Nasa 176988main 05 21 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 176988main 05 21 2007 Tl as PDF for free.

More details

  • Words: 356
  • Pages: 2
Radiogram No. 5376u Form 24 for 05/21/2007 Deactivate ВД–СУ without powering БИТС. Review EVA procedure and timeline. GMT CREW ACTIVITY 06:00-06:10 .

Morning inspection

06:10-06:40 .

Post-sleep

06:40-07:15 FE-1

BREAKFAST

06:40-07:30 CDR, FE-2

BREAKFAST

07:15-07:30 FE-1

БМП Ф1 filter regeneration (start)

07:30-07:45 .

Daily planning conference (S-band)

07:45-08:15 CDR, FE-2

Work prep

07:45-08:00 FE-1

BREAKFAST

08:00-08:15 FE-1

Work prep

08:15-08:45 CDR, FE-1

EVA Support Panel (ПОВ) check. Tagup with EVA specialists.

08:45-10:45 CDR, FE-1

Review of EVA procedure and preliminary timeline. View DVD. Tagup with EVA specialists

09:45-10:45 FE-2

Physical exercise (RED)

10:45-12:00 CDR

Physical exercise (RED), day 2

10:45-12:00 FE-1

Physical exercise (VELO), day 2

10:45-12:15 FE-2

Physical exercise (CEVIS)

12:00-13:15 FE-1

Physical exercise (RED), day 2

12:00-13:15 CDR

Physical exercise (VELO), day 2

13:15-14:15 .

LUNCH

14:15-14:45 FE-2

Reconfigure HAM radio

14:15-16:00 CDR, FE-1

Review of EVA procedure and preliminary timeline. View DVD. Tagup with EVA specialists

15:05-15:20 FE-2

Crew discretionary event (S-band)

16:00-16:15 .

RPM OBT conference

16:15-17:15 CDR, FE-1

Prep of АСН-М Satellite Navigation Equipment HF cable 17КС.30Ю 8630А-2410. Photo imagery. Tagup with specialists

17:15-17:20 FE-2

Amateur radio equipment prep

17:15-17:35 FE-1

Edit IMS data

17:15-17:55 CDR

Recharge EDV Purified Water Container (КОВ) from CWC No. 1068 (~5 L) and 1035 for the Elektron system

17:20-17:30 FE-2

Amateur radio session

17:30-17:50 FE-2

Conference on loading Progress No. 360.

17:55-18:25 CDR

СОЖ maintenance

18:00-18:10 FE-2

Video camera prep for Orlan ops

18:00-18:35 FE-1

Evening work prep

18:10-18:15 FE-2

Transfer TVIS, RED, CEVIS, and HRM data to MEC

18:15-18:35 FE-2

Evening work prep

18:25-18:35 CDR

Evening work prep

18:35-18:50 .

Daily planning conference (S-band)

18:50-19:15 FE-1

Evening work prep

18:50-19:30 CDR, FE-2

Evening work prep

19:15-19:30 FE-1

Daily food prep

19:30-20:00 .

DINNER

20:00-20:15 FE-1

Daily food prep

20:00-20:30 CDR, FE-2

Daily food prep

20:15-21:00 FE-1

Pre-sleep

20:30-21:30 CDR, FE-2

Pre-sleep

21:00-21:15 FE-1

БМП Ф1 filter regeneration (complete)

21:15-21:30 FE-1

Pre-sleep

21:30-06:00 .

SLEEP

CDR, FE-1 Task List

ISS RS Audit Pump condensate from CWC to EDV through filter

FE-1

Check operability of the Regul-OS–packet link by replacing БСР-ТМ with БСР No. 2 Note: See OSTP for references to US activities. End of radiogram

Related Documents