AVERAGE LEAD OF 1 km
S.No.
Kind of Materials
Name of Quarry
Lead
Cost
conveyance
Total
1 Mortar Sand
Arjuna River
23
115.00
114.50
229.50
2 Filling Sand
Arjuna River
23
85.00
114.50
199.50
3 40 mm Metal
Malaipatti
19
290.00
97.85
387.85
4 20 mm Metal
Malaipatti
19
365.00
97.85
462.85
5 6 mm Metal
Malaipatti
19
215.00
97.85
312.85
6 Rough Stone
Malaipatti
19
160.00
97.85
257.85
7 Bond Stone
Malaipatti
19
250.00
97.85
347.85
8 Country Bricks
Gollapatti
29
1250.00
117.10
1250.00
9 Brick Jelly 20 mm
Gollapatti
29
240.00
#REF!
#REF!
10 Shell lime
Virudhunagar
10
650.00
#REF!
#REF!
11 Pressed Tiles
Virudhunagar
10
3550.00
63.00
3550.00
12 Lime Stone
Virudhunagar
10
320.00
#REF!
#REF!
13 Steel
Virudhunagar
10
16110.00
35.00
16110.00
14 Cement
Virudhunagar
10
2600.00
35.00
2635.00
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
0 3.50 7 14 18 21 25 28 32 35 38 41 44 47 50 52 55 58 61 64 67 69 72 74 77 79 82 84 87 89 92 94 97 99 102 104 107 109 112 114
CEMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
7.90 15.80 23.70 31.60 39.50 47.40 55.30 63.20 71.10 79.00 85.55 92.10 98.65 105.20 111.75 118.30 124.85 131.40 137.95 144.50 150-.15 155.80 161.45 167.10 172.75 178.40 184.05 189.70 195.35 201.00 206.65 212.30 217.95 223.60 229.25 234.90 240.55 246.20 251.85 257.50
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
6.80 13.60 20.40 27.20 34.00 40.80 47.60 54.40 61.20 68.00 73.40 78.80 84.20 89.60 95.00 100.40 105.80 111.20 116.60 122.00 126.45 130.90 135.35 139.80 144.25 148.70 153.15 157.60 162.05 166.50 170.95 175.40 179.85 184.30 188.75 193.20 197.65 202.10 206.55 211.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41-80 add
6.30 12.60 18.90 25.20 31.50 37.80 44.10 50.40 56.70 63.00 68.20 73.40 78.60 83.80 89.00 94.20 99.40 104.60 109.80 115.00 119.50 124.00 128.50 133.00 137.50 142.00 146.50 151.00 155..50 160.00 164.50 169.00 173.50 178.00 182.50 187.00 191.50 196.00 200.50 205.00
2.75 per km
Mangalore Tiles (2000 nos.) Machine Pressed Tiles
Pressed Tiles
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41-80 add
4.75 9.50 14.25 19.00 23.75 28.50 33.25 38.00 42.75 47.50 51.40 55.30 59.20 63.10 67.00 70.90 74.80 78.70 82.60 86.50 89.90 93.30 96.70 100.10 103.50 106.90 110.30 113.70 117.10 120.50 123.90 127.30 130.70 134.10 137.50 140.90 144.30 147.70 151.10 154.50
2.00 per km
Country Bricks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41-80 add
3.85 7.70 11.55 15.40 19.25 23.10 26.95 30.80 34.65 38.50 41.70 44.90 48.10 51.30 54.50 57.70 60.90 64.10 67.30 70.50 73.25 76.00 78.75 81.50 84.25 87.00 89.75 92.50 95.25 98.00 100.75 103.50 106.25 109.00 111.75 114.50 117.25 120.00 122.75 125.50
1.65 per km
Lime Stone,Broken Stone Brick jelly Wood Work
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
6 11 17 22 28 34 39 45 50 56 61 65 70 75 79 84 89 93 98 103 107 111 115 119 123 127 131 135 139 143 147 151 155 159 162.50 166.50 170.50 174.50 178.50 182.50 185.70 188.90 192.10
Rough Stone,Bond Stone,sand,Earth Broken Stone,Gr
44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80
195.30 198.50 201.70 204.90 208.10 211.30 214.50 217.70 220.90 224.10 227.30 230.50 233.70 236.90 240.10 243.30 246.50 249.70 252.90 256.10 259.30 262.50 265.70 268.90 272.10 275.30 278.50 281.70 284.90 288.10 291.30 294.50 297.70 300.90 304.10 307.30 310.50
h Broken Stone,Gravel,Surki
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
0 3.50 7.00 10.50 14.00 17.50 21.00 24.50 28.00 31.50 35.00 37.90 40.80 43.70 46.60 49.50 52.40 55.30 58.20 61.10 64.00 66.50 69.00 71.50 74.00 76.50 79.00 81.50 84.00 86.50 89.00 91.50 94.00 96.50 99.00 101.50 104.00 106.50 109.00 111.50 114.00
STEEL
Mazon I Mazon II Mazdoor I Mazsdoor II Fitter I Fitter II Painter I Painter II Carpenter I Carpenter I I
160 145 100 90 140 130 130 120 160 145
Stocking charge Metal Gravel Sand
3.15 3.05 3.05
Filling gravel Filling Sand
9.20 8.20
Mixing CM Mixing LM Cleaning surface
27.00 38.00 1.80
Kind of Materials Mortar Sand Filling Sand 40 mm Metal 20 mm Metal 12 mm Metal 10 mm Metal 6 mm Metal Rough Stone Bond Stone Country Bricks Brick Jelly 20 mm Shell lime Pressed Tiles Lime Stone Steel Cement Red Gravel Well Gravel Quarry Rubbish Snowcem Distember Enemal paint
Rate 110 110 490 685 630 465 315 230 315 1470 280 705 4500 345 31000 4300 92 82 51 30 60 150
0
Name of Work:
S.No.
Kind of Materials
1 2
Mortar Sand Filling Sand
3
Special Repairs to the cement concrete road at Mettu vadakarai. LEAD STATEMENT
Name of Quarry
Lead Unit in km
conv Cost eyan ce 110.00 ### 110.00 ###
Total
29 29
1 cum 1 cum
Cement
7
1 Mt
4
Steel
7
1 Mt
5
40 mm Metal
3
1 cum
490.00 16.80
506.80
6
20 mm Metal
3
1 cum
685.00 16.80
701.80
7
12mm Metal
3
1 cum
630.00 16.80
646.80
8
10 mm Metal
3
1 cum
465.00 16.80
481.80
9
6 mm Metal
3
1 cum
315.00 16.80
331.80
3
1 cum
230.00 16.80
246.80
3 1 cum 315.00 16.80 (8 3/4x 4 1/4 x2) 2 1000 Nos1470.00 9.50
331.80
10 Rough Stone 11 Bond Stone Country Bricks 12
3600.00 24.50 ###
248.50 248.50 3624.50
0.00 31000.00
1470.00
13 Brick Jelly 20 mm
2
1 cum
280.00
7.70
287.70
14 Red Gravel
1
1 cum
92.00
5.60
97.60
15 Well Murambu
1
1 cum
82.00
5.60
87.60
1 1 cum 345.00 3.85 (20 cm 20 cm*2cm) 12 1000 Nos4500.00 36.70
348.85
16 Lime Stone 17 Pressed Tiles 18 Shell Lime
1 cum
705.00
4536.70 705.00
Certified that the above leads and rates are shortest and correct to the best of my kno
s to the cement concrete road at Mettu vadakarai.
s are shortest and correct to the best of my knowledge.
SUB-DATA Name of Materials Cost of Materials
Mixing Ratio
CM 1:1 1/2 960 CMkgs 1:2
3624.50
Cement Sand Concrete Works
720 CM 1:3 kgs
480 CM 1:4 kgs
360 CM 1:5 kgs
288 kgs
3479.52
2609.64
1739.76
1304.82
1043.86
248.50
248.50
248.50
248.50
248.50
3728.02
2858.14
1988.26
1553.32
1292.36
27.00
27.00
27.00
27.00
27.00
3755.02
2885.14
2015.26
1580.32
1319.36
Mixing charges
27.00 For Mortar Works
Main Data 7.Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20 B. For Structure works For Drainage works For C.C pavement
Rs.26 x 2 Rs.26 x 1.5 Rs.26x1
= = =
52.00/ 1 cum. 39.00/ 1 cum. 26.00/ 1 cum.
8. Filling with carted sand including cost and conveyance and all labour charges such as watering and ramming etc., complete as per standard specification.
1.00
Cum
Cost of Sand
1.00
Cum
Filling Charges
248.50
1 Cum
248.50
8.20
1 Cum
8.20
Total
Rs
256.70 /1CUM
256.70
SKM,SVPR.
5
288 kgs
Name of Work :Qty
Unit
Description of Work
KM Rate
Applying tack coat over WBM surface using 4Kg of Bitumen per 10 sqm. Including cost of Bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of Bitumen emulsion to actual workspot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour for applying the required quantity of bitumen emulsion including, hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing 4.000 KG Cost of Biumen danger lights, flages etc., 10 SQM Higher Charges for Tools and complete as per standard Plan specification KM. 10
Sqm Labour Charges Rate for 10 sqm Rate for 1 sqm
24700 75.40
Per
MT 10 sqm
Amount
98.80 75.40
10 Sqm 174.20 17.42
Name of Work :Qty
Unit
Description of Work
KM
Rate Per Amount PROVIDING AND LAYING PREMIX CARPET WITH SEAL COAT TYPE - ‘A’
0.180 Cum 0.090 Cum 0.090 Cum 24.40 KG 0 10 Sqm 10
Sqm
Providing and laying P.C. with seal coat type A for 20mm thickness using 0.18 cum of 13.20 MM IRC and 0.09 Cum of 11.2 mm IRC. Machine crushed metal with 14.60 Kg of Bitumen for Green mixing 10 Sqm of premix carpet and 0.09 cum of 6.70mm IRC machine crusher metal with 9.80 kgs of bitumen for seal coat type A per 10 sqm including cost and conveyance of materials to the work sight and stacking them to the departmental metric guage for pre measurement hating bitumen boiler heating the aggregates andIRCmixing Cost of 13.2 mm HBG them with bitumen in mini hot machine metal mix plaint for premixIRC rollerHBG for Cost of 11.2mm rolling to mix for pre mix machine metal carpeter and seals Cost of 6.70mm IRC coats HBG separately including labour machine metal charges for spreading seals Cost of packed Bitumen cost charges for mini hot mix plant bitumen boiler power Hire for Tools roller charges and all other tools and and plant plants employed to Labour Chargesas per standard accommodate specification KM. Rate for 10 Sqm Rate for 1 Sqm
657 1 cum
118.22
512 1 Cum
46.06
383 1 Cum
34.45
26500 1 Mt 266.25
10 Sqm 10 Sqm
646.60 266.25
1111.57 111.16
Name of Work :WBM – I Layer Using Grade II Metal (90mm to 22.4mm) size metal Qty Unit Description 0.050 Cum Cost of 90mm IRC HBG Metal
Rate Per 221.75 1 cum
Amount 11.09
0.450 Cum
Cost of 63mm IRC HBG Metal
358.75 1cum
161.44
0.425 Cum
Cost of 53mm IRC HBG metal
433.75 1 cum
184.34
0.050 Cum
Cost of 45mm IRC HBG metal
509.75 1 cum
25.49
0.025 Cum
Cost of 22.4 mm IRC HBG metal
710.75 1 cum
17.77
Cost of Red Gravel
100.65 1 cum
24.16
10.00 Sqm
Higher Charges for Tolls & Plant
169.17 10 Sqm
169.17
10.00 Sqm
Labour Charges
-
Rate for 10 Sqm
593.45
-
Rate for 1 Cum
791.27
0.24 Cum
Name of Work :WBM – II Layer Using Grade III Metal (63mm to 22.4mm) size metal Qty Unit Description 0.025 Cum Cost of 63mm IRC HBG Metal
Rate Per 358.75 1 cum
Amount 8.97
0.200 Cum
Cost of 53mm IRC HBG metal
433.75 1 cum
86.75
0.725 Cum
Cost of 45mm IRC HBG metal
509.75 1 cum
369.57
0.025 Cum
Cost of 22.4 mm IRC HBG metal
710.75 1 cum
17.77
0.025 Cum
Cost of 11.20 mm IRC HBG metal Cost of Red Gravel
511.75 1 cum
12.79
100.65 1 cum
24.16
10 Sqm
Higher Charges for Tolls & Plant
169.17 10 Sqm
169.17
10 Sqm
Labour Charges
-
Rate for 10 Sqm
689.18
-
Rate for 1 Cum
918.91
0.24 Cum
Name of Work :-
LEAD PARTICULARS Sl.
No
KIND OF MATERIALS
No. 1 90MM IRC HBG METAL
NAME OF QUARRY LEAD IN KM
COST
CONVEY STAC ANCE KING
TOTAL
1
213.00
5.60
3.15
221.75
2 63 MM IRC HBG METAL
1
350.00
5.60
3.15
358.75
3 53MM IRC HBG METAL
1
425.00
5.60
3.15
433.75
4 45 MM IRC HBG METAL
1
501.00
5.60
3.15
509.75
5 26.5 MM IRC HBG METAL
1
550.00
5.60
3.15
558.75
6 22.4 MM IRC HBG METAL
1
702.00
5.60
3.15
710.75
7 13.2MM IRC Machine Crusher Metal 8 11.2MM IRC Machine Crusher Metal 9 6.7MM IRC Machine Crusher Metal 10 Red Gravel
1
648.00
5.60
3.15
656.75
1
503.00
5.60
3.15
511.75
1
374.00
5.60
3.15
382.75
1
92.00
5.60
3.05
100.65
11 Well Murambu
1
82.00
5.60
3.05
90.65
12 Bitumen (packed) 60/70 13 Emulsion Bitumen
26500. 00 24700. 00
26500.0 0 24700.0 0
Certified that the Lead particulars furnished above are correct to the best of my knowledge
9.Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and
conveyance and all labour charges etc., Complete for 10 Cum 9.00 Cum Cost of 40mm metal 4.50 Cum Cost of CM 1:4
506.80 1 Cum
4561.20
1553.32 1 Cum
6989.94
1.80
Nos
Mason II Class
145.00
Each
261.00
17.70
Nos
Mazdoor I Class
100.00
Each
1770.00
14.10
Nos
Mazdoor II Class
90.00
Each
1269.00
L.S.
Sundries
L.S
For 10 cum
0.06 14851.20
Rs.
1485.12
/1 cum
Brick work in CM 1:5 mix using country bricks of size 8½” x 4½” x 2” including all cost and conveyance of all materials and all labour charges etc., Complete for 10 Cum.
6570.00
Nos
Cost of country bricks
3.00 Cum Cost of
Sand
1470.00 1000 Nos
9657.90
248.50
1Cum
745.50
860.00
Kgs
Cost of Cement
3624.50
1Mt
3117.07
3.50
Nos
Mason I Class
160.00
Each
560.00
7.10
Nos
Mason II Class
145.00
Each
1029.50
7.10
Nos
Mazdoor I Class
100.00
Each
710.00
14.10
Nos
Mazdoor II Class
90.00
Each
1269.00
L.S
Sundries
L.S
Rate for 10 Cum
0.03 17089.00
Rs. 1708.90 / 1 cum Plastering with Cm 1:5 mix using to 12 mm thick including all cost and conveyance of all Materials and all labour charges etc., Complete for 10 Sqm.
0.14 Cum Cost of CM 1:5
1319.36
1Cum
184.71
1.10
Nos
Mason I Class
160.00
Each
176.00
0.50
Nos
Mazdoor I Class
100.00
Each
50.00
1.10
Nos
Mazdoor II Class
90.00
Each
99.00
L.S
Sundries
L.S
0.09
For 10 sqm
509.80 Rs
50.98 /1 sqm
Random Rubble Masonry in CM 1:5 mix using required Bond stone simultaneous pointing including all cost conveyance and all labour charges etc, Complete. 10.00 Cum Cost of Rough stone
246.80
1Cum
2468.00
1.00 Cum Cost of Bond stone
331.80
1Cum
331.80
1553.32
1Cum
5281.29
3.40
Nos
Cost of CM 1:5
7.10
Nos
Mason I Class
160.00
Each
1136.00
10.60
Nos
Mason II Class
145.00
Each
1537.00
14.10
Nos
Mazdoor I Class
100.00
Each
1410.00
14.10
Nos
Mazdoor II Class
90.00
Each
1269.00
L.S
Sundries
L.S
For 10 cum
0.01 13433.10
Rs. 1343.31 / 1 cum
Plastering with CM 1:5 mix using to 20 MM thick including all cost conveyance etc., Complete.
0.22 Cum Cost of CM 1:5
1319.36 1 Cum
290.26
2.20
Nos
Mason I Class
160.00
Each
352.00
0.50
Nos
Mazdoor I Class
100.00
Each
50.00
3.20
Nos
Mazdoor II Class
90.00
Each
288.00
L.S
Sundries
L.S
0.04
For 10 sqm
980.30 Rs.
98.03 /1 sqm
CC 1: 2: 4 Mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., Complete.
9.00 Cum Cost of 20mm Iss HBG metal 4.50 Cum Cement Mortar 1:2 1.80 1Nos Mason II Class
701.80
1Cum
6316.20
2858.14
1Cum
12861.63
145.00
1Cum
261.00
17.70
Nos
Mazdoor I Class
100.00
Each
1770.00
14.10
Nos
Mazdoor II Class
90.00
Each
1269.00
L.S
Sundries
L.S
0.07
Rate for 10 cum
22477.90 Rs. 2247.79 / 1 cum
Supplying and fabrication of steel for RCC works including all cost and conveyance etc., complete
1.00
Qtl
Cost of steel
0.01
Qtl
Cost of binding wire
3.50
Nos
Fitter I Class
31000.00
1Mt
3100.00
33.00
1 kg
33.00
140.00
Each
490.00
For 1 qtl
3623.00 Rs.
3623.00
/qtl
RCC 1:11/2:3 mix using using 20mm size of HBG metal including all cost and conveyance etc., complete
9.00 Cum Cost of 20mm Metal
701.80 1 Cum
6316.20
4.50 Cum Cost of Sand
248.50
1Cum
1118.25
4308.00
Kgs
Cost of Cement
3624.50
1 Mt
15614.35
3.50
Nos
Mason II Class
145.00
Each
507.50
21.20
Nos
Mazdoor I Class
100.00
Each
2120.00
35.30
Nos
Mazdoor II class
90.00
Each
3177.00
L.S
Sundries
L.S
For 10 cum
0.00 28853.30
Rs. 2885.33 /1 cum
Granolithic Cement Concrete 1:2:4 mix to 0.25m thick using 10mm to 12mm ISS size of HBG metal including all cost and conveyance of all materials to work site and all labour charges etc., complete for 10 cum
9.00 Cum Cost of 10mm to 12mm ISS HBG metal 4.50 Cum Cement Mortar 1:2 1.80 Nos Mason II Class 17.70 Nos Mazdoor I Class 14.10 Nos Mazdoor II L.S Sundries For 10 cum
564.30 1 Cum
5078.70
2858.14 1 Cum 145.00 Each 100.00 Each 90.00 Each L.S
12861.63 261.00 1770.00 1269.00 0.07 21240.40
Rs. 2124.04 /1 cum Pointing with CM 1:3 mix over pressed titles on terrace roofing including all cost and conveyance of all materials and labour charges etc., Complete for 10 sqm 0.04 Cum Cost of CM 1: 3 2.20 Nos Mason II Class 0.50 Nos Mazdoor I Class 1.10 Nos Mazdoor II Class L.S Sundries For 10 sqm
2015.26 1 Cum 145.00 Each 100.00 Each 90.00 Each L.S
Rs.
80.61 319.00 50.00 99.00 0.09 548.70
54.87 /1 sqm
Brick jelly with lime concrete using 20mm size of brick jelly with no sand to be add including all cost and conveyance and all labour charges etc., complete 12.80 Cum Cost of 20mm brick jelly 5.00 Cum Cost of lime Stone 1.80 Nos Mason I Class 17.70 Nos Mazdoor I Class 14.10 Nos Mazdoor II Class L.S Sundries For 10 cum Rs.
287.70 1 Cum
3682.56
348.85 1 Cum 160.00 Each 100.00 Each 90.00 Each L.S
1744.25 288.00 1770.00 1269.00 0.09 8753.90
875.39
/ 1 cum
Weathering course concrete using brick jelly of size 20mm slacked lime (no sand to be used) over the RCC roof slab brick jelly in lime being 32 : 12 ½ by volume and top finished with one course of pressed tiles and pointing with CM 1:3 etc., complete.
250.00
Nos
0.75 Cum
Cost of pressed tiles Cost of brick jelly concrete
0.12 Cum Cost of CM 1:3 5.80
Kgs
Cost of Crude Oil
10.00 Sqm Pointing with CM 1:3
4536.70 1000 Nos
1134.18
875.39 1 Cum
656.54
2015.26 1 Cum
241.83
20.00
1 kg
116.00
54.87
1 Sqm
548.70
1.10
Nos
Mason I Class
160.00
Each
176.00
2.10
Nos
Mason II Class
145.00
Each
304.50
2.20
Nos
Mazdoor I Class
100.00
Each
220.00
1.10
Nos
L.S
Mazdoor II Class
90.00
Sundries
Each
99.00
L.S
0.05
For 10 sqm
3496.80 Rs.
349.68
/ 1 sqm
White washing two coats with best shell lime including all cost and conveyance and all materials and all labour charges etc., complete for 100 Sqm 0.07 Cum Cost of shell lime 705.00 1 Cum 49.35 1.60 Nos Mason II Class 145.00 Each 232.00 0.50 Nos Mazdoor I Class 100.00 Each 50.00 2.70 Nos Mazdoor II Class 90.00 Each 243.00 L.S Sundries for gum & L.S 2.05 conjee water For 100 sqm Rs.
576.40
5.76
/ 1 sqm
Colour washing two coats including all cost conveyance and all labour charges etc., complete 10.00 Sqm Cost of white washing
5.76
and for colour pigments (50% whitewash)
L.S
L.S
1 Sqm
28.82
For 10 sqm Rs.
8.65
57.64
86.46 / 1 sqm
Painting with ready mixed good quality of enamel paint two coats including all cost and conveyance etc., complete for 10 Sqm Over new Iron works. 2.22 Lits Cost of enamel paint 150.00 1 Litter 333.00 1.10 Nos Painter Ist Class 130.00 Each 143.00 L.S Sundries L.S 0.00 For 10 sqm 476.00 Rs. 47.60 / 1 sqm Plastering withs CM 1:3 10mm thick including all cost and conveyance and all labour charges etc., complete. 0.10 Cum Cost of CM 1:3 2015.26 1Cum 201.53 1.10 Nos Mason I Class 160.00 Each 176.00 1.10 Nos Mazdoor I Class 100.00 Each 110.00 1.10 Nos Mazdoor II Class 90.00 Each 99.00 L.S Sundries L.S 0.07 For 10 sqm 586.60 Rs.
58.66
/ 1 sqm
Distermpering two coats includidng all cost anad conv eyance and all labour charges for 10 sqm.
1.34 0.50 0.50 0.80
Kgs Nos No. No.
Distember Painter I grade Mazdoor I grade Mazdoor II grade Sundries for 10 sqm
60.00 130.00 100.00 90.00 L.S. Rs.
1Kg Each Each Each
80.40 65.00 50.00 72.00 0.60 268.00
26.80 / 1 sqm
Snowcem painting two coats with approved paint over cement plastered wall surface ceiling and other new
surface including cleaning preparing the surface and curing etc. complete for 10 sqm
10.00 sqm
Cleaning plastered surface
1.80 1sqm
18.00
3.23 kgs 0.50 No. 0.50 No. 0.80 No.
30.00 130.00 100.00 90.00 L.S.
snowcem paint Painter I class Mazdoor Igrade Mazdoor II Grade
Sundries for 10 sqm Rs.
1Kg Each Each Each
96.90 65.00 50.00 72.00 0.10 302.00
30.20 / 1 sqm
Brick work in CM1:3mix using country bricss including all cost and conveyance etc. complete. 6570.00 Nos Cost of country bricks 3.00 Cum Cost of Sand 1433.33 Kgs Cost of Cement 3.50 Nos Mason I Class 7.10 Nos Mason II Class 7.10 Nos Mazdoor I Class 14.10 Nos Mazdoor II Class L.S Sundries Rate for 10 Cum
1470.00 1000 Nos 248.50 1Cum 3624.50 1Mt 160.00 Each 145.00 Each 100.00 Each 90.00 Each L.S
9657.90 745.50 5195.10 560.00 1029.50 710.00 1269.00 0.07 19167.07
Rs. 1916.71 / 1 cum
Plastering with CM1:3, 1:520mm mixthick using to 20 thick including all cost including all MM cost and conveyance etc., Complete.
0.22 Cum Cost of CM 1:3 2.20 Nos Mason I Class 0.50 Nos Mazdoor I Class 3.20 Nos Mazdoor II Class L.S Sundries For 10 sqm
2015.26 1 Cum 160.00 Each 100.00 Each 90.00 Each L.S
Rs.
113.34 /1 sqm
443.36 352.00 50.00 288.00 0.04 1133.40
country bricss including all cost and conveyance etc. complete.
Rough stone Dry packing for approns and revetmante including Gravel packing including all lapour Charges etc. complete
11.00
Cum
Cost of Rough stone
1 Cum
3.50
Nos
Wooder
105.00
Each
367.50
10.60
Nos
Mazdoor I Class
100.00
Each
1060.00
7.10
Nos
Mazdoor II Class
90.00
Each
639.00
11.60
Cum
Cost. Red Gravel
97.60
Each
1132.16
7.10
Nos
Mazdoor I Class
100.00
710.00
3.50
Nos
Mazdoor II Class
90.00
315.00
L.S.
Sundries
L.S
For 10 cum Rs.
/1 cum