Nirav-4

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nirav-4 as PDF for free.

More details

  • Words: 627
  • Pages: 3
BHATT NIRAVKUMAR SURESHCHANDRA

At. & Po.-Sajod, Zaverkhadki, Ta.-Ankleshwar, Di.- Bharuch.Pin-393020 (P) 9904068456, (R) 02646 265597. [email protected],[email protected].

-------------------------------------------------------------

Education qualification:1. Diploma Mechanical Engg. With 68% for N.I.E. 2. 3. 4.

A.T.I. (State Transfer Co.) with 73% (Regional First). I.T.I. (Diesel Mechanic) with 71% (Trade first) from N.C.V.T. H.S.C. (comm.) with 40% from G.H.S.E.B.

____________________________________________________________

Personal Profile:• • • • • •

Passport No Material Status: Date Of Birth Nationality Language Know: Current Location:

:- G 9069860 - Married. :- 11/June/1984 :- Indian English, Hindi, Gujarati.

- Ankleshwar, Gujarat.

--------------------------------------------------------------------------------------

Hobby:-

Thinking, Reading, Hear Cool Music, Playing Games Indoor & Outdoor, Self Drive Traveling, Bike Riding,

Space time activities:book,

To meet relatives, friends, and family member, Reading technically data & technically

Ambition:-

My ambition is drive towards the excellence work ethic and work culture, hard working and honesty. My ambition is outlined hear under.

Industrial Experience:1.

Presently Employ: - Oasis ceramic (P) Ltd.

Date of Joining: - 01/05/2007 Position: - Power Plant In charge. Objective: -Presently I am working in Oasis ceramic (P) Ltd. As a Power Plant In charge,

o

Make a 1 M.W. Project Work,

My Responsibility

o Making planning of all types Preventives & Routing Maintenance of P.C.C, M.C.C, & Gas bas o o o o

o o o

2.

Power Plant, Maintain Synchronizing System, Maintain & Maintenance of Cooling System, Making Dailey, Weekly, Monthly, Production,Comption & Attendance Report, Making all types of Routing & Preventives Maintenance Report, Making All types of Troubleshooting & Reporting, All types document file Recording & Reporting. And Also handling Work shop,

Name of Employer: - Green Power Int. (P) Ltd. Date of Joining:-16/10/2005 Date of Relive: - 17/06/2007

 Site:-Ginni Filament Ltd.

Date of Joining:-10/10/2006 Date of Relive: - 17/06/2007

Position:-Power Plant Supervisor. Objective:-I was worked in Ginni Filament Ltd. Under O. & M. Contract of Green Power Int.

(P) Ltd. Capacity of Power Plant [8.1 M.W., {6 X 1365kw}]

• • • • • • •

• • • • •

My Responsibility

Attend all types of Routing Maintenances & Preventives Maintenance of Gas base Power Plant. Ventilation System. Synchronizing System. H.R.U.System. V.A.M.System. Cooling System. Maintains %Ge Humidity in Engine Room. Preventive & Routing Maintains of P.C.C. & M.C.C. All types document file Recording & Reporting, Work. Making Dailey, Weekly, Monthly, Consumptions & Production Report, Making P.M. & Routing Maintenance Planning, Making Preventive Maintenance & Routing Maintenance Report. & etc.

 Site: - Sun Pharmaceuticals (P) Ltd. Date of Joining:-16/10/2005 Date of Relive: - 10/10/2006

Position: - Power Plant Operator. Objective: - I was worked in Sun Pharmaceuticals (P) Ltd. Under O. &M. Contract. Green

Power Int. (P) Ltd. Capacity of Power Plant (1.7 M.W.) Gas base Power Plant. As a Power Plant Operator.

3. Name of Employer: - State Transport Corporation.

Date of Joining : - 14/10/2003 Date of Relive : - 13/10/2005 Position: - Apprentice Trainee, in Work shop. Utility & Tyre plant. Objective: - I was worked as an Apprentice Trainee in Work shop, Utility & Tyre

Plant (hot & cold remold). I worked as Apprentice Trainee of Engine Section, Head Section, Gearbox Section, Flore (Cheeses) Section, Engineering Section, Joint Section, Clutch Section, Air assembly Section, Differentials Section, Seat Section, F.I.Pump Section, Injector Section, Radiator Section, Spring Section, Scrape yard, Hot Remold Tyre Section, Cold Remold Tyre Section, Boiler Section, & Utility Section,

4. Name of Employer: - - Green Power Int. (P) Ltd. Date of Joining: - 01/06/2002 Date of Relive: - 13/10/2003

 Site: - Sun Pharmaceuticals (P) Ltd.

Position: - Power plant Operator, Objective: - I was worked in Sun Pharmaceuticals (P) Ltd. Under O. & M. Contract.

Green Power Int. (P) Ltd. Capacity of Power Plant (2 M.W.) Gas base Power Plant. As a Power Plant Operator.

Yours faithfully,

NIRAV S .BHATT