North Blaine Estates - Checklist

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View North Blaine Estates - Checklist as PDF for free.

More details

  • Words: 205
  • Pages: 1
Nor th Blaine

Esta tes

Chec klist f or A rchitectur al R eview S ubmittal ____ Completed Architectural Review Request form. ____ Complete set of exterior plans, which include elevations of all sides of structure. ____ Plot plan, with structure placed and dimensions from lot boundaries, as well as location of access to driveway. ____ Locations of any large trees that are to be planted of removed from lot. If there are any other documents or other information that you feel are relevant to your application, please include those, as well. If you have any questions during the review process, please contact the HOA president, or any other member of the ACC. Thank you! North Blaine Estates HOA

Ar chitectu ral R evie w Pr ocedur e 1 – Homeowner(s) submit completed Architectural Review package to current HOA president. (see checklist) 2 – HOA president distributes package to each member of Architectural Control Committee (ACC) 3 – ACC has 30 days to review package and notify homeowner of approval or request additional information. If additional information is requested, ACC has an additional 30 days to process the application. 4 – Written notification will be provided to the homeowner upon final approval of the application.

Related Documents

The Estates
November 2019 4
Blaine Second Floor
May 2020 9
North
November 2019 35
Blaine First Floor
May 2020 7
North
April 2020 15