Radiogram 5346u Form 24 for 05/17/07 Progress 360 Attitude Control Thruster (ДПО) Dynamic Test ПхО and DC1 EVA Setup. GMT CREW ACTIVITY 06:00-06:10
.
Morning Inspection
06:10-06:40
.
Post-Sleep
06:40-07:30
.
Breakfast
07:30-07:45
.
Work Prep
07:45-08:00
.
Daily Planning Conference (S-band)
08:00-08:15
.
Work Prep
08:15-08:45
FE-2
Setup for Ops LAN Restart
08:15-09:45
CDR, FE-1
Progress 360 unloading w/IMS support
08:45-09:45
FE-2
Printing Procedures for OPS LAN Software Load
09:45-11:15
CDR
Physical Exercise – TVIS – Day 2
09:45-10:45
FE-2
Physical Exercise - RED
10:00-10:15
FE-1
АОК ГАНК-4М Reading
10:15-11:15
FE-1
ПхО and DC1 EVA setup w/IMS support. Tagup w/specialists as required. (Sband)
10:45-12:45
FE-2
Making tools to repair SA during 13A joint ops
11:15-12:15
CDR
ПхО and DC1 EVA setup w/IMS support. Tagup w/specialists as required. (Sband)
11:15-12:15
FE-1
Physical Exercise (VELO) – Day 2
12:15-12:45
FE-1
БПК and БПК Conrtrol Panel Replacement
12:25-12:45
CDR
ALTCRISS. ОСА Data Downlink
12:45-13:45
.
Lunch
13:45-15:45
CDR, FE-1
ПхО and DC1 EVA setup w/IMS support. Tagup w/specialists as required. (Sband)
13:45-13:50
FE-2
VTR Tape Replacement
14:05-15:35
FE-2
EDV-ZV Sevicing from Progress 360 БВ1 (2 new EDVs, except for EDV-M. Report to MCC storage locations and Nos. or record in IMS)
15:40-15:50
FE-2
PAO Event Hardware Setup
15:45-16:45
CDR
Physical Exercise (VELO) – Day 2
15:45-17:15
FE-1
Physical Exercise (RED) – Day -2
15:50-16:00
FE-2
PAO Event Crew Prep
16:00-16:20
FE-2
PAO with WHDH-TV, Boston and WBZ-TV, Boston (S+Ku-band)
16:20-16:30
FE-2
CWC Audit
16:30-18:00
FE-2
Physical Exercise - CEVIS
16:45-17:30
CDR
БРПК Separator Replacement
17:15-17:30
FE-1
Evening Work Prep
17:30-18:00
CDR, FE-1
Training of Orbiter Maneuver Skills (R-Bar Pitch)
18:00-18:15
.
Crew Requested Conference (S+Ku-band)
18:15-18:20
FE-2
TVIS, RED, CEVIS, and HRM Data Transfer to MEC
18:15-18:35
FE-1
IMS Update
18:15-18:20
CDR
Downlink of Imagery Obtained during RPM OBT
18:20-18:45
CDR
Evening Work Prep
18:20-18:30
FE-2
TEPC Disassembly
18:30-18:35
FE-2
VTR Tape Replacement
18:35-18:45
FE-2
Evening Work Prep
18:35-18:45
FE-1
Evening Work Prep
18:45-19:00
.
Daily Planning Conference (S-band)
19:00-19:30
.
Evening Work Prep
19:30-20:00
.
Dinner
20:00-20:30
.
Daily Food Prep
20:30-21:30
.
Pre-Sleep
21:30-06:00
.
Sleep
CDR, FE-1 Task List FE-1
ISS RS Audit Inspection of [PO] shell and frame behind Panels 130, 134, 135, 138 and TVIS СОЖ Maintenance
EDV condensate processing using БПК Note:Cf. OSTP for any missing references to US Activities. End of Radiogram