Nasa 176714main 05 17 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 176714main 05 17 2007 Tl as PDF for free.

More details

  • Words: 387
  • Pages: 2
Radiogram 5346u Form 24 for 05/17/07 Progress 360 Attitude Control Thruster (ДПО) Dynamic Test ПхО and DC1 EVA Setup. GMT CREW ACTIVITY 06:00-06:10

.

Morning Inspection

06:10-06:40

.

Post-Sleep

06:40-07:30

.

Breakfast

07:30-07:45

.

Work Prep

07:45-08:00

.

Daily Planning Conference (S-band)

08:00-08:15

.

Work Prep

08:15-08:45

FE-2

Setup for Ops LAN Restart

08:15-09:45

CDR, FE-1

Progress 360 unloading w/IMS support

08:45-09:45

FE-2

Printing Procedures for OPS LAN Software Load

09:45-11:15

CDR

Physical Exercise – TVIS – Day 2

09:45-10:45

FE-2

Physical Exercise - RED

10:00-10:15

FE-1

АОК ГАНК-4М Reading

10:15-11:15

FE-1

ПхО and DC1 EVA setup w/IMS support. Tagup w/specialists as required. (Sband)

10:45-12:45

FE-2

Making tools to repair SA during 13A joint ops

11:15-12:15

CDR

ПхО and DC1 EVA setup w/IMS support. Tagup w/specialists as required. (Sband)

11:15-12:15

FE-1

Physical Exercise (VELO) – Day 2

12:15-12:45

FE-1

БПК and БПК Conrtrol Panel Replacement

12:25-12:45

CDR

ALTCRISS. ОСА Data Downlink

12:45-13:45

.

Lunch

13:45-15:45

CDR, FE-1

ПхО and DC1 EVA setup w/IMS support. Tagup w/specialists as required. (Sband)

13:45-13:50

FE-2

VTR Tape Replacement

14:05-15:35

FE-2

EDV-ZV Sevicing from Progress 360 БВ1 (2 new EDVs, except for EDV-M. Report to MCC storage locations and Nos. or record in IMS)

15:40-15:50

FE-2

PAO Event Hardware Setup

15:45-16:45

CDR

Physical Exercise (VELO) – Day 2

15:45-17:15

FE-1

Physical Exercise (RED) – Day -2

15:50-16:00

FE-2

PAO Event Crew Prep

16:00-16:20

FE-2

PAO with WHDH-TV, Boston and WBZ-TV, Boston (S+Ku-band)

16:20-16:30

FE-2

CWC Audit

16:30-18:00

FE-2

Physical Exercise - CEVIS

16:45-17:30

CDR

БРПК Separator Replacement

17:15-17:30

FE-1

Evening Work Prep

17:30-18:00

CDR, FE-1

Training of Orbiter Maneuver Skills (R-Bar Pitch)

18:00-18:15

.

Crew Requested Conference (S+Ku-band)

18:15-18:20

FE-2

TVIS, RED, CEVIS, and HRM Data Transfer to MEC

18:15-18:35

FE-1

IMS Update

18:15-18:20

CDR

Downlink of Imagery Obtained during RPM OBT

18:20-18:45

CDR

Evening Work Prep

18:20-18:30

FE-2

TEPC Disassembly

18:30-18:35

FE-2

VTR Tape Replacement

18:35-18:45

FE-2

Evening Work Prep

18:35-18:45

FE-1

Evening Work Prep

18:45-19:00

.

Daily Planning Conference (S-band)

19:00-19:30

.

Evening Work Prep

19:30-20:00

.

Dinner

20:00-20:30

.

Daily Food Prep

20:30-21:30

.

Pre-Sleep

21:30-06:00

.

Sleep

CDR, FE-1 Task List FE-1

ISS RS Audit Inspection of [PO] shell and frame behind Panels 130, 134, 135, 138 and TVIS СОЖ Maintenance

EDV condensate processing using БПК Note:Cf. OSTP for any missing references to US Activities. End of Radiogram

Related Documents