Nasa 167987main 01 25 2007 Tl

  • October 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Nasa 167987main 01 25 2007 Tl as PDF for free.

More details

  • Words: 339
  • Pages: 2
Radiogram No. 4576u Form 24 for 01/25/07 Progress 359 Transfers. СОТР Hardware Installation GMT

CREW

ACTIVITY

08:30-08:40

Morning Inspection

08:40-09:10

Post-sleep

09:10-10:00

BREAKFAST

10:00-10:10

Prep for Work

10:10-10:25

Daily Planning Conference (S-band)

10:25-10:45 CDR

Prep for Work

10:25-10:30 FE-1

Prep for Work

10:25-10:40 FE-2

Prep for Work

10:30-13:00 FE-1

Installation of vibration isolator for ВСЭП1 and muffler for fans ВСЭП1, ВПО10, ВПО11. Tagup (S-band)

10:40-10:50 FE-2

Terminate BSA battery charge

10:50-11:10 FE-2

Start BSA battery charge

11:05-11:10 CDR

Connect DCP power cable

11:10-11:40 CDR, FE-2 Installation of REBA batteries 11:40-11:55 CDR, FE-2 REBA powered equipment test 11:55-12:25 CDR, FE-2 PGT test 12:25-13:25 CDR

Physical Exercise (RED)

12:25-12:55 FE-2

Degassing P/L water tank

12:55-14:10 FE-2

EMU-LVCG water charge

13:00-14:15 FE-1

Physical Exercise (TVIS) day 2

13:25-13:40 CDR

SLEEP - Actiwatch set up

13:40-14:20 CDR

SLEEP - data upload and initialization of two Actiwatch devices

14:15-14:20 FE-2

HAM radio setup

14:15-14:30 FE-1

Crew prep for PAO

14:20-14:30 FE-2

HAM radio session

14:20-14:30 CDR

PAO hardware setup

14:30-15:00

Telebridge with Expolang-2007 competition winners in Paris (Ku + S-band)

15:00-15:45 CDR

Filling CWC from the Lab Condensate Tank

15:00-15:40 FE-1

Filling EDV [KOB] (separation) for Elektron

15:00-16:00 FE-2

Physical Exercise (RED)

15:40-16:10 FE-1

СОЖ Maintenance

15:45-15:55 CDR

CWC audit

16:00-17:00 CDR, FE-2 LUNCH 16:10-17:10 FE-1

LUNCH

17:00-18:45 CDR, FE-2 EVA procedure review 17:10-17:20 FE-1

PLANTS-2. Data downlink

17:20-19:00 FE-1

Progress 359 transfers and IMS updates

18:45-19:30 CDR, FE-2 EVA tagup with MCC (S-band) 19:00-19:10 FE-1

PLANTS-2. Data downlink

19:25-19:45 FE-1

IMS Update

19:30-21:00 FE-2

Physical Exercise (TVIS)

19:30-19:45 CDR

SLEEP - Actiwatch stow

19:45-21:15 CDR

Physical Exercise (CEVIS)

19:45-20:45 FE-1

Physical Exercise (VELO+RED) day 2

20:45-21:45 FE-1

Report prep

21:00-21:40 FE-2

Report prep

21:15-21:20 CDR

Disconnect Display and Control Panel (DCP) power cable

21:20-21:45 CDR

Report prep

21:40-21:45 FE-2

Transfer TVIS/RED/CEVIS/HRM data to MEC

21:45-21:55

Daily food prep

21:55-22:10

Daily Planning Conference (S-band)

22:10-22:30

Daily Food Prep

22:30-23:00

DINNER

23:00-00:00

Pre-sleep

00:00-08:30

SLEEP

FE-1 ТБУ (Universal Bioengineering Thermostat). Temperature check Task List Note: See OSTP for references to US activities. End of Radiogram

Related Documents