Radiogram No. 4873u
Form 24 for 03/16/07
ДВ2 TEST. FGB STORAGE BATTERY АБ1 MONITORING CHANNEL CHECK GMT CREW ACTIVITY 08:00-08:10
Morning inspection
08:10-08:40
Post-sleep
08:40-09:30
BREAKFAST
09:30-10:00
.
Prep for Work
10:20-10:35
Daily Planning Conference (S-band)
10:35-10:50
ISS crew and ГОГУ (RSA Flight Control Team) weekly conference (S-band)
11:05-13:35 CDR,FE-2
Stowing cargo in NODE
12:05-13:35 FE-1
Physical Exercise (TVIS), day 3
13:35-15:05 CDR
Physical Exercise (TVIS + CEVIS)
13:45-13:50
Connect DCP power cable
13:50-14:05
FE-2
Food frequency questionnaire
13:50-14:05 FE-1
Liquid Unit БЖ #056 Pressure Check
14:05-15:05 FE-2
Physical Exercise (RED)
14.05-14.45 FE-1
Elektron activation and БД temperature monitoring. S-band Tagup
15:05-16:05 .
LUNCH
16:05-16:20 CDR
Food frequency questionnaire
16:05-18:35 FE-1
FGB Storage Battery АБ1 monitoring channel check. Tagup with specialists (Sband)
16:10-16:15
HAM radio setup
16:15-16:25 16:20-16:25 16:25-16:30
FE-2 CDR
HAM radio session SSC File Server Reboot OCA SSC Router Reboot
17:05-17:35 CDR,FE-2
ISL Conference (S-band)
17:35-18:35 CDR
Physical Exercise (RED)
18:05-18:25
SSRMS ops
18:25-19:55
FE-2
Physical Exercise (CEVIS)
18:35-19:35 FE-1
Physical Exercise (VELO+RED) day 3
18:40-19:00
IWIS deactivation
19:50-20:00
CDR
19:55-20:00 FE-2 20:00-20:05
O2 level check Payload status check
CDR
Transfer TVIS/RED/CEVIS/HRM data to MEC
FE-2
Disconnect Display and Control Panel (DCP) power cable
20:05-20:35
Evening work prep
20:35-20:50
Daily Planning Conference (S-band)
20:50-21:10
Evening work prep
21:10-21:30 21:30-22:00
.
FD / ISS Crew Conference (S-band) DINNER
22:00-22:30
Daily Food Prep
22:30-23:30
Pre-sleep
23:30-10:00
SLEEP
Task List
FE-1
On MCC Go ISS О2 repress from Progress 358 СрПК (start)
ТБУ (Universal Bioengineering Thermostat). Temperature check PLANTS-2. Status check URAGAN. Observations and photography Note: See OSTP for references to US activities. End of Radiogram