

$6,239

Process 4

$0

$36

$34

$1,300

$1,529

$1,242

$1,497

$1,872

Finished Goods A

$0

$18

$17

$650

$765

$621

$749

$936

Finished Goods A Material

Labor

Fixed Exp

OH

Finished Goods B

$0

Total

$0

$402

$375

$16,249

$21,155

$17,185

$19,217

$20,901

$0

$1,407

$1,313

$100,135

$129,860

$105,974

$120,037

$130,493

Process 1

$0

$168

$157

$10,681

$12,517

$10,214

$12,471

$15,581

Process 2

$0

$336

$314

$32,043

$50,067

$40,858

$40,532

$31,163

Rework 2

$0

$252

$235

$16,022

$18,775

$15,322

$18,707

$23,372

Process 3

$0

$420

$392

$26,703

$31,292

$25,536

$31,179

$38,953

Process 4

$0

$126

$118

$8,011

$9,387

$7,661

$9,354

$11,686

Finished Goods A

$0

$63

$59

$4,005

$4,694

$3,830

$4,677

$5,843

Finished Goods B

$0

$42

$39

$2,670

$3,129

$2,554

$3,118

$3,895

Total

$0

$1,407

$1,313

$100,135

$129,860

$105,974

$120,037

$130,493

Process 1

$0

$0

$0

$0

$4,034

$6,357

$7,867

$10,776

Process 2

$0

$0

$0

$0

$16,134

$25,428

$25,567

$21,552

Rework 2

$0

$0

$0

$0

$6,050

$9,536

$11,800

$16,164

Process 3

$0

$0

$0

$0

$10,084

$15,893

$19,667

$26,940

Process 4

$0

$0

$0

$0

$3,025

$4,768

$5,900

$8,082

Finished Goods A

$0

$0

$0

$0

$1,513

$2,384

$2,950

$4,041

Finished Goods B

$0

$0

$0

$0

$1,008

$1,589

$1,967

$2,694

Total

$0

$0

$0

$0

$41,849

$65,954

$75,717

$90,248

Process 1

$0

$30

$33

$17

$3,731

$5,945

$7,378

$10,034

Process 2

$0

$60

$65

$52

$14,922

$23,781

$23,979

$20,069

Rework 2

$0

$45

$49

$26

$5,596

$8,918

$11,067

$15,051

Process 3

$0

$75

$82

$44

$9,326

$14,863

$18,445

$25,086

Process 4

$0

$23

$25

$13

$2,798

$4,459

$5,534

$7,526

Finished Goods A

$0

$11

$12

$7

$1,399

$2,229

$2,767

$3,763

Finished Goods B

$0

$8

$8

$4

$933

$1,486

$1,845

$2,509

Total

$0

$251

$274

$164

$38,705

$61,682

$71,014

$84,037

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$12

$13

$7

$1,492

$2,378

$2,951

$4,014

Process 2

$0

$24

$26

$21

$5,969

$9,512

$9,591

$8,027

Rework 2

$0

$18

$20

$10

$2,238

$3,567

$4,427

$6,021

Process 3

$0

$30

$33

$17

$3,731

$5,945

$7,378

$10,034

Process 4

$0

$9

$10

$5

$1,119

$1,784

$2,213

$3,010

Finished Goods A

$0

$5

$5

$3

$560

$892

$1,107

$1,505

Finished Goods B

$0

$3

$3

$2

$373

$595

$738

$1,003

Total

$0

$101

$110

$65

$15,482

$24,673

$28,405

$33,615

Total

$12

$11

$433

$510

$414

$499

$624

Finished Goods B Material

Labor

Fixed Exp

OH

Total

$0

$352

$383

$229

$96,035

$152,309

$175,136

$207,900

Process 1

$0

$42

$46

$24

$9,256

$14,680

$18,196

$24,824

Process 2

$0

$84

$92

$73

$37,026

$58,721

$59,137

$49,648

Rework 2

$0

$63

$69

$37

$13,885

$22,021

$27,294

$37,236

Process 3

$0

$105

$114

$61

$23,141

$36,701

$45,490

$62,060

Process 4

$0

$32

$34

$18

$6,942

$11,010

$13,647

$18,618

Finished Goods A

$0

Finished Goods B

$0

$11

$11

$6

$2,314

$3,670

$4,549

$6,206

Total

$0

$352

$383

$229

$96,035

$152,309

$175,136

$207,900

$0

$28,076

$133,043

$302,403

$438,760

$524,146

$606,900

$630,792

Process 1

$0

$1,587

$8,992

$15,887

$20,033

$24,535

$30,657

$36,087

Process 2

$0

$3,174

$17,983

$47,662

$80,134

$98,139

$99,634

$72,174

Rework 2

$0

$2,381

$13,487

$23,831

$30,050

$36,802

$45,985

$54,130

Process 3

$0

$3,968

$22,479

$39,718

$50,084

$61,337

$76,642

$90,217

Process 4

$0

$1,190

$6,744

$11,915

$15,025

$18,401

$22,993

$27,065

Finished Goods A

$0

$595

$3,372

$5,958

$7,513

$9,201

$11,496

$13,533

Finished Goods B

$0

$397

$2,248

$3,972

$5,008

$6,134

$7,664

$9,022

Total

$0

$13,292

$75,305

$148,943

$207,847

$254,548

$295,071

$302,228

Process 1

$0

$1,261

$4,924

$11,692

$15,898

$18,561

$23,141

$28,023

Process 2

$0

$2,522

$9,849

$35,077

$63,591

$74,244

$75,209

$56,045

Rework 2

$0

$1,891

$7,386

$17,538

$23,846

$27,841

$34,712

$42,034

Process 3

$0

$3,152

$12,311

$29,230

$39,744

$46,402

$57,853

$70,056

Process 4

$0

$946

$3,693

$8,769

$11,923

$13,921

$17,356

$21,017

Finished Goods A

$0

$473

$1,847

$4,385

$5,962

$6,960

$8,678

$10,508

Finished Goods B

$0

$315

$1,231

$2,923

$3,974

$4,640

$5,785

$7,006

Total

$0

$10,560

$41,241

$109,614

$164,938

$192,570

$222,735

$234,689

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Total

$16

$17

$9

$3,471

$5,505

$6,823

$9,309

Material

Labor

Fixed Exp

OH Process 1

$0

$504

$1,970

$4,677

$6,359

$7,424

$9,257

$11,209

Process 2

$0

$1,009

$3,939

$14,031

$25,436

$29,698

$30,084

$22,418

Rework 2

$0

$757

$2,955

$7,015

$9,539

$11,137

$13,885

$16,814

Process 3

$0

$1,261

$4,924

$11,692

$15,898

$18,561

$23,141

$28,023

Process 4

$0

$378

$1,477

$3,508

$4,769

$5,568

$6,942

$8,407

Finished Goods A

$0

$189

$739

$1,754

$2,385

$2,784

$3,471

$4,203

Finished Goods B

$0

$126

$492

$1,169

$1,590

$1,856

$2,314

$2,802

Total

$0

$4,224

$16,497

$43,846

$65,975

$77,028

$89,094

$93,875

$0

$28,076

$133,043

$302,403

$438,760

$524,146

$606,900

$630,792

Process 1

$0

$3,352

$15,886

$32,256

$42,290

$50,520

$63,055

$75,318

Process 2

$0

$6,705

$31,771

$96,769

$169,160

$202,080

$204,927

$150,637

Rework 2

$0

$5,029

$23,829

$48,384

$63,435

$75,780

$94,582

$112,978

Process 3

$0

$8,381

$39,714

$80,641

$105,725

$126,300

$157,636

$188,296

Process 4

$0

$2,514

$11,914

$24,192

$31,718

$37,890

$47,291

$56,489

Finished Goods A

$0

$1,257

$5,957

$12,096

$15,859

$18,945

$23,645

$28,244

Finished Goods B

$0

$838

$3,971

$8,064

$10,573

$12,630

$15,764

$18,830

Total

$0

$28,076

$133,043

$302,403

$438,760

$524,146

$606,900

$630,792

Total

Scrap_Cost_2 Lvl 1

0001

0002

0003

0004

0005

0006

0007

0008

Process 1 Material Process 1

$1,600

$1,380

$1,168

$1,863

$2,303

$2,331

$2,265

$2,258

Process 2

$2,000

$2,760

$2,336

$5,590

$9,211

$9,323

$7,361

$4,516

Rework 2

$4,000

$2,070

$1,752

$2,795

$3,454

$3,496

$3,398

$3,387

Process 3

$800

$3,450

$2,920

$4,658

$5,757

$5,827

$5,663

$5,645

Process 4

$1,200

$1,035

$876

$1,398

$1,727

$1,748

$1,699

$1,694

Finished Goods A

$0

$518

$438

$699

$863

$874

$849

$847

Finished Goods B

$0

$345

$292

$466

$576

$583

$566

$565

$9,600

$11,558

$9,781

$17,469

$23,890

$24,180

$21,801

$18,912

Total Labor Process 1

$1,120

$966

$818

$1,304

$1,612

$1,631

$1,586

$1,581

Process 2

$1,400

$1,932

$1,635

$3,913

$6,447

$6,526

$5,153

$3,161

Rework 2

$2,800

$1,449

$1,226

$1,957

$2,418

$2,447

$2,378

$2,371

Process 3

$560

$2,415

$2,044

$3,261

$4,030

$4,079

$3,964

$3,952

Process 4

$840

$725

$613

$978

$1,209

$1,224

$1,189

$1,186

Finished Goods A

$0

$362

$307

$489

$604

$612

$595

$593

Finished Goods B

$0

$242

$204

$326

$403

$408

$396

$395

$6,720

$8,090

$6,847

$12,228

$16,723

$16,926

$15,261

$13,238

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$448

$386

$327

$522

$645

$653

$634

$632

Process 2

$560

$773

$654

$1,565

$2,579

$2,610

$2,061

$1,265

Rework 2

$1,120

$580

$491

$783

$967

$979

$951

$948

Process 3

$224

$966

$818

$1,304

$1,612

$1,631

$1,586

$1,581

Process 4

$336

$290

$245

$391

$484

$489

$476

$474

Finished Goods A

$0

$145

$123

$196

$242

$245

$238

$237

Finished Goods B

$0

$97

$82

$130

$161

$163

$159

$158

$2,688

$3,236

$2,739

$4,891

$6,689

$6,770

$6,104

$5,295

$19,008

$22,884

$19,366

$34,588

$47,302

$47,877

$43,166

$37,445

Process 1

$3,168

$2,732

$2,312

$3,689

$4,559

$4,615

$4,485

$4,471

Process 2

$3,960

$5,465

$4,625

$11,068

$18,237

$18,459

$14,576

$8,942

Rework 2

$7,920

$4,099

$3,469

$5,534

$6,839

$6,922

$6,727

$6,707

Process 3

$1,584

$6,831

$5,781

$9,224

$11,398

$11,537

$11,212

$11,178

Process 4

$2,376

$2,049

$1,734

$2,767

$3,419

$3,461

$3,364

$3,353

$0

$1,025

$867

$1,384

$1,710

$1,730

$1,682

$1,677

Total Fixed Exp

OH

Total Total

Finished Goods A Finished Goods B

$0

$683

$578

$922

$1,140

$1,154

$1,121

$1,118

$19,008

$22,884

$19,366

$34,588

$47,302

$47,877

$43,166

$37,445

Process 1

$0

$6,144

$5,299

$4,485

$7,155

$8,842

$8,950

$8,698

Process 2

$0

$12,288

$10,598

$13,454

$28,621

$35,368

$29,086

$17,396

Rework 2

$0

$9,216

$7,949

$6,727

$10,733

$13,263

$13,424

$13,047

Process 3

$0

$15,360

$13,248

$11,212

$17,888

$22,105

$22,374

$21,744

Process 4

$0

$4,608

$3,974

$3,363

$5,366

$6,632

$6,712

$6,523

Finished Goods A

$0

$2,304

$1,987

$1,682

$2,683

$3,316

$3,356

$3,262

Finished Goods B

$0

$1,536

$1,325

$1,121

$1,789

$2,211

$2,237

$2,174

Total

$0

$51,456

$44,381

$42,044

$74,235

$91,737

$86,140

$72,844

Total Process 2 Material

Labor

Process 1

$0

$2,765

$2,385

$2,018

$3,220

$3,979

$4,027

$3,914

Process 2

$0

$5,530

$4,769

$6,054

$12,879

$15,916

$13,089

$7,828

Rework 2

$0

$4,147

$3,577

$3,027

$4,830

$5,968

$6,041

$5,871

Process 3

$0

$6,912

$5,962

$5,045

$8,050

$9,947

$10,068

$9,785

Process 4

$0

$2,074

$1,788

$1,514

$2,415

$2,984

$3,021

$2,936

Finished Goods A

$0

$1,037

$894

$757

$1,207

$1,492

$1,510

$1,468

Finished Goods B

$0

$691

$596

$505

$805

$995

$1,007

$979

Total

$0

$23,155

$19,971

$18,920

$33,406

$41,282

$38,763

$32,780

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$1,106

$954

$807

$1,288

$1,592

$1,611

$1,566

Process 2

$0

$2,212

$1,908

$2,422

$5,152

$6,366

$5,236

$3,131

Rework 2

$0

$1,659

$1,431

$1,211

$1,932

$2,387

$2,416

$2,348

Process 3

$0

$2,765

$2,385

$2,018

$3,220

$3,979

$4,027

$3,914

Process 4

$0

$829

$715

$605

$966

$1,194

$1,208

$1,174

Finished Goods A

$0

$415

$358

$303

$483

$597

$604

$587

Finished Goods B

$0

$276

$238

$202

$322

$398

$403

$391

Total

$0

$9,262

$7,989

$7,568

$13,362

$16,513

$15,505

$13,112

Fixed Exp

OH

Total

$0

$83,873

$72,341

$68,531

$121,004

$149,531

$140,409

$118,736

Process 1

$0

$10,015

$8,638

$7,310

$11,663

$14,413

$14,588

$14,177

Process 2

$0

$20,029

$17,275

$21,930

$46,652

$57,650

$47,411

$28,355

Rework 2

$0

$15,022

$12,957

$10,965

$17,494

$21,619

$21,882

$21,266

Process 3

$0

$25,037

$21,594

$18,275

$29,157

$36,032

$36,470

$35,444

Process 4

$0

$7,511

$6,478

$5,482

$8,747

$10,809

$10,941

$10,633

Finished Goods A

$0

$3,756

$3,239

$2,741

$4,374

$5,405

$5,470

$5,317

Finished Goods B

$0

$2,504

$2,159

$1,827

$2,916

$3,603

$3,647

$3,544

Total

$0

$83,873

$72,341

$68,531

$121,004

$149,531

$140,409

$118,736

Process 1

$0

$0

$85

$73

$59

$90

$111

$117

Process 2

$0

$0

$170

$219

$237

$361

$362

$234

Rework 2

$0

$0

$127

$110

$89

$135

$167

$175

Process 3

$0

$0

$212

$183

$148

$225

$279

$292

Process 4

$0

$0

$64

$55

$44

$68

$84

$88

Finished Goods A

$0

$0

$32

$27

$22

$34

$42

$44

Finished Goods B

$0

$0

$21

$18

$15

$23

$28

$29

Total

$0

$0

$710

$686

$614

$935

$1,072

$978

Process 1

$0

$0

$177

$152

$123

$188

$232

$243

Process 2

$0

$0

$353

$457

$493

$751

$754

$487

Rework 2

$0

$0

$265

$229

$185

$282

$348

$365

Process 3

$0

$0

$442

$381

$308

$470

$580

$608

Process 4

$0

$0

$132

$114

$92

$141

$174

$182

Finished Goods A

$0

$0

$66

$57

$46

$70

$87

$91

Finished Goods B

$0

$0

$44

$38

$31

$47

$58

$61

Total

$0

$0

$1,479

$1,428

$1,280

$1,949

$2,234

$2,038

Rework 2 Material

Labor

Fixed Exp Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$71

$61

$49

$75

$93

$97

Process 2

$0

$0

$141

$183

$197

$301

$302

$195

Rework 2

$0

$0

$106

$91

$74

$113

$139

$146

Process 3

$0

$0

$177

$152

$123

$188

$232

$243

Process 4

$0

$0

$53

$46

$37

$56

$70

$73

Finished Goods A

$0

$0

$26

$23

$18

$28

$35

$36

Finished Goods B

$0

$0

$18

$15

$12

$19

$23

$24

Total

$0

$0

$592

$571

$512

$779

$894

$815

OH

Total

$0

$0

$2,781

$2,685

$2,406

$3,664

$4,200

$3,831

Process 1

$0

$0

$332

$286

$232

$353

$436

$457

Process 2

$0

$0

$664

$859

$927

$1,412

$1,418

$915

Rework 2

$0

$0

$498

$430

$348

$530

$655

$686

Process 3

$0

$0

$830

$716

$580

$883

$1,091

$1,144

Process 4

$0

$0

$249

$215

$174

$265

$327

$343

Finished Goods A

$0

$0

$125

$107

$87

$132

$164

$172

Finished Goods B

$0

$0

$83

$72

$58

$88

$109

$114

Total

$0

$0

$2,781

$2,685

$2,406

$3,664

$4,200

$3,831

Process 1

$0

$0

$537

$490

$398

$590

$734

$775

Process 2

$0

$0

$1,074

$1,469

$1,591

$2,358

$2,385

$1,549

Rework 2

$0

$0

$805

$735

$597

$884

$1,101

$1,162

Process 3

$0

$0

$1,342

$1,224

$995

$1,474

$1,835

$1,936

Process 4

$0

$0

$403

$367

$298

$442

$550

$581

Finished Goods A

$0

$0

$201

$184

$149

$221

$275

$290

Finished Goods B

$0

$0

$134

$122

$99

$147

$183

$194

Total

$0

$0

$4,497

$4,591

$4,127

$6,116

$7,063

$6,487

Process 1

$0

$0

$3,625

$3,306

$2,685

$3,979

$4,953

$5,229

Process 2

$0

$0

$7,249

$9,917

$10,741

$15,917

$16,099

$10,457

Rework 2

$0

$0

$5,437

$4,958

$4,028

$5,969

$7,430

$7,843

Process 3

$0

$0

$9,062

$8,264

$6,713

$9,948

$12,384

$13,071

Process 4

$0

$0

$2,718

$2,479

$2,014

$2,985

$3,715

$3,921

Finished Goods A

$0

$0

$1,359

$1,240

$1,007

$1,492

$1,858

$1,961

Finished Goods B

$0

$0

$906

$826

$671

$995

$1,238

$1,307

Total

$0

$0

$30,356

$30,990

$27,861

$41,286

$47,677

$43,789

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Process 3 Material

Labor

Fixed Exp

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$1,450

$1,322

$1,074

$1,592

$1,981

$2,091

Process 2

$0

$0

$2,900

$3,967

$4,297

$6,367

$6,440

$4,183

Rework 2

$0

$0

$2,175

$1,983

$1,611

$2,388

$2,972

$3,137

Process 3

$0

$0

$3,625

$3,306

$2,685

$3,979

$4,953

$5,229

Process 4

$0

$0

$1,087

$992

$806

$1,194

$1,486

$1,569

Finished Goods A

$0

$0

$544

$496

$403

$597

$743

$784

Finished Goods B

$0

$0

$362

$331

$269

$398

$495

$523

Total

$0

$0

$12,143

$12,396

$11,144

$16,514

$19,071

$17,516

OH

Total

$0

$0

$46,996

$47,977

$43,132

$63,917

$73,811

$67,792

Process 1

$0

$0

$5,611

$5,118

$4,157

$6,161

$7,669

$8,095

Process 2

$0

$0

$11,223

$15,353

$16,629

$24,643

$24,923

$16,189

Rework 2

$0

$0

$8,417

$7,676

$6,236

$9,241

$11,503

$12,142

Process 3

$0

$0

$14,029

$12,794

$10,393

$15,402

$19,172

$20,236

Process 4

$0

$0

$4,209

$3,838

$3,118

$4,620

$5,752

$6,071

Finished Goods A

$0

$0

$2,104

$1,919

$1,559

$2,310

$2,876

$3,035

Finished Goods B

$0

$0

$1,403

$1,279

$1,039

$1,540

$1,917

$2,024

Total

$0

$0

$46,996

$47,977

$43,132

$63,917

$73,811

$67,792

Process 1

$0

$0

$0

$967

$881

$716

$1,061

$1,321

Process 2

$0

$0

$0

$2,900

$3,526

$2,864

$3,449

$2,642

Rework 2

$0

$0

$0

$1,450

$1,322

$1,074

$1,592

$1,981

Process 3

$0

$0

$0

$2,416

$2,204

$1,790

$2,653

$3,302

Process 4

$0

$0

$0

$725

$661

$537

$796

$991

Finished Goods A

$0

$0

$0

$362

$331

$269

$398

$495

Finished Goods B

$0

$0

$0

$242

$220

$179

$265

$330

Total

$0

$0

$0

$9,062

$9,145

$7,429

$10,214

$11,063

Process 1

$0

$0

$0

$870

$793

$644

$955

$1,189

Process 2

$0

$0

$0

$2,610

$3,173

$2,578

$3,104

$2,378

Rework 2

$0

$0

$0

$1,305

$1,190

$967

$1,433

$1,783

Process 3

$0

$0

$0

$2,175

$1,983

$1,611

$2,388

$2,972

Process 4

$0

$0

$0

$652

$595

$483

$716

$892

Finished Goods A

$0

$0

$0

$326

$298

$242

$358

$446

Finished Goods B

$0

$0

$0

$217

$198

$161

$239

$297

Total

$0

$0

$0

$8,155

$8,231

$6,687

$9,192

$9,956

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$0

$0

$0

$348

$317

$258

$382

$476

Process 2

$0

$0

$0

$1,044

$1,269

$1,031

$1,242

$951

Rework 2

$0

$0

$0

$522

$476

$387

$573

$713

Process 3

$0

$0

$0

$870

$793

$644

$955

$1,189

Process 4

$0

$0

$0

$261

$238

$193

$287

$357

Finished Goods A

$0

$0

$0

$130

$119

$97

$143

$178

Process 4 Material

Labor

Fixed Exp

OH

Finished Goods B

$0

$0

$0

Total

$0

$0

$0

$3,262

$3,292

$2,675

$3,677

$3,983

$0

$0

$0

$20,479

$20,669

$16,791

$23,083

$25,002

Process 1

$0

$0

$0

$2,184

$1,992

$1,618

$2,398

$2,985

Process 2

$0

$0

$0

$6,553

$7,969

$6,474

$7,794

$5,971

Rework 2

$0

$0

$0

$3,277

$2,988

$2,428

$3,597

$4,478

Process 3

$0

$0

$0

$5,461

$4,980

$4,046

$5,996

$7,463

Process 4

$0

$0

$0

$1,638

$1,494

$1,214

$1,799

$2,239

Finished Goods A

$0

$0

$0

$819

$747

$607

$899

$1,119

Finished Goods B

$0

$0

$0

$546

$498

$405

$600

$746

Total

$0

$0

$0

$20,479

$20,669

$16,791

$23,083

$25,002

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$160

$120

$70

$86

$86

$67

$80

$99

Process 2

$200

$240

$140

$257

$346

$268

$259

$198

Rework 2

$400

$180

$105

$128

$130

$100

$119

$149

Process 3

$80

$300

$176

$214

$216

$167

$199

$248

Process 4

$120

$90

$53

$64

$65

$50

$60

$74

Finished Goods A

$0

$45

$26

$32

$32

$25

$30

$37

Finished Goods B

$0

$30

$18

$21

$22

$17

$20

$25

$960

$1,005

$588

$803

$897

$694

$766

$830

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

$64

$48

$28

$34

$35

$27

$32

$40

Process 2

$80

$96

$56

$103

$138

$107

$103

$79

Rework 2

$160

$72

$42

$51

$52

$40

$48

$59

Process 3

$32

$120

$70

$86

$86

$67

$80

$99

Process 4

$48

$36

$21

$26

$26

$20

$24

$30

$0

$18

$11

$13

$13

$10

$12

$15

Total

$87

$79

$64

$96

$119

Finished Goods A Material

Labor

Total Fixed Exp

OH Process 1

Finished Goods A Finished Goods B Total Total

$0

$12

$7

$9

$9

$7

$8

$10

$384

$402

$235

$321

$359

$278

$306

$332

$1,344

$1,407

$823

$1,124

$1,256

$971

$1,072

$1,162

Process 1

$224

$168

$98

$120

$121

$94

$111

$139

Process 2

$280

$336

$197

$360

$484

$375

$362

$277

Rework 2

$560

$252

$147

$180

$182

$140

$167

$208

Process 3

$112

$420

$246

$300

$303

$234

$279

$347

Process 4

$168

$126

$74

$90

$91

$70

$84

$104

Finished Goods A Finished Goods B

$0

$63

$37

$45

$45

$35

$42

$52

$0

$42

$25

$30

$30

$23

$28

$35

$1,344

$1,407

$823

$1,124

$1,256

$971

$1,072

$1,162

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$38

$30

$20

$8

$47

$73

$89

$120

Process 2

$48

$60

$39

$23

$188

$293

$290

$239

Rework 2

$95

$45

$30

$11

$70

$110

$134

$180

Process 3

$19

$75

$49

$19

$117

$183

$223

$299

Process 4

Total Finished Goods B Material

Labor

$29

$23

$15

$6

$35

$55

$67

$90

Finished Goods A

$0

$11

$7

$3

$18

$27

$33

$45

Finished Goods B

$0

$8

$5

$2

$12

$18

$22

$30

$228

$251

$165

$70

$486

$759

$858

$1,003

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$15

$12

$8

$3

$19

$29

$36

$48

Process 2

$19

$24

$16

$9

$75

$117

$116

$96

Rework 2

$38

$18

$12

$5

$28

$44

$53

$72

Process 3

$8

$30

$20

$8

$47

$73

$89

$120

Process 4

$11

$9

$6

$2

$14

$22

$27

$36

Finished Goods A

$0

$5

$3

$1

$7

$11

$13

$18

Finished Goods B

$0

$3

$2

$1

$5

$7

$9

$12

$91

$101

$66

$28

$195

$304

$343

$401

$319

$352

$231

$98

$681

$1,063

$1,201

$1,404

Process 1

$53

$42

$28

$11

$66

$102

$125

$168

Process 2

$67

$84

$55

$32

$263

$410

$406

$335

Rework 2

$133

$63

$41

$16

$98

$154

$187

$251

Process 3

$27

$105

$69

$26

$164

$256

$312

$419

Process 4

$40

$32

$21

$8

$49

$77

$94

$126

Finished Goods A

$0

$16

$10

$4

$25

$38

$47

$63

Finished Goods B

$0

$11

$7

$3

$16

$26

$31

$42

$319

$352

$231

$98

$681

$1,063

$1,201

$1,404

$20,671

$108,516

$142,539

$175,483

$236,449

$283,813

$286,943

$255,371

Process 1

$1,600

$7,524

$7,089

$7,877

$10,796

$12,569

$13,121

$13,168

Process 2

$2,000

$15,048

$14,178

$23,632

$43,185

$50,274

$42,644

$26,336

Rework 2

$4,000

$11,286

$10,633

$11,816

$16,195

$18,853

$19,682

$19,752

Total Fixed Exp

OH

Total Total

Total Total Material

Process 3

$800

$18,810

$17,722

$19,694

$26,991

$31,421

$32,803

$32,921

Process 4

$1,200

$5,643

$5,317

$5,908

$8,097

$9,426

$9,841

$9,876

Finished Goods A

$0

$2,822

$2,658

$2,954

$4,049

$4,713

$4,920

$4,938

Finished Goods B

$0

$1,881

$1,772

$1,969

$2,699

$3,142

$3,280

$3,292

$9,600

$63,014

$59,369

$73,851

$112,012

$130,398

$126,291

$110,284

Process 1

$1,318

$3,881

$7,093

$7,743

$8,567

$10,562

$11,922

$12,374

Process 2

$1,648

$7,762

$14,187

$23,230

$34,268

$42,248

$38,747

$24,748

Rework 2

$3,295

$5,821

$10,640

$11,615

$12,851

$15,843

$17,883

$18,561

Process 3

$659

$9,702

$17,733

$19,359

$21,418

$26,405

$29,806

$30,935

Process 4

$989

$2,911

$5,320

$5,808

$6,425

$7,922

$8,942

$9,281

$0

$1,455

$2,660

$2,904

$3,213

$3,961

$4,471

$4,640

Total Labor

Finished Goods A Finished Goods B

$0

$970

$1,773

$1,936

$2,142

$2,641

$2,981

$3,094

$7,908

$32,502

$59,407

$72,595

$88,883

$109,582

$114,752

$103,634

Process 1

$0

$0

$0

$0

$0

$0

$0

$0

Process 2

$0

$0

$0

$0

$0

$0

$0

$0

Rework 2

$0

$0

$0

$0

$0

$0

$0

$0

Process 3

$0

$0

$0

$0

$0

$0

$0

$0

Process 4

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods A

$0

$0

$0

$0

$0

$0

$0

$0

Finished Goods B

$0

$0

$0

$0

$0

$0

$0

$0

Total

$0

$0

$0

$0

$0

$0

$0

$0

Process 1

$527

$1,552

$2,837

$3,097

$3,427

$4,225

$4,769

$4,950

Process 2

$659

$3,105

$5,675

$9,292

$13,707

$16,899

$15,499

$9,899

Rework 2

$1,318

$2,328

$4,256

$4,646

$5,140

$6,337

$7,153

$7,425

Process 3

$264

$3,881

$7,093

$7,743

$8,567

$10,562

$11,922

$12,374

Process 4

$395

$1,164

$2,128

$2,323

$2,570

$3,169

$3,577

$3,712

Finished Goods A

$0

$582

$1,064

$1,162

$1,285

$1,584

$1,788

$1,856

Finished Goods B

$0

$388

$709

$774

$857

$1,056

$1,192

$1,237

$3,163

$13,001

$23,763

$29,038

$35,553

$43,833

$45,901

$41,454

Total Fixed Exp

OH

Total Total

$20,671

$108,516

$142,539

$175,483

$236,449

$283,813

$286,943

$255,371

Process 1

$3,445

$12,957

$17,020

$18,718

$22,790

$27,355

$29,812

$30,492

Process 2

$4,307

$25,914

$34,039

$56,155

$91,161

$109,422

$96,890

$60,984

Rework 2

$8,613

$19,436

$25,529

$28,077

$34,185

$41,033

$44,718

$45,738

Process 3

$1,723

$32,393

$42,549

$46,796

$56,976

$68,389

$74,531

$76,230

Process 4

$2,584

$9,718

$12,765

$14,039

$17,093

$20,517

$22,359

$22,869

Finished Goods A

$0

$4,859

$6,382

$7,019

$8,546

$10,258

$11,180

$11,435

Finished Goods B

$0

$3,239

$4,255

$4,680

$5,698

$6,839

$7,453

$7,623

$20,671

$108,516

$142,539

$175,483

$236,449

$283,813

$286,943

$255,371

Total WIP_Buffer_Stock_1 Lvl 1

0001

0002

0003

0004

0005

0006

0007

0008

Process 1 Material

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Labor

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fixed Exp

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OH

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Material

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Labor

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fixed Exp

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OH

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Process 2

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Material

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Labor

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fixed Exp

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OH

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Material

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Labor

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fixed Exp

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OH

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Material

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Labor

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fixed Exp

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OH

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Material

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Labor

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fixed Exp

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OH

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Material

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Labor

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fixed Exp

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OH

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Material

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Labor

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Fixed Exp

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

OH

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Rework 2

Process 3

Process 4

Finished Goods A

Finished Goods B

Total

Units_Demand_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Units_Demand_2 0001

0002

0003

0004

0005

0006

0007

0008

Units_In_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Units_In_2 0001

0002

0003

0004

0005

0006

0007

0008

Units_Avail_In_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Units_Avail_In_2

0001

0002

0003

0004

0005

0006

0007

0008

Units_Out_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Units_Out_2 0001

0002

0003

0004

0005

0006

0007

0008

Process_Yield_pct_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Process_Yield_pct_2 0001

0002

0003

0004

0005

0006

0007

0008

Units_Sold_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Units_Sold_2 0001

0002

0003

0004

0005

0006

0007

0008

Units_Buffer_Stock_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Units_Buffer_Stock_2 0001

0002

0003

0004

0005

0006

0007

0008

Process_Cost_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Process_Cost_2 0001

0002

0003

0004

0005

0006

0007

0008

Proc_Cost_per_U_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Proc_Cost_per_U_2 0001

0002

0003

0004

0005

0006

0007

0008

Units_Scrap_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Units_Scrap_2 0001

0002

0003

0004

0005

0006

0007

0008

Revenue_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Revenue_2 0001

0002

0003

0004

0005

0006

0007

0008

COGS_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

COGS_2

0001

0002

0003

0004

0005

0006

0007

0008

COGS_per_U_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

COGS_per_U_2 0001

0002

0003

0004

0005

0006

0007

0008

Scrap_Cost_per_U_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Scrap_Cost_per_U_2 0001

0002

0003

0004

0005

0006

0007

0008

Scrap_Cost_3 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Scrap_Cost_4 0001

0002

0003

0004

0005

0006

0007

0008

Gross_Margin_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Gross_Margin_2 0001

0002

0003

0004

0005

0006

0007

0008

Gross_Margin_pct_1 0001

0002

0003

0004

0005

0006

0007

0008

1/1/2001

1/1/2002

1/1/2003

1/1/2004

1/1/2005

1/1/2006

1/1/2007

1/1/2008

0001

0002

0003

0004

0005

0006

0007

0008

Gross_Margin_pct_2 0001

0002

0003

0004

0005

0006

0007

0008

0009

0010

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,240

$2,302

$3,360

$3,453

$3,360

$3,453

$5,600

$5,754

$1,680

$1,726

$840

$863

$560

$575

$17,639

$18,126

$1,568

$1,611

$2,352

$2,417

$2,352

$2,417

$3,920

$4,028

$1,176

$1,208

$588

$604

$392

$403

$12,347

$12,688

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$627

$644

$941

$967

$941

$967

$1,568

$1,611

$470

$483

$235

$242

$157

$161

$4,939

$5,075

$34,925

$35,889

$4,435

$4,557

$6,652

$6,836

$6,652

$6,836

$11,087

$11,393

$3,326

$3,418

$1,663

$1,709

$1,109

$1,139

$34,925

$35,889

$540

$540

$809

$810

$809

$810

$1,349

$1,350

$405

$405

$202

$202

$135

$135

$4,249

$4,251

$270

$271

$406

$406

$406

$406

$676

$677

$203

$203

$101

$101

$68

$68

$2,130

$2,131

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$108

$108

$162

$162

$162

$162

$270

$271

$81

$81

$41

$41

$27

$27

$852

$852

$7,231

$7,235

$918

$919

$1,377

$1,378

$1,377

$1,378

$2,296

$2,297

$689

$689

$344

$345

$230

$230

$7,231

$7,235

$10,915

$10,912

$16,372

$16,368

$16,372

$16,368

$27,286

$27,280

$8,186

$8,184

$4,093

$4,092

$2,729

$2,728

$85,952

$85,931

$5,655

$5,659

$8,483

$8,489

$8,483

$8,489

$14,138

$14,148

$4,241

$4,244

$2,121

$2,122

$1,414

$1,415

$44,535

$44,565

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,262

$2,264

$3,393

$3,395

$3,393

$3,395

$5,655

$5,659

$1,697

$1,698

$848

$849

$566

$566

$17,814

$17,826

$148,301

$148,322

$18,832

$18,835

$28,248

$28,252

$28,248

$28,252

$47,080

$47,086

$14,124

$14,126

$7,062

$7,063

$4,708

$4,709

$148,301

$148,322

$4,700

$4,633

$7,051

$6,949

$7,051

$6,949

$11,751

$11,582

$3,525

$3,475

$1,763

$1,737

$1,175

$1,158

$37,015

$36,485

$4,341

$4,365

$6,512

$6,547

$6,512

$6,547

$10,853

$10,912

$3,256

$3,274

$1,628

$1,637

$1,085

$1,091

$34,186

$34,373

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,736

$1,746

$2,605

$2,619

$2,605

$2,619

$4,341

$4,365

$1,302

$1,309

$651

$655

$434

$436

$13,675

$13,749

$84,876

$84,607

$10,778

$10,744

$16,167

$16,116

$16,167

$16,116

$26,945

$26,860

$8,083

$8,058

$4,042

$4,029

$2,694

$2,686

$84,876

$84,607

$7,161

$6,988

$10,742

$10,482

$10,742

$10,482

$17,903

$17,469

$5,371

$5,241

$2,685

$2,620

$1,790

$1,747

$56,394

$55,029

$6,614

$6,583

$9,921

$9,875

$9,921

$9,875

$16,535

$16,458

$4,961

$4,937

$2,480

$2,469

$1,654

$1,646

$52,087

$51,843

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,646

$2,633

$3,968

$3,950

$3,968

$3,950

$6,614

$6,583

$1,984

$1,975

$992

$987

$661

$658

$20,835

$20,737

$129,316

$127,609

$16,421

$16,204

$24,632

$24,307

$24,632

$24,307

$41,053

$40,511

$12,316

$12,153

$6,158

$6,077

$4,105

$4,051

$129,316

$127,609

$14,627

$18,471

$21,941

$27,706

$21,941

$27,706

$36,568

$46,177

$10,970

$13,853

$5,485

$6,927

$3,657

$4,618

$115,189

$145,457

$13,586

$17,227

$20,379

$25,841

$20,379

$25,841

$33,965

$43,068

$10,189

$12,920

$5,095

$6,460

$3,396

$4,307

$106,990

$135,665

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$5,434

$6,891

$8,152

$10,336

$8,152

$10,336

$13,586

$17,227

$4,076

$5,168

$2,038

$2,584

$1,359

$1,723

$42,796

$54,266

$264,975

$335,388

$33,648

$42,589

$50,471

$63,883

$50,471

$63,883

$84,119

$106,472

$25,236

$31,942

$12,618

$15,971

$8,412

$10,647

$264,975

$335,388

$669,624

$739,051

$40,183

$43,845

$60,274

$65,767

$60,274

$65,767

$100,457

$109,612

$30,137

$32,884

$15,069

$16,442

$10,046

$10,961

$316,439

$345,279

$32,035

$35,716

$48,052

$53,574

$48,052

$53,574

$80,087

$89,291

$24,026

$26,787

$12,013

$13,394

$8,009

$8,929

$252,275

$281,266

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$12,814

$14,287

$19,221

$21,430

$19,221

$21,430

$32,035

$35,716

$9,610

$10,715

$4,805

$5,357

$3,203

$3,572

$100,910

$112,506

$669,624

$739,051

$85,032

$93,848

$127,547

$140,772

$127,547

$140,772

$212,579

$234,619

$63,774

$70,386

$31,887

$35,193

$21,258

$23,462

$669,624

$739,051

0009

$2,320

0010

$2,441

$3,481

$3,661

$3,481

$3,661

$5,801

$6,102

$1,740

$1,831

$870

$915

$580

$610

$18,273

$19,221

$1,624

$1,709

$2,436

$2,563

$2,436

$2,563

$4,061

$4,271

$1,218

$1,281

$609

$641

$406

$427

$12,791

$13,455

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$650

$683

$975

$1,025

$975

$1,025

$1,624

$1,709

$487

$513

$244

$256

$162

$171

$5,117

$5,382

$36,181

$38,058

$4,594

$4,833

$6,892

$7,249

$6,892

$7,249

$11,486

$12,082

$3,446

$3,625

$1,723

$1,812

$1,149

$1,208

$36,181

$38,058

$8,671

$8,910

$13,007

$13,366

$13,007

$13,366

$21,678

$22,276

$6,503

$6,683

$3,252

$3,341

$2,168

$2,228

$68,286

$70,170

$3,902

$4,010

$5,853

$6,015

$5,853

$6,015

$9,755

$10,024

$2,927

$3,007

$1,463

$1,504

$976

$1,002

$30,729

$31,577

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$1,561

$1,604

$2,341

$2,406

$2,341

$2,406

$3,902

$4,010

$1,171

$1,203

$585

$601

$390

$401

$12,291

$12,631

$111,306

$114,377

$14,134

$14,524

$21,201

$21,786

$21,201

$21,786

$35,335

$36,310

$10,601

$10,893

$5,300

$5,447

$3,534

$3,631

$111,306

$114,377

$120

$122

$180

$183

$180

$183

$300

$306

$90

$92

$45

$46

$30

$31

$945

$963

$250

$255

$375

$382

$375

$382

$625

$637

$188

$191

$94

$96

$63

$64

$1,969

$2,006

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$100

$102

$150

$153

$150

$153

$250

$255

$75

$76

$38

$38

$25

$25

$788

$802

$3,702

$3,771

$470

$479

$705

$718

$705

$718

$1,175

$1,197

$353

$359

$176

$180

$118

$120

$3,702

$3,771

$797

$812

$1,195

$1,218

$1,195

$1,218

$1,992

$2,030

$598

$609

$299

$304

$199

$203

$6,275

$6,394

$5,378

$5,481

$8,067

$8,221

$8,067

$8,221

$13,446

$13,702

$4,034

$4,110

$2,017

$2,055

$1,345

$1,370

$42,354

$43,160

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$2,151

$2,192

$3,227

$3,288

$3,227

$3,288

$5,378

$5,481

$1,613

$1,644

$807

$822

$538

$548

$16,942

$17,264

$65,570

$66,818

$8,326

$8,485

$12,490

$12,727

$12,490

$12,727

$20,816

$21,212

$6,245

$6,364

$3,122

$3,182

$2,082

$2,121

$65,570

$66,818

$1,394

$1,434

$2,091

$2,151

$2,091

$2,151

$3,486

$3,586

$1,046

$1,076

$523

$538

$349

$359

$10,980

$11,294

$1,255

$1,291

$1,882

$1,936

$1,882

$1,936

$3,137

$3,227

$941

$968

$471

$484

$314

$323

$9,882

$10,165

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$502

$516

$753

$774

$753

$774

$1,255

$1,291

$376

$387

$188

$194

$125

$129

$3,953

$4,066

$24,815

$25,525

$3,151

$3,241

$4,727

$4,862

$4,727

$4,862

$7,878

$8,103

$2,363

$2,431

$1,182

$1,215

$788

$810

$24,815

$25,525

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$106

$108

$159

$162

$159

$162

$265

$270

$80

$81

$40

$41

$27

$27

$836

$852

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$42

$43

$64

$65

$64

$65

$106

$108

$32

$32

$16

$16

$11

$11

$334

$341

$1,170

$1,192

$149

$151

$223

$227

$223

$227

$372

$378

$111

$114

$56

$57

$37

$38

$1,170

$1,192

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$161

$203

$241

$304

$241

$304

$402

$507

$120

$152

$60

$76

$40

$51

$1,265

$1,596

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$64

$81

$96

$122

$96

$122

$161

$203

$48

$61

$24

$30

$16

$20

$506

$638

$1,771

$2,234

$225

$284

$337

$426

$337

$426

$562

$709

$169

$213

$84

$106

$56

$71

$1,771

$2,234

$244,515

$251,976

$13,303

$13,720

$19,954

$20,580

$19,954

$20,580

$33,257

$34,299

$9,977

$10,290

$4,989

$5,145

$3,326

$3,430

$104,759

$108,043

$12,676

$13,055

$19,014

$19,583

$19,014

$19,583

$31,691

$32,638

$9,507

$9,791

$4,754

$4,896

$3,169

$3,264

$99,826

$102,809

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$0

$5,071

$5,222

$7,606

$7,833

$7,606

$7,833

$12,676

$13,055

$3,803

$3,917

$1,901

$1,958

$1,268

$1,306

$39,930

$41,124

$244,515

$251,976

$31,050

$31,997

$46,574

$47,995

$46,574

$47,995

$77,624

$79,992

$23,287

$23,998

$11,644

$11,999

$7,762

$7,999

$244,515

$251,976

0009

0010

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

0009

0010

1/1/2009

1/1/2010

0009

0010

0009

0010

Process Flow Analysis, Scenario 1 Default Variables Ident Lvl 1

Process 1

Process 2

Rework 2

Process 3

Process 4

Finished Goods A

Process 1

1

0

0

0

0

0

Process 2

0

1

0

0

0

0

Rework 2

0

0

1

0

0

0

Process 3

0

0

0

1

0

0

Process 4

0

0

0

0

1

0

Finished Goods A

0

0

0

0

0

1

Finished Goods B

0

0

0

0

0

0

Scrap Cost/Unit Lvl 1

0001

0002

0003

0004

0005

0006

Process 1 Material

$60.00

$83.75

$83.75

$93.75

$103.75

$103.75

Labor

$42.00

$58.63

$58.63

$65.63

$72.63

$72.63

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Fixed Exp OH

$16.80

$23.45

$23.45

$26.25

$29.05

$29.05

$118.80

$165.83

$165.83

$185.63

$205.43

$205.43

Material

$0.00

$210.77

$210.77

$157.29

$130.55

$130.55

Labor

$0.00

$105.66

$105.66

$78.85

$65.45

$65.45

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$42.26

$42.26

$31.54

$26.18

$26.18

Total

$0.00

$358.69

$358.69

$267.68

$222.18

$222.18

Material

$0.00

$0.00

$368.18

$412.14

$470.29

$485.83

Labor

$0.00

$0.00

$290.57

$325.27

$367.07

$374.86

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$116.23

$130.11

$146.83

$149.95

Total

$0.00

$0.00

$774.98

$867.52

$984.20

$1,010.64

Material

$0.00

$0.00

$194.11

$220.49

$252.25

$260.08

Labor

$0.00

$0.00

$181.04

$208.35

$234.98

$236.73

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$72.42

$83.34

$93.99

$94.69

Total

$0.00

$0.00

$447.57

$512.18

$581.23

$591.50

Material

$0.00

$0.00

$0.00

$1,045.73

$1,170.48

$1,200.92

Labor

$0.00

$0.00

$0.00

$967.17

$1,093.59

$1,109.99

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$0.00

$0.00

$386.87

$437.44

$443.99

Total

$0.00

$0.00

$0.00

$2,399.76

$2,701.51

$2,754.90

Material

$0.00

$0.00

$0.00

$1,347.14

$1,721.41

$1,827.23

Labor

$0.00

$44.67

$57.96

$1,289.91

$1,658.74

$1,740.80

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$0.00

$17.87

$23.19

$515.96

$663.50

$696.32

Total

$0.00

$62.53

$81.15

$3,153.01

$4,043.65

$4,264.35

Material

$0.00

$0.00

$0.00

$0.00

$3,570.80

$3,605.92

Labor

$0.00

$67.00

$89.09

$124.71

$3,344.04

$3,413.82

Fixed Exp

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

Total Process 2

Rework 2

Process 3

Process 4

Finished Goods A

Finished Goods B

OH Total

$0.00

$26.80

$35.64

$49.88

$1,337.62

$1,365.53

$0.00

$93.80

$124.73

$174.59

$8,252.45

$8,385.27

$129.20

$274.45

$362.98

$526.23

$527.91

$515.53

Material

$2,833.26

$910.83

$597.09

$499.18

$354.43

$289.25

Labor

$2,400.47

$771.70

$505.89

$422.93

$300.29

$245.07

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

OH

$960.19

$308.68

$202.35

$169.17

$120.11

$98.03

Total

$129.20

$274.45

$362.98

$526.23

$527.91

$515.53

Total

Fixed Exp

Finished Goods B 0 0 0 0 0 0 1 0007

0008

0009

0010

$96.25

$83.75

$78.75

$78.75

$67.38

$58.63

$55.13

$55.13

$0.00

$0.00

$0.00

$0.00

$26.95

$23.45

$22.05

$22.05

$190.58

$165.83

$155.93

$155.93

$149.06

$210.77

$264.25

$264.25

$74.73

$105.66

$132.47

$132.47

$0.00

$0.00

$0.00

$0.00

$29.89

$42.26

$52.99

$52.99

$253.68

$358.69

$449.71

$449.71

$450.71

$382.66

$346.20

$341.16

$347.77

$297.83

$273.22

$270.70

$0.00

$0.00

$0.00

$0.00

$139.11

$119.13

$109.29

$108.28

$937.58

$799.63

$728.71

$720.13

$242.00

$205.47

$185.20

$181.93

$220.52

$189.77

$174.48

$172.87

$0.00

$0.00

$0.00

$0.00

$88.21

$75.91

$69.79

$69.15

$550.74

$471.15

$429.47

$423.95

$1,140.89

$995.05

$917.95

$888.37

$1,035.84

$904.23

$842.84

$828.11

$0.00

$0.00

$0.00

$0.00

$414.34

$361.69

$337.14

$331.25

$2,591.07

$2,260.98

$2,097.93

$2,047.73

$1,768.44

$1,543.44

$1,416.67

$1,357.14

$1,635.35

$1,428.80

$1,329.45

$1,299.57

$0.00

$0.00

$0.00

$0.00

$654.14

$571.52

$531.78

$519.83

$4,057.93

$3,543.77

$3,277.90

$3,176.54

$3,396.87

$3,014.89

$2,868.90

$2,871.52

$3,224.34

$2,840.91

$2,696.19

$2,709.72

$0.00

$0.00

$0.00

$0.00

$1,289.74

$1,136.36

$1,078.47

$1,083.89

$7,910.95

$6,992.17

$6,643.56

$6,665.13

$588.76

$694.46

$760.23

$795.39

$298.60

$355.26

$377.00

$363.83

$252.98

$300.99

$319.41

$308.26

$0.00

$0.00

$0.00

$0.00

$101.19

$120.40

$127.76

$123.30

$588.76

$694.46

$760.23

$795.39

Process Flow Analysis, Scenario 1 Labels Variable

Display Label

Capacity_per_Station

Capacity/Station

Capacity_Util_pct

Capacity Utilization %

COGS

Cost of Goods

COGS_per_U

COGS/Unit

Cost_per_U_Purchd_In

Cost/Unit Purch'd In

Cost_Purchd_U_In

Cost Purch'd Units In

FG_Inven_Targ_Periods

FG Inventory Target Periods

Fixed_Exp_per_Station

Fixed Expense/Station

Fixed_Expense

Fixed Expense

Gross_Margin

Gross Margin

Gross_Margin_pct

Gross Margin %

Ident

Ident

Labor_Overhead_pct

Labor Overhead %

Proc_Cost_per_U

Process Cost/Unit

Proc_Cost_per_U_Sc1

Process Cost/U Scenario 1

Proc_Cost_per_U_Sc2

Process Cost/U Scenario 2

Process_Cost

Process Cost

Process_Yield_pct

Yield %

Process_Yield_pct_Sc1

Yield % Scenario 1

Process_Yield_pct_Sc2

Yield % Scenario 2

Revenue

Revenue

Scenario

Scenario (1 or 2)

Scrap_Cost

Scrap Cost

Scrap_Cost_per_U

Scrap Cost/Unit

Scrap_Net_Cost

Scrap Net Cost

Scrap_Net_Cost_per_U

Scrap Net Cost/Unit

Scrap_pct

Scrap %

Scrap_Salvage_Value

Scrap Salvage Value

Scrap_Salvage_Value_per_U

Scrap Salvage $/Unit

Selling_Price

Selling Price

Stations

Processing Stations

Transition_pct

Transition %

Transition_pct_Sc1

Transition % Scenario 1

Transition_pct_Sc2

Transition % Scenario 2

Units_Avail_In

Units Available In

Units_Buffer_Stock

Units Buffer Stock

Units_Capacity

Units Capacity

Units_Demand

Units Demand

Units_In

Units In

Units_Out

Units Out

Units_Purchd_In

Purch'd Units In

Units_Scrap

Units Scrap

Units_Sold

Units Sold

WIP_Avail_In

WIP Available In

WIP_Buffer_Stock

WIP_Buffer Stock

WIP_In

WIP In

WIP_Out

WIP Out

WIP_per_U_In

WIP/Unit In

WIP_per_U_Out

WIP/Unit Out

Dimension (item)

Display Item As

Total As

Level As

Cost_Types

Cost Types

Total

Cost_Types

Material

Material

Labor

Labor

Fixed_Exp

Fixed Exp

OH

OH

Process

Process

Process_1

Process 1

Process_2

Process 2

Rework_2

Rework 2

Process_3

Process 3

Process_4

Process 4

Finished_Goods_A

Finished Goods A

Finished_Goods_B

Finished Goods B

ProcessX

ProcessX

Process_1

Process 1

Process_2

Process 2

Rework_2

Rework 2

Process_3

Process 3

Process_4

Process 4

Finished_Goods_A

Finished Goods A

Finished_Goods_B

Finished Goods B

Cost_Types

Total

Process Lvl 1

Total

ProcessX

Lvl 1

ProcessY

ProcessY

Process_1

Process 1

Process_2

Process 2

Rework_2

Rework 2

Process_3

Process 3

Process_4

Process 4

Finished_Goods_A

Finished Goods A

Finished_Goods_B

Finished Goods B

Total

ProcessY

Lvl 1

Comment Units processing capacity for each stage per station per time period Percentage of processing capacity utilized for each stage, by time period Cost of units sold as finished goods from out put of each stage, segmented by cost factor (material, labor, fixed expense, overhead), by time period Cost per unit of units sold as finished goods as output of each stage, segmented by cost factor (material, labor, fixed expense, overhead), by time period Cost per unit of purchased input units entered into each state, by time period Cost of purchased input units entered into each state, segmented by cost factor (material, labor, fixed expense, overhead) by time period Target finished goods inventory for each stage, expressed as number of periods of sales, by time period Fixed expense per processing station, for each stage, per time period Fixed expense for each stage, per time period Gross margin amount (revenue - cost of goods) for finished goods sold as output from each stage, by time period Gross margin percent = gross margin / revenue An "identify matrix" that switches index variables, enabling matrix multiplication of 2-index variables using function matmult. Used in definitions of variable Units_Out and Units_Scrap. Overhead rate on labor expense, by process stage, by time period Processing cost per unit for units processed at each stage, segmented by cost factors (material, labor, fixed expense, overhead), by time period Processing cost per unit for units processed at each stage, segmented by cost factors (material, labor, fixed expense, overhead), by time period, for scenario 1 Processing cost per unit for units processed at each stage, segmented by cost factors (material, labor, fixed expense, overhead), by time period, for scenario 2 Processing cost at each stage, segmented by process stage, by time period Pecentage of input units that exit as good units for each processing stage, by time period Pecentage of input units that exit as good units for each processing stage, by time period, for scenario 1 Pecentage of input units that exit as good units for each processing stage, by time period, for scenario 2 Revenue from selling finished good output of each stage, by time period Specifies which scenario to use in the model. Affects assumptions for processing costs per unit, transition probabilities, and yield rates. Cost imputed to scrap at each stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period Cost per unit imputed to scrapped units at each stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period Cost of scrap less salvage value of scrap at each stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period Cost of scrap less salvage value of scrap at each stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period Percentage of units input that become scrap at each stage, by time period Salvage value of units scrapped at each stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period Salvage value per unit of units scrapped at each stage, by time period Price of finished goods units sold from output of each stage, by time period Number of processing stations at each processing stage, by time period Percent of good units output from stage A that goes to stage B for the next time period, for all pairs of processes A and B, by time period Percent of good units output from stage A that goes to stage B for the next time period, for all pairs of processes A and B, by time period, for scenario 1

Percent of good units output from stage A that goes to stage B for the next time period, for all pairs of processes A and B, by time period, for scenario 2 Good units available to enter each processing stage, by time period Good units in buffer stock available to ente each processign stage, by time period Units processing capacity for each stage, per time period Market demand for units of finished goods output from each stage, by time period Good units input to each processing stage, by time period Good units output from each processing stage, by time period. WIP Units purchased externally as input to each stage, by time period Units scrapped during processing at each stage, by time period Good output units sold as finished goods at each processing stage, by time period Value of work in process inventory available to enter each processing stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period Value of units in buffer stock available to enter each processing stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period Value of units of work in process inventory that enter each processing stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period Value of units of work in process inventory that exit each processing stage as good units, segmented by cost factor (material, labor, fixed expense, overhead) by time period Value per unit of work in process inventory that enters each processing stage, segmented by cost factor (material, labor, fixed expense, overhead) by time period Value per unit of work in process inventory that exits each processing stage as good units, segmented by cost factor (material, labor, fixed expense, overhead) by time period

Comment A list of the types of costs that are tracked separately in the analysis. Cost of purchased input units are assigned to "Material". Fixed overhead costs aer assigned to "Fixed_Exp".

A list of the process stages in the process flow

A duplicate list of process stages in the process flow. This list is needed so that some variables can have two dimensions consisting of process stages, because ModelSheet does not permit the same dimension to be used two times in a variable.

A duplicate list of process stages in the process flow. This list is needed so that some variables can have two dimensions consisting of process stages, because ModelSheet does not permit the same dimension to be used two times in a variable.

'Input Data'!Units_Demand_Process_Process_1 'Input Data'!Units_Demand_Process_Process_2 'Input Data'!Units_Demand_Process_Rework_2 'Input Data'!Units_Demand_Process_Process_3 'Input Data'!Units_Demand_Process_Process_4 'Input Data'!Units_Demand_Process_Finished_Goods_A 'Input Data'!Units_Demand_Process_Finished_Goods_B 'Input Data'!Units_Demand_Process 'Default Shadow'!Units_Demand_Time_Period 'Default Shadow'!Units_Demand_Date Units!Units_In_Process_Process_1 Units!Units_In_Process_Process_2 Units!Units_In_Process_Rework_2 Units!Units_In_Process_Process_3 Units!Units_In_Process_Process_4 Units!Units_In_Process_Finished_Goods_A Units!Units_In_Process_Finished_Goods_B Units!Units_In_Process 'Default Shadow'!Units_In_Time_Period 'Default Shadow'!Units_In_Date Units!Units_Avail_In_Process_Process_1 Units!Units_Avail_In_1 Units!Units_Avail_In_2 Units!Units_Avail_In_3 Units!Units_Avail_In_4 Units!Units_Avail_In_5 Units!Units_Avail_In_6 Units!Units_Avail_In_7 Units!Units_Avail_In_8 Units!Units_Avail_In_9 Units!Units_Avail_In_10 Units!Units_Avail_In_Process_Process_2 Units!Units_Avail_In_Process_Rework_2 Units!Units_Avail_In_Process_Process_3 Units!Units_Avail_In_Process_Process_4 Units!Units_Avail_In_Process_Finished_Goods_A Units!Units_Avail_In_Process_Finished_Goods_B Units!Units_Avail_In_Process 'Default Shadow'!Units_Avail_In_Time_Period 'Default Shadow'!Units_Avail_In_Date Units!Units_Out_Process_Process_1 Units!Units_Out_Process_Process_2 Units!Units_Out_Process_Rework_2 Units!Units_Out_Process_Process_3 Units!Units_Out_Process_Process_4 Units!Units_Out_Process_Finished_Goods_A Units!Units_Out_Process_Finished_Goods_B Units!Units_Out_Process 'Default Shadow'!Units_Out_Time_Period 'Default Shadow'!Units_Out_Date Transitions!Process_Yield_pct_ProcessX_Process_1 Transitions!Process_Yield_pct_1 Transitions!Process_Yield_pct_2 Transitions!Process_Yield_pct_3

Transitions!Process_Yield_pct_4 Transitions!Process_Yield_pct_5 Transitions!Process_Yield_pct_6 Transitions!Process_Yield_pct_7 Transitions!Process_Yield_pct_8 Transitions!Process_Yield_pct_9 Transitions!Process_Yield_pct_10 Transitions!Process_Yield_pct_ProcessX_Process_2 Transitions!Process_Yield_pct_ProcessX_Rework_2 Transitions!Process_Yield_pct_ProcessX_Process_3 Transitions!Process_Yield_pct_ProcessX_Process_4 Transitions!Process_Yield_pct_ProcessX_Finished_Goods_A Transitions!Process_Yield_pct_ProcessX_Finished_Goods_B Transitions!Process_Yield_pct_ProcessX 'Default Shadow'!Process_Yield_pct_Time_Period 'Default Shadow'!Process_Yield_pct_Date Units!Units_Sold_Process_Process_1 Units!Units_Sold_Process_Process_2 Units!Units_Sold_Process_Rework_2 Units!Units_Sold_Process_Process_3 Units!Units_Sold_Process_Process_4 Units!Units_Sold_Process_Finished_Goods_A Units!Units_Sold_Process_Finished_Goods_B Units!Units_Sold_Process 'Default Shadow'!Units_Sold_Time_Period 'Default Shadow'!Units_Sold_Date Units!Units_Buffer_Stock_Process_Process_1 Units!Units_Buffer_Stock_Process_Process_2 Units!Units_Buffer_Stock_Process_Rework_2 Units!Units_Buffer_Stock_Process_Process_3 Units!Units_Buffer_Stock_Process_Process_4 Units!Units_Buffer_Stock_Process_Finished_Goods_A Units!Units_Buffer_Stock_Process_Finished_Goods_B Units!Units_Buffer_Stock_Process 'Default Shadow'!Units_Buffer_Stock_Time_Period 'Default Shadow'!Units_Buffer_Stock_Date 'Cost Flow Detail'!Process_Cost_Process_Process_1_Cost_Types_Material ZZZ_Ranges!Process_Cost_1 40000 28000 0 11200 0 0 ZZZ_Ranges!Process_Cost_2 34500 24150 0 9660 153600 69120 ZZZ_Ranges!Process_Cost_3 29197 20437.9 0 8175.16 132480 59616 ZZZ_Ranges!Process_Cost_4 46583.42 32608.39 0 13043.36 112116.48 50452.42 ZZZ_Ranges!Process_Cost_5 57565.75 40296.03 0 16118.41 178880.33 80496.15 ZZZ_Ranges!Process_Cost_6 58265.91 40786.14 0 16314.45 221052.48 99473.62 ZZZ_Ranges!Process_Cost_7 56626.29 39638.41 0 15855.36 223741.09 100683.49 ZZZ_Ranges!Process_Cost_8 56453.11 39517.18 0 15806.87 217444.97 97850.24 ZZZ_Ranges!Process_Cost_9 58011.03 40607.72 0 16243.09 216779.96 97550.98 ZZZ_Ranges!Process_Cost_10 61019.29 42713.5 0 17085.4 222762.34 100243.05 'Cost Flow Detail'!Process_Cost_Process_Process_1_Cost_Types_Labor 'Cost Flow Detail'!Process_Cost_Process_Process_1_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Process_Cost_Process_Process_1_Cost_Types_OH 'Cost Flow'!Process_Cost_Process_Process_1_Cost_Types 'Cost Flow'!Process_Cost_Process_Process_1 'Cost Flow Detail'!Process_Cost_Process_Process_2_Cost_Types_Material 'Cost Flow Detail'!Process_Cost_Process_Process_2_Cost_Types_Labor

0 0 0 0 0 0 0 0 0 0

0 27648 23846.4 20180.97 32198.46 39789.45 40273.4 39140.1 39020.39 40097.22

'Cost Flow Detail'!Process_Cost_Process_Process_2_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Process_Cost_Process_Process_2_Cost_Types_OH 'Cost Flow'!Process_Cost_Process_Process_2_Cost_Types 'Cost Flow'!Process_Cost_Process_Process_2 'Cost Flow Detail'!Process_Cost_Process_Rework_2_Cost_Types_Material 'Cost Flow Detail'!Process_Cost_Process_Rework_2_Cost_Types_Labor 'Cost Flow Detail'!Process_Cost_Process_Rework_2_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Process_Cost_Process_Rework_2_Cost_Types_OH 'Cost Flow'!Process_Cost_Process_Rework_2_Cost_Types 'Cost Flow'!Process_Cost_Process_Rework_2 'Cost Flow Detail'!Process_Cost_Process_Process_3_Cost_Types_Material 'Cost Flow Detail'!Process_Cost_Process_Process_3_Cost_Types_Labor 'Cost Flow Detail'!Process_Cost_Process_Process_3_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Process_Cost_Process_Process_3_Cost_Types_OH 'Cost Flow'!Process_Cost_Process_Process_3_Cost_Types 'Cost Flow'!Process_Cost_Process_Process_3 'Cost Flow Detail'!Process_Cost_Process_Process_4_Cost_Types_Material 'Cost Flow Detail'!Process_Cost_Process_Process_4_Cost_Types_Labor 'Cost Flow Detail'!Process_Cost_Process_Process_4_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Process_Cost_Process_Process_4_Cost_Types_OH 'Cost Flow'!Process_Cost_Process_Process_4_Cost_Types 'Cost Flow'!Process_Cost_Process_Process_4 'Cost Flow Detail'!Process_Cost_Process_Finished_Goods_A_Cost_Types_Material 'Cost Flow Detail'!Process_Cost_Process_Finished_Goods_A_Cost_Types_Labor 'Cost Flow Detail'!Process_Cost_Process_Finished_Goods_A_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Process_Cost_Process_Finished_Goods_A_Cost_Types_OH 'Cost Flow'!Process_Cost_Process_Finished_Goods_A_Cost_Types 'Cost Flow'!Process_Cost_Process_Finished_Goods_A 'Cost Flow Detail'!Process_Cost_Process_Finished_Goods_B_Cost_Types_Material 'Cost Flow Detail'!Process_Cost_Process_Finished_Goods_B_Cost_Types_Labor 'Cost Flow Detail'!Process_Cost_Process_Finished_Goods_B_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Process_Cost_Process_Finished_Goods_B_Cost_Types_OH 'Cost Flow'!Process_Cost_Process_Finished_Goods_B_Cost_Types 'Cost Flow'!Process_Cost_Process_Finished_Goods_B 'Cost Flow'!Process_Cost_Process 'Default Shadow'!Process_Cost_Time_Period 'Default Shadow'!Process_Cost_Date 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_1_Cost_Types_Material ZZZ_Ranges!Proc_Cost_per_U_1 10 7 0 2.8 40 18 ZZZ_Ranges!Proc_Cost_per_U_2 10 7 0 2.8 40 18 ZZZ_Ranges!Proc_Cost_per_U_3 10 7 0 2.8 40 18 ZZZ_Ranges!Proc_Cost_per_U_4 10 7 0 2.8 40 18 ZZZ_Ranges!Proc_Cost_per_U_5 10 7 0 2.8 40 18 ZZZ_Ranges!Proc_Cost_per_U_6 10 7 0 2.8 40 18 ZZZ_Ranges!Proc_Cost_per_U_7 10 7 0 2.8 40 18 ZZZ_Ranges!Proc_Cost_per_U_8 10 7 0 2.8 40 18 ZZZ_Ranges!Proc_Cost_per_U_9 10 7 0 2.8 40 18 ZZZ_Ranges!Proc_Cost_per_U_10 10 7 0 2.8 40 18 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_1_Cost_Types_Labor 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_1_Cost_Types_Fixed_Exp 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_1_Cost_Types_OH 'Unit Cost'!Proc_Cost_per_U_Process_Process_1_Cost_Types 'Unit Cost'!Proc_Cost_per_U_Process_Process_1 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_2_Cost_Types_Material

0 0 0 0 0 0 0 0 0 0

7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2

'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_2_Cost_Types_Labor 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_2_Cost_Types_Fixed_Exp 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_2_Cost_Types_OH 'Unit Cost'!Proc_Cost_per_U_Process_Process_2_Cost_Types 'Unit Cost'!Proc_Cost_per_U_Process_Process_2 'Unit Cost Detail'!Proc_Cost_per_U_Process_Rework_2_Cost_Types_Material 'Unit Cost Detail'!Proc_Cost_per_U_Process_Rework_2_Cost_Types_Labor 'Unit Cost Detail'!Proc_Cost_per_U_Process_Rework_2_Cost_Types_Fixed_Exp 'Unit Cost Detail'!Proc_Cost_per_U_Process_Rework_2_Cost_Types_OH 'Unit Cost'!Proc_Cost_per_U_Process_Rework_2_Cost_Types 'Unit Cost'!Proc_Cost_per_U_Process_Rework_2 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_3_Cost_Types_Material 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_3_Cost_Types_Labor 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_3_Cost_Types_Fixed_Exp 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_3_Cost_Types_OH 'Unit Cost'!Proc_Cost_per_U_Process_Process_3_Cost_Types 'Unit Cost'!Proc_Cost_per_U_Process_Process_3 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_4_Cost_Types_Material 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_4_Cost_Types_Labor 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_4_Cost_Types_Fixed_Exp 'Unit Cost Detail'!Proc_Cost_per_U_Process_Process_4_Cost_Types_OH 'Unit Cost'!Proc_Cost_per_U_Process_Process_4_Cost_Types 'Unit Cost'!Proc_Cost_per_U_Process_Process_4 'Unit Cost Detail'!Proc_Cost_per_U_Process_Finished_Goods_A_Cost_Types_Material 'Unit Cost Detail'!Proc_Cost_per_U_Process_Finished_Goods_A_Cost_Types_Labor 'Unit Cost Detail'!Proc_Cost_per_U_Process_Finished_Goods_A_Cost_Types_Fixed_Exp 'Unit Cost Detail'!Proc_Cost_per_U_Process_Finished_Goods_A_Cost_Types_OH 'Unit Cost'!Proc_Cost_per_U_Process_Finished_Goods_A_Cost_Types 'Unit Cost'!Proc_Cost_per_U_Process_Finished_Goods_A 'Unit Cost Detail'!Proc_Cost_per_U_Process_Finished_Goods_B_Cost_Types_Material 'Unit Cost Detail'!Proc_Cost_per_U_Process_Finished_Goods_B_Cost_Types_Labor 'Unit Cost Detail'!Proc_Cost_per_U_Process_Finished_Goods_B_Cost_Types_Fixed_Exp 'Unit Cost Detail'!Proc_Cost_per_U_Process_Finished_Goods_B_Cost_Types_OH 'Unit Cost'!Proc_Cost_per_U_Process_Finished_Goods_B_Cost_Types 'Unit Cost'!Proc_Cost_per_U_Process_Finished_Goods_B 'Unit Cost'!Proc_Cost_per_U_Process 'Default Shadow'!Proc_Cost_per_U_Time_Period 'Default Shadow'!Proc_Cost_per_U_Date Units!Units_Scrap_Process_Process_1 Units!Units_Scrap_Process_Process_2 Units!Units_Scrap_Process_Rework_2 Units!Units_Scrap_Process_Process_3 Units!Units_Scrap_Process_Process_4 Units!Units_Scrap_Process_Finished_Goods_A Units!Units_Scrap_Process_Finished_Goods_B Units!Units_Scrap_Process 'Default Shadow'!Units_Scrap_Time_Period 'Default Shadow'!Units_Scrap_Date Financials!Revenue_Process_Process_1 Financials!Revenue_1 Financials!Revenue_2 Financials!Revenue_3 Financials!Revenue_4 Financials!Revenue_5

Financials!Revenue_6 Financials!Revenue_7 Financials!Revenue_8 Financials!Revenue_9 Financials!Revenue_10 Financials!Revenue_Process_Process_2 Financials!Revenue_Process_Rework_2 Financials!Revenue_Process_Process_3 Financials!Revenue_Process_Process_4 Financials!Revenue_Process_Finished_Goods_A Financials!Revenue_Process_Finished_Goods_B Financials!Revenue_Process 'Default Shadow'!Revenue_Time_Period 'Default Shadow'!Revenue_Date 'Cost Flow Detail'!COGS_Process_Process_1_Cost_Types_Material ZZZ_Ranges!COGS_1 0 0 0 0 0 ZZZ_Ranges!COGS_2 0 0 0 0 0 ZZZ_Ranges!COGS_3 0 0 0 0 0 ZZZ_Ranges!COGS_4 0 0 0 0 0 ZZZ_Ranges!COGS_5 0 0 0 0 0 ZZZ_Ranges!COGS_6 0 0 0 0 0 ZZZ_Ranges!COGS_7 0 0 0 0 0 ZZZ_Ranges!COGS_8 0 0 0 0 0 ZZZ_Ranges!COGS_9 0 0 0 0 0 ZZZ_Ranges!COGS_10 0 0 0 0 0 'Cost Flow Detail'!COGS_Process_Process_1_Cost_Types_Labor 'Cost Flow Detail'!COGS_Process_Process_1_Cost_Types_Fixed_Exp 'Cost Flow Detail'!COGS_Process_Process_1_Cost_Types_OH 'Cost Flow'!COGS_Process_Process_1_Cost_Types 'Cost Flow'!COGS_Process_Process_1 'Cost Flow Detail'!COGS_Process_Process_2_Cost_Types_Material 'Cost Flow Detail'!COGS_Process_Process_2_Cost_Types_Labor 'Cost Flow Detail'!COGS_Process_Process_2_Cost_Types_Fixed_Exp 'Cost Flow Detail'!COGS_Process_Process_2_Cost_Types_OH 'Cost Flow'!COGS_Process_Process_2_Cost_Types 'Cost Flow'!COGS_Process_Process_2 'Cost Flow Detail'!COGS_Process_Rework_2_Cost_Types_Material 'Cost Flow Detail'!COGS_Process_Rework_2_Cost_Types_Labor 'Cost Flow Detail'!COGS_Process_Rework_2_Cost_Types_Fixed_Exp 'Cost Flow Detail'!COGS_Process_Rework_2_Cost_Types_OH 'Cost Flow'!COGS_Process_Rework_2_Cost_Types 'Cost Flow'!COGS_Process_Rework_2 'Cost Flow Detail'!COGS_Process_Process_3_Cost_Types_Material 'Cost Flow Detail'!COGS_Process_Process_3_Cost_Types_Labor 'Cost Flow Detail'!COGS_Process_Process_3_Cost_Types_Fixed_Exp 'Cost Flow Detail'!COGS_Process_Process_3_Cost_Types_OH 'Cost Flow'!COGS_Process_Process_3_Cost_Types 'Cost Flow'!COGS_Process_Process_3 'Cost Flow Detail'!COGS_Process_Process_4_Cost_Types_Material 'Cost Flow Detail'!COGS_Process_Process_4_Cost_Types_Labor 'Cost Flow Detail'!COGS_Process_Process_4_Cost_Types_Fixed_Exp 'Cost Flow Detail'!COGS_Process_Process_4_Cost_Types_OH 'Cost Flow'!COGS_Process_Process_4_Cost_Types 'Cost Flow'!COGS_Process_Process_4

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

'Cost Flow Detail'!COGS_Process_Finished_Goods_A_Cost_Types_Material 'Cost Flow Detail'!COGS_Process_Finished_Goods_A_Cost_Types_Labor 'Cost Flow Detail'!COGS_Process_Finished_Goods_A_Cost_Types_Fixed_Exp 'Cost Flow Detail'!COGS_Process_Finished_Goods_A_Cost_Types_OH 'Cost Flow'!COGS_Process_Finished_Goods_A_Cost_Types 'Cost Flow'!COGS_Process_Finished_Goods_A 'Cost Flow Detail'!COGS_Process_Finished_Goods_B_Cost_Types_Material 'Cost Flow Detail'!COGS_Process_Finished_Goods_B_Cost_Types_Labor 'Cost Flow Detail'!COGS_Process_Finished_Goods_B_Cost_Types_Fixed_Exp 'Cost Flow Detail'!COGS_Process_Finished_Goods_B_Cost_Types_OH 'Cost Flow'!COGS_Process_Finished_Goods_B_Cost_Types 'Cost Flow'!COGS_Process_Finished_Goods_B 'Cost Flow'!COGS_Process 'Default Shadow'!COGS_Time_Period 'Default Shadow'!COGS_Date 'Unit Cost Detail'!COGS_per_U_Process_Process_1_Cost_Types_Material ZZZ_Ranges!COGS_per_U_1 0 0 0 0 0 0 ZZZ_Ranges!COGS_per_U_2 0 0 0 0 0 0 ZZZ_Ranges!COGS_per_U_3 0 0 0 0 0 0 ZZZ_Ranges!COGS_per_U_4 0 0 0 0 0 0 ZZZ_Ranges!COGS_per_U_5 0 0 0 0 0 0 ZZZ_Ranges!COGS_per_U_6 0 0 0 0 0 0 ZZZ_Ranges!COGS_per_U_7 0 0 0 0 0 0 ZZZ_Ranges!COGS_per_U_8 0 0 0 0 0 0 ZZZ_Ranges!COGS_per_U_9 0 0 0 0 0 0 ZZZ_Ranges!COGS_per_U_10 0 0 0 0 0 0 'Unit Cost Detail'!COGS_per_U_Process_Process_1_Cost_Types_Labor 'Unit Cost Detail'!COGS_per_U_Process_Process_1_Cost_Types_Fixed_Exp 'Unit Cost Detail'!COGS_per_U_Process_Process_1_Cost_Types_OH 'Unit Cost'!COGS_per_U_Process_Process_1_Cost_Types 'Unit Cost'!COGS_per_U_Process_Process_1 'Unit Cost Detail'!COGS_per_U_Process_Process_2_Cost_Types_Material 'Unit Cost Detail'!COGS_per_U_Process_Process_2_Cost_Types_Labor 'Unit Cost Detail'!COGS_per_U_Process_Process_2_Cost_Types_Fixed_Exp 'Unit Cost Detail'!COGS_per_U_Process_Process_2_Cost_Types_OH 'Unit Cost'!COGS_per_U_Process_Process_2_Cost_Types 'Unit Cost'!COGS_per_U_Process_Process_2 'Unit Cost Detail'!COGS_per_U_Process_Rework_2_Cost_Types_Material 'Unit Cost Detail'!COGS_per_U_Process_Rework_2_Cost_Types_Labor 'Unit Cost Detail'!COGS_per_U_Process_Rework_2_Cost_Types_Fixed_Exp 'Unit Cost Detail'!COGS_per_U_Process_Rework_2_Cost_Types_OH 'Unit Cost'!COGS_per_U_Process_Rework_2_Cost_Types 'Unit Cost'!COGS_per_U_Process_Rework_2 'Unit Cost Detail'!COGS_per_U_Process_Process_3_Cost_Types_Material 'Unit Cost Detail'!COGS_per_U_Process_Process_3_Cost_Types_Labor 'Unit Cost Detail'!COGS_per_U_Process_Process_3_Cost_Types_Fixed_Exp 'Unit Cost Detail'!COGS_per_U_Process_Process_3_Cost_Types_OH 'Unit Cost'!COGS_per_U_Process_Process_3_Cost_Types 'Unit Cost'!COGS_per_U_Process_Process_3 'Unit Cost Detail'!COGS_per_U_Process_Process_4_Cost_Types_Material 'Unit Cost Detail'!COGS_per_U_Process_Process_4_Cost_Types_Labor 'Unit Cost Detail'!COGS_per_U_Process_Process_4_Cost_Types_Fixed_Exp 'Unit Cost Detail'!COGS_per_U_Process_Process_4_Cost_Types_OH 'Unit Cost'!COGS_per_U_Process_Process_4_Cost_Types

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

'Unit Cost'!COGS_per_U_Process_Process_4 'Unit Cost Detail'!COGS_per_U_Process_Finished_Goods_A_Cost_Types_Material 'Unit Cost Detail'!COGS_per_U_Process_Finished_Goods_A_Cost_Types_Labor 'Unit Cost Detail'!COGS_per_U_Process_Finished_Goods_A_Cost_Types_Fixed_Exp 'Unit Cost Detail'!COGS_per_U_Process_Finished_Goods_A_Cost_Types_OH 'Unit Cost'!COGS_per_U_Process_Finished_Goods_A_Cost_Types 'Unit Cost'!COGS_per_U_Process_Finished_Goods_A 'Unit Cost Detail'!COGS_per_U_Process_Finished_Goods_B_Cost_Types_Material 'Unit Cost Detail'!COGS_per_U_Process_Finished_Goods_B_Cost_Types_Labor 'Unit Cost Detail'!COGS_per_U_Process_Finished_Goods_B_Cost_Types_Fixed_Exp 'Unit Cost Detail'!COGS_per_U_Process_Finished_Goods_B_Cost_Types_OH 'Unit Cost'!COGS_per_U_Process_Finished_Goods_B_Cost_Types 'Unit Cost'!COGS_per_U_Process_Finished_Goods_B 'Unit Cost'!COGS_per_U_Process 'Default Shadow'!COGS_per_U_Time_Period 'Default Shadow'!COGS_per_U_Date 'Default Variables'!Scrap_Cost_per_U_Process_Process_1_Cost_Types_Material ZZZ_Ranges!Scrap_Cost_per_U_1 60 42 0 16.8 0 0 ZZZ_Ranges!Scrap_Cost_per_U_2 83.75 58.63 0 23.45 210.77 105.66 ZZZ_Ranges!Scrap_Cost_per_U_3 83.75 58.63 0 23.45 210.77 105.66 ZZZ_Ranges!Scrap_Cost_per_U_4 93.75 65.63 0 26.25 157.29 78.85 ZZZ_Ranges!Scrap_Cost_per_U_5 103.75 72.63 0 29.05 130.55 65.45 ZZZ_Ranges!Scrap_Cost_per_U_6 103.75 72.63 0 29.05 130.55 65.45 ZZZ_Ranges!Scrap_Cost_per_U_7 96.25 67.38 0 26.95 149.06 74.73 ZZZ_Ranges!Scrap_Cost_per_U_8 83.75 58.63 0 23.45 210.77 105.66 ZZZ_Ranges!Scrap_Cost_per_U_9 78.75 55.13 0 22.05 264.25 132.47 ZZZ_Ranges!Scrap_Cost_per_U_10 78.75 55.13 0 22.05 264.25 132.47 'Default Variables'!Scrap_Cost_per_U_Process_Process_1_Cost_Types_Labor 'Default Variables'!Scrap_Cost_per_U_Process_Process_1_Cost_Types_Fixed_Exp 'Default Variables'!Scrap_Cost_per_U_Process_Process_1_Cost_Types_OH 'Unit Cost'!Scrap_Cost_per_U_Process_Process_1_Cost_Types 'Unit Cost'!Scrap_Cost_per_U_Process_Process_1 'Default Variables'!Scrap_Cost_per_U_Process_Process_2_Cost_Types_Material 'Default Variables'!Scrap_Cost_per_U_Process_Process_2_Cost_Types_Labor 'Default Variables'!Scrap_Cost_per_U_Process_Process_2_Cost_Types_Fixed_Exp 'Default Variables'!Scrap_Cost_per_U_Process_Process_2_Cost_Types_OH 'Unit Cost'!Scrap_Cost_per_U_Process_Process_2_Cost_Types 'Unit Cost'!Scrap_Cost_per_U_Process_Process_2 'Default Variables'!Scrap_Cost_per_U_Process_Rework_2_Cost_Types_Material 'Default Variables'!Scrap_Cost_per_U_Process_Rework_2_Cost_Types_Labor 'Default Variables'!Scrap_Cost_per_U_Process_Rework_2_Cost_Types_Fixed_Exp 'Default Variables'!Scrap_Cost_per_U_Process_Rework_2_Cost_Types_OH 'Unit Cost'!Scrap_Cost_per_U_Process_Rework_2_Cost_Types 'Unit Cost'!Scrap_Cost_per_U_Process_Rework_2 'Default Variables'!Scrap_Cost_per_U_Process_Process_3_Cost_Types_Material 'Default Variables'!Scrap_Cost_per_U_Process_Process_3_Cost_Types_Labor 'Default Variables'!Scrap_Cost_per_U_Process_Process_3_Cost_Types_Fixed_Exp 'Default Variables'!Scrap_Cost_per_U_Process_Process_3_Cost_Types_OH 'Unit Cost'!Scrap_Cost_per_U_Process_Process_3_Cost_Types 'Unit Cost'!Scrap_Cost_per_U_Process_Process_3 'Default Variables'!Scrap_Cost_per_U_Process_Process_4_Cost_Types_Material 'Default Variables'!Scrap_Cost_per_U_Process_Process_4_Cost_Types_Labor 'Default Variables'!Scrap_Cost_per_U_Process_Process_4_Cost_Types_Fixed_Exp 'Default Variables'!Scrap_Cost_per_U_Process_Process_4_Cost_Types_OH

0 0 0 0 0 0 0 0 0 0

0 42.26 42.26 31.54 26.18 26.18 29.89 42.26 52.99 52.99

'Unit Cost'!Scrap_Cost_per_U_Process_Process_4_Cost_Types 'Unit Cost'!Scrap_Cost_per_U_Process_Process_4 'Default Variables'!Scrap_Cost_per_U_Process_Finished_Goods_A_Cost_Types_Material 'Default Variables'!Scrap_Cost_per_U_Process_Finished_Goods_A_Cost_Types_Labor 'Default Variables'!Scrap_Cost_per_U_Process_Finished_Goods_A_Cost_Types_Fixed_Exp 'Default Variables'!Scrap_Cost_per_U_Process_Finished_Goods_A_Cost_Types_OH 'Unit Cost'!Scrap_Cost_per_U_Process_Finished_Goods_A_Cost_Types 'Unit Cost'!Scrap_Cost_per_U_Process_Finished_Goods_A 'Default Variables'!Scrap_Cost_per_U_Process_Finished_Goods_B_Cost_Types_Material 'Default Variables'!Scrap_Cost_per_U_Process_Finished_Goods_B_Cost_Types_Labor 'Default Variables'!Scrap_Cost_per_U_Process_Finished_Goods_B_Cost_Types_Fixed_Exp 'Default Variables'!Scrap_Cost_per_U_Process_Finished_Goods_B_Cost_Types_OH 'Unit Cost'!Scrap_Cost_per_U_Process_Finished_Goods_B_Cost_Types 'Unit Cost'!Scrap_Cost_per_U_Process_Finished_Goods_B 'Unit Cost'!Scrap_Cost_per_U_Process 'Default Shadow'!Scrap_Cost_per_U_Time_Period 'Default Shadow'!Scrap_Cost_per_U_Date 'Cost Flow Detail'!Scrap_Cost_Process_Process_1_Cost_Types_Material ZZZ_Ranges!Scrap_Cost_1 9600 6720 0 2688 0 0 0 0 ZZZ_Ranges!Scrap_Cost_2 11557.5 8090.25 0 3236.1 64747.72 32459.4 0 12983.76 ZZZ_Ranges!Scrap_Cost_3 9781 6846.7 0 2738.68 55844.91 27996.23 0 11198.49 ZZZ_Ranges!Scrap_Cost_4 17468.78 12228.15 0 4891.26 52904.08 26521.94 0 10608.77 ZZZ_Ranges!Scrap_Cost_5 23889.79 16722.85 0 6689.14 93411.24 46829.03 0 18731.61 ZZZ_Ranges!Scrap_Cost_6 24180.35 16926.25 0 6770.5 115433.52 57869.27 0 23147.71 ZZZ_Ranges!Scrap_Cost_7 21801.12 15260.79 0 6104.31 108391.42 54338.92 0 21735.57 ZZZ_Ranges!Scrap_Cost_8 18911.79 13238.26 0 5295.3 91660.58 45951.39 0 18380.56 ZZZ_Ranges!Scrap_Cost_9 18273.47 12791.43 0 5116.57 85924.72 43075.88 0 17230.35 ZZZ_Ranges!Scrap_Cost_10 19221.08 13454.75 0 5381.9 88295.95 44264.63 0 17705.85 'Cost Flow Detail'!Scrap_Cost_Process_Process_1_Cost_Types_Labor 'Cost Flow Detail'!Scrap_Cost_Process_Process_1_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Scrap_Cost_Process_Process_1_Cost_Types_OH 'Cost Flow'!Scrap_Cost_Process_Process_1_Cost_Types 'Cost Flow'!Scrap_Cost_Process_Process_1 'Cost Flow Detail'!Scrap_Cost_Process_Process_2_Cost_Types_Material 'Cost Flow Detail'!Scrap_Cost_Process_Process_2_Cost_Types_Labor 'Cost Flow Detail'!Scrap_Cost_Process_Process_2_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Scrap_Cost_Process_Process_2_Cost_Types_OH 'Cost Flow'!Scrap_Cost_Process_Process_2_Cost_Types 'Cost Flow'!Scrap_Cost_Process_Process_2 'Cost Flow Detail'!Scrap_Cost_Process_Rework_2_Cost_Types_Material 'Cost Flow Detail'!Scrap_Cost_Process_Rework_2_Cost_Types_Labor 'Cost Flow Detail'!Scrap_Cost_Process_Rework_2_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Scrap_Cost_Process_Rework_2_Cost_Types_OH 'Cost Flow'!Scrap_Cost_Process_Rework_2_Cost_Types 'Cost Flow'!Scrap_Cost_Process_Rework_2 'Cost Flow Detail'!Scrap_Cost_Process_Process_3_Cost_Types_Material 'Cost Flow Detail'!Scrap_Cost_Process_Process_3_Cost_Types_Labor 'Cost Flow Detail'!Scrap_Cost_Process_Process_3_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Scrap_Cost_Process_Process_3_Cost_Types_OH 'Cost Flow'!Scrap_Cost_Process_Process_3_Cost_Types 'Cost Flow'!Scrap_Cost_Process_Process_3 'Cost Flow Detail'!Scrap_Cost_Process_Process_4_Cost_Types_Material 'Cost Flow Detail'!Scrap_Cost_Process_Process_4_Cost_Types_Labor 'Cost Flow Detail'!Scrap_Cost_Process_Process_4_Cost_Types_Fixed_Exp

'Cost Flow Detail'!Scrap_Cost_Process_Process_4_Cost_Types_OH 'Cost Flow'!Scrap_Cost_Process_Process_4_Cost_Types 'Cost Flow'!Scrap_Cost_Process_Process_4 'Cost Flow Detail'!Scrap_Cost_Process_Finished_Goods_A_Cost_Types_Material 'Cost Flow Detail'!Scrap_Cost_Process_Finished_Goods_A_Cost_Types_Labor 'Cost Flow Detail'!Scrap_Cost_Process_Finished_Goods_A_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Scrap_Cost_Process_Finished_Goods_A_Cost_Types_OH 'Cost Flow'!Scrap_Cost_Process_Finished_Goods_A_Cost_Types 'Cost Flow'!Scrap_Cost_Process_Finished_Goods_A 'Cost Flow Detail'!Scrap_Cost_Process_Finished_Goods_B_Cost_Types_Material 'Cost Flow Detail'!Scrap_Cost_Process_Finished_Goods_B_Cost_Types_Labor 'Cost Flow Detail'!Scrap_Cost_Process_Finished_Goods_B_Cost_Types_Fixed_Exp 'Cost Flow Detail'!Scrap_Cost_Process_Finished_Goods_B_Cost_Types_OH 'Cost Flow'!Scrap_Cost_Process_Finished_Goods_B_Cost_Types 'Cost Flow'!Scrap_Cost_Process_Finished_Goods_B 'Cost Flow'!Scrap_Cost_Process 'Default Shadow'!Scrap_Cost_Time_Period 'Default Shadow'!Scrap_Cost_Date Financials!Gross_Margin_Process_Process_1 Financials!Gross_Margin_1 Financials!Gross_Margin_2 Financials!Gross_Margin_3 Financials!Gross_Margin_4 Financials!Gross_Margin_5 Financials!Gross_Margin_6 Financials!Gross_Margin_7 Financials!Gross_Margin_8 Financials!Gross_Margin_9 Financials!Gross_Margin_10 Financials!Gross_Margin_Process_Process_2 Financials!Gross_Margin_Process_Rework_2 Financials!Gross_Margin_Process_Process_3 Financials!Gross_Margin_Process_Process_4 Financials!Gross_Margin_Process_Finished_Goods_A Financials!Gross_Margin_Process_Finished_Goods_B Financials!Gross_Margin_Process 'Default Shadow'!Gross_Margin_Time_Period 'Default Shadow'!Gross_Margin_Date Financials!Gross_Margin_pct_Process_Process_1 Financials!Gross_Margin_pct_1 Financials!Gross_Margin_pct_2 Financials!Gross_Margin_pct_3 Financials!Gross_Margin_pct_4 Financials!Gross_Margin_pct_5 Financials!Gross_Margin_pct_6 Financials!Gross_Margin_pct_7 Financials!Gross_Margin_pct_8 Financials!Gross_Margin_pct_9 Financials!Gross_Margin_pct_10 Financials!Gross_Margin_pct_Process_Process_2 Financials!Gross_Margin_pct_Process_Rework_2 Financials!Gross_Margin_pct_Process_Process_3 Financials!Gross_Margin_pct_Process_Process_4 Financials!Gross_Margin_pct_Process_Finished_Goods_A

Financials!Gross_Margin_pct_Process_Finished_Goods_B Financials!Gross_Margin_pct_Process 'Default Shadow'!Gross_Margin_pct_Time_Period 'Default Shadow'!Gross_Margin_pct_Date

0 0 2119.68 1828.22 1479.94 2253.89 2785.26 2919.82 3000.74 3056.6

0 0 4416 3808.8 3083.2 4695.61 5802.63 6082.96 6251.54 6367.91

0 0 0 0 0 0 0 0 0 0

0 0 1766.4 1523.52 1233.28 1878.24 2321.05 2433.18 2500.62 2547.16

0 0 0 0 13424.64 90616.32 12242.92 82639.7 9945.78 67134.02 14738.36 99483.96 18346.21 123836.9 19364.92 130713.18 19919.57 134457.08 20298.68 137016.1

0 0 0 0 0 0 0 0 0 0

0 0 36246.53 33055.88 26853.61 39793.58 49534.76 52285.27 53782.83 54806.44

0 0 0 24164.35 22037.25 17902.41 26529.06 33023.17 34856.85 35855.22

12 12 12 12 12 12 12 12 12 12

25 25 25 25 25 25 25 25 25 25

0 0 0 0 0 0 0 0 0 0

10 10 10 10 10 10 10 10 10 10

4 4 4 4 4 4 4 4 4 4

27 27 27 27 27 27 27 27 27 27

0 0 0 0 0 0 0 0 0 0

10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8 10.8

20 20 20 20 20 20 20 20 20 20

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 368.18 412.14 470.29 485.83 450.71 382.66 346.2 341.16

0 0 290.57 325.27 367.07 374.86 347.77 297.83 273.22 270.7

0 0 0 0 0 0 0 0 0 0

0 0 116.23 130.11 146.83 149.95 139.11 119.13 109.29 108.28

0 0 194.11 220.49 252.25 260.08 242 205.47 185.2 181.93

0 0 181.04 208.35 234.98 236.73 220.52 189.77 174.48 172.87

0 0 0 0 0 0 0 0 0 0

0 0 72.42 83.34 93.99 94.69 88.21 75.91 69.79 69.15

0 0 0 1045.73 1170.48 1200.92 1140.89 995.05 917.95 888.37

0 0 3902.13 3767.44 3480.02 5475.07 6276.75 5586.52 5194.28 5213.92

0 0 3079.59 2973.3 2716.24 4224.53 4843.1 4348.07 4099.37 4137.06

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 1231.84 65145.88 60760.91 1189.32 67486.16 63769.87 1086.5 62720.81 58427.2 1689.81 95828.74 87226.02 1937.24 110995.34 101144.88 1739.23 99474.37 91872.36 1639.75 92226.49 86889.35 1654.82 92325.51 87724.99

0 0 0 0 0 0 0 0 0 0

0 0 24304.36 25507.95 23370.88 34890.41 40457.95 36748.94 34755.74 35090

0 0 0 37903.93 38691.25 32249.13 45399.99 49289.81 47995.11 47779.12

0 0 0 21747.92 19833.53 16112.17 23876.15 29720.86 31371.16 32269.7

0 0 0 0 0 0 0 8699.17 0 7933.41 0 6444.87 0 9550.46 0 11888.34 0 12548.47 0 12907.88

0 0 0 0 0 0 0 0 0 0

4000 3000 1755 2141 2161.68 1671.94 1989.68 2476.74 2653.85 2703.18

0 0 0 0 0 0 0 0 0 0

1600 1200 702 856.4 864.67 668.77 795.87 990.7 1061.54 1081.27

0 0 0 0 0 0 0 0 0 0

950 750 492.5 187.58 1171.97 1829.06 2229.03 2993.4 4015.09 5065.5

18 18 18 18 18 18 18 18 18 18

0 0 0 0 0 0 0 0 0 0

7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2 7.2

0 0 0 0 0 0 0 0 0 0

1 1 1 1 1 1 1 1 1 1

0 0 0 0 0 0 0 0 0 0

0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4

0 0 0 0 0 0 0 0 0 0

1 1 1 1 1 1 1 1 1 1

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 1000 0 0 1914.43 0 0 3079.7 0 87113.53 83412.49 0 113233.95 109111.86 0 109992.35 104789.46 0 136569.24 126291.29 0 167751.67 155291.61 0 177383.63 166462.97 0 174001.93 166621.39

0 0 0 0 0 0 0 0 0 0

400 765.77 1231.88 33365 43644.74 41915.78 50516.52 62116.64 66585.19 66648.56

0 0 0 0 34677.54 39397.56 44452.36 49878.47 55066.89 59710.74

200 414.86 697.67 556.8 32475.41 37298.73 42194.64 47000.05 51751.68 56346.11

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 54.45 62.91 66.79 69.68 69.9 68.22 65.35

1 1.6 2.2 52.13 60.62 63.63 64.44 64.7 64.02 62.58

0 0 0 0 0 0 0 0 0 0

0.4 0.64 0.88 20.85 24.25 25.45 25.78 25.88 25.61 25.03

0 0 0 0 86.69 87.55 88.9 90.69 91.78 91.86

1 1.66 2.33 3 81.19 82.89 84.39 85.45 86.25 86.69

0 0 0 967.17 1093.59 1109.99 1035.84 904.23 842.84 828.11

0 0 0 0 0 0 0 0 0 0

0 0 0 386.87 437.44 443.99 414.34 361.69 337.14 331.25

0 0 0 1347.14 1721.41 1827.23 1768.44 1543.44 1416.67 1357.14

0 44.67 57.96 1289.91 1658.74 1740.8 1635.35 1428.8 1329.45 1299.57

0 0 0 0 0 0 0 0 0 0

0 17.87 23.19 515.96 663.5 696.32 654.14 571.52 531.78 519.83

0 0 0 0 3570.8 3605.92 3396.87 3014.89 2868.9 2871.52

0 67 89.09 124.71 3344.04 3413.82 3224.34 2840.91 2696.19 2709.72

0 0 0 35056.39 36149.69 29807.12 41219.88 44791.01 44068.35 44538.32

0 0 0 0 0 0 0 0 0 0

0 0 0 14022.56 14459.88 11922.85 16487.95 17916.41 17627.34 17815.33

0 0 0 43263.45 55817 45825.21 52779.46 57340.57 56394.41 55028.88

960 2010 1525.88 41425.39 53785.07 43657.57 48807.37 53081.5 52922.48 52694.76

0 0 0 0 0 0 0 0 0 0

384 0 228 804 0 502.5 610.35 0 438.78 16570.16 0 233.92 21514.03 41848.69 39191.17 17463.03 65954.38 62440.78 19522.95 75717.38 71871.72 21232.6 90247.94 85039.85 21168.99 115189.13 108254.35 21077.9 145456.99 137260.66

0 0 0 0 0 0 0 0 0 0

380 300 197 75.03 468.79 731.62 891.61 1197.36 1606.04 2026.2

0 0 0 0 0 0 0 0 0 0

0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4

0 0 0 0 0 0 0 0 0 0

80 165.95 279.07 222.72 12990.16 14919.49 16877.86 18800.02 20700.67 22538.45

0 0 0 0 0 0 0 0 0 0

0.4 0.66 0.93 1.2 32.48 33.15 33.76 34.18 34.5 34.67

0 0 0 0 0 0 0 0 0 0

0 26.8 35.64 49.88 1337.62 1365.53 1289.74 1136.36 1078.47 1083.89

0 0 0 0 0 0 0 0 0 0

91.2 201 175.51 93.57 15676.47 24976.31 28748.69 34015.94 43301.74 54904.26

Scenario[]| 1 Transition_pct_Sc1["ProcessX.Process_1", 0.00% Transition_pct_Sc1["ProcessX.Process_1", 100.00%"Process.Process_1"]|=0 Transition_pct_Sc1["ProcessX.Process_1", 0.00%"Process.Process_2"]| Transition_pct_Sc1["ProcessX.P "Process.R Transition_pct_Sc1["ProcessX.Process_4", 0.00% Transition_pct_Sc1["ProcessX.Process_4", 0.00%"Process.Process_3"]|=0 Transition_pct_Sc1["ProcessX.Process_4", 0.00%"Process.Process_4"]| Transition_pct_Sc1["ProcessX.Process_4", 100.00%"Process.Finished_Goods_A"]|=0 Transition_pct_Sc1["ProcessX.F "Process.Fi Transition_pct_Sc2["ProcessX.Rework_2", 0.00% Transition_pct_Sc2["ProcessX.Rework_2", 0.00%"Process.Process_1"]|=0 Transition_pct_Sc2["ProcessX.Rework_2", 0.00%"Process.Process_2"]|=0 Transition_pct_Sc2["ProcessX.Rework_2", 100.00%"Process.Rework_2"]|=0 Transition_pct_Sc2["ProcessX.R "Process.Pr Transition_pct_Sc2["ProcessX.Finished_Goods_B", 0.00% Transition_pct_Sc2["ProcessX.Finished_Goods_B", 0.00% Transition_pct_Sc2["ProcessX.Finished_Goods_B", "Process.Process_4"]|=0 100.00% Process_Yield_pct_Sc1["ProcessX.Process_1", "Process.Finished_Goods_A"]|=0 96.00% Process_Yield_pct_Sc1["Process "Process.Finished_Goods DATE( Process_Yield_pct_Sc1["ProcessX.Rework_2", 94.00% Process_Yield_pct_Sc1["ProcessX.Process_3", 90.00% Process_Yield_pct_Sc1["ProcessX.Process_3", DATE(10,1,1)]|=J32 90.00% Process_Yield_pct_Sc1["ProcessX.Process_3", DATE(1,1,1)]| 90.00% Process_Yield_pct_Sc1["Process DATE(2,1,1)]|=B33 DATE( Process_Yield_pct_Sc1["ProcessX.Finished_Goods_B", 99.00% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_B", 99.00% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_B", DATE(2,1,1)]|=B36 99.00% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_B" DATE(3,1,1)]|=C36 99.00% Process_Yield_pct_Sc1["Process DATE(4,1,1)]|=D36 Process_Yield_pct_Sc2["ProcessX.Rework_2", 94.00% Process_Yield_pct_Sc2["ProcessX.Rework_2", 94.00% Process_Yield_pct_Sc2["ProcessX.Rework_2", DATE(4,1,1)]|=D42 94.00% Process_Yield_pct_Sc2["ProcessX.Rework_2", DATE(5,1,1)]|=E42 94.00% Process_Yield_pct_Sc2["Process DATE(6,1,1)]|=F42 DATE(7 Process_Yield_pct_Sc2["ProcessX.Finished_Goods_A", 98.50% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_A", 98.50% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_A", DATE(6,1,1)]|=F45 98.50% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_A" DATE(7,1,1)]|=G45 98.50% Process_Yield_pct_Sc2["Process DATE(8,1,1)]|=H45 Units_Purchd_In["Process.Process_2", 0 Units_Purchd_In["Process.Process_2", DATE(7,1,1)]|=G55 0 Units_Purchd_In["Process.Process_2", DATE(8,1,1)]|=H55 0 Units_Purchd_In["Process.Process_2", DATE(9,1,1)]|=I55 0 Units_Purchd_In["Process.Rewo DATE(10,1,1)]|= Units_Purchd_In["Process.Process_4", 0 Units_Purchd_In["Process.Process_4", DATE(9,1,1)]|=I58 0 Units_Purchd_In["Process.Finished_Goods_A", 4000 DATE(10,1,1)]|=J58 Units_Purchd_In["Process.Finished_Goods_A", 0 Units_Purchd_In["Process.Finish DATE(1,1,1)]| DATE( Stations["Process.Process_2", 2 Stations["Process.Process_2", DATE(1,1,1)]| 2 Stations["Process.Process_2", DATE(2,1,1)]|=B65 2 Stations["Process.Process_2", DATE(3,1,1)]|=C65 2 Stations["Process.Process_2", DATE(4,1,1)]|=D65 D Stations["Process.Process_4", 1 Stations["Process.Process_4", DATE(3,1,1)]|=C68 1 Stations["Process.Process_4", DATE(4,1,1)]|=D68 1 Stations["Process.Process_4", DATE(5,1,1)]|=E68 1 Stations["Process.Process_4", DATE(6,1,1)]|=F68 D Capacity_per_Station["Process.Process_1", 3000 Capacity_per_Station["Process.Process_1", 3000 DATE(5,1,1)]|=E74 Capacity_per_Station["Process.Process_1", 3000 DATE(6,1,1)]|=F74 Capacity_per_Station["Process.Process_1", 3000 DATE(7,1,1)]|=G74 Capacity_per_Station["Process.P DATE(8,1, Capacity_per_Station["Process.Process_3", 3000 Capacity_per_Station["Process.Process_3", 3000 DATE(7,1,1)]|=G77 Capacity_per_Station["Process.Process_3", 3000 DATE(8,1,1)]|=H77 Capacity_per_Station["Process.Process_3", 3000 DATE(9,1,1)]|=I77 Capacity_per_Station["Process.P DATE(10,1 Capacity_per_Station["Process.Finished_Goods_B", 3000 Capacity_per_Station["Process.Finished_Goods_B", 3000 Proc_Cost_per_U_Sc1["Process.Process_1", DATE(9,1,1)]|=I80 10 Proc_Cost_per_U_Sc1["Process.Process_1", DATE(10,1,1)]|=J80 10 Proc_Cost_per_U_Sc1["Process "Cost_Types.Material","Cost_Ty DATE(1 Proc_Cost_per_U_Sc1["Process.Process_1", 2.8 Proc_Cost_per_U_Sc1["Process.Process_1", 2.8 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.OH",2.8 DATE(1,1,1)]|=B214*B87 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.OH",2.8 DATE(2,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc1["Process "Cost_Types.OH", DATE(3,1,1) "Cost_Ty Proc_Cost_per_U_Sc1["Process.Process_2", 0 Proc_Cost_per_U_Sc1["Process.Process_2", 0 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.Fixed_Exp", DATE(3,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process "Cost_Types.Fixed_Exp", DATE(4,1,1)]|=if("Cost_Typ "Cost_Ty DATE if(Un Proc_Cost_per_U_Sc1["Process.Rework_2", 25 Proc_Cost_per_U_Sc1["Process.Rework_2", 25 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Labor", 25DATE(5,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Labor", 25DATE(6,1,1)]|=if("Cost_Types"="F Proc_Cost_per_U_Sc1["Process "Cost_Types.Labor", DATE(7,1, if(Units!F2 "Cost_Typ Proc_Cost_per_U_Sc1["Process.Process_3", 4 Proc_Cost_per_U_Sc1["Process.Process_3", 4 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Material", 4 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Material", DATE(7,1,1)]|=if("Cost_Types"="Fixed_Exp", 4 Proc_Cost_per_U_Sc1["Process "Cost_Types.Material", DATE(8,1,1)]|=if("Cost_Types" "Cost_Ty DATE(9 if(Units! Proc_Cost_per_U_Sc1["Process.Process_3", 10.8 Proc_Cost_per_U_Sc1["Process.Process_3", 10.8 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.OH",20 DATE(9,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.OH",20 DATE(10,1,1)]|=if("Cost_Types"="F Proc_Cost_per_U_Sc1["Process "Cost_Types.Material", if(Units!J30= "Cost_Ty DATE(1 Proc_Cost_per_U_Sc1["Process.Process_4", 7.2 Proc_Cost_per_U_Sc1["Process.Process_4", 7.2 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.OH",7.2 DATE(1,1,1)]|=B214*B111 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.OH",7.2 DATE(2,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc1["Process "Cost_Types.OH", DATE(3,1,1) "Cost_Ty Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.Fixed_Exp", DATE(3,1,1)]|=if("Cost_Types"="Fixed_Ex 0 Proc_Cost_per_U_Sc1["Process "Cost_Types.Fixed_Ex DATE(4,1,1)]|=if("C" Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Labor", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", DATE(5,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 1 Proc_Cost_per_U_Sc1["Process DATE(6,1,1)]|=if("Cost_T "Cost_Types.Labor", Dif" Proc_Cost_per_U_Sc2["Process.Process_1", 10 Proc_Cost_per_U_Sc2["Process.Process_1", 10 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Material", 10 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Material", DATE(7,1,1)]|=if("Cost_Types"="Fixed_Exp", 10 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", DATE(8,1,1)]|=if("Cost_Types" "Cost_Ty DATE(9 if(Units! Proc_Cost_per_U_Sc2["Process.Process_1", 2.8 Proc_Cost_per_U_Sc2["Process.Process_1", 2.8 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.OH",40 DATE(9,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.OH",40 DATE(10,1,1)]|=if("Cost_Types"="F Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", if(Units!J27= "Cost_Ty DATE(1 Proc_Cost_per_U_Sc2["Process.Process_2", 7.2 Proc_Cost_per_U_Sc2["Process.Process_2", 7.2 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.OH",7.2 DATE(1,1,1)]|=B214*B143 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.OH",7.2 DATE(2,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc2["Process "Cost_Types.OH", DATE(3,1,1) "Cost_Ty Proc_Cost_per_U_Sc2["Process.Rework_2", 0 Proc_Cost_per_U_Sc2["Process.Rework_2", 0 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Fixed_Exp", DATE(3,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process "Cost_Types.Fixed_Exp", DATE(4,1,1)]|=if("Cost_Type "Cost_Typ DATE if(Uni Proc_Cost_per_U_Sc2["Process.Process_3", 40 Proc_Cost_per_U_Sc2["Process.Process_3", 40 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Labor", 40 Proc_Cost_per_U_Sc2["Process.Process_3", DATE(5,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 40 Proc_Cost_per_U_Sc2["Process DATE(6,1,1)]|=if("Cost_Types"=" "Cost_Types.Labor", DATE(7,1 if(Units!F3 "Cost_Ty Proc_Cost_per_U_Sc2["Process.Process_4", 20 Proc_Cost_per_U_Sc2["Process.Process_4", 20 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Material", 20 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Material", DATE(7,1,1)]|=if("Cost_Types"="Fixed_Exp", 20 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", DATE(8,1,1)]|=if("Cost_Types" "Cost_Ty DATE(9 if(Units! Proc_Cost_per_U_Sc2["Process.Process_4", 7.2 Proc_Cost_per_U_Sc2["Process.Process_4", 7.2 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.OH", DATE(9,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.OH", DATE(10,1,1)]|=if("Cost_Types"="F 0 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", if(Units!J31= " Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", DATE(1,1,1)]|=B214*B167 "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc2["Process DATE(2,1,1)]|=if("Cost_Ty "Cost_Types.OH", DAT" Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.Fixed_Exp", DATE(3,1,1)]|=if("Cost_Types"="Fixed_Ex 0 Proc_Cost_per_U_Sc2["Process "Cost_Types.Fixed_Ex DATE(4,1,1)]|=if("C" Cost_per_U_Purchd_In["Process.Process_2", 50 Cost_per_U_Purchd_In["Process.Process_2", 50 Cost_per_U_Purchd_In["Process.Process_2", DATE(5,1,1)]|=E186 50 Cost_per_U_Purchd_In["Process.Process_2", DATE(6,1,1)]|=F186 50 Cost_per_U_Purchd_In["Process DATE(7,1,1)]|=G186 DATE(8, Cost_per_U_Purchd_In["Process.Process_4", 160 Cost_per_U_Purchd_In["Process.Process_4", 160 Cost_per_U_Purchd_In["Process.Process_4", DATE(7,1,1)]|=G189 160 Cost_per_U_Purchd_In["Process.Process_4", DATE(8,1,1)]|=H189 160 Cost_per_U_Purchd_In["Process DATE(9,1,1)]|=I189 DATE(10 Scrap_Salvage_Value_per_U["Process.Process_1", 4 Scrap_Salvage_Value_per_U["Process.Process_1", 4 Scrap_Salvage_Value_per_U["Process.Process_2", DATE(9,1,1)]|=I195 15 Scrap_Salvage_Value_per_U["Process.Process_2", DATE(10,1,1)]|=J195 15 Scrap_Salvage_Value_per_U["P DATE(1,1,1)]| DA Scrap_Salvage_Value_per_U["Process.Process_4", 15 Scrap_Salvage_Value_per_U["Process.Process_4", 15 Scrap_Salvage_Value_per_U["Process.Process_4", DATE(1,1,1)]| 15 Scrap_Salvage_Value_per_U["Process.Process_4", DATE(2,1,1)]|=B199 15 Scrap_Salvage_Value_per_U["P DATE(3,1,1)]|=C199 DA Fixed_Exp_per_Station["Process.Process_1", 10000 Fixed_Exp_per_Station["Process.Process_1", 10000 Fixed_Exp_per_Station["Process.Process_1", DATE(3,1,1)]|=C205 10000 Fixed_Exp_per_Station["Process.Process_1", DATE(4,1,1)]|=D205 10000 Fixed_Exp_per_Station["Process DATE(5,1,1)]|=E205 DATE(6, Fixed_Exp_per_Station["Process.Process_3", 9700 Fixed_Exp_per_Station["Process.Process_3", 9700 Fixed_Exp_per_Station["Process.Process_3", DATE(5,1,1)]|=E208 9700 Fixed_Exp_per_Station["Process.Process_3", DATE(6,1,1)]|=F208 9700 Fixed_Exp_per_Station["Process DATE(7,1,1)]|=G208 DATE(8, Fixed_Exp_per_Station["Process.Finished_Goods_B", 1000 Fixed_Exp_per_Station["Process.Finished_Goods_B", 1000 Fixed_Exp_per_Station["Process.Finished_Goods_B", DATE(7,1,1)]|=G211 1000 Fixed_Exp_per_Station["Process.Finished_Goods_B", DATE(8,1,1)]|=H211 1000 Labor_Overhead_pct[DATE(1,1,1 DATE(9,1,1)]|=I211 Units_Demand["Process.Process_2", 0 Units_Demand["Process.Process_2", DATE(9,1,1)]|=0/7 0 Units_Demand["Process.Rework_2", DATE(10,1,1)]|=0/7 0 Units_Demand["Process.Rework_2", DATE(1,1,1)]|=0/7 0 Units_Demand["Process.Rework DATE(2,1,1)]|=0/7 Units_Demand["Process.Finished_Goods_A", 1000 Units_Demand["Process.Finished_Goods_A", 1200 Units_Demand["Process.Finished_Goods_A", DATE(1,1,1)]| 1400 Units_Demand["Process.Finished_Goods_A", DATE(2,1,1)]| 1600 Units_Demand["Process.Finishe DATE(3,1,1)]|=2*C223-B223 DATE(4, Selling_Price["Process.Process_2", 190 Selling_Price["Process.Process_2", DATE(3,1,1)]|=C229 190 Selling_Price["Process.Process_2", DATE(4,1,1)]|=D229 190 Selling_Price["Process.Process_2", DATE(5,1,1)]|=E229 190 Selling_Price["Process.Process_ DATE(6,1,1)]|=F22 Selling_Price["Process.Process_4", 400 Selling_Price["Process.Process_4", DATE(5,1,1)]|=E232 400 Selling_Price["Process.Process_4", DATE(6,1,1)]|=F232 400 Selling_Price["Process.Process_4", DATE(7,1,1)]|=G232 400 Selling_Price["Process.Process_ DATE(8,1,1)]|=H23 :A:0:Units_Purchd_In Purch'd Units :A:-1:Units_Purchd_In In WIP Units purchased :A:0:FG_Inven_Targ_Periods externally FG Inventory as:A:-1:FG_Inven_Targ_Periods input Target to each Periods Target stage, finished by :A:0:Ident time goods period inventory for each sta :A:0:Units_In Units In :A:-1:Units_In Good units :A:0:Units_Avail_In input to each Units processing Available :A:-1:Units_Avail_In stage, In byGood time units period :A:0:Units_Buffer_Stock available to enter each processin :A:0:COGS_per_U COGS/Unit:A:-1:COGS_per_U Cost per unit :A:0:Capacity_Util_pct of units sold Capacity as finished Utilization :A:-1:Capacity_Util_pct goods %as Percentage output of:A:0:Fixed_Exp_per_Station each of processing stage, segmented capacity utilized by costfo :A:0:Scrap_Net_Cost_per_U Scrap Net Cost/Unit :A:-1:Scrap_Net_Cost_per_U Cost of scrap :D:-1:Process less salvage A listvalue of theof :D:0:Process process scrap atstages each Process stage, in the :D:2:Process process segmented flowby cost factor (mater :D:0:ProcessY.Process_2 Process 2 :D:0:ProcessY.Rework_2 Rework 2 :D:0:ProcessY.Process_3 Process 3 :D:0:ProcessY.Process_4 Process 4 :D:0:ProcessY.Finished_Goods_ :WS:Output 0 :WS:Output 0 :WS: 0 :WS: 0 :WS:

0.00% Transition_pct_Sc1["ProcessX.Process_1", 0.00% Transition_pct_Sc1["ProcessX.Process_1", 0.00%"Process.Process_4"]|=0 Transition_pct_Sc1["ProcessX.Process_1", 0.00%"Process.Finished_Goods_A"]|=0 Transition_pct_Sc1["ProcessX.Process_2", 0.00%"Process.Finished_Go 0.00% Transition_pct_Sc1["ProcessX.Finished_Goods_A", 0.00% Transition_pct_Sc1["ProcessX.Finished_Goods_A", 0.00% Transition_pct_Sc1["ProcessX.Finished_Goods_A", "Process.Process_2"]|=0 0.00% Transition_pct_Sc1["ProcessX.Finished_Go "Process.Rework_2"]|=0 0.00% "Process.Proc 0.00% Transition_pct_Sc2["ProcessX.Rework_2", 0.00% Transition_pct_Sc2["ProcessX.Rework_2", 0.00%"Process.Finished_Goods_A"]|=0 Transition_pct_Sc2["ProcessX.Process_3", 0.00%"Process.Finished_Goods_B"]|=0 Transition_pct_Sc2["ProcessX.Process_3", 0.00%"Process.Process_1"]| 96.00% Process_Yield_pct_Sc1["ProcessX.Process_1", 96.00% Process_Yield_pct_Sc1["ProcessX.Process_1", 96.00% Process_Yield_pct_Sc1["ProcessX.Process_1", DATE(3,1,1)]|=C30 96.00% Process_Yield_pct_Sc1["ProcessX.Process DATE(4,1,1)]|=D30 96.00% DATE(5,1,1)]|=E3 90.00% Process_Yield_pct_Sc1["ProcessX.Process_3", 90.00% Process_Yield_pct_Sc1["ProcessX.Process_3", 90.00% Process_Yield_pct_Sc1["ProcessX.Process_3", DATE(5,1,1)]|=E33 90.00% Process_Yield_pct_Sc1["ProcessX.Process DATE(6,1,1)]|=F33 90.00% DATE(7,1,1)]|=G3 99.00% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_B", 99.00% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_B", 99.00% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_B", DATE(7,1,1)]|=G36 99.00% Process_Yield_pct_Sc1["ProcessX.Finished DATE(8,1,1)]|=H36 99.00% DATE(9,1 94.00% Process_Yield_pct_Sc2["ProcessX.Rework_2", 94.00% Process_Yield_pct_Sc2["ProcessX.Rework_2", 94.00% Process_Yield_pct_Sc2["ProcessX.Process_3", DATE(9,1,1)]|=I42 98.00% Process_Yield_pct_Sc2["ProcessX.Process DATE(10,1,1)]|=J42 98.00% DATE(1,1,1)]| 98.50% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_B", 99.00% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_B", 99.00% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_B", DATE(1,1,1)]| 99.00% Process_Yield_pct_Sc2["ProcessX.Finished DATE(2,1,1)]|=B46 99.00% DATE(3,1 0 Units_Purchd_In["Process.Rework_2", 0 Units_Purchd_In["Process.Rework_2", DATE(2,1,1)]|=B56 0 Units_Purchd_In["Process.Rework_2", DATE(3,1,1)]|=C56 0 Units_Purchd_In["Process.Rework_2", DATE(4,1,1)]|=D56 0 DAT 0 Units_Purchd_In["Process.Finished_Goods_A", 0 Units_Purchd_In["Process.Finished_Goods_A", 0 Units_Purchd_In["Process.Finished_Goods_A", DATE(4,1,1)]|=D59 0 Units_Purchd_In["Process.Finished_Goods_ DATE(5,1,1)]|=E59 0 DATE(6,1,1)]|=F59 2 Stations["Process.Process_2", 2 Stations["Process.Process_2", DATE(6,1,1)]|=F65 2 Stations["Process.Process_2", DATE(7,1,1)]|=G65 2 Stations["Process.Process_2", DATE(8,1,1)]|=H65 2 DATE(9,1,1) 1 Stations["Process.Process_4", 1 Stations["Process.Process_4", DATE(8,1,1)]|=H68 1 Stations["Process.Process_4", DATE(9,1,1)]|=I68 1 Stations["Process.Finished_Goods_A", DATE(10,1,1)]|=J68 1 DAT 3000 Capacity_per_Station["Process.Process_1", 3000 Capacity_per_Station["Process.Process_2", 3000 DATE(10,1,1)]|=J74 Capacity_per_Station["Process.Process_2", 3000 DATE(1,1,1)]| Capacity_per_Station["Process.Process_2", 3000 DATE(2,1,1)]|=B75 3000 Capacity_per_Station["Process.Process_4", 3000 Capacity_per_Station["Process.Process_4", 3000 DATE(2,1,1)]|=B78 Capacity_per_Station["Process.Process_4", 3000 DATE(3,1,1)]|=C78 Capacity_per_Station["Process.Process_4", 3000 DATE(4,1,1)]|=D78 10 Proc_Cost_per_U_Sc1["Process.Process_1", 10 Proc_Cost_per_U_Sc1["Process.Process_1", 10 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.Material", 10 Proc_Cost_per_U_Sc1["Process.Process_1 "Cost_Types.Material", DATE(4,1,1)]|=if("Cost_Types"="Fixed_Ex 10 "Cost_Types.Materia DATE(5,1,1)]|=if("C 2.8 Proc_Cost_per_U_Sc1["Process.Process_1", 2.8 Proc_Cost_per_U_Sc1["Process.Process_1", 2.8 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.OH",2.8 DATE(6,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Process_1 "Cost_Types.OH",2.8 DATE(7,1,1)]|=if("Cost_ "Cost_Types.OH", Di 0 Proc_Cost_per_U_Sc1["Process.Process_2", 0 Proc_Cost_per_U_Sc1["Process.Process_2", 0 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Process_2 "Cost_Types.Fixed_Exp", DATE(8,1,1)]|=if("Cost_Types"="Fixed_ 7.2 "Cost_Types.Fixed_ DATE(9,1,1)]|=if( 25 Proc_Cost_per_U_Sc1["Process.Rework_2", 25 Proc_Cost_per_U_Sc1["Process.Rework_2", 0 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Labor",0DATE(10,1,1)]|=if("Cost_Types"="Fixed_Exp Proc_Cost_per_U_Sc1["Process.Rework_2" "Cost_Types.Fixed_Exp", 0 "Cost_Types.Fixed_E DATE(1,1,1)]|=if( 27 Proc_Cost_per_U_Sc1["Process.Process_3", 27 Proc_Cost_per_U_Sc1["Process.Process_3", 27 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Labor", 27 Proc_Cost_per_U_Sc1["Process.Process_3 DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp" "Cost_Types.Labor", 27 DATE(3,1,1)]|=if("Cos "Cost_Types.Labor" 20 Proc_Cost_per_U_Sc1["Process.Process_4", 20 Proc_Cost_per_U_Sc1["Process.Process_4", 20 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.Material", 20 Proc_Cost_per_U_Sc1["Process.Process_4 "Cost_Types.Material", DATE(4,1,1)]|=if("Cost_Types"="Fixed_Ex 20 "Cost_Types.Materia DATE(5,1,1)]|=if("C 7.2 Proc_Cost_per_U_Sc1["Process.Process_4", 7.2 Proc_Cost_per_U_Sc1["Process.Process_4", 7.2 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.OH",7.2 DATE(6,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Process_4 "Cost_Types.OH",7.2 DATE(7,1,1)]|=if("Cost_ "Cost_Types.OH", Di 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Finished_G "Cost_Types.Fixed_Exp", DATE(8,1,1)]|=if("Cost_Types" 0.4 "Cost_Type DATE(9 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Labor", 0 Proc_Cost_per_U_Sc1["Process.Finished_G DATE(10,1,1)]|=if("Cost_Types"="F "Cost_Types.Fixed_Exp", 0 "Cost_Type DATE(1 7 Proc_Cost_per_U_Sc2["Process.Process_1", 7 Proc_Cost_per_U_Sc2["Process.Process_1", 7 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Labor", 7 Proc_Cost_per_U_Sc2["Process.Process_1 DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp" "Cost_Types.Labor", 7 DATE(3,1,1)]|=if("Cos "Cost_Types.Labor" 40 Proc_Cost_per_U_Sc2["Process.Process_2", 40 Proc_Cost_per_U_Sc2["Process.Process_2", 40 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.Material", 40 Proc_Cost_per_U_Sc2["Process.Process_2 "Cost_Types.Material", DATE(4,1,1)]|=if("Cost_Types"="Fixed_Ex 40 "Cost_Types.Materia DATE(5,1,1)]|=if("C 7.2 Proc_Cost_per_U_Sc2["Process.Process_2", 7.2 Proc_Cost_per_U_Sc2["Process.Process_2", 7.2 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.OH",7.2 DATE(6,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Process_2 "Cost_Types.OH",7.2 DATE(7,1,1)]|=if("Cost_ "Cost_Types.OH", Di 0 Proc_Cost_per_U_Sc2["Process.Rework_2", 0 Proc_Cost_per_U_Sc2["Process.Rework_2", 0 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Rework_2" "Cost_Types.Fixed_Exp", DATE(8,1,1)]|=if("Cost_Types"="Fixed_ 10 "Cost_Types.Fixed_E DATE(9,1,1)]|=if( 40 Proc_Cost_per_U_Sc2["Process.Process_3", 40 Proc_Cost_per_U_Sc2["Process.Process_3", 0 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Labor", 0 Proc_Cost_per_U_Sc2["Process.Process_3 DATE(10,1,1)]|=if("Cost_Types"="Fixed_Exp "Cost_Types.Fixed_Exp", 0 "Cost_Types.Fixed_ DATE(1,1,1)]|=if( 18 Proc_Cost_per_U_Sc2["Process.Process_4", 18 Proc_Cost_per_U_Sc2["Process.Process_4", 18 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc2["Process.Process_4 DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp" "Cost_Types.Labor", 18 DATE(3,1,1)]|=if("Cos "Cost_Types.Labor" 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.Material", 0 Proc_Cost_per_U_Sc2["Process.Finished_G "Cost_Types.Material", DATE(4,1,1)]|=if("Cost_Types"="F 0 "Cost_Type DATE(5,1, 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_G DATE(6,1,1)]|=if("Cost_Types"="Fixed "Cost_Types.OH", 0.4 DATE(7,1,1)]|= "Cost_Type 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Finished_G "Cost_Types.Fixed_Exp", DATE(8,1,1)]|=if("Cost_Types" 0.4 "Cost_Type DATE(9 50 Cost_per_U_Purchd_In["Process.Process_2", 50 Cost_per_U_Purchd_In["Process.Rework_2", 150 Cost_per_U_Purchd_In["Process.Rework_2", DATE(10,1,1)]|=J186 150 Cost_per_U_Purchd_In["Process.Rework_2 DATE(1,1,1)]| 150 DATE(2,1,1)]|=B187 220 Cost_per_U_Purchd_In["Process.Finished_Goods_A", 220 Cost_per_U_Purchd_In["Process.Finished_Goods_A", 220 Cost_per_U_Purchd_In["Process.Finished_Goods_A", DATE(2,1,1)]|=B190 220 Cost_per_U_Purchd_In["Process.Finished_G DATE(3,1,1)]|=C190 220 DATE(4,1,1 15 Scrap_Salvage_Value_per_U["Process.Process_2", 15 Scrap_Salvage_Value_per_U["Process.Process_2", 15 Scrap_Salvage_Value_per_U["Process.Process_2", DATE(4,1,1)]|=D196 15 Scrap_Salvage_Value_per_U["Process.Proc DATE(5,1,1)]|=E196 15 DATE(6,1,1)]| 15 Scrap_Salvage_Value_per_U["Process.Process_4", 15 Scrap_Salvage_Value_per_U["Process.Process_4", 15 Scrap_Salvage_Value_per_U["Process.Process_4", DATE(6,1,1)]|=F199 15 Scrap_Salvage_Value_per_U["Process.Proc DATE(7,1,1)]|=G199 15 DATE(8,1,1)]| 10000 Fixed_Exp_per_Station["Process.Process_1", 10000 Fixed_Exp_per_Station["Process.Process_1", 10000 Fixed_Exp_per_Station["Process.Process_1", DATE(8,1,1)]|=H205 10000 Fixed_Exp_per_Station["Process.Process_2 DATE(9,1,1)]|=I205 105000 DATE(10,1,1)]|=J20 9700 Fixed_Exp_per_Station["Process.Process_3", 9700 Fixed_Exp_per_Station["Process.Process_4", 11000 Fixed_Exp_per_Station["Process.Process_4", DATE(10,1,1)]|=J208 11000 Fixed_Exp_per_Station["Process.Process_4 DATE(1,1,1)]| 11000 DATE(2,1,1)]|=B209 40.00% Labor_Overhead_pct[DATE(2,1,1)]|=B214 40.00% Labor_Overhead_pct[DATE(3,1,1)]|=C214 40.00% Labor_Overhead_pct[DATE(4,1,1)]|=D214 40.00% Labor_Overhead_pct[DATE(5,1,1)]|=E214 40.00% 0 Units_Demand["Process.Rework_2", 0 Units_Demand["Process.Rework_2", DATE(4,1,1)]|=0/7 0 Units_Demand["Process.Rework_2", DATE(5,1,1)]|=0/7 0 Units_Demand["Process.Rework_2", DATE(6,1,1)]|=0/7 0 DATE( 1800 Units_Demand["Process.Finished_Goods_A", 2000 Units_Demand["Process.Finished_Goods_A", 2200 Units_Demand["Process.Finished_Goods_A", DATE(6,1,1)]|=2*F223-E223 2400 Units_Demand["Process.Finished_Goods_A DATE(7,1,1)]|=2*G223-F223 2600 DATE(8,1,1)]|=2*H2 190 Selling_Price["Process.Process_2", 190 Selling_Price["Process.Process_2", DATE(8,1,1)]|=H229 190 Selling_Price["Process.Process_2", DATE(9,1,1)]|=I229 190 Selling_Price["Process.Rework_2", DATE(10,1,1)]|=J229 385 DATE(1 400 Selling_Price["Process.Process_4", 400 Selling_Price["Process.Finished_Goods_A", DATE(10,1,1)]|=J232 380 Selling_Price["Process.Finished_Goods_A", 380 DATE(1,1,1)]| Selling_Price["Process.Finished_Goods_A", 380 DATE(2,1,1)]|=B233 Ident :A:-1:Ident An "identify:A:0:Units_Demand matrix" thatUnits switches Demand index :A:-1:Units_Demand variables, Market enabling demand :A:0:Cost_Purchd_U_In matrix for units multiplication Cost of finished Purch'dofgoods Units 2-index Inoutput variables from ue Units Buffer:A:-1:Units_Buffer_Stock Stock Good units :A:0:Units_Out in buffer stock Units available Out :A:-1:Units_Out to ente each Good processign units :A:0:Units_Sold output stage, fromby Units each time Sold processing period stage, by time Fixed Expense/Station :A:-1:Fixed_Exp_per_Station Fixed expense :A:0:Fixed_Expense per processing Fixed Expense station, :A:-1:Fixed_Expense for each Fixed stage, expense per :A:0:Selling_Price time for period eachSelling stage,Price per time period Process :D:1:Process Total :D:0:Process.Process_1 Process 1 :D:2:Process.Process_1 Lvl 1 :D:0:Process.Process_2 Process 2 Finished Goods :D:0:ProcessY.Finished_Goods_B A Finished Goods :D:-1:Cost_Types B A list of the:D:0:Cost_Types types of costs Costthat Types:D:2:Cost_Types are tracked separately Cost_Types in the analysis. Cost of 0 :WS: 0 :WS: 0 :WS: 0 :WS: 0

Transition_pct_Sc1["ProcessX.Process_2", 0.00% Transition_pct_Sc1["ProcessX.Process_2", 5.00%"Process.Process_2"]|=0 Transition_pct_Sc1["ProcessX.Process_2", 95.00%"Process.Rework_2"]| Transition_pct_Sc1["ProcessX.Process_2", 0.00%"Process.Process_3"]| Transition_pct_Sc1["ProcessX.P "Process.P Transition_pct_Sc1["ProcessX.Finished_Goods_A", 100.00% Transition_pct_Sc1["ProcessX.Finished_Goods_A", 0.00% Transition_pct_Sc1["ProcessX.Finished_Goods_B", "Process.Finished_Goods_A"]| 0.00% Transition_pct_Sc1["ProcessX.Finished_Goods_B", "Process.Finished_Goods_B"]|=0 0.00% Transition_pct_Sc1["ProcessX.F "Process.Process_1"]|=0 "Pr Transition_pct_Sc2["ProcessX.Process_3", 0.00% Transition_pct_Sc2["ProcessX.Process_3", 0.00%"Process.Rework_2"]|=0 Transition_pct_Sc2["ProcessX.Process_3", 40.00%"Process.Process_3"]|=0 Transition_pct_Sc2["ProcessX.Process_3", 60.00%"Process.Process_4"]| Transition_pct_Sc2["ProcessX.P "Process.Fi Process_Yield_pct_Sc1["ProcessX.Process_1", 96.00% Process_Yield_pct_Sc1["ProcessX.Process_1", 96.00% Process_Yield_pct_Sc1["ProcessX.Process_1", DATE(7,1,1)]|=G30 96.00% Process_Yield_pct_Sc1["ProcessX.Process_1", DATE(8,1,1)]|=H30 96.00% Process_Yield_pct_Sc1["Process DATE(9,1,1)]|=I30 DATE( Process_Yield_pct_Sc1["ProcessX.Process_3", 90.00% Process_Yield_pct_Sc1["ProcessX.Process_3", 90.00% Process_Yield_pct_Sc1["ProcessX.Process_4", DATE(9,1,1)]|=I33 97.00% Process_Yield_pct_Sc1["ProcessX.Process_4", DATE(10,1,1)]|=J33 97.00% Process_Yield_pct_Sc1["Process DATE(1,1,1)]| DATE( Process_Yield_pct_Sc2["ProcessX.Process_1", 96.00% Process_Yield_pct_Sc2["ProcessX.Process_1", 96.00% Process_Yield_pct_Sc2["ProcessX.Process_1", DATE(1,1,1)]| 96.00% Process_Yield_pct_Sc2["ProcessX.Process_1", DATE(2,1,1)]|=B40 96.00% Process_Yield_pct_Sc2["Process DATE(3,1,1)]|=C40 DATE( Process_Yield_pct_Sc2["ProcessX.Process_3", 98.00% Process_Yield_pct_Sc2["ProcessX.Process_3", 98.00% Process_Yield_pct_Sc2["ProcessX.Process_3", DATE(3,1,1)]|=C43 98.00% Process_Yield_pct_Sc2["ProcessX.Process_3", DATE(4,1,1)]|=D43 98.00% Process_Yield_pct_Sc2["Process DATE(5,1,1)]|=E43 DATE( Process_Yield_pct_Sc2["ProcessX.Finished_Goods_B", 99.00% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_B", 99.00% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_B", DATE(5,1,1)]|=E46 99.00% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_B" DATE(6,1,1)]|=F46 99.00% Process_Yield_pct_Sc2["Process DATE(7,1,1)]|=G46 Units_Purchd_In["Process.Rework_2", 0 Units_Purchd_In["Process.Rework_2", DATE(6,1,1)]|=F56 0 Units_Purchd_In["Process.Rework_2", DATE(7,1,1)]|=G56 0 Units_Purchd_In["Process.Rework_2", DATE(8,1,1)]|=H56 0 Units_Purchd_In["Process.Rewo DATE(9,1,1)]|=I Units_Purchd_In["Process.Finished_Goods_A", 0 Units_Purchd_In["Process.Finished_Goods_A", 0 Units_Purchd_In["Process.Finished_Goods_A", DATE(8,1,1)]|=H59 0 Units_Purchd_In["Process.Finished_Goods_B", DATE(9,1,1)]|=I59 950 Units_Purchd_In["Process.Finish DATE(10,1,1)]|=J59 DATE( Stations["Process.Process_2", 3 Stations["Process.Rework_2", DATE(10,1,1)]| 1 Stations["Process.Rework_2", DATE(1,1,1)]| 1 Stations["Process.Rework_2", DATE(2,1,1)]|=B66 1 Stations["Process.Rework_2", DATE(3,1,1)]|=C66 DA Stations["Process.Finished_Goods_A", 1 Stations["Process.Finished_Goods_A", DATE(2,1,1)]|=B69 1 Stations["Process.Finished_Goods_A", DATE(3,1,1)]|=C69 1 Stations["Process.Finished_Goods_A", DATE(4,1,1)]|=D69 1 Stations["Process.Finished_Goo DATE(5,1,1)]|=E Capacity_per_Station["Process.Process_2", 3000 Capacity_per_Station["Process.Process_2", 3000 DATE(4,1,1)]|=D75 Capacity_per_Station["Process.Process_2", 3000 DATE(5,1,1)]|=E75 Capacity_per_Station["Process.Process_2", 3000 DATE(6,1,1)]|=F75 Capacity_per_Station["Process.P DATE(7,1, Capacity_per_Station["Process.Process_4", 3000 Capacity_per_Station["Process.Process_4", 3000 DATE(6,1,1)]|=F78 Capacity_per_Station["Process.Process_4", 3000 DATE(7,1,1)]|=G78 Capacity_per_Station["Process.Process_4", 3000 DATE(8,1,1)]|=H78 Capacity_per_Station["Process.P DATE(9,1, Proc_Cost_per_U_Sc1["Process.Process_1", 10 Proc_Cost_per_U_Sc1["Process.Process_1", 10 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.Material", 10 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.Material", DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp", 7 Proc_Cost_per_U_Sc1["Process "Cost_Types.Material", DATE(9,1,1)]|=if("Cost_Types" "Cost_Ty DATE(1 if(Units! Proc_Cost_per_U_Sc1["Process.Process_1", 2.8 Proc_Cost_per_U_Sc1["Process.Process_2", 40 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.OH",40 DATE(10,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.Material", 40 Proc_Cost_per_U_Sc1["Process "Cost_Types.Material", DATE(1,1,1)]| if(Units!K27 "Cost_Ty DATE(2 Proc_Cost_per_U_Sc1["Process.Process_2", 7.2 Proc_Cost_per_U_Sc1["Process.Process_2", 7.2 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.OH",7.2 DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.OH",7.2 DATE(3,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc1["Process "Cost_Types.OH", DATE(4,1,1) if(Units!C28 "Cost_Ty Proc_Cost_per_U_Sc1["Process.Rework_2", 0 Proc_Cost_per_U_Sc1["Process.Rework_2", 0 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Fixed_Exp", DATE(4,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process "Cost_Types.Fixed_Exp", DATE(5,1,1)]|=if("Cost_Type "Cost_Typ DATE if(Uni Proc_Cost_per_U_Sc1["Process.Process_3", 27 Proc_Cost_per_U_Sc1["Process.Process_3", 27 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Labor", 27 Proc_Cost_per_U_Sc1["Process.Process_3", DATE(6,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 27 Proc_Cost_per_U_Sc1["Process DATE(7,1,1)]|=if("Cost_Types"=" "Cost_Types.Labor", DATE(8,1 if(Units!G "Cost_Ty Proc_Cost_per_U_Sc1["Process.Process_4", 20 Proc_Cost_per_U_Sc1["Process.Process_4", 20 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.Material", 20 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.Material", DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp", 18 Proc_Cost_per_U_Sc1["Process "Cost_Types.Material", DATE(9,1,1)]|=if("Cost_Types" "Cost_Ty DATE(1 if(Units! Proc_Cost_per_U_Sc1["Process.Process_4", 7.2 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.OH", DATE(10,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.Material", 0 Proc_Cost_per_U_Sc1["Process "Cost_Types.Material", DATE(1,1,1)]| if(Units!K31 " Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc1["Process DATE(3,1,1)]|=if("Cost_Ty "Cost_Types.OH", DAT if(U" Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Fixed_Exp", DATE(4,1,1)]|=if("Cost_Types"="Fixed_Ex 0 Proc_Cost_per_U_Sc1["Process "Cost_Types.Fixed_Ex DATE(5,1,1)]|=if("C" Proc_Cost_per_U_Sc2["Process.Process_1", 7 Proc_Cost_per_U_Sc2["Process.Process_1", 7 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Labor", 7 Proc_Cost_per_U_Sc2["Process.Process_1", DATE(6,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 7 Proc_Cost_per_U_Sc2["Process DATE(7,1,1)]|=if("Cost_Types"=" "Cost_Types.Labor", DATE(8,1 if(Units!G "Cost_Ty Proc_Cost_per_U_Sc2["Process.Process_2", 40 Proc_Cost_per_U_Sc2["Process.Process_2", 40 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.Material", 40 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.Material", DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp", 18 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", DATE(9,1,1)]|=if("Cost_Types" "Cost_Ty DATE(1 if(Units! Proc_Cost_per_U_Sc2["Process.Process_2", 7.2 Proc_Cost_per_U_Sc2["Process.Rework_2", 12 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.OH",12 DATE(10,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Material", 12 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", DATE(1,1,1)]| if(Units!K28 "Cost_Typ DATE(2, Proc_Cost_per_U_Sc2["Process.Rework_2", 10 Proc_Cost_per_U_Sc2["Process.Rework_2", 10 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.OH", 10 DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.OH", 10 DATE(3,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc2["Process "Cost_Types.OH", DATE(4,1,1)] if(Units!C29= "Cost_Typ Proc_Cost_per_U_Sc2["Process.Process_3", 0 Proc_Cost_per_U_Sc2["Process.Process_3", 0 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Fixed_Exp", DATE(4,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process "Cost_Types.Fixed_Exp", DATE(5,1,1)]|=if("Cost_Typ "Cost_Ty DATE if(Un Proc_Cost_per_U_Sc2["Process.Process_4", 18 Proc_Cost_per_U_Sc2["Process.Process_4", 18 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc2["Process.Process_4", DATE(6,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc2["Process DATE(7,1,1)]|=if("Cost_Types"=" "Cost_Types.Labor", DATE(8,1 if(Units!G "Cost_Ty Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.Material", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.Material", DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp" 1 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", DATE(9,1,1)]|=if("Cos" Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.OH", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", DATE(10,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Material", 0 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", DATE(1,1,1)]| if(" Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc2["Process DATE(3,1,1)]|=if("Cost_Ty "Cost_Types.OH", DAT if(U" Cost_per_U_Purchd_In["Process.Rework_2", 150 Cost_per_U_Purchd_In["Process.Rework_2", 150 Cost_per_U_Purchd_In["Process.Rework_2", DATE(4,1,1)]|=D187 150 Cost_per_U_Purchd_In["Process.Rework_2", DATE(5,1,1)]|=E187 150 Cost_per_U_Purchd_In["Process DATE(6,1,1)]|=F187 DATE(7,1 Cost_per_U_Purchd_In["Process.Finished_Goods_A", 220 Cost_per_U_Purchd_In["Process.Finished_Goods_A", 220 Cost_per_U_Purchd_In["Process.Finished_Goods_A", DATE(6,1,1)]|=F190 220 Cost_per_U_Purchd_In["Process.Finished_Goods_A", DATE(7,1,1)]|=G190 220 Cost_per_U_Purchd_In["Process DATE(8,1,1)]|=H190 Scrap_Salvage_Value_per_U["Process.Process_2", 15 Scrap_Salvage_Value_per_U["Process.Process_2", 15 Scrap_Salvage_Value_per_U["Process.Process_2", DATE(8,1,1)]|=H196 15 Scrap_Salvage_Value_per_U["Process.Rework_2", DATE(9,1,1)]|=I196 15 Scrap_Salvage_Value_per_U["P DATE(10,1,1)]|=J196 DA Scrap_Salvage_Value_per_U["Process.Process_4", 15 Scrap_Salvage_Value_per_U["Process.Finished_Goods_A", 40 Scrap_Salvage_Value_per_U["Process.Finished_Goods_A", DATE(10,1,1)]|=J199 40 Scrap_Salvage_Value_per_U["Process.Finished_Good DATE(1,1,1)]| 40 Scrap_Salvage_Value_per_U["P DATE(2,1,1)]|=B Fixed_Exp_per_Station["Process.Process_2", 105000 Fixed_Exp_per_Station["Process.Process_2", 105000 Fixed_Exp_per_Station["Process.Process_2", DATE(2,1,1)]|=B206 105000 Fixed_Exp_per_Station["Process.Process_2", DATE(3,1,1)]|=C206 105000 Fixed_Exp_per_Station["Process DATE(4,1,1)]|=D206 DATE(5, Fixed_Exp_per_Station["Process.Process_4", 11000 Fixed_Exp_per_Station["Process.Process_4", 11000 Fixed_Exp_per_Station["Process.Process_4", DATE(4,1,1)]|=D209 11000 Fixed_Exp_per_Station["Process.Process_4", DATE(5,1,1)]|=E209 11000 Fixed_Exp_per_Station["Process DATE(6,1,1)]|=F209 DATE(7, Labor_Overhead_pct[DATE(6,1,1)]|=F214 40.00% Labor_Overhead_pct[DATE(7,1,1)]|=G214 40.00% Labor_Overhead_pct[DATE(8,1,1)]|=H214 40.00% Labor_Overhead_pct[DATE(9,1,1)]|=I214 40.00% Labor_Overhead_pct[DATE(10,1 Units_Demand["Process.Rework_2", 0 Units_Demand["Process.Rework_2", DATE(8,1,1)]|=0/7 0 Units_Demand["Process.Rework_2", DATE(9,1,1)]|=0/7 0 Units_Demand["Process.Process_3", DATE(10,1,1)]|=0/7 0 Units_Demand["Process.Process DATE(1,1,1)]|=0/ Units_Demand["Process.Finished_Goods_A", 2800 Units_Demand["Process.Finished_Goods_B", 200 Units_Demand["Process.Finished_Goods_B", DATE(10,1,1)]|=2*J223-I223 250 Units_Demand["Process.Finished_Goods_B", DATE(1,1,1)]| 300 Units_Demand["Process.Finishe DATE(2,1,1)]| DATE(3, Selling_Price["Process.Rework_2", 385 Selling_Price["Process.Rework_2", DATE(2,1,1)]|=B230 385 Selling_Price["Process.Rework_2", DATE(3,1,1)]|=C230 385 Selling_Price["Process.Rework_2", DATE(4,1,1)]|=D230 385 Selling_Price["Process.Rework_2 DATE(5,1,1)]|=E230 Selling_Price["Process.Finished_Goods_A", 380 Selling_Price["Process.Finished_Goods_A", 380 DATE(4,1,1)]|=D233 Selling_Price["Process.Finished_Goods_A", 380 DATE(5,1,1)]|=E233 Selling_Price["Process.Finished_Goods_A", 380 DATE(6,1,1)]|=F233 Selling_Price["Process.Finished_ DATE(7,1, :A:-1:Cost_Purchd_U_In Cost of purchased :A:0:Proc_Cost_per_U input Process units entered Cost/Unit :A:-1:Proc_Cost_per_U into each Processing state, segmented :A:0:Scenario cost per unit byScenario cost for units factor (1processed :A:-1:Scenario or (material, 2) at labor, eachfixed stage, expense, segmen :A:-1:Units_Sold Good output :A:0:Units_Scrap units soldUnits as finished Scrap:A:-1:Units_Scrap goods at each Unitsprocessing scrapped :A:0:Scrap_pct during stage, Scrap processing by time %period :A:-1:Scrap_pct at each stage, by time period :A:-1:Selling_Price Price of finished :A:0:Revenue goodsRevenue units sold :A:-1:Revenue from outputRevenue of each stage, from :A:0:Gross_Margin selling by timefinished Gross periodMargin good :A:-1:Gross_Margin output of each stage, by time p :D:0:Process.Rework_2 Rework 2 :D:0:Process.Process_3 Process 3 :D:0:Process.Process_4 Process 4 :D:0:Process.Finished_Goods_A Finished Goods :D:0:Process.Finished_Goods_B A :D:1:Cost_Types Total :D:0:Cost_Types.Material Material :D:2:Cost_Types.Material Cost_Types:D:0:Cost_Types.Labor Labor :D:0:Cost_Types.Fixed_Exp :WS: 0 :WS: 0 :WS: Process Flow :WS: Analysis, Scenario0 1:WS:

0.00% Transition_pct_Sc1["ProcessX.Process_2", 0.00% Transition_pct_Sc1["ProcessX.Rework_2", 0.00%"Process.Finished_Goods_B"]|=0 Transition_pct_Sc1["ProcessX.Rework_2", 0.00%"Process.Process_1"]|=0 Transition_pct_Sc1["ProcessX.Rework_2", 0.00%"Process.Process_2"]|= " 0.00% Transition_pct_Sc1["ProcessX.Finished_Goods_B", 0.00% Transition_pct_Sc1["ProcessX.Finished_Goods_B", 0.00% Transition_pct_Sc1["ProcessX.Finished_Goods_B", "Process.Process_3"]|=0 0.00% Transition_pct_Sc1["ProcessX.Finished_Go "Process.Process_4"]|=0 100.00% "Process.Finis 0.00% Transition_pct_Sc2["ProcessX.Process_4", 0.00% Transition_pct_Sc2["ProcessX.Process_4", 0.00%"Process.Process_1"]|=0 Transition_pct_Sc2["ProcessX.Process_4", 0.00%"Process.Process_2"]|=0 Transition_pct_Sc2["ProcessX.Process_4", 0.00%"Process.Rework_2"]|= 92.00% Process_Yield_pct_Sc1["ProcessX.Process_2", 92.00% Process_Yield_pct_Sc1["ProcessX.Process_2", 92.00% Process_Yield_pct_Sc1["ProcessX.Process_2", DATE(2,1,1)]|=B31 88.00% Process_Yield_pct_Sc1["ProcessX.Process DATE(3,1,1)]|=C31 84.00% DATE(4,1,1)]| 97.00% Process_Yield_pct_Sc1["ProcessX.Process_4", 97.00% Process_Yield_pct_Sc1["ProcessX.Process_4", 97.00% Process_Yield_pct_Sc1["ProcessX.Process_4", DATE(4,1,1)]|=D34 97.00% Process_Yield_pct_Sc1["ProcessX.Process DATE(5,1,1)]|=E34 97.00% DATE(6,1,1)]|=F34 96.00% Process_Yield_pct_Sc2["ProcessX.Process_1", 96.00% Process_Yield_pct_Sc2["ProcessX.Process_1", 96.00% Process_Yield_pct_Sc2["ProcessX.Process_1", DATE(6,1,1)]|=F40 96.00% Process_Yield_pct_Sc2["ProcessX.Process DATE(7,1,1)]|=G40 96.00% DATE(8,1,1)]|=H4 98.00% Process_Yield_pct_Sc2["ProcessX.Process_3", 98.00% Process_Yield_pct_Sc2["ProcessX.Process_3", 98.00% Process_Yield_pct_Sc2["ProcessX.Process_3", DATE(8,1,1)]|=H43 98.00% Process_Yield_pct_Sc2["ProcessX.Process DATE(9,1,1)]|=I43 97.00% DATE(10,1,1)]|=J4 99.00% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_B", 99.00% FG_Inven_Targ_Periods[]| 2 Units_Purchd_In["Process.Process_1", DATE(10,1,1)]|=J46 4000 Units_Purchd_In["Process.Process_1", 3450 DATE(1,1,1)]| DAT 0 Units_Purchd_In["Process.Process_3", 0 Units_Purchd_In["Process.Process_3", DATE(1,1,1)]|=0/7 0 Units_Purchd_In["Process.Process_3", DATE(2,1,1)]|=B57 0 Units_Purchd_In["Process.Process_3", DATE(3,1,1)]|=C57 0 DAT 0 Units_Purchd_In["Process.Finished_Goods_B", 0 Units_Purchd_In["Process.Finished_Goods_B", 0 Units_Purchd_In["Process.Finished_Goods_B", DATE(3,1,1)]|=C60 0 Units_Purchd_In["Process.Finished_Goods_ DATE(4,1,1)]|=D60 0 DATE(5,1,1)]|=E60 1 Stations["Process.Rework_2", 1 Stations["Process.Rework_2", DATE(5,1,1)]|=E66 1 Stations["Process.Rework_2", DATE(6,1,1)]|=F66 1 Stations["Process.Rework_2", DATE(7,1,1)]|=G66 1 DATE(8,1,1)] 1 Stations["Process.Finished_Goods_A", 1 Stations["Process.Finished_Goods_A", DATE(7,1,1)]|=G69 1 Stations["Process.Finished_Goods_A", DATE(8,1,1)]|=H69 1 Stations["Process.Finished_Goods_A", DATE(9,1,1)]|=I69 1 DAT 3000 Capacity_per_Station["Process.Process_2", 3000 Capacity_per_Station["Process.Process_2", 3000 DATE(9,1,1)]|=I75 Capacity_per_Station["Process.Rework_2", 500 DATE(10,1,1)]|=J75 Capacity_per_Station["Process.Rework_2", 500DATE(1,1,1)]| 3000 Capacity_per_Station["Process.Finished_Goods_A", 6000 Capacity_per_Station["Process.Finished_Goods_A", 6000 Capacity_per_Station["Process.Finished_Goods_A", DATE(1,1,1)]| 6000 Capacity_per_Station["Process.Finished_Go DATE(2,1,1)]|=B79 6000 DATE(3,1,1)] 7 Proc_Cost_per_U_Sc1["Process.Process_1", 7 Proc_Cost_per_U_Sc1["Process.Process_1", 7 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.Labor", 7 Proc_Cost_per_U_Sc1["Process.Process_1 DATE(3,1,1)]|=if("Cost_Types"="Fixed_Exp" "Cost_Types.Labor", 7 DATE(4,1,1)]|=if("Cos "Cost_Types.Labor" 40 Proc_Cost_per_U_Sc1["Process.Process_2", 40 Proc_Cost_per_U_Sc1["Process.Process_2", 40 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.Material", 40 Proc_Cost_per_U_Sc1["Process.Process_2 "Cost_Types.Material", DATE(5,1,1)]|=if("Cost_Types"="Fixed_Ex 40 "Cost_Types.Materia DATE(6,1,1)]|=if("C 7.2 Proc_Cost_per_U_Sc1["Process.Process_2", 7.2 Proc_Cost_per_U_Sc1["Process.Process_2", 7.2 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.OH",7.2 DATE(7,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Process_2 "Cost_Types.OH",7.2 DATE(8,1,1)]|=if("Cost_ "Cost_Types.OH", Di 0 Proc_Cost_per_U_Sc1["Process.Rework_2", 0 Proc_Cost_per_U_Sc1["Process.Rework_2", 0 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Fixed_Exp", 10 Proc_Cost_per_U_Sc1["Process.Rework_2" "Cost_Types.Fixed_Exp", DATE(9,1,1)]|=if("Cost_Types"="Fixed_ 10 "Cost_Types.OH", DATE(10,1,1)]|=i D 27 Proc_Cost_per_U_Sc1["Process.Process_3", 0 Proc_Cost_per_U_Sc1["Process.Process_3", 0 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Process_3 "Cost_Types.Fixed_Exp", DATE(1,1,1)]|=if("Cost_Types"="Fixed_ 0 "Cost_Types.Fixed_ DATE(2,1,1)]|=if( 18 Proc_Cost_per_U_Sc1["Process.Process_4", 18 Proc_Cost_per_U_Sc1["Process.Process_4", 18 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc1["Process.Process_4 DATE(3,1,1)]|=if("Cost_Types"="Fixed_Exp" "Cost_Types.Labor", 18 DATE(4,1,1)]|=if("Cos "Cost_Types.Labor" 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.Material", 0 Proc_Cost_per_U_Sc1["Process.Finished_G "Cost_Types.Material", DATE(5,1,1)]|=if("Cost_Types"="F 0 "Cost_Type DATE(6,1, 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_G DATE(7,1,1)]|=if("Cost_Types"="Fixed "Cost_Types.OH", 0.4 DATE(8,1,1)]|= "Cost_Type 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Fixed_Exp", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_G "Cost_Types.Fixed_Exp", DATE(9,1,1)]|=if("Cost_Types" 0.4 "Cost_Type DATE(1 7 Proc_Cost_per_U_Sc2["Process.Process_1", 0 Proc_Cost_per_U_Sc2["Process.Process_1", 0 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Process_1 "Cost_Types.Fixed_Exp", DATE(1,1,1)]|=if("Cost_Types"="Fixed_ 0 "Cost_Types.Fixed_ DATE(2,1,1)]|=if( 18 Proc_Cost_per_U_Sc2["Process.Process_2", 18 Proc_Cost_per_U_Sc2["Process.Process_2", 18 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc2["Process.Process_2 DATE(3,1,1)]|=if("Cost_Types"="Fixed_Exp" "Cost_Types.Labor", 18 DATE(4,1,1)]|=if("Cos "Cost_Types.Labor" 12 Proc_Cost_per_U_Sc2["Process.Rework_2", 12 Proc_Cost_per_U_Sc2["Process.Rework_2", 12 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Material", 12 Proc_Cost_per_U_Sc2["Process.Rework_2" "Cost_Types.Material", DATE(5,1,1)]|=if("Cost_Types"="Fixed_Ex 12 "Cost_Types.Materia DATE(6,1,1)]|=if("C 10 Proc_Cost_per_U_Sc2["Process.Rework_2", 10 Proc_Cost_per_U_Sc2["Process.Rework_2", 10 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.OH", 10 DATE(7,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Rework_2" "Cost_Types.OH", 10 DATE(8,1,1)]|=if("Cost_T "Cost_Types.OH", Dif 0 Proc_Cost_per_U_Sc2["Process.Process_3", 0 Proc_Cost_per_U_Sc2["Process.Process_3", 0 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Fixed_Exp", 16 Proc_Cost_per_U_Sc2["Process.Process_3 "Cost_Types.Fixed_Exp", DATE(9,1,1)]|=if("Cost_Types"="Fixed_ 16 "Cost_Types.OH", DATE(10,1,1)]|= D 18 Proc_Cost_per_U_Sc2["Process.Process_4", 0 Proc_Cost_per_U_Sc2["Process.Process_4", 0 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Process_4 "Cost_Types.Fixed_Exp", DATE(1,1,1)]|=00 "Cost_Types.Fixed_ DATE(2,1,1)]|=if( 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.Labor", 1 Proc_Cost_per_U_Sc2["Process.Finished_G DATE(3,1,1)]|=if("Cost_Types"="Fix "Cost_Types.Labor", 1 DATE(4,1,1)] "Cost_Type 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.Material", 0 Proc_Cost_per_U_Sc2["Process.Finished_G "Cost_Types.Material", DATE(5,1,1)]|=if("Cost_Types"="F 0 "Cost_Type DATE(6,1, 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc2["Process.Finished_G DATE(7,1,1)]|=if("Cost_Types"="Fixed "Cost_Types.OH", 0.4 DATE(8,1,1)]|= "Cost_Type 150 Cost_per_U_Purchd_In["Process.Rework_2", 150 Cost_per_U_Purchd_In["Process.Rework_2", 150 Cost_per_U_Purchd_In["Process.Process_3", DATE(9,1,1)]|=I187 150 Cost_per_U_Purchd_In["Process.Process_3 DATE(10,1,1)]|=J187 150 DATE(1,1,1)]| 220 Cost_per_U_Purchd_In["Process.Finished_Goods_B", 310 Cost_per_U_Purchd_In["Process.Finished_Goods_B", 310 Cost_per_U_Purchd_In["Process.Finished_Goods_B", DATE(1,1,1)]| 310 Cost_per_U_Purchd_In["Process.Finished_G DATE(2,1,1)]|=B191 310 DATE(3,1,1 15 Scrap_Salvage_Value_per_U["Process.Rework_2", 15 Scrap_Salvage_Value_per_U["Process.Rework_2", 15 Scrap_Salvage_Value_per_U["Process.Rework_2", DATE(3,1,1)]|=C197 15 Scrap_Salvage_Value_per_U["Process.Rew DATE(4,1,1)]|=D197 15 DATE(5,1,1)]|= 40 Scrap_Salvage_Value_per_U["Process.Finished_Goods_A", 40 Scrap_Salvage_Value_per_U["Process.Finished_Goods_A", 40 Scrap_Salvage_Value_per_U["Process.Finished_Goods_A", DATE(5,1,1)]|=E200 40 Scrap_Salvage_Value_per_U["Process.Finis DATE(6,1,1)]|=F200 40 DATE 105000 Fixed_Exp_per_Station["Process.Process_2", 105000 Fixed_Exp_per_Station["Process.Process_2", 105000 Fixed_Exp_per_Station["Process.Process_2", DATE(7,1,1)]|=G206 105000 Fixed_Exp_per_Station["Process.Process_2 DATE(8,1,1)]|=H206 105000 DATE(9,1,1)]|=I206 11000 Fixed_Exp_per_Station["Process.Process_4", 11000 Fixed_Exp_per_Station["Process.Process_4", 11000 Fixed_Exp_per_Station["Process.Finished_Goods_A", DATE(9,1,1)]|=I209 1000 Fixed_Exp_per_Station["Process.Finished_G DATE(10,1,1)]|=J209 1000 DATE(1,1,1 40.00% Units_Demand["Process.Process_1", 0 Units_Demand["Process.Process_1", DATE(1,1,1)]|=0/7 0 Units_Demand["Process.Process_1", DATE(2,1,1)]|=0/7 0 Units_Demand["Process.Process_1", DATE(3,1,1)]|=0/7 0 DATE 0 Units_Demand["Process.Process_3", 0 Units_Demand["Process.Process_3", DATE(3,1,1)]|=0/7 0 Units_Demand["Process.Process_3", DATE(4,1,1)]|=0/7 0 Units_Demand["Process.Process_3", DATE(5,1,1)]|=0/7 0 DATE 350 Units_Demand["Process.Finished_Goods_B", 400 Units_Demand["Process.Finished_Goods_B", 450 Units_Demand["Process.Finished_Goods_B", DATE(5,1,1)]|=2*E224-D224 500 Units_Demand["Process.Finished_Goods_B DATE(6,1,1)]|=2*F224-E224 550 DATE(7,1,1)]|=2*G2 385 Selling_Price["Process.Rework_2", 385 Selling_Price["Process.Rework_2", DATE(7,1,1)]|=G230 385 Selling_Price["Process.Rework_2", DATE(8,1,1)]|=H230 385 Selling_Price["Process.Rework_2", DATE(9,1,1)]|=I230 385 DATE(1 380 Selling_Price["Process.Finished_Goods_A", 380 Selling_Price["Process.Finished_Goods_A", 380 DATE(9,1,1)]|=I233 Selling_Price["Process.Finished_Goods_B", 450 DATE(10,1,1)]|=J233 Selling_Price["Process.Finished_Goods_B", 450 DATE(1,1,1)]| Specifies which :A:0:Proc_Cost_per_U_Sc1 scenario Process to useCost/U in:A:-1:Proc_Cost_per_U_Sc1 the model. Scenario Processing Affects 1 assumptions :A:0:Proc_Cost_per_U_Sc2 cost per unit for Process for processing units Cost/U processed :A:-1:Proc_Cost_per_U_Sc2 costs Scenario per at Processing unit, each 2 transition stage, cost segmented probabilities, per unit for byunits cos and Percentage:A:0:Process_Cost of units input Process that become Cost :A:-1:Process_Cost scrap at Processing each stage, :A:0:COGSCost cost byattime each period stage, of Goods segmented :A:-1:COGS byCost process of units stage, soldbyastime finished period goo Gross margin :A:0:Gross_Margin_pct amount (revenue Gross Margin - cost :A:-1:Gross_Margin_pct %of goods) Gross for finished margin :A:0:WIP_Avail_In percent goods sold = WIP gross as Available output margin :A:-1:WIP_Avail_In from In/ revenue each Value stage, of work by time in process period invento Finished Goods :D:-1:ProcessX B A duplicate:D:0:ProcessX list of process ProcessX stages in :D:2:ProcessX the process ProcessX flow. This :D:1:ProcessX list is needed Totalso that some variables can h Fixed Exp :D:0:Cost_Types.OH OH 0 :WS: Process Flow :WS: Analysis,'Input Scenario Data'!Units_Demand_Process_Process_1 1:WS: Scenario[]|

Transition_pct_Sc1["ProcessX.Rework_2", 100.00% Transition_pct_Sc1["ProcessX.Rework_2", 0.00%"Process.Process_3"]| Transition_pct_Sc1["ProcessX.Rework_2", 0.00%"Process.Process_4"]|=0 Transition_pct_Sc1["ProcessX.Rework_2", 0.00%"Process.Finished_Goods_A"]|=0 Transition_pct_Sc1["ProcessX.P "Process.Fin Transition_pct_Sc2["ProcessX.Process_1", 0.00% Transition_pct_Sc2["ProcessX.Process_1", 100.00%"Process.Process_1"]|=0 Transition_pct_Sc2["ProcessX.Process_1", 0.00%"Process.Process_2"]| Transition_pct_Sc2["ProcessX.Process_1", 0.00%"Process.Rework_2"]|=0 Transition_pct_Sc2["ProcessX.P "Process.P Transition_pct_Sc2["ProcessX.Process_4", 0.00% Transition_pct_Sc2["ProcessX.Process_4", 0.00%"Process.Process_4"]| Transition_pct_Sc2["ProcessX.Process_4", 100.00%"Process.Finished_Goods_A"]|=0 Transition_pct_Sc2["ProcessX.Finished_Goods_A", 0.00%"Process.Finished_Goods_B"]| Transition_pct_Sc2["ProcessX.F "Pr Process_Yield_pct_Sc1["ProcessX.Process_2", 84.00% Process_Yield_pct_Sc1["ProcessX.Process_2", 87.00% Process_Yield_pct_Sc1["ProcessX.Process_2", DATE(6,1,1)]|=F31 92.00% Process_Yield_pct_Sc1["ProcessX.Process_2", DATE(7,1,1)]| 94.00% Process_Yield_pct_Sc1["Process DATE(8,1,1)]| DATE( Process_Yield_pct_Sc1["ProcessX.Process_4", 97.00% Process_Yield_pct_Sc1["ProcessX.Process_4", 97.00% Process_Yield_pct_Sc1["ProcessX.Process_4", DATE(8,1,1)]|=H34 97.00% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_A" DATE(9,1,1)]|=I34 98.50% Process_Yield_pct_Sc1["Process DATE(10,1,1)]|=J34 Process_Yield_pct_Sc2["ProcessX.Process_1", 96.00% Process_Yield_pct_Sc2["ProcessX.Process_2", 92.00% Process_Yield_pct_Sc2["ProcessX.Process_2", DATE(10,1,1)]|=J40 92.00% Process_Yield_pct_Sc2["ProcessX.Process_2", DATE(1,1,1)]| 92.00% Process_Yield_pct_Sc2["Process DATE(2,1,1)]|=B41 DATE( Process_Yield_pct_Sc2["ProcessX.Process_4", 97.00% Process_Yield_pct_Sc2["ProcessX.Process_4", 97.00% Process_Yield_pct_Sc2["ProcessX.Process_4", DATE(2,1,1)]|=B44 97.00% Process_Yield_pct_Sc2["ProcessX.Process_4", DATE(3,1,1)]|=C44 97.00% Process_Yield_pct_Sc2["Process DATE(4,1,1)]|=D44 DATE( Units_Purchd_In["Process.Process_1", 2919.7 Units_Purchd_In["Process.Process_1", 4658.34 DATE(3,1,1)]|=max(0, Units_Purchd_In["Process.Process_1", 5756.58 DATE(4,1,1)]|=max(0, B50*3*C225-Units!D29-Units!D30-Units!D32-Units!D33) Units_Purchd_In["Process.Process_1", 5826.59 DATE(5,1,1)]|=max(0, B50*3*D225-Units!E29-Units!E30-Uni Units_Purchd_In["Process.Proce DATE(6,1,1)]|=m B50*3*E225-Un Units_Purchd_In["Process.Process_3", 0 Units_Purchd_In["Process.Process_3", DATE(5,1,1)]|=E57 0 Units_Purchd_In["Process.Process_3", DATE(6,1,1)]|=F57 0 Units_Purchd_In["Process.Process_3", DATE(7,1,1)]|=G57 0 Units_Purchd_In["Process.Proce DATE(8,1,1)]|=H Units_Purchd_In["Process.Finished_Goods_B", 0 Units_Purchd_In["Process.Finished_Goods_B", 0 Units_Purchd_In["Process.Finished_Goods_B", DATE(7,1,1)]|=G60 0 Units_Purchd_In["Process.Finished_Goods_B", DATE(8,1,1)]|=H60 0 Stations["Process.Process_1", DATE(9,1,1)]|=I60 DATE( D Stations["Process.Rework_2", 1 Stations["Process.Rework_2", DATE(9,1,1)]|=I66 1 Stations["Process.Process_3", DATE(10,1,1)]|=J66 2 Stations["Process.Process_3", DATE(1,1,1)]| 2 Stations["Process.Process_3", DATE(2,1,1)]|=B67 D Stations["Process.Finished_Goods_B", 1 Stations["Process.Finished_Goods_B", DATE(1,1,1)]| 1 Stations["Process.Finished_Goods_B", DATE(2,1,1)]|=B70 1 Stations["Process.Finished_Goods_B", DATE(3,1,1)]|=C70 1 Stations["Process.Finished_Goo DATE(4,1,1)]|=D Capacity_per_Station["Process.Rework_2", 500 Capacity_per_Station["Process.Rework_2", 500DATE(3,1,1)]|=C76 Capacity_per_Station["Process.Rework_2", 500DATE(4,1,1)]|=D76 Capacity_per_Station["Process.Rework_2", 500DATE(5,1,1)]|=E76 Capacity_per_Station["Process.R DATE(6,1,1 Capacity_per_Station["Process.Finished_Goods_A", 6000 Capacity_per_Station["Process.Finished_Goods_A", 6000 Capacity_per_Station["Process.Finished_Goods_A", DATE(5,1,1)]|=E79 6000 Capacity_per_Station["Process.Finished_Goods_A", DATE(6,1,1)]|=F79 6000 Capacity_per_Station["Process.F DATE(7,1,1)]|=G79 DA Proc_Cost_per_U_Sc1["Process.Process_1", 7 Proc_Cost_per_U_Sc1["Process.Process_1", 7 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.Labor", 7 Proc_Cost_per_U_Sc1["Process.Process_1", DATE(7,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 7 Proc_Cost_per_U_Sc1["Process DATE(8,1,1)]|=if("Cost_Types"=" "Cost_Types.Labor", DATE(9,1 if(Units!H "Cost_Ty Proc_Cost_per_U_Sc1["Process.Process_2", 40 Proc_Cost_per_U_Sc1["Process.Process_2", 40 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.Material", 18 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.Material", DATE(9,1,1)]|=if("Cost_Types"="Fixed_Exp", 18 Proc_Cost_per_U_Sc1["Process "Cost_Types.Labor", DATE(10,1,1)]|=if("Cost_Types DATE(1,1 "Cost_Ty if(Units! Proc_Cost_per_U_Sc1["Process.Rework_2", 12 Proc_Cost_per_U_Sc1["Process.Rework_2", 12 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Material", 12 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Material", DATE(1,1,1)]| 12 Proc_Cost_per_U_Sc1["Process "Cost_Types.Material", DATE(2,1,1)]|=if("Cost_Types" "Cost_Typ DATE(3, Proc_Cost_per_U_Sc1["Process.Rework_2", 10 Proc_Cost_per_U_Sc1["Process.Rework_2", 10 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.OH", 10 DATE(3,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.OH", 10 DATE(4,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc1["Process "Cost_Types.OH", DATE(5,1,1)] if(Units!D29= "Cost_Typ Proc_Cost_per_U_Sc1["Process.Process_3", 0 Proc_Cost_per_U_Sc1["Process.Process_3", 0 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Fixed_Exp", DATE(5,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process "Cost_Types.Fixed_Exp", DATE(6,1,1)]|=if("Cost_Typ "Cost_Ty DATE if(Un Proc_Cost_per_U_Sc1["Process.Process_4", 18 Proc_Cost_per_U_Sc1["Process.Process_4", 18 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc1["Process.Process_4", DATE(7,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc1["Process DATE(8,1,1)]|=if("Cost_Types"=" "Cost_Types.Labor", DATE(9,1 if(Units!H "Cost_Ty Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.Material", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.Material", DATE(9,1,1)]|=if("Cost_Types"="Fixed_Exp" 1 Proc_Cost_per_U_Sc1["Process "Cost_Types.Labor", DATE(10,1,1)]|=if("Co D" Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Material", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Material", DATE(1,1,1)]| 0 Proc_Cost_per_U_Sc1["Process "Cost_Types.Material", DATE(2,1,1)]|=if("Cos" Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", DATE(3,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc1["Process DATE(4,1,1)]|=if("Cost_Ty "Cost_Types.OH", DAT if(U" Proc_Cost_per_U_Sc2["Process.Process_1", 0 Proc_Cost_per_U_Sc2["Process.Process_1", 0 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Fixed_Exp", DATE(5,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process "Cost_Types.Fixed_Exp", DATE(6,1,1)]|=if("Cost_Typ "Cost_Ty DATE if(Un Proc_Cost_per_U_Sc2["Process.Process_2", 18 Proc_Cost_per_U_Sc2["Process.Process_2", 18 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc2["Process.Process_2", DATE(7,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc2["Process DATE(8,1,1)]|=if("Cost_Types"=" "Cost_Types.Labor", DATE(9,1 if(Units!H "Cost_Ty Proc_Cost_per_U_Sc2["Process.Rework_2", 12 Proc_Cost_per_U_Sc2["Process.Rework_2", 12 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Material", 25 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Material", DATE(9,1,1)]|=if("Cost_Types"="Fixed_Exp", 25 Proc_Cost_per_U_Sc2["Process "Cost_Types.Labor", DATE(10,1,1)]|=if("Cost_Types DATE(1,1, "Cost_Typ if(Units! Proc_Cost_per_U_Sc2["Process.Process_3", 8 Proc_Cost_per_U_Sc2["Process.Process_3", 8 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Material", 8 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Material", DATE(1,1,1)]| 8 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", DATE(2,1,1)]|=if("Cost_Types" "Cost_Ty DATE(3 Proc_Cost_per_U_Sc2["Process.Process_3", 16 Proc_Cost_per_U_Sc2["Process.Process_3", 16 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.OH",16 DATE(3,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.OH",16 DATE(4,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc2["Process "Cost_Types.OH", DATE(5,1,1) if(Units!D30 "Cost_Ty Proc_Cost_per_U_Sc2["Process.Process_4", 0 Proc_Cost_per_U_Sc2["Process.Process_4", 0 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Fixed_Exp", DATE(5,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process "Cost_Types.Fixed_Exp", DATE(6,1,1)]|=if("Cost_Typ "Cost_Ty DATE if(Un Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.Labor", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", DATE(7,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 1 Proc_Cost_per_U_Sc2["Process DATE(8,1,1)]|=if("Cost_T "Cost_Types.Labor", Dif" Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.Material", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.Material", DATE(9,1,1)]|=if("Cost_Types"="Fixed_Exp" 1 Proc_Cost_per_U_Sc2["Process "Cost_Types.Labor", DATE(10,1,1)]|=if("Co D" Cost_per_U_Purchd_In["Process.Process_1", 10 Cost_per_U_Purchd_In["Process.Process_1", 10 Cost_per_U_Purchd_In["Process.Process_1", DATE(1,1,1)]| 10 Cost_per_U_Purchd_In["Process.Process_1", DATE(2,1,1)]|=B185 10 Cost_per_U_Purchd_In["Process DATE(3,1,1)]|=C185 DATE(4, Cost_per_U_Purchd_In["Process.Process_3", 150 Cost_per_U_Purchd_In["Process.Process_3", 150 Cost_per_U_Purchd_In["Process.Process_3", DATE(3,1,1)]|=C188 150 Cost_per_U_Purchd_In["Process.Process_3", DATE(4,1,1)]|=D188 150 Cost_per_U_Purchd_In["Process DATE(5,1,1)]|=E188 DATE(6, Cost_per_U_Purchd_In["Process.Finished_Goods_B", 310 Cost_per_U_Purchd_In["Process.Finished_Goods_B", 310 Cost_per_U_Purchd_In["Process.Finished_Goods_B", DATE(5,1,1)]|=E191 310 Cost_per_U_Purchd_In["Process.Finished_Goods_B", DATE(6,1,1)]|=F191 310 Cost_per_U_Purchd_In["Process DATE(7,1,1)]|=G191 Scrap_Salvage_Value_per_U["Process.Rework_2", 15 Scrap_Salvage_Value_per_U["Process.Rework_2", 15 Scrap_Salvage_Value_per_U["Process.Rework_2", DATE(7,1,1)]|=G197 15 Scrap_Salvage_Value_per_U["Process.Rework_2", DATE(8,1,1)]|=H197 15 Scrap_Salvage_Value_per_U["P DATE(9,1,1)]|=I197 DA Scrap_Salvage_Value_per_U["Process.Finished_Goods_A", 40 Scrap_Salvage_Value_per_U["Process.Finished_Goods_A", 40 Scrap_Salvage_Value_per_U["Process.Finished_Goods_B", DATE(9,1,1)]|=I200 50 Scrap_Salvage_Value_per_U["Process.Finished_Good DATE(10,1,1)]|=J200 50 Scrap_Salvage_Value_per_U["P DATE(1,1,1)]| Fixed_Exp_per_Station["Process.Rework_2", 2000 Fixed_Exp_per_Station["Process.Rework_2", 2000 Fixed_Exp_per_Station["Process.Rework_2", DATE(1,1,1)]| 2000 Fixed_Exp_per_Station["Process.Rework_2", DATE(2,1,1)]|=B207 2000 Fixed_Exp_per_Station["Process DATE(3,1,1)]|=C207 DATE(4,1 Fixed_Exp_per_Station["Process.Finished_Goods_A", 1000 Fixed_Exp_per_Station["Process.Finished_Goods_A", 1000 Fixed_Exp_per_Station["Process.Finished_Goods_A", DATE(3,1,1)]|=C210 1000 Fixed_Exp_per_Station["Process.Finished_Goods_A", DATE(4,1,1)]|=D210 1000 Fixed_Exp_per_Station["Process DATE(5,1,1)]|=E210 Units_Demand["Process.Process_1", 0 Units_Demand["Process.Process_1", DATE(5,1,1)]|=0/7 0 Units_Demand["Process.Process_1", DATE(6,1,1)]|=0/7 0 Units_Demand["Process.Process_1", DATE(7,1,1)]|=0/7 0 Units_Demand["Process.Process DATE(8,1,1)]|=0/ Units_Demand["Process.Process_3", 0 Units_Demand["Process.Process_3", DATE(7,1,1)]|=0/7 0 Units_Demand["Process.Process_3", DATE(8,1,1)]|=0/7 0 Units_Demand["Process.Process_3", DATE(9,1,1)]|=0/7 0 Units_Demand["Process.Process DATE(10,1,1)]|=0 Units_Demand["Process.Finished_Goods_B", 600 Units_Demand["Process.Finished_Goods_B", 650 Selling_Price["Process.Process_1", DATE(9,1,1)]|=2*I224-H224 60 Selling_Price["Process.Process_1", DATE(10,1,1)]|=2*J224-I224 DATE(1,1,1)]| 60 Selling_Price["Process.Process_ DATE(2,1,1)]|=B22 Selling_Price["Process.Process_3", 300 Selling_Price["Process.Process_3", DATE(1,1,1)]| 300 Selling_Price["Process.Process_3", DATE(2,1,1)]|=B231 300 Selling_Price["Process.Process_3", DATE(3,1,1)]|=C231 300 Selling_Price["Process.Process_ DATE(4,1,1)]|=D23 Selling_Price["Process.Finished_Goods_B", 450 Selling_Price["Process.Finished_Goods_B", 450 DATE(3,1,1)]|=C234 Selling_Price["Process.Finished_Goods_B", 450 DATE(4,1,1)]|=D234 Selling_Price["Process.Finished_Goods_B", 450 DATE(5,1,1)]|=E234 Selling_Price["Process.Finished_ DATE(6,1, :A:0:Units_Capacity Units Capacity :A:-1:Units_Capacity Units processing :A:0:Capacity_per_Station capacity Capacity/Station for each:A:-1:Capacity_per_Station stage, perUnits time period processing :A:0:Stations capacity for each stage pe :A:0:WIP_InWIP In :A:-1:WIP_In Value of units :A:0:WIP_Out of work in WIP process Out inventory :A:-1:WIP_Out that Value enter ofeach units :A:0:WIP_per_U_Out processing of work in process stage, segmented inventory th :A:0:Scrap_Salvage_Value_per_U Scrap Salvage :A:-1:Scrap_Salvage_Value_per_U $/Unit Salvage value :A:0:Labor_Overhead_pct per unit Labor of units Overhead scrapped :A:-1:Labor_Overhead_pct %at each Overhead stage, rate by :A:0:Scrap_Cost time on labor periodexpense, by process :D:0:ProcessX.Process_1 Process 1 :D:2:ProcessX.Process_1 Lvl 1 :D:0:ProcessX.Process_2 Process 2 :D:0:ProcessX.Rework_2 Rework 2 :D:0:ProcessX.Process_3

0.00% Transition_pct_Sc1["ProcessX.Process_3", 0.00% Transition_pct_Sc1["ProcessX.Process_3", 0.00%"Process.Process_2"]|=0 Transition_pct_Sc1["ProcessX.Process_3", 0.00%"Process.Rework_2"]|=0 Transition_pct_Sc1["ProcessX.Process_3", 40.00%"Process.Process_3"]| 0.00% Transition_pct_Sc2["ProcessX.Process_1", 0.00% Transition_pct_Sc2["ProcessX.Process_1", 0.00%"Process.Finished_Goods_A"]|=0 Transition_pct_Sc2["ProcessX.Process_2", 0.00%"Process.Finished_Goods_B"]|=0 Transition_pct_Sc2["ProcessX.Process_2", 0.00%"Process.Process_1"]| 0.00% Transition_pct_Sc2["ProcessX.Finished_Goods_A", 0.00% Transition_pct_Sc2["ProcessX.Finished_Goods_A", 0.00% Transition_pct_Sc2["ProcessX.Finished_Goods_A", "Process.Rework_2"]|=0 0.00% Transition_pct_Sc2["ProcessX.Finished_Go "Process.Process_3"]|=0 100.00% "Process.Proc 94.00% Process_Yield_pct_Sc1["ProcessX.Rework_2", 94.00% Process_Yield_pct_Sc1["ProcessX.Rework_2", 94.00% Process_Yield_pct_Sc1["ProcessX.Rework_2", DATE(1,1,1)]| 94.00% Process_Yield_pct_Sc1["ProcessX.Rework_ DATE(2,1,1)]|=B32 94.00% DATE(3,1,1)]|=C32 98.50% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_A", 98.50% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_A", 98.50% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_A", DATE(3,1,1)]|=C35 98.50% Process_Yield_pct_Sc1["ProcessX.Finished DATE(4,1,1)]|=D35 98.50% DATE(5,1 88.00% Process_Yield_pct_Sc2["ProcessX.Process_2", 84.00% Process_Yield_pct_Sc2["ProcessX.Process_2", 84.00% Process_Yield_pct_Sc2["ProcessX.Process_2", DATE(5,1,1)]| 87.00% Process_Yield_pct_Sc2["ProcessX.Process DATE(6,1,1)]|=F41 92.00% DATE(7,1,1)]| 97.00% Process_Yield_pct_Sc2["ProcessX.Process_4", 97.00% Process_Yield_pct_Sc2["ProcessX.Process_4", 97.00% Process_Yield_pct_Sc2["ProcessX.Process_4", DATE(7,1,1)]|=G44 97.00% Process_Yield_pct_Sc2["ProcessX.Process DATE(8,1,1)]|=H44 97.00% DATE(9,1,1)]|=I44 5662.63 Units_Purchd_In["Process.Process_1", 5645.31 Units_Purchd_In["Process.Process_1", 5801.1 DATE(8,1,1)]|=max(0, Units_Purchd_In["Process.Process_1", 6101.93 DATE(9,1,1)]|=max(0, B50*3*H225-Units!I29-Units!I30-Units!I32-Units!I3 Units_Purchd_In["Process.Process_2", DATE(10,1,1)]|=max(0, B50*3*I225-Units!J29-Unit 0 DAT B5 0 Units_Purchd_In["Process.Process_3", 0 Units_Purchd_In["Process.Process_4", DATE(10,1,1)]|=J57 0 Units_Purchd_In["Process.Process_4", DATE(1,1,1)]|=0/7 0 Units_Purchd_In["Process.Process_4", DATE(2,1,1)]|=B58 0 DAT 2 Stations["Process.Process_1", 2 Stations["Process.Process_1", DATE(2,1,1)]|=B64 2 Stations["Process.Process_1", DATE(3,1,1)]|=C64 2 Stations["Process.Process_1", DATE(4,1,1)]|=D64 2 DATE(5,1,1) 2 Stations["Process.Process_3", 2 Stations["Process.Process_3", DATE(4,1,1)]|=D67 2 Stations["Process.Process_3", DATE(5,1,1)]|=E67 2 Stations["Process.Process_3", DATE(6,1,1)]|=F67 2 DATE(7,1,1) 1 Stations["Process.Finished_Goods_B", 2 Stations["Process.Finished_Goods_B", DATE(6,1,1)]| 2 Stations["Process.Finished_Goods_B", DATE(7,1,1)]|=G70 2 Stations["Process.Finished_Goods_B", DATE(8,1,1)]|=H70 2 DAT 500 Capacity_per_Station["Process.Rework_2", 500 Capacity_per_Station["Process.Rework_2", 500DATE(8,1,1)]|=H76 Capacity_per_Station["Process.Rework_2", 500DATE(9,1,1)]|=I76 Capacity_per_Station["Process.Process_3", 3000DATE(10,1,1)]|=J76 6000 Capacity_per_Station["Process.Finished_Goods_A", 6000 Capacity_per_Station["Process.Finished_Goods_B", 3000 Capacity_per_Station["Process.Finished_Goods_B", DATE(10,1,1)]|=J79 3000 Capacity_per_Station["Process.Finished_Go DATE(1,1,1)]| 3000 DATE(2,1,1)] 0 Proc_Cost_per_U_Sc1["Process.Process_1", 0 Proc_Cost_per_U_Sc1["Process.Process_1", 0 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Process_1 "Cost_Types.Fixed_Exp", DATE(2,1,1)]|=if("Cost_Types"="Fixed_ 0 "Cost_Types.Fixed_ DATE(3,1,1)]|=if( 18 Proc_Cost_per_U_Sc1["Process.Process_2", 18 Proc_Cost_per_U_Sc1["Process.Process_2", 18 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc1["Process.Process_2 DATE(4,1,1)]|=if("Cost_Types"="Fixed_Exp" "Cost_Types.Labor", 18 DATE(5,1,1)]|=if("Cos "Cost_Types.Labor" 12 Proc_Cost_per_U_Sc1["Process.Rework_2", 12 Proc_Cost_per_U_Sc1["Process.Rework_2", 12 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Material", 12 Proc_Cost_per_U_Sc1["Process.Rework_2" "Cost_Types.Material", DATE(6,1,1)]|=if("Cost_Types"="Fixed_Ex 12 "Cost_Types.Materia DATE(7,1,1)]|=if("C 10 Proc_Cost_per_U_Sc1["Process.Rework_2", 10 Proc_Cost_per_U_Sc1["Process.Rework_2", 10 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.OH", 10 DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Process_3 "Cost_Types.OH", DATE(9,1,1)]|=if("Cost_T 4 "Cost_Types.OH", Dif 0 Proc_Cost_per_U_Sc1["Process.Process_3", 0 Proc_Cost_per_U_Sc1["Process.Process_3", 10.8 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Fixed_Exp", 10.8 Proc_Cost_per_U_Sc1["Process.Process_3 "Cost_Types.OH", DATE(10,1,1)]|=if("Cost_Types"="Fixed 10.8 DATE(1,1,1)]|=B214*B1 "Cost_Types.OH", D 0 Proc_Cost_per_U_Sc1["Process.Process_4", 0 Proc_Cost_per_U_Sc1["Process.Process_4", 0 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Process_4 "Cost_Types.Fixed_Exp", DATE(2,1,1)]|=if("Cost_Types"="Fixed_ 0 "Cost_Types.Fixed_ DATE(3,1,1)]|=if( 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.Labor", 1 Proc_Cost_per_U_Sc1["Process.Finished_G DATE(4,1,1)]|=if("Cost_Types"="Fix "Cost_Types.Labor", 1 DATE(5,1,1)] "Cost_Type 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Material", 0 Proc_Cost_per_U_Sc1["Process.Finished_G "Cost_Types.Material", DATE(6,1,1)]|=if("Cost_Types"="F 0 "Cost_Type DATE(7,1, 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0.4 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.OH", 0.4 Proc_Cost_per_U_Sc2["Process.Process_1 DATE(8,1,1)]|=if("Cost_Types"="Fixed "Cost_Types.OH", 10 DATE(9,1,1)]|= "Cost_Type 0 Proc_Cost_per_U_Sc2["Process.Process_1", 0 Proc_Cost_per_U_Sc2["Process.Process_1", 2.8 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Fixed_Exp", 2.8 Proc_Cost_per_U_Sc2["Process.Process_1 "Cost_Types.OH", DATE(10,1,1)]|=if("Cost_Types"="Fixed 2.8 DATE(1,1,1)]|=B214*B1 "Cost_Types.OH", D 0 Proc_Cost_per_U_Sc2["Process.Process_2", 0 Proc_Cost_per_U_Sc2["Process.Process_2", 0 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Process_2 "Cost_Types.Fixed_Exp", DATE(2,1,1)]|=if("Cost_Types"="Fixed_ 0 "Cost_Types.Fixed_ DATE(3,1,1)]|=if( 25 Proc_Cost_per_U_Sc2["Process.Rework_2", 25 Proc_Cost_per_U_Sc2["Process.Rework_2", 25 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Labor", 25DATE(4,1,1)]|=if("Cost_Types"="Fixed_Exp" Proc_Cost_per_U_Sc2["Process.Rework_2" "Cost_Types.Labor", 25DATE(5,1,1)]|=if("Cos "Cost_Types.Labor", 8 Proc_Cost_per_U_Sc2["Process.Process_3", 8 Proc_Cost_per_U_Sc2["Process.Process_3", 8 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Material", 8 Proc_Cost_per_U_Sc2["Process.Process_3 "Cost_Types.Material", DATE(6,1,1)]|=if("Cost_Types"="Fixed_Ex 8 "Cost_Types.Materia DATE(7,1,1)]|=if("C 16 Proc_Cost_per_U_Sc2["Process.Process_3", 16 Proc_Cost_per_U_Sc2["Process.Process_3", 16 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.OH",16 DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Process_4 "Cost_Types.OH",20 DATE(9,1,1)]|=if("Cost_ "Cost_Types.OH", Di 0 Proc_Cost_per_U_Sc2["Process.Process_4", 0 Proc_Cost_per_U_Sc2["Process.Process_4", 7.2 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Fixed_Exp", 7.2 Proc_Cost_per_U_Sc2["Process.Process_4 "Cost_Types.OH", DATE(10,1,1)]|=if("Cost_Types"="Fixed 7.2 DATE(1,1,1)]|=B214*B1 "Cost_Types.OH", D 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Finished_G "Cost_Types.Fixed_Exp", DATE(2,1,1)]|=if("Cost_Types" 0 "Cost_Type DATE(3 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.Labor", 1 Proc_Cost_per_U_Sc2["Process.Finished_G DATE(4,1,1)]|=if("Cost_Types"="Fix "Cost_Types.Labor", 1 DATE(5,1,1)] "Cost_Type 10 Cost_per_U_Purchd_In["Process.Process_1", 10 Cost_per_U_Purchd_In["Process.Process_1", 10 Cost_per_U_Purchd_In["Process.Process_1", DATE(6,1,1)]|=F185 10 Cost_per_U_Purchd_In["Process.Process_1 DATE(7,1,1)]|=G185 10 DATE(8,1,1)]|=H185 150 Cost_per_U_Purchd_In["Process.Process_3", 150 Cost_per_U_Purchd_In["Process.Process_3", 150 Cost_per_U_Purchd_In["Process.Process_3", DATE(8,1,1)]|=H188 150 Cost_per_U_Purchd_In["Process.Process_4 DATE(9,1,1)]|=I188 160 DATE(10,1,1)]|=J18 310 Cost_per_U_Purchd_In["Process.Finished_Goods_B", 310 Scrap_Salvage_Value_per_U["Process.Process_1", 4 Scrap_Salvage_Value_per_U["Process.Process_1", DATE(10,1,1)]|=J191 4 Scrap_Salvage_Value_per_U["Process.Proc DATE(1,1,1)]|4 DATE(2,1,1)]| 15 Scrap_Salvage_Value_per_U["Process.Process_3", 15 Scrap_Salvage_Value_per_U["Process.Process_3", 15 Scrap_Salvage_Value_per_U["Process.Process_3", DATE(2,1,1)]|=B198 15 Scrap_Salvage_Value_per_U["Process.Proc DATE(3,1,1)]|=C198 15 DATE(4,1,1)]| 50 Scrap_Salvage_Value_per_U["Process.Finished_Goods_B", 50 Scrap_Salvage_Value_per_U["Process.Finished_Goods_B", 50 Scrap_Salvage_Value_per_U["Process.Finished_Goods_B", DATE(4,1,1)]|=D201 50 Scrap_Salvage_Value_per_U["Process.Finis DATE(5,1,1)]|=E201 50 DATE 2000 Fixed_Exp_per_Station["Process.Rework_2", 2000 Fixed_Exp_per_Station["Process.Rework_2", 2000 Fixed_Exp_per_Station["Process.Rework_2", DATE(6,1,1)]|=F207 2000 Fixed_Exp_per_Station["Process.Rework_2 DATE(7,1,1)]|=G207 2000 DATE(8,1,1)]|=H207 1000 Fixed_Exp_per_Station["Process.Finished_Goods_A", 1000 Fixed_Exp_per_Station["Process.Finished_Goods_A", 1000 Fixed_Exp_per_Station["Process.Finished_Goods_A", DATE(8,1,1)]|=H210 1000 Fixed_Exp_per_Station["Process.Finished_G DATE(9,1,1)]|=I210 1000 DATE(10,1 0 Units_Demand["Process.Process_1", 0 Units_Demand["Process.Process_2", DATE(10,1,1)]|=0/7 0 Units_Demand["Process.Process_2", DATE(1,1,1)]|=0/7 0 Units_Demand["Process.Process_2", DATE(2,1,1)]|=0/7 0 DATE 0 Units_Demand["Process.Process_4", 0 Units_Demand["Process.Process_4", DATE(2,1,1)]|=0/7 0 Units_Demand["Process.Process_4", DATE(3,1,1)]|=0/7 0 Units_Demand["Process.Process_4", DATE(4,1,1)]|=0/7 0 DATE 60 Selling_Price["Process.Process_1", 60 Selling_Price["Process.Process_1", DATE(4,1,1)]|=D228 60 Selling_Price["Process.Process_1", DATE(5,1,1)]|=E228 60 Selling_Price["Process.Process_1", DATE(6,1,1)]|=F228 60 DATE(7 300 Selling_Price["Process.Process_3", 300 Selling_Price["Process.Process_3", DATE(6,1,1)]|=F231 300 Selling_Price["Process.Process_3", DATE(7,1,1)]|=G231 300 Selling_Price["Process.Process_3", DATE(8,1,1)]|=H231 300 DATE(9 450 Selling_Price["Process.Finished_Goods_B", 450 Selling_Price["Process.Finished_Goods_B", 450 DATE(8,1,1)]|=H234 Selling_Price["Process.Finished_Goods_B", 450 DATE(9,1,1)]|=I234 DATE(10,1,1)]|=J234 Processing:A:-1:Stations Stations Number of processing :A:0:Process_Yield_pct Yield stations % at :A:-1:Process_Yield_pct each processing Pecentage stage,:A:0:Transition_pct ofbyinput timeunits period Transition that exit % as good units for each WIP/Unit Out :A:-1:WIP_per_U_Out Value per unit :A:0:WIP_per_U_In of work WIP/Unit in processIn:A:-1:WIP_per_U_In inventory that Value exitsper each unit :A:0:WIP_Buffer_Stock processing of work WIP_Buffer in process stage asinventory good Stockunits, thatsegmente enters e Scrap Cost:A:-1:Scrap_Cost Cost imputed :A:0:Scrap_Cost_per_U to scrap Scrap at eachCost/Unit stage, :A:-1:Scrap_Cost_per_U segmented Costby per cost unit :A:0:Cost_per_U_Purchd_In factor imputed (material, to Cost/Unit scrapped labor, Purch'd units fixed at expense, Ineach stage, overhs Process 3 :D:0:ProcessX.Process_4 Process 4 :D:0:ProcessX.Finished_Goods_A Finished Goods :D:0:ProcessX.Finished_Goods_B A Finished Goods :D:-1:ProcessY B A duplicate list of process stages

Transition_pct_Sc1["ProcessX.Process_3", 60.00% Transition_pct_Sc1["ProcessX.Process_3", 0.00%"Process.Finished_Goods_A"]| Transition_pct_Sc1["ProcessX.Process_4", 0.00%"Process.Finished_Goods_B"]|=0 Transition_pct_Sc1["ProcessX.Process_4", 0.00%"Process.Process_1"]|=0 Transition_pct_Sc1["ProcessX.P "Process.P Transition_pct_Sc2["ProcessX.Process_2", 5.00% Transition_pct_Sc2["ProcessX.Process_2", 95.00%"Process.Rework_2"]| Transition_pct_Sc2["ProcessX.Process_2", 0.00%"Process.Process_3"]| Transition_pct_Sc2["ProcessX.Process_2", 0.00%"Process.Process_4"]|=0 Transition_pct_Sc2["ProcessX.P "Process.Fi Transition_pct_Sc2["ProcessX.Finished_Goods_A", 0.00% Transition_pct_Sc2["ProcessX.Finished_Goods_B", 0.00% Transition_pct_Sc2["ProcessX.Finished_Goods_B", "Process.Finished_Goods_B"]|=0 0.00% Transition_pct_Sc2["ProcessX.Finished_Goods_B", "Process.Process_1"]|=0 0.00% Transition_pct_Sc2["ProcessX.F "Process.Process_2"]|=0 "Pr Process_Yield_pct_Sc1["ProcessX.Rework_2", 94.00% Process_Yield_pct_Sc1["ProcessX.Rework_2", 94.00% Process_Yield_pct_Sc1["ProcessX.Rework_2", DATE(5,1,1)]|=E32 94.00% Process_Yield_pct_Sc1["ProcessX.Rework_2", DATE(6,1,1)]|=F32 94.00% Process_Yield_pct_Sc1["Process DATE(7,1,1)]|=G32 DATE(8 Process_Yield_pct_Sc1["ProcessX.Finished_Goods_A", 98.50% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_A", 98.50% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_A", DATE(7,1,1)]|=G35 98.50% Process_Yield_pct_Sc1["ProcessX.Finished_Goods_A" DATE(8,1,1)]|=H35 98.50% Process_Yield_pct_Sc1["Process DATE(9,1,1)]|=I35 Process_Yield_pct_Sc2["ProcessX.Process_2", 94.00% Process_Yield_pct_Sc2["ProcessX.Process_2", 94.00% Process_Yield_pct_Sc2["ProcessX.Rework_2", DATE(9,1,1)]| 94.00% Process_Yield_pct_Sc2["ProcessX.Rework_2", DATE(10,1,1)]|=J41 94.00% Process_Yield_pct_Sc2["Process DATE(1,1,1)]| DATE(2 Process_Yield_pct_Sc2["ProcessX.Finished_Goods_A", 98.50% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_A", 98.50% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_A", DATE(1,1,1)]| 98.50% Process_Yield_pct_Sc2["ProcessX.Finished_Goods_A" DATE(2,1,1)]|=B45 98.50% Process_Yield_pct_Sc2["Process DATE(3,1,1)]|=C45 Units_Purchd_In["Process.Process_2", 0 Units_Purchd_In["Process.Process_2", DATE(2,1,1)]|=B55 0 Units_Purchd_In["Process.Process_2", DATE(3,1,1)]|=C55 0 Units_Purchd_In["Process.Process_2", DATE(4,1,1)]|=D55 0 Units_Purchd_In["Process.Proce DATE(5,1,1)]|=E Units_Purchd_In["Process.Process_4", 0 Units_Purchd_In["Process.Process_4", DATE(4,1,1)]|=D58 0 Units_Purchd_In["Process.Process_4", DATE(5,1,1)]|=E58 0 Units_Purchd_In["Process.Process_4", DATE(6,1,1)]|=F58 0 Units_Purchd_In["Process.Proce DATE(7,1,1)]|=G Stations["Process.Process_1", 2 Stations["Process.Process_1", DATE(6,1,1)]|=F64 2 Stations["Process.Process_1", DATE(7,1,1)]|=G64 2 Stations["Process.Process_1", DATE(8,1,1)]|=H64 2 Stations["Process.Process_1", DATE(9,1,1)]|=I64 D Stations["Process.Process_3", 2 Stations["Process.Process_3", DATE(8,1,1)]|=H67 2 Stations["Process.Process_3", DATE(9,1,1)]|=I67 2 Stations["Process.Process_4", DATE(10,1,1)]|=J67 1 Stations["Process.Process_4", DATE(1,1,1)]| D Stations["Process.Finished_Goods_B", 3 Capacity_per_Station["Process.Process_1", 3000 DATE(10,1,1)]| Capacity_per_Station["Process.Process_1", 3000 DATE(1,1,1)]| Capacity_per_Station["Process.Process_1", 3000 DATE(2,1,1)]|=B74 Capacity_per_Station["Process.P DATE(3,1, Capacity_per_Station["Process.Process_3", 3000 Capacity_per_Station["Process.Process_3", 3000 DATE(2,1,1)]|=B77 Capacity_per_Station["Process.Process_3", 3000 DATE(3,1,1)]|=C77 Capacity_per_Station["Process.Process_3", 3000 DATE(4,1,1)]|=D77 Capacity_per_Station["Process.P DATE(5,1, Capacity_per_Station["Process.Finished_Goods_B", 3000 Capacity_per_Station["Process.Finished_Goods_B", 3000 Capacity_per_Station["Process.Finished_Goods_B", DATE(4,1,1)]|=D80 3000 Capacity_per_Station["Process.Finished_Goods_B", DATE(5,1,1)]|=E80 3000 Capacity_per_Station["Process.F DATE(6,1,1)]|=F80 DA Proc_Cost_per_U_Sc1["Process.Process_1", 0 Proc_Cost_per_U_Sc1["Process.Process_1", 0 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Process_1", "Cost_Types.Fixed_Exp", DATE(6,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process "Cost_Types.Fixed_Exp", DATE(7,1,1)]|=if("Cost_Typ "Cost_Ty DATE if(Un Proc_Cost_per_U_Sc1["Process.Process_2", 18 Proc_Cost_per_U_Sc1["Process.Process_2", 18 Proc_Cost_per_U_Sc1["Process.Process_2", "Cost_Types.Labor", 18 Proc_Cost_per_U_Sc1["Process.Process_2", DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 0 Proc_Cost_per_U_Sc1["Process DATE(9,1,1)]|=if("Cost_Types"=" "Cost_Types.Labor", DATE(10, if(Units!I2 "Cost_Ty Proc_Cost_per_U_Sc1["Process.Rework_2", 12 Proc_Cost_per_U_Sc1["Process.Rework_2", 25 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Material", 25 Proc_Cost_per_U_Sc1["Process.Rework_2", "Cost_Types.Labor", DATE(10,1,1)]|=if("Cost_Types"="Fixed_Exp", 25DATE(1,1,1)]| Proc_Cost_per_U_Sc1["Process "Cost_Types.Labor", DATE(2,1, "Cost_Typ if(Units Proc_Cost_per_U_Sc1["Process.Process_3", 4 Proc_Cost_per_U_Sc1["Process.Process_3", 4 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Material", 4 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.Material", DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp", 4 Proc_Cost_per_U_Sc1["Process "Cost_Types.Material", DATE(3,1,1)]|=if("Cost_Types" "Cost_Ty DATE(4 if(Units! Proc_Cost_per_U_Sc1["Process.Process_3", 10.8 Proc_Cost_per_U_Sc1["Process.Process_3", 10.8 Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.OH", 10.8 DATE(4,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc1["Process.Process_3", "Cost_Types.OH", 10.8 DATE(5,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc1["Process "Cost_Types.OH", DATE(6,1,1) if(Units!E30= "Cost_Ty Proc_Cost_per_U_Sc1["Process.Process_4", 0 Proc_Cost_per_U_Sc1["Process.Process_4", 0 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process.Process_4", "Cost_Types.Fixed_Exp", DATE(6,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc1["Process "Cost_Types.Fixed_Exp", DATE(7,1,1)]|=if("Cost_Typ "Cost_Ty DATE if(Un Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", "Cost_Types.Labor", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_A", DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 0 Proc_Cost_per_U_Sc1["Process DATE(9,1,1)]|=if("Cost_T "Cost_Types.Labor", Dif" Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 0 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Material", 1 Proc_Cost_per_U_Sc1["Process.Finished_Goods_B", "Cost_Types.Labor", DATE(10,1,1)]|=if("Cost_Types"="Fixed_Exp 1 Proc_Cost_per_U_Sc1["Process DATE(1,1,1)]| "Cost_Types.Labor", D" Proc_Cost_per_U_Sc2["Process.Process_1", 10 Proc_Cost_per_U_Sc2["Process.Process_1", 10 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Material", 10 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.Material", DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp", 10 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", DATE(3,1,1)]|=if("Cost_Types" "Cost_Ty DATE(4 if(Units! Proc_Cost_per_U_Sc2["Process.Process_1", 2.8 Proc_Cost_per_U_Sc2["Process.Process_1", 2.8 Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.OH",2.8 DATE(4,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Process_1", "Cost_Types.OH",2.8 DATE(5,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc2["Process "Cost_Types.OH", DATE(6,1,1) if(Units!E27= "Cost_Ty Proc_Cost_per_U_Sc2["Process.Process_2", 0 Proc_Cost_per_U_Sc2["Process.Process_2", 0 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Process_2", "Cost_Types.Fixed_Exp", DATE(6,1,1)]|=if("Cost_Types"="Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process "Cost_Types.Fixed_Exp", DATE(7,1,1)]|=if("Cost_Typ "Cost_Ty DATE if(Un Proc_Cost_per_U_Sc2["Process.Rework_2", 25 Proc_Cost_per_U_Sc2["Process.Rework_2", 25 Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Labor", 25DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Rework_2", "Cost_Types.Labor",0DATE(9,1,1)]|=if("Cost_Types"="F Proc_Cost_per_U_Sc2["Process "Cost_Types.Labor", DATE(10,1 if(Units!I29 "Cost_Typ Proc_Cost_per_U_Sc2["Process.Process_3", 8 Proc_Cost_per_U_Sc2["Process.Process_3", 40 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Material", 40 Proc_Cost_per_U_Sc2["Process.Process_3", "Cost_Types.Labor", DATE(10,1,1)]|=if("Cost_Types"="Fixed_Exp", 40 Proc_Cost_per_U_Sc2["Process DATE(1,1,1)]| "Cost_Types.Labor", DATE(2,1 "Cost_Ty if(Unit Proc_Cost_per_U_Sc2["Process.Process_4", 20 Proc_Cost_per_U_Sc2["Process.Process_4", 20 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Material", 20 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.Material", DATE(2,1,1)]|=if("Cost_Types"="Fixed_Exp", 20 Proc_Cost_per_U_Sc2["Process "Cost_Types.Material", DATE(3,1,1)]|=if("Cost_Types" "Cost_Ty DATE(4 if(Units! Proc_Cost_per_U_Sc2["Process.Process_4", 7.2 Proc_Cost_per_U_Sc2["Process.Process_4", 7.2 Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.OH",7.2 DATE(4,1,1)]|=if("Cost_Types"="Fixed_Exp", Proc_Cost_per_U_Sc2["Process.Process_4", "Cost_Types.OH",7.2 DATE(5,1,1)]|=if("Cost_Types"="Fix Proc_Cost_per_U_Sc2["Process "Cost_Types.OH", DATE(6,1,1) if(Units!E31= "Cost_Ty Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.Fixed_Exp", 0 Proc_Cost_per_U_Sc2["Process.Finished_Goods_A", "Cost_Types.Fixed_Exp", DATE(6,1,1)]|=if("Cost_Types"="Fixed_Ex 0 Proc_Cost_per_U_Sc2["Process "Cost_Types.Fixed_Ex DATE(7,1,1)]|=if("C" Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", "Cost_Types.Labor", 1 Proc_Cost_per_U_Sc2["Process.Finished_Goods_B", DATE(8,1,1)]|=if("Cost_Types"="Fixed_Exp", "Cost_Types.Labor", 0 Proc_Cost_per_U_Sc2["Process DATE(9,1,1)]|=if("Cost_T "Cost_Types.Labor", Dif" Cost_per_U_Purchd_In["Process.Process_1", 10 Cost_per_U_Purchd_In["Process.Process_2", 50 Cost_per_U_Purchd_In["Process.Process_2", DATE(10,1,1)]|=J185 50 Cost_per_U_Purchd_In["Process.Process_2", DATE(1,1,1)]| 50 Cost_per_U_Purchd_In["Process DATE(2,1,1)]|=B186 DATE(3, Cost_per_U_Purchd_In["Process.Process_4", 160 Cost_per_U_Purchd_In["Process.Process_4", 160 Cost_per_U_Purchd_In["Process.Process_4", DATE(2,1,1)]|=B189 160 Cost_per_U_Purchd_In["Process.Process_4", DATE(3,1,1)]|=C189 160 Cost_per_U_Purchd_In["Process DATE(4,1,1)]|=D189 DATE(5, Scrap_Salvage_Value_per_U["Process.Process_1", 4 Scrap_Salvage_Value_per_U["Process.Process_1", 4 Scrap_Salvage_Value_per_U["Process.Process_1", DATE(4,1,1)]|=D195 4 Scrap_Salvage_Value_per_U["Process.Process_1", DATE(5,1,1)]|=E195 4 Scrap_Salvage_Value_per_U["P DATE(6,1,1)]|=F195 DA Scrap_Salvage_Value_per_U["Process.Process_3", 15 Scrap_Salvage_Value_per_U["Process.Process_3", 15 Scrap_Salvage_Value_per_U["Process.Process_3", DATE(6,1,1)]|=F198 15 Scrap_Salvage_Value_per_U["Process.Process_3", DATE(7,1,1)]|=G198 15 Scrap_Salvage_Value_per_U["P DATE(8,1,1)]|=H198 DA Scrap_Salvage_Value_per_U["Process.Finished_Goods_B", 50 Scrap_Salvage_Value_per_U["Process.Finished_Goods_B", 50 Scrap_Salvage_Value_per_U["Process.Finished_Goods_B", DATE(8,1,1)]|=H201 50 Fixed_Exp_per_Station["Process.Process_1", 10000 DATE(9,1,1)]|=I201 Fixed_Exp_per_Station["Process DATE(10,1,1)]|= DATE(1, Fixed_Exp_per_Station["Process.Rework_2", 2000 Fixed_Exp_per_Station["Process.Process_3", 9700 Fixed_Exp_per_Station["Process.Process_3", DATE(10,1,1)]|=J207 9700 Fixed_Exp_per_Station["Process.Process_3", DATE(1,1,1)]| 9700 Fixed_Exp_per_Station["Process DATE(2,1,1)]|=B208 DATE(3, Fixed_Exp_per_Station["Process.Finished_Goods_B", 1000 Fixed_Exp_per_Station["Process.Finished_Goods_B", 1000 Fixed_Exp_per_Station["Process.Finished_Goods_B", DATE(2,1,1)]|=B211 1000 Fixed_Exp_per_Station["Process.Finished_Goods_B", DATE(3,1,1)]|=C211 1000 Fixed_Exp_per_Station["Process DATE(4,1,1)]|=D211 Units_Demand["Process.Process_2", 0 Units_Demand["Process.Process_2", DATE(4,1,1)]|=0/7 0 Units_Demand["Process.Process_2", DATE(5,1,1)]|=0/7 0 Units_Demand["Process.Process_2", DATE(6,1,1)]|=0/7 0 Units_Demand["Process.Process DATE(7,1,1)]|=0/ Units_Demand["Process.Process_4", 0 Units_Demand["Process.Process_4", DATE(6,1,1)]|=0/7 0 Units_Demand["Process.Process_4", DATE(7,1,1)]|=0/7 0 Units_Demand["Process.Process_4", DATE(8,1,1)]|=0/7 0 Units_Demand["Process.Process DATE(9,1,1)]|=0/ Selling_Price["Process.Process_1", 60 Selling_Price["Process.Process_1", DATE(8,1,1)]|=H228 60 Selling_Price["Process.Process_1", DATE(9,1,1)]|=I228 60 Selling_Price["Process.Process_2", DATE(10,1,1)]|=J228 190 Selling_Price["Process.Process_ DATE(1,1,1)]| Selling_Price["Process.Process_3", 300 Selling_Price["Process.Process_4", DATE(10,1,1)]|=J231 400 Selling_Price["Process.Process_4", DATE(1,1,1)]| 400 Selling_Price["Process.Process_4", DATE(2,1,1)]|=B232 400 Selling_Price["Process.Process_ DATE(3,1,1)]|=C23

:A:-1:Transition_pct Percent of good :A:0:Transition_pct_Sc1 units output Transition from% :A:-1:Transition_pct_Sc1 stage Scenario A that Percent 1 goes toofstage good :A:0:Transition_pct_Sc2 Bunits for the output Transition nextfrom time % :A:-1:Transition_pct_Sc2 stage period, Scenario A that for2all goes pairs to of stage processes B for :A:-1:WIP_Buffer_Stock Value of units :A:0:Process_Yield_pct_Sc1 in bufferYield stock%available Scenario :A:-1:Process_Yield_pct_Sc1 to1enter Pecentage each processing :A:0:Process_Yield_pct_Sc2 of input stage, units Yield that segmented %exit Scenario as :A:-1:Process_Yield_pct_Sc2 good by 2cost units factor for each (material, processing labor :A:-1:Cost_per_U_Purchd_In Cost per unit :A:0:Scrap_Net_Cost of purchased Scrap input Net units Cost :A:-1:Scrap_Net_Cost enteredCost into of each scrap :A:0:Scrap_Salvage_Value state, lessby salvage time Scrap period value Salvage of :A:-1:Scrap_Salvage_Value scrap Value at each stage, segmente :D:0:ProcessY ProcessY :D:2:ProcessY ProcessY :D:1:ProcessY Total :D:0:ProcessY.Process_1 Process 1 :D:2:ProcessY.Process_1

0.00% 0.00% 0.00% 94.00% 99.00% 94.00% 98.50% 0 0 3 1 3000 3000 3000 0 0 25 4 10.8 0 0 1 10 2.8 0 0 40 20 7.2 0 0 50 160 4 15 10000 9700 1000 0 0 190 400

Percent of good units output from stage A that goes to stage B for the next time period, for all pairs of processes A and B, b Pecentage of input units that exit as good units for each processing stage, by time period, for scenario 2 Salvage value of units scrapped at each stage, segmented by cost factor (material, labor, fixed expense, overhead) by time Lvl 1

or all pairs of processes A and B, by time period, for scenario 2 d, for scenario 2 , fixed expense, overhead) by time period

Related Documents