AVERAGE LEAD OF 1 km

S.No.

Kind of Materials

Name of Quarry

Lead

Cost

conveyance

Total

1 Mortar Sand

Arjuna River

23

115.00

114.50

229.50

2 Filling Sand

Arjuna River

23

85.00

114.50

199.50

3 40 mm Metal

Malaipatti

19

290.00

97.85

387.85

4 20 mm Metal

Malaipatti

19

365.00

97.85

462.85

5 6 mm Metal

Malaipatti

19

215.00

97.85

312.85

6 Rough Stone

Malaipatti

19

160.00

97.85

257.85

7 Bond Stone

Malaipatti

19

250.00

97.85

347.85

8 Country Bricks

Gollapatti

29

1250.00

117.10

1250.00

9 Brick Jelly 20 mm

Gollapatti

29

240.00

#REF!

#REF!

10 Shell lime

Virudhunagar

10

650.00

#REF!

#REF!

11 Pressed Tiles

Virudhunagar

10

3550.00

63.00

3550.00

12 Lime Stone

Virudhunagar

10

320.00

#REF!

#REF!

13 Steel

Virudhunagar

10

16110.00

35.00

16110.00

14 Cement

Virudhunagar

10

2600.00

35.00

2635.00

0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

0 3.50 7 14 18 21 25 28 32 35 38 41 44 47 50 52 55 58 61 64 67 69 72 74 77 79 82 84 87 89 92 94 97 99 102 104 107 109 112 114

CEMENT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

7.90 15.80 23.70 31.60 39.50 47.40 55.30 63.20 71.10 79.00 85.55 92.10 98.65 105.20 111.75 118.30 124.85 131.40 137.95 144.50 150-.15 155.80 161.45 167.10 172.75 178.40 184.05 189.70 195.35 201.00 206.65 212.30 217.95 223.60 229.25 234.90 240.55 246.20 251.85 257.50

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

6.80 13.60 20.40 27.20 34.00 40.80 47.60 54.40 61.20 68.00 73.40 78.80 84.20 89.60 95.00 100.40 105.80 111.20 116.60 122.00 126.45 130.90 135.35 139.80 144.25 148.70 153.15 157.60 162.05 166.50 170.95 175.40 179.85 184.30 188.75 193.20 197.65 202.10 206.55 211.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41-80 add

6.30 12.60 18.90 25.20 31.50 37.80 44.10 50.40 56.70 63.00 68.20 73.40 78.60 83.80 89.00 94.20 99.40 104.60 109.80 115.00 119.50 124.00 128.50 133.00 137.50 142.00 146.50 151.00 155..50 160.00 164.50 169.00 173.50 178.00 182.50 187.00 191.50 196.00 200.50 205.00

2.75 per km

Mangalore Tiles (2000 nos.) Machine Pressed Tiles

Pressed Tiles

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41-80 add

4.75 9.50 14.25 19.00 23.75 28.50 33.25 38.00 42.75 47.50 51.40 55.30 59.20 63.10 67.00 70.90 74.80 78.70 82.60 86.50 89.90 93.30 96.70 100.10 103.50 106.90 110.30 113.70 117.10 120.50 123.90 127.30 130.70 134.10 137.50 140.90 144.30 147.70 151.10 154.50

2.00 per km

Country Bricks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41-80 add

3.85 7.70 11.55 15.40 19.25 23.10 26.95 30.80 34.65 38.50 41.70 44.90 48.10 51.30 54.50 57.70 60.90 64.10 67.30 70.50 73.25 76.00 78.75 81.50 84.25 87.00 89.75 92.50 95.25 98.00 100.75 103.50 106.25 109.00 111.75 114.50 117.25 120.00 122.75 125.50

1.65 per km

Lime Stone,Broken Stone Brick jelly Wood Work

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

6 11 17 22 28 34 39 45 50 56 61 65 70 75 79 84 89 93 98 103 107 111 115 119 123 127 131 135 139 143 147 151 155 159 162.50 166.50 170.50 174.50 178.50 182.50 185.70 188.90 192.10

Rough Stone,Bond Stone,sand,Earth Broken Stone,Gr

44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

195.30 198.50 201.70 204.90 208.10 211.30 214.50 217.70 220.90 224.10 227.30 230.50 233.70 236.90 240.10 243.30 246.50 249.70 252.90 256.10 259.30 262.50 265.70 268.90 272.10 275.30 278.50 281.70 284.90 288.10 291.30 294.50 297.70 300.90 304.10 307.30 310.50

h Broken Stone,Gravel,Surki

0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

0 3.50 7.00 10.50 14.00 17.50 21.00 24.50 28.00 31.50 35.00 37.90 40.80 43.70 46.60 49.50 52.40 55.30 58.20 61.10 64.00 66.50 69.00 71.50 74.00 76.50 79.00 81.50 84.00 86.50 89.00 91.50 94.00 96.50 99.00 101.50 104.00 106.50 109.00 111.50 114.00

STEEL

Mazon I Mazon II Mazdoor I Mazsdoor II Fitter I Fitter II Painter I Painter II Carpenter I Carpenter I I

160 145 100 90 140 130 130 120 160 145

Stocking charge Metal Gravel Sand

3.15 3.05 3.05

Filling gravel Filling Sand

9.20 8.20

Mixing CM Mixing LM Cleaning surface

27.00 38.00 1.80

Kind of Materials Mortar Sand Filling Sand 40 mm Metal 20 mm Metal 12 mm Metal 10 mm Metal 6 mm Metal Rough Stone Bond Stone Country Bricks Brick Jelly 20 mm Shell lime Pressed Tiles Lime Stone Steel Cement Red Gravel Well Gravel Quarry Rubbish Snowcem Distember Enemal paint

Rate 110 110 490 685 630 465 315 230 315 1470 280 705 4500 345 31000 4300 92 82 51 30 60 150

0

Name of Work:

S.No.

Kind of Materials

1 2

Mortar Sand Filling Sand

3

Special Repairs to the cement concrete road at Mettu vadakarai. LEAD STATEMENT

Name of Quarry

Lead Unit in km

conv Cost eyan ce 110.00 ### 110.00 ###

Total

29 29

1 cum 1 cum

Cement

7

1 Mt

4

Steel

7

1 Mt

5

40 mm Metal

3

1 cum

490.00 16.80

506.80

6

20 mm Metal

3

1 cum

685.00 16.80

701.80

7

12mm Metal

3

1 cum

630.00 16.80

646.80

8

10 mm Metal

3

1 cum

465.00 16.80

481.80

9

6 mm Metal

3

1 cum

315.00 16.80

331.80

3

1 cum

230.00 16.80

246.80

3 1 cum 315.00 16.80 (8 3/4x 4 1/4 x2) 2 1000 Nos1470.00 9.50

331.80

10 Rough Stone 11 Bond Stone Country Bricks 12

3600.00 24.50 ###

248.50 248.50 3624.50

0.00 31000.00

1470.00

13 Brick Jelly 20 mm

2

1 cum

280.00

7.70

287.70

14 Red Gravel

1

1 cum

92.00

5.60

97.60

15 Well Murambu

1

1 cum

82.00

5.60

87.60

1 1 cum 345.00 3.85 (20 cm 20 cm*2cm) 12 1000 Nos4500.00 36.70

348.85

16 Lime Stone 17 Pressed Tiles 18 Shell Lime

1 cum

705.00

4536.70 705.00

Certified that the above leads and rates are shortest and correct to the best of my kno

s to the cement concrete road at Mettu vadakarai.

s are shortest and correct to the best of my knowledge.

SUB-DATA Name of Materials Cost of Materials

Mixing Ratio

CM 1:1 1/2 960 CMkgs 1:2

3624.50

Cement Sand Concrete Works

720 CM 1:3 kgs

480 CM 1:4 kgs

360 CM 1:5 kgs

288 kgs

3479.52

2609.64

1739.76

1304.82

1043.86

248.50

248.50

248.50

248.50

248.50

3728.02

2858.14

1988.26

1553.32

1292.36

27.00

27.00

27.00

27.00

27.00

3755.02

2885.14

2015.26

1580.32

1319.36

Mixing charges

27.00 For Mortar Works

Main Data 7.Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20 B. For Structure works For Drainage works For C.C pavement

Rs.26 x 2 Rs.26 x 1.5 Rs.26x1

= = =

52.00/ 1 cum. 39.00/ 1 cum. 26.00/ 1 cum.

8. Filling with carted sand including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.

1.00

Cum

Cost of Sand

1.00

Cum

Filling Charges

248.50

1 Cum

248.50

8.20

1 Cum

8.20

Total

Rs

256.70 /1CUM

256.70

SKM,SVPR.

5

288 kgs

Name of Work :Qty

Unit

Description of Work

KM Rate

Applying tack coat over WBM surface using 4Kg of Bitumen per 10 sqm. Including cost of Bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of Bitumen emulsion to actual workspot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour for applying the required quantity of bitumen emulsion including, hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing 4.000 KG Cost of Biumen danger lights, flages etc., 10 SQM Higher Charges for Tools and complete as per standard Plan specification KM. 10

Sqm Labour Charges Rate for 10 sqm Rate for 1 sqm

24700 75.40

Per

MT 10 sqm

Amount

98.80 75.40

10 Sqm 174.20 17.42

Name of Work :Qty

Unit

Description of Work

KM

Rate Per Amount PROVIDING AND LAYING PREMIX CARPET WITH SEAL COAT TYPE - ‘A’

0.180 Cum 0.090 Cum 0.090 Cum 24.40 KG 0 10 Sqm 10

Sqm

Providing and laying P.C. with seal coat type A for 20mm thickness using 0.18 cum of 13.20 MM IRC and 0.09 Cum of 11.2 mm IRC. Machine crushed metal with 14.60 Kg of Bitumen for Green mixing 10 Sqm of premix carpet and 0.09 cum of 6.70mm IRC machine crusher metal with 9.80 kgs of bitumen for seal coat type A per 10 sqm including cost and conveyance of materials to the work sight and stacking them to the departmental metric guage for pre measurement hating bitumen boiler heating the aggregates andIRCmixing Cost of 13.2 mm HBG them with bitumen in mini hot machine metal mix plaint for premixIRC rollerHBG for Cost of 11.2mm rolling to mix for pre mix machine metal carpeter and seals Cost of 6.70mm IRC coats HBG separately including labour machine metal charges for spreading seals Cost of packed Bitumen cost charges for mini hot mix plant bitumen boiler power Hire for Tools roller charges and all other tools and and plant plants employed to Labour Chargesas per standard accommodate specification KM. Rate for 10 Sqm Rate for 1 Sqm

657 1 cum

118.22

512 1 Cum

46.06

383 1 Cum

34.45

26500 1 Mt 266.25

10 Sqm 10 Sqm

646.60 266.25

1111.57 111.16

Name of Work :WBM – I Layer Using Grade II Metal (90mm to 22.4mm) size metal Qty Unit Description 0.050 Cum Cost of 90mm IRC HBG Metal

Rate Per 221.75 1 cum

Amount 11.09

0.450 Cum

Cost of 63mm IRC HBG Metal

358.75 1cum

161.44

0.425 Cum

Cost of 53mm IRC HBG metal

433.75 1 cum

184.34

0.050 Cum

Cost of 45mm IRC HBG metal

509.75 1 cum

25.49

0.025 Cum

Cost of 22.4 mm IRC HBG metal

710.75 1 cum

17.77

Cost of Red Gravel

100.65 1 cum

24.16

10.00 Sqm

Higher Charges for Tolls & Plant

169.17 10 Sqm

169.17

10.00 Sqm

Labour Charges

-

Rate for 10 Sqm

593.45

-

Rate for 1 Cum

791.27

0.24 Cum

Name of Work :WBM – II Layer Using Grade III Metal (63mm to 22.4mm) size metal Qty Unit Description 0.025 Cum Cost of 63mm IRC HBG Metal

Rate Per 358.75 1 cum

Amount 8.97

0.200 Cum

Cost of 53mm IRC HBG metal

433.75 1 cum

86.75

0.725 Cum

Cost of 45mm IRC HBG metal

509.75 1 cum

369.57

0.025 Cum

Cost of 22.4 mm IRC HBG metal

710.75 1 cum

17.77

0.025 Cum

Cost of 11.20 mm IRC HBG metal Cost of Red Gravel

511.75 1 cum

12.79

100.65 1 cum

24.16

10 Sqm

Higher Charges for Tolls & Plant

169.17 10 Sqm

169.17

10 Sqm

Labour Charges

-

Rate for 10 Sqm

689.18

-

Rate for 1 Cum

918.91

0.24 Cum

Name of Work :-

LEAD PARTICULARS Sl.

No

KIND OF MATERIALS

No. 1 90MM IRC HBG METAL

NAME OF QUARRY LEAD IN KM

COST

CONVEY STAC ANCE KING

TOTAL

1

213.00

5.60

3.15

221.75

2 63 MM IRC HBG METAL

1

350.00

5.60

3.15

358.75

3 53MM IRC HBG METAL

1

425.00

5.60

3.15

433.75

4 45 MM IRC HBG METAL

1

501.00

5.60

3.15

509.75

5 26.5 MM IRC HBG METAL

1

550.00

5.60

3.15

558.75

6 22.4 MM IRC HBG METAL

1

702.00

5.60

3.15

710.75

7 13.2MM IRC Machine Crusher Metal 8 11.2MM IRC Machine Crusher Metal 9 6.7MM IRC Machine Crusher Metal 10 Red Gravel

1

648.00

5.60

3.15

656.75

1

503.00

5.60

3.15

511.75

1

374.00

5.60

3.15

382.75

1

92.00

5.60

3.05

100.65

11 Well Murambu

1

82.00

5.60

3.05

90.65

12 Bitumen (packed) 60/70 13 Emulsion Bitumen

26500. 00 24700. 00

26500.0 0 24700.0 0

Certified that the Lead particulars furnished above are correct to the best of my knowledge

9.Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and

conveyance and all labour charges etc., Complete for 10 Cum 9.00 Cum Cost of 40mm metal 4.50 Cum Cost of CM 1:4

506.80 1 Cum

4561.20

1553.32 1 Cum

6989.94

1.80

Nos

Mason II Class

145.00

Each

261.00

17.70

Nos

Mazdoor I Class

100.00

Each

1770.00

14.10

Nos

Mazdoor II Class

90.00

Each

1269.00

L.S.

Sundries

L.S

For 10 cum

0.06 14851.20

Rs.

1485.12

/1 cum

Brick work in CM 1:5 mix using country bricks of size 8½” x 4½” x 2” including all cost and conveyance of all materials and all labour charges etc., Complete for 10 Cum.

6570.00

Nos

Cost of country bricks

3.00 Cum Cost of

Sand

1470.00 1000 Nos

9657.90

248.50

1Cum

745.50

860.00

Kgs

Cost of Cement

3624.50

1Mt

3117.07

3.50

Nos

Mason I Class

160.00

Each

560.00

7.10

Nos

Mason II Class

145.00

Each

1029.50

7.10

Nos

Mazdoor I Class

100.00

Each

710.00

14.10

Nos

Mazdoor II Class

90.00

Each

1269.00

L.S

Sundries

L.S

Rate for 10 Cum

0.03 17089.00

Rs. 1708.90 / 1 cum Plastering with Cm 1:5 mix using to 12 mm thick including all cost and conveyance of all Materials and all labour charges etc., Complete for 10 Sqm.

0.14 Cum Cost of CM 1:5

1319.36

1Cum

184.71

1.10

Nos

Mason I Class

160.00

Each

176.00

0.50

Nos

Mazdoor I Class

100.00

Each

50.00

1.10

Nos

Mazdoor II Class

90.00

Each

99.00

L.S

Sundries

L.S

0.09

For 10 sqm

509.80 Rs

50.98 /1 sqm

Random Rubble Masonry in CM 1:5 mix using required Bond stone simultaneous pointing including all cost conveyance and all labour charges etc, Complete. 10.00 Cum Cost of Rough stone

246.80

1Cum

2468.00

1.00 Cum Cost of Bond stone

331.80

1Cum

331.80

1553.32

1Cum

5281.29

3.40

Nos

Cost of CM 1:5

7.10

Nos

Mason I Class

160.00

Each

1136.00

10.60

Nos

Mason II Class

145.00

Each

1537.00

14.10

Nos

Mazdoor I Class

100.00

Each

1410.00

14.10

Nos

Mazdoor II Class

90.00

Each

1269.00

L.S

Sundries

L.S

For 10 cum

0.01 13433.10

Rs. 1343.31 / 1 cum

Plastering with CM 1:5 mix using to 20 MM thick including all cost conveyance etc., Complete.

0.22 Cum Cost of CM 1:5

1319.36 1 Cum

290.26

2.20

Nos

Mason I Class

160.00

Each

352.00

0.50

Nos

Mazdoor I Class

100.00

Each

50.00

3.20

Nos

Mazdoor II Class

90.00

Each

288.00

L.S

Sundries

L.S

0.04

For 10 sqm

980.30 Rs.

98.03 /1 sqm

CC 1: 2: 4 Mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., Complete.

9.00 Cum Cost of 20mm Iss HBG metal 4.50 Cum Cement Mortar 1:2 1.80 1Nos Mason II Class

701.80

1Cum

6316.20

2858.14

1Cum

12861.63

145.00

1Cum

261.00

17.70

Nos

Mazdoor I Class

100.00

Each

1770.00

14.10

Nos

Mazdoor II Class

90.00

Each

1269.00

L.S

Sundries

L.S

0.07

Rate for 10 cum

22477.90 Rs. 2247.79 / 1 cum

Supplying and fabrication of steel for RCC works including all cost and conveyance etc., complete

1.00

Qtl

Cost of steel

0.01

Qtl

Cost of binding wire

3.50

Nos

Fitter I Class

31000.00

1Mt

3100.00

33.00

1 kg

33.00

140.00

Each

490.00

For 1 qtl

3623.00 Rs.

3623.00

/qtl

RCC 1:11/2:3 mix using using 20mm size of HBG metal including all cost and conveyance etc., complete

9.00 Cum Cost of 20mm Metal

701.80 1 Cum

6316.20

4.50 Cum Cost of Sand

248.50

1Cum

1118.25

4308.00

Kgs

Cost of Cement

3624.50

1 Mt

15614.35

3.50

Nos

Mason II Class

145.00

Each

507.50

21.20

Nos

Mazdoor I Class

100.00

Each

2120.00

35.30

Nos

Mazdoor II class

90.00

Each

3177.00

L.S

Sundries

L.S

For 10 cum

0.00 28853.30

Rs. 2885.33 /1 cum

Granolithic Cement Concrete 1:2:4 mix to 0.25m thick using 10mm to 12mm ISS size of HBG metal including all cost and conveyance of all materials to work site and all labour charges etc., complete for 10 cum

9.00 Cum Cost of 10mm to 12mm ISS HBG metal 4.50 Cum Cement Mortar 1:2 1.80 Nos Mason II Class 17.70 Nos Mazdoor I Class 14.10 Nos Mazdoor II L.S Sundries For 10 cum

564.30 1 Cum

5078.70

2858.14 1 Cum 145.00 Each 100.00 Each 90.00 Each L.S

12861.63 261.00 1770.00 1269.00 0.07 21240.40

Rs. 2124.04 /1 cum Pointing with CM 1:3 mix over pressed titles on terrace roofing including all cost and conveyance of all materials and labour charges etc., Complete for 10 sqm 0.04 Cum Cost of CM 1: 3 2.20 Nos Mason II Class 0.50 Nos Mazdoor I Class 1.10 Nos Mazdoor II Class L.S Sundries For 10 sqm

2015.26 1 Cum 145.00 Each 100.00 Each 90.00 Each L.S

Rs.

80.61 319.00 50.00 99.00 0.09 548.70

54.87 /1 sqm

Brick jelly with lime concrete using 20mm size of brick jelly with no sand to be add including all cost and conveyance and all labour charges etc., complete 12.80 Cum Cost of 20mm brick jelly 5.00 Cum Cost of lime Stone 1.80 Nos Mason I Class 17.70 Nos Mazdoor I Class 14.10 Nos Mazdoor II Class L.S Sundries For 10 cum Rs.

287.70 1 Cum

3682.56

348.85 1 Cum 160.00 Each 100.00 Each 90.00 Each L.S

1744.25 288.00 1770.00 1269.00 0.09 8753.90

875.39

/ 1 cum

Weathering course concrete using brick jelly of size 20mm slacked lime (no sand to be used) over the RCC roof slab brick jelly in lime being 32 : 12 ½ by volume and top finished with one course of pressed tiles and pointing with CM 1:3 etc., complete.

250.00

Nos

0.75 Cum

Cost of pressed tiles Cost of brick jelly concrete

0.12 Cum Cost of CM 1:3 5.80

Kgs

Cost of Crude Oil

10.00 Sqm Pointing with CM 1:3

4536.70 1000 Nos

1134.18

875.39 1 Cum

656.54

2015.26 1 Cum

241.83

20.00

1 kg

116.00

54.87

1 Sqm

548.70

1.10

Nos

Mason I Class

160.00

Each

176.00

2.10

Nos

Mason II Class

145.00

Each

304.50

2.20

Nos

Mazdoor I Class

100.00

Each

220.00

1.10

Nos

L.S

Mazdoor II Class

90.00

Sundries

Each

99.00

L.S

0.05

For 10 sqm

3496.80 Rs.

349.68

/ 1 sqm

White washing two coats with best shell lime including all cost and conveyance and all materials and all labour charges etc., complete for 100 Sqm 0.07 Cum Cost of shell lime 705.00 1 Cum 49.35 1.60 Nos Mason II Class 145.00 Each 232.00 0.50 Nos Mazdoor I Class 100.00 Each 50.00 2.70 Nos Mazdoor II Class 90.00 Each 243.00 L.S Sundries for gum & L.S 2.05 conjee water For 100 sqm Rs.

576.40

5.76

/ 1 sqm

Colour washing two coats including all cost conveyance and all labour charges etc., complete 10.00 Sqm Cost of white washing

5.76

and for colour pigments (50% whitewash)

L.S

L.S

1 Sqm

28.82

For 10 sqm Rs.

8.65

57.64

86.46 / 1 sqm

Painting with ready mixed good quality of enamel paint two coats including all cost and conveyance etc., complete for 10 Sqm Over new Iron works. 2.22 Lits Cost of enamel paint 150.00 1 Litter 333.00 1.10 Nos Painter Ist Class 130.00 Each 143.00 L.S Sundries L.S 0.00 For 10 sqm 476.00 Rs. 47.60 / 1 sqm Plastering withs CM 1:3 10mm thick including all cost and conveyance and all labour charges etc., complete. 0.10 Cum Cost of CM 1:3 2015.26 1Cum 201.53 1.10 Nos Mason I Class 160.00 Each 176.00 1.10 Nos Mazdoor I Class 100.00 Each 110.00 1.10 Nos Mazdoor II Class 90.00 Each 99.00 L.S Sundries L.S 0.07 For 10 sqm 586.60 Rs.

58.66

/ 1 sqm

Distermpering two coats includidng all cost anad conv eyance and all labour charges for 10 sqm.

1.34 0.50 0.50 0.80

Kgs Nos No. No.

Distember Painter I grade Mazdoor I grade Mazdoor II grade Sundries for 10 sqm

60.00 130.00 100.00 90.00 L.S. Rs.

1Kg Each Each Each

80.40 65.00 50.00 72.00 0.60 268.00

26.80 / 1 sqm

Snowcem painting two coats with approved paint over cement plastered wall surface ceiling and other new

surface including cleaning preparing the surface and curing etc. complete for 10 sqm

10.00 sqm

Cleaning plastered surface

1.80 1sqm

18.00

3.23 kgs 0.50 No. 0.50 No. 0.80 No.

30.00 130.00 100.00 90.00 L.S.

snowcem paint Painter I class Mazdoor Igrade Mazdoor II Grade

Sundries for 10 sqm Rs.

1Kg Each Each Each

96.90 65.00 50.00 72.00 0.10 302.00

30.20 / 1 sqm

Brick work in CM1:3mix using country bricss including all cost and conveyance etc. complete. 6570.00 Nos Cost of country bricks 3.00 Cum Cost of Sand 1433.33 Kgs Cost of Cement 3.50 Nos Mason I Class 7.10 Nos Mason II Class 7.10 Nos Mazdoor I Class 14.10 Nos Mazdoor II Class L.S Sundries Rate for 10 Cum

1470.00 1000 Nos 248.50 1Cum 3624.50 1Mt 160.00 Each 145.00 Each 100.00 Each 90.00 Each L.S

9657.90 745.50 5195.10 560.00 1029.50 710.00 1269.00 0.07 19167.07

Rs. 1916.71 / 1 cum

Plastering with CM1:3, 1:520mm mixthick using to 20 thick including all cost including all MM cost and conveyance etc., Complete.

0.22 Cum Cost of CM 1:3 2.20 Nos Mason I Class 0.50 Nos Mazdoor I Class 3.20 Nos Mazdoor II Class L.S Sundries For 10 sqm

2015.26 1 Cum 160.00 Each 100.00 Each 90.00 Each L.S

Rs.

113.34 /1 sqm

443.36 352.00 50.00 288.00 0.04 1133.40

country bricss including all cost and conveyance etc. complete.

Rough stone Dry packing for approns and revetmante including Gravel packing including all lapour Charges etc. complete

11.00

Cum

Cost of Rough stone

1 Cum

3.50

Nos

Wooder

105.00

Each

367.50

10.60

Nos

Mazdoor I Class

100.00

Each

1060.00

7.10

Nos

Mazdoor II Class

90.00

Each

639.00

11.60

Cum

Cost. Red Gravel

97.60

Each

1132.16

7.10

Nos

Mazdoor I Class

100.00

710.00

3.50

Nos

Mazdoor II Class

90.00

315.00

L.S.

Sundries

L.S

For 10 cum Rs.

/1 cum