Office Relocation Project 39th Floor One Kowloon
1
Gross 23,305.ft. per floor
2
Headcount per Department >
CCO
1 SVP room + 2 gen. desks (sec & pa)
>
GCASALMNG
1 VP room + 2 gen. desks (sec & pa)
>
GCAKCMMNG
2 manager room + 1 gen. desk (sec)
>
KCM-Mark Team
1 manager desk + 10 general desks
>
KCM-Claus Team
1 manager desk + 17 general desks
>
KCM-BDV
1 manager desk + 2 general desks
KCM-NVO
1 manager room 2 manager desks + 10 general desks
KCM-LINCOM
1 manager desk + 4 general desks
>
ISM
1 manager desk + 5 general desks
>
GCASALDIR
1 manager room + 4 general desks
>
GCASALBDV
1 manager desk + 7 general desks
3
Headcount per Department >
CDM
1 manager desk + 7 general desks
>
SCD
1 manager desk + 2 general desks
>
CSCM
3 manager desks + 40 general desks
>
GCACORP
2 manager desks + 3 general desks
Total SVP room:
1
VP room:
1
Manager room:
4
Manager desk:
15
General desk:
116 ---137
4
Proposed Floor Plan GCAKCMMNG + 2 Teams KCM-BDV, NVO
Board Room
Meeting Room
CCO (SVP)
Reception GCASALBDV CDM, SCD, CSCM
3 small meeting rooms
GCASALDIR
This wall is blocked
GCACORP ISM
Breakout area
2 Meeting Rooms with moveable partition connecting to breakout area
GCASALMNG Gross 23,305.ft. per floor 5
Requirements >
Create one Reception on 39/F
>
Reuse current desks as fixed desks: > General desk: L1600 x W1600 x H1050 > Manager desk: L3200 x W1600 x H1050
>
Size of the manager room: 150sq.ft. per room
>
Divide the store room into 3 small meeting rooms with different style and colour tone
>
Boardroom Requirements: > Style – Grand & High-Tec > Size – Approx. 580 sqft which should accommodate 20 persons > Equipment – “One-panel” controls all equipments in rooms (e.g. Lightings, AV, PC & Screen, etc.) > Table setting – suggest a more flexible setting e.g. U-shape setting, small tables comprise a large meeting table, etc. > Ceiling Design – Hide projector at the ceiling and lower it down when use
6
Requirements >
Other Meeting rooms Requirements: >
1 meeting set up next to the Boardroom > Size – Approx. 250 sq. ft. > Similar equipments in Boardroom should be set up (AV/PC/Screen/Tel-conferencing, etc)
>
Pay attention to the noise-proof feature between meeting rooms
>
2 more meeting rooms locate near the Breakout Area > Movable partitions should be built between 2 rooms and the Breakout Area
> >
Small open meeting areas between Departments for short and small meeting (if possible)
6 Store rooms with size around 140 sq.ft. each are required: >
CCO
>
GCAKCMMNG 1
>
GCAKCMMNG 1
>
CSCM& CDM
1
>
GCACORP
1
>
HKGADM
1
1
7
Requirements > Major Fit-out Work Completion date: 8 January 2008*
* Users have to move in on 11 January 2008. It is allowed to have some minor fit-out works (no noise disturbance) to be finished on or before 31 January 2008.
8
Estimate Costs - Indication >
Fit-out costs including new furniture and fittings where applicable
>
Project Management Fee
>
Design fee
>
Warranty period
Please have the estimate costs in a sealed envelop!
9