Nasa 169838main 02 19 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 169838main 02 19 2007 Tl as PDF for free.

More details

  • Words: 426
  • Pages: 2
Radiogram No. 4724u Form 24 for 02/19/07 COMMANDING САУП ОНА [HIGH-GAIN ANTENNA AUTOMATIC DRIVE CONTROL SYSTEM] FROM POSITION 1 TO POSITION 2. DC1-ТКГ LEAK CHECK GMT CREW ACTIVITY 02:00-02:10 .

Morning inspection

02:10-02:40 .

Post-sleep

02:40-03:30 .

BREAKFAST

03:30-04:00 .

Prep for Work

04:00-04:15 .

Daily Planning Conference (S-band)

04:15-04:45 CDR,FE-2 Conference to brief the crew on 13A Prepack Operations (S-band) 05:10-05:15 CDR

Connect DCP power cable

05:10-05:30 FE-2

MELFI - ICEPAC Insertion into a Box Module

05:15-06:15 CDR

Physical Exercise (RED)

05:30-05:50 FE-2

IMS update

06:15-07:45 CDR

Physical Exercise (TVIS + CEVIS)

06:15-06:20 FE-2

Payload status check /

06:20-07:20 FE-2

EarthKAM: setup, activation

06:35-06:45 FE-1

Soyuz 219 Gas Analyzer deactivation

06:45-08:15 FE-1

Physical Exercise (TVIS), day 3

07:20-08:20 FE-2

Physical Exercise (RED)

07:45-08:15 CDR

Multi-Use Tether (MUT) Modification

08:15-08:30 CDR,FE-1 Fresnel lens install in Orlan 08:30-09:30 .

Review Airlock Ops Procedure per RODF "EVA from DC1". Tagup with specialists (VHF+S-band)

09:30-10:30 .

LUNCH

10:30-10:40 FE-1

PLANTS-2. Photography

10:30-11:30 FE-2

DOUG Software Review

10:40-11:20 FE-1

Filling EDV [KOB] (separation) for Elektron

10:50-10:55

Configure Cameras for 2B Solar Array Wing Survey

10:55-11:10 CDR

Removal of sealing cover from window #13 in SM ПхО during survey of SA 2В.

11:10-11:40

Photo/TV 2B Solar Array Wing Survey

11:20-11:50 FE-1

СОЖ Maintenance

11:30-12:30 FE-2

SSRMS checkout

11:50-12:50 FE-1

Physical Exercise (VELO + RED) day 3

12:30-14:00 FE-2

Physical Exercise (CEVIS)

12:45-13:15 CDR

Photo/TV 2B Solar Array Wing Survey

13:00-13:20 FE-1

Testing КВД [Pressure Equalization Vlv] from ПОВ panels in ПхО and in DC1 DC1 Comm Config

13:15-13:30 CDR

Installation of sealing cover on window #13 in SM ПхО after survey of SA 2В

13:30-13:40 FE-1

Medical Kit config for EVA

13:45-14:45 CDR,FE-1 Install Progress 359 Docking Mechanism 14:00-15:30 FE-2

SSRMS checkout

14:45-15:30 FE-1

Progress 359 activation, air duct dismantling

14:50-15:30 CDR

Portable Repress Tank (БНП) set up in РО (Working Compartment) (#3 п.1, 001473R, СМ1ПхО_4)

15:30-15:50 CDR,FE-1 Removal of quick-release screw clamps from DC1 15:30-15:35 15:35-16:15

FE-2

Transfer TVIS/RED/CEVIS/HRM data to MEC Evening work prep

15:50-16:10 CDR,FE-1 DC1-Progress transfer hatch closure 16:10-17:10 FE-1

DC1-СУ and СУ-Progress hatch leak check

16:10-16:20 CDR

Daily Food Prep

16:15-16:40 FE-2

Daily Food Prep

16:20-16:35

Private Family Conference (S + Ku-band)

16:35-16:40

CDR

Daily Food Prep

16:40-17:10 CDR,FE-2 DINNER 17:10-17:25 .

Daily Planning Conference (S-band)

17:25-17:55 FE-1

DINNER

17:25-18:30 FE-2

Pre-sleep

17:25-17:55 CDR

Installation of additional Portable Repress Tank (БНП) in DC1 In-flight comm procedures

17:55-18:30 CDR,FE-1 Pre-sleep 18:30-03:00 . Task List

FE-1

SLEEP ТБУ (Universal Bioengineering Thermostat). Temperature check

PLANTS-2. Payload status check Note: See OSTP for references to US activities. End of Radiogram

Related Documents