Radiogram No. 5164u GMT
Form 24 for 04/20-04/21/07 CREW
20:45-20:55
ACTIVITY Morning inspection
20:55-21:25
Post-sleep
21:25-22:15
BREAKFAST
22:15-22:30
FE-1, FE-2, CDR, CDR-15, FE-1-15
22:30-22:55
Daily Planning Conference (S-band) Prep for Work
22:55-23:10
FE-1
REGENERATION. Transfer hardware to Soyuz 219
23:10-23:25
FE-1
CRYSTALLIZER. Deactivation and transfer to DM
23:10-23:25
FE-2
Hardware set up for USOS camera ops
23:20-23:50
FE-1-15
SAMPLE. Prepack and Transfer sample kit to Soyuz
23:20-23:35
CDR
Private Medical Conference (S + Ku-band)
23:25-00:25
FE-2
Physical Exercise (RED)
23:25-00:25
CDR-15
Physical Exercise (CEVIS)
23:25-00:00
FE-1
GCF-JAXA. Hardware disassembly and transfer to Soyuz 219
23:50-00:20
FE-1-15
BIOEMULSION. Placing Ice-Packs and bioreactor into BIOCONT for return
00:00-02:05
FE-1
Packing return equipment in Soyuz 219
00:20-00:50
FE-1-15
Hardware (BIO-8, BTX-10, BTX-14) removal from Cryogem-03M and transfer to Soyuz 219
00:25-01:55
FE-2
Physical Exercise (CEVIS)
00:50-01:50
FE-1-15
Physical Exercise (RED)
01:50-02:05
CDR-15
Verify ИП-1 sensor installation
01:55-02:00
FE-2
Transfer TVIS/RED/CEVIS/HRM data to MEC
02:00-02:05
FE-2
On MCC Go ISS O2 repress from Progress 359 СрПК (start)
02:05-03:05 03:05-03:10
LUNCH FE-2
03:10-03:25
ISS O2 repress from Progress 359 СрПК (terminate) TV PAO downlink “E14 / E15 crew farewell” (S + Ku-band)
03:25-03:35
FE-1-15
Transfer VC Emergency Ops Books (3 copies) from Soyuz 219 to Soyuz 220
03:25-04:15
FE-1
Stow return equipment in Soyuz 219
03:25-03:30
FE-2
Connect DCP power cable
03:30-03:40
FE-2
O2 level check
03:35-04:05
FE-1-15
Activation of CRYOGEM-03M, CRYOGEM-03, ТБУ [Universal Bioengineering Thermostat] and KUBIK-AMBER
04:15-04:30
FE-1
Soyuz loading completion report
04:25-04:30
CDR
SLEEP - Donning Actiwatch
04:30-04:40
FE-1
Check and maintain comm from Soyuz 219 via RGS coverage
04:35-04:45
FE-1-15
Comm config for Soyuz undocking and descent
04:40-05:40
FE-1, CDR
Soyuz TMA-9 activation, comm check from Soyuz using S-band
05:00-05:05
FE-1-15
HAM radio powerdown in FGB
05:00-05:05
FE-2
US window shutter closure
05:05-05:10
FE-2
OCA SSC router reboot
05:15-05:30
FE-2
Food frequency questionnaire
05:40-06:00
FE-1, CDR
Removal and inspection of quick-release screw clamps
05:40-05:45
FE-2
Setting up USOS video camera
05:55-06:00
FE-2
TCS LTL QD demate
06:00-06:20
FE-1, CDR, SFPVC
Soyuz/SM AO transfer hatches closed. TV coverage Transfer Hatch Close
06:00-06:20
FE-1-15, CDR-15, FE-2
Video of Soyuz / SM transfer hatches closure
06:20-06:35
FE-2
TV downlink of hatch closure (S + Ku-band)
06:20-07:20
FE-1, CDR
Soyuz 219 /SM interface leak check
06:50-06:55
FE-2
Activation of SAMS ICU
07:20-07:40
CDR-15
IMS update
07:20-07:50
FE-1-15
СОЖ maintenance
07:20-12:35
FE-1, CDR, SFPVC
Soyuz ODF ops
07:50-08:05
FE-1-15
Gas Analyzer deactivation in Soyuz 220
09:15-09:20
CDR-15
Switch ПрК-ТК PEV to CLOSED position
09:15-09:20
FE-1-15
Post-Soyuz undocking comm reconfig
09:20-09:45
FE-1-15
Evening work prep
09:30-09:45
CDR-15,FE-2
Evening work prep
09:45-10:00
FE-2, FE-1-15, CDRDaily Planning Conference (S-band) 15
10:00-10:35
FE-1-15
Evening work prep
10:00-10:45
FE-2, CDR-15
Evening work prep
10:35-12:35
FE-1-15
Pre-sleep
10:45-12:45
CDR-15, FE-2
Pre-sleep
12:35-12:45
FE-1-15
Post-Soyuz landing comm reconfig
12:45-00:00
FE-1-15, CDR-15, FE-2
SLEEP
Note: See OSTP for references to US activities. End of Radiogram