Radiogram No. 4576u Form 24 for 01/25/07 Progress 359 Transfers. СОТР Hardware Installation GMT
CREW
ACTIVITY
08:30-08:40
Morning Inspection
08:40-09:10
Post-sleep
09:10-10:00
BREAKFAST
10:00-10:10
Prep for Work
10:10-10:25
Daily Planning Conference (S-band)
10:25-10:45 CDR
Prep for Work
10:25-10:30 FE-1
Prep for Work
10:25-10:40 FE-2
Prep for Work
10:30-13:00 FE-1
Installation of vibration isolator for ВСЭП1 and muffler for fans ВСЭП1, ВПО10, ВПО11. Tagup (S-band)
10:40-10:50 FE-2
Terminate BSA battery charge
10:50-11:10 FE-2
Start BSA battery charge
11:05-11:10 CDR
Connect DCP power cable
11:10-11:40 CDR, FE-2 Installation of REBA batteries 11:40-11:55 CDR, FE-2 REBA powered equipment test 11:55-12:25 CDR, FE-2 PGT test 12:25-13:25 CDR
Physical Exercise (RED)
12:25-12:55 FE-2
Degassing P/L water tank
12:55-14:10 FE-2
EMU-LVCG water charge
13:00-14:15 FE-1
Physical Exercise (TVIS) day 2
13:25-13:40 CDR
SLEEP - Actiwatch set up
13:40-14:20 CDR
SLEEP - data upload and initialization of two Actiwatch devices
14:15-14:20 FE-2
HAM radio setup
14:15-14:30 FE-1
Crew prep for PAO
14:20-14:30 FE-2
HAM radio session
14:20-14:30 CDR
PAO hardware setup
14:30-15:00
Telebridge with Expolang-2007 competition winners in Paris (Ku + S-band)
15:00-15:45 CDR
Filling CWC from the Lab Condensate Tank
15:00-15:40 FE-1
Filling EDV [KOB] (separation) for Elektron
15:00-16:00 FE-2
Physical Exercise (RED)
15:40-16:10 FE-1
СОЖ Maintenance
15:45-15:55 CDR
CWC audit
16:00-17:00 CDR, FE-2 LUNCH 16:10-17:10 FE-1
LUNCH
17:00-18:45 CDR, FE-2 EVA procedure review 17:10-17:20 FE-1
PLANTS-2. Data downlink
17:20-19:00 FE-1
Progress 359 transfers and IMS updates
18:45-19:30 CDR, FE-2 EVA tagup with MCC (S-band) 19:00-19:10 FE-1
PLANTS-2. Data downlink
19:25-19:45 FE-1
IMS Update
19:30-21:00 FE-2
Physical Exercise (TVIS)
19:30-19:45 CDR
SLEEP - Actiwatch stow
19:45-21:15 CDR
Physical Exercise (CEVIS)
19:45-20:45 FE-1
Physical Exercise (VELO+RED) day 2
20:45-21:45 FE-1
Report prep
21:00-21:40 FE-2
Report prep
21:15-21:20 CDR
Disconnect Display and Control Panel (DCP) power cable
21:20-21:45 CDR
Report prep
21:40-21:45 FE-2
Transfer TVIS/RED/CEVIS/HRM data to MEC
21:45-21:55
Daily food prep
21:55-22:10
Daily Planning Conference (S-band)
22:10-22:30
Daily Food Prep
22:30-23:00
DINNER
23:00-00:00
Pre-sleep
00:00-08:30
SLEEP
FE-1 ТБУ (Universal Bioengineering Thermostat). Temperature check Task List Note: See OSTP for references to US activities. End of Radiogram