Mtdf 2009-12 Development Programme 2009-10 2009-10 Punjab V-i

  • Uploaded by: Ahmad Mahmood Chaudhary
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Mtdf 2009-12 Development Programme 2009-10 2009-10 Punjab V-i as PDF for free.

More details

  • Words: 159,268
  • Pages: 582
GOVERNMENT OF THE PUNJAB

MTDF 2009-12 DEVELOPMENT PROGRAMME 2009-10 VOLUME - I

SOCIAL SECTORS Sr No

Sector

1

School Education

2

Higher Education

3

Special Education

4

Literacy

5

Sports

6

Health

7

Water Supply & Sanitation

8

Social Protection

9

Regional Planning

10

LG&CD

7

School Education

8

SCHOOL EDUCATION

VISION Enlightened and prosperous Punjab through equitable opportunities for quality education. TREND OF ALLOCATIONS Years 2005-06 2006-07 2007-08 2008-09 2009-10

(Rs. in million) Revised Allocation

Original Allocation 2000.000 3305.000 8488.000 16454.000

2020.344 1151.529 8305.514 9661.025 13,600.000

POLICY INTERVENTIONS Ensure achievement of education related Millennium Development Goals by 2015: •

Universal Primary Education.



Completion of full Primary Schooling by all Children.



Promote Gender Equality.



Ensure 100% participation rate at primary level by 2011 and participation enhancement at the elementary & secondary level;



Improving quality of education;



Promotion of science & computer education upto secondary level;



Reduction in gender and regional disparity in access to education;



Equitable access to learning and life skills;



Provision of Quality Education to most deprived and marginalized segments of society.

9

SECTORAL PRIORITY •

Education is the inherent right of all children. For providing quality education, different interventions like capacity building of teachers as well as education managers; continued assessment of learning achievement through examinations; provision of quality text books; I.T. labs; and state of the art libraries have already been introduced. In addition, up gradation of girls’ schools from primary to middle in general and from Middle to high, in particular, will be the target areas during CFY 2009-10.

TARGETS INTERVENTION

Targets 2008-09 Achievements 2008-09

Establishment / Upgradation of Schools

Targets 2009-10 2010-11 2011-12

1050

1100

900

1200

1400

122,087

120,000

122,100

122,300

122,400

Provision of Computers in 4286 High / Higher Secondary Schools in Punjab

-

-

4,286

-

-

Establishment of Centers of Excellence & Daanish Schools in Punjab

-

-

234

144

-

Provision of Edible Oil for promoting education among girls students (metric tons)

4,126

3,392

3,763

4,330

-

Provision of Missing Facilities in Schools

2,800

2,791

1,500

1,500

-

Training of School Teachers and Managers

10

STRATEGIC INTERVENTIONS Establishment of Punjab Daanish School System (PDSS):

Provision of quality education is a high priority area of the Government and therefore it has been decided to set up Daanish School System and convert existing schools in public sector as Centers of Excellence to achieve this goal. Poorest of the poor will get education of the standards of richest of the rich in PDSS which may be termed as ‘Aitchison of the Poor’. It will target the most deprived and marginalized segments of the society. The main objectives of Daanish School System are as under: •

To provide quality education to most deprived and marginalized segments of the society.



To combine the best features of traditional education in the context of progressive Islamic and modern learning paradigm with prime focus on science subjects.



To develop the students’ intellect, character and physique, thereby enabling them to make purposeful contribution to the community at the micro level and to the nation at the national level.



To cater for the overall development of marginalized students with emphasis on academics, sports and physical education mixed with social/cultural activities. Ninety Daanish Schools will be established and 144 existing schools will be converted into Centers of Excellence. Major components of the

scheme include (a) Provision of infrastructural facilities (b) Free boarding and lodging facilities (c) Establishment of science and I.T. Labs (d) Establishment of Libraries and (e) Provision of transport facilities.

11

Provision of Computer / I.T. Education in Secondary and Higher Secondary Schools: In order to better equip the students with I.T. education, 4286 I.T. Labs are being established at high and higher secondary level. Employment opportunities for I.T. trained personnel would also be created. Provision of Equipment for Vocational Training in 1050 High Schools: To equip the students with market based skills, it has been proposed to provide skill development courses in secondary schools both for male and female. Trades like stitching, flower making, paintings, dress designing, plumbing, electricity and woodwork will be introduced in these schools. In the first phase, 1050 secondary schools (male & female) will be targeted.

Introduction of English as a Medium of Instructions: Parallel to O’level and A’level, the Government has introduced English as the Medium of instruction in 2205 Schools this year all over the Punjab.

MINIMUM SERVICE DELIVERY STANDARDS-SCHOOL EDUCATION Establishment of a New Primary School: Minimum Requirements

Urban Areas

Rural Areas

1500

500

--

25

1 km

1.5 km

1 kanal

2 kanals

Population Number of Households Distance from nearest primary school Availability of land

12

Criteria for Upgradation of Schools: From Primary to Middle School: Boys Schools

Girls Schools

25 Marlas

20 Marlas

Total enrolment

100 Students

80 Students

Total enrolment in Class IV & V

20 Students

15 Students

Area

From Middle to High School: Boys Schools

Girls Schools

60 Marlas

40 Marlas

Total enrolment

200 Students

150 Students

Total enrolment in Class VII & VIII

40 Students

30 Students

Area

From High to Higher Secondary School: •

Location

at

Tehsil

Headquarters/Markaz

headquarters

to

be

determined/decided

by

the

Provincial

identification/recommendation of District Government. •

No college/higher secondary school should exist in a radius of 10 km in case of girls and 20 km in case of boys.



Minimum land requirement is 16 kanals. However, it could be less in urban areas with a vertical structure.

13

Government

upon

MTDF 2009-12 School Education: Summary Development Programme 2009-10 (Million Rs) Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Regular

1.861 4,148.139 4,150.000

0.000 4,150.000

0.000

1,000.000

1,000.000

0.000

1,000.000

1.861

5,148.139

5,150.000

0.000

5,150.000

Provision of Missing Facilities

0.000 4,000.000 4,000.000

0.000 4,000.000

0.000

0.000

0.000

0.000

0.000

0.000

4,000.000

4,000.000

0.000

4,000.000

Provision for Incomplete APSE Schemes

0.000

250.000

250.000

0.000

250.000

0.000

0.000

0.000

0.000

0.000

0.000

250.000

250.000

0.000

250.000

Accelerated Programme for School Education

0.000

0.000

0.000

0.000

0.000

0.000

700.000

700.000

0.000

700.000

0.000

700.000

700.000

0.000

700.000

Upgradation of Schools from Primary to Middle

0.000

0.000

0.000

0.000

0.000

0.000

2,500.000

2,500.000

0.000

2,500.000

0.000

2,500.000

2,500.000

0.000

2,500.000

Upgradation of Schools from Middle to High

0.000

0.000

0.000

0.000

0.000

0.000

1,000.000

1,000.000

0.000

1,000.000

0.000

1,000.000

1,000.000

0.000

1,000.000

Total

1.861 8,398.139 8,400.000

0.000 8,400.000

0.000

5,200.000

5,200.000

0.000

5,200.000

1.861 13,598.139

13,600.000

43

Number of Schemes

7

0.000 13,600.000

50

Development Programme 2010-11 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Regular

0.000 1,106.833 1,106.833

0.000 1,106.833

0.000

1,593.167

1,593.167

0.000

1,593.167

0.000

2,700.000

2,700.000

0.000

2,700.000

Provision of Missing Facilities

0.000 3,000.000 3,000.000

0.000 3,000.000

0.000

0.000

0.000

0.000

0.000

0.000

3,000.000

3,000.000

0.000

3,000.000

Provision for Incomplete APSE Schemes

0.000 1,000.000 1,000.000

0.000 1,000.000

0.000

0.000

0.000

0.000

0.000

0.000

1,000.000

1,000.000

0.000

1,000.000

Accelerated Programme for School Education

0.000

0.000

0.000

0.000

0.000

0.000

2,500.000

2,500.000

0.000

2,500.000

0.000

2,500.000

2,500.000

0.000

2,500.000

Upgradation of Schools from Primary to Middle

0.000

0.000

0.000

0.000

0.000

0.000

4,500.000

4,500.000

0.000

4,500.000

0.000

4,500.000

4,500.000

0.000

4,500.000

Upgradation of Schools from Middle to High

0.000

0.000

0.000

0.000

0.000

0.000

2,300.000

2,300.000

0.000

2,300.000

0.000

2,300.000

2,300.000

0.000

2,300.000

Total

0.000 5,106.833 5,106.833

0.000 10,893.167 10,893.167

0.000

10,893.167

0.000 16,000.000

16,000.000

0.000 5,106.833

14

0.000 16,000.000

Development Programme 2011-12 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Regular

0.000 1,750.000 1,750.000

0.000 1,750.000

0.000

1,150.000

1,150.000

0.000

1,150.000

0.000

2,900.000

2,900.000

0.000

2,900.000

Provision of Missing Facilities

0.000 4,000.000 4,000.000

0.000 4,000.000

0.000

0.000

0.000

0.000

0.000

0.000

4,000.000

4,000.000

0.000

4,000.000

Provision for Incomplete APSE Schemes

0.000 1,000.000 1,000.000

0.000 1,000.000

0.000

0.000

0.000

0.000

0.000

0.000

1,000.000

1,000.000

0.000

1,000.000

Accelerated Programme for School Education

0.000

0.000

0.000

0.000

0.000

0.000

2,000.000

2,000.000

0.000

2,000.000

0.000

2,000.000

2,000.000

0.000

2,000.000

Upgradation of Schools from Primary to Middle

0.000

0.000

0.000

0.000

0.000

0.000

5,500.000

5,500.000

0.000

5,500.000

0.000

5,500.000

5,500.000

0.000

5,500.000

Upgradation of Schools from Middle to High

0.000

0.000

0.000

0.000

0.000

0.000

3,300.000

3,300.000

0.000

3,300.000

0.000

3,300.000

3,300.000

0.000

3,300.000

Total

0.000 6,750.000 6,750.000

0.000 11,950.000 11,950.000

0.000

11,950.000

0.000 18,700.000

18,700.000

0.000 6,750.000

SCHOOL EDUCATION - MTDF 2009-12 - GRAND TOTAL

15

0.000 18,700.000 48,300.000

SCHOOL EDUCATION: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES 7

1.861

4,148.139

0.000

0.000

1.861

4,148.139

4,150.000

558.960

0.000

35

0.000

4,000.000

0.000

0.000

0.000

4,000.000

4,000.000

0.000

0.000

1

0.000

250.000

0.000

0.000

0.000

250.000

250.000

0.000

0.000

43

1.861

8,398.139

0.000

0.000

1.861

8,398.139

8,400.000

558.960

0.000

Regular

4

0.000

1,000.000

0.000

0.000

0.000

1,000.000

1,000.000

547.873

84.873

Accelerated Programme for School Education

1

0.000

700.000

0.000

0.000

0.000

700.000

700.000

0.000

0.000

Upgradation of Schools from Primary to Middle

1

0.000

2,500.000

0.000

0.000

0.000

2,500.000

2,500.000

0.000

0.000

Upgradation of Schools from Middle to High

1

0.000

1,000.000

0.000

0.000

0.000

1,000.000

1,000.000

0.000

0.000

Total: NEW SCHEMES

7

0.000

5,200.000

0.000

0.000

0.000

5,200.000

5,200.000

547.873

84.873

50

1.861

13,598.139

0.000

0.000

1.861

13,598.139

13,600.000

1,106.833

84.873

Regular Provision of missing facilities Provision for Incomplete APSE Schemes Total: ON-GOING SCHEMES NEW SCHEMES

Grand Total

16

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

ON-GOING SCHEMES Regular 1

2

3

1 Name of the Scheme

Repair / Maintenance of Boys Scouts Building Damaged due to Earth Quake at Summer Training Centre Ghora Gali Murree Hills.

Approval Date

Approved 28-05-2009

Major Components

Repair / Maintenance and furniture, equipment etc.

Major Targets

Refurbishing existing Boys Scouts Building demaged due to earth quake.

District and Tehsil

Rawalpindi , Murree

2 Name of the Scheme

Provision of computers/ IT education in 4286 high/ higher secondary schools in Punjab

Approval Date

Approved 12-02-2009

Major Components

Establishmernt of IT labs in High/ HSS in Punjab

Major Targets

Provision of IT Education

District and Tehsil

Punjab

3 Name of the Scheme

Capacity building of School Councils (Non-Pilot Districts)

Approval Date

Approved 28-11-2008

Major Components

Capacity Building/Training of School Councils

Major Targets

Capacity Building/Training of School Councils

District and Tehsil

Punjab

0.000

6.477

3.060

1.861

1.556

0.000

0.000

1.861

1.556

3.417

0.000

0.000

0.000

0.000

4,997.851

2,068.851

0.000

2,929.000

0.000

0.000

0.000

2,929.000

2,929.000

0.000

0.000

0.000

0.000

780.858

82.030

0.000

438.572

0.000

0.000

0.000

438.572

438.572

260.256

0.000

0.000

17

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

4

5

6

7

4 Name of the Scheme

Connectivity of IT Labs and Capacity Building of IT Teachers in Punjab

Approval Date

Approved 12-02-2009

Major Components

Provision of Networking, Ducting and Cabling for IT Labs in 4286 Schools

Major Targets

Provision of Networking, Ducting and Cabling for IT Labs in 4286 Schools

District and Tehsil

Punjab

5 Name of the Scheme

Capacity Building of Education Department at District level.

Approval Date

Approved 12-2-2006

Major Components

Provision of Vehicles. Provision of Computers Training. Testing

Major Targets

Training/Testing, Provision of Computers, Provision of Transport Facilities to EDOs

District and Tehsil

Punjab

6 Name of the Scheme

Promotion of Primary Education for girls in rural areas (W.F.P) (Revised)

Approval Date

Approved 12-07-2004

Major Components

Provision of edible oil

Major Targets

Provision of edible oil to 123,000 students of 700 schools of seven backward districts.

District and Tehsil

Punjab

7 Name of the Scheme

Provision of Building for Punjab Examination Commission

Approval Date

Approved 03-01-2009

Major Components

Civil Work & Furniture etc.

Major Targets

Construction of building for Punjab Examination Commission

District and Tehsil

Punjab

Sub-Total: Regular

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

1,090.912

600.000

0.000

306.000

0.000

0.000

0.000

306.000

306.000

184.912

0.000

0.000

0.000

530.000

95.360

0.000

400.000

0.000

0.000

0.000

400.000

400.000

34.640

0.000

0.000

1,805.353

2,076.156

499.596

0.000

68.792

0.000

0.000

0.000

68.792

68.792

79.152

0.000

0.000

0.000

26.092

21.873

0.000

4.219

0.000

0.000

0.000

4.219

4.219

0.000

0.000

0.000

9,508.346

3,370.770

1,805.353

1.861 4,148.139

18

0.000

0.000

1.861 4,148.139

4,150.000

558.960

0.000

0.000

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

Provision of missing facilities 8

8 Name of the Scheme

Provision of missing facilities in 42 Schools of District Rawalpindi

0.000

111.576

0.000

0.000

111.576

0.000

0.000

0.000

111.576

111.576

0.000

0.000

0.000

0.000

135.742

0.000

0.000

135.742

0.000

0.000

0.000

135.742

135.742

0.000

0.000

0.000

0.000

87.563

0.000

0.000

87.563

0.000

0.000

0.000

87.563

87.563

0.000

0.000

0.000

0.000

85.024

0.000

0.000

85.024

0.000

0.000

0.000

85.024

85.024

0.000

0.000

0.000

0.000

108.896

0.000

0.000

108.896

0.000

0.000

0.000

108.896

108.896

0.000

0.000

0.000

Approval Date

9

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Rawalpindi

9 Name of the Scheme

Provision of missing facilities in 52 Schools of District Attock

Approval Date

10

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Attock

10 Name of the Scheme

Provision of missing facilities in 33 Schools of District Chakwal

Approval Date

11

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Chakwal

11 Name of the Scheme

Provision of missing facilities in 31 Schools of District Jhelum

Approval Date

12

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Jhelum

12 Name of the Scheme

Provision of missing facilities in 41 Schools of District Sargodha

Approval Date Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Sargodha

19

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

13

13 Name of the Scheme

Provision of missing facilities in 50 Schools of District Khushab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

131.293

0.000

0.000

131.293

0.000

0.000

0.000

131.293

131.293

0.000

0.000

0.000

0.000

131.166

0.000

0.000

131.166

0.000

0.000

0.000

131.166

131.166

0.000

0.000

0.000

0.000

107.507

0.000

0.000

107.507

0.000

0.000

0.000

107.507

107.507

0.000

0.000

0.000

0.000

154.677

0.000

0.000

154.677

0.000

0.000

0.000

154.677

154.677

0.000

0.000

0.000

0.000

134.858

0.000

0.000

134.858

0.000

0.000

0.000

134.858

134.858

0.000

0.000

0.000

Approval Date

14

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Khushab

14 Name of the Scheme

Provision of missing facilities in 49 Schools of District Mianwali

Approval Date

15

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Mianwali

15 Name of the Scheme

Provision of missing facilities in 40 Schools of District Bhakkar

Approval Date

16

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Bhakkar

16 Name of the Scheme

Provision of missing facilities in 58 Schools of District Faisalabad

Approval Date

17

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Faisalabad

17 Name of the Scheme

Provision of missing facilities in 50 Schools of District Jhang

Approval Date Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Jhang

20

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

18

18 Name of the Scheme

Provision of missing facilities in 51 Schools of District T.T. Singh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

135.973

0.000

0.000

135.973

0.000

0.000

0.000

135.973

135.973

0.000

0.000

0.000

0.000

105.182

0.000

0.000

105.182

0.000

0.000

0.000

105.182

105.182

0.000

0.000

0.000

0.000

83.997

0.000

0.000

83.997

0.000

0.000

0.000

83.997

83.997

0.000

0.000

0.000

0.000

128.666

0.000

0.000

128.666

0.000

0.000

0.000

128.666

128.666

0.000

0.000

0.000

0.000

63.488

0.000

0.000

63.488

0.000

0.000

0.000

63.488

63.488

0.000

0.000

0.000

Approval Date

19

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Toba Tek Singh

19 Name of the Scheme

Provision of missing facilities in 39 Schools of District Gujranwala

Approval Date

20

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Gujranwala

20 Name of the Scheme

Provision of missing facilities in 31 Schools of District Hafizabad

Approval Date

21

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Hafizabad

21 Name of the Scheme

Provision of missing facilities in 48 Schools of District Gujrat

Approval Date

22

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Gujrat

22 Name of the Scheme

Provision of missing facilities in 24 Schools of District M.B. Din

Approval Date Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Mandi Bahauddin

21

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

23

23 Name of the Scheme

Provision of missing facilities in 32 Schools of District Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

85.928

0.000

0.000

85.928

0.000

0.000

0.000

85.928

85.928

0.000

0.000

0.000

0.000

116.902

0.000

0.000

116.902

0.000

0.000

0.000

116.902

116.902

0.000

0.000

0.000

0.000

144.349

0.000

0.000

144.349

0.000

0.000

0.000

144.349

144.349

0.000

0.000

0.000

0.000

140.240

0.000

0.000

140.240

0.000

0.000

0.000

140.240

140.240

0.000

0.000

0.000

0.000

134.866

0.000

0.000

134.866

0.000

0.000

0.000

134.866

134.866

0.000

0.000

0.000

Approval Date

24

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Sialkot

24 Name of the Scheme

Provision of missing facilities in 44 Schools of District Narowal

Approval Date

25

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Narowal

25 Name of the Scheme

Provision of missing facilities in 54 Schools of District Lahore

Approval Date

26

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Lahore

26 Name of the Scheme

Provision of missing facilities in 53 Schools of District Sheikhupura

Approval Date

27

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Sheikhupura

27 Name of the Scheme

Provision of missing facilities in 51 Schools of District Nankana Sahib

Approval Date Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Nankana Sahib

22

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

28

28 Name of the Scheme

Provision of missing facilities in 39 Schools of District Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

105.442

0.000

0.000

105.442

0.000

0.000

0.000

105.442

105.442

0.000

0.000

0.000

0.000

85.870

0.000

0.000

85.870

0.000

0.000

0.000

85.870

85.870

0.000

0.000

0.000

0.000

123.222

0.000

0.000

123.222

0.000

0.000

0.000

123.222

123.222

0.000

0.000

0.000

0.000

120.866

0.000

0.000

120.866

0.000

0.000

0.000

120.866

120.866

0.000

0.000

0.000

0.000

101.040

0.000

0.000

101.040

0.000

0.000

0.000

101.040

101.040

0.000

0.000

0.000

Approval Date

29

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Kasur

29 Name of the Scheme

Provision of missing facilities in 32 Schools of District Okara

Approval Date

30

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Okara

30 Name of the Scheme

Provision of missing facilities in 46 Schools of District Multan

Approval Date

31

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Multan

31 Name of the Scheme

Provision of missing facilities in 45 Schools of District Lodhran

Approval Date

32

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Lodhran

32 Name of the Scheme

Provision of missing facilities in 38 Schools of District Khanewal

Approval Date Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Khanewal

23

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

33

33 Name of the Scheme

Provision of missing facilities in 42 Schools of District Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

112.651

0.000

0.000

112.651

0.000

0.000

0.000

112.651

112.651

0.000

0.000

0.000

0.000

102.438

0.000

0.000

102.438

0.000

0.000

0.000

102.438

102.438

0.000

0.000

0.000

0.000

132.106

0.000

0.000

132.106

0.000

0.000

0.000

132.106

132.106

0.000

0.000

0.000

0.000

115.765

0.000

0.000

115.765

0.000

0.000

0.000

115.765

115.765

0.000

0.000

0.000

0.000

91.614

0.000

0.000

91.614

0.000

0.000

0.000

91.614

91.614

0.000

0.000

0.000

Approval Date

34

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Sahiwal

34 Name of the Scheme

Provision of missing facilities in 39 Schools of District Pakpattan

Approval Date

35

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Pakpattan

35 Name of the Scheme

Provision of missing facilities in 50 Schools of District Vehari

Approval Date

36

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Vehari

36 Name of the Scheme

Provision of missing facilities in 43 Schools of District D.G. Khan

Approval Date

37

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Dera Ghazi Khan

37 Name of the Scheme

Provision of missing facilities in 34 Schools of District Rajanpur

Approval Date Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Rajanpur

24

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

38

38 Name of the Scheme

Provision of missing facilities in 43 Schools of District M/Garh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

114.525

0.000

0.000

114.525

0.000

0.000

0.000

114.525

114.525

0.000

0.000

0.000

0.000

103.189

0.000

0.000

103.189

0.000

0.000

0.000

103.189

103.189

0.000

0.000

0.000

0.000

121.946

0.000

0.000

121.946

0.000

0.000

0.000

121.946

121.946

0.000

0.000

0.000

0.000

106.994

0.000

0.000

106.994

0.000

0.000

0.000

106.994

106.994

0.000

0.000

0.000

0.000

134.440

0.000

0.000

134.440

0.000

0.000

0.000

134.440

134.440

0.000

0.000

0.000

0.000

4,000.000

4,000.000

0.000

Approval Date

39

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Muzaffargarh

39 Name of the Scheme

Provision of missing facilities in 39 Schools of District Layyah

Approval Date

40

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Layyah

40 Name of the Scheme

Provision of missing facilities in 46 Schools of District B/Pur

Approval Date

41

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Bahawalpur

41 Name of the Scheme

Provision of missing facilities in 40 Schools of District B/Nagar

Approval Date

42

Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Bahawalnagar

42 Name of the Scheme

Provision of missing facilities in 51 Schools of District R.Y. Khan

Approval Date Major Components

Provision of Missing facilities etc.

Major Targets

Provision of Missing facilities etc.

District and Tehsil

Rahim Yar Khan

Sub-Total: Provision of missing facilities

0.000

0.000 4,000.000

25

0.000

0.000

0.000 4,000.000

0.000

0.000

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

0.000

0.000

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

Provision for Incomplete APSE Schemes 43

43 Name of the Scheme

Provision for Incomplete APSE Schemes of 2008-09

Approval Date

Approved

Major Components

Civil Work & Furniture etc.

Major Targets

Civil Work & Furniture etc.

District and Tehsil

Punjab

Sub-Total: Provision for Incomplete APSE Schemes Total: ON-GOING SCHEMES

0.000

250.000

250.000

0.000

0.000

0.000

250.000

250.000

0.000

0.000

0.000

250.000

0.000

0.000

0.000

250.000

250.000

0.000

0.000

0.000

1.861 8,398.139

0.000

0.000

1.861 8,398.139

8,400.000

558.960

0.000

0.000

84.873

84.873

84.873

84.873

0.000

0.000

315.000

315.000

263.000

0.000

0.000

0.000

300.127

300.127

0.000

0.000

0.000

0.000

250.000

0.000

0.000

1,805.353

13,758.346

3,370.770

0.000

254.619

0.000

0.000

84.873

0.000

0.000

0.000

0.000

578.000

0.000

0.000

315.000

0.000

0.000

0.000

300.127

0.000

0.000

300.127

0.000

0.000

NEW SCHEMES Regular 44

45

46

44 Name of the Scheme

Internal Merit Scholarships

Approval Date

Un-Approved

Major Components

Prov. of Scholarship to talented students

Major Targets

Prov. of Scholarship to students in Punjab

District and Tehsil

Punjab

45 Name of the Scheme

Provision of equipment for Vocational training in 1050 High Schools (male & female) @ 30 schools per district

Approval Date

Un-Approved

Major Components

Prov. of equipment for Stitching, Dress Designing, Electricity / Electronics, Plumbing etc.

Major Targets

Prov. of equipment for Stitching, Dress Designing, Electricity/Electronics, Plumbing etc.

District and Tehsil

Punjab

46 Name of the Scheme

Construction of DPI's office complex at Lahore.

Approval Date

Un-Approved

Major Components

Civil Work & Furniture etc.

Major Targets

Civil Work & Furniture etc.

District and Tehsil

Punjab 26

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

300.000

200.000

0.000

1,000.000

547.873

84.873

700.000

0.000

0.000

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

47

47 Name of the Scheme

Up gradation / Establishment of Labs schools in GCETs.

Approval Date

Un-Approved

Major Components

Provision of additional class rooms, lab equipment & furnuture etc.

Major Targets

Provision of additional class rooms, lab equipment & furnuture etc.

District and Tehsil

Punjab

Sub-Total: Regular

Estimated Cost F. Aid 4

Total 5

0.000

500.000

0.000

1,632.746

0.000

700.000

Exp. upto 2008-09

Local

6

Cap 7

0.000

0.000

0.000

Rev 8

300.000

0.000 1,000.000

Foreign Aid Cap Rev 9 10

0.000

0.000

0.000

0.000

Total Cap 11

0.000

Rev 12

300.000

0.000 1,000.000

0.000

0.000

Accelerated Programme for School Education 48

48 Name of the Scheme

Accelerated Programme for School Education

Approval Date

Un-Approved

Major Components

Establishment / Upgradation

Major Targets

Civil Work & Furniture etc.

District and Tehsil

Punjab

Sub-Total: Accelerated Programme for School Education

0.000

700.000

0.000

0.000

0.000

0.000

700.000

700.000

0.000

0.000

0.000

0.000

0.000

0.000

700.000

700.000

700.000

0.000

0.000

0.000

0.000

Upgradation of Schools from Primary to Middle 49

49 Name of the Scheme

Upgradation of 600 Schools from Primary to Middle

Approval Date

Un-Approved

Major Components

Upgradation of Schools from Primary to Middle

Major Targets

Civil Work & Furniture etc.

District and Tehsil

Punjab

Sub-Total: Upgradation of Schools from Primary to Middle

0.000

0.000

2,500.000

2,500.000

0.000

0.000

0.000

2,500.000

0.000 2,500.000

27

0.000

0.000

0.000

0.000

0.000

2,500.000

0.000 2,500.000

2,500.000

0.000

2,500.000

0.000

0.000

0.000

0.000

0.000

SCHOOL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

0.000

0.000

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

Upgradation of Schools from Middle to High 50

50 Name of the Scheme

Upgradation of 200 Schools from Middle to High

Approval Date

Un-Approved

Major Components

Upgradation of Schools from Middle to High

Major Targets

Civil Work & Furniture etc.

District and Tehsil

Punjab

0.000

1,000.000

1,000.000

0.000

0.000

0.000

1,000.000

1,000.000

0.000

0.000

0.000

Sub-Total: Upgradation of Schools from Middle to High

0.000

1,000.000

0.000

0.000 1,000.000

0.000

0.000

0.000 1,000.000

1,000.000

0.000

0.000

0.000

Total: NEW SCHEMES

0.000

5,832.746

0.000

0.000 5,200.000

0.000

0.000

0.000 5,200.000

5,200.000

547.873

84.873

0.000

1,805.353

19,591.092

3,370.770

1.861 13,598.139

0.000

0.000

1.861 13,598.139

13,600.000

1,106.833

84.873

0.000

Grand Total

28

HIGHER EDUCATION

29

HIGHER EDUCATION VISION Enlightened and prospering Punjab reinforcing knowledge economy and equitable, quality learning at tertiary level. TREND OF ALLOCATIONS YEAR

ORIGINAL ALLOCATION 1200 2900 9936 9100

2005-05 2006-07 2007-08 2008-09 2009-10

REVISED ALLOCATION 1499.791 2749.24 4945.14 7257.579 6125

POLICY INTERVENTIONS •

Improving quality of education



Increasing equitable access to Higher Education



Rehabilitation and development of colleges infrastructure



Revamping college education by developing strong relationship between tertiary education and the job market

OBJECTIVES/STRATEGIC INTERVENTIONS •

Improving college infrastructure through provision of missing and additional facilities to public sector colleges



Promotion of Science and Computer education at tertiary level



Capacity building of college teachers as per need assessment



Capacity building of Managers / field officers of college sector



Use of MIS for decision making



Development of monitoring and evaluation system



Provision of merit scholarships for professional education

30

REFORMS INITIATED College Teachers Training For improved governance and quality education, capacity building & training of teachers and educational managers cannot be ignored. In the Higher Education Sector, no institutional arrangement existed for the training of teachers and managers. For this purpose, a scheme titled “Punjab College Teachers Training” was included in the Development Programme 2008-09. The Scheme is of specific and innovative nature. Due to non availability of modules for College Teachers’ training and diversified disciplines being offered in the colleges, the department intends to cover pedagogy, communication skills, class room management and the modules for the training skill. To realize the objectives into reality, Teachers’ Need Assessment was got conducted through a research team. The team after visiting 72 colleges of 18 districts interviewed 1042 teachers and 348 Principals / Heads of Departments, identified professional paradigm involved in the training of college teachers and proposed parameters for the training Programme. Accordingly, the scheme “Punjab College Teacher Training” with a cost of RS.727.722 million was got approved from the PDWP.

Internal Merit Scholarship for Professional Students To recognize the brilliance of talented students, a scheme for scholarship for professional students has been a part of Development Programme of Higher Education Sector. Taking into account the establishment of new universities in Public Sector and emerging disciplines like Polymer and Process Engineering, Energy and Power Engineering, Mechatronics and Control Engineering and Industrial and Manufacturing Engineering etc. implementations & mechanism of the scheme were redefined in Financial Year 2007-08. Parameters of the scheme: • The scholarship is for degree program •

Scholarship is to be awarded to the students enrolled in professional discipline in the Public Sector Universities / Institutions of the Punjab, on the basis of their merit



Scholarship is not to be awarded to the students admitted in the university on any quota or self finance



The Scholarship is to be paid annually and is continued for full study cycle



Scholarships cover annual academic charges of the institution (tuition fee etc.) as well as other expenses 31

Punjab Education Endowment Fund Punjab Educational Endowment Fund (PEEF) is an initiative of the Government of Punjab. It is established with the objective of providing scholarships/monetary assistance to talented and needy students for pursuing quality education with equal opportunities. To make it more efficient, transparent and autonomous in its functioning, it is established under Section 42 of the Companies Ordinance, 1984. The Endowment Fund has been established with initial seed money of Rs. 2 billion, which is proposed to be raised subsequently. Investment proceeds out of this fund will be utilized for the scholarship. At this point only students belonging to government institutions are being considered for these scholarships, however, the same shall be extended to other sectors in due course of time. These scholarships will be available for higher studies in both public and private institutions. Allocation of these scholarships will be on the basis of Tehsils and District wise results of students. More focus of these scholarships will be towards the fifteen less developed districts, especially from southern Punjab. Special quotas for orphans, children of govt. employees (up to BS-14) disabled, minorities and widows have also been allocated. Bright and needy students of other provinces including Azad Kashmir shall also be provided opportunities for higher education through this program. Establishment of Cluster Examination Centers at Tehsil Level At present eight Board of Intermediate and Secondary Educations(BISE) are functioning in Punjab. The Punjab Government has now planned to establish a new BISE for Sahiwal Division. The primary function of the Board is to conduct examination of secondary and intermediate levels. The Boards manage to conduct examination in the institutions affiliated with them. It has, however, been observed that make’ shift examination centers do not provide customized environment for the safe and secure conduct of examinations. Experience of a Cluster Centre established by BISE, Lahore shows the better conducting of examinations viz-a-viz temporary examination centers. Accordingly, two schemes for “Establishment of Cluster Examination Centers at district level” have been included in the Development Programme 2009-10. Provision of Missing Facilities to Colleges Punjab Government has embarked upon a comprehensive plan to enhance the quality of college education with special focus on improvement of physical infrastructure of colleges. Punjab Education Sector Reform Programme (PESRP) has been launched in college 32

sector since Financial Year 2006-07.Under PERSP, the Department is providing missing / additional infrastructure facilities like boundary wall, toilets, building, furniture etc. to the Colleges all over the Punjab. For provision of facilities to Colleges (non-civil work) like transport, equipment e.g. computers, photocopiers, faxes etc. an umbrella scheme has been approved by the PDWP for a cost of Rs. 1068.810 million.

TARGETS INTERVENTION Training of College Teachers. Training of College Managers Training of Master Trainers Rehabilitation/ Improvement of Public Sector Colleges under Missing Facilities Programme Establishment / Up gradation of Colleges

2008-09 TARGETS 3500

2008-09 ACHIEVEMENTS -

TARGET 2009-10 6400

TARGET 2010-11 6400

TARGET 2011-12 -

-

-

500

-

-

-

-

500

-

-

70

24

60

90

90

48

74

60

20

10

33

CRITERIA FOR ESTABLISHMENT OF DEGREE COLLEGE (PROPOSED) •

Minimum Population of the locality (Tehsil / Markz / Thana/Town): 35,000



There should be at least 200 & 75 in case of male and 100 & 40 in case of female passing out students in Matriculation &

Intermediate, respectively in last three consecutive years. •



Minimum Distance from already available College/facility in the vicinity:Category Male Rural 20 Km Urban 5 Km Minimum Land required

Female 10 Km 5 Km

i) For rural area ii) For Urban area iii) For Hilly area (Murree, Kahota & Kotli Satiyan Tehsils)

: 30-Kanals : 10-kanals : 3 to 4-kanals

NOTE:i. Inter College will not be established due to introduction of Higher Secondary Schools (HSS) scheme and plan to have four years Degree Programme under National Education Policy-1979. ii.

Data of population and classification of rural / urban part of the locality will be as per latest census figures of Bureau of

Statistics. iii. Suitability of land for construction shall be certified by the Buildings Department. iv. In case of non-availability of state land, the private land may be acquired / purchased on market rate, assessed by the District Revenue Office. v. The identified private land shall be preferably within ½ K.M from main road.

34

MTDF 2009-12 Higher Education : Summary Development Programme 2009-10 (Million Rs) Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Regular

455.582

709.764 1,165.346

0.000 1,165.346

70.000

55.000

125.000

0.000

125.000

Provision of Missing Facilities

531.000 1,029.000 1,560.000

0.000 1,560.000

0.000

0.000

0.000

0.000

Establishment of Colleges

733.418

29.236

762.654

0.000

762.654

0.000

0.000

0.000

Upgradation of Colleges Establishment / Upgradation of Colleges

385.000

127.000

512.000

0.000

512.000

0.000

0.000

0.000

0.000

0.000

0.000

Total

2,105.000 1,895.000 4,000.000

525.582

Revenue

Total

F. Aid

Total

764.764

1,290.346

0.000

1,290.346

0.000

531.000 1,029.000

1,560.000

0.000

1,560.000

0.000

0.000

733.418

29.236

762.654

0.000

762.654

0.000

0.000

0.000

385.000

127.000

512.000

0.000

512.000

0.000 2,000.000

0.000 2,000.000

0.000

2,000.000 2,000.000

0.000

2,000.000

0.000

2,000.000

0.000 4,000.000 2,070.000

55.000 2,125.000

0.000

2,125.000 4,175.000 1,950.000

6,125.000

0.000

6,125.000

124

Number of Schemes

Capital

9

133

DEVELOPMENT PROGRAMME 2010-11 New Schemes

On-Going Schemes

Total

Sub-Sector/ Department Capital Regular Provision of Missing Facilities Establishment / Upgradation of Colleges Total

1,208.000

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

0.000 1,208.000

0.000 1,208.000

242.000

50.000

292.000

0.000

0.000 2,500.000 2,500.000

0.000 2,500.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000 3,500.000

0.000 3,500.000

0.000

3,500.000 3,500.000

0.000 3,708.000 3,742.000

50.000 3,792.000

0.000

0.000

0.000

1,208.000 2,500.000 3,708.000

292.000 1,450.000

Revenue

Total

F. Aid

Total

50.000

1,500.000

0.000

1,500.000

0.000 2,500.000

2,500.000

0.000

2,500.000

0.000

3,500.000

0.000

3,500.000

3,792.000 4,950.000 2,550.000

7,500.000

0.000

7,500.000

0.000

DEVELOPMENT PROGRAMME 2011-12 On-Going Schemes

New Schemes

Total

Sub-Sector/ Department Capital Regular Provision of Missing Facilities Establishment / Upgradation of Colleges Total

855.000

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

220.000 1,075.000

0.000 1,075.000

350.000

75.000

425.000

0.000

0.000 3,000.000 3,000.000

0.000 3,000.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000 4,500.000

0.000 4,500.000

0.000

4,500.000 4,500.000

0.000 4,075.000 4,850.000

75.000 4,925.000

0.000

0.000

0.000

855.000 3,220.000 4,075.000

425.000 1,205.000

Revenue

Total

F. Aid

295.000

1,500.000

0.000

1,500.000

0.000 3,000.000

3,000.000

0.000

3,000.000

0.000

4,500.000

0.000

4,500.000

4,925.000 5,705.000 3,295.000

9,000.000

0.000

9,000.000

0.000

HIGHER EDUCATION - MTDF 2009-12 - GRAND TOTAL

35

Total

22,625.000

HIGHER EDUCATION: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES Regular

5

455.582

709.764

0.000

0.000

455.582

709.764

1,165.346

897.000

48.000

Provision of Missing Facilities (Phase-I)

1

0.000

800.000

0.000

0.000

0.000

800.000

800.000

0.000

0.000

Establishment of Colleges

50

733.418

29.236

0.000

0.000

733.418

29.236

762.654

525.000

41.000

Upgradation of Colleges

24

385.000

127.000

0.000

0.000

385.000

127.000

512.000

149.000

0.000

Provision of Missing Facilities (Phase-II)

44

531.000

229.000

0.000

0.000

531.000

229.000

760.000

474.458

0.000

124

2,105.000

1,895.000

0.000

0.000

2,105.000

1,895.000

4,000.000

2,045.458

89.000

Regular

8

70.000

55.000

0.000

0.000

70.000

55.000

125.000

311.000

279.000

Establishment / Upgradation of Colleges

1

2,000.000

0.000

0.000

0.000

2,000.000

0.000

2,000.000

0.000

0.000

Total: NEW SCHEMES

9

2,070.000

55.000

0.000

0.000

2,070.000

55.000

2,125.000

311.000

279.000

133

4,175.000

1,950.000

0.000

0.000

4,175.000

1,950.000

6,125.000

2,356.458

368.000

Total: ON-GOING SCHEMES NEW SCHEMES

Grand Total

36

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

ON-GOING SCHEMES Regular 51

52

53

54

1 Name of the Scheme

Establishment of University of Gujrat (Phase-I & II Revised)

Approval Date

Approved 28-06-2006

Major Components

Construction of various academic blocks and hostels.

Major Targets

Establishment of new University.

District and Tehsil

Gujrat

2 Name of the Scheme

Preservation of Quaid-e-Azam Library Building Lahore

Approval Date

Approved 12-09-2005

Major Components

Preservation of existing building

Major Targets

Up-gradation of existing building / facilities.

District and Tehsil

Lahore

3 Name of the Scheme

Punjab College Teachers Training

Approval Date

Approved

Major Components

Module development and training

Major Targets

Training of college teachers and managers

District and Tehsil

Punjab

4 Name of the Scheme

Internal Merit Scholarships for Professional Colleges in Punjab.

Approval Date

Approved 08-03-2008 Revised 21-022009

Major Components

Scholarship for students in professional Institutions.

Major Targets

Scholarship for students in professional Institutions.

District and Tehsil

Punjab

0.000

3,517.314

2,365.732

451.582

200.000

0.000

0.000

451.582

200.000

651.582

500.000

0.000

0.000

0.000

89.030

85.030

4.000

0.000

0.000

0.000

4.000

0.000

4.000

0.000

0.000

0.000

0.000

727.722

19.722

0.000

400.000

0.000

0.000

0.000

400.000

400.000

260.000

48.000

0.000

0.000

309.080

70.080

0.000

102.000

0.000

0.000

0.000

102.000

102.000

137.000

0.000

0.000

37

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

55

5 Name of the Scheme

Establishment of Computer Labs in Colleges

Approval Date

Approved 16-09-2008

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Punjab

Sub-Total: Regular

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

0.000

0.000

59.525

51.761

0.000

7.764

0.000

4,702.671

2,592.325

455.582

709.764

0.000

0.000

0.000

0.000

0.000

Total Cap 11

Rev 12

0.000

7.764

455.582

709.764

7.764

0.000

0.000

1,165.346

897.000

48.000

800.000

0.000

0.000

0.000

0.000

Provision of Missing Facilities (Phase-I) 56

6 Name of the Scheme

Punjab Education Sector Reform Programme (PESRP) Phase-I

0.000

0.000

800.000

0.000

0.000

0.000

800.000

0.000

Approval Date Major Components

Provision of missing facilities to colleges

Major Targets

Provision of missing facilities to colleges

District and Tehsil

Punjab

Sub-Total: Provision of Missing Facilities (Phase-I)

0.000

0.000

0.000

0.000

800.000

0.000

0.000

0.000

800.000

800.000

0.000

0.000

0.000

Establishment of Colleges 57

58

7 Name of the Scheme

Establishment of Govt. Degree College for Girls Kotli Sattian

Approval Date

Approved 22-04-2008/07-03-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Rawalpindi , Kotli Sattian

8 Name of the Scheme

Establishment of Govt. Degree College for Boys Kotli Sattian

Approval Date

Approved

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Rawalpindi , Kotli Sattian

0.000

65.023

13.500

30.000

0.000

0.000

0.000

30.000

0.000

30.000

21.523

0.000

0.000

0.000

26.992

22.492

1.000

3.500

0.000

0.000

1.000

3.500

4.500

0.000

0.000

0.000

38

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

59

60

61

62

9 Name of the Scheme

Establishment of Govt. Inter College for Women Dhoke Syedan

Approval Date

Approved 21-02-2008

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Rawalpindi

10 Name of the Scheme

Establishment of Govt. Girls Degree College, Dhudial

Approval Date

Approved 11-09-2007

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Chakwal

11 Name of the Scheme

Establishment of Govt. Inter College for Women, Mulhal Mughlan

Approval Date

Approved 11-09-2007

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Chakwal

12 Name of the Scheme

Establishment of Govt. Girls Degree College, Balkasar

Approval Date

Approved 09-12-2005

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Chakwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

33.158

32.337

0.821

0.000

0.000

0.000

0.821

0.000

0.821

0.000

0.000

0.000

0.000

40.435

39.165

1.270

0.000

0.000

0.000

1.270

0.000

1.270

0.000

0.000

0.000

0.000

41.416

35.876

5.540

0.000

0.000

0.000

5.540

0.000

5.540

0.000

0.000

0.000

0.000

35.536

33.436

2.100

0.000

0.000

0.000

2.100

0.000

2.100

0.000

0.000

0.000

39

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

63

64

65

66

13 Name of the Scheme

Establishment of Govt. Degree College at Mangowal

Approval Date

Approved 17-02-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Chakwal

14 Name of the Scheme

Establishment of Govt. Degree College at Aara Basharat

Approval Date

Approved 17-02-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Chakwal , Chua Syedan Shah

15 Name of the Scheme

Establishment of Govt. Inter College for Women, Trandha

Approval Date

Approved 21-02-2008

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Chakwal , Talagang

16 Name of the Scheme

Establishment of Govt. Boys Inter College at Rasool Pur

Approval Date

Approved 15-09-2004 revised on 11-032009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Jhelum , Sohawa

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

92.693

5.000

40.000

0.000

0.000

0.000

40.000

0.000

40.000

47.693

0.000

0.000

0.000

50.160

5.000

27.216

0.000

0.000

0.000

27.216

0.000

27.216

17.944

0.000

0.000

0.000

40.979

35.643

5.336

0.000

0.000

0.000

5.336

0.000

5.336

0.000

0.000

0.000

0.000

39.707

20.000

17.952

1.755

0.000

0.000

17.952

1.755

19.707

0.000

0.000

0.000

40

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

67

68

69

70

17 Name of the Scheme

Establishment of Govt. Boys Degree College in Higher Secondary School for Boys Phullarwan

Approval Date

Approved 09-12-2005

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Sargodha , Bhalwal

18 Name of the Scheme

Establishment of Govt. Boys Degree College in Higher Secondary School for Boys Kot Moman

Approval Date

Approved 30-01-2006

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Sargodha , Kot Moman

19 Name of the Scheme

Establishment of Govt. Girls Degree College in Higher Secondary School for Girls Kot Moman

Approval Date

Approved 09-12-2005

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Sargodha , Kot Moman

20 Name of the Scheme

Establishment of Govt. College for Women at Quaidabad

Approval Date

Approved 09-12-2005 Revised on 1103-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Khushab , Quaidabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

34.669

29.669

5.000

0.000

0.000

0.000

5.000

0.000

5.000

0.000

0.000

0.000

0.000

34.999

32.699

2.300

0.000

0.000

0.000

2.300

0.000

2.300

0.000

0.000

0.000

0.000

33.838

29.838

4.000

0.000

0.000

0.000

4.000

0.000

4.000

0.000

0.000

0.000

0.000

35.698

20.342

11.356

4.000

0.000

0.000

11.356

4.000

15.356

0.000

0.000

0.000

41

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

71

72

73

74

21 Name of the Scheme

Establishment of Govt. Degree College for Women at Isa Khel

Approval Date

Approved 09-12-2005

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Mianwali , Isa Khel

22 Name of the Scheme

Establishment of Govt. Degree College for Women at Kammar Mashani

Approval Date

Approved 09-12-2005

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Mianwali , Isa Khel

23 Name of the Scheme

Establishment of Govt. Degree College for Boys at Kala Bagh

Approval Date

Approved 09-12-2005

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Mianwali , Isa Khel

24 Name of the Scheme

Establishment of Govt. Degree College Kundian

Approval Date

Approved 09-12-2005

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Mianwali , Kundian

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

33.505

32.245

1.260

0.000

0.000

0.000

1.260

0.000

1.260

0.000

0.000

0.000

0.000

31.186

27.861

3.325

0.000

0.000

0.000

3.325

0.000

3.325

0.000

0.000

0.000

0.000

34.505

33.505

1.000

0.000

0.000

0.000

1.000

0.000

1.000

0.000

0.000

0.000

0.000

33.505

26.070

7.435

0.000

0.000

0.000

7.435

0.000

7.435

0.000

0.000

0.000

42

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

75

76

77

78

25 Name of the Scheme

Establishment of Govt. Degree College for Boys Ban Hafiz Jee

Approval Date

Approved 25-10-2004

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Mianwali

26 Name of the Scheme

Establishment of Govt. Girls Degree College at Mankera

Approval Date

Approved 15-09-2004

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Bhakkar , Mankera

27 Name of the Scheme

Establishment of Govt. Degree College Satiana Road

Approval Date

Approved

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Faisalabad

28 Name of the Scheme

Establishment of Public Library at Kamalia

Approval Date

Approved 16-04-2007

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Toba Tek Singh , Kamalia

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

61.456

56.589

4.867

0.000

0.000

0.000

4.867

0.000

4.867

0.000

0.000

0.000

0.000

47.069

42.011

5.058

0.000

0.000

0.000

5.058

0.000

5.058

0.000

0.000

0.000

0.000

54.415

34.415

17.000

3.000

0.000

0.000

17.000

3.000

20.000

0.000

0.000

0.000

0.000

33.093

25.093

4.000

4.000

0.000

0.000

4.000

4.000

8.000

0.000

0.000

0.000

43

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

79

80

81

82

29 Name of the Scheme

Establishment of Govt. Degree College for Boys at Aimanabad

Approval Date

Approved 14-02-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Gujranwala

30 Name of the Scheme

Establishment of Govt. Girls Degree College at Gakhar Mandi

Approval Date

Approved 14-02-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Gujranwala

31 Name of the Scheme

Establishment of Government Home Economics College Gujranwala

Approval Date

Approved 04-05-2007 Revised on 0405-2007

Major Components

Construction of various academic blocks and hostels.

Major Targets

Construction of New Building

District and Tehsil

Gujranwala

32 Name of the Scheme

Establishment of Rachna College of Engineering & Technology at Gujranwala.

Approval Date

Approved 04-05-2007 Revised on 0405-2007

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

52.632

5.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

17.632

0.000

0.000

0.000

38.583

3.000

25.000

0.000

0.000

0.000

25.000

0.000

25.000

10.583

0.000

0.000

0.000

86.380

83.931

2.449

0.000

0.000

0.000

2.449

0.000

2.449

0.000

0.000

0.000

0.000

68.042

65.991

2.051

0.000

0.000

0.000

2.051

0.000

2.051

0.000

0.000

0.000

44

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

83

84

85

86

33 Name of the Scheme

Establishment of Govt. Degree College Peoples Colony

Approval Date

Approved 22-04-2008 revised on 14-022009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Gujranwala

34 Name of the Scheme

Establishment of Govt. Boys Degree College Rahwali

Approval Date

Approved 15-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Gujranwala

35 Name of the Scheme

Establishment of Govt. Degree College for Women at Wando

Approval Date

Approved on 09-12-2005 Revised on 04-05-2007

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Gujranwala

36 Name of the Scheme

Establishment of Govt. Degree College for Boys at Noushera Virkan

Approval Date

Approved 30-01-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Gujranwala , Noushera Virkan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

18.170

4.709

12.593

0.868

0.000

0.000

12.593

0.868

13.461

0.000

0.000

0.000

0.000

70.066

5.000

35.000

0.000

0.000

0.000

35.000

0.000

35.000

30.066

0.000

0.000

0.000

63.074

62.600

0.474

0.000

0.000

0.000

0.474

0.000

0.474

0.000

0.000

0.000

0.000

58.619

5.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

33.619

0.000

0.000

45

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

87

88

89

90

37 Name of the Scheme

Establishment of Govt. Girls Degree College Sagheer Shaheed Park, Nowshera Road, Gujranwala

Approval Date

Approved 15-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Gujranwala , Noushera Virkan

38 Name of the Scheme

Establishment of Govt. Girls Degree College at Wazirabad

Approval Date

Approved 28-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Gujranwala , Wazirabad

39 Name of the Scheme

Establishment of Govt. Boys Degree College at Kunjah Mangowal

Approval Date

Approved 11-09-2007

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Gujrat

40 Name of the Scheme

Establishment of Govt. Zulfiqar Ali Bhutto Shaheed Degree College at Pharianwali

Approval Date

Approved 11-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Mandi Bahauddin , Phalia

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

68.778

5.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

33.778

0.000

0.000

0.000

67.477

2.000

30.360

0.000

0.000

0.000

30.360

0.000

30.360

35.117

0.000

0.000

0.000

40.435

40.335

0.100

0.000

0.000

0.000

0.100

0.000

0.100

0.000

0.000

0.000

0.000

65.318

5.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

35.318

0.000

0.000

46

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

91

92

93

94

41 Name of the Scheme

Establishment of Govt. Benazir Shaheed Degree College at Bhaghat

Approval Date

Approved 11-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Mandi Bahauddin , Phalia

42 Name of the Scheme

Establishment of Govt. Shahbaz Sharif Degree College for Women Jamke Cheema

Approval Date

Approved 06-05-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Sialkot

43 Name of the Scheme

Establishment of Govt. Girls Degree College Sokinwind

Approval Date

Approved 11-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Sialkot , Pasrur

44 Name of the Scheme

Establishment of Mohtarma Benazir Bhutto Shaheed Degree College at Phukalian

Approval Date

Approved 30-05-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Sialkot , Pasrur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

64.414

5.000

24.000

0.000

0.000

0.000

24.000

0.000

24.000

40.414

0.000

0.000

0.000

44.000

5.000

39.000

0.000

0.000

0.000

39.000

0.000

39.000

0.000

0.000

0.000

0.000

44.937

5.000

29.210

0.836

0.000

0.000

29.210

0.836

30.046

9.891

0.000

0.000

0.000

44.000

1.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

33.000

0.000

0.000

47

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

95

96

97

98

45 Name of the Scheme

Establishment of Govt. Girls degree College Shahdara

Approval Date

Approved 26-02-2008 Revised on 0703-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Lahore

46 Name of the Scheme

Establishment of Govt. Boys Degree College Shalimar Town

Approval Date

Approved 25-08-2008

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Lahore

47 Name of the Scheme

Establishment of Govt. Degree College for Women, Shalimar Town

Approval Date

Approved 18-10-2005 revised on 09-022008

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Lahore

48 Name of the Scheme

Establishment of Govt. Degree College Kot Lakhpat

Approval Date

Approved 09-12-2005

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

88.288

3.699

50.000

0.000

0.000

0.000

50.000

0.000

50.000

34.589

0.000

0.000

0.000

98.350

25.000

50.000

0.000

0.000

0.000

50.000

0.000

50.000

23.350

0.000

0.000

0.000

108.962

103.962

5.000

0.000

0.000

0.000

5.000

0.000

5.000

0.000

0.000

0.000

0.000

85.137

70.655

14.482

0.000

0.000

0.000

14.482

0.000

14.482

0.000

0.000

0.000

48

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

99

100

101

102

49 Name of the Scheme

Establishment of Govt. Girls Degree College Marghzar Colony

Approval Date

Approved 07-02-2008 revised on 19-092008

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Lahore

50 Name of the Scheme

Establishment of Govt. Girls Degree College Chung

Approval Date

Approved 25-08-2008 revised on 14-032009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Lahore

51 Name of the Scheme

Establishment of Govt. Boys Degree College at Qadirpur Ran

Approval Date

Approved 06-02-2008

Major Components

Construction of New Building

Major Targets

Construction of New Building

District and Tehsil

Multan

52 Name of the Scheme

Establishment of Govt. Girls Degree College Abdul Hakeem

Approval Date

Approved 10-01-2008

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Khanewal , Abdul Hakeem

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

64.344

30.000

23.067

11.277

0.000

0.000

23.067

11.277

34.344

0.000

0.000

0.000

0.000

77.483

25.000

25.000

0.000

0.000

0.000

25.000

0.000

25.000

27.483

0.000

0.000

0.000

36.850

23.730

13.120

0.000

0.000

0.000

13.120

0.000

13.120

0.000

0.000

0.000

0.000

51.534

42.534

9.000

0.000

0.000

0.000

9.000

0.000

9.000

0.000

0.000

0.000

49

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

103

104

105

106

53 Name of the Scheme

Establishment of Govt. Girls Degree College Talamba

Approval Date

Approved 09-12-2005 Revised on 1412-2006

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Khanewal , Mian Channu

54 Name of the Scheme

Establishment of Govt. Girls Degree College at Karam Dad Qureshi

Approval Date

Approved 18-10-2005 Revised on 0412-2006

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Muzaffargarh

55 Name of the Scheme

Establishment of Govt. Girls Degree College at Sanawaan

Approval Date

Approved 07-05-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Muzaffargarh

56 Name of the Scheme

Establishment of Government Degree College for Women at Mirhan

Approval Date

Approved 18-05-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Layyah , Karor

Sub-Total: Establishment of Colleges

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

36.723

33.547

3.176

0.000

0.000

0.000

3.176

0.000

3.176

0.000

0.000

0.000

0.000

39.741

37.241

2.500

0.000

0.000

0.000

2.500

0.000

2.500

0.000

0.000

0.000

0.000

44.000

1.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

33.000

0.000

0.000

0.000

92.000

1.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

40.000

41.000

0.000

0.000

2,652.374

1,333.720

733.418

29.236

733.418

29.236

762.654

525.000

50

0.000

0.000

41.000

0.000

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

Upgradation of Colleges 107

108

109

110

57 Name of the Scheme

Up-Gradation of Govt. Inter College for Boys Daultala

Approval Date

Approved 25-08-2008

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Rawalpindi , Gujar Khan

58 Name of the Scheme

Up-Gradation of Govt. Inter College for Women Daultala

Approval Date

Approved 25-08-2008

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Rawalpindi , Gujar Khan

59 Name of the Scheme

Up-Gradation of Govt. Inter Hashmat Ali Islamia College

Approval Date

Approved 14-02-2009 revised on 07-032009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of college building.

District and Tehsil

Rawalpindi

60 Name of the Scheme

Up-Gradation of Govt. Inter College for Women Taxila

Approval Date

Approved 14-02-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Rawalpindi , Taxila

0.000

27.305

17.603

1.690

7.992

0.000

0.000

1.690

7.992

9.682

0.000

0.000

0.000

0.000

25.261

10.000

7.269

7.992

0.000

0.000

7.269

7.992

15.261

0.000

0.000

0.000

0.000

52.823

10.000

24.912

7.911

0.000

0.000

24.912

7.911

32.823

10.000

0.000

0.000

0.000

67.979

18.000

35.000

0.000

0.000

0.000

35.000

0.000

35.000

14.979

0.000

0.000

51

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

111

112

113

114

61 Name of the Scheme

Up-Gradation of Govt. Inter College for Women Fateh Jang

Approval Date

Approved 25-08-2008

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Attock , Fateh Jang

62 Name of the Scheme

Up-Gradation of Govt. Inter College for Women Jand

Approval Date

Approved 25-08-2008

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Attock , Jand

63 Name of the Scheme

Up-gradation of Govt. Inter College Bhera

Approval Date

Approved 16-12-2008 revised on 28-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Sargodha , Bhalwal

64 Name of the Scheme

Up-gradation of Govt. Inter College Miani

Approval Date

Approved 16-09-2008 revised on 28-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Sargodha , Bhalwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

24.166

19.624

0.542

4.000

0.000

0.000

0.542

4.000

4.542

0.000

0.000

0.000

0.000

21.868

8.868

9.000

4.000

0.000

0.000

9.000

4.000

13.000

0.000

0.000

0.000

0.000

31.915

5.000

18.915

8.000

0.000

0.000

18.915

8.000

26.915

0.000

0.000

0.000

0.000

31.945

10.000

13.945

7.972

0.000

0.000

13.945

7.972

21.917

0.000

0.000

0.000

52

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

115

116

117

118

65 Name of the Scheme

Up-gradation of Govt. Inter College for Women Phullarwan

Approval Date

Approved 16-12-2008 revised on 28-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Sargodha , Bhalwal

66 Name of the Scheme

Up-Gradation of Govt. Inter College for Boys Mankera to Degree Level

Approval Date

Approved 16-09-2008 revised on 19-022009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Bhakkar , Mankera

67 Name of the Scheme

Up-Gradation of Govt. Inter Muslim College Chak NO. 41/JB

Approval Date

Approved 25-08-2008 revised on 14-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Faisalabad

68 Name of the Scheme

Up-Gradation of Govt. Inter K.A. Islamia College Jamia Muhammadi Sharif

Approval Date

Approved 25-08-2008

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Jhang , Bhawana

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

17.976

5.000

6.858

6.118

0.000

0.000

6.858

6.118

12.976

0.000

0.000

0.000

0.000

44.573

7.500

26.893

10.180

0.000

0.000

26.893

10.180

37.073

0.000

0.000

0.000

0.000

29.178

9.506

18.822

1.850

0.000

0.000

18.822

1.850

20.672

0.000

0.000

0.000

0.000

43.547

10.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

23.547

0.000

0.000

53

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

119

120

121

122

69 Name of the Scheme

Up-Gradation of Ghazali College

Approval Date

Approved 16-09-2008

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Jhang

70 Name of the Scheme

Up-gradation of Govt. Inter College Ali Pur Chatha to Degree Level

Approval Date

Approved 09-12-2005 Revised on 2112-2006

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of academic block, Admin Block, Labs, etc.

District and Tehsil

Gujranwala , Ali Pur Chatha

71 Name of the Scheme

Up-Gradation of Govt. Inter A.H. Islamia College Jalalpur Jattan

Approval Date

Approved 16-12-2008 revised on 28-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Gujrat

72 Name of the Scheme

Up-gradation of Govt. Boys Inter College at Jalalpur Jattan

Approval Date

Approved 09-12-2005

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of academic block, Admin Block, Labs, etc.

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

43.077

10.000

25.077

8.000

0.000

0.000

25.077

8.000

33.077

0.000

0.000

0.000

0.000

25.730

16.530

0.000

9.200

0.000

0.000

0.000

9.200

9.200

0.000

0.000

0.000

0.000

18.463

3.807

13.104

1.552

0.000

0.000

13.104

1.552

14.656

0.000

0.000

0.000

0.000

22.834

21.221

1.613

0.000

0.000

0.000

1.613

0.000

1.613

0.000

0.000

0.000

54

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

123

124

125

126

73 Name of the Scheme

Up-Gradation of Govt. Inter College for Women Kunjah

Approval Date

Approved 16-09-2008 revised on 14-032009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Gujrat

74 Name of the Scheme

Up-Gradation of Govt. Degree College Lalamusa

Approval Date

Approved 16-09-2008 revised on 19-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Gujrat , Kharian

75 Name of the Scheme

Up-Gradation of Govt. Inter College for Women Raiwind

Approval Date

Approved 11-11-2008 revised on 27-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Lahore

76 Name of the Scheme

Up-Gradation of Govt. Inter College for Women Ferozewala

Approval Date

Approved 16-12-2008 revised on 09-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Sheikhupura , Ferozewala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

49.868

20.000

27.607

2.261

0.000

0.000

27.607

2.261

29.868

0.000

0.000

0.000

0.000

45.513

10.000

33.556

1.957

0.000

0.000

33.556

1.957

35.513

0.000

0.000

0.000

0.000

18.127

5.000

6.944

6.183

0.000

0.000

6.944

6.183

13.127

0.000

0.000

0.000

0.000

45.122

5.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

20.122

0.000

0.000

55

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

127

128

129

130

77 Name of the Scheme

Up-Gradation of Govt. Inter College Narang Mandi

Approval Date

Approved 16-12-2008 revised on 09-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Sheikhupura , Muridkey

78 Name of the Scheme

Up-gradation of Govt. Degree College Shahkot

Approval Date

Approved 16-09-2008 revised on 03-022009

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Nankana Sahib , Shahkot

79 Name of the Scheme

Up-gradation of Govt. Inter Millat College Mumtazabad

Approval Date

Approved 25-08-2008

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Multan

80 Name of the Scheme

Up-gradation of Govt. Inter College Karor Pacca

Approval Date

Approved 16-09-2008

Major Components

Construction of academic block, Labs and allied facilities.

Major Targets

Construction of academic block, Labs and allied facilities.

District and Tehsil

Lodhran , Karor Pacca

Sub-Total: Upgradation of Colleges

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

62.337

13.000

20.000

7.921

0.000

0.000

20.000

7.921

27.921

21.416

0.000

0.000

0.000

64.828

10.000

26.828

8.000

0.000

0.000

26.828

8.000

34.828

20.000

0.000

0.000

0.000

44.425

20.000

16.425

8.000

0.000

0.000

16.425

8.000

24.425

0.000

0.000

0.000

0.000

76.847

10.000

20.000

7.911

0.000

0.000

20.000

7.911

27.911

38.936

0.000

0.000

0.000

935.707

275.659

385.000

127.000

512.000

149.000

56

127.000

0.000

0.000

385.000

0.000

0.000

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

Provision of Missing Facilities (Phase-II) 131

132

133

134

81 Name of the Scheme

Construction of additional Block in Govt. College for Girls at Gujar Khan

Approval Date

Approved on 17-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Rawalpindi , Gujar Khan

82 Name of the Scheme

Re-construction of Building for Govt. College for Women Murree

Approval Date

Approved 11-11-2008 revised on 13-022009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Reconstruction of College Building.

District and Tehsil

Rawalpindi , Murree

83 Name of the Scheme

Provision of Missing Facilities in Govt. Degree College for Women, Zafar-ul-Haq Road, Rawalpindi

Approval Date

Approved 11-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Rawalpindi

84 Name of the Scheme

Construction of Academic Block & Library at Govt. Degree College for Women Murree Road, Rawalpindi.

Approval Date

Approved 16-12-2008 revised on 11-022009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of academic block for the college and 3 class rooms.

District and Tehsil

Rawalpindi

0.000

38.810

1.000

15.000

0.000

0.000

0.000

15.000

0.000

15.000

23.810

0.000

0.000

0.000

51.615

18.604

25.011

8.000

0.000

0.000

25.011

8.000

33.011

0.000

0.000

0.000

0.000

40.744

5.000

25.000

7.250

0.000

0.000

25.000

7.250

32.250

3.494

0.000

0.000

0.000

44.918

10.000

31.104

3.814

0.000

0.000

31.104

3.814

34.918

0.000

0.000

0.000

57

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

135

136

137

138

85 Name of the Scheme

Provision of Missing Facilities in Govt. Degree College Gujar Khan (Additional Block)

Approval Date

Approved 11-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Up-gradation of existing building / facilities.

District and Tehsil

Rawalpindi

86 Name of the Scheme

Provision of Missing facilities in Govt. Degree College Hasanabdal

Approval Date

Approved 07-03-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Attock , Hasanabdal

87 Name of the Scheme

Provision of Missing Facilities in Govt. Degree College for Women Talagang

Approval Date

Approved 20-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Up-gradation of existing building / facilities.

District and Tehsil

Chakwal , Talagang

88 Name of the Scheme

Provision of Missing Facilities in Govt. Degree College for Boys Dina

Approval Date

Approved 20-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Up-gradation of existing building / facilities.

District and Tehsil

Jhelum , Dina

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

33.784

1.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

13.784

0.000

0.000

0.000

8.710

8.610

0.100

0.000

0.000

0.000

0.100

0.000

0.100

0.000

0.000

0.000

0.000

16.135

1.000

13.000

0.000

0.000

0.000

13.000

0.000

13.000

3.135

0.000

0.000

0.000

21.966

2.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

11.966

0.000

0.000

58

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

139

140

141

142

89 Name of the Scheme

Provision of Missing Facilities in Govt. Degree College for Women Dina

Approval Date

Approved 20-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Up-gradation of existing building / facilities.

District and Tehsil

Jhelum , Dina

90 Name of the Scheme

Construction of Multipurpose Hall in Govt. Girls Degree College Bhagtanwala

Approval Date

Approved 18-10-2005, 02-03-2006

Major Components

Construction of multipurpose hall

Major Targets

Provision of missing facilities.

District and Tehsil

Sargodha

91 Name of the Scheme

Construction of Building of Govt. Boys Degree College at Bhagtanwala

Approval Date

Approved 12-09-2005, Revised 01-032006

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of New Building

District and Tehsil

Sargodha

92 Name of the Scheme

Provision of missing facilities to Govt. Post Graduate College Noor Pur Thal

Approval Date

Approved 14-07-2007

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Khushab , Noor Pur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

24.415

1.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

14.415

0.000

0.000

0.000

17.094

16.029

1.065

0.000

0.000

0.000

1.065

0.000

1.065

0.000

0.000

0.000

0.000

33.325

32.443

0.882

0.000

0.000

0.000

0.882

0.000

0.882

0.000

0.000

0.000

0.000

7.228

6.278

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

59

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

143

144

145

146

93 Name of the Scheme

Construction of Degree Block with Allied Facilities and Construction of Multipurpose Hall in Govt. Boys Degree College Kalur Kot

Approval Date

Approved 15-09-2004

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of academic block, Admin Block, Labs, etc.

District and Tehsil

Bhakkar , Kalur Kot

94 Name of the Scheme

Provision of missing facilities in Govt. College for Women Gulshan Colony

Approval Date

Approved 18-02-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Faisalabad

95 Name of the Scheme

Construction of Building of Govt. College for Boys Gojra

Approval Date

Approved 25-08-2008 revised on 12-022009

Major Components

Construction of building for Post Graduate Block & Library.

Major Targets

Construction of building

District and Tehsil

Toba Tek Singh , Gojra

96 Name of the Scheme

Construction of building of Govt. College for Women Gojra

Approval Date

Approved 16-09-2008

Major Components

Construction of New Building

Major Targets

Construction of New Building

District and Tehsil

Toba Tek Singh , Gojra

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

28.417

23.551

4.866

0.000

0.000

0.000

4.866

0.000

4.866

0.000

0.000

0.000

0.000

19.882

19.782

0.100

0.000

0.000

0.000

0.100

0.000

0.100

0.000

0.000

0.000

0.000

56.410

10.000

19.431

16.773

0.000

0.000

19.431

16.773

36.204

10.000

0.000

0.000

0.000

4.516

2.405

1.803

0.308

0.000

0.000

1.803

0.308

2.111

0.000

0.000

0.000

60

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

147

148

149

97 Name of the Scheme

Construction of Govt. Boys Degree College Kotla Arab Ali Khan

Approval Date

Approved 28-04-2009

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

New Establishment / Provision of building

District and Tehsil

Gujrat , Kharian

98 Name of the Scheme

Construction of Academic Block & Post Graduate Block in Govt. Girls Degree College M.B. Din

Approval Date

Approved 18-10-2005

Major Components

Construction of New Building

Major Targets

Construction of New Building

District and Tehsil

Mandi Bahauddin

99 Name of the Scheme

Provision of Missing facilities in Govt. Degree College for Boys Pasrur

Approval Date

Approved

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Sialkot , Pasrur

150 100 Name of the Scheme

Erection of barbed wire fence around 500 acres land for the Establishment of Swedish University of Engineering at Samberial

Approval Date

Approved 23-02-2009

Major Components

Erection of barbed wire

Major Targets

Provision of missing facilities

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

67.948

2.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

37.948

0.000

0.000

0.000

52.044

32.910

19.134

0.000

0.000

0.000

19.134

0.000

19.134

0.000

0.000

0.000

0.000

8.650

7.800

0.000

0.850

0.000

0.000

0.000

0.850

0.850

0.000

0.000

0.000

0.000

3.980

3.880

0.100

0.000

0.000

0.000

0.100

0.000

0.100

0.000

0.000

0.000

61

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

151 101 Name of the Scheme

Provision of missing facilities in Govt. Islamia College for Women Cooper Road

Approval Date

Approved 18-02-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Lahore

152 102 Name of the Scheme

Provision of Missing facilities in Govt. Queen Marry College

Approval Date

Approved 18-02-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Lahore

153 103 Name of the Scheme

Provision of missing facilities in Govt. Degree College for Women Gulshan-e-Ravi

Approval Date

Approved 26-09-2008

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Lahore

154 104 Name of the Scheme

Construction of Building of Govt. College for Commerce Sabzazar

Approval Date

Approved 07-03-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

43.194

43.094

0.100

0.000

0.000

0.000

0.100

0.000

0.100

0.000

0.000

0.000

0.000

194.370

50.000

35.876

59.950

0.000

0.000

35.876

59.950

95.826

48.544

0.000

0.000

0.000

12.212

12.112

0.000

0.100

0.000

0.000

0.000

0.100

0.100

0.000

0.000

0.000

0.000

152.728

79.428

30.000

0.000

0.000

0.000

30.000

0.000

30.000

43.300

0.000

0.000

62

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

155 105 Name of the Scheme

Construction of addl. Rooms in Govt. Aiwa College for Women Lahore

Approval Date

Approved 25-08-2008

Major Components

Construction of 8 class rooms / staff room and renovation of Govt. APWA College for Women, Lahore

Major Targets

Construction of New Building

District and Tehsil

Lahore

156 106 Name of the Scheme

Construction of Building for Government College (Boys) Gulberg Lahore

Approval Date

Approved 21-02-2008

Major Components

Construction of building for introduction of general classes

Major Targets

Construction of New Building

District and Tehsil

Lahore

157 107 Name of the Scheme

Construction of Multipurpose Hall and Provision of Missing Facilities at Govt. Degree College for Women Chunian

Approval Date

Approved 09-01-2007

Major Components

Construction of Hall and provision of other facilities

Major Targets

Construction of Hall and provision of other facilities

District and Tehsil

Kasur , Chunian

158 108 Name of the Scheme

Construction of Building of Govt. Degree College for Boys Renala Khurd

Approval Date

Approved 08-04-2004, Revised 11-032006

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Construction of academic block, Admin Block, Labs, etc.

District and Tehsil

Okara , Renala Khurd

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

22.542

17.957

4.585

0.000

0.000

0.000

4.585

0.000

4.585

0.000

0.000

0.000

0.000

127.425

40.000

35.319

17.106

0.000

0.000

35.319

17.106

52.425

35.000

0.000

0.000

0.000

29.246

4.000

19.085

6.161

0.000

0.000

19.085

6.161

25.246

0.000

0.000

0.000

0.000

74.954

63.957

3.383

0.000

0.000

0.000

3.383

0.000

3.383

7.614

0.000

0.000

63

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

159 109 Name of the Scheme

Provision of missing facilities in Govt. Islamia College Willayat Hussain

Approval Date

Approved 25-03-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Multan

160 110 Name of the Scheme

Provision of missing facilities in Govt. Degree College for Women Jahania

Approval Date

Approved 25-03-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Khanewal , Jahanian

161 111 Name of the Scheme

Construction of Building of Govt. College for Boys Khanewal

Approval Date

Approved 23-03-2007

Major Components

Construction of academic block, Admin Block, Labs, etc.

Major Targets

Provision of building

District and Tehsil

Khanewal

162 112 Name of the Scheme

Provision of missing facilities in Govt. College for Women Pakpattan

Approval Date

Approved 12-06-2008

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Pakpattan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

10.030

5.000

5.030

0.000

0.000

0.000

5.030

0.000

5.030

0.000

0.000

0.000

0.000

20.889

11.845

9.044

0.000

0.000

0.000

9.044

0.000

9.044

0.000

0.000

0.000

0.000

45.763

42.881

2.882

0.000

0.000

0.000

2.882

0.000

2.882

0.000

0.000

0.000

0.000

2.873

2.073

0.000

0.800

0.000

0.000

0.000

0.800

0.800

0.000

0.000

0.000

64

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

163 113 Name of the Scheme

Provision of Missing facilities in Govt. Degree College for Women Rajanpur

Approval Date

Approved 17-09-2008

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Rajanpur

164 114 Name of the Scheme

Provision of Post Graduate College for Boys Muzaffargarh

Approval Date

Approved 12-06-2008

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Muzaffargarh

165 115 Name of the Scheme

Provision of missing facilities in Govt. College for Boys Dera Nawab Sahib

Approval Date

Approved 12-06-2008

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Bahawalpur , Ahmedpur East

166 116 Name of the Scheme

Provision of missing facilities in Govt. Girls Degree College Satellite Town

Approval Date

Approved 07-03-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Bahawalpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

6.601

5.415

0.000

1.186

0.000

0.000

0.000

1.186

1.186

0.000

0.000

0.000

0.000

8.881

6.531

0.000

2.350

0.000

0.000

0.000

2.350

2.350

0.000

0.000

0.000

0.000

32.031

29.481

0.000

2.550

0.000

0.000

0.000

2.550

2.550

0.000

0.000

0.000

0.000

136.891

33.040

50.000

6.000

0.000

0.000

50.000

6.000

56.000

47.851

0.000

0.000

65

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

167 117 Name of the Scheme

Provision of Missing facilities in Govt. S.E College for Boys Bahawalpur

Approval Date

Approved 12-06-2008

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Bahawalpur

168 118 Name of the Scheme

Provision of missing facilities in Govt. Girls Degree College Minchnabad

Approval Date

Approved 07-03-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Bahawalnagar , Minchnabad

169 119 Name of the Scheme

Demolishing and reconstruction of boundary wall at Govt. Post Graduate College for Women

Approval Date

Approved 23-02-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Bahawalnagar

170 120 Name of the Scheme

Provision of Missing facilities in Govt. Degree College for Boys

Approval Date

Approved

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Bahawalnagar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

87.756

78.886

0.000

8.870

0.000

0.000

0.000

8.870

8.870

0.000

0.000

0.000

0.000

114.430

16.520

25.000

6.520

0.000

0.000

25.000

6.520

31.520

66.390

0.000

0.000

0.000

1.834

1.734

0.100

0.000

0.000

0.000

0.100

0.000

0.100

0.000

0.000

0.000

0.000

11.193

8.643

0.000

2.550

0.000

0.000

0.000

2.550

2.550

0.000

0.000

0.000

66

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

171 121 Name of the Scheme

Provision of missing facilities in Govt. Post Graduate College for Boys Chishtian

Approval Date

Approved 24-03-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Bahawalnagar , Chishtian

172 122 Name of the Scheme

Provision of missing facilities in Govt. Girls Degree College Dharanwala

Approval Date

Approved 17-02-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Bahawalnagar , Chishtian

173 123 Name of the Scheme

Provision of missing facilities in Govt. Boys Degree College Dharanwala

Approval Date

Approved 17-02-2009

Major Components

Provision of missing facilities

Major Targets

Provision of missing facilities

District and Tehsil

Bahawalnagar , Chishtian

174 124 Name of the Scheme

Provision of Facilities in Colleges

Approval Date

Approved

Major Components

Establishment / Up-gradation / Cost of additional block

Major Targets

New Establishment / Provision of building

District and Tehsil

Punjab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

77.779

16.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

31.779

0.000

0.000

0.000

69.769

3.000

27.000

4.051

0.000

0.000

27.000

4.051

31.051

35.718

0.000

0.000

0.000

73.761

3.000

27.000

4.051

0.000

0.000

27.000

4.051

31.051

39.710

0.000

0.000

0.000

1,068.810

1,000.000

0.000

68.810

0.000

0.000

0.000

68.810

68.810

0.000

0.000

0.000

Sub-Total: Provision of Missing Facilities (Phase-II)

0.000

3,006.553

Total: ON-GOING SCHEMES

0.000

11,297.305

229.000

0.000

0.000

229.000

760.000

474.458

0.000

0.000

5,981.593 2,105.000 1,895.000

0.000

0.000 2,105.000 1,895.000

4,000.000

2,045.458

89.000

0.000

1,779.889

531.000

67

531.000

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

NEW SCHEMES Regular

175 125 Name of the Scheme

Erection of Barbed wire around 800 acres land for Swedish University Muridkey

Approval Date

Un-Approved

Major Components

Erection of barbed wire

Major Targets

Erection of Barbed wire

District and Tehsil

Sheikhupura , Muridkey

176 126 Name of the Scheme

Establishment of Public Library at Roshan Bhilla

Approval Date

Un-Approved

Major Components

Establishment of Library

Major Targets

Establishment of Public Library

District and Tehsil

Kasur

177 127 Name of the Scheme

Establishment of PMU for Women University, Multan

Approval Date

Un-Approved

Major Components

Preparation of feasibility Study

Major Targets

Preparation of feasibility Study

District and Tehsil

Multan

178 128 Name of the Scheme

Construction of Cluster Examination Centres at District Level (North Zone)

Approval Date

Un-Approved

Major Components

Construction of Cluster Examination Center

Major Targets

Construction of Cluster Examination Center

District and Tehsil

Punjab

0.000

10.000

0.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

0.000

30.000

0.000

5.000

5.000

0.000

0.000

5.000

5.000

10.000

20.000

0.000

0.000

0.000

53.833

0.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

0.000

0.000

0.000

0.000

500.000

0.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

50.000

80.000

350.000

68

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

179 129 Name of the Scheme

Construction of Cluster Examination Centres at District Level (South Zone)

Approval Date

Un-Approved

Major Components

Construction of Cluster Examination Center

Major Targets

Construction of Cluster Examination Center

District and Tehsil

Punjab

180 130 Name of the Scheme

Construction of Complex for Higher Education Department

Approval Date

Un-Approved

Major Components

Educational Complex for Higher Education Department. (Policy, DPI and Divisional Directorate)

Major Targets

Educational Complex for Higher Education Department. (Policy, DPI and Divisional Directorate)

District and Tehsil

Punjab

181 131 Name of the Scheme

Capacity Building for Higher Education Department

Approval Date

Approved

Major Components

1)Provision of missing facilities. 2)Strengthening of Planning Wing

Major Targets

Capacity Building for Higher Education Department, Provision of Better Facilities to Planning Wing like computers, vehicles and financial benefits.

District and Tehsil

Punjab

182 132 Name of the Scheme

Provision of Facilities for the Divisional Directorate of Colleges

Approval Date

Un-Approved

Major Components

Provision of Furniture & Equipment etc.

Major Targets

Provision of Furniture & Equipment etc.

District and Tehsil

Punjab

Sub-Total: Regular

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

500.000

0.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

50.000

80.000

350.000

0.000

100.000

0.000

20.000

6.000

0.000

0.000

20.000

6.000

26.000

74.000

0.000

0.000

0.000

170.000

0.000

0.000

21.000

0.000

0.000

0.000

21.000

21.000

67.000

82.000

0.000

0.000

100.000

0.000

5.000

8.000

0.000

0.000

5.000

8.000

13.000

50.000

37.000

0.000

0.000

1,463.833

70.000

55.000

70.000

55.000

125.000

311.000

279.000

700.000

0.000

69

0.000

0.000

HIGHER EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

Rev 8

Foreign Aid Cap Rev 9 10

0.000

0.000

Total Cap 11

Rev 12

Establishment / Upgradation of Colleges 183 133 Name of the Scheme

Establishment / Upgradation of Colleges

Approval Date

Un-Approved

Major Components

Establishment / Upgradation / Missing Facililties

Major Targets

Establishment / Upgradation / Missing Facililties

District and Tehsil

Punjab

0.000

2,000.000

0.000

2,000.000

0.000

2,000.000

0.000

2,000.000

0.000

0.000

0.000

Sub-Total: Establishment / Upgradation of Colleges

0.000

2,000.000

0.000 2,000.000

0.000

0.000

0.000 2,000.000

0.000

2,000.000

0.000

0.000

0.000

Total: NEW SCHEMES

0.000

3,463.833

0.000 2,070.000

55.000

0.000

0.000 2,070.000

55.000

2,125.000

311.000

279.000

700.000

Grand Total

0.000

14,761.138

5,981.593 4,175.000 1,950.000

0.000

0.000 4,175.000 1,950.000

6,125.000

2,356.458

368.000

700.000

70

SPECIAL EDUCATION

71

SPECIAL EDUCATION VISION To provide conducive learning environment to the disabled and physically challenged persons so as to make them useful members of the society and utilize their potential and skills in all spheres of life. TREND OF ALLOCATIONS Years 2005-06 2006-07 2007-08 2008-09 2009-10

Original Allocation

(Rs. in million) Revised Allocation

500.000 600.000 945.450 1825.000

409.245 600.000 844.134 604.742 1000.000

POLICY INTERVENTIONS •

Provide educational facilities to school going age special children and ensure maximum coverage by 2015



Enhance enrolment of special children in the institutions/ centers of special education in Punjab through improved facilities



Impart knowledge and skills to physically challenged children to enable them to become economically independent members of the society



Provide healthy atmosphere to the special children in the institutions / centers of special education in Punjab by providing them buildings with special facilities



Skill development & rehabilitation of physically challenged children

STRATEGIC INTERVENTIONS To achieve above mentioned goals, the following measures will be taken: •

Enhancement of enrolment through provision of:o Buildings with special facilities to special education centres

72

o Cochlear Implant Devices to Hearing Impaired Students o Stipend o Free uniform o Free text & Braille books o Free pick & drop facility o Merit scholarship o Free boarding & lodging facility o Free Teaching Aids

(i)



Improvement of teaching methodologies through teachers training programme



Adoption of Internationally accepted best practices PROVISION OF COCHLEAR IMPLANT FOR THE STUDENTS OF HEARING IMPAIRED CHILDREN IN PUNJAB (PHASE-I)

The scheme titled “Provision of Cochlear Implant for the Students of Hearing Impaired in Punjab (Phase-I)” was approved at a total cost of Rs.177.662 million by the Departmental Development Sub Committee in its meeting held on 23.12.2008. Under this scheme, 115 Cochlear Implant Devices were proposed to be provided to Hearing Impaired students of Special Education Institutions / Centres in Punjab during the period of 03years. Year wise allocation and number of beneficiaries is as under:Sr.No. 1. 2. 3.

(ii)

Year 2008-09 2009-10 2010-11

No. of Beneficiaries 30 30 55

Allocation Rs. 41.762 million Rs. 50.000 million Rs. 85.900 million

ESTABLISHMENT OF INTERNATIONAL STANDARD REHABILITATION CENTRE FOR DISABLED

Government of the Punjab is committed to provide free education, vocational and rehabilitation facilities to the special children on modern and scientific lines so as to bring them at par with the normal children and to make them self supportive and self reliant members of the society. Chief

73

Minister Punjab desired to establish an International Standard Rehabilitation Centre for the Disabled at Lahore. The scheme would be executed by the Board of Management to be constituted by the Chief Minister. (iii)

CONSTRUCTION OF BUILDINGS OF SPECIAL EDUCATION CENTRES IN PUNJAB (PHASE-II)

Special Education Department has planned to provide buildings to special education centres in Punjab which are functioning in rented buildings. The buildings will be constructed in accordance with the need of special students of four disabilities for which a standard design prepared by the Architecture Department has been approved by the Special Education Department. During the year 2007-08, a sum of Rs. 478.980 million was provided to 05-District Governments for construction of 13-buildings. Construction work on these buildings is under progress. During the year 200809, a sum of Rs. 361.155 million has been provided to six District Governments for the construction of 08-buildings of special education centres. The Department has planned to construct 15-buildings of Centres of Special Education in seven Districts through Development Programme 2009-10. For these buildings, land has been transferred / allotted to Special Education Department by the Board of Revenue, Punjab. These buildings will be completed during the year 2009-10 and 2010-11. 1500 special students of centres of special education will benefit out of it. The detail of buildings to be constructed during the year 2009-2010 is as under:Sr.No. 1.

Name of District Sargodha. (05)

2.

Bhakkar. (02) T.T.Singh. (01) Khanewal. (03)

3. 4.

5. 6. 7.

Lahore. (02) Hafizabad (01) Bahawalpur (01) 74

Name of Centre GSEC, Sahiwal GSEC, Silanwali GSEC, Kot Moman GSEC, Shahpur Saddar GSEC, Bhalwal GSEC, Bhakkar GSEC, Mankara GSEC, Gojra GSEC, Jahanian GSEC, Mian Channu GSEC, Kabirwala GSEC, Nishter Town GSEC, Wagha Town GSEC, Pindi Bhattian GSEC, Khairpur Tamiwali

(iv)

CONSTRUCTION OF BUILDING OF GOVT. DEGREE COLLEGE OF SPECIAL EDUCATION AT LAHORE

At present two Degree Colleges of Special Education, one at Lahore and the other at Bahawalpur are functioning. Government Degree College of Special Education, Lahore was established in 2004-05. This college is functioning in the building of Govt. Training College of the Teachers of Deaf (Special House), Lahore. The functioning of both the colleges in same premises is creating problems for the college administrations, especially in terms of boarding facilities. The enrolment of special students is increasing day by day and students from other cities demand hostel facilities. To cope with the demand, the department has planned to provide a separate building of its own to Govt. Degree College of Special Education, Lahore. The estimated cost of the project is Rs.300.000 million, out of which Rs.66.000 million are proposed to be provided during the year 2009-2010. (v)

CONSTRUCTION OF 09-BUILDINGS OF OFFICES OF DISTRICT EDUCATION OFFICERS (SPL. EDU) IN PUNJAB RS.31.500 MILLION.

At present, offices of District Education Officers (Spl.Edu) in Punjab are functioning in the buildings of Institutions of Special Education which is not conducive for office as well as educational environment. To provide them a separate building, the Department has decided to construct the office buildings of District Education Officers (Spl.Edu) in Punjab in the premises of institutions / schools of Special Education Punjab where sufficient land to construct the offices is available. Necessary equipment / furniture will also be provided to these offices.

75

MTDF 2009-12 Special Education Department : Summary Development Programme 2009-10 (Million Rs) Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Regular

0.000

50.000

50.000

0.000

50.000

927.000

23.000

950.000

0.000

950.000

927.000

73.000

1,000.000

0.000 1,000.000

Total

0.000

50.000

50.000

0.000

50.000

927.000

23.000

950.000

0.000

950.000

927.000

73.000

1,000.000

0.000 1,000.000

1

No. of Schemes

9

10

Development Programme 2010-11 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Regular

817.000

123.900

940.900

0.000

940.900

219.000

40.100

259.100

0.000

259.100 1,036.000

164.000

1,200.000

0.000 1,200.000

Total

817.000

123.900

940.900

0.000

940.900

219.000

40.100

259.100

0.000

259.100 1,036.000

164.000

1,200.000

0.000 1,200.000

Development Programme 2011-12 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Regular

700.000

200.000

900.000

0.000

900.000

444.000

156.000

600.000

0.000

600.000 1,144.000

356.000

1,500.000

0.000 1,500.000

Total

700.000

200.000

900.000

0.000

900.000

444.000

156.000

600.000

0.000

600.000 1,144.000

356.000

1,500.000

0.000 1,500.000

SPECIAL EDUCATION - MTDF 2009-12 - GRAND TOTAL

76

3,700.000

SPECIAL EDUCATION: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES

1

0.000

50.000

0.000

0.000

0.000

50.000

50.000

85.900

0.000

NEW SCHEMES

9

927.000

23.000

0.000

0.000

927.000

23.000

950.000

855.000

330.000

10

927.000

73.000

0.000

0.000

927.000

73.000

1,000.000

940.900

330.000

Grand Total

77

SPECIAL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

85.900

0.000

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

0.000

50.000

0.000

0.000

Total Cap 11

Rev 12

ON-GOING SCHEMES Regular 184

1 Name of the Scheme

Provision of Cochlear Implant for Hearing Impaired Students (PhaseI)

Approval Date

Approved 27-01-2009

Major Components

Purchase of 30-cochlear implant devices

Major Targets

Provision of Implant facility to 30 Hearing Impaired students of Special Education Institutions/centres in Punjab

District and Tehsil

Punjab

0.000

177.662

41.762

0.000

50.000

50.000

0.000

Sub-Total: Regular

0.000

177.662

41.762

0.000

50.000

0.000

0.000

0.000

50.000

50.000

85.900

0.000

0.000

Total: ON-GOING SCHEMES

0.000

177.662

41.762

0.000

50.000

0.000

0.000

0.000

50.000

50.000

85.900

0.000

0.000

0.000

85.000

0.000

34.000

0.000

0.000

0.000

34.000

0.000

34.000

51.000

0.000

0.000

0.000

1,000.000

0.000

100.000

0.000

0.000

0.000

100.000

0.000

100.000

700.000

200.000

0.000

NEW SCHEMES Regular 185

186

2 Name of the Scheme

Construction of Building of Govt. Special Education School for Hearing Impaired Girls

Approval Date

Un-Approved

Major Components

Civil work, equipment, furniture, transport & hostel utensils, etc.

Major Targets

200 hearing impaired girls.

District and Tehsil

Sargodha , Sargodha.

3 Name of the Scheme

Establishment of International Standard Rehabilitation Centre for the Disabled

Approval Date

Un-Approved

Major Components

Civil work, equipment, furniture.

Major Targets

Civil work, equipment, furniture.

District and Tehsil

Lahore

78

SPECIAL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

187

188

189

190

4 Name of the Scheme

Construction of building of Govt. Degree College of Special Education

Approval Date

Un-Approved

Major Components

Cost of land. Civil work, furniture & hostel utensils, etc.

Major Targets

300-disabled students of visually impaired, hearing impaired and physically disabled.

District and Tehsil

Lahore

5 Name of the Scheme

Capacity building of Directorate of Special Education Punjab

Approval Date

Un-Approved

Major Components

Office equipment, I.T. equipment & furniture, etc.

Major Targets

Office equipment, I.T. equipment & furniture, etc.

District and Tehsil

Lahore

6 Name of the Scheme

Establishment of Computer Lab, Resource & Guidance Centre in Existing Govt. In-service Training College for the Teachers of Disabled Children

Approval Date

Un-Approved

Major Components

Purchase of I.T.equipment, furniture

Major Targets

Training of Teachers of Special Education

District and Tehsil

Lahore

7 Name of the Scheme

Establishment of Govt. Special Education School for Visually Impaired

Approval Date

Un-Approved

Major Components

Equipment, furniture, transport & hostel utensils.

Major Targets

50 visually impaired. students.

District and Tehsil

Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

300.000

0.000

66.000

0.000

0.000

0.000

66.000

0.000

66.000

104.000

130.000

0.000

0.000

5.000

0.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

0.000

0.000

0.000

0.000

6.000

0.000

0.000

6.000

0.000

0.000

0.000

6.000

6.000

0.000

0.000

0.000

0.000

6.000

0.000

0.000

6.000

0.000

0.000

0.000

6.000

6.000

0.000

0.000

0.000

79

SPECIAL EDUCATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

8 Name of the Scheme

Construction of Buildings of Special Education Centre (PhaseII).

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

Foreign Aid Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

700.000

0.000

700.000

0.000

0.000

0.000

700.000

0.000

700.000

0.000

0.000

0.000

0.000

1.500

0.000

0.000

1.500

0.000

0.000

0.000

1.500

1.500

0.000

0.000

0.000

0.000

31.500

0.000

27.000

4.500

0.000

0.000

27.000

4.500

31.500

0.000

0.000

0.000

Sub-Total: Regular

0.000

2,135.000

0.000

927.000

23.000

0.000

0.000

927.000

23.000

950.000

855.000

330.000

0.000

Total: NEW SCHEMES

0.000

2,135.000

0.000

927.000

23.000

0.000

0.000

927.000

23.000

950.000

855.000

330.000

0.000

Grand Total

0.000

2,312.662

41.762

927.000

73.000

0.000

0.000

927.000

73.000

1,000.000

940.900

330.000

0.000

191

192

193

Approval Date

Un-Approved

Major Components

Construction of 15-buildings of special education centres

Major Targets

1500-disabled students.

District and Tehsil

Sargodha, Bhakkar,Toba Tek Singh, Khanewal, Lahore, Bahawalpur, Hafizabad. , Sahiwal, Silanwali, Kot Moman, Shahpur Saddar, Bhalwal, Bhakkar, Mankera, Gojra, Jahanian, Mian Chunnu, Kabirwala, Nishter Town, Wahga Town, Khairpur Temiwali & Pindi Bhattian.

9 Name of the Scheme

Establishment of Low Vision Assessment Centres in Visually Impaired Institutions

Approval Date

Un-Approved

Major Components

Ophthalmic equipment & furniture, etc.

Major Targets

Students of Institutions/ centres of Multan & D.G.Khan Division.

District and Tehsil

Multan, Dera Ghazi Khan. , Multan, D.G.Khan.

10 Name of the Scheme

Construction of 09-office buildings of District Education Officer (Spl.Edu)

Approval Date

Un-Approved

Major Components

Civil work, I.T. equipment & furniture.

Major Targets

Provision of office buildings of DEO (Spl.Edu).

District and Tehsil

Lahore, Gujranwala, Faislabad, Sargodha, Dera Ghazi Khan, Multan, Bahawalpur, Sahiwal, Rawalpindi , Lahore, Gujranwala, Faislabad, Sargodha, D.G. Khan, Multan, Bahawalpur, Sahiwal, Rawalpindi

80

LITERACY

81

LITERACY VISION Literate, aware and thriving Punjab

YEARS 2005-06 2006-07 2007-08 2008-09 2009-10

TREND OF ALLOCATIONS (Rs. in million) ORIGINAL ALLOCATION REVISED ALLOCATION 200.000 179.840 275.000 198.940 1200.000 650.000 1250.000 682.473 800.000

POLICY /MISSION STATEMENT We, in the Literacy & Non Formal Basic Education Department, are committed to providing quality learning opportunities and Education for All, through focused and continuous non-formal means, to illiterate/out of school population of all age groups of both genders in Punjab by the year 2020.

STRATEGY •

Ensure access to basic education by adopting Non Formal Basic Education (NFBE) options linked with poverty alleviation strategy



Support initiatives of formal education towards achieving Universal Primary Education (UPE) by adopting NFBE option



Integrate all basic education and Literacy Programmes with life and marketable earning skills



Mobilize community and civil society for achievement of the targets



Reduce gender and urban – rural disparities

STRATEGIC INTERVENTIONS i) Opening of literacy centres on need basis (PC-II) Targets 82

Study to develop mechanism for promotion of literacy ii) Punjab Literacy & Livelihood Programme Targets • Opening of centres in Punjab. •

Provision of Literacy material for the centres.



Technical and vocational training component of learners.



Research component at Provincial level.



Monitoring and evaluation

iii) Capacity Building of the Department Major Components To enhance the capacity of the officers and officials of the Provincial Department and EDOs (Literacy) Targets • Creating institutional base for capacity building activities. •

Research, case/ impacts/ process studies.



Establishment of MIS wing for managing database for base line data.



Material, curriculum and training modules development.

iv) Establishment of 300 Adult Literacy Centres & 200 NFBE Schools at Brick Kilns (5 years Programme) Major Components • Establishment of 300 ALC at Brick Kilns •

Establishment of 200 NFBES in at Brick Kilns

v) Community Learning Centres (CLCs) Project Major Components Establishment of 360 Community Learning Centres CLCs/ Literacy Resource Centres - 10 in each District as an intervention for Literacy & Continuing Education.

83

Targets Providing post Literacy & Continuing Education options to Neo-Literate & NFBE Graduates. vi) Construction of Literacy House Targets Construction of Office Building of Literacy Department vii) Literacy in Mother Tongue viii) Awareness Campaign for Promotion of Literacy

Major Components Awareness campaign through print & electronic media and through traditional means like use of mosque, distribution of pamphlets, stickers, etc. Targets Creating Awareness among the masses about the importance of Education and Literacy in improving their standards of life. Generating movement for a paradigm shift for creating demand for Literacy i.e. shift from supply driven to a demand driven service. The aforementioned interventions coupled with a number of management reforms and inputs undertaken through the non-development budget would help achieve the Millennium Development Goals commitments. Indicator Literacy rate 10 years and above (%)

2001-02 (PHIS) 47

2006-07 (PSLM) 58

2007-08 65

84

2008-09 68

2009-10 71

Projected year of reaching MDGs 2013

2015 (MDGs) 88

MTDF TARGETS The following summary of Medium Term Development Framework (MTDF) is based on the population projections and other indicators as provided in the PSLM 2006-07. Literacy rate of Punjab, estimated in the PSLM 2006-07 as 58%, has been projected to be 65% in 2007-08, 68% in 2008-09 and 71% in 2009-10 on the basis of the efforts of Government to eradicate illiteracy from the province.

YEAR

Literacy Rate %

Total Male Female Planned Literacy Rate Coverage (18.33 % Increase) Planned Coverage of illiterates No. of Adult Literacy Centers

85

2006-07 (BASE YEAR) 60.93 69.93 51.93 3.01

2007-08

2008-09

2009-10

201011

64.8 73.63 55.97 3.7

70.6 78.03 63.17 4.4

76.6 82.73 70.47 4.7

82.3 90 74 5.56

1926680 3400312 3759612 3766575 32111 56672 62660 62776

4.12 0.24

MTDF 2009-12 Literacy & NFBE Department: Summary Development Programme 2009-10 (Million Rs) Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Literacy & NFBE

0.000

250.000

250.000

0.000

250.000

75.000

475.000

550.000

0.000

550.000

75.000

725.000

800.000

0.000

800.000

Total

0.000

250.000

250.000

0.000

250.000

75.000

475.000

550.000

0.000

550.000

75.000

725.000

800.000

0.000

800.000

2

No. of Schemes

8

10

DEVELOPMENT PROGRAMME 2010-11 Ongoing Programme

Total

New Programme

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Literacy & NFBE

25.000

974.853

999.853

0.000

999.853

25.147

75.000

100.147

0.000

100.147

50.147 1,049.853

1,100.000

0.000 1,100.000

Total

25.000

974.853

999.853

0.000

999.853

25.147

75.000

100.147

0.000

100.147

50.147 1,049.853

1,100.000

0.000 1,100.000

DEVELOPMENT PROGRAMME 2011-12 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Literacy & NFBE

665.000

0.000

665.000

0.000

665.000

0.000

735.000

735.000

0.000

735.000

665.000

735.000

1,400.000

0.000 1,400.000

Total

665.000

0.000

665.000

0.000

665.000

0.000

735.000

735.000

0.000

735.000

665.000

735.000

1,400.000

0.000 1,400.000

Literacy & NFBE MTDF 2009-12 - GRAND TOTAL

86

3,300.000

LITERACY: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES

2

0.000

250.000

0.000

0.000

0.000

250.000

250.000

529.853

466.815

NEW SCHEMES

8

75.000

475.000

0.000

0.000

75.000

475.000

550.000

470.000

105.840

10

75.000

725.000

0.000

0.000

75.000

725.000

800.000

999.853

572.655

Grand Total

87

LITERACY

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

Foreign Aid Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

ON-GOING SCHEMES Regular 194

195

1 Name of the Scheme

Model Districts for Literacy Campaigns to achieve 100% Literacy with JICA Assistance in M.B.Din, Khushab, Khanewal & D.G.Khan districts (Federal Govt. Share 35%, Provincial Share 37%, District Govt. share 20%& JICA Share 8%)

Approval Date

Approved 07-12-2004

Major Components

Adult Literacy Centers NFBE Centers Awareness Campaigns

Major Targets

Achieving 100% Literacy and UPE in four Districts (Khanewal, Khushab, M.B.Din & D.G.Khan)

District and Tehsil

Khushab, Khanewal, Mandi Bahauddin , Dera Ghazi Khan

2 Name of the Scheme

Literacy Programme: Establishment of District Literacy Management Information System (LitMIS) Cell. Establishment of 6200 Adult Literacy Centres (200 in each of 31 Districts) Establishment of 6200 NonFormal Basic Education Schools (200 NFBE in each of 31 Districts)

Approval Date

Approved 07-01-2008

Major Components

Conduct of household data collection under District Literacy Management Information System (LitMIS)Cell. Adult Literacy Centres Non-Formal Basic Education Centres

Major Targets

Establishment of District LitMIS. Establishment of 6200 ALCS, Establishment of 6200 NFBE Schools

District and Tehsil

31 districts except Khanewal, Khushab, M.B.Din & D.G.Khan

0.000

981.374

327.896

0.000

195.000

0.000

0.000

0.000

195.000

195.000

129.853

145.685

182.940

0.000

1,754.130

978.000

0.000

55.000

0.000

0.000

0.000

55.000

55.000

400.000

321.130

0.000

Sub-Total: Regular

0.000

2,735.504

1,305.896

0.000

250.000

0.000

0.000

0.000

250.000

250.000

529.853

466.815

182.940

Total: ON-GOING SCHEMES

0.000

2,735.504

1,305.896

0.000

250.000

0.000

0.000

0.000

250.000

250.000

529.853

466.815

182.940

88

LITERACY

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

NEW SCHEMES Regular 196

197

198

3 Name of the Scheme

Opening of Literacy Centres on need basis (PC-II)

Approval Date

Un-Approved

Major Components

Study to develop mechanism for promotion of literacy

Major Targets

Study to develop mechanism for promotion of literacy

District and Tehsil

Punjab

4 Name of the Scheme

Punjab Literacy and Livelihood Programme

Approval Date

Un-Approved

Major Components

To open centres for skill training and literacy in Punjab.

Major Targets

Opening of centres in Punjab. Provision of Literacy material for the centres.Technical and vocational training component of learners. Research component at Provincial level. Monitoring and evaluation

District and Tehsil

Punjab

5 Name of the Scheme

Awareness Campaign for Promotion of Literacy

Approval Date

Un-Approved

Major Components

Awareness campagin through print and electronic media. Awareness campaign through traditional means like use of mosque, distribution of pamphlets, stickers, etc.

Major Targets

Creating Awareness among the masses about the importance of Education and Literacy in improving their standards of life. Generating movement for a paradigm shift for creating demand for Literacy i.e. shift from supply driven to a demand driven service

District and Tehsil

Punjab

0.000

10.000

0.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

0.000

385.000

0.000

0.000

195.000

0.000

0.000

0.000

195.000

195.000

190.000

0.000

0.000

0.000

100.000

0.000

0.000

50.000

0.000

0.000

0.000

50.000

50.000

50.000

0.000

0.000

89

LITERACY

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

199

200

201

202

6 Name of the Scheme

Establishment of 300 Adult Literacy Centres & 200 NFBE Schools at Brick Kiln

Approval Date

Un-Approved

Major Components

Establishment of 300 ALCs at Brick Kilns Establishment of 200 NFBE Schools at Brick Kilns

Major Targets

Educating Brick Kilns workers.

District and Tehsil

Punjab

7 Name of the Scheme

Community Learning Centres (CLCs) Project (Establishment of 360 CLCs/ Literacy Resource Centres - 10 in each District

Approval Date

Un-Approved

Major Components

Establishment of Community learning Centres as an intervention for Literacy & Continuing Education Institution

Major Targets

Providing post Literacy & Continuing Education options to Neo-Literate & NFBE Graduates.

District and Tehsil

Punjab

8 Name of the Scheme

Construction of Literacy House

Approval Date

Un-Approved

Major Components

Construction of Office Building of Literacy Department

Major Targets

Construction of Office Building of Literacy Department

District and Tehsil

Punjab

9 Name of the Scheme

Literacy in Mother Tongue.

Approval Date

Un-Approved

Major Components

Literacy in Mother Tongue.

Major Targets

Literacy in Mother Tongue.

District and Tehsil

Punjab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

235.840

0.000

0.000

75.000

0.000

0.000

0.000

75.000

75.000

95.000

65.840

0.000

0.000

195.000

0.000

0.000

75.000

0.000

0.000

0.000

75.000

75.000

80.000

40.000

0.000

0.000

100.000

0.000

75.000

0.000

0.000

0.000

75.000

0.000

75.000

25.000

0.000

0.000

0.000

50.000

0.000

0.000

50.000

0.000

0.000

0.000

50.000

50.000

0.000

0.000

0.000

90

LITERACY

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

10 Name of the Scheme

Capacity Building of the Department

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

0.000

0.000

20.000

0.000

0.000

0.000

50.000

Sub-Total: Regular

0.000

1,125.840

0.000

75.000

475.000

0.000

Total: NEW SCHEMES

0.000

1,125.840

0.000

75.000

475.000

Grand Total

0.000

3,861.344

1,305.896

75.000

725.000

203

Approval Date

Un-Approved

Major Components

Enhance the capacity of the officers and officials of the Provincial Department and EDOs (Literacy)

Major Targets

1. Creating institutional base for capacity building activities. 2. Research, case/ impacts/ process studies.3. MIS wing for managing database for base line data determining numbers and names of illiterates and centres, teachers, learners and monitoring staff (NGOs, project staff).4. Material, curriculum and training modules development.

District and Tehsil

Punjab

91

Total Cap 11

Rev 12

0.000

20.000

20.000

30.000

0.000

0.000

75.000

475.000

550.000

470.000

105.840

0.000

0.000

0.000

75.000

475.000

550.000

470.000

105.840

0.000

0.000

0.000

75.000

725.000

800.000

999.853

572.655

182.940

0.000

SPORTS

92

SPORTS VISION Provide world class sports facilities and equal sporting opportunities to all citizens of the province; develop healthy life styles through sports; and help develop competitive advantage in sports. TREND OF ALLOCATIONS Years 2005-06 2006-07 2007-08 2008-09 2009-10

(Rs. in million) Revised Allocation

Original Allocation 300.000 400.000 902.000 1500.000

8.500 225.616 638.000 1077.983 1600.000

POLICY INTERVENTIONS •

To set up sports nurseries by establishing sports infrastructure at grassroots level;



To build better and modern sports infrastructure at district, tehsil and union council levels for local and traditional games along with multipurpose gymnasium halls for indoor games;



To provide quality coaching facilities all over the province and introduce training for coaches;



To encourage participation of females in sports; and



To introduce scientific training to help develop competitive advantage in various sports.

93

STRATEGIC INTERVENTIONS •

Construction of international level swimming pool at Nishtar Park Sports Complex, Lahore.



Construction of Gymnasiums at district level.



Capacity Building of Sports Department.



Construction of international level tennis stadium at Nishtar Park Sports Complex, Lahore.



Construction of international level multipurpose (indoor) gymnasium at Nishtar Park Sports Complex, Lahore.



Construction of prototype gymnasiums at tehsil level.



Construction of Squash Complex at Lahore.



Development of sports facilities around school clusters in districts/tehsils.



Improvement / Development of Existing Cricket Grounds to the 1st Class Ground level in the Urban Areas at Ex-Divisional Headquarters in Punjab.



Development / improvement of grounds in districts.

94

MTDF 2009-12 Sports : Summary Development Programme 2009-10 (Million Rs) Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Sports

1,382.500

17.500

1,400.000

0.000

1,400.000

150.000

50.000

200.000

0.000

200.000

1,532.500

67.500

1,600.000

0.000

1,600.000

Total

1,382.500

17.500

1,400.000

0.000

1,400.000

150.000

50.000

200.000

0.000

200.000

1,532.500

67.500

1,600.000

0.000

1,600.000

99

No. of Schemes

9

108

Development Programme 2010-11 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Sports

1,341.467

0.000

1,341.467

0.000

1,341.467

858.533

0.000

858.533

0.000

858.533

2,200.000

0.000

2,200.000

0.000

2,200.000

Total

1,341.467

0.000

1,341.467

0.000

1,341.467

858.533

0.000

858.533

0.000

858.533

2,200.000

0.000

2,200.000

0.000

2,200.000

Development Programme 2011-12 New Programme

Ongoing Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Sports

700.000

0.000

700.000

0.000

700.000

1,300.000

0.000

1,300.000

0.000 1,300.000

2,000.000

0.000

2,000.000

0.000

2,000.000

Total

700.000

0.000

700.000

0.000

700.000

1,300.000

0.000

1,300.000

0.000 1,300.000

2,000.000

0.000

2,000.000

0.000

2,000.000

SPORTS MTDF 2009-12 - GRAND TOTAL

95

5800.000

SPORTS: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES Regular

5

172.401

0.000

0.000

0.000

172.401

0.000

172.401

170.000

159.319

Upgradation of existing cricket grounds to first class level

5

34.374

0.000

0.000

0.000

34.374

0.000

34.374

0.000

0.000

Construction of Gymnasiums

26

576.234

0.000

0.000

0.000

576.234

0.000

576.234

275.295

74.670

Upgradation of Sports Grounds

23

126.624

0.000

0.000

0.000

126.624

0.000

126.624

0.000

0.000

Development of sports facilities around school clusters

24

140.072

0.000

0.000

0.000

140.072

0.000

140.072

0.000

0.250

Construction of Prototype Gymnasiums at Tehsil Level

11

303.845

0.000

0.000

0.000

303.845

0.000

303.845

342.990

56.171

5

28.950

17.500

0.000

0.000

28.950

17.500

46.450

13.182

0.000

99

1,382.500

17.500

0.000

0.000

1,382.500

17.500

1,400.000

801.467

290.410

Regular

9

150.000

50.000

0.000

0.000

150.000

50.000

200.000

540.000

0.000

Total: NEW SCHEMES

9

150.000

50.000

0.000

0.000

150.000

50.000

200.000

540.000

0.000

108

1,532.500

67.500

0.000

0.000

1,532.500

67.500

1,600.000

1,341.467

290.410

Others Total: ON-GOING SCHEMES NEW SCHEMES

Grand Total

96

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

ON-GOING SCHEMES Regular 204

205

206

207

1 Name of the Scheme

Construction of International Level Swimming Pool at Nishtar Park Sports Complex

Approval Date

Approved 21-08-2007

Major Components

Civil Works

Major Targets

Training of 250 Swimmers annually

District and Tehsil

Lahore

2 Name of the Scheme

Construction of Squash Complex at Lahore

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Lahore

3 Name of the Scheme

Construction of International Level Multipurpose indoor Gymnasium at Nishtar Park Sports Complex Lahore.

Approval Date

Approved 27-09-2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Lahore

4 Name of the Scheme

Construction of International Level Tennis Stadium at Nishtar Park Sports Complex , Lahore

Approval Date

Approved 04-06-2009

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Lahore

0.000

173.560

97.936

75.624

0.000

0.000

0.000

75.624

0.000

75.624

0.000

0.000

0.000

0.000

220.000

0.000

35.000

0.000

0.000

0.000

35.000

0.000

35.000

95.000

89.500

0.000

0.000

74.425

2.000

26.000

0.000

0.000

0.000

26.000

0.000

26.000

25.000

21.425

0.000

0.000

120.012

0.500

30.000

0.000

0.000

0.000

30.000

0.000

30.000

50.000

39.512

0.000

97

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

208

5 Name of the Scheme

Improvement & Renovation of Sports Fields at: A) Iqbal Park Sports Complex, Lahore; B) Nishtar Park Sports Complex Qaddafi Stadium , Lahore

Approval Date

Approved 27-09-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Lahore

Sub-Total: Regular

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

5.777

0.000

0.000

0.000

Total Cap 11

0.000

21.777

16.000

0.000

609.774

116.436

172.401

0.000

11.276

7.264

4.012

0.000

0.000

0.000

4.012

0.000

16.342

4.500

11.842

0.000

0.000

0.000

11.842

0.000

0.000

0.000

5.777

172.401

Rev 12

5.777

0.000

8.882

172.401

170.000

159.319

0.000

4.012

0.000

0.000

0.000

0.000

11.842

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Upgradation of existing cricket grounds to first class level 209

210

6 Name of the Scheme

Up gradation of Existing Cricket Grounds to the level of first class ground at ex-divisional headquarters in Punjab - One at Multan

Approval Date

Approved 04-06-2009

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Multan

7 Name of the Scheme

Up gradation of existing cricket grounds to the level of first class ground at ex-Divisional Headquarters in Punjab - One at Sargodha

Approval Date

Approved 23-12-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Sargodha

98

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

211

212

213

8 Name of the Scheme

Up gradation of existing cricket grounds to the level of first class ground at ex-Divisional Headquarters in Punjab - One at Faisalabad.

Approval Date

Approved 30-06-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Faisalabad

9 Name of the Scheme

Up gradation of existing cricket grounds to the level of first class ground at ex-Divisional Headquarters in Punjab - One at Lahore.

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Lahore

10 Name of the Scheme

Up gradation of existing cricket grounds to the level of first class ground at ex-Divisional Headquarters in Punjab - One at D.G. Khan

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Dera Ghazi Khan

Sub-Total: Upgradation of existing cricket grounds to first class level

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

13.000

3.500

9.500

0.000

0.000

0.000

9.500

0.000

9.500

0.000

0.000

0.000

0.000

5.322

2.947

2.375

0.000

0.000

0.000

2.375

0.000

2.375

0.000

0.000

0.000

0.000

11.145

4.500

6.645

0.000

0.000

0.000

6.645

0.000

6.645

0.000

0.000

0.000

57.085

22.711

34.374

34.374

0.000

9.372

0.000

0.000

0.000

0.000

0.000

34.374

0.000

0.000

0.000

Construction of Gymnasiums 214

11 Name of the Scheme

Construction of Gymnasium at Rawalpindi.

Approval Date

28-02-2006

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Rawalpindi

0.000

52.297

42.925

9.372

99

0.000

0.000

0.000

9.372

0.000

0.000

0.000

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

215

216

217

218

219

12 Name of the Scheme

Construction of Gymnasium at Attock

Approval Date

25-09-2006

Major Components

Civil Works

Major Targets

Training of 275 players annually

District and Tehsil

Attock

13 Name of the Scheme

Construction of Gymnasium at Chakwal

Approval Date

17-02-2006

Major Components

Civil Works

Major Targets

Training of 250 Swimmers annually

District and Tehsil

Chakwal

14 Name of the Scheme

Construction of Gymnasium at Jhelum

Approval Date

23-12-2008

Major Components

Civil Works

Major Targets

Training of 275 players annually

District and Tehsil

Jhelum

15 Name of the Scheme

Construction of Gymnasium at Sargodha.

Approval Date

17-02-2006

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Sargodha

16 Name of the Scheme

Construction of Gymnasium at Khushab

Approval Date

27-11-2007

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Khushab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

49.700

18.050

31.650

0.000

0.000

0.000

31.650

0.000

31.650

0.000

0.000

0.000

0.000

51.566

47.855

3.711

0.000

0.000

0.000

3.711

0.000

3.711

0.000

0.000

0.000

0.000

73.957

7.000

25.000

0.000

0.000

0.000

25.000

0.000

25.000

41.957

0.000

0.000

0.000

50.623

40.373

10.250

0.000

0.000

0.000

10.250

0.000

10.250

0.000

0.000

0.000

0.000

45.658

6.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

19.658

0.000

0.000

100

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

220

221

222

223

224

17 Name of the Scheme

Construction of Gymnasium at Bhakkar.

Approval Date

21-08-2007

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Bhakkar

18 Name of the Scheme

Construction of Gymnasium at Faisalabad.

Approval Date

17-02-2008

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Faisalabad

19 Name of the Scheme

Construction of Gymnasium at Gujranwala.

Approval Date

30-06-2008

Major Components

Civil Works

Major Targets

Training of 275 players annually

District and Tehsil

Gujranwala

20 Name of the Scheme

Construction of Gymnasium at Hafizabad

Approval Date

25-09-2006

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Hafizabad

21 Name of the Scheme

Construction of Gymnasium at Gujrat.

Approval Date

25-09-2006

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

49.842

8.489

30.000

0.000

0.000

0.000

30.000

0.000

30.000

1.353

10.000

0.000

0.000

46.688

40.148

1.540

0.000

0.000

0.000

1.540

0.000

1.540

5.000

0.000

0.000

0.000

75.423

60.000

15.423

0.000

0.000

0.000

15.423

0.000

15.423

0.000

0.000

0.000

0.000

51.814

35.769

16.045

0.000

0.000

0.000

16.045

0.000

16.045

0.000

0.000

0.000

0.000

53.277

29.212

24.065

0.000

0.000

0.000

24.065

0.000

24.065

0.000

0.000

0.000

101

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

225

226

227

228

229

22 Name of the Scheme

Construction of Gymnasium at Sialkot.

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Sialkot

23 Name of the Scheme

Construction of Gymnasium at Narowal.

Approval Date

30-06-2008

Major Components

Civil Works

Major Targets

Training of 175 players annually

District and Tehsil

Narowal

24 Name of the Scheme

Construction of Gymnasium at Sheikhupura.

Approval Date

30-06-2008

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Sheikhupura

25 Name of the Scheme

Construction of Gymnasium at Kasur

Approval Date

17-02-2006

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Kasur

26 Name of the Scheme

Construction of Gymnasium at Multan.

Approval Date

3/10/2007

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

72.573

10.000

31.395

0.000

0.000

0.000

31.395

0.000

31.395

31.178

0.000

0.000

0.000

69.035

3.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

46.035

0.000

0.000

0.000

77.908

2.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

35.908

10.000

0.000

0.000

56.257

23.486

32.771

0.000

0.000

0.000

32.771

0.000

32.771

0.000

0.000

0.000

0.000

55.572

29.761

25.811

0.000

0.000

0.000

25.811

0.000

25.811

0.000

0.000

0.000

102

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

230

231

232

233

234

27 Name of the Scheme

Construction of Gymnasium at Lodhran

Approval Date

31-10-2006

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Lodhran

28 Name of the Scheme

Construction of Gymnasium at Khanewal

Approval Date

16-11-2006

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Khanewal

29 Name of the Scheme

Construction of Gymnasium at Sahiwal.

Approval Date

30-11-2007

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Sahiwal

30 Name of the Scheme

Construction of Gymnasium at Pakpattan.

Approval Date

28-11-2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Pakpattan

31 Name of the Scheme

Construction of Gymnasium at D.G.Khan.

Approval Date

30-06-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Dera Ghazi Khan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

50.594

20.000

25.594

0.000

0.000

0.000

25.594

0.000

25.594

5.000

0.000

0.000

0.000

52.505

32.451

20.054

0.000

0.000

0.000

20.054

0.000

20.054

0.000

0.000

0.000

0.000

70.660

16.000

32.948

0.000

0.000

0.000

32.948

0.000

32.948

14.660

7.052

0.000

0.000

64.606

6.000

15.988

0.000

0.000

0.000

15.988

0.000

15.988

25.000

17.618

0.000

0.000

69.928

10.704

30.000

0.000

0.000

0.000

30.000

0.000

30.000

19.224

10.000

0.000

103

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

235

236

237

238

239

32 Name of the Scheme

Construction of Gymnasium at Rajanpur

Approval Date

2/6/2006

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Rajanpur

33 Name of the Scheme

Construction of Gymnasium at Muzaffargarh.

Approval Date

9/8/2008

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Muzaffargarh

34 Name of the Scheme

Construction of Gymnasium at Layyah

Approval Date

25-09-2006

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Layyah

35 Name of the Scheme

Construction of Gymnasium at Bahawalpur.

Approval Date

30-06-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Bahawalpur

36 Name of the Scheme

Construction of Gymnasium at Bahawalnagar

Approval Date

25-09-2006

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Bahawalnagar

Sub-Total: Construction of Gymnasiums

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

51.837

30.588

21.249

0.000

0.000

0.000

21.249

0.000

21.249

0.000

0.000

0.000

0.000

67.875

17.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

10.875

10.000

0.000

0.000

53.720

27.930

25.790

0.000

0.000

0.000

25.790

0.000

25.790

0.000

0.000

0.000

0.000

66.797

15.350

22.000

0.000

0.000

0.000

22.000

0.000

22.000

19.447

10.000

0.000

0.000

47.415

21.837

25.578

0.000

0.000

0.000

25.578

0.000

25.578

0.000

0.000

0.000

0.000

1,528.127

601.928

576.234

576.234

275.295

74.670

104

0.000

0.000

0.000

576.234

0.000

0.000

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

Upgradation of Sports Grounds 240

241

242

243

244

37 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Attock

Approval Date

9/8/2008

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Attock

38 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Chakwal

Approval Date

28-11-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Chakwal

39 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Jhelum

Approval Date

31-12-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Jhelum

40 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Faisalabad

Approval Date

9/8/2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Faisalabad

41 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Jhang

Approval Date

28-11-2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Jhang , Shorkot

0.000

7.126

4.000

3.126

0.000

0.000

0.000

3.126

0.000

3.126

0.000

0.000

0.000

0.000

5.653

1.000

4.653

0.000

0.000

0.000

4.653

0.000

4.653

0.000

0.000

0.000

0.000

5.759

3.000

2.759

0.000

0.000

0.000

2.759

0.000

2.759

0.000

0.000

0.000

0.000

6.060

1.000

5.060

0.000

0.000

0.000

5.060

0.000

5.060

0.000

0.000

0.000

0.000

7.248

2.000

5.248

0.000

0.000

0.000

5.248

0.000

5.248

0.000

0.000

0.000

105

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

245

246

247

248

249

42 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at T.T. Singh

Approval Date

22-12-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Toba Tek Singh

43 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Hafizabad

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Hafizabad

44 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Mandi Bahauddin

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Mandi Bahauddin

45 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Narowal

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 175 players annually

District and Tehsil

Narowal

46 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Lahore

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.363

2.000

1.363

0.000

0.000

0.000

1.363

0.000

1.363

0.000

0.000

0.000

0.000

12.849

4.000

8.849

0.000

0.000

0.000

8.849

0.000

8.849

0.000

0.000

0.000

0.000

4.930

1.000

3.930

0.000

0.000

0.000

3.930

0.000

3.930

0.000

0.000

0.000

0.000

12.575

6.000

6.575

0.000

0.000

0.000

6.575

0.000

6.575

0.000

0.000

0.000

0.000

4.958

2.400

2.558

0.000

0.000

0.000

2.558

0.000

2.558

0.000

0.000

0.000

106

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

250

251

252

253

254

47 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Nankana.

Approval Date

18-02-2009

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Nankana Sahib

48 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Multan

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Multan

49 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Lodhran

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 175 players annually

District and Tehsil

Lodhran

50 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Khanewal

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Khanewal

51 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Sahiwal

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

12.118

2.000

10.118

0.000

0.000

0.000

10.118

0.000

10.118

0.000

0.000

0.000

0.000

13.001

2.000

11.001

0.000

0.000

0.000

11.001

0.000

11.001

0.000

0.000

0.000

0.000

10.224

3.000

7.224

0.000

0.000

0.000

7.224

0.000

7.224

0.000

0.000

0.000

0.000

10.000

1.000

9.000

0.000

0.000

0.000

9.000

0.000

9.000

0.000

0.000

0.000

0.000

7.441

4.000

3.441

0.000

0.000

0.000

3.441

0.000

3.441

0.000

0.000

0.000

107

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

255

256

257

258

259

52 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Pakpattan

Approval Date

9/8/2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Pakpattan

53 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Vehari

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 100 players annually

District and Tehsil

Vehari , Mailsi

54 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at D.G Khan

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Dera Ghazi Khan

55 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Rajanpur

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Rajanpur

56 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Layyah

Approval Date

23-12-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Layyah

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.077

2.000

5.077

0.000

0.000

0.000

5.077

0.000

5.077

0.000

0.000

0.000

0.000

6.612

2.000

4.612

0.000

0.000

0.000

4.612

0.000

4.612

0.000

0.000

0.000

0.000

9.273

2.000

7.273

0.000

0.000

0.000

7.273

0.000

7.273

0.000

0.000

0.000

0.000

10.391

4.000

6.391

0.000

0.000

0.000

6.391

0.000

6.391

0.000

0.000

0.000

0.000

7.596

1.000

6.596

0.000

0.000

0.000

6.596

0.000

6.596

0.000

0.000

0.000

108

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

260

261

262

57 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Bahawalpur

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Bahawalpur , Hasilpur

58 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Bahawalnagar

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Bahawalnagar

59 Name of the Scheme

Up gradation of Sports Grounds in 24 Districts in Punjab - One at Rahim Yar Khan

Approval Date

22-12-2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Rahim Yar Khan

Sub-Total: Upgradation of Sports Grounds

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.909

4.000

2.909

0.000

0.000

0.000

2.909

0.000

2.909

0.000

0.000

0.000

0.000

8.029

2.000

6.029

0.000

0.000

0.000

6.029

0.000

6.029

0.000

0.000

0.000

0.000

3.832

1.000

2.832

0.000

0.000

0.000

2.832

0.000

2.832

0.000

0.000

0.000

0.000

183.024

126.624

0.000

0.000

6.204

1.454

0.000

56.400

126.624

0.000

0.000

0.000

126.624

0.000

0.000

0.000

Development of sports facilities around school clusters 263

60 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Rawalpindi

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Rawalpindi , Kahota

4.750

1.454

109

0.000

0.000

0.000

1.454

0.000

0.000

0.000

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

264

265

266

267

61 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Attock

Approval Date

30-06-2008

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Attock

62 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Jhelum

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Jhelum

63 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Sargodha

Approval Date

18-02-2009

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Sargodha

64 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Khushab

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Khushab , Johar Abad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.228

3.750

3.478

0.000

0.000

0.000

3.478

0.000

3.478

0.000

0.000

0.000

0.000

7.929

4.750

3.179

0.000

0.000

0.000

3.179

0.000

3.179

0.000

0.000

0.000

0.000

11.290

2.000

9.290

0.000

0.000

0.000

9.290

0.000

9.290

0.000

0.000

0.000

0.000

11.868

2.000

9.868

0.000

0.000

0.000

9.868

0.000

9.868

0.000

0.000

0.000

110

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

268

269

270

271

65 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Mianwali

Approval Date

30-06-2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Mianwali

66 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Bhakkar

Approval Date

18-02-2009

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Bhakkar

67 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Jhang.

Approval Date

28-11-2008

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Jhang , Ahmadpur Sial

68 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Toba Tek Singh

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 175 players annually

District and Tehsil

Toba Tek Singh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.474

1.750

2.724

0.000

0.000

0.000

2.724

0.000

2.724

0.000

0.000

0.000

0.000

11.972

1.750

10.222

0.000

0.000

0.000

10.222

0.000

10.222

0.000

0.000

0.000

0.000

7.137

1.750

5.387

0.000

0.000

0.000

5.387

0.000

5.387

0.000

0.000

0.000

0.000

8.819

2.000

6.819

0.000

0.000

0.000

6.819

0.000

6.819

0.000

0.000

0.000

111

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

272

273

274

275

69 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Hafizabad

Approval Date

30-06-2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Hafizabad

70 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Pindi Bhattian, Hafiz Abad

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Hafizabad , Pindibhattian

71 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Gujrat

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Gujrat

72 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Mandi Bahauddin

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Mandi Bahauddin

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

11.491

4.355

7.136

0.000

0.000

0.000

7.136

0.000

7.136

0.000

0.000

0.000

0.000

11.983

4.750

6.983

0.000

0.000

0.000

6.983

0.000

6.983

0.000

0.250

0.000

0.000

14.449

6.750

7.699

0.000

0.000

0.000

7.699

0.000

7.699

0.000

0.000

0.000

0.000

3.750

2.000

1.750

0.000

0.000

0.000

1.750

0.000

1.750

0.000

0.000

0.000

112

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

276

277

278

279

73 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Pasroor, Sialkot

Approval Date

23-12-2008

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Sialkot , Pasroor

74 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Lahore

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Lahore

75 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Kasur

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Kasur

76 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Multan

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

11.639

2.000

9.639

0.000

0.000

0.000

9.639

0.000

9.639

0.000

0.000

0.000

0.000

1.874

1.174

0.700

0.000

0.000

0.000

0.700

0.000

0.700

0.000

0.000

0.000

0.000

7.278

1.000

6.278

0.000

0.000

0.000

6.278

0.000

6.278

0.000

0.000

0.000

0.000

10.825

4.750

6.075

0.000

0.000

0.000

6.075

0.000

6.075

0.000

0.000

0.000

113

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

280

281

282

283

77 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Dunya Pur, Lodhran

Approval Date

23-12-2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Lodhran , Dunyapur

78 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Vehari

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Vehari

79 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at D.G Khan

Approval Date

13-10-2008

Major Components

Civil Works

Major Targets

Training of 350 players annually

District and Tehsil

Dera Ghazi Khan

80 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Rajanpur

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Rajanpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.826

2.000

6.826

0.000

0.000

0.000

6.826

0.000

6.826

0.000

0.000

0.000

0.000

6.621

1.000

5.621

0.000

0.000

0.000

5.621

0.000

5.621

0.000

0.000

0.000

0.000

8.911

4.750

4.161

0.000

0.000

0.000

4.161

0.000

4.161

0.000

0.000

0.000

0.000

6.683

1.750

4.933

0.000

0.000

0.000

4.933

0.000

4.933

0.000

0.000

0.000

114

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

284

285

286

81 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Layyah.

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Layyah

82 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Bahawalpur

Approval Date

9/8/2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Bahawalpur

83 Name of the Scheme

Development of sports facilities around school clusters in 24 Districts at Tehsil level - One at Bahawalnagar

Approval Date

30-06-2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Bahawalnagar

Sub-Total: Development of sports facilities around school clusters

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

11.307

1.000

10.307

0.000

0.000

0.000

10.307

0.000

10.307

0.000

0.000

0.000

0.000

5.326

3.750

1.576

0.000

0.000

0.000

1.576

0.000

1.576

0.000

0.000

0.000

0.000

9.717

1.750

7.967

0.000

0.000

0.000

7.967

0.000

7.967

0.000

0.000

0.000

0.000

207.601

67.279

140.072

140.072

0.000

0.000

69.718

7.000

25.000

0.000

0.000

0.000

140.072

0.000

0.250

0.000

Construction of Prototype Gymnasiums at Tehsil Level 287

84 Name of the Scheme

Construction of prototype Gymnasium at Kallur Kot

Approval Date

24-11-2008

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Bhakkar , Kallur Kot

115

0.000

0.000

0.000

25.000

0.000

25.000

37.718

0.000

0.000

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

288

289

290

291

292

85 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level - One at Darya Khan

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Bhakkar , Darya Khan

86 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level - One at Mankera

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Bhakkar , Mankera

87 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level - One at Chak Jhumra

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Faisalabad , Chak Jhumra

88 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level one at Tandlianwala

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Faisalabad , Tandlianwala

89 Name of the Scheme

Construction of Prototype Gymnasium one at Samundri

Approval Date

16-01-2009

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Faisalabad , Samundri

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

70.999

6.500

25.000

0.000

0.000

0.000

25.000

0.000

25.000

39.499

0.000

0.000

0.000

70.939

6.500

20.000

0.000

0.000

0.000

20.000

0.000

20.000

40.939

3.500

0.000

0.000

74.516

1.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

25.000

18.516

0.000

0.000

75.219

6.500

25.000

0.000

0.000

0.000

25.000

0.000

25.000

33.719

10.000

0.000

0.000

76.096

5.000

25.000

0.000

0.000

0.000

25.000

0.000

25.000

46.096

0.000

0.000

116

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

293

294

295

296

297

90 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level - One at Burewala

Approval Date

1/9/2008

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Vehari , Burewala

91 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level - One at Mailsi

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Vehari , Mailsi

92 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level - One at Jampur

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 300 players annually

District and Tehsil

Rajanpur , Jampur

93 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level - One at Tamewali

Approval Date

27-09-2008

Major Components

Civil Works

Major Targets

Training of 200 players annually

District and Tehsil

Bahawalpur , Khairpur Tamewali

94 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level - One at Sadiqabad

Approval Date

17-11-2008

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Rahim Yar Khan , Sadiqabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

70.139

14.000

35.000

0.000

0.000

0.000

35.000

0.000

35.000

16.139

5.000

0.000

0.000

67.875

6.500

30.000

0.000

0.000

0.000

30.000

0.000

30.000

21.375

10.000

0.000

0.000

62.555

6.000

31.845

0.000

0.000

0.000

31.845

0.000

31.845

21.555

3.155

0.000

0.000

63.992

2.000

22.000

0.000

0.000

0.000

22.000

0.000

22.000

33.992

6.000

0.000

0.000

63.958

2.000

35.000

0.000

0.000

0.000

35.000

0.000

35.000

26.958

0.000

0.000

117

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Sub-Total: Construction of Prototype Gymnasiums at Tehsil Level

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

303.845

Foreign Aid Rev 8

0.000

Cap 9

Rev 10

Total Cap 11

Rev 12

303.845

342.990

56.171

0.000

9.000

0.000

0.000

0.000

15.000

0.000

15.000

4.947

0.000

0.000

0.000

0.000

7.500

7.500

0.000

0.000

0.000

0.000

0.000

0.000

10.000

10.000

8.235

0.000

0.000

0.000

0.000

4.950

0.000

4.950

0.000

0.000

0.000

0.000

766.006

63.000

0.000

0.000

303.845

0.000

14.000

5.000

9.000

0.000

0.000

0.000

9.000

0.000

29.947

10.000

15.000

0.000

0.000

0.000

0.000

17.500

10.000

0.000

7.500

0.000

0.000

60.681

42.446

0.000

10.000

0.000

9.950

5.000

4.950

0.000

0.000

0.000

Others 298

299

300

301

302

95 Name of the Scheme

Construction of Sports Stadium at Sohawa

Approval Date

2/1/2006

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Jhelum , Sohawa

96 Name of the Scheme

Provision of missing facilities at Sports Stadium, Bhakkar

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Bhakkar

97 Name of the Scheme

Computerization of Sports Department

Approval Date

9/8/2008

Major Components

Establishment of Computer Lab

Major Targets

Computerization of data

District and Tehsil

Lahore

98 Name of the Scheme

Capacity Building of Sports Department.

Approval Date

21-03-2007

Major Components

Capacity Building

Major Targets

Capacity Building

District and Tehsil

Lahore

99 Name of the Scheme

Rehabilitation/Construction of stadium at Muridkey City

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Sheikhupura , Muridkey

118

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid Cap 9

Rev 10

Total

6

Cap 7

Rev 8

Cap 11

Rev 12

72.446

28.950

17.500

0.000

0.000

28.950

17.500

46.450

13.182

0.000

0.000

1,000.200 1,382.500

17.500

0.000

0.000 1,382.500

17.500

1,400.000

801.467

290.410

0.000

Sub-Total: Others

0.000

132.078

Total: ON-GOING SCHEMES

0.000

3,483.695

0.000

10.000

0.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

0.000

0.000

0.000

0.000

60.000

0.000

0.000

20.000

0.000

0.000

0.000

20.000

20.000

40.000

0.000

0.000

0.000

25.000

5.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

0.000

0.000

0.000

0.000

25.000

0.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

15.000

0.000

0.000

NEW SCHEMES Regular 303 100 Name of the Scheme

Development of Sports Facilities at Government Boys Higher Secondary School, Choa Khalsa

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Rawalpindi , Kallar Syedan

304 101 Name of the Scheme

Laying of Astroturf at Hockey Stadium, Gojra

Approval Date

Un-Approved

Major Components

Astroturf

Major Targets

Training of 250 players annually

District and Tehsil

Toba Tek Singh , Gojra

305 102 Name of the Scheme

Construction of Sports Hall at Nowshera Virkan

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Gujranwala , Nowshera Virkan

306 103 Name of the Scheme

Up-gradation of existing structure to convert into Players' Hostel at Nishtar Park Sports Complex under the stairs of National Hockey Stadium, Lahore.

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

To facilitate the players during the matches

District and Tehsil

Lahore

119

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

307 104 Name of the Scheme

Provision of Gym Equipments in 35 districts of Punjab

Approval Date

Un-Approved

Major Components

Gym Equipments

Major Targets

Training of 250 players annually

District and Tehsil

35 districts of Punjab

308 105 Name of the Scheme

Up gradation of Sports Grounds in 12 District in Punjab

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Sargodha, Gujranwala, Gujrat, Mianwali, Muzaffargarh, Narowal, Okara, Rawalpindi, Toba Tek Singh, Sheikhupura, Sialkot, Sahiwal

309 106 Name of the Scheme

Development of sports facilities around schools clusters in 12 Districts at Tehsil level in Punjab

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Chakwal, Sargodha, Faisalabad, Gujranwala, Rahim Yar Khan, Nankana, Narowal, Okara, Pakpattan, Rahim Yar Khan, Khushab , Tala Gang, Shahpur, Jaranwala, Wazirabad, R.Y. Khan, Shahkot, Shakargarh, Depalpur, Arifwala, Khanpur, Quidabad

310 107 Name of the Scheme

Construction of Prototype Gymnasium at Tehsil Level in 7 Tehsils of Punjab

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 150 players annually

District and Tehsil

Jhang, Bahawalnagar, Bahawalpur, Faisalabad, Khanewal, Hafizabad, Rahim Yar Khan , Shorkot, Jaranwala, Haroonabad, Hasilpur, Mian Channu, Pindibhattian, R.Y. Khan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

80.000

0.000

0.000

30.000

0.000

0.000

0.000

30.000

30.000

50.000

0.000

0.000

0.000

100.000

0.000

25.000

0.000

0.000

0.000

25.000

0.000

25.000

75.000

0.000

0.000

0.000

120.000

0.000

25.000

0.000

0.000

0.000

25.000

0.000

25.000

95.000

0.000

0.000

0.000

300.000

0.000

45.000

0.000

0.000

0.000

45.000

0.000

45.000

255.000

0.000

0.000

120

SPORTS

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

0.000

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

311 108 Name of the Scheme

Missing facilities around constructed Gymnasium in 4 Tehsils

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

15.000

0.000

0.000

0.000

15.000

0.000

15.000

10.000

0.000

25.000

Sub-Total: Regular

0.000

745.000

5.000

150.000

50.000

0.000

0.000

150.000

50.000

200.000

540.000

0.000

0.000

Total: NEW SCHEMES

0.000

745.000

5.000

150.000

50.000

0.000

0.000

150.000

50.000

200.000

540.000

0.000

0.000

Grand Total

0.000

4,228.695

1,005.200 1,532.500

67.500

0.000

0.000 1,532.500

67.500

1,600.000

1,341.467

290.410

0.000

Approval Date

Un-Approved

Major Components

Civil Works

Major Targets

Training of 250 players annually

District and Tehsil

Rahim Yar Khan ,Nankana , Bhakkar , Kasur , Khanpur, Nankana Sahib, Bhakkar, Kasur

121

0.000

HEALTH

122

HEALTH VISION Healthy population with a sound health care system practicing healthy life style, in partnership with private sector including civil society, which is effective, efficient and responsive to the needs of low socio-economic groups especially women in the reproduction age. OBJECTIVES • • • • • • •

Measurable impact on Millennium Development Goals (MDGs) through major interventions in the health services delivery with significant reduction in incidence of diseases Implementation of standardized service delivery package through effective implementation of Minimum Service Delivery Standards (MSDS) Bringing in that hitherto lacking element of regional equity in the developmental portfolio Focus on Preventive Health Care through inter-sectoral coordination and regular health education/promotion Improved primary, secondary and tertiary health care through inclusion of needs-based and result-oriented schemes Complement the current side pro-poor investments effectively and strategically Alignment with the Health Policy Framework Trend of Allocation Original Allocation

(Million Rs.) Revised Allocation

2005-06

3,290

3,499

2006-07

4,300

4,369

2007-08

6,500

6,901

2008-09

9,000

9,278

2009-10

12,525

Year

123

STRATEGIC INTERVENTIONS MICS Punjab 2007-08 highlights Infant Mortality Rate as 77/1000 births and Under-five Mortality Rate as 111/1000 births whereas only 43% of the deliveries are attended by the Skilled Birth Attendants. This situation along with a heavy toll of communicable / non-communicable diseases demands change in interventions with a focus on the pro-poor initiatives. 7 Criteria for selection of schemes have been developed and each of them addresses and reinforces the over-arching goal of pro-poor service delivery. The 7 criteria are explained hereunder: Greater Focus on Preventive Health Care & Attainment of the MDGs: Punjab has a unique situation of a Double Burden of Disease, wherein there is parity between Communicable and Non-Communicable Diseases. Yet, the preventable diseases still take heavy tolls and diseases which are believed to have been rolled back / re-emerged. Obviously pro-poor in essence, the two criteria have been clubbed together for better targeting, synergizing and streamlining efforts. The following interventions are going to contribute towards this end: y y y y y y y y y y y

Punjab Millennium Development Goals Programme (PMDGP) Punjab Safe Motherhood Initiative Project National Blood Transfusion Service Programme HIV/AIDS Programme TB Control Programme Expanded Programme of Immunization Prevention & Control of Hepatitis Programme Dengue Control Programme Punjab Thalassemia Prevention Programme Malaria Control Programme National Maternal and New Born Child Health Programme (Federal)

Focus on Rural Health Centres (RHCs) and Renewed Focus on Secondary Health Care y

Policy is to consolidate the existing health facilities instead of creating new infrastructure. No new Basic Health Unit (BHU) will be established. Focus, now, would be on strengthening Primary Health Care facilities (RHCs) based on yardsticks.

y

Secondary Health Care level has re-emerged as critical for effective and efficient service delivery. It also has the potential of

124

meaningful pro-poor interventions. The emphasis is on upgradation of THQ & DHQ Hospitals as well as establishment of new ones. In the case of THQ Hospitals, priority would be given to those THQ Hospitals which are farthest from the DHQ Hospital. As for the DHQ Hospitals, the upgradation would be prioritized on needs basis and geographical as well as equity considerations would be kept paramount. y

Rs. 2955 million has been allocated for such facilities, which is 23.5% of total allocation for health sector

NEED BASED & RESULT ORIENTED ALLOCATION FOR TERTIARY HEALTH CARE y

Being autonomous, the tertiary health care level is witnessing a great deal of dynamism and several innovations which need substantial funding and support. Therefore, the tertiary health care allocations remain high but they have been made more needbased and targeted.

y

The high level of allocation for Tertiary Health Care is also because of the intended establishment of Centres of Excellence which obviously are cost-intensive.

y

Rs. 3,981 million have been allocated, which is 33% of total funds for health sector.

IMPROVED DIAGNOSTIC FACILITIES The area of diagnostics needs to be strengthened appreciably to keep pace with the ever-changing demands of time and to make health and medical analyses more scientific. There a few schemes in this ADP which would help in refurbishing the diagnostic facilities and also help in ascertaining the quality and purity of food and beverages. The significant ones are given below: y

Establishment of Drug Testing Labs at Faisalabad and Rawalpindi

y

Strengthening of Drug Testing Lab at Multan

y

Establishment of Food Testing Labs at Rawalpindi and Faisalabad

y

Establishment of Mobile Food Testing Lab

y

Upgradation of Bacteriologist Lab at Institute of Public Health, Lahore

y

PCR Facilities at Tertiary level

125

NEW STRATEGIC THRUST Delivering services in the traditional manner has shown to be riddled with typical public sector inefficiencies. With this in perspective, priorities have been re-orientated leading to a new strategic thrust. This would enable to grapple with service delivery issues with a fresh approach and in a focused manner. The following are the salient initiatives in this respect: y

Mobile Health Unit system is being introduced/piloted at Tehsil level to make up for the deficiencies of static coverage. This initiative shall be piloted in three Tehsils and then subsequently shall be expanded in phases. The Mobile Health Unit shall comprise collapsible and non-collapsible diagnostic, invasive and non-invasive electro-medical equipment. It would also contain health education material that would be disseminated strategically. Stationed at the THQ Hospital, its destination would be RHC where, or close to where, it would administer services on well-advertised date and time. An allocation of Rs. 300 million is being proposed to take this off to a good start.

y

Model THQ Hospital as future Lynch-pin of Service Delivery. Absenteeism, particularly in respect of female doctors in RHCs and BHUs is the principal factor contributing to unsatisfactory service delivery. With the inescapable obligation to attain the MDGs under the PMDGP, ensuring the required improvement in service delivery mandates out of the box approach over and above the traditional arrangements. Currently, about 70% of total enrolment in Medical Colleges comprises female students. Sustaining outreach in the near future by way of ensuring their presence in Primary Health Care facilities is going to be a daunting challenge. To address this, there is a policy to develop prototype in which THQ Hopsital would be the base from where Primary Health Care facilities shall be provided medical coverage. The concept entails providing accommodation facilities to all Medical Officers (MOs) and Women Medical Officers (WMOs) posted in RHCs and BHUs who would be provided joint transportation facilities to travel to their respective stations of duty in the morning and return to the security of their enclave after duty hours. Compact apartment type, functionally efficient affordable accommodation is being recommended to house different categories of doctors. The concept also involves rotation of doctors between the upgraded THQ Hopsital, where Secondary level health care facilities are being envisioned and Primary Health Care facilities to provide them incentive of simultaneously updating the professional skills while working in the rural areas. The Minimum Service Delivery Standards (MSDS) implementation would also benefit from this effort. Rs. 225 million is allocated for this purpose.

126

y

Emergency Services Block at 10 DHQ Hospitals; this would again be pro-poor as well as a result-oriented intervention and give a real boost to service delivery. The service delivery has to be expanded in a manner so that people living in different districts and rural areas are provided quality health care services at the local level. With this object in mind, a plan has been chalked out to undertake construction of dedicated Emergency Blocks in a phased manner which would be equipped with all necessary diagnostic and trauma facilities. An initial allocation of Rs. 500 million would take this initiative forward rapidly.

ESTABLISHMENT OF CENTRES OF EXCELLENCE Centres of Excellence augment specialized service delivery at the high-end level and could become avenues of revenue generation in times to come as well. The possibility of medical tourism also becomes more likely because of their establishment. The approved Health Policy Framework also recognized their significance. Their establishment is now believed to be appropriate and result-oriented. The following can be enlisted in this regard: y

Rawalpindi Institute of Cardiology

y

Institute of Urology & Transplantation at Rawalpindi

y

Liver Disease Management Centre at Lahore

y

Kidney Centre at Multan

y

Cancer Hospital at Lahore

y

Institute of Neurosciences at Lahore

y

Faisalabad Institute of Cardiology

y

Multan Institute of Cardiology

y

Fatima Jinnah Institute of Dental Sciences, Lahore

y

Burn Units in 4 Tertiary level Hospitals

The Centres of Excellence have been allocated Rs. 1,300 million i.e. 10% of the total.

127

ENHANCED FOCUS ON MEDICAL EDUCATION The inequity in Doctor to Population Ratio has impeded efficient service delivery as well. The current Doctor-Population Ratio stands at 1:2187 instead of the WHO recommended 1:1000. With a view to rectifying this mis-match, the Punjab Government intends to establish new Medical Colleges at Gujranwala, Sialkot, Sahiwal, Multan and D.G. Khan while MBBS class for 1st year has commenced in April, 2009 in the newlyestablished Medical College, Gujrat. Nursing Education has also been prioritized through the successful partnership with the Fatima Memorial Hospital. This is a manifestation of priority to this critical area.

MDGs & MTDF TARGETS Targets

2009-10

2010-11

2011-12

Year of reaching MDGs

MDGs 2015

Children fully immunized 12-23 months (%)

84

88

92

2010-11

>90

Delivery by Trained Birth Attendants (%)

52

57

62

2014-15

>90

Infant Mortality Rate per 1000 live births

73

70

67

2014-15

40

Maternal Mortality Ratio per 100,000 live births

232

225

218

2018-19

140

Performance Indicators

128

MTDF 2009-12 Health: Summary Development Programme 2009-10 (Million Rs) Ongoing Program

New Program

Total

Sub-Sector Capital

Revenue

Total

F. Aid

100.000 1,090.248

Preventive and Primary Health Care

200.000

790.248

990.248

Acclerated Programme for Health Care Tertiary Care Hospitals

690.735

643.721

Medical Education Research & Development Total

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

0.000

790.000

790.000

0.000

790.000

200.000

1,580.248

1,780.248 100.000

1,880.248

1,334.456

0.000 1,334.456 1,303.566

1,302.400

2,605.966

0.000

2,605.966

1,994.301

1,946.121

3,940.422

0.000

3,940.422

1,349.060 1,418.280

2,767.340

0.000 2,767.340

675.497

538.185

1,213.682

0.000

1,213.682

2,024.557

1,956.465

3,981.022

0.000

3,981.022

566.385 1,111.437

1,677.822

0.000 1,677.822

203.520

50.180

253.700

0.000

253.700

769.905

1,161.617

1,931.522

0.000

1,931.522

70.000

66.652

136.652

0.000

136.652

119.855

171.931

291.786

0.000

291.786

100.000 7,025.000 2,252.583

2,747.417

5,000.000

0.000

5,000.000

5,108.618

49.855

105.279

155.134

2,856.035 4,068.965

6,925.000

0.000

155.134

216

No. of Schemes

6,816.382 11,925.000 100.000 12,025.000

82

298

New Programme

Total

Development Programme 2010-11 Ongoing Programme Sub-Sector Capital Preventive and Primary Health Care

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

0.000 1,600.000

1,600.000

500.000 2,100.000

360.000

540.000

900.000

0.000

900.000

360.000

2,140.000

2,500.000 500.000

3,000.000

Acclerated Programme for Health Care

1,176.000 1,764.000

2,940.000

0.000 2,940.000

504.000

756.000

1,260.000

0.000

1,260.000

1,680.000

2,520.000

4,200.000

0.000

4,200.000

Tertiary Care Hospitals

1,386.000 2,079.000

3,465.000

0.000 3,465.000

594.000

891.000

1,485.000

0.000

1,485.000

1,980.000

2,970.000

4,950.000

0.000

4,950.000

714.000 1,071.000

1,785.000

0.000 1,785.000

306.000

459.000

765.000

0.000

765.000

1,020.000

1,530.000

2,550.000

0.000

2,550.000

36.000

54.000

90.000

0.000

90.000

120.000

180.000

300.000

0.000

300.000

500.000 10,500.000 1,800.000

2,700.000

4,500.000

0.000

4,500.000

5,160.000

Medical Education Research & Development Total

84.000

126.000

210.000

3,360.000 6,640.000 10,000.000

0.000

210.000

9,340.000 14,500.000 500.000 15,000.000

Development Programme 2011-12 Ongoing Programme

New Programme

Total

Sub-Sector Capital Preventive and Primary Health Care

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

0.000 2,100.000

2,100.000

500.000 2,600.000

320.000

480.000

800.000

0.000

800.000

320.000

2,580.000

2,900.000 500.000

3,400.000

Acclerated Programme for Health Care Tertiary Care Hospitals

1,200.000 1,800.000

3,000.000

0.000 3,000.000

400.000

600.000

1,000.000

0.000

1,000.000

1,600.000

2,400.000

4,000.000

0.000

4,000.000

1,800.000 2,700.000

4,500.000

0.000 4,500.000

600.000

900.000

1,500.000

0.000

1,500.000

2,400.000

3,600.000

6,000.000

0.000

6,000.000

Medical Education

1,260.000 1,440.000

2,700.000

0.000 2,700.000

320.000

480.000

800.000

0.000

800.000

1,580.000

1,920.000

3,500.000

0.000

3,500.000

40.000

60.000

100.000

0.000

100.000

160.000

240.000

400.000

0.000

400.000

500.000 13,100.000 1,680.000

2,520.000

4,200.000

0.000

4,200.000

Research & Development Total

120.000

180.000

300.000

4,380.000 8,220.000 12,600.000

0.000

300.000

6,060.000 10,740.000 16,800.000 500.000 17,300.000 HEALTH MTDF 2009-12 GRAND TOTAL: 44,325.000

129

HEALTH: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES Preventive & Primary Health Care

5

200.000

790.248

0.000

100.000

200.000

890.248

1,090.248

2,008.375

1,275.643

Accelerated Programme for Health Care

136

690.735

643.721

0.000

0.000

690.735

643.721

1,334.456

1,962.647

1,206.103

Tertiary Care Hospitals

52

1,349.060

1,418.280

0.000

0.000

1,349.060

1,418.280

2,767.340

3,318.921

3,847.093

Medical Education

18

566.385

1,111.437

0.000

0.000

566.385

1,111.437

1,677.822

2,352.867

2,507.045

5

49.855

105.279

0.000

0.000

49.855

105.279

155.134

200.631

53.792

216

2,856.035

4,068.965

0.000

100.000

2,856.035

4,168.965

7,025.000

9,843.441

8,889.676

Preventive & Primary Health Care

9

0.000

790.000

0.000

0.000

0.000

790.000

790.000

1,015.000

560.183

Accelerated Programme for Health Care

25

1,303.566

1,302.400

0.000

0.000

1,303.566

1,302.400

2,605.966

3,158.832

608.141

Tertiary Care Hospitals

31

675.497

538.185

0.000

0.000

675.497

538.185

1,213.682

4,535.685

1,559.410

Medical Education

10

203.520

50.180

0.000

0.000

253.700

2,112.981

2,000.000

7

70.000

66.652

0.000

0.000

70.000

66.652

136.652

15.000

0.000

82

2,252.583

2,747.417

0.000

0.000

2,252.583

2,747.417

5,000.000

10,837.498

4,727.734

298

5,108.618

6,816.382

0.000

100.000

5,108.618

6,916.382

12,025.000

20,680.939

13,617.410

Research & Development Total: ON-GOING SCHEMES NEW SCHEMES

Research & Development Total: NEW SCHEMES Grand Total

130

203.520

50.180

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

2,304.881

2,881.101

0.000

0.000

Exp. upto 2008-09

Local

Foreign Aid

Cap 7

Rev 8

Cap 9

291.608

0.000

80.000

0.000

100.000

0.000

180.000

180.000

598.624

575.643

1,235.226

191.230

140.000

0.000

51.230

0.000

0.000

0.000

51.230

51.230

0.000

0.000

0.000

6,000.000

4,754.000

200.000

300.000

0.000

0.000

200.000

300.000

500.000

746.000

0.000

0.000

6

Rev 10

Total Cap 11

Rev 12

ON-GOING SCHEMES Preventive & Primary Health Care 312

313

314

1 Name of the Scheme

Enhanced HIV / AIDS Control Programme Punjab

Approval Date

Approved 22-11-2008

Major Components

Improved preventive care and practices to reduce incidence of HIV / AIDS. Capacity building & programme management. Service delivery packages in major cities for awareness and treatment.

Major Targets

Service delivery to 14000 Injecting Drug Users, 12000 Female Sex Workers and 8000 Male Sex Workers. Uninterrupted supply of kits to 120 Blood Banks. Behavior Change Communication through media.

District and Tehsil

Punjab

2 Name of the Scheme

Hepatitis Control Program in Punjab

Approval Date

Approved 12-08-2008

Major Components

Prevention and Treatment of Hepatitis, awareness and training

Major Targets

Treatment of 3500 patients , awareness, staff training and workshops.

District and Tehsil

Punjab

3 Name of the Scheme

Provision of Missing Facilities in RHCs / BHUs in the Punjab

Approval Date

Approved

Major Components

Provision of missing facilities in RHCs / BHUs like repair of main building, compound wall, mortuary, garages B/wall etc.Provision of clinical and surgical equipment, ambulances etc.

Major Targets

Work for provision of Missing Facilities on 918 BHUs & 275 RHCs already taken up. Work on remaining 1338 BHUs & 18 RHCs to be completed.

District and Tehsil

Punjab

131

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

315

316

4 Name of the Scheme

Establishment of Health Sector Reforms Unit, Punjab

Approval Date

Approved 26-06-2006 Revised 29-112007

Major Components

Health Sector Reforms Unit to supervise the Programme.

Major Targets

Operational expenditures and staff salary for the Health Sector Reforms Unit.

District and Tehsil

Punjab

5 Name of the Scheme

Punjab Integrated Primary Health Care Model Programme.

Approval Date

Approved 28-11-2007

Major Components

Strengthening of Field Health Interventions, Staff Training, Program Monitoring, Equipment & Supplies, Information Dissemination, Research & Development and School Health. Integrated PHC Model (including School Health and Nutrition) being implemented in 919 BHUs in collaboration with National Commission for Human Development.

Major Targets

Integrated Primary Health Care Model in 919 BHUs. Redefining catchment areas of BHUs. De-worming medicines for students in Primary Schools. 149,975 spectacles for students. Focus on Mother & Child Health Care

District and Tehsil

Attock, Jhelum, Gujrat, Sheikhupura,Jhang, Sargodha, Sialkot, Khanawal, Muzaffargarh, Bahawalpur, Mandi Bahauddin, Gujranwala

Sub-Total: Preventive & Primary Health Care

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

183.327

60.558

0.000

59.018

0.000

0.000

0.000

59.018

59.018

63.751

0.000

0.000

0.000

3,377.025

800.000

0.000

300.000

0.000

0.000

0.000

300.000

300.000

600.000

700.000

977.025

12,632.683

6,046.166

200.000

100.000

200.000

890.248

1,090.248

2,008.375

1,275.643

2,212.251

110.224

10.000

0.000

50.000

2,304.881

790.248

0.000

Accelerated Programme for Health Care 317

6 Name of the Scheme

Upgradation of RHC Kotli Sattian into 60 bedded THQ Hospital District Rawalpindi.

Approval Date

Approved 05-06-2007/13-03-2008

Major Components

Construction of building. Purchase of equipment.

Major Targets

Civil works to be completed.

District and Tehsil

Rawalpindi , Kotli Sattian

0.000

50.000

132

0.000

0.000

0.000

50.000

50.224

0.000

0.000

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

318

319

320

321

322

7 Name of the Scheme

F. Aid 4

Upgradation of RHC Kallar Syedan into THQ Hospital District Rawalpindi.

Approval Date

Approved 26.09.08

Major Components

Building and Equipment

Major Targets

Civil works to be taken up.

District and Tehsil

Rawalpindi , Kallar Syedan

8 Name of the Scheme

Upgradation of THQ Hospital, Hazro, District Attock.

Approval Date

Approved 29.11.07

Major Components

Building and Equipment

Major Targets

Renovation of existing main building in progress. Remaining civil works to be executed.

District and Tehsil

Attock , Hazro

9 Name of the Scheme

Establishment of 50 Bedded Hospital Talagang District Chakwal

Approval Date

Approved

Major Components

Triple storey Hospital and purchase of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Chakwal , Talagang

10 Name of the Scheme

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

94.474

20.000

40.000

0.000

0.000

0.000

40.000

0.000

40.000

34.474

0.000

0.000

0.000

75.360

13.544

30.899

0.000

0.000

0.000

30.899

0.000

30.899

30.917

0.000

0.000

0.000

99.386

81.493

8.493

9.400

0.000

0.000

8.493

9.400

17.893

0.000

0.000

0.000

0.000

42.225

20.977

10.118

11.130

0.000

0.000

10.118

11.130

21.248

0.000

0.000

0.000

0.000

20.000

5.000

0.000

15.000

0.000

0.000

0.000

15.000

15.000

0.000

0.000

0.000

24.01.06

Construction of 20 bedded Hospital at Khewra Tehsil P.D. Khan District Jhelum.

Approval Date

Approved

Major Components

Building & Equipment

Major Targets

Completion of scheme.

District and Tehsil

Jhelum , P.D. Khan

11 Name of the Scheme

Estimated Cost

30.01.06

Establishment of BHU at Baragwah

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Jhelum

133

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

323

324

325

326

12 Name of the Scheme

Upgradation of BHU at Chak No.75/SB to RHC, district Sargodha

Approval Date

Approved 14.07.05

Major Components

Building & Equipment

Major Targets

Completion of scheme

District and Tehsil

Sargodha , Shah pur

13 Name of the Scheme

Establishment of Govt. Rural Dispensary without Residential accommodation at Luk More UC No. 109 Mari, Tehsil & District Sargodha

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha

14 Name of the Scheme

Establishment of Govt. Rural Dispensary at Chak No. 17/NB UC No. 19 Chak No. 18/NB Tehsil Bhalwal, district Sargodha

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha , Bhalwal

15 Name of the Scheme

Establishment of Govt. Rural Dispensary Sardar Alam Colony Dhakhali Ratto Kala UC No. 15 Ratto Kala, Tehsil Bhalwal & district Sargodha

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha , Bhalwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

19.980

16.990

0.000

2.990

0.000

0.000

0.000

2.990

2.990

0.000

0.000

0.000

0.000

4.737

3.837

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

0.000

4.737

3.837

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

0.000

4.737

3.837

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

134

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

327

328

329

330

16 Name of the Scheme

Establishment of Govt. Rural Dispensary at Gulshanpura Havali Dhali uppi UC No.41 Chak 19/SB Tehsil Bhalwal District Sargodha

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha , Bhalwal

17 Name of the Scheme

Construction of Government Rural Dispensary at Laksian including 2 Nos. quarters 990 Sft each

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha

18 Name of the Scheme

Improvement of Mullah Bakhsh Hospital Sargodha by addition of 10 beds wards and 6 Nos. Consultant rooms in OPD Block.

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha

19 Name of the Scheme

Establishment of Govt. Rural Dispensary at Tirkhanwala, UC No. 81 Jhanianshah Tehsil Bhalwal, District Sargodha

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha , Bhalwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.737

3.837

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

0.000

7.458

2.960

0.000

4.498

0.000

0.000

0.000

4.498

4.498

0.000

0.000

0.000

0.000

10.000

2.600

0.000

7.400

0.000

0.000

0.000

7.400

7.400

0.000

0.000

0.000

0.000

4.737

3.837

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

135

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

331

332

333

334

335

20 Name of the Scheme

Construction of Government Rural Dispensary at Noshera Khokran, district Sargodha

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha

21 Name of the Scheme

Establishment of Govt. Rural Dispensary at Lehhar UC No. 64 Kandan, Tehsil Shahpur, District Sargodha

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha , Shahpur

22 Name of the Scheme

Establishment of Govt. Rural Dispensary at Chakrala, UC No. 67 Sabowal, Tehsil Shahpur, District Sargodha

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha , Shahpur

23 Name of the Scheme

Upgradation of RHC Sillanwali, District Sargodha.

Approval Date

Approved 26.11.07, 08.03.08

Major Components

Building & Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sargodha , Sillanwali

24 Name of the Scheme

Establishment of THQ Hospital, Quaidabad, District Khushab.

Approval Date

Approved 18.10.08

Major Components

Building and Equipment

Major Targets

Completion of civil works and procurement of equipment.

District and Tehsil

Khushab , Quaidabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.737

0.900

0.000

3.837

0.000

0.000

0.000

3.837

3.837

0.000

0.000

0.000

0.000

4.737

3.837

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

0.000

4.737

3.837

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

0.000

22.915

9.872

13.043

0.000

0.000

0.000

13.043

0.000

13.043

0.000

0.000

0.000

0.000

184.584

5.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

40.000

70.000

59.584

136

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

336

337

338

339

340

25 Name of the Scheme

Establishment of BHU at Chak No.59/MB, District Khushab

Approval Date

Approved 28.09.05 11.04.07

Major Components

Building

Major Targets

Completion of scheme

District and Tehsil

Khushab

26 Name of the Scheme

Establishment of BHU at Jaura kalan District Khushab

Approval Date

Approved

Major Components

Building

Major Targets

Completion of scheme.

District and Tehsil

Khushab

27 Name of the Scheme

Upgradation of THQ Hospital IsaKhel District Mianwali.

Approval Date

Approved

Major Components

Building

Major Targets

Completion of scheme.

District and Tehsil

Mianwali. , IsaKhel

28 Name of the Scheme

Construction of 40 bedded THQ Hospital Piplan District Mianwali.

Approval Date

Approved 18.10.08

Major Components

Construction of building. Purchase of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Mianwali , Piplan

29 Name of the Scheme

Construction of BHU Bhrami Nawab, district Bhakkar

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bhakkar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

13.112

11.826

1.286

0.000

0.000

0.000

1.286

0.000

1.286

0.000

0.000

0.000

0.000

12.410

8.640

3.770

0.000

0.000

0.000

3.770

0.000

3.770

0.000

0.000

0.000

0.000

20.000

19.588

0.412

0.000

0.000

0.000

0.412

0.000

0.412

0.000

0.000

0.000

0.000

68.909

61.392

4.043

3.474

0.000

0.000

4.043

3.474

7.517

0.000

0.000

0.000

0.000

16.013

5.000

0.000

11.013

0.000

0.000

0.000

11.013

11.013

0.000

0.000

0.000

137

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

341

342

343

344

345

30 Name of the Scheme

Construction of BHU Chak No. 47/TDA, district Bhakkar

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bhakkar

31 Name of the Scheme

Rehabilitation of THQ Hospital, Sammundari, district Faisalabad

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Faisalabad , Sammundari

32 Name of the Scheme

Establishment of RHC Waryamwala (Chak No. 492) Tehsil Shorkot District, Jhang.

Approval Date

Approved 17.01.06 12.01.07

Major Components

Building & Equipment

Major Targets

Completion of scheme.

District and Tehsil

Jhang , Shorkot

33 Name of the Scheme

Rehabilitation & Renovation of main building & residences BHU Chak No. 126/JB Tehsil Chiniot

Approval Date

Approved

Major Components

Rehabilitation & Renovation of building

Major Targets

Completion of scheme.

District and Tehsil

Jhang , Chiniot

34 Name of the Scheme

Rehabilitation & Renovation of main building & residences RHC Chak No. 14/JB, Tehsil Chiniot, district Jhang

Approval Date

Approved

Major Components

Rehabilitation & Renovation of building

Major Targets

Completion of scheme.

District and Tehsil

Jhang , Chiniot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

14.812

5.000

0.000

9.812

0.000

0.000

0.000

9.812

9.812

0.000

0.000

0.000

0.000

49.897

5.000

0.000

44.897

0.000

0.000

0.000

44.897

44.897

0.000

0.000

0.000

0.000

38.816

33.816

0.661

4.339

0.000

0.000

0.661

4.339

5.000

0.000

0.000

0.000

0.000

1.270

0.500

0.000

0.770

0.000

0.000

0.000

0.770

0.770

0.000

0.000

0.000

0.000

1.290

0.300

0.000

0.990

0.000

0.000

0.000

0.990

0.990

0.000

0.000

0.000

138

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

346

347

348

349

35 Name of the Scheme

Rehabilitation & Renovation of main building & residences BHU Hersa Sheikh Tehsil Chiniot

Approval Date

Approved

Major Components

Rehabilitation & Renovation of building

Major Targets

Completion of scheme.

District and Tehsil

Jhang , Chiniot

36 Name of the Scheme

Construction & Repair of Boundary Wall and Building of THQ Hospital Chiniot, district Jhang

Approval Date

Approved

Major Components

Repair of building

Major Targets

Completion of scheme.

District and Tehsil

Jhang , Chiniot

37 Name of the Scheme

Rehabilitation & Renovation of main building of BHU Chak No. 143/JB Tehsil Chiniot, district Jhang

Approval Date

Approved

Major Components

Rehabilitation & Renovation of building

Major Targets

Completion of scheme.

District and Tehsil

Jhang , Chiniot

38 Name of the Scheme

Repair work of main building with boundary wall and residences of BHU Bheroo, District Jhang

Approval Date

Approved

Major Components

M&R of Building

Major Targets

Completion of scheme.

District and Tehsil

Jhang , Chiniot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.297

0.500

0.000

0.797

0.000

0.000

0.000

0.797

0.797

0.000

0.000

0.000

0.000

3.300

0.300

0.000

3.000

0.000

0.000

0.000

3.000

3.000

0.000

0.000

0.000

0.000

2.237

0.650

0.000

1.587

0.000

0.000

0.000

1.587

1.587

0.000

0.000

0.000

0.000

2.500

1.500

0.000

1.000

0.000

0.000

0.000

1.000

1.000

0.000

0.000

0.000

139

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

350

351

352

353

354

39 Name of the Scheme

Repair work of main building and residences of BHU Salyana, District Jhang

Approval Date

Approved

Major Components

M&R of Building

Major Targets

M&R of Building and Equipment

District and Tehsil

Jhang , Chiniot

40 Name of the Scheme

Repair work of main building with boundary wall and residences of BHU Ali Pur, District Jhang

Approval Date

Approved

Major Components

M&R of Building

Major Targets

M&R of Building and Equipment

District and Tehsil

Jhang , Chiniot

41 Name of the Scheme

Repair work of main building of BHU Hassan Khan, District Jhang

Approval Date

Approved

Major Components

M&R of Building

Major Targets

M&R of Building

District and Tehsil

Jhang , Chiniot

42 Name of the Scheme

Construction of Mortuary at RHC Shah Juana, district Jhang

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Jhang , Chiniot

43 Name of the Scheme

Construction of RHC at Sandahiliwali Tehsil Kamalia District T.T. Singh.

Approval Date

Approved

Major Components

Building & Equipment

Major Targets

Completion of scheme.

District and Tehsil

Toba Tek Singh , Kamalia

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.480

1.490

0.000

0.990

0.000

0.000

0.000

0.990

0.990

0.000

0.000

0.000

0.000

2.730

1.490

0.000

1.240

0.000

0.000

0.000

1.240

1.240

0.000

0.000

0.000

0.000

2.730

1.490

0.000

1.240

0.000

0.000

0.000

1.240

1.240

0.000

0.000

0.000

0.000

1.580

0.951

0.000

0.629

0.000

0.000

0.000

0.629

0.629

0.000

0.000

0.000

0.000

21.914

13.591

3.388

4.935

0.000

0.000

3.388

4.935

8.323

0.000

0.000

0.000

140

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

355

356

357

358

359

44 Name of the Scheme

Construction of BHU at Chak No. 322/JB Toba Tak Singh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Toba Tek Singh , T.T. Singh

45 Name of the Scheme

Construction of BHU at Chak No. 269/GB Adda Kot Kathran, Toba Tak Singh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Toba Tek Singh , T.T. Singh

46 Name of the Scheme

Construction of Eye Out Door and Operation Theatre at THQ Hospital Kamalia, District T.T.Singh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Toba Tek Singh , Kamalia

47 Name of the Scheme

Construction of BHU at Chak No. 668/9/GB Kamalia, District Toba Tak Singh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Toba Tek Singh , Kamalia

48 Name of the Scheme

Up gradation of MCH Centre to BHU at Chak No. 305/GB, District T.T.Singh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Toba Tek Singh , Kamalia

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

13.747

9.847

0.000

3.900

0.000

0.000

0.000

3.900

3.900

0.000

0.000

0.000

0.000

12.473

9.418

0.000

3.055

0.000

0.000

0.000

3.055

3.055

0.000

0.000

0.000

0.000

12.624

9.662

0.000

2.962

0.000

0.000

0.000

2.962

2.962

0.000

0.000

0.000

0.000

13.683

10.023

0.000

3.660

0.000

0.000

0.000

3.660

3.660

0.000

0.000

0.000

0.000

14.063

10.213

0.000

3.850

0.000

0.000

0.000

3.850

3.850

0.000

0.000

0.000

141

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

360

361

362

363

364

49 Name of the Scheme

Construction of RHC Mongi Bunglow, Tehsil Gojra

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Toba Tek Singh , Gojra

50 Name of the Scheme

Establishment of City Hospital at Kamalia, District T.T.Singh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Toba Tek Singh , Kamalia

51 Name of the Scheme

Upgradation of Civil Hospital, Lalamusa into 40-Bedded Tehsil Level Hospital, District Gujrat.

Approval Date

Approved 23.12.08

Major Components

Building & Equipment

Major Targets

Civil works to be taken up.

District and Tehsil

Gujrat , Lalamusa

52 Name of the Scheme

Establishment Civil Hospital at Kotla Arab Ali Khan District Gujrat

Approval Date

Approved 23.12.08

Major Components

Building & Equipment

Major Targets

Completion of scheme.

District and Tehsil

Gujrat , Lalamusa

53 Name of the Scheme

Construction of Mother & Child Health Care Centre at Sukh Chana, District Gujrat

Approval Date

Approved 29.5.09

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

69.765

9.715

0.000

60.050

0.000

0.000

0.000

60.050

60.050

0.000

0.000

0.000

0.000

7.500

6.000

0.000

1.500

0.000

0.000

0.000

1.500

1.500

0.000

0.000

0.000

0.000

174.689

5.000

15.000

0.000

0.000

0.000

15.000

0.000

15.000

85.000

69.689

0.000

0.000

38.000

20.000

5.000

13.000

0.000

0.000

5.000

13.000

18.000

0.000

0.000

0.000

0.000

5.000

0.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

0.000

0.000

0.000

142

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

365

366

367

368

54 Name of the Scheme

F. Aid 4

Upgradation of BHU Bosal to RHC District M.B. Din.

Approval Date

Approved 26.06.06

Major Components

Building and Equipment.

Major Targets

Completion of scheme.

District and Tehsil

Mandi Bahauddin , Malikwal

55 Name of the Scheme

Reconstruction of 80 Bedded out of 179 Bedded Civil Hospital, Daska, District Sialkot.

Approval Date

Approved

Major Components

Main building, residences and procurement of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Sialkot , Daska

56 Name of the Scheme

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

29.287

26.690

0.000

2.597

0.000

0.000

0.000

2.597

2.597

0.000

0.000

0.000

0.000

130.492

96.008

22.825

11.659

0.000

0.000

22.825

11.659

34.484

0.000

0.000

0.000

0.000

80.123

39.267

27.506

13.350

0.000

0.000

27.506

13.350

40.856

0.000

0.000

0.000

0.000

449.750

214.809

52.636

0.000

0.000

0.000

52.636

0.000

52.636

182.305

0.000

0.000

19.01.05 21.02.06

Upgradation of THQ Hospital Pasrur, District Sialkot.

Approval Date

Approved 22.04.06 27.11.07

Major Components

Main building, residences and procurement of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Sialkot , Pasrur

57 Name of the Scheme

Estimated Cost

Construction of DHQ Hospital, Narowal

Approval Date

Approved 12.06.04 02.01.0613.12.06

Major Components

Main building, residences, hostel and equipment.

Major Targets

Work on 2-hostels and main building near completion. Civil works to be completed in all respects.

District and Tehsil

Narowal

143

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

369

370

371

372

58 Name of the Scheme

F. Aid 4

Upgradation of THQ Hospital Shakargarh, District Narowal.

Approval Date

Approved

Major Components

2-storey building and provision of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Narowal , Shakargarh

59 Name of the Scheme

Maintenance & Operation of Health Centre Terkhana (Installation of instruments like BP Apparatus Ultrasound, ECG etc.) Approved

Major Components

Maintenance of building & procurement of equipment

Major Targets

Maintenance of building & procurement of equipment

District and Tehsil

Narowal , Shakargarh

Establishment of RHC at Mureeda, Tehsil Shakargarh, District Narowal

Approval Date

Un-Approved

Major Components

Building, equipment and furniture

Major Targets

Civil works to be taken up.

District and Tehsil

Narowal , Shakargarh

61 Name of the Scheme

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

53.905

42.577

2.328

9.000

0.000

0.000

2.328

9.000

11.328

0.000

0.000

0.000

0.000

1.215

1.000

0.000

0.215

0.000

0.000

0.000

0.215

0.215

0.000

0.000

0.000

0.000

20.000

5.000

0.000

15.000

0.000

0.000

0.000

15.000

15.000

0.000

0.000

0.000

0.000

10.000

5.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

0.000

0.000

0.000

08.11.04

Approval Date

60 Name of the Scheme

Estimated Cost

Ambulance for BHU Chak Amru, District Narowal

Approval Date

Approved

Major Components

Vehicle

Major Targets

Vehicle

District and Tehsil

Narowal , Shakargarh

144

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

373

374

375

376

377

62 Name of the Scheme

F. Aid 4

Dispensary at Bamboo, Sungran, Dussari, Chaura & Pandori Dhoonda, District Narowal

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Narowal

63 Name of the Scheme

Dispensary for Chak Beeka (U.C.Phalwari), District Narowal

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Narowal

64 Name of the Scheme

Purchase of Ambulance for RHC Baddomalhi, District Narowal

Approval Date

Approved

Major Components

Ambulance

Major Targets

Ambulance

District and Tehsil

Narowal

65 Name of the Scheme

Establishment of New Emergency Block at Kot Khawaja Saeed Hospital (DHQ-II), Lahore

Approval Date

Approved

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

66 Name of the Scheme

Estimated Cost Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.500

0.500

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

0.000

4.300

0.700

0.000

3.600

0.000

0.000

0.000

3.600

3.600

0.000

0.000

0.000

0.000

4.100

2.670

0.000

1.430

0.000

0.000

0.000

1.430

1.430

0.000

0.000

0.000

0.000

105.985

94.590

11.395

0.000

0.000

0.000

11.395

0.000

11.395

0.000

0.000

0.000

0.000

440.704

66.926

17.000

0.000

0.000

0.000

17.000

0.000

17.000

145.000

211.778

0.000

17.12.08

Construction of Mian Mir Hospital, Lahore.

Approval Date

Approved

28.02.07

Major Components

Building and purchase of equipment.

Major Targets

Work up to roof of basement in progress. Civil works to be continued.

District and Tehsil

Lahore

145

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

378

379

380

381

67 Name of the Scheme

Reconstruction of Govt. Said Mitha Hospital, Lahore

Approval Date

Approved 29.04.09

Major Components

Building and Equipment

Major Targets

Construction of Hospital Buildings

District and Tehsil

Lahore

68 Name of the Scheme

Purchase of Equipment for Up gradation of existing departments of Govt. Mian Muhammad Nawaz Sharif Hospital ,Govt Kot Khawaja Saeed Hospital and establishment of PMU

Approval Date

Approved 13.04.09

Major Components

Equipment

Major Targets

Procurement of equipment for up gradation of existing departments.

District and Tehsil

Lahore

69 Name of the Scheme

Improvement / Rehabilitation of Exiting building at Kot khawaja Saeed Hospital, Lahore

Approval Date

Approved 27.4.09

Major Components

Renovation Building

Major Targets

Renovation of building

District and Tehsil

Lahore

70 Name of the Scheme

Construction of Residential Flats at Kot Khawaja Saeed Hospital, Lahore

Approval Date

Approved 18.4.09

Major Components

Construction of residential flats

Major Targets

Construction of residential flats

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

321.567

10.000

42.297

0.000

0.000

0.000

42.297

0.000

42.297

269.270

0.000

0.000

0.000

360.236

53.000

0.000

31.383

0.000

0.000

0.000

31.383

31.383

275.853

0.000

0.000

0.000

32.268

9.550

22.718

0.000

0.000

0.000

22.718

0.000

22.718

0.000

0.000

0.000

0.000

129.494

5.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

94.494

0.000

0.000

146

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

382

383

384

385

386

71 Name of the Scheme

Establishment of THQ Hospital, Sharaqpur, District Sheikhupura.

Approval Date

Approved 01.01.09

Major Components

Building & Equipment

Major Targets

Work allotted on 2.3.09. Civil works to be continued.

District and Tehsil

Sheikhupura , Sharaqpur

72 Name of the Scheme

Establishment of THQ Hospital, Ferozwala, District Sheikhupura.

Approval Date

Approved 18.10.08

Major Components

Building & Equipment

Major Targets

Work allotted on 11.4.09. Civil works to be continued.

District and Tehsil

Sheikhupura , Ferozwala

73 Name of the Scheme

Upgradation of DHQ Hospital, Nankan Sahib, District Nankana Sahib

Approval Date

Approved 04.11.04

Major Components

Buildings and Residences

Major Targets

Completion of scheme.

District and Tehsil

Nankana Sahib

74 Name of the Scheme

Establishment of THQ Hospital, Sangla Hill, District Nankana Sahib

Approval Date

Approved 23.12.08

Major Components

Hospital Building, additional block, residences, mortuary, laundry, boundary wall and equipment.

Major Targets

Civil works to be continued.

District and Tehsil

Nankana Sahib , Sangla Hill

75 Name of the Scheme

Establishment of THQ Hospital, Shahkot, District Nankana Sahib.

Approval Date

Approved 23.12.08

Major Components

Building, equipment, furniture, management systems and training.

Major Targets

Work allotted on 8.4.09. Civil works to be continued.

District and Tehsil

Nankana Sahib , Shahkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

188.804

10.000

9.553

0.000

0.000

0.000

9.553

0.000

9.553

80.000

89.251

0.000

0.000

169.237

5.000

15.000

0.000

0.000

0.000

15.000

0.000

15.000

60.000

89.237

0.000

0.000

31.926

24.288

7.638

0.000

0.000

0.000

7.638

0.000

7.638

0.000

0.000

0.000

0.000

189.047

5.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

75.000

89.047

0.000

0.000

166.563

5.000

15.715

0.000

0.000

0.000

15.715

0.000

15.715

59.647

86.201

0.000

147

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

387

388

389

390

391

76 Name of the Scheme

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Nankana Sahib

Government Rural Dispensary Hanjli Chak No. 284 Lalan Wala, District Nankana Sahib

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Nankana Sahib

78 Name of the Scheme

Construction of BHU Chajoo shah Multan

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Multan

79 Name of the Scheme

F. Aid 4

Government Rural Dispensary Hanjli Chak No. 121, District Nankana Sahib

Approval Date

77 Name of the Scheme

Estimated Cost

Establishment of 268 bedded DHQ Hospital, Multan

Approval Date

Approved 27.10.07

Major Components

Main building, residences, hostel and equipment.

Major Targets

Work on external development and boundary wall near completion. Civil works on main building to be continued.

District and Tehsil

Multan

80 Name of the Scheme

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Multan

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.500

4.700

0.000

1.800

0.000

0.000

0.000

1.800

1.800

0.000

0.000

0.000

0.000

6.500

4.700

0.000

1.800

0.000

0.000

0.000

1.800

1.800

0.000

0.000

0.000

0.000

22.000

3.000

0.000

19.000

0.000

0.000

0.000

19.000

19.000

0.000

0.000

0.000

0.000

1,681.591

63.517

46.083

0.000

0.000

0.000

46.083

0.000

46.083

273.917

330.000

968.074

0.000

13.000

7.032

0.000

5.968

0.000

0.000

0.000

5.968

5.968

0.000

0.000

0.000

19.09.08

Construction of Health Centre Ansari Chowk or St. Tanki Wali Shaheen Abad, District Multan

Approval Date

Total 5

Exp. upto 2008-09

148

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

392

393

394

395

81 Name of the Scheme

Construction / Repair & Boundary Walls, Floors, Bath Room and Repair and Purchase of Furniture, Computer etc. at Multan Faqir, district Multan

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Multan

82 Name of the Scheme

Construction of RHC Miran Mallah, Tehsil Jalapur Pirwala, district Multan

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Multan

83 Name of the Scheme

Construction of Dispensary Union Council No. 10 (Hassan Abad), district Multan

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Multan

84 Name of the Scheme

Construction of Dispensary Union Council No. 4 (Nizam Abad Kotla Tolay Khan), district Multan

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.491

0.400

0.000

0.091

0.000

0.000

0.000

0.091

0.091

0.000

0.000

0.000

0.000

15.000

4.750

0.000

10.250

0.000

0.000

0.000

10.250

10.250

0.000

0.000

0.000

0.000

3.000

2.372

0.000

0.628

0.000

0.000

0.000

0.628

0.628

0.000

0.000

0.000

0.000

3.628

3.000

0.000

0.628

0.000

0.000

0.000

0.628

0.628

0.000

0.000

0.000

149

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

396

397

398

399

400

85 Name of the Scheme

Construction of Dispensary Union Council No. 1 (Dewan ka Bagh), district Multan

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Multan

86 Name of the Scheme

Establishment of 125 bedded DHQ Hospital, Lodhran

Approval Date

Approved 25.11.04 31.12.05

Major Components

Main building, residences, hostel and equipment.

Major Targets

Work on main building and residences at flooring stage. Completion of scheme.

District and Tehsil

Lodhran

87 Name of the Scheme

Establishment / Construction of Govt Rural Dispensary at chak No 36-M District Lodhran

Approval Date

Approved 28.09.05

Major Components

Building.

Major Targets

Main building completed. Electric connection to be provided.

District and Tehsil

Lodhran

88 Name of the Scheme

Construction of BHU Chak No. 28/10-R Khanewal, District Khanewal

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Khanewal

89 Name of the Scheme

Construction of BHU Chak No. 141/10-R Jahanian, District Khanewal

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Khanewal , Jahanian

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.000

3.000

0.000

4.000

0.000

0.000

0.000

4.000

4.000

0.000

0.000

0.000

0.000

394.156

273.570

57.496

63.090

0.000

0.000

57.496

63.090

120.586

0.000

0.000

0.000

0.000

4.475

3.415

1.060

0.000

0.000

0.000

1.060

0.000

1.060

0.000

0.000

0.000

0.000

14.781

8.439

0.000

6.342

0.000

0.000

0.000

6.342

6.342

0.000

0.000

0.000

0.000

14.140

2.000

0.000

12.140

0.000

0.000

0.000

12.140

12.140

0.000

0.000

0.000

150

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

401

402

403

404

405

90 Name of the Scheme

Provision of Ambulance BHU Mumdal

Approval Date

Approved

Major Components

Provision of ambulance.

Major Targets

Completion of scheme.

District and Tehsil

Khanewal , Kabirwala

91 Name of the Scheme

Provision of Dental Unit THQ Hospital, Kabirwala

Approval Date

Approved

Major Components

Provision of dental unit.

Major Targets

Completion of scheme.

District and Tehsil

Khanewal , Kabirwala

92 Name of the Scheme

Provision of 10 Nos. Mobile BP Operates (Bauman meter)

Approval Date

Approved

Major Components

Provision of 10 Nos. mobile.

Major Targets

Completion of scheme.

District and Tehsil

Khanewal , Kabirwala

93 Name of the Scheme

Construction of RHC Thatha Sadiqabad Tehsil Jhanian District Khanewal.

Approval Date

Approved 19.07.05 09.01.07

Major Components

Building & Equipment

Major Targets

Completion of scheme.

District and Tehsil

Khanewal , Jhanian

94 Name of the Scheme

Provision of 01 No. Generator for CCU (100 KV) in DHQ Hospital, Khanewal

Approval Date

Approved

Major Components

Provision of generator.

Major Targets

Completion of scheme.

District and Tehsil

Khanewal , Kabirwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.500

2.950

0.000

0.550

0.000

0.000

0.000

0.550

0.550

0.000

0.000

0.000

0.000

1.440

0.900

0.000

0.540

0.000

0.000

0.000

0.540

0.540

0.000

0.000

0.000

0.000

0.190

0.100

0.000

0.090

0.000

0.000

0.000

0.090

0.090

0.000

0.000

0.000

0.000

38.542

28.535

7.823

2.184

0.000

0.000

7.823

2.184

10.007

0.000

0.000

0.000

0.000

2.200

1.000

0.000

1.200

0.000

0.000

0.000

1.200

1.200

0.000

0.000

0.000

151

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

406

407

408

409

410

95 Name of the Scheme

F. Aid 4

Provision of 02 Nos. Ventilator in CCU, DHQ Hospital, Khanewal

Approval Date

Approved

Major Components

Provision of ventilator.

Major Targets

Completion of scheme.

District and Tehsil

Khanewal , Kabirwala

96 Name of the Scheme

Construction of BHU at Chak No. 50/12L, district Sahiwal

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sahiwal

97 Name of the Scheme

Upgradation of DHQ Hospital, Pakpattan

Approval Date

Approved

Major Components

Main building and equipment.

Major Targets

completion of scheme.

District and Tehsil

Pakpattan

98 Name of the Scheme

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.500

3.000

0.000

0.500

0.000

0.000

0.000

0.500

0.500

0.000

0.000

0.000

0.000

7.000

3.500

0.000

3.500

0.000

0.000

0.000

3.500

3.500

0.000

0.000

0.000

0.000

81.514

60.514

8.000

13.000

0.000

0.000

8.000

13.000

21.000

0.000

0.000

0.000

0.000

2.032

1.999

0.000

0.033

0.000

0.000

0.000

0.033

0.033

0.000

0.000

0.000

0.000

1.792

1.700

0.000

0.092

0.000

0.000

0.000

0.092

0.092

0.000

0.000

0.000

30.09.05

Mortuary in THQ Hospital, Burewala, district Vehari

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Vehari

99 Name of the Scheme

Estimated Cost

Upgradation of Sub Health Centre Chak No.327/EB, district Vehari

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Vehari

152

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

411 100 Name of the Scheme

Upgradation of Sub Health Centre 331/EB Burewala, district Vehari

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Vehari , Burewala

412 101 Name of the Scheme

Upgradation of Sub Health Centre 269/EB Burewala, district Vehari

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Vehari , Burewala

413 102 Name of the Scheme

Upgradation of BHU 148/EB Burewala as RHC, district Vehari

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Vehari , Burewala

414 103 Name of the Scheme

Upgradation of BHU 188/EB Velar as RHC Mian Pakhi, district Vehari

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Vehari , Burewala

415 104 Name of the Scheme

Upgradation from BHU to RHC Karampur Mailsi, district Vehari

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Vehari , Melsi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.792

1.700

0.000

0.092

0.000

0.000

0.000

0.092

0.092

0.000

0.000

0.000

0.000

1.792

1.600

0.000

0.192

0.000

0.000

0.000

0.192

0.192

0.000

0.000

0.000

0.000

7.032

5.000

0.000

2.032

0.000

0.000

0.000

2.032

2.032

0.000

0.000

0.000

0.000

7.032

3.516

0.000

3.516

0.000

0.000

0.000

3.516

3.516

0.000

0.000

0.000

0.000

7.032

6.219

0.000

0.813

0.000

0.000

0.000

0.813

0.813

0.000

0.000

0.000

153

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

416 105 Name of the Scheme

F. Aid 4

Upgradation of Civil Hospital Fort Munro Tribal Area, D.G.Khan.

Approval Date

Approved 07.10.05 06.12.06

Major Components

Main building / medical ward.

Major Targets

Completion of scheme.

District and Tehsil

Dera Ghazi Khan , Fort Munro

417 106 Name of the Scheme

Upgradation of DHQ Hospital, D.G.Khan

Approval Date

Approved

Major Components

Main building for Orthopiedic,Urology & TB Wards. Equipment.

Major Targets

Work on main building up to flooring completed. Remaining civil works to be executed & equipment to be procured.

District and Tehsil

Dera Ghazi Khan , D.G.Khan

418 107 Name of the Scheme

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

21.378

3.078

18.000

0.300

0.000

0.000

18.000

0.300

18.300

0.000

0.000

0.000

0.000

437.974

143.900

18.454

0.564

0.000

0.000

18.454

0.564

19.018

166.546

108.510

0.000

0.000

2.460

2.015

0.000

0.445

0.000

0.000

0.000

0.445

0.445

0.000

0.000

0.000

0.000

2.460

2.015

0.000

0.445

0.000

0.000

0.000

0.445

0.445

0.000

0.000

0.000

28.06.06

Construction of Building of Dispensary at Bait Baharwali U.C. Hanjrai, district Muzaffargarh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Muzaffargarh

419 108 Name of the Scheme

Estimated Cost

Construction of Building of Dispensary at Chakar Dari U.C. Bait Qaim Wala, district Muzaffargarh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Muzaffargarh

154

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

420 109 Name of the Scheme

Construction of Building of Dispensary at Thatta Salian, district Muzaffargarh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Muzaffargarh

421 110 Name of the Scheme

Upgradation of BHU to RHC level at Muradabad, district Muzaffargarh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Muzaffargarh

422 111 Name of the Scheme

Construction of Dispensary at Azmat Pur U/C Multan Wali, district Muzaffargarh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Muzaffargarh

423 112 Name of the Scheme

Construction of Dispensary at Mud Wala, district Muzaffargarh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Muzaffargarh

424 113 Name of the Scheme

Construction of Dispensary at Mauza Dera Wadhoo U/C Ghazanfargarh, district Muzaffargarh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Muzaffargarh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.460

2.015

0.000

0.445

0.000

0.000

0.000

0.445

0.445

0.000

0.000

0.000

0.000

9.345

8.200

0.000

1.145

0.000

0.000

0.000

1.145

1.145

0.000

0.000

0.000

0.000

2.460

2.015

0.000

0.445

0.000

0.000

0.000

0.445

0.445

0.000

0.000

0.000

0.000

2.460

2.015

0.000

0.445

0.000

0.000

0.000

0.445

0.445

0.000

0.000

0.000

0.000

3.500

3.000

0.000

0.500

0.000

0.000

0.000

0.500

0.500

0.000

0.000

0.000

155

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

425 114 Name of the Scheme

Construction of Dispensary at Katchy Jai U/C Thatha Qureshi, district Muzaffargarh

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Muzaffargarh

426 115 Name of the Scheme

Provision of C.T Scan Machine at DHQ Hospital Layyah.

Approval Date

Approved 02.01.06

Major Components

Construction of building for CT Scan

Major Targets

Remaining civil works to be completed.

District and Tehsil

Layyah.

427 116 Name of the Scheme

Establishment of Cardiac Unit at DHQ Hospital Layyah

Approval Date

Approved 28.09.05

Major Components

Building and equipment

Major Targets

Completion of scheme.

District and Tehsil

Layyah.

428 117 Name of the Scheme

Establishment of Trauma Centre at Fatehpur, District Layyah.

Approval Date

Approved 29.09.07 25.10.08

Major Components

Building and equipment.

Major Targets

Brick work on main building completed up to door level. Civil works to be continued.

District and Tehsil

Layyah , Karor

429 118 Name of the Scheme

Construction of Civil Dispensary Buchi Wala, district Layyah

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Layyah , Karor

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.500

3.000

0.000

0.500

0.000

0.000

0.000

0.500

0.500

0.000

0.000

0.000

0.000

51.632

51.032

0.600

0.000

0.000

0.000

0.600

0.000

0.600

0.000

0.000

0.000

0.000

21.139

18.567

2.572

0.000

0.000

0.000

2.572

0.000

2.572

0.000

0.000

0.000

0.000

158.386

20.996

35.000

0.000

0.000

0.000

35.000

0.000

35.000

40.000

62.390

0.000

0.000

4.176

0.850

0.000

3.326

0.000

0.000

0.000

3.326

3.326

0.000

0.000

0.000

156

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

430 119 Name of the Scheme

Construction of Civil Dispensary 239-A/TDA, district Layyah

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Layyah , Karor

431 120 Name of the Scheme

Construction of Civil Dispensary Imrani Tibba Dstian Wala, district Layyah

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Layyah , Karor

432 121 Name of the Scheme

Construction of Civil Dispensary 113/ML, district Layyah

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Layyah , Karor

433 122 Name of the Scheme

Construction of Civil Dispensary Tibbi Khurad, district Layyah

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Layyah , Karor

434 123 Name of the Scheme

Construction of Civil Dispensary 240/TDA, district Layyah

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Layyah , Karor

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.176

0.850

0.000

3.326

0.000

0.000

0.000

3.326

3.326

0.000

0.000

0.000

0.000

4.176

0.850

0.000

3.326

0.000

0.000

0.000

3.326

3.326

0.000

0.000

0.000

0.000

4.176

0.850

0.000

3.326

0.000

0.000

0.000

3.326

3.326

0.000

0.000

0.000

0.000

4.176

0.850

0.000

3.326

0.000

0.000

0.000

3.326

3.326

0.000

0.000

0.000

0.000

4.176

0.850

0.000

3.326

0.000

0.000

0.000

3.326

3.326

0.000

0.000

0.000

157

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

435 124 Name of the Scheme

Construction of Civil Dispensary 95/ML, district Layyah

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Layyah , Karor

436 125 Name of the Scheme

Purchase of Van for THQ Hospital Choubara, district Layyah

Approval Date

Approved

Major Components

Vehicle

Major Targets

Vehicle

District and Tehsil

Layyah , Choubara

437 126 Name of the Scheme

Upgradation of RHC Kot Sultan up to THQ facilities, District Layyah

Approval Date

Approved

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Layyah

438 127 Name of the Scheme

Upgradation of BHU Mehran up to RHC facilities, Layyah

Approval Date

Approved

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Layyah

439 128 Name of the Scheme

Establishment of Paramedical School at Layyah

Approval Date

Approved

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Layyah

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.176

0.850

0.000

3.326

0.000

0.000

0.000

3.326

3.326

0.000

0.000

0.000

0.000

1.630

0.600

0.000

1.030

0.000

0.000

0.000

1.030

1.030

0.000

0.000

0.000

0.000

14.203

1.500

0.000

12.703

0.000

0.000

0.000

12.703

12.703

0.000

0.000

0.000

0.000

14.006

1.000

0.000

13.006

0.000

0.000

0.000

13.006

13.006

0.000

0.000

0.000

0.000

16.245

2.500

0.000

13.745

0.000

0.000

0.000

13.745

13.745

0.000

0.000

0.000

158

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

440 129 Name of the Scheme

Construction of Civil Dispensary 86/ML, district Layyah

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Layyah , karor

441 130 Name of the Scheme

Construction of Basic Health Unit Kot Khalifa Tehsil Ahmedpur East, district Bahawalpur

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur , Ahmedpur East

442 131 Name of the Scheme

Construction of BHU Bukhtiari (UC-Bukhtiari) Tehsil Ahmadpur East, district Bahawalpur

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur , Ahmedpur East

443 132 Name of the Scheme

Construction of Hospital for Dera Nawab Sahib BHU level (Saeed Park Tehsil Ahmedpur East, district Bahawalpur

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur , Ahmedpur East

444 133 Name of the Scheme

Construction / Extension and Repair of Building Govt. Tibbia College near vegetable market Bahawalpur

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.176

0.850

0.000

3.326

0.000

0.000

0.000

3.326

3.326

0.000

0.000

0.000

0.000

8.812

5.000

0.000

3.812

0.000

0.000

0.000

3.812

3.812

0.000

0.000

0.000

0.000

5.533

5.000

0.000

0.533

0.000

0.000

0.000

0.533

0.533

0.000

0.000

0.000

0.000

18.051

15.000

0.000

3.051

0.000

0.000

0.000

3.051

3.051

0.000

0.000

0.000

0.000

2.005

1.500

0.000

0.505

0.000

0.000

0.000

0.505

0.505

0.000

0.000

0.000

159

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

445 134 Name of the Scheme

Construction of New Dispensary Building Islami Colony near Girls Middle School Bahawalpur

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur

446 135 Name of the Scheme

Construction of new Dispensary Building Muhajir Colony, Baghdad near Masjid Al-Farooq, Gali Nouman Model Middle School (UC17) Bahawalpur City

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur

447 136 Name of the Scheme

Construction of Basic Health Unit Bhinda Ghulam Hussain Miani Jhabail (UC-27) Tehsil Bahawalpur

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur

448 137 Name of the Scheme

Renovation/ Improvement of Nursery room with provision of fully equipped ambulance and 2 No. Infant Incubators for THQ Hospital, Khair Pur Tamewali, district Bahawalpur

Approval Date

Approved

Major Components

Equipment

Major Targets

Equipment

District and Tehsil

Bahawalpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.292

1.500

0.000

1.792

0.000

0.000

0.000

1.792

1.792

0.000

0.000

0.000

0.000

3.373

2.000

0.000

1.373

0.000

0.000

0.000

1.373

1.373

0.000

0.000

0.000

0.000

18.200

15.000

0.000

3.200

0.000

0.000

0.000

3.200

3.200

0.000

0.000

0.000

0.000

6.200

4.559

0.000

1.641

0.000

0.000

0.000

1.641

1.641

0.000

0.000

0.000

160

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

449 138 Name of the Scheme

F. Aid 4

Provision of Delivery Table, Emergency Light, Three No. Iron beds and Sucker Machine for BHU Jamalpur, district Bahawalpur

Approval Date

Approved

Major Components

Provision of equipment

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur

450 139 Name of the Scheme

Upgradation of BHU Kud wala into RHC level (UC-68/DB) Tehsil Yazman, district Bahawalpur

Approval Date

Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur , Yazman

451 140 Name of the Scheme

Upgradation of BHU Bhong, Tehsil Sadiqabad District R.Y. Khan.

Approval Date

Approved

Major Components

Building & Equipment

Major Targets

Completion of scheme.

District and Tehsil

Rahim Yar Khan , Sadiqabad

452 141 Name of the Scheme

Estimated Cost Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.015

0.800

0.000

0.215

0.000

0.000

0.000

0.215

0.215

0.000

0.000

0.000

0.000

39.300

9.000

0.000

30.300

0.000

0.000

0.000

30.300

30.300

0.000

0.000

0.000

0.000

31.991

22.568

0.000

9.423

0.000

0.000

0.000

9.423

9.423

0.000

0.000

0.000

0.000

23.735

10.812

2.923

10.000

0.000

0.000

2.923

10.000

12.923

0.000

0.000

0.000

0.000

7,605.651

2,074.787

690.735

06.11.06 03.02.07

Upgradation of THQ Hospital Liaquatpur district R.Y. Khan.

Approval Date

Approved

Major Components

Building & Equipment

Major Targets

Completion of scheme.

District and Tehsil

Rahim Yar Khan , Liaquatpur

Sub-Total: Accelerated Programme for Health Care

161

643.721

0.000

0.000

690.735

643.721

1,334.456

1,962.647

1,206.103

1,027.658

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

Tertiary Care Hospitals 453 142 Name of the Scheme

Safe Motherhood Initiative Project (in collaboration with Holy Family Hospital, Rawalpindi), District Chakwal.

Approval Date

Approved 05.06.07

Major Components

Outreach Gyane / Obstetric services through the teaching faculty members / post graduate trainees at BHU, RHC and THQ Hospitals.

Major Targets

Field visits of the teaching faculty members / post graduate trainees of Holy Family Hospital, Rawalpindi at BHUs, RHCs and THQs in District Chakwal for Gynae / Obstetric Care.

District and Tehsil

Chakwal , Chakwal.

454 143 Name of the Scheme

Upgradation of DHQ Hospital, Sargodha.

Approval Date

Approved 15.12.08

Major Components

Addition of 350 beds. Upgradation of existing facilities to affiliate the hospital with Medical College, Sargodha.

Major Targets

Civil works to be executed & equipment to be purchased.

District and Tehsil

Sargodha

455 144 Name of the Scheme

Establishment of Faisalabad Institute of Cardiology, Faisalabad.

Approval Date

Approved 30.06.05 16.07.05 13.09.08

Major Components

4-storey building, 200 bedded Institute, hostels and procurement of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Faisalabad

0.000

29.850

14.130

0.000

15.720

0.000

0.000

0.000

15.720

15.720

0.000

0.000

0.000

0.000

611.667

15.000

50.000

5.000

0.000

0.000

50.000

5.000

55.000

145.000

354.145

42.522

0.000

1,528.683

1,455.559

42.290

30.834

0.000

0.000

42.290

30.834

73.124

0.000

0.000

0.000

162

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

456 145 Name of the Scheme

Establishment of Allied Burn & Reconstructive Surgery Centre in Allied Hospital, Faisalabad.

Approval Date

Approved 02.11.06

Major Components

65-bedded Burn Centre. To provide quality and prompt health care facilities to the cases of burn injuries.

Major Targets

5-storey building with 65-beds Burn Centre. Work up to 1st floor in progress. Civil works to be continued.

District and Tehsil

Faisalabad

457 146 Name of the Scheme

Construction of Additional 100 Bedded Ward at DHQ Hospital, Faisalabad.

Approval Date

Approved 08.02.07 21.02.08

Major Components

100 Bedded Ward and provision of equipment.

Major Targets

Work on ward up to DPC level. Civil works to be continued.

District and Tehsil

Faisalabad

458 147 Name of the Scheme

Establishment of Wazirabad Institute of Cardiology, Wazirabad, District Gujranwala.

Approval Date

Approved 02.08.06 16.03.07 20.10.07 13.04.09

Major Components

200 Bedded Institute, Hostels, Residences, equipment, PMU and management systems.

Major Targets

Civil works to be executed & equipment to be purchased.

District and Tehsil

Gujranwala , Wazirabad

459 148 Name of the Scheme

Replacement of Sewerage/ Drainage System Jinnah Hospital Lahore

Approval Date

Approved 18.01.08

Major Components

Replacement of Sewerage/ Drainage System

Major Targets

Sewerage/ Drainage System

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

478.815

55.000

50.000

0.000

0.000

0.000

50.000

0.000

50.000

100.000

273.815

0.000

0.000

134.317

7.007

25.000

0.000

0.000

0.000

25.000

0.000

25.000

50.000

52.310

0.000

0.000

1,953.926

331.233

80.000

20.000

0.000

0.000

80.000

20.000

100.000

220.000

400.000

902.693

0.000

25.726

12.466

13.260

0.000

0.000

0.000

13.260

0.000

13.260

0.000

0.000

0.000

163

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

460 149 Name of the Scheme

F. Aid 4

Extension & Upgradation of Obstetrics & Gynae: Operation Theaters & Labor Room in Jinnah hospital Lahore

Approval Date

Approved

Major Components

Extension & Upgradation of Obstetrics & Gynae: Operation Theaters & Labor Room

Major Targets

Completion of Scheme

District and Tehsil

Lahore

461 150 Name of the Scheme

Upgradation / Strengthening of School of Nursing, Mayo Hospital, Lahore.

Approval Date

Approved

Major Components

Building and Equipment.

Major Targets

Nursing School building completed. Hostel work still to be taken up. Remaining civil works and procurement of equipment to be completed.

District and Tehsil

Lahore

462 151 Name of the Scheme

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

32.685

23.510

9.175

0.000

0.000

0.000

9.175

0.000

9.175

0.000

0.000

0.000

0.000

177.969

48.287

29.864

1.840

0.000

0.000

29.864

1.840

31.704

97.978

0.000

0.000

0.000

656.150

176.462

70.000

0.000

0.000

0.000

70.000

0.000

70.000

180.000

229.688

0.000

0.000

56.465

55.466

0.000

0.999

0.000

0.000

0.000

0.999

0.999

0.000

0.000

0.000

21.08.07 20.3.09

Construction of Surgical Tower at Mayo Hospital, Lahore

Approval Date

Approved

Major Components

Four storey building, 8 Private wards, 50 Private rooms, 120 beds ICU, 16 Operation Theatre Rooms and ElectroMedical Equipment.

Major Targets

Building structure completed up to 3rd floor. Civil works to continued.

District and Tehsil

Lahore

463 152 Name of the Scheme

Estimated Cost

25.07.0521.02.06

Upgradation of Renal Transplantation and Haemodialysis Unit, Urology Department, Mayo Hospital, Lahore.

Approval Date

Approved

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

8.11.04

164

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

464 153 Name of the Scheme

F. Aid 4

Modernization of Urology Operation Theatre, Mayo Hospital, Lahore

Approval Date

Approved

Major Components

Building and purchase of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

465 154 Name of the Scheme

Completion of Children Medical Specialties Block, Mayo Hospital, Lahore. Approved 22.03.05 16.5.09

Major Components

Five storey building and provision of equipment.

Major Targets

Main building completed. Finishing of main building and procurement of remaining equipment to be completed.

District and Tehsil

Lahore

Renovation / Protection of Institute of Ophthalmology, Mayo Hospital, Lahore

Approval Date

Approved 21.08.07 18.10.08

Major Components

Renovation of the existing infrastructure and procurement of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

467 156 Name of the Scheme

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

83.611

68.210

0.000

15.401

0.000

0.000

0.000

15.401

15.401

0.000

0.000

0.000

0.000

250.623

113.497

2.843

38.127

0.000

0.000

2.843

38.127

40.970

96.156

0.000

0.000

0.000

145.250

67.005

18.860

59.385

0.000

0.000

18.860

59.385

78.245

0.000

0.000

0.000

0.000

140.400

61.655

30.000

48.745

0.000

0.000

30.000

48.745

78.745

0.000

0.000

0.000

08.11.04

Approval Date

466 155 Name of the Scheme

Estimated Cost

Construction of 200 beds Lady Aitchison Hospital, Lahore. (Balance work of Internees Hostel, Private Wards & Rooms, Removal of defects).

Approval Date

Approved 09.08.05 29.09.07 18.04.09

Major Components

Completion of civil works and purchase of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

165

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

468 157 Name of the Scheme

Construction of New Operation Theatre and Store Complex, Lady Willingdon Hospital, Lahore.

Approval Date

Approved 13.12.06 29.11.07

Major Components

Construction of new operation theatre and store complex. Provision of Operation Theatre equipment.

Major Targets

Site yet to be cleared. Civil works to be continued.

District and Tehsil

Lahore

469 158 Name of the Scheme

Construction of OPD Block in Services Hospital, Lahore.

Approval Date

Approved 08.05.07 28.11.07

Major Components

Building and purchase of equipment for OPD Block.

Major Targets

Civil Works completed up to basement. Civil works to be continued.

District and Tehsil

Lahore

470 159 Name of the Scheme

Upgradation of Radiology / Specialties Departments in Services Hospital, Lahore.

Approval Date

Approved 20.10.08

Major Components

Civil works. Provision of electro medical equipments.

Major Targets

Civil works to be initiated.

District and Tehsil

Lahore.

471 160 Name of the Scheme

Improvement of Water Supply, Sewerage System, Roads and Provision of CSSD, Generators & Laundry Plant in Sir Ganga Ram Hospital, Lahore.

Approval Date

Approved 28.02.06 10.07.08

Major Components

Laying of water supply / sewerage system and roads. Provision of CSSD & Laundry Plant.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

94.700

0.030

20.000

0.000

0.000

0.000

20.000

0.000

20.000

44.670

30.000

0.000

0.000

803.977

88.000

50.000

0.000

0.000

0.000

50.000

0.000

50.000

110.000

250.000

305.977

0.000

1,188.971

5.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

100.000

300.000

753.971

0.000

103.338

70.429

32.909

0.000

0.000

0.000

32.909

0.000

32.909

0.000

0.000

0.000

166

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

472 161 Name of the Scheme

F. Aid 4

Upgradation / Renovation of Sir Ganga Ram Hospital, Lahore.

Approval Date

Approved 18.10.08

Major Components

Renovation of existing old buildings & installations.

Major Targets

Renovation works to be executed.

District and Tehsil

Lahore.

473 162 Name of the Scheme

Provision of MRI and upgradation of existing facilities of CT Scan for FJMC / Sir Ganga Ram Hospital, Lahore

Approval Date

Approved 5.6.07

Major Components

MRI and CT Scan upgradation.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

474 163 Name of the Scheme

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

167.250

5.000

25.000

0.000

0.000

0.000

25.000

0.000

25.000

50.000

87.250

0.000

0.000

192.500

159.000

0.000

33.500

0.000

0.000

0.000

33.500

33.500

0.000

0.000

0.000

0.000

649.260

290.531

80.000

0.000

0.000

0.000

80.000

0.000

80.000

150.000

128.729

0.000

0.000

440.765

79.958

60.000

0.000

0.000

0.000

60.000

0.000

60.000

100.000

200.807

0.000

27.4.09

Implementation of Master Plan in Lahore General Hospital, Lahore(Phase-II)

Approval Date

Approved 25.11.04 29.08.05

Major Components

Building, Equipment and Furniture.

Major Targets

Tiling works up to 4th floor completed & civil works to be executed.

District and Tehsil

Lahore

475 164 Name of the Scheme

Estimated Cost

Implementation of Master Plan in Lahore General Hospital, Lahore(Phase-III)

Approval Date

Approved 19.09.05 22.11.06

Major Components

Construction of building and procurement of equipment for Urology, Gynae, and Orthopedics Departments.

Major Targets

Roof laid on 1st floor. 34% of civil works to be executed.

District and Tehsil

Lahore

167

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

476 165 Name of the Scheme

F. Aid 4

Purchase of equipment for Physiotherapy & Neuro Radiology Department, Lahore General Hospital, Lahore.

Approval Date

Approved 21.08.08

Major Components

Equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

477 166 Name of the Scheme

Punjab Institute of Neuro Sciences, Lahore (PC-II)

Approval Date

Approved 24.10.07

Major Components

Feasibility, preparation of PC-I and designing of the Institute of Neuro Sciences by the consultants.

Major Targets

Feasibility and designing of the Institute.

District and Tehsil

Lahore

478 167 Name of the Scheme

Upgradation of Neurosurgery Department & Head Injury Unit in Jinnah Hospital, Lahore

Approval Date

Approved

Major Components

Equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore.

479 168 Name of the Scheme

Estimated Cost Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

109.641

11.422

0.000

98.219

0.000

0.000

0.000

98.219

98.219

0.000

0.000

0.000

0.000

196.634

0.343

0.000

10.000

0.000

0.000

0.000

10.000

10.000

50.000

75.000

61.291

0.000

195.150

89.000

0.000

51.250

0.000

0.000

0.000

51.250

51.250

54.900

0.000

0.000

0.000

892.954

523.529

90.000

10.000

0.000

0.000

90.000

10.000

100.000

269.425

0.000

0.000

21.08.07

Establishment of Fatima Jinnah Burn and Reconstructive Surgery Centre, Lahore.

Approval Date

Approved 07.09.04 29.05.06

Major Components

Building, equipment, furniture, training and management systems of patients, inventory, financial and human resource.

Major Targets

Civil works to be executed & equipment to be purchased.

District and Tehsil

Lahore

168

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

480 169 Name of the Scheme

Estimated Cost F. Aid 4

Construction of 4th Floor of Jinnah Hospital, Lahore.

Approval Date

Approved

Major Components

Construction of 4th floor for Neurosurgery Department, Liver Diseases & Endoscopy Unit, TB, Pediatric, Pediatric Surgery, Neurology and a bay of private rooms.

Major Targets

Roof laid. Remaining civil works to be completed. Equipment to be procured.

District and Tehsil

Lahore

481 170 Name of the Scheme

19.09.05

Establishment of Pediatric Hospital / Institute, Lahore. Approved 13.07.88 26.11.05 05.11.0811.02.09

Major Components

Inpatient Block, comprising 684 beds..

Major Targets

One out of 3 blocks completed. Civil works to be continued. Equipment to be procured.

District and Tehsil

Lahore

Female / Male Internees Hostel in Children Hospital Lahore

Approval Date

Approved 05.1.08 11.02.09

Major Components

Building and furniture.

Major Targets

Civil works to be continued.

District and Tehsil

Lahore

483 172 Name of the Scheme

Upgradation of 5 Operation Theatres & Purchase of Equipment for 10 Bedded New ICU at Punjab Institute of Cardiology, Lahore.

Approval Date

Approved 14.04.05

Major Components

Equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

393.233

159.775

41.580

18.807

0.000

0.000

41.580

18.807

60.387

173.071

0.000

0.000

0.000

2,676.966

1,271.602

70.000

30.000

0.000

0.000

70.000

30.000

100.000

250.000

450.000

605.364

0.000

297.224

25.000

35.000

0.000

0.000

0.000

35.000

0.000

35.000

75.000

162.224

0.000

0.000

162.975

132.975

0.000

30.000

0.000

0.000

0.000

30.000

30.000

0.000

0.000

0.000

23.04.09

Approval Date

482 171 Name of the Scheme

Total 5

Exp. upto 2008-09

169

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

484 173 Name of the Scheme

Construction of New OPD Block in Punjab Institute of Cardiology, Lahore.

Approval Date

Approved 10.10.05

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

485 174 Name of the Scheme

Extension of 10 bedded emergency / Diagnostic centre and provision of Diagnostic Equipment in Punjab institute of Mental Health Lahore.

Approval Date

Approved 12.1.04

Major Components

Equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore.

486 175 Name of the Scheme

Establishment of Cancer Hospital at Lahore. (PC-II)

Approval Date

Approved 28.02.07

Major Components

Feasibility study for designing and preparation of PC-I.

Major Targets

Feasibility for detailed designing and preparation of PC-I.

District and Tehsil

Lahore.

487 176 Name of the Scheme

Upgradation of Urology Department Lahore General Hospital, Lahore

Approval Date

Approved 29.09.07

Major Components

Provision of latest equipment for the treatment of kidney patients.

Major Targets

Completion of scheme.

District and Tehsil

Lahore.

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

160.420

135.420

25.000

0.000

0.000

0.000

25.000

0.000

25.000

0.000

0.000

0.000

0.000

18.669

7.035

0.000

11.634

0.000

0.000

0.000

11.634

11.634

0.000

0.000

0.000

0.000

92.680

3.425

0.000

15.000

0.000

0.000

0.000

15.000

15.000

25.000

49.255

0.000

0.000

63.230

8.000

0.000

55.230

0.000

0.000

0.000

55.230

55.230

0.000

0.000

0.000

170

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

488 177 Name of the Scheme

Estimated Cost F. Aid 4

Upgradation of Department of Medicine, Medical Unit-II, Lahore General Hospital, Lahore.

Approval Date

Approved

Major Components

Provision of equipment to improve GI diagnostic and therapeutic services.

Major Targets

Completion of scheme.

District and Tehsil

Lahore.

489 178 Name of the Scheme

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

72.325

41.325

0.000

31.000

0.000

0.000

0.000

31.000

31.000

0.000

0.000

0.000

0.000

53.208

37.368

0.000

15.840

0.000

0.000

0.000

15.840

15.840

0.000

0.000

0.000

0.000

29.850

12.705

0.000

17.145

0.000

0.000

0.000

17.145

17.145

0.000

0.000

0.000

29.09.07

Punjab Safe Motherhood Initiative Project, Sheikhupura.

Approval Date

Approved 05.06.07

Major Components

Outreach Gynae / Obstetric services through the teaching faculty members / post-graduate trainees of Lady Willingdon Hospital at health facilities in District Sheikhupura.

Major Targets

Field visits of the teaching faculty members / post graduate trainees of Lady Willingdon Hospital at BHUs, RHCs and THQs in District Sheikhupura for Gynae / Obstetric Care.

District and Tehsil

Sheikhupura

490 179 Name of the Scheme

Total 5

Exp. upto 2008-09

Safe Motherhood Initiative Project (in collaboration with Sir Ganga Ram Hospital, Lahore), District Nankana Sahib.

Approval Date

Approved 05.06.07

Major Components

Outreach Gyne / Obstetric services through the teaching faculty members / post graduate trainees at BHUs, RHCs and THQs Hospitals.

Major Targets

Field visits of the teaching faculty members / post graduate trainees of Sir Ganga Ram Hospital at BHUs, RHCs and THQs in District Nankana Sahib for Gynae / Obstetric Care.

District and Tehsil

Nankana Sahib

171

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

491 180 Name of the Scheme

Estimated Cost F. Aid 4

Construction / Expansion of 150 Beds for Provision of SubSpecialist Services at Children Hospital Complex, Multan.

Approval Date

Approved 03.7.08

Major Components

4-storey building. MRI, Incinerator, Laundry, electro-medical equipment, etc

Major Targets

Civil works to be continued. Equipment like MRI and incinerator to be procured.

District and Tehsil

Multan

492 181 Name of the Scheme

Upgradation of Neurosurgery Department & Head Injury Unit in Nishtar Medical College, Multan.

Approval Date

Approved 29.9.07

Major Components

Provision of latest equipments & Training for treatment of Head Injury / Neuro Patients.

Major Targets

Completion of scheme.

District and Tehsil

Multan

493 182 Name of the Scheme

Local

6

Foreign Aid

Cap 7

Rev 8

Total

Cap 9

Rev 10

Cap 11

Rev 12

0.000

1,367.732

10.000

40.000

141.198

0.000

0.000

40.000

141.198

181.198

278.000

340.000

558.534

0.000

195.150

100.600

0.000

94.550

0.000

0.000

0.000

94.550

94.550

0.000

0.000

0.000

0.000

392.177

119.925

80.275

5.000

0.000

0.000

80.275

5.000

85.275

186.977

0.000

0.000

0.000

277.422

137.121

40.000

0.201

0.000

0.000

40.000

0.201

40.201

100.000

0.000

0.000

18.01.08

Establishment of Modern Burn Unit at Nishtar Hospital, Multan.

Approval Date

Approved 01.08.05

Major Components

Building, equipment and furniture.

Major Targets

Civil Works except finishing completed. Civil works to be completed. Equipment to be procured.

District and Tehsil

Multan.

494 183 Name of the Scheme

Total 5

Exp. upto 2008-09

18.07.07

Construction of Doctors' Residences in Multan Institute of Cardiology, Multan.

Approval Date

Approved 12.07.06 21.04.07

Major Components

4-residences and 3-guest houses. 5storey hostel comprising 20 single units + 12 family suites.

Major Targets

Completion of scheme.

District and Tehsil

Multan

172

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

495 184 Name of the Scheme

Provision of Lacking Facilities in Multan Institute of Cardiology, Multan.

Approval Date

Approved 12.07.06 20.03.08

Major Components

Equipment.

Major Targets

Equipment to be procured: Gama Camera, Angiography machine, Cardiac CT Scan, 40 Beds, Fluoroscopy, Two ambulances, electro physiology, ultra sound system and Blood Warmer. Scheme to be completed.

District and Tehsil

Multan

496 185 Name of the Scheme

Establishment of Kidney Transplantation / Dialysis Unit, B.V. Hospital, Bahawalpur.

Approval Date

Approved 19.01.05 30.09.06

Major Components

4-storey building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur

497 186 Name of the Scheme

Upgradation and Improvement of Jubilee Female Hospital, Bahawalpur.

Approval Date

Approved 05.06.07

Major Components

Renovation of the existing building, construction of additional floor and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur

498 187 Name of the Scheme

Establishment of ICU at B.V. Hospital, Bahawalpur.

Approval Date

Approved 29.11.07 09.10.08

Major Components

2-storey 20 bedded ICU and procurement of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

Foreign Aid Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

569.381

346.175

0.000

223.206

0.000

0.000

0.000

223.206

223.206

0.000

0.000

0.000

0.000

372.077

230.406

16.093

125.578

0.000

0.000

16.093

125.578

141.671

0.000

0.000

0.000

0.000

68.785

34.995

7.560

26.230

0.000

0.000

7.560

26.230

33.790

0.000

0.000

0.000

0.000

208.721

62.000

59.221

87.500

0.000

0.000

59.221

87.500

146.721

0.000

0.000

0.000

173

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

499 188 Name of the Scheme

Upgradation of Neurosurgery Department & Head Injury Unit in B.V. Hospital, Bahawalpur.

Approval Date

Approved 29.09.07 29.11.07

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Bahawalpur

500 189 Name of the Scheme

Addition of 4 Nos. Operation Theatres in Accident & Emergency Department B.V. Hospital, Bahawalpur

Approval Date

Approved 10.07.08

Major Components

Construction of building for four Operation Theatres. Procurement of equipment: Vital Sign Monitor, Auto Claves, Venture Suction System, CT Scan 16 Slice, Multipurpose Hydraulic Operation Table, Furniture and Fixture etc.

Major Targets

Completion of civil works for four Operation Theatres.

District and Tehsil

Bahawalpur

501 190 Name of the Scheme

Construction of Cardiology and Cardiac Surgery Block at B.V. Hospital, Bahawalpur.

Approval Date

Approved 19.08.08

Major Components

Civil works for construction of cardiac block. Purchase and installation of cardiac equipment.

Major Targets

Civil works to be executed.

District and Tehsil

Bahawalpur

502 191 Name of the Scheme

Provision of 20 Bedded Coronary Care Unit (CCU) & Angiography System in SZMC/H, R.Y.Khan

Approval Date

Approved 12.08.08

Major Components

Building and Equipment.

Major Targets

Completion of scheme.

District and Tehsil

Rahim Yar Khan , R.Y. Khan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

198.725

188.595

10.130

0.000

0.000

0.000

10.130

0.000

10.130

0.000

0.000

0.000

0.000

197.519

19.775

20.000

0.000

0.000

0.000

20.000

0.000

20.000

157.744

0.000

0.000

0.000

742.637

15.000

50.000

0.000

0.000

0.000

50.000

0.000

50.000

175.000

400.000

102.637

0.000

191.073

146.073

45.000

0.000

0.000

0.000

45.000

0.000

45.000

0.000

0.000

0.000

174

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

503 192 Name of the Scheme

Upgradation of Blood Units located at Teaching Hospitals.

Approval Date

Approved 17.05.04

Major Components

Equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore, Multan, Rawalpindi,Bahawalpur,Faisalabad

504 193 Name of the Scheme

Provincial Programme for Prevention & Control of Blindness, Punjab

Approval Date

Approved 29.11.07

Major Components

Human Resource Development. Mass distribution of drugs for prevention & control Trachoma and blindness. Provision of equipment.

Major Targets

Facilities to be provided for treatment of blindness and trachoma. Training of doctors / paramedics.

District and Tehsil

Punjab

Sub-Total: Tertiary Care Hospitals

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

85.400

54.259

0.000

31.141

0.000

0.000

0.000

31.141

31.141

0.000

0.000

0.000

0.000

186.110

22.240

0.000

20.000

0.000

0.000

0.000

20.000

20.000

80.000

63.870

0.000

0.000

20,414.966

3,847.093

3,332.989

7,148.523 1,349.060 1,418.280

0.000

0.000 1,349.060 1,418.280

2,767.340

3,318.921

Medical Education 505 194 Name of the Scheme

Construction of Hostel No.2 for 200 Girls Students at RMC Staff Colony Rawal Road, Rawalpindi.

Approval Date

Approved 13.12.06

Major Components

Hostel accommodation for female students.

Major Targets

Completion of scheme.

District and Tehsil

Rawalpindi

506 195 Name of the Scheme

Establishment of Institute of Paramedics at Rawalpindi General Hospital, Rawalpindi.

Approval Date

Approved 29.11.07 18.10.08

Major Components

Building and equipment / furniture.

Major Targets

Completion of scheme.

District and Tehsil

Rawalpindi

0.000

64.782

45.000

14.852

4.930

0.000

0.000

14.852

4.930

19.782

0.000

0.000

0.000

0.000

43.939

28.241

10.363

5.335

0.000

0.000

10.363

5.335

15.698

0.000

0.000

0.000

175

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

507 196 Name of the Scheme

Upgradation of School of Nursing to degree level at Holy Family Hospital, Rawalpindi.

Approval Date

Approved 18.10.08

Major Components

Renovation of existing building to start nursing classes. Purchase of lab. equipment, furniture and fixture.

Major Targets

Completion of scheme.

District and Tehsil

Rawalpindi , Rawalpindi.

508 197 Name of the Scheme

Establishment of Nawaz Sharif Medical College, University of Gujrat and Uplifting of Aziz Bhatti Shaheed (DHQ) as Teaching Hospital.

Approval Date

Approved 13.4.09

Major Components

Establishment of 7 Basic Sciences Departments, equipment & furniture, labs, up gradation of DHQ hospital and residences for faculty & student hostels.

Major Targets

Equipment and furniture for establishment of 7 Basic Sciences Departments, labs and up gradation of DHQ hospital. Civil works for residences for faculty & student hostels to be initiated.

District and Tehsil

Gujrat

509 198 Name of the Scheme

Establishment of Services Institute of Medical Sciences, Lahore.

Approval Date

Approved 19.01.05 17.01.06

Major Components

Academic Block, 16-apartments, Boys and Girls Hostels, equipment and furniture.

Major Targets

Tiling works in academic block in progress. Civil works to be continued. Equipment to be procured.

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

38.388

20.000

8.093

10.295

0.000

0.000

8.093

10.295

18.388

0.000

0.000

0.000

0.000

1,351.810

0.000

100.000

300.000

0.000

0.000

100.000

300.000

400.000

550.000

401.810

0.000

0.000

1,244.300

759.233

150.000

119.626

0.000

0.000

150.000

119.626

269.626

215.441

0.000

0.000

176

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

510 199 Name of the Scheme

F. Aid 4

Construction of Building / Provision of Equipment & Staff for Research in Surgical & Medical Skills in Services Institute of Medical Sciences / Services Hospital, Lahore.

Approval Date

Approved

Major Components

Civil works and equipments for research works by medical students.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

511 200 Name of the Scheme

Establishment of Nursing College for B.Sc Nursing and Upgradation of Lecture Theatres for Basic Departments, etc in Allama Iqbal Medical College, Lahore. Approved 29.09.07

Major Components

Building, Teaching Aides, Nurses Training, equipment & furniture.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

Construction of Forensic Department / Mortuary at Allama Iqbal Medical College / Jinnah Hospital, Lahore.

Approval Date

Approved 18.10.08

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

513 202 Name of the Scheme

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

18.790

5.000

6.030

7.760

0.000

0.000

6.030

7.760

13.790

0.000

0.000

0.000

0.000

99.087

49.087

13.000

37.000

0.000

0.000

13.000

37.000

50.000

0.000

0.000

0.000

0.000

50.416

0.001

27.910

22.505

0.000

0.000

27.910

22.505

50.415

0.000

0.000

0.000

0.000

1,083.198

105.064

100.000

0.000

0.000

0.000

100.000

0.000

100.000

232.006

400.000

246.128

29.11.07

Approval Date

512 201 Name of the Scheme

Estimated Cost

Establishment of Post-graduate Medical Institute, Lahore.

Approval Date

Approved 24.07.06

Major Components

Civil works, equipment and furniture.

Major Targets

Roof laid on upper basement. Civil works to be continued.

District and Tehsil

Lahore

177

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

514 203 Name of the Scheme

Construction of Forensic Department / Mortuary at Lahore General Hospital / PGMI, Lahore.

Approval Date

Approved 18.10.08

Major Components

Construction of Forensic Department / Mortuary.

Major Targets

Civil works to be completed and equipment to be purchased.

District and Tehsil

Lahore

515 204 Name of the Scheme

Improvement and Upgradation of de'Montmorency College of Dentistry, Lahore (Old Campus).

Approval Date

Approved 07.09.06

Major Components

Procurement & installation of equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

516 205 Name of the Scheme

Establishment of Fatima Jinnah Institute of Dental Sciences, Jubilee Town, Lahore.

Approval Date

Approved

Major Components

Dental College, Dental Hospital, Paramedics Training Institute and Centre of Excellence for Post Graduate Students.

Major Targets

Civil works on Academic Block to be continued.

District and Tehsil

Lahore

517 206 Name of the Scheme

Improvement and Upgradation of Post-Graduate College of Nursing Punjab at Bird wood Road Lahore, Lahore

Approval Date

Approved

Major Components

Building

Major Targets

Completion of scheme.

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

54.595

0.001

26.973

27.621

0.000

0.000

26.973

27.621

54.594

0.000

0.000

0.000

0.000

21.281

14.170

0.000

7.111

0.000

0.000

0.000

7.111

7.111

0.000

0.000

0.000

0.000

2,778.051

332.795

0.000

150.000

0.000

0.000

0.000

150.000

150.000

578.843

750.000

966.413

0.000

30.184

22.658

7.526

0.000

0.000

0.000

7.526

0.000

7.526

0.000

0.000

0.000

178

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

518 207 Name of the Scheme

Estimated Cost F. Aid 4

Establishment of New College of Nursing, Multan

Approval Date

Approved 07.09.07

Major Components

Main building, equipment and furniture.

Major Targets

Main building completed. Dental chairs and furniture to be procured.

District and Tehsil

Multan

519 208 Name of the Scheme

Establishment of an Independent Dental College Block at Nishtar Medical College, Multan

Approval Date

Approved 07.09.04 20.06.05 23.06.06 07.10.07

Major Components

Main building, equipment and furniture.

Major Targets

Main building completed. Dental chairs and furniture to be procured.

District and Tehsil

Multan

520 209 Name of the Scheme

Construction of Phase-II Sheikh Zayed Medical Complex, R.Y. Khan

Approval Date

Approved 13.4.09

Major Components

Medical College, Hospital, Hostels and Residences. Development of Management Systems.

Major Targets

Civil works on main building medical college to be continued.

District and Tehsil

Rahim Yar Khan , R.Y. Khan

521 210 Name of the Scheme

27.10.07

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

58.881

32.684

5.600

20.597

0.000

0.000

5.600

20.597

26.197

0.000

0.000

0.000

0.000

428.137

364.246

5.000

58.891

0.000

0.000

5.000

58.891

63.891

0.000

0.000

0.000

0.000

4,990.381

26.000

91.038

15.000

0.000

0.000

91.038

15.000

106.038

369.597

513.518

3,975.228

0.000

3,205.493

356.016

0.000

305.680

0.000

0.000

0.000

305.680

305.680

406.980

441.717

1,695.100

15.01.08

Nursing Health Care in Punjab in partnership with Fatima Memorial Hospital, Lahore.

Approval Date

Approved

Major Components

Training of nurses in partnership with Fatima Memorial Hospital.

Major Targets

Nurses to be trained. 140 nurses in Diploma in General Nursing, 100 in PostBasic Diploma, 50 in Post Registered Nureses B.Sc. Nursing and 50 in B.Sc. Nursing.

District and Tehsil

Punjab

28.11.07

179

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

19.086

0.000

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

522 211 Name of the Scheme

Upgradation of training facilities in 44 General Nursing Schools in Punjab.

Approval Date

Approved 05.08.04

Major Components

Equipment, buses, Educational Models and Books.

Major Targets

Completion of scheme.

District and Tehsil

Punjab

Sub-Total: Medical Education

Estimated Cost F. Aid 4

0.000

0.000

Total 5

69.600

15,631.313

Exp. upto 2008-09

Local

6

50.514

2,210.710

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

0.000

19.086

0.000

0.000

566.385 1,111.437

0.000

0.000

Total Cap 11

0.000

Rev 12

19.086

566.385 1,111.437

1,677.822

2,352.867

0.000

2,507.045

0.000

6,882.869

Research & Development 523 212 Name of the Scheme

Establishment of PCR based diagnostic laboratory, Lahore

Approval Date

Approved 04.02.09

Major Components

Building and equipment

Major Targets

Completion of scheme.

District and Tehsil

Lahore

524 213 Name of the Scheme

Survey of Child Blindness in Punjab by the Punjab Institute of Preventive Ophthalmology, KEMU / Mayo Hospital, Lahore.

Approval Date

Approved 29.11.07

Major Components

Survey for finding out causes for child blindness and low vision in Punjab.

Major Targets

Survey of 100,000 children to determine the causes of blindness and low vision in Punjab.

District and Tehsil

Lahore

525 214 Name of the Scheme

Upgradation of Lab. of Bacteriologist Punjab at Institute of Public Health, Lahore.

Approval Date

Approved 13.09.08

Major Components

Civil works. Equipment.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

0.000

24.740

23.740

0.000

1.000

0.000

0.000

0.000

1.000

1.000

0.000

0.000

0.000

0.000

184.660

30.868

0.000

26.390

0.000

0.000

0.000

26.390

26.390

73.610

53.792

0.000

0.000

54.215

6.000

25.955

22.260

0.000

0.000

25.955

22.260

48.215

0.000

0.000

0.000

180

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

526 215 Name of the Scheme

Accommodation and Upgradation of Food Testing Laboratory (Government Public Analyst Laboratory), Lahore.

Approval Date

Approved 11.07.07

Major Components

Building, Staff, Equipment, Furniture & Vehicles for Food Testing / Analysis.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

527 216 Name of the Scheme

Strengthening of Health Management Information System in Punjab.

Approval Date

Approved 21.08.07

Major Components

JICA HMIS Model to be made operational in all districts.

Major Targets

Procurement of software modules, IT equipment and training of staff.

District and Tehsil

Punjab

Sub-Total: Research & Development Total: ON-GOING SCHEMES

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Total

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

76.420

20.000

23.900

32.520

0.000

0.000

23.900

32.520

56.420

0.000

0.000

0.000

0.000

194.780

44.222

0.000

23.109

0.000

0.000

0.000

23.109

23.109

127.021

0.000

0.000

534.815

124.830

49.855

105.279

0.000

49.855

105.279

155.134

200.631

53.792

0.000

56,819.428 17,605.016 2,856.035 4,068.965

0.000

100.000 2,856.035 4,168.965

7,025.000

9,843.441

8,889.676

13,455.767

225.000

435.000

340.000

0.000 2,304.881

0.000

NEW SCHEMES Preventive & Primary Health Care 528 217 Name of the Scheme

Prevention and Control of Hepatitis in Punjab

Approval Date

Un-Approved

Major Components

Prevention of Hepatitis. Screening & Diagnosis. Treatment and management. Targeted initiatives. Training & Capacity building. Establishment of PMU

Major Targets

Treatment of 35,500 patients. Stop the transmission of Hepatitis B and C. Reduce the incidence and mortality by the disease. Provision of free treatment to poor and deserving patients. Education and awareness.

District and Tehsil

Punjab

0.000

1,000.000

0.000

0.000

181

225.000

0.000

0.000

0.000

225.000

0.000

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

529 218 Name of the Scheme

Strengthening Expanded Programme for Immunization (EPI)

Approval Date

Un-Approved

Major Components

Immunization delivery system, Human Resource Development, Communication, Advocacy and Programme Management

Major Targets

84% Immunization of 3.29 million children under one year age and 14 million children under 5 years age. Purchase of cold chains and staff salary.

District and Tehsil

Punjab

530 219 Name of the Scheme

TB Control Programme

Approval Date

Un-Approved

Major Components

Diagnosis centers in hospitals, free medicine to all patients, laboratory supplies, awareness and programme management Directly Observed Treatment Short Courses (DOTS)

Major Targets

DOTS Coverage: 100% Case Detection Rate all types: 90% Treatment success rate: 85% free medicine to all patients, laboratory supplies, awareness and programme management

District and Tehsil

Punjab

531 220 Name of the Scheme

Punjab Thalassemia Prevention Program

Approval Date

Approved 20.3.09

Major Components

Awareness, screening out carriers, genetic counseling and pre-natal diagnosis.

Major Targets

Awareness, screening out carriers, genetic counseling and pre-natal diagnosis.

District and Tehsil

Punjab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

200.000

0.000

0.000

50.000

0.000

0.000

0.000

50.000

50.000

150.000

0.000

0.000

0.000

300.000

0.000

0.000

75.000

0.000

0.000

0.000

75.000

75.000

225.000

0.000

0.000

0.000

149.503

0.000

0.000

40.000

0.000

0.000

0.000

40.000

40.000

60.000

49.503

0.000

182

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

532 221 Name of the Scheme

Roll Back Malaria (RBM)

Approval Date

Approved 9.2.09

Major Components

Case detection, diagnosis, and treatment. Capacity building of staff, Research activities and monitoring & evaluation

Major Targets

Early detection and prompt treatment at health outlets and community level (outreach service). Free medicines to be distributed. Reduced reliance on insecticide. Spraying in selected union councils in endemic areas.

District and Tehsil

Punjab

533 222 Name of the Scheme

National Blood Transfusion Service, Punjab

Approval Date

Approved 25.4.09

Major Components

Setting up a network of Regional Blood Transfusion Centres (RBTCs) linked to Hospital Based Blood Banks (HBBBs).

Major Targets

Setting up a network of Regional Blood Transfusion Centres (RBTCs) linked to Hospital Based Blood Banks (HBBBs). The RBTCs will serve as blood procurement and distribution centres ensuring quality systems.

District and Tehsil

Punjab

534 223 Name of the Scheme

Dengue Control Program in Punjab

Approval Date

Un-Approved

Major Components

Integrated Vector Control and Strengthening Disease Surveillance

Major Targets

Integrated Vector Control and Strengthening Disease Surveillance

District and Tehsil

Punjab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

185.680

0.000

0.000

30.000

0.000

0.000

0.000

30.000

30.000

55.000

100.680

0.000

200.530

323.750

0.000

0.000

30.000

0.000

0.000

0.000

30.000

30.000

20.000

20.000

253.750

0.000

60.000

0.000

0.000

20.000

0.000

0.000

0.000

20.000

20.000

40.000

0.000

0.000

183

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

535 224 Name of the Scheme

Introduction of Mobile Health Units at Tehsil Level (Pilot)

Approval Date

Un-Approved

Major Components

Introduction of Mobile Health Units for diagnostic and treatment at Tehsil level.

Major Targets

Mobile Health Units to make up for deficiencies of static coverage and provide diagnostic and treatment facilities at remote areas.

District and Tehsil

Punjab

536 225 Name of the Scheme

Nutrition Support Project

Approval Date

Un-Approved

Major Components

Provision of supplements and awareness for nutrition.

Major Targets

Provision of supplements and awareness for nutrition.

District and Tehsil

Punjab

Sub-Total: Preventive & Primary Health Care

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Foreign Aid Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

300.000

0.000

0.000

300.000

0.000

0.000

0.000

300.000

300.000

0.000

0.000

0.000

0.000

100.000

0.000

0.000

20.000

0.000

0.000

0.000

20.000

20.000

30.000

50.000

0.000

790.000

790.000

560.183

253.750

200.530

2,618.933

0.000

0.000

790.000

0.000

0.000

0.000

1,015.000

Accelerated Program for Health Care 537 226 Name of the Scheme

Construction of 150 bedded Hospital at Murree

Approval Date

Un-Approved

Major Components

Provision of 150 beds. Building, equipment and furniture

Major Targets

Civil works to be taken up.

District and Tehsil

Rawalpindi , Murree

538 227 Name of the Scheme

Upgradation of Govt. General Hospital Ghulam Muhammadabad, Faisalabad

Approval Date

Approved 13.4.09

Major Components

Addition of 200-beds, Building and Equipment

Major Targets

Civil works to be taken up and procurement of equipment

District and Tehsil

Faisalabad

0.000

200.000

0.000

40.000

0.000

0.000

0.000

40.000

0.000

40.000

55.000

55.000

50.000

0.000

924.633

0.000

200.000

200.000

0.000

0.000

200.000

200.000

400.000

524.633

0.000

0.000

184

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

539 228 Name of the Scheme

Upgradation of DHQ Hospital, Toba Tek Singh

Approval Date

Un-Approved

Major Components

Building and Equipment

Major Targets

Civil works and equipment

District and Tehsil

Toba Tek Singh , T.T.Singh

540 229 Name of the Scheme

Establishment of 50-Bedded Hospital on Western Side of Gujranwala City

Approval Date

Un-approved

Major Components

Building & equipment

Major Targets

Civil Works to be taken up

District and Tehsil

Gujranwala

541 230 Name of the Scheme

Establishment of ICU and Ward at DHQ Hospital, Gujranwala

Approval Date

Un-Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Gujranwala

542 231 Name of the Scheme

Upgradation of DHQ Hospital, Hafizabad

Approval Date

Un-Approved

Major Components

Addition of 125 beds. Building, Equipment and furniture

Major Targets

Civil works and procurement of equipment

District and Tehsil

Hafizabad

543 232 Name of the Scheme

Construction of THQ Hospital, Sarai Alamgir, District Gujrat.

Approval Date

Approved 29.5.09

Major Components

60-bedded building, equipment and furniture

Major Targets

Civil works to be taken up.

District and Tehsil

Gujrat , Sarai Alamgir

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

100.000

0.000

19.000

1.000

0.000

0.000

19.000

1.000

20.000

80.000

0.000

0.000

0.000

120.000

0.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

90.000

0.000

0.000

0.000

120.000

0.000

15.000

15.000

0.000

0.000

15.000

15.000

30.000

90.000

0.000

0.000

0.000

200.000

0.000

19.000

1.000

0.000

0.000

19.000

1.000

20.000

180.000

0.000

0.000

0.000

173.707

0.000

20.000

0.000

0.000

0.000

20.000

0.000

20.000

40.000

70.000

43.707

185

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

544 233 Name of the Scheme

Establishment of DHQ Hospital, M.B. Din (on cost sharing basis)

Approval Date

Approved 13.4.09

Major Components

Building Equipment and Furniture

Major Targets

Civil works to be taken up

District and Tehsil

Mandi Bahauddin , M.B. Din

545 234 Name of the Scheme

Establishment of THQ Hospital Malikwal, District M.B. Din

Approval Date

Un-Approved

Major Components

40-bedded building, equipment and furniture.

Major Targets

Completion of civil works

District and Tehsil

Mandi Bahauddin , M.B. Din

546 235 Name of the Scheme

Establishment of ICU, Neurology Ward, Burn Unit and Orthopedic Ward, Allama Iqbal Memorial Hospital, Sialkot

Approval Date

Un-Approved

Major Components

Building and Equipment

Major Targets

Completion of scheme.

District and Tehsil

Sialkot

547 236 Name of the Scheme

Eatablishment of ICU, Government Sardar Begum Hospital, Sialkot

Approval Date

Un-Approved

Major Components

Building and equipment.

Major Targets

Completion of scheme.

District and Tehsil

Sialkot

548 237 Name of the Scheme

Provision of CT Scan at Govt. Said Mitha Hospital and MRI at Mian Muhammad Nawaz Sharif Hospital, Yakki Gate, Lahore

Approval Date

Un-Approved

Major Components

CT Scan Equipment

Major Targets

CT Scan Equipment

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

Foreign Aid Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

955.159

0.000

120.000

5.000

0.000

0.000

120.000

5.000

125.000

415.000

415.159

0.000

0.000

150.000

0.000

15.000

0.000

0.000

0.000

15.000

0.000

15.000

135.000

0.000

0.000

0.000

180.206

0.000

15.206

14.000

0.000

0.000

15.206

14.000

29.206

0.000

0.000

0.000

0.000

20.000

0.000

10.000

10.000

0.000

0.000

10.000

10.000

20.000

0.000

0.000

0.000

0.000

160.000

0.000

0.000

100.000

0.000

0.000

0.000

100.000

100.000

60.000

0.000

0.000

186

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

549 238 Name of the Scheme

Construction of Emergency and Trauma Center at Government Mian Muhammad Nawaz Sharif Hospital, Lahore

Approval Date

Approved 13.04.09

Major Components

Building and Equipment

Major Targets

Construction of building civil works

District and Tehsil

Lahore

550 239 Name of the Scheme

Establishment of 20-Bedded Hospital at Ghaziabad Aziz Bhatti Town, Lahore

Approval Date

Un-Approved

Major Components

20-bedded building, equipment and furniture

Major Targets

Civil works to be taken up.

District and Tehsil

Lahore

551 240 Name of the Scheme

Establishment of 40 bedded Tehsil level Hospital at Lal Quarters Samanabad, Lahore

Approval Date

Approved 18.10.08

Major Components

40-bedded building, equipment and furniture

Major Targets

Civil works to be taken up.

District and Tehsil

Lahore

552 241 Name of the Scheme

Upgradation of Governor's House Medical Center, Lahore

Approval Date

Approved 27.11.07

Major Components

Equipment

Major Targets

Procurement of equipment

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

310.578

0.000

21.180

0.000

0.000

0.000

21.180

0.000

21.180

289.398

0.000

0.000

0.000

80.000

0.000

25.180

0.000

0.000

0.000

25.180

0.000

25.180

54.820

0.000

0.000

0.000

177.982

0.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

80.000

67.982

0.000

0.000

5.400

0.000

0.000

5.400

0.000

0.000

0.000

5.400

5.400

0.000

0.000

0.000

187

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

553 242 Name of the Scheme

Establishment of 40 bedded Hospital at Roshan Bheela, District Kasur

Approval Date

Un-Approved

Major Components

40-bedded building, equipment and furniture

Major Targets

Civil works to be taken up.

District and Tehsil

Kasur

554 243 Name of the Scheme

Upgradation of DHQ Hospital Okara

Approval Date

Un-Approved

Major Components

A 40 bedded Cardiology ward10 bedded CCU ward40 bedded Urology ward with Dialysis unit40-bedded C-Neuro Surgery ward along with CT Scan

Major Targets

Civil works to be taken up.

District and Tehsil

Okara

555 244 Name of the Scheme

Construction of Residences at THQ Hospital Dunyapur, District Lodhran

Approval Date

Un-Approved

Major Components

Residences

Major Targets

Civil works on residences to be taken up.

District and Tehsil

Lodhran , Dunyapur

556 245 Name of the Scheme

Establishment of Trauma Centre at DHQ Hospital, D.G.Khan

Approval Date

Un-Approved

Major Components

Civil work / purchase of equipment.

Major Targets

Civil work.

District and Tehsil

Dera Ghazi Khan , D.G.Khan

557 246 Name of the Scheme

Upgradation of DHQ Hospital, Layyah

Approval Date

Un-Approved

Major Components

Addition of 40-beds at the land of Thal Dispensary. Building and Equipment

Major Targets

Civil works to be initiated.

District and Tehsil

Layyah

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

100.000

0.000

25.000

0.000

0.000

0.000

25.000

0.000

25.000

75.000

0.000

0.000

0.000

100.000

0.000

19.000

1.000

0.000

0.000

19.000

1.000

20.000

80.000

0.000

0.000

0.000

59.981

0.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

49.981

0.000

0.000

0.000

90.000

0.000

30.000

0.000

0.000

0.000

30.000

0.000

30.000

60.000

0.000

0.000

0.000

60.000

0.000

30.000

5.000

0.000

0.000

30.000

5.000

35.000

25.000

0.000

0.000

188

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

558 247 Name of the Scheme

Upgradation of THQ Hospital, Khanpur District R.Y. Khan

Approval Date

Un-Approved

Major Components

Addition of 60-beds, building, equipment and furniture.

Major Targets

Civil works to be taken up.

District and Tehsil

Rahim Yar Khan , Khanpur

559 248 Name of the Scheme

Strengthening Primary Health Care (RHCs) and Secondary Health Care Facilities in Punjab

Approval Date

Un-approved

Major Components

Provision of Building and Equipment for RHCs and DHQ / THQ Hospitals

Major Targets

Provision of Building and Equipment for RHCs and DHQ / THQ Hospitals

District and Tehsil

Punjab

560 249 Name of the Scheme

Establishment of Separate Emergency Blocks in 10 DHQ Hospitals

Approval Date

Un-Approved

Major Components

Building & Equipment

Major Targets

Construction of Emergency Block and Procurement of equipment for all emergency cases.

District and Tehsil

Punjab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

30.000

0.000

10.000

20.000

0.000

0.000

10.000

20.000

30.000

0.000

0.000

0.000

0.000

800.000

0.000

300.000

500.000

0.000

0.000

300.000

500.000

800.000

0.000

0.000

0.000

0.000

1,000.000

0.000

200.000

300.000

0.000

0.000

200.000

300.000

500.000

500.000

0.000

0.000

189

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

225.000

275.000

0.000

2,605.966

3,158.832

608.141

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

561 250 Name of the Scheme

Piloting of Model THQ Hospitals as Linchpin of Service delivery in Punjab

Approval Date

Un-Approved

Major Components

Equipment for THQ Hospital and residential enclave for doctors working in RHCs / BHUs.

Major Targets

Model THQ Hospital to serve as a base for providing Primary Health Care facilities by accommodation facilities for doctors posted in RHCs / BHUs alongwith joint transportation facility. Professional skills will improve which will facilitate in implementation of Minimum Service Delivry Standards.

District and Tehsil

Punjab

Sub-Total: Accelerated Program for Health Care

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Cap 7

Rev 8

100.000

125.000

6

Cap 9

Rev 10

0.000

0.000

Total Cap 11

Rev 12

100.000

125.000

0.000

500.000

0.000

6,617.646

0.000

130.000

0.000

0.000

50.683

0.000

0.000

0.000

50.683

50.683

122.517

0.000

0.000

0.000

2,500.000

0.000

90.000

10.000

0.000

0.000

90.000

10.000

100.000

500.000

500.000

1,400.000

0.000

0.000 1,303.566 1,302.400

0.000

0.000 1,303.566 1,302.400

0.000

93.707

Tertiary Care Hospitals 562 251 Name of the Scheme

Upgradation of Gastroenterology, Hepatology & Endoscopy in Holy Family Hospital, Rawalpindi

Approval Date

Un-Approved

Major Components

Equipment

Major Targets

Equipment for Gastroenterology, Hepatology & Endoscopy

District and Tehsil

Rawalpindi

563 252 Name of the Scheme

Rawalpindi Institute of Cardiology

Approval Date

Un-Approved

Major Components

200-bedded building, equipment and furniture etc.

Major Targets

Construction of building

District and Tehsil

Rawalpindi

190

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

564 253 Name of the Scheme

Institute of Urology & Transplantation, Rawalpindi

Approval Date

Un-Approved

Major Components

200-bedded building, equipment and furniture etc.

Major Targets

Construction of building

District and Tehsil

Rawalpindi

565 254 Name of the Scheme

Improvement / Upgradation of DHQ Hospital, Faisalabad

Approval Date

Approved 29.11.07

Major Components

Building & Equipment

Major Targets

Civil works to be taken up

District and Tehsil

Faisalabad

566 255 Name of the Scheme

Upgradation of Diagnostic & Research Centre at Eye Department, Allied Hospital, Faisalabad

Approval Date

Approved 20.3.2009

Major Components

Equipment

Major Targets

Purchase of Equipment for Eye Ward

District and Tehsil

Faisalabad

567 256 Name of the Scheme

Purchase of 6 ambulances for Allied Hospital, Faisalabad

Approval Date

Approved 27.4.09

Major Components

6 ambulances

Major Targets

Purchase of 6 ambulances

District and Tehsil

Faisalabad

568 257 Name of the Scheme

Upgradation of Pediatric Gastroenterology and Hepatology Department and Establishment of Pediatric Endoscopy Unit, Children Hospital, Lahore

Approval Date

Approved 20.3.09

Major Components

Equipment

Major Targets

Procurement of Equipment

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

2,500.000

0.000

90.000

10.000

0.000

0.000

90.000

10.000

100.000

500.000

500.000

1,400.000

0.000

115.651

0.000

20.000

5.000

0.000

0.000

20.000

5.000

25.000

90.651

0.000

0.000

0.000

18.000

0.000

0.000

18.000

0.000

0.000

0.000

18.000

18.000

0.000

0.000

0.000

0.000

24.000

0.000

0.000

24.000

0.000

0.000

0.000

24.000

24.000

0.000

0.000

0.000

0.000

31.806

0.000

0.000

31.806

0.000

0.000

0.000

31.806

31.806

0.000

0.000

0.000

191

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

569 258 Name of the Scheme

Upgradation of Neuro Surgery Department, Mayo Hospital, Lahore

Approval Date

Approved 20.3.09

Major Components

Equipment

Major Targets

Equipment for Neuro Surgery

District and Tehsil

Lahore

570 259 Name of the Scheme

Procurement of Equipment for Cardiology Department, Mayo Hospital, Lahore

Approval Date

Approved 20.3.09

Major Components

Equipment

Major Targets

Procurement of equipment

District and Tehsil

Lahore

571 260 Name of the Scheme

Upgradation of Plastic Surgery Unit, Mayo Hospital, Lahore

Approval Date

Approved 27.4.09

Major Components

Equipment

Major Targets

Procurement of equipment

District and Tehsil

Lahore

572 261 Name of the Scheme

Upgradation of Neuro-surgery Department, Sir Ganga Ram Hospital, Lahore

Approval Date

Approved 27.11.08

Major Components

Equipment

Major Targets

Modular Operation TheatreHVAC Unit, Neuro Navigation System, Operating Microscope, ICU Ventilator, etc.

District and Tehsil

Lahore

573 262 Name of the Scheme

Purchase of Equipment for Sir Ganga Ram Hospital, Lahore

Approval Date

Approved 27.11.08

Major Components

Equipment

Major Targets

Procurement of equipment

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

198.890

0.000

0.000

30.000

0.000

0.000

0.000

30.000

30.000

168.890

0.000

0.000

0.000

45.500

0.000

0.000

36.500

0.000

0.000

0.000

36.500

36.500

9.000

0.000

0.000

0.000

195.700

0.000

0.000

29.396

0.000

0.000

0.000

29.396

29.396

166.304

0.000

0.000

0.000

121.548

0.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

111.548

0.000

0.000

0.000

130.000

0.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

120.000

0.000

0.000

192

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

574 263 Name of the Scheme

Construction of 400 bedded Fatima Block, Sir Ganga Ram Hospital, Lahore (4 Modules of 100 Beds each)

Approval Date

Un-Approved

Major Components

Building, Equipment and Furniture

Major Targets

Civil works to be taken up

District and Tehsil

Lahore

575 264 Name of the Scheme

Expansion and Upgradation of Cardiovascular Services, Jinnah Hospital, Lahore

Approval Date

Approved 27.04.09

Major Components

Equipment

Major Targets

Procurement of equipment including Angiography machine

District and Tehsil

Lahore

576 265 Name of the Scheme

Extension of 10 bedded ICU Jinnah Hospital, Lahore

Approval Date

Approved 9.2.09

Major Components

Building and equipment

Major Targets

Civil works to be completed.

District and Tehsil

Lahore

577 266 Name of the Scheme

Establishment of Laparoscopic Surgery Centre, AIMC / Jinnah Hospital, Lahore

Approval Date

Approved

Major Components

Equipment.

Major Targets

Purchase of equipment.

District and Tehsil

Lahore

578 267 Name of the Scheme

Provision of two Angiography Machines in Punjab Institute of Cardiology, Lahore

Approval Date

Approved 09.02.09

Major Components

Two Angiography Machines

Major Targets

Procurement of Angiography Machine

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

600.000

0.000

5.000

0.000

0.000

0.000

5.000

0.000

5.000

195.000

200.000

200.000

0.000

94.050

0.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

84.050

0.000

0.000

0.000

48.382

0.000

12.497

0.000

0.000

0.000

12.497

0.000

12.497

35.885

0.000

0.000

0.000

198.000

0.000

0.000

54.500

0.000

0.000

0.000

54.500

54.500

113.500

0.000

0.000

0.000

160.000

0.000

0.000

80.000

0.000

0.000

0.000

80.000

80.000

80.000

0.000

0.000

193

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

579 268 Name of the Scheme

Renovation of Building and Procuremet of Electro-Medical Equipment for Services Hospital, Lahore

Approval Date

Un-Approved

Major Components

Addition / Alteration in existing building and procurement of equipment on need basis.

Major Targets

Renovation of existing building.

District and Tehsil

Lahore

580 269 Name of the Scheme

Establishment of Liver Disease Management Cell, Lahore

Approval Date

Un-Approved

Major Components

Procurement of equipment

Major Targets

Procurement of equipment

District and Tehsil

Lahore

581 270 Name of the Scheme

Establishment of Kidney Centre, Multan

Approval Date

Un-Approved

Major Components

Building and equipment

Major Targets

Civil works to be taken up

District and Tehsil

Multan

582 271 Name of the Scheme

Renovation of Nishtar Medical College, Multan

Approval Date

Un-Approved

Major Components

Renovation work on old college building.

Major Targets

Renovation.

District and Tehsil

Multan

583 272 Name of the Scheme

Construction of Sarai for Attendants in Nishtar Hospital, Multan

Approval Date

Un-Approved

Major Components

Building and furniture

Major Targets

Civil works and procurement of furniture

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

120.000

0.000

5.000

5.000

0.000

0.000

5.000

5.000

10.000

110.000

0.000

0.000

0.000

1,300.000

0.000

0.000

100.000

0.000

0.000

0.000

100.000

100.000

300.000

300.000

600.000

0.000

400.000

0.000

195.000

5.000

0.000

0.000

195.000

5.000

200.000

200.000

0.000

0.000

0.000

150.000

0.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

140.000

0.000

0.000

0.000

9.000

0.000

9.000

0.000

0.000

0.000

9.000

0.000

9.000

0.000

0.000

0.000

194

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

584 273 Name of the Scheme

Construction of Two Pedestrain Bridges at Nishtar Medical College, Multan

Approval Date

Un-Approved

Major Components

Bridges

Major Targets

Bridges

District and Tehsil

Multan

585 274 Name of the Scheme

Expansion of Emergency Block in Institute of Cardiology, Multan

Approval Date

Approved 18.4.09

Major Components

Building and equipment

Major Targets

Civil works.

District and Tehsil

Multan

586 275 Name of the Scheme

Upgradation of Thalassaemia Unit and Bone Marrow Transplant Centre at Bahawal Victoria Hospital, Bahawalpur

Approval Date

Un-Approved

Major Components

Building, Equipment, Furniture, etc.

Major Targets

Civil works and procurement of equipment

District and Tehsil

Bahawalpur

587 276 Name of the Scheme

Establishment of 20 bedded Burn Unit at B.V. Hospital, Bahawalpur

Approval Date

Un-Approved

Major Components

20-bedded building & electro medical equipments

Major Targets

Civil works to be taken up

District and Tehsil

Bahawalpur , Bahawalpur

588 277 Name of the Scheme

Establishment of Children Complex, B.V. Hospital, Bahawalpur

Approval Date

Un-Approved

Major Components

Building, equipment and furniture

Major Targets

Civil works to be taken up

District and Tehsil

Bahawalpur , Bahawalpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

0.000

28.000

0.000

15.000

0.000

0.000

0.000

15.000

0.000

15.000

13.000

0.000

0.000

0.000

155.160

0.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

145.160

0.000

0.000

0.000

400.000

0.000

100.000

0.000

0.000

0.000

100.000

0.000

100.000

300.000

0.000

0.000

0.000

300.000

0.000

10.000

0.000

0.000

0.000

10.000

0.000

10.000

290.000

0.000

0.000

0.000

300.000

0.000

95.000

5.000

0.000

0.000

95.000

5.000

100.000

200.000

0.000

0.000

195

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

589 278 Name of the Scheme

Construction of Gynae & Obstetric Care Complex, B.V. Hospital, Bahawalpur

Approval Date

Un-Approved

Major Components

Building, equipment and furniture

Major Targets

Civil works to be taken up

District and Tehsil

Bahawalpur , Bahawalpur

590 279 Name of the Scheme

Establishment of Orthopaedic Unit-II at B.V. Hospital, Bahawalpur

Approval Date

Un-Approved

Major Components

Building, equipment and furniture

Major Targets

Civil works to be taken up

District and Tehsil

Bahawalpur , Bahawalpur

591 280 Name of the Scheme

Construction of Sheikh Zayed Institute of Cardiology in Rahim Yar Khan (PC-II)

Approval Date

Un-Approved

Major Components

Feasibility study by consultants.

Major Targets

Feasibility study including preparation of PC-I.

District and Tehsil

Rahim Yar Khan

592 281 Name of the Scheme

Provision of Cell Separator Machines (Aphaeresis Machines) and other Blood Component Preparation Equipment to Blood Banks of all Teaching Hospitals of Punjab

Approval Date

Approved 27.04.09

Major Components

Equipment

Major Targets

Procurement of equipment

District and Tehsil

Punjab

Sub-Total: Tertiary Care Hospitals

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

300.000

0.000

5.000

0.000

0.000

0.000

5.000

0.000

5.000

295.000

0.000

0.000

0.000

150.000

0.000

4.000

1.000

0.000

0.000

4.000

1.000

5.000

145.000

0.000

0.000

0.000

2.500

0.000

0.000

2.500

0.000

0.000

0.000

2.500

2.500

0.000

0.000

0.000

0.000

169.400

0.000

0.000

9.800

0.000

0.000

0.000

9.800

9.800

100.180

59.410

0.010

0.000

10,895.587

675.497

538.185

675.497

538.185

4,535.685

1,559.410

3,600.010

0.000

196

0.000

0.000

1,213.682

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

Medical Education 593 282 Name of the Scheme

Additional Compensation for Land acquired for Rawalpindi Medical College Colony, Rawalpindi

Approval Date

Un-Approved

Major Components

Payment as compensation of Land under court judgment

Major Targets

Payment as compensation of Land.

District and Tehsil

Rawalpindi

594 283 Name of the Scheme

Establishment of Medical College, Gujranwala

Approval Date

Un-Approved

Major Components

Building, Equipment, Furninture, Training, etc.

Major Targets

Civil works to be taken up.

District and Tehsil

Gujranwala

595 284 Name of the Scheme

Establishment of Medical College, Sialkot (Public-Private Partnership)

Approval Date

Un-Approved

Major Components

Building, Equipment, Furniture, Training, etc.

Major Targets

Civil Works to be taken up.

District and Tehsil

Sialkot

596 285 Name of the Scheme

Upgradation of Pathology Lab, Allama Iqbal Medical College, Lahore

Approval Date

Approved

Major Components

Purchase of equipment.

Major Targets

Purchase of equipment.

District and Tehsil

Lahore

597 286 Name of the Scheme

Providing and Installation of Passenger Lift in King Edward Medical University, Lahore

Approval Date

Approved 9.2.09

Major Components

Passenger lift.

Major Targets

Completion of scheme.

District and Tehsil

Lahore

0.000

4.000

0.000

0.000

4.000

0.000

0.000

0.000

4.000

4.000

0.000

0.000

0.000

0.000

2,000.000

0.000

98.000

2.000

0.000

0.000

98.000

2.000

100.000

500.000

500.000

900.000

0.000

2,000.000

0.000

45.000

5.000

0.000

0.000

45.000

5.000

50.000

512.000

500.000

938.000

0.000

43.617

0.000

0.000

15.000

0.000

0.000

0.000

15.000

15.000

28.617

0.000

0.000

0.000

4.520

0.000

0.000

4.500

0.000

0.000

0.000

4.500

4.500

0.000

0.000

0.020

197

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

598 287 Name of the Scheme

Training Plan for Paramedics in all districts of Punjab, Institute of Public Health, Lahore

Approval Date

Approved

Major Components

Training of paramedics in various specialities for improving skills.

Major Targets

Training in various specialities.

District and Tehsil

Lahore

599 288 Name of the Scheme

Establishment of Women Medical College, Multan (PC-II)

Approval Date

Un-Approved

Major Components

Feasibility Study by consultants.

Major Targets

Feasibility Study

District and Tehsil

Multan

600 289 Name of the Scheme

Establishment of Medical College, Sahiwal

Approval Date

Un-Approved

Major Components

Building, Equipment, Furniture, Training, etc.

Major Targets

Civil Works to be taken up.

District and Tehsil

Sahiwal

601 290 Name of the Scheme

Establishment of Medical College, D.G. Khan

Approval Date

Un-Approved

Major Components

Building, Equipment, Furniture, Training, etc.

Major Targets

Civil Works to be taken up

District and Tehsil

Dera Ghazi Khan , D.G.Khan

602 291 Name of the Scheme

Upgradation of Nursing Hostel at Sheikh Zayed Medical College / Hospital, Rahim Yar Khan

Approval Date

Approved 9.2.09

Major Components

Hostel, Building, Furniture

Major Targets

Civil Works for nursing hostel

District and Tehsil

Rahim Yar Khan

Sub-Total: Medical Education

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.680

0.000

0.000

8.680

0.000

0.000

0.000

8.680

8.680

0.000

0.000

0.000

0.000

1.000

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

0.000

0.000

0.000

0.000

2,000.000

0.000

20.000

5.000

0.000

0.000

20.000

5.000

25.000

515.000

500.000

960.000

0.000

2,000.000

0.000

20.000

5.000

0.000

0.000

20.000

5.000

25.000

515.000

500.000

960.000

0.000

62.884

0.000

20.520

0.000

0.000

0.000

20.520

0.000

20.520

42.364

0.000

0.000

0.000

8,124.701

203.520

50.180

203.520

50.180

253.700

0.000

198

0.000

0.000

2,112.981

2,000.000

3,758.020

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

Total

6

Cap 7

Rev 8

Cap 9

Rev 10

Cap 11

Rev 12

Research & Development 603 292 Name of the Scheme

Establishment of Drugs Testing Laboratory, Rawalpindi

Approval Date

Un-Approved

Major Components

Construction of Building & Purchase of Equipment

Major Targets

Construction of Building & Purchase of Equipment

District and Tehsil

Rawalpindi

604 293 Name of the Scheme

Establishment of Food Testing Laboratory, Rawalpindi

Approval Date

Un-Approved

Major Components

Purchase of Equipment/ Machinery, Furniture, Glass etc.

Major Targets

Purchase of Equipment/ Machinery, Furniture, Glass etc.

District and Tehsil

Rawalpindi

605 294 Name of the Scheme

Establishment of Drugs Testing Laboratory, Faisalabad

Approval Date

Un-Approved

Major Components

Construction of Building & Purchase of Equipment

Major Targets

Construction of Building & Purchase of Equipment

District and Tehsil

Faisalabad

606 295 Name of the Scheme

Establishment of Food Testing Laboratory, Faisalabad

Approval Date

Un-Approved

Major Components

Purchase of Equipment/ Machinery, Furniture, Glass etc.

Major Targets

Purchase of Equipment/ Machinery, Furniture, Glass etc.

District and Tehsil

Faislabad

0.000

30.000

0.000

20.000

10.000

0.000

0.000

20.000

10.000

30.000

0.000

0.000

0.000

0.000

20.000

0.000

10.000

10.000

0.000

0.000

10.000

10.000

20.000

0.000

0.000

0.000

0.000

30.000

0.000

20.000

10.000

0.000

0.000

20.000

10.000

30.000

0.000

0.000

0.000

0.000

20.000

0.000

10.000

10.000

0.000

0.000

10.000

10.000

20.000

0.000

0.000

0.000

199

HEALTH

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

607 296 Name of the Scheme

Establishment of Mobile Food Testing Laboratory, Lahore

Approval Date

Un-Approved

Major Components

Purchase of Equipment/ Machinery, Furniture, Glass etc.

Major Targets

Purchase of Equipment/ Machinery, Furniture, Glass etc.

District and Tehsil

Lahore

608 297 Name of the Scheme

Upgradation of Drugs Testing Laboratory, Multan

Approval Date

Un-Approved

Major Components

Construction of Building & Purchase of Equipment

Major Targets

Construction of Building & Purchase of Equipment

District and Tehsil

Multan

609 298 Name of the Scheme

Establishment of Health Care Commission, Punjab

Approval Date

Un-Approved

Major Components

Overall improvement of Health Care System by establishing HCC.

Major Targets

Regulation, performance evaluation and regular surveillance of health care institutions.

District and Tehsil

Punjab

Sub-Total: Research & Development Total: NEW SCHEMES Grand Total

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

11.652

0.000

0.000

11.652

0.000

0.000

0.000

11.652

11.652

0.000

0.000

0.000

0.000

20.000

0.000

10.000

10.000

0.000

0.000

10.000

10.000

20.000

0.000

0.000

0.000

0.000

20.000

0.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

15.000

0.000

0.000

0.000

151.652

70.000

66.652

0.000

0.000

70.000

66.652

136.652

15.000

0.000

0.000

200.530

28,408.519

0.000 2,252.583 2,747.417

0.000

0.000 2,252.583 2,747.417

5,000.000 10,837.498

4,727.734

7,705.487

85,227.947 17,605.016 5,108.618 6,816.382

0.000

100.000 5,108.618 6,916.382

12,025.000 20,680.939 13,617.410

21,161.254

2,505.411

0.000

200

WATER SUPPLY & SANITATION

201

WATER SUPPLY & SANITATION VISION Achievement of Millennium Development Goals (MDGs) within the stipulated time period by providing Safe Drinking Water & Sanitation coverage to the community.

POLICY INTERVENTIONS/CRITERIA •

Identification of Rural Water Supply Schemes on need base particularly in Barani & Brackish areas and involvement of community from day one in scheme’s identification, execution and monitoring.



Discouraging provision of “Sewerage System” in the rural areas. Instead, open drains of Type-I & Type-II will be provided in the compact/consolidated Abadies/Villages. Scattered houses/areas will not qualify to attract this facility.



Rehabilitation of need based non-functional schemes requiring minimum cost and ensured sustainability.



“Linking investment with achievements” particularly stepping forward to attain MDGs.



Only such schemes under would be considered which are technically and financially viable/feasible.



Priority for Rural water supply schemes and rural sewerage/drainage, PCC initiatives would generally be discouraged.



No financial contribution/subsidy to the Rural Communities for the O&M of schemes and community will have to generate resources for the same.

OBJECTIVES/STRATEGIC INTERVENTIONS: Attaining Millennium Development Goals (MDG`s) •

961 Water Supply Schemes (88 Urban and 863 Rural) are being executed at a total cost of Rs. 5,122 Million.



Like wise 622 Sanitation Schemes (92 Urban and 530 Rural) have been conceived at a cost of Rs. 2,394 million.



232 schemes costing Rs. 800.00 million are being rehabilitated in the Barani and Brackish areas.



Execution of these interventions will result into substantial improvement of population coverage and will lead to the attainment of MDGs.

202

Ensuring Sustainability of the Completed Schemes •

Community participation/mobilization has been made mandatory in projects identification & execution for sustainability.



Formulation of “Regulatory Frame Work” for the maintenance of Rural schemes is under way which will define the role and responsibility of the community viz a viz the Government functionaries, ensuring sustainability of WATSAN schemes.



Maintenance of schemes will also be tried on pilot based either through out sourcing or involving the Union Administration in the process.

Judicious Resource Distribution •

Need based resource distribution have been encouraged and more funds provided to the low profiled areas as identified in the MICS 200708.



Balance maintained between the districts located Northern and Southern part of the province.



Main emphasis and resource provisions to the Barani and Brackish areas for meeting the public demand and improving the coverage in the deserving communities.

Ensuring Quality Control •

Water testing laboratories are being established at each district headquarter for continuous water quality monitoring, at source, in the system and at users end.



Water filtration plants are being installed in each union council to provide safe drinking water particularly to the rural community.



“Reverse Osmosis” technology is being promoted where quality drinking water is not economically available.



Replacement of the damaged water supply lines to avoid intermixing and controlling water born diseases.

203

Improving Sanitation and Environmental Sustainability •

Making “Waste Water Treatment Plant” as an integral part of Urban Sewerage Drainage schemes such as. o Kasur Environmental Improvement Project with total outlay of Rs.2332 million. o



Provision of Sewerage System Rahim Yar Khan City with treatment plant at the total cost of Rs.2009 million.

Provision of appropriate disposal station for efficient drainage and disposal of the effluent in the urban localities such as: o Water supply and sewerage scheme Arifwala and Pakpattan costing Rs.486 million. o Urban water supply and Drainage scheme D.G Khan costing Rs.1057 million. o Provision of south disposal station Okara city costing Rs.275 million.



Encouraging provision of economical disposal of Rural Sewage by provision of oxidation ponds.



Making Environmental Impact Analysis (EIA) as an integral part of PC-I for the Urban Sewerage schemes and no intervention will be undertaken except environmentally friendly.

Preservation of the Water Resources •

Proper management of Ground Water resources and its conservation at Provincial level.



Controlling over pumpage and maintaining a balance between in and out flows.



Promoting water metering concept in the rural communities and ensuring 100% metering in the urban localities for economical and efficient use of water.

Capacity Building of PHED •

Provision of MIS & IT services for data collection, monitoring and capacity building of PHED.



Digital mapping of the Urban and Rural communities for comprehensive planning and prioritizing the future interventions.



Establishment of Research and Training institute in PHED.

204

SALIENT FEATURES OF THE PROJECTS TAKEN UNDER MTDF 2009-10 •

Need Based.



Covers all the districts.



Main focus to the low profiled districts/areas.



Maintaining balance between the Northern and Southern part of the Province.



Operationalization of non-functional and closed schemes.



Providing resources to the sectors lagging in attaining the MDGs.



Focusing on the main issues i.e. institutional strengthening & capacity building, environmental de-gradation, qualitative policy shift, role of community, regulatory frame work and public private partnership.

YEAR-WISE RESOURCE PROVISION 9000 8000

8500

8000 6500

Rs. in Million

7000 6000

5200

5000

4500

4000 2900 3000 2000 1000 0 2004-05

2005-06

2006-07

2007-08 Year

205

2008-09

2009-10

SUB-SECTOR WISE ALLOCATIONS (Rs. in Million) COMPLETION TARGET SUB SECTOR

Total No. of Schemes

ON-GOING

NEW

TOTAL

Urban Water Supply Urban Sewerage / Drainage

1119 1499

453 154

1572 1653

88 92

Schemes to be completed 50 52

Rural Water supply

1875

1675

3550

863

768

83

Rural Sewerage / Drainage Punjab Basis Others TOTAL

708 535 264 6000

33 185 0 2500

741 720 264 8500

530 16 13 1602

227 5 5 1107

42 31 38 69

Sub-Sectoral Weight age •

Water Supply Component

5122 (60%)



Sewerage Drainage Component

2394 (28%)



Others

984 (12%)

206

%age 55 53

COMPONENT WISE PROJECTIONS FOR THE YEAR 2009-10 Punjab Basis 12%

UWS 18%

RSD 9%

USD 20%

RWS 41%

INVESTMENT VS MILLENNIUM DEVELOPMENT GOALS (MDGS)

Sub Sector

Urban Water Supply Rural Water Supply Urban Sew./Drainage Rural Sew./ Drainage

Population Coverage (Baseline Year 2001) ( %) 56 25 51 33

Population Coverage (2006-07) ( %)

Population Coverage (2007-08) ( %)

Population Coverage (2008-09) ( %)

Additional population coverage

66.2 30.8 68.5 41.3

72.0 33.0 72.0 43.8

75.5 36.1 76.0 48.6

7.5 2.9 3.0 3.4

207

Population Coverage (2009-10) ( %) 83.0 39.0 79.0 52.0

Projected year of Reaching MDG 2009-10 2020-21 2010-11 2015-16

MDG’s Targets 2015 ( %) 80.00 64.62 82.10 69.85

MTDF 2009-12 Water Supply & Sanitation : Summary Development Programme 2009-10 (Million Rs) On going Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F.Aid

Total

Capital

Revenue

Total

F.Aid

G.Total

Capital

Revenue

Total

F.Aid

Total

RURAL WATER SUPPLY & SANITATION

0.000

2,605.000

2,605.000

0.000

2,605.000

0.000 1,808.000 1,808.000

0.000 1,808.000

0.000

4,413.000

4,413.000

0.000

4,413.000

URBAN WATER SUPPLY & SANITATION

0.000

3,395.000

3,395.000

0.000

3,395.000

0.000

0.000

692.000

0.000

4,087.000

4,087.000

0.000

4,087.000

TOTAL

0.000

6,000.000

6,000.000

0.000

6,000.000

0.000 2,500.000 2,500.000

0.000 2,500.000

0.000

8,500.000

8,500.000

0.000

8,500.000

692.000

692.000

DEVELOPMENT PROGRAMME 2010-11 On going Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F.Aid

Total

Capital

Revenue

Total

F.Aid

G.Total

Capital

Revenue

Total

F.Aid

Total

RURAL WATER SUPPLY & SANITATION

0.000

3,000.000

3,000.000

0.000

3,000.000

0.000 1,200.000 1,200.000

0.000 1,200.000

0.000

4,200.000

4,200.000

0.000

4,200.000

URBAN WATER SUPPLY & SANITATION

0.000

4,000.000

4,000.000

0.000

4,000.000

0.000 1,800.000 1,800.000

0.000 1,800.000

0.000

5,800.000

5,800.000

0.000

5,800.000

TOTAL

0.000

7,000.000

7,000.000

0.000

7,000.000

0.000 3,000.000 3,000.000

0.000 3,000.000

0.000 10,000.000 10,000.000

0.000 10,000.000

DEVELOPMENT PROGRAMME 2011-12 On going Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F.Aid

Total

Capital

Revenue

Total

F.Aid

G.Total

Capital

Revenue

Total

F.Aid

Total

RURAL WATER SUPPLY & SANITATION

0.000

3,200.000

3,200.000

0.000

3,200.000

0.000 1,400.000 1,400.000

0.000 1,400.000

0.000

4,600.000

4,600.000

0.000

4,600.000

URBAN WATER SUPPLY & SANITATION

0.000

5,200.000

5,200.000

0.000

5,200.000

0.000 2,200.000 2,200.000

0.000 2,200.000

0.000

7,400.000

7,400.000

0.000

7,400.000

TOTAL

0.000

8,400.000

8,400.000

0.000

8,400.000

0.000 3,600.000 3,600.000

0.000 3,600.000

0.000 12,000.000 12,000.000

0.000 12,000.000

WATER SUPPLY & SANITATION MTDF 2009-10: GRAND TOTAL

208

30,500.000

WATER SUPPLY & SANITATION: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES Urban Water Supply

82

0.000

1,118.930

0.000

0.000

0.000

1,118.930

1,118.930

4,040.455

3,670.544

Urban Sewerage Drainage

89

0.000

1,498.829

0.000

0.000

0.000

1,498.829

1,498.829

3,416.721

3,314.574

Rural Water Supply

861

0.000

1,875.863

0.000

0.000

0.000

1,875.863

1,875.863

1,608.754

83.924

Rural Sewerage Drainage

530

0.000

708.398

0.000

0.000

0.000

708.398

708.398

1,544.874

124.178

10

0.000

534.980

0.000

0.000

0.000

534.980

534.980

382.652

51.304

1

0.000

20.000

0.000

0.000

0.000

20.000

20.000

0.000

0.000

12

0.000

243.000

0.000

0.000

0.000

243.000

243.000

528.207

528.110

1,585

0.000

6,000.000

0.000

0.000

0.000

6,000.000

6,000.000

11,521.663

7,772.634

Urban Water Supply

6

0.000

420.000

0.000

0.000

0.000

420.000

420.000

770.000

845.000

Urban Sewerage Drainage

3

0.000

140.000

0.000

0.000

0.000

140.000

140.000

250.000

215.000

Rural Water Supply

2

0.000

1,755.000

0.000

0.000

0.000

1,755.000

1,755.000

0.000

0.000

Punjab Basis

6

0.000

185.000

0.000

0.000

0.000

185.000

185.000

190.000

200.000

17

0.000

2,500.000

0.000

0.000

0.000

2,500.000

2,500.000

1,210.000

1,260.000

1,602

0.000

8,500.000

0.000

0.000

0.000

8,500.000

8,500.000

12,731.663

9,032.634

Punjab Basis Forieign Aided Project PSDP Total: ON-GOING SCHEMES NEW SCHEMES

Total: NEW SCHEMES Grand Total

209

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

ON-GOING SCHEMES Urban Water Supply 610

611

612

613

1 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Attock (Revised)

Approval Date

Apporved 03-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

2 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Bhakkar

Approval Date

Approved 20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Bhakkar

3 Name of the Scheme

Urban Water Supply Scheme, Haroonabad

Approval Date

Approved 03-12-2008

Major Components

Source,Main Pipe Disatribution, P/Machineryetc.

Major Targets

88%

District and Tehsil

Bahawalnagar , Haroonabad

4 Name of the Scheme

Urban Water Supply Scheme, Faqir Wali

Approval Date

Approved 03-11-2007

Major Components

Source,Main Pipe Disatribution, P/Machineryetc.

Major Targets

60%

District and Tehsil

Bahawalnagar , Haroonabad

0.000

25.870

12.860

0.000

16.891

0.000

0.000

0.000

16.891

16.891

0.000

0.000

0.000

0.000

16.176

11.957

0.000

6.645

0.000

0.000

0.000

6.645

6.645

0.000

0.000

0.000

0.000

35.856

34.331

0.000

2.000

0.000

0.000

0.000

2.000

2.000

0.000

0.000

0.000

0.000

83.586

48.096

0.000

10.000

0.000

0.000

0.000

10.000

10.000

38.028

0.000

0.000

210

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

614

615

616

617

5 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Bahawalnagar

Approval Date

Approved 21-03-09

Major Components

Source,Main Pipe Disatribution, P/Machineryetc.

Major Targets

22%

District and Tehsil

Bahawalnagar

6 Name of the Scheme

Comprehensive Urban Water Supply Scheme, Chishtian PhaseIV

Approval Date

Approved 10.11.08

Major Components

Source,Main Pipe Disatribution, P/Machineryetc.

Major Targets

23%

District and Tehsil

Bahawalnagar , Chishtian

7 Name of the Scheme

Water Supply Scheme / Replacement of old damaged Pipelines, Tehsil Chishtian, Distt: Bahawalnagar.

Approval Date

21.03.09

Major Components

Source,Main Pipe Disatribution, P/Machineryetc.

Major Targets

4%

District and Tehsil

Bahawalnagar , Chishtian

8 Name of the Scheme

Providing Laying 4" to 3" dia PVC pipe in PP-279

Approval Date

02.02.09

Major Components

Laying of 3",4" dia PVC pipe etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

117.949

19.631

0.000

10.000

0.000

0.000

0.000

10.000

10.000

40.000

66.010

0.000

0.000

80.800

11.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

30.000

41.920

0.000

0.000

117.249

0.500

0.000

5.000

0.000

0.000

0.000

5.000

5.000

40.000

89.336

0.000

0.000

2.438

2.000

0.000

0.804

0.000

0.000

0.000

0.804

0.804

0.000

0.000

0.000

211

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

618

619

620

621

9 Name of the Scheme

Rehabilitation and Augmentation of Water Supply Scheme / Water Works No.2 Fortabbas

Approval Date

02.02.09

Major Components

Laying of 3",4" dia PVC pipe etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Fortabbas

10 Name of the Scheme

Rehabilitation and Augmentation of Water Supply Scheme, Bahawalpur

Approval Date

03.12.08

Major Components

Source,Main Pipe Disatribution, P/Machineryetc.

Major Targets

61%

District and Tehsil

Bhawalpur

11 Name of the Scheme

Rehabilitation and Augmentation of Urban Water Supply Scheme, Islamia Colony Bahawalpur

Approval Date

11.9.08

Major Components

Source,Main Pipe Disatribution, P/Machineryetc.

Major Targets

100%

District and Tehsil

Bhawalpur

12 Name of the Scheme

Water Supply Scheme Talagang

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Cap 9

Rev 10

11.05.2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

93%

District and Tehsil

Chakwal

Total Cap 11

Rev 12

0.000

7.125

3.000

0.000

5.194

0.000

0.000

0.000

5.194

5.194

0.000

0.000

0.000

0.000

199.988

125.175

0.000

15.000

0.000

0.000

0.000

15.000

15.000

30.000

59.811

0.000

0.000

3.957

3.957

0.000

0.594

0.000

0.000

0.000

0.594

0.594

0.000

0.000

0.000

0.000

45.984

39.256

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

2nd (Revised) Approval Date

Foreign Aid

212

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

622

623

624

625

626

13 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Chakwal (Revised)

Approval Date

11.05.2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

61%

District and Tehsil

Chakwal

14 Name of the Scheme

Ext. & Improvement Urban Water Supply Scheme, D.G.Khan City & Adj.abadies.

Approval Date

20.06.08

Major Components

Rising Main,D/system, P/House, P.Machinery,OHR,Generating sets etc.

Major Targets

73%

District and Tehsil

Dera Ghazi Khan

15 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines D.G.Khan

Approval Date

25.05.2009

Major Components

Replacement of outlived pipe lines,Machinery,Distribution system etc.

Major Targets

57%

District and Tehsil

Dera Ghazi Khan

16 Name of the Scheme

Ext./Reh. Urban Water Supply Scheme, Jaranwala.

Approval Date

09.03.06

Major Components

Source,Main Pipe Disatribution, P/Machinery

Major Targets

89%

District and Tehsil

Faisalabad , Jaranwala

17 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Faisalabad

Approval Date

27.1.09

Major Components

Water Testing Labortaryetc.

Major Targets

90%

District and Tehsil

Faisalabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

23.786

6.806

0.000

10.000

0.000

0.000

0.000

10.000

10.000

10.548

0.000

0.000

0.000

453.540

338.844

0.000

40.000

0.000

0.000

0.000

40.000

40.000

142.727

0.000

0.000

0.000

99.984

55.452

0.000

10.000

0.000

0.000

0.000

10.000

10.000

49.530

0.000

0.000

0.000

99.570

83.455

0.000

18.000

0.000

0.000

0.000

18.000

18.000

0.000

0.000

0.000

0.000

5.197

4.120

0.000

1.267

0.000

0.000

0.000

1.267

1.267

0.000

0.000

0.000

213

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

627

628

629

630

631

18 Name of the Scheme

Urban Water Supply Scheme, Sammundri

Approval Date

27.1.09

Major Components

Source,Main Pipe Disatribution, P/Machinery

Major Targets

24%

District and Tehsil

Faisalabad , Sammundri

19 Name of the Scheme

Urban Water Supply Scheme, Chak No.263/RB(Dijkot) (Revised)

Approval Date

3.12.08

Major Components

Source,Main Pipe Disatribution, P/Machinery

Major Targets

25%

District and Tehsil

Faisalabad

20 Name of the Scheme

Water Supply Scheme in Franchisabad

Approval Date

26-01-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

21 Name of the Scheme

Urban Water Supply Scheme Wazirabad (Revised)

Approval Date

27-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

35%

District and Tehsil

Gujranwala

22 Name of the Scheme

Extension Urban Water Supply Scheme Kharian ,District Gujrat

Approval Date

16-08-2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

142.568

10.000

0.000

30.000

0.000

0.000

0.000

30.000

30.000

50.000

73.953

0.000

0.000

55.318

5.750

0.000

10.000

0.000

0.000

0.000

10.000

10.000

47.866

0.000

0.000

0.000

5.309

5.178

0.000

0.927

0.000

0.000

0.000

0.927

0.927

0.000

0.000

0.000

0.000

50.000

5.000

0.000

15.000

0.000

0.000

0.000

15.000

15.000

37.500

0.000

0.000

0.000

11.036

7.053

0.000

5.638

0.000

0.000

0.000

5.638

5.638

0.000

0.000

0.000

214

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

632

633

634

635

636

23 Name of the Scheme

Urban Water Supply Scheme Lala Musa

Approval Date

26-01-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

24 Name of the Scheme

Construction of Urban Water Supply Scheme Gujrat

Approval Date

28-01-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

10%

District and Tehsil

Gujrat

25 Name of the Scheme

Ext:/Imp: of Urban Water Supply Scheme Sarai Alam Gir

Approval Date

7/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

49%

District and Tehsil

Gujrat , Sarai Alamgir

26 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Gujrat

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

37%

District and Tehsil

Gujrat

27 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Hafizabad (Revised)

Approval Date

3/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Hafizabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.150

10.665

0.000

1.008

0.000

0.000

0.000

1.008

1.008

0.000

0.000

0.000

0.000

684.050

30.000

0.000

50.000

0.000

0.000

0.000

50.000

50.000

300.100

406.558

0.000

0.000

49.985

18.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

29.483

0.000

0.000

0.000

42.580

8.180

0.000

10.000

0.000

0.000

0.000

10.000

10.000

30.787

0.000

0.000

0.000

21.180

12.480

0.000

11.877

0.000

0.000

0.000

11.877

11.877

0.000

0.000

0.000

215

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

637

638

639

640

641

28 Name of the Scheme

Water Supply Scheme Based on Naromi Dhun Spring (Revised)

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

79%

District and Tehsil

Jhelum

29 Name of the Scheme

Urban Water Supply Scheme Sohawa

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

30 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Jhelum (Revised)

Approval Date

27-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

31 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Jhang

Approval Date

21.03.09

Major Components

T/well, Sewer,DisposalWorks,D/system etc.

Major Targets

63%

District and Tehsil

Jhang

32 Name of the Scheme

Urban Water Supply Scheme (Rabwah)

Approval Date

24.3.2008

Major Components

T/well, OHR,D/system etc.

Major Targets

100%

District and Tehsil

Jhang , Chiniot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

154.356

130.184

0.000

10.000

0.000

0.000

0.000

10.000

10.000

37.325

0.000

0.000

0.000

24.070

26.160

0.000

1.521

0.000

0.000

0.000

1.521

1.521

0.000

0.000

0.000

0.000

22.418

12.962

0.000

12.819

0.000

0.000

0.000

12.819

12.819

0.000

0.000

0.000

0.000

107.962

68.758

0.000

10.000

0.000

0.000

0.000

10.000

10.000

45.398

0.000

0.000

0.000

54.034

50.726

0.000

11.413

0.000

0.000

0.000

11.413

11.413

0.000

0.000

0.000

216

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

642

643

644

645

646

33 Name of the Scheme

Urban Water Supply & Sewerage/ Drainage Scheme Phool Nagar

Approval Date

23-01-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

11%

District and Tehsil

Kasur

34 Name of the Scheme

Water Supply Scheme Chunian (Amended)

Approval Date

12/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

15%

District and Tehsil

Kasur

35 Name of the Scheme

Water Supply Scheme in Pattoki

Approval Date

23-11-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

24%

District and Tehsil

Kasur

36 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Kasur

Approval Date

4/4/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

30%

District and Tehsil

Kasur

37 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Khushab (Revised)

Approval Date

24-12-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

389.496

20.000

0.000

30.000

0.000

0.000

0.000

30.000

30.000

150.000

247.920

0.000

0.000

199.874

15.400

0.000

20.000

0.000

0.000

0.000

20.000

20.000

194.455

0.000

0.000

0.000

173.397

27.813

0.000

20.000

0.000

0.000

0.000

20.000

20.000

151.594

0.000

0.000

0.000

132.204

20.290

0.000

25.000

0.000

0.000

0.000

25.000

25.000

106.745

0.000

0.000

0.000

23.589

17.499

0.000

9.628

0.000

0.000

0.000

9.628

9.628

0.000

0.000

0.000

217

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

647

648

649

650

38 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Khanewal(Revised)

Approval Date

24.12.08

Major Components

Replacement of outlived pipe lines & Labortary.

Major Targets

100%

District and Tehsil

Khanewal

39 Name of the Scheme

Rehabilitation Urban Water Supply Scheme Old Khanewal.

Approval Date

16.1.09

Major Components

Boundary wall,Repair of P/Machinery /P.House,Replacement of rising main and d/system ext.electrification.

Major Targets

100%

District and Tehsil

Khanewal

40 Name of the Scheme

Rehabilitation Urban Water Supply Scheme Kabirwala.

Approval Date

16.1.09

Major Components

Boundary wall,Repair of P/Machinery /P.House,Replacement of rising main and d/system ext.electrification.

Major Targets

100%

District and Tehsil

Khanewal , Kabirwala

41 Name of the Scheme

Urban Water Supply and Sewerage/ Drainage Scheme Dubai Town

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

22.626

19.227

0.000

6.793

0.000

0.000

0.000

6.793

6.793

0.000

0.000

0.000

0.000

10.822

6.100

0.000

6.345

0.000

0.000

0.000

6.345

6.345

0.000

0.000

0.000

0.000

7.326

5.000

0.000

3.425

0.000

0.000

0.000

3.425

3.425

0.000

0.000

0.000

0.000

18.747

13.797

0.000

7.762

0.000

0.000

0.000

7.762

7.762

0.000

0.000

0.000

218

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

651

652

653

654

42 Name of the Scheme

Urban Water Supply Scheme Hanjarwal

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Lahore

43 Name of the Scheme

Urban Water Supply & Sewerage / Drainage Scheme, Nawazishabad (Revised)

Approval Date

25-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Lahore

44 Name of the Scheme

Urban Water Supply Scheme Raiwind (Revised)

Approval Date

4/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

85%

District and Tehsil

Lahore

45 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Lodhran

Approval Date

3.12.08

Major Components

Replacement of outlived pipe lines, Machinery,House connections, Laboratory etc.

Major Targets

100%

District and Tehsil

Lodhran

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

13.708

3.627

0.000

12.137

0.000

0.000

0.000

12.137

12.137

0.000

0.000

0.000

0.000

17.803

8.136

0.000

12.337

0.000

0.000

0.000

12.337

12.337

0.000

0.000

0.000

0.000

86.623

35.000

0.000

50.000

0.000

0.000

0.000

50.000

50.000

0.000

0.000

0.000

0.000

9.946

8.363

0.000

3.075

0.000

0.000

0.000

3.075

3.075

0.000

0.000

0.000

219

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

655

656

657

658

659

46 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Layyah

Approval Date

27.01.09

Major Components

Replacement of outlived pipe lines, Machinery,House connections, Laboratory etc.

Major Targets

100%

District and Tehsil

Layyah

47 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Mianwali (Revised)

Approval Date

24-12-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

48 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines M.B.Din (Amended)

Approval Date

4/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mandi Bahauddin

49 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Muzaffargarh

Approval Date

7.2.09

Major Components

Testing labortorty and allied works.

Major Targets

100%

District and Tehsil

Muzaffargarh

50 Name of the Scheme

Water Supply Scheme for Shah Kot Town

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

30%

District and Tehsil

Nankana Sahib

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

33.000

22.510

0.000

15.440

0.000

0.000

0.000

15.440

15.440

0.000

0.000

0.000

0.000

22.960

11.180

0.000

15.224

0.000

0.000

0.000

15.224

15.224

0.000

0.000

0.000

0.000

20.680

12.564

0.000

11.218

0.000

0.000

0.000

11.218

11.218

0.000

0.000

0.000

0.000

6.454

4.151

0.000

3.271

0.000

0.000

0.000

3.271

3.271

0.000

0.000

0.000

0.000

118.147

30.173

0.000

10.000

0.000

0.000

0.000

10.000

10.000

35.696

30.000

30.000

220

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

660

661

662

663

51 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Nankana Sahib (Revised)

Approval Date

25-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

52 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Narowal (Revised)

Approval Date

27-08-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Narowal

53 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Okara

Approval Date

11/10/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

54 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Pakpattan

Approval Date

Approved

Major Components

T/well, P/house,Labortary, R.Main Distributin system and OHR.

Major Targets

91%

District and Tehsil

Pakpattan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

25.159

10.915

0.000

18.018

0.000

0.000

0.000

18.018

18.018

0.000

0.000

0.000

0.000

27.287

14.360

0.000

17.020

0.000

0.000

0.000

17.020

17.020

0.000

0.000

0.000

0.000

19.098

12.684

0.000

9.279

0.000

0.000

0.000

9.279

9.279

0.000

0.000

0.000

0.000

28.972

24.219

0.000

6.032

0.000

0.000

0.000

6.032

6.032

3.067

0.000

0.000

221

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

664

665

666

667

668

55 Name of the Scheme

Water Supply Scheme for Benazir Bhutto New International Airport Islamabad

Approval Date

17-10-2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

1%

District and Tehsil

Rawalpindi

56 Name of the Scheme

Augmentation of Water Supply Scheme Murree

Approval Date

12/3/2005

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

57 Name of the Scheme

Urban Water Supply Scheme Daultala

Approval Date

20-03-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

42%

District and Tehsil

Rawalpindi

58 Name of the Scheme

Feasibility Study of Augmentation Urban Water Supply Scheme Kahuta City

Approval Date

9/3/2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

59 Name of the Scheme

Bulk Water Supply Project from River Jhelum to Murree

Approval Date

5/1/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

6%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

680.000

3.210

0.000

1.000

0.000

0.000

0.000

1.000

1.000

0.000

0.000

0.000

0.000

99.960

101.307

0.000

13.520

0.000

0.000

0.000

13.520

13.520

0.000

0.000

0.000

0.000

92.706

30.149

0.000

15.000

0.000

0.000

0.000

15.000

15.000

61.463

0.000

0.000

0.000

3.200

3.200

0.000

0.480

0.000

0.000

0.000

0.480

0.480

0.000

0.000

0.000

0.000

4,254.000

200.000

0.000

100.000

0.000

0.000

0.000

100.000

100.000

2,000.000

2,592.100

0.000

222

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

669

670

671

672

60 Name of the Scheme

Urban Water Supply Scheme Kahuta

Approval Date

12/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

18%

District and Tehsil

Rawalpindi

61 Name of the Scheme

Rehabilitation of Water Supply Scheme Chak Baili Khan

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

62 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Pothohar Town Rawalpindi.(2 Revised)

Approval Date

29-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

63%

District and Tehsil

Rawalpindi

63 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines R.Y.Khan

Approval Date

21.03.09

Major Components

T/well, P/house,Labortary, R.Main Distributin system and OHR.Replacement of outlived pipe lines etc.

Major Targets

58%

District and Tehsil

Rahim Yar Khan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

172.117

10.000

0.000

25.000

0.000

0.000

0.000

25.000

25.000

100.000

62.935

0.000

0.000

10.000

0.100

0.000

11.400

0.000

0.000

0.000

11.400

11.400

0.000

0.000

0.000

0.000

66.434

33.194

0.000

15.000

0.000

0.000

0.000

15.000

15.000

28.205

0.000

0.000

0.000

141.609

75.251

0.000

20.000

0.000

0.000

0.000

20.000

20.000

67.599

0.000

0.000

223

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

673

674

675

676

677

64 Name of the Scheme

Rehabilitation of main Water Works (Canal Source)Urban Water Supply Scheme, Liaquatpur

Approval Date

24.09.08

Major Components

T/well, P/house,Labortary, R.Main Distributin system and OHR.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Liaquatpur

65 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Rajanpur

Approval Date

25.05.2009

Major Components

Replacement of out lived pipe lines,D/system,House Connections, Water Testing Laboratory etc.

Major Targets

78%

District and Tehsil

Rajanpur

66 Name of the Scheme

Ext. Urban Water Supply Scheme Sheikhupura (Revised)

Approval Date

8/11/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

72%

District and Tehsil

Sheikhupura

67 Name of the Scheme

Urban Water Supply Scheme Ferozewala

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

99%

District and Tehsil

Sheikhupura

68 Name of the Scheme

Urban Water Supply Scheme Kot Abdul Malik (Revised)

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

97%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.112

11.000

0.000

0.629

0.000

0.000

0.000

0.629

0.629

0.000

0.000

0.000

0.000

13.194

8.162

0.000

3.701

0.000

0.000

0.000

3.701

3.701

0.000

0.000

0.000

0.000

126.120

89.926

0.000

15.000

0.000

0.000

0.000

15.000

15.000

40.112

0.000

0.000

0.000

40.528

35.737

0.000

10.452

0.000

0.000

0.000

10.452

10.452

0.000

0.000

0.000

0.000

56.524

43.204

0.000

20.000

0.000

0.000

0.000

20.000

20.000

0.000

0.000

0.000

224

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

678

679

680

681

682

69 Name of the Scheme

Urban Water Supply Scheme Manawala

Approval Date

8/11/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

74%

District and Tehsil

Sheikhupura

70 Name of the Scheme

Urban Water Supply Scheme Safdarabad (Amended)

Approval Date

4/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

85%

District and Tehsil

Sheikhupura , Safdarabad

71 Name of the Scheme

Urban Water Supply Scheme Khan Qah Dogran (Amended)

Approval Date

4/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sheikhupura , Safdarabad

72 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Sheikhupura

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sheikhupura

73 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Sargodha

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

68.694

48.100

0.000

10.000

0.000

0.000

0.000

10.000

10.000

20.898

0.000

0.000

0.000

27.481

10.000

0.000

17.000

0.000

0.000

0.000

17.000

17.000

0.000

0.000

0.000

0.000

30.781

20.000

0.000

15.398

0.000

0.000

0.000

15.398

15.398

0.000

0.000

0.000

0.000

16.819

12.190

0.000

7.152

0.000

0.000

0.000

7.152

7.152

0.000

0.000

0.000

0.000

61.410

53.560

0.000

17.061

0.000

0.000

0.000

17.061

17.061

0.000

0.000

0.000

225

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

683

684

685

686

74 Name of the Scheme

PC-II Conducting Study for Designing of Water Supply Sewerage / System along with Treatment Plant of Sargodha City

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

92%

District and Tehsil

Sargodha

75 Name of the Scheme

Urban Water Supply Scheme Bhalwal City

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

36%

District and Tehsil

Sargodha , Bhalwal

76 Name of the Scheme

Urban Water Supply Scheme Samberial Phase-I

Approval Date

24-07-2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

77 Name of the Scheme

Replacement of Outlived / Old Damaged Pipe Lines Sialkot (2Revised)

Approval Date

6/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

76%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.000

0.500

0.000

8.000

0.000

0.000

0.000

8.000

8.000

0.000

0.000

0.000

0.000

48.665

5.000

0.000

15.000

0.000

0.000

0.000

15.000

15.000

35.965

0.000

0.000

0.000

51.626

47.881

0.000

11.212

0.000

0.000

0.000

11.212

11.212

0.000

0.000

0.000

0.000

123.970

88.818

0.000

20.000

0.000

0.000

0.000

20.000

20.000

33.748

0.000

0.000

226

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

687

688

689

690

78 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Sahiwal

Approval Date

24.12.08

Major Components

T/well,Pump House,Machinery,R.mian and Distribution System etc.

Major Targets

98%

District and Tehsil

Sahiwal

79 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines T.T.Singh

Approval Date

24.12.08

Major Components

T/well,Pump House,Machinery,R.mian and Distribution System etc.

Major Targets

113%

District and Tehsil

Toba Tek Singh

80 Name of the Scheme

Provision of Water Supply Scheme Mohallah Katchi Basti Bilal Gunj, Gulbehar Colony, Amertesar and Mohallah Islampura, Kamalia.

Approval Date

19.03.09

Major Components

T/well,Pump House,Machinery,R.mian and Distribution System etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh , Kamalia

81 Name of the Scheme

Replacement of Outlived/Old Damaged Pipe Lines Vehari

Approval Date

24.12.08

Major Components

Replacement of outlived T/well,P/House,Labortary,R.Main,D/syste m OHR etc.

Major Targets

83%

District and Tehsil

Vehari

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

85.034

75.816

0.000

20.000

0.000

0.000

0.000

20.000

20.000

0.000

0.000

0.000

0.000

33.278

23.160

0.000

20.000

0.000

0.000

0.000

20.000

20.000

0.000

0.000

0.000

0.000

2.162

2.162

0.000

0.324

0.000

0.000

0.000

0.324

0.324

0.000

0.000

0.000

0.000

42.182

32.167

0.000

8.000

0.000

0.000

0.000

8.000

8.000

0.000

0.000

0.000

227

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

51.616

0.000

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

691

82 Name of the Scheme

Urban Water Supply Scheme, Burewala

Approval Date

27.1.09

Major Components

T/well,P/House,R.Main,D/system OHR etc.

Major Targets

40%

District and Tehsil

Vehari , Burewala

Sub-Total: Urban Water Supply

Estimated Cost F. Aid 4

0.000

0.000

Total 5

75.318

10,703.913

Exp. upto 2008-09

Local

6

10.000

2,618.338

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

0.000

25.000

0.000

0.000

0.000 1,118.930

0.000

0.000

Total Cap 11

0.000

Rev 12

25.000

0.000 1,118.930

25.000

1,118.930

4,040.455

3,670.544

0.000

30.000

Urban Sewerage Drainage 692

693

694

83 Name of the Scheme

Urban Drainage Scheme Attock City

Approval Date

4/9/2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

84 Name of the Scheme

Construction of Sewer Nullah from Masjid Chah Jamali Mohallah Malkan Wala to Goreha Nashaib length 937 Rft. Bhakkar city.

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Bhakkar

85 Name of the Scheme

Urban Sewerage / Drainage Scheme, Jandanwala, Tehsil Kallur Kot, Distt. Bhakkar

Approval Date

01.06.2009

Major Components

Sewer System and disposal work etc.

Major Targets

8%

District and Tehsil

Bhakkar , Kalur Kot

0.000

34.196

19.090

0.000

20.235

0.000

0.000

0.000

20.235

20.235

0.000

0.000

0.000

0.000

12.667

12.667

0.000

1.900

0.000

0.000

0.000

1.900

1.900

0.000

0.000

0.000

0.000

25.000

1.222

0.000

1.000

0.000

0.000

0.000

1.000

1.000

26.528

0.000

0.000

228

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

695

696

697

698

699

86 Name of the Scheme

Comprehensive Sewerage Scheme Haroonabad,

Approval Date

04.04.09

Major Components

Sewer system/Drains and other allied works etc.

Major Targets

12%

District and Tehsil

Bahawalnagar , Haroonabad,

87 Name of the Scheme

Comprehensive Sewerage Scheme Bahawalnagar.

Approval Date

04.04.09

Major Components

Sewer system/Drains and other allied works etc.

Major Targets

14%

District and Tehsil

Bahawalnagar

88 Name of the Scheme

Providing and Laying RCC Sewer Line in UC No.6 Muslim Colony

Approval Date

2.2.09

Major Components

Sewer system/Drains and other allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

89 Name of the Scheme

Construction of Street Pavement and Sewerage in Lala Zar Colony Ahmedpur.

Approval Date

Approved

Major Components

Sewer system/Drains and other allied works etc.

Major Targets

100%

District and Tehsil

Bahawalpur

90 Name of the Scheme

Urban Sewerage Scheme Talagang City (Revised)

Approval Date

3/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

34%

District and Tehsil

Chakwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

182.066

10.000

0.000

15.000

0.000

0.000

0.000

15.000

15.000

50.000

134.376

0.000

0.000

192.212

10.000

0.000

20.000

0.000

0.000

0.000

20.000

20.000

50.000

141.044

0.000

0.000

2.613

2.500

0.000

0.505

0.000

0.000

0.000

0.505

0.505

0.000

0.000

0.000

0.000

4.804

1.000

0.000

4.525

0.000

0.000

0.000

4.525

4.525

0.000

0.000

0.000

0.000

57.257

12.128

0.000

10.000

0.000

0.000

0.000

10.000

10.000

43.718

0.000

0.000

229

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

700

701

702

703

704

91 Name of the Scheme

Urban Sewerage Scheme Chakwal City

Approval Date

5/3/2007

Major Components

Sewer System and disposal work etc.

Major Targets

35%

District and Tehsil

Chakwal

92 Name of the Scheme

Extension and Improvement of Urban Sewerage Scheme D.G.Khan.

Approval Date

29.11.08

Major Components

Sewer lines,Disposal Stations Forced main,Sullage Carrier,Generating sets.etc.

Major Targets

6%

District and Tehsil

Dera Ghazi Khan

93 Name of the Scheme

Ext.Sewerage Scheme, Jaranwala.

Approval Date

12.04.06

Major Components

Sewer lines,Disposal Stations Forced main,Sullage Carrier,Generating sets.etc.

Major Targets

94%

District and Tehsil

Faisalabad , jaranwala

94 Name of the Scheme

Urban Sewerage Scheme,Sammundari

Approval Date

27.1.09

Major Components

Sewer lines,Disposal Stations Forced main,Sullage Carrier,Generating sets.etc.

Major Targets

38%

District and Tehsil

Faisalabad , Sammundri

95 Name of the Scheme

Construction of PCC in Qila Dedar Singh

Approval Date

13-4-2007

Major Components

Sewer System and disposal work etc.

Major Targets

41%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

185.459

50.854

0.000

24.000

0.000

0.000

0.000

24.000

24.000

50.000

88.424

0.000

0.000

604.079

10.000

0.000

32.372

0.000

0.000

0.000

32.372

32.372

125.000

527.319

0.000

0.000

65.687

50.849

0.000

20.000

0.000

0.000

0.000

20.000

20.000

0.000

0.000

0.000

0.000

114.084

10.000

0.000

40.000

0.000

0.000

0.000

40.000

40.000

50.000

31.197

0.000

0.000

29.596

7.531

0.000

6.500

0.000

0.000

0.000

6.500

6.500

20.004

0.000

0.000

230

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

705

706

707

708

96 Name of the Scheme

Sewerage System & Franchisabad

Approval Date

17-10-2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

97 Name of the Scheme

Urban Sewerage/Drainage Scheme Kamoke

Approval Date

26-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

28%

District and Tehsil

Gujranwala

98 Name of the Scheme

Urban Sewerage/Drainage Scheme and Provision of PCC pavements in Mohallah Karimabad Ghakhar,

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

38%

District and Tehsil

Gujranwala , Kamoke

99 Name of the Scheme

Urban Sewerage/Drainage Scheme Wazirabad

Approval Date

4/4/2009

Major Components

Sewer System and disposal work etc.

Major Targets

17%

District and Tehsil

Gujranwala , Wazirabad

709 100 Name of the Scheme

Urban Sewerage Scheme Kullowal

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

5%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.932

6.461

0.000

4.961

0.000

0.000

0.000

4.961

4.961

0.000

0.000

0.000

0.000

248.575

40.000

0.000

40.000

0.000

0.000

0.000

40.000

40.000

50.000

155.861

0.000

0.000

45.628

10.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

32.472

0.000

0.000

0.000

100.455

5.000

0.000

15.000

0.000

0.000

0.000

15.000

15.000

50.000

45.523

0.000

0.000

50.000

2.000

0.000

2.350

0.000

0.000

0.000

2.350

2.350

45.650

0.000

0.000

231

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

710 101 Name of the Scheme

Urban Drainage Scheme & PCC at

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

29.953

7.663

0.000

5.000

0.000

0.000

0.000

5.000

5.000

21.783

0.000

0.000

0.000

6.654

6.652

0.000

1.000

0.000

0.000

0.000

1.000

1.000

0.000

0.000

0.000

UC 187 Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala , Wazirabad

711 102 Name of the Scheme

Urban Drainage Scheme & PCC at UC 188/2

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala , Wazirabad

712 103 Name of the Scheme

Construction of PCC in Qila Dedar Ladhewala Warraich

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

37%

District and Tehsil

Gujranwala

713 104 Name of the Scheme

Construction of Storm Water Drain on both side of Railway Track Extended Upto Jhatoakal and Dera Kunjahian

Approval Date

8/8/2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujrat

232

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

714 105 Name of the Scheme

Extension Sewerage Scheme Gujrat for Areas of Ghari Ahmedabad,Ghori Shahdaula and Kalupura i/c augmentation of Kalra disposal and sewers in deficient areas. (Revised)

Approval Date

18-10-2005

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujrat

715 106 Name of the Scheme

Rehabilitation of Kalra Drain from Ram Talai Chowk upto Irrigation drain

Approval Date

30-05-2005

Major Components

Sewer System and disposal work etc.

Major Targets

78%

District and Tehsil

Gujrat

716 107 Name of the Scheme

Extension of Sewerage / Drainage Scheme along Jalalpur Jattan Road Gujrat City

Approval Date

23-04-2006

Major Components

Sewer System and disposal work etc.

Major Targets

59%

District and Tehsil

Gujrat

717 108 Name of the Scheme

Construction of Storm Water Channel along G.T.Road upto River Chenab (North-East side of G.T.Road) (Revised)

Approval Date

23-04-2006

Major Components

Sewer System and disposal work etc.

Major Targets

53%

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

68.280

62.477

0.000

16.045

0.000

0.000

0.000

16.045

16.045

0.000

0.000

0.000

0.000

128.998

104.995

0.000

10.000

0.000

0.000

0.000

10.000

10.000

33.353

0.000

0.000

0.000

137.326

83.554

0.000

10.000

0.000

0.000

0.000

10.000

10.000

64.371

0.000

0.000

0.000

140.664

75.130

0.000

10.000

0.000

0.000

0.000

10.000

10.000

76.634

0.000

0.000

233

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

718 109 Name of the Scheme

Sewerage Scheme along Sargodha Road and Amar Colony

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

87%

District and Tehsil

Gujrat

719 110 Name of the Scheme

Sewerage/Drainage Scheme along Mohallah Chah Tarang Industrial Area and Palace Colony.

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

87%

District and Tehsil

Gujrat

720 111 Name of the Scheme

Construction of Drains Type-II and PCC in Mohallah Ali Abad (UC-50)

Approval Date

7/12/2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujrat

721 112 Name of the Scheme

Sewerage Drainage Scheme along Shah Jahangir road and Shahdullah road and Al-Nabi Colony (Amended)

Approval Date

26-03-2009

Major Components

Sewer System and disposal work etc.

Major Targets

25%

District and Tehsil

Gujrat

722 113 Name of the Scheme

Sewerage Drainage Scheme Mohallah Shah Hussain

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

25%

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

29.998

20.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

0.000

29.910

20.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

0.000

3.971

2.265

0.000

2.302

0.000

0.000

0.000

2.302

2.302

0.000

0.000

0.000

0.000

88.442

15.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

76.708

0.000

0.000

0.000

86.465

15.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

20.000

54.435

0.000

234

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

723 114 Name of the Scheme

Provision of Sewerage at Sarai Alam Gir

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

37%

District and Tehsil

Gujrat

724 115 Name of the Scheme

Extension Urban Sewerage Scheme Pindi Bhattian (Left Over Area)

Approval Date

20-06-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

725 116 Name of the Scheme

Urban Sewerage Scheme P.D.Khan (Revised)

Approval Date

27-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

57%

District and Tehsil

Jhelum

726 117 Name of the Scheme

Urban Drainage Scheme Sohawa

Approval Date

17-11-2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Jhelum

727 118 Name of the Scheme

Urban Sewerage Scheme Kot Radha Kishan (Revised)

Approval Date

28-03-2009

Major Components

Sewer System and disposal work etc.

Major Targets

66%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

58.132

15.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

20.000

21.852

0.000

0.000

12.380

12.500

0.000

1.737

0.000

0.000

0.000

1.737

1.737

0.000

0.000

0.000

0.000

57.595

22.685

0.000

15.000

0.000

0.000

0.000

15.000

15.000

28.549

0.000

0.000

0.000

13.156

9.875

0.000

5.254

0.000

0.000

0.000

5.254

5.254

0.000

0.000

0.000

0.000

74.722

31.351

0.000

25.000

0.000

0.000

0.000

25.000

25.000

29.579

0.000

0.000

235

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

728 119 Name of the Scheme

Kasur Environmental Improvement Project

Approval Date

5/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

5%

District and Tehsil

Kasur

729 120 Name of the Scheme

PC-II for Consultancy Service of Rehabilitation of existing Sewerage System and Remodelling of Rohi Nullah, Kasur.

Approval Date

6/9/2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

730 121 Name of the Scheme

Urban Sewerage / Drainage Scheme Noor Pur Thal

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khushab

731 122 Name of the Scheme

Urban Sewerage Scheme, Sarai Siddu

Approval Date

14.12.2006

Major Components

Sewer lines,Disposal Stations Forced main,Sullage Carrier,Generating sets.etc.

Major Targets

100%

District and Tehsil

Khanewal , Mian Chunnu

732 123 Name of the Scheme

Drainage Scheme of Azeemabad & Barketpura (2 Amended)

Approval Date

24-01-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

Foreign Aid Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2,272.769

34.251

0.000

100.000

0.000

0.000

0.000

100.000

100.000

719.163

1,560.270

200.000

0.000

9.099

5.749

0.000

4.715

0.000

0.000

0.000

4.715

4.715

0.000

0.000

0.000

0.000

19.970

11.338

0.000

11.628

0.000

0.000

0.000

11.628

11.628

0.000

0.000

0.000

0.000

5.397

3.973

0.000

2.234

0.000

0.000

0.000

2.234

2.234

0.000

0.000

0.000

0.000

5.384

3.000

0.000

3.192

0.000

0.000

0.000

3.192

3.192

0.000

0.000

0.000

236

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

733 124 Name of the Scheme

Urban Sewerage/Drainage Scheme Raiwind (Amended)

Approval Date

24-01-2009

Major Components

Sewer System and disposal work etc.

Major Targets

45%

District and Tehsil

Lahore

734 125 Name of the Scheme

Urban Sewerage Scheme, Chowk Azim

Approval Date

21.8.08

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

51%

District and Tehsil

Layyah

735 126 Name of the Scheme

Urban Sewerage Scheme for Kot Sultan

Approval Date

24.02.09

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

49%

District and Tehsil

Layyah

736 127 Name of the Scheme

Extension and Improvement of Sewerage Scheme, Karor Lal Easan

Approval Date

24.02.09

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

100%

District and Tehsil

Layyah , Karor Lal Easan

737 128 Name of the Scheme

Urban Sewerage Scheme Lawyers Colony, City Layyah

Approval Date

Approved

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

100%

District and Tehsil

Layyah

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

156.156

30.000

0.000

50.000

0.000

0.000

0.000

50.000

50.000

60.000

39.579

0.000

0.000

74.367

19.000

0.000

25.000

0.000

0.000

0.000

25.000

25.000

41.522

0.000

0.000

0.000

52.795

10.000

0.000

20.000

0.000

0.000

0.000

20.000

20.000

30.714

0.000

0.000

0.000

27.667

8.000

0.000

23.817

0.000

0.000

0.000

23.817

23.817

0.000

0.000

0.000

0.000

10.000

2.000

0.000

9.500

0.000

0.000

0.000

9.500

9.500

0.000

0.000

0.000

237

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

738 129 Name of the Scheme

Sewerage / Drainage Scheme Piplan

Approval Date

6/10/2005

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

739 130 Name of the Scheme

Sewerage Scheme, Muzaffargarh (Rev.)

Approval Date

28.11.07

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

80%

District and Tehsil

Muzaffargarh

740 131 Name of the Scheme

Construction of Drains and Brick tuff tiles and sullage carrier Basti Ghulam Muhammad Mouza Gugray wali mad wala

Approval Date

Approved

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

100%

District and Tehsil

Muzaffargarh , Ali Pur

741 132 Name of the Scheme

Urban Sewerage Scheme Sangla Hill (Revised)

Approval Date

13-05-2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Nankana Sahib

742 133 Name of the Scheme

Disposal of Storm Water of Nankana Sahib (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

70%

District and Tehsil

Nankana Sahib

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

14.924

16.553

0.000

0.610

0.000

0.000

0.000

0.610

0.610

0.000

0.000

0.000

0.000

103.462

85.750

0.000

10.000

0.000

0.000

0.000

10.000

10.000

23.231

0.000

0.000

0.000

5.000

4.000

0.000

1.750

0.000

0.000

0.000

1.750

1.750

0.000

0.000

0.000

0.000

57.600

44.500

0.000

21.740

0.000

0.000

0.000

21.740

21.740

0.000

0.000

0.000

0.000

47.610

26.349

0.000

11.919

0.000

0.000

0.000

11.919

11.919

0.000

0.000

0.000

238

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

743 134 Name of the Scheme

Construction of PCC, RCC, Sewerage Drainage in Streets and Water Supply and Water Purification Plant in each union Council (UC No.2 & 3).

Approval Date

Approved

Major Components

Construction of PCC,RCC,Sew.Drainage in Streets and Water Supply & Purification Plant.

Major Targets

100%

District and Tehsil

Pakpattan

744 135 Name of the Scheme

Construction of PCC, RCC, Sewerage Drainage in Streets and Water Supply and Water Purification Plant in each Union Council (UC No.20 & 21)

Approval Date

Approved

Major Components

Construction of PCC,RCC,Sew.Drainage in Streets and Water Supply & Purification Plant.

Major Targets

100%

District and Tehsil

Pakpattan

745 136 Name of the Scheme

Construction of PCC, RCC, Sewerage Drainage in Streets and Water Supply and Water Purification Plant in each Union Council (UC No.5 & 3)

Approval Date

Approved

Major Components

Construction of PCC,RCC,Sew.Drainage in Streets and Water Supply & Purification Plant.

Major Targets

100%

District and Tehsil

Pakpattan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.000

2.500

0.000

3.250

0.000

0.000

0.000

3.250

3.250

0.000

0.000

0.000

0.000

2.500

2.500

0.000

0.375

0.000

0.000

0.000

0.375

0.375

0.000

0.000

0.000

0.000

2.500

2.500

0.000

0.375

0.000

0.000

0.000

0.375

0.375

0.000

0.000

0.000

239

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

746 137 Name of the Scheme

Construction of PCC, RCC, Sewerage Drainage in Streets and Water Supply and Water Purification Plant in each Union Council (UC No.1,2 & 4

Approval Date

Approved

Major Components

Construction of PCC,RCC,Sew.Drainage in Streets and Water Supply & Purification Plant.

Major Targets

100%

District and Tehsil

Pakpattan

747 138 Name of the Scheme

Construction of PCC, RCC, Sewerage Drainage in Streets and Water Supply and Water Purification Plant in each Union Council (UC No.19 & 26)

Approval Date

Approved

Major Components

Construction of PCC,RCC,Sew.Drainage in Streets and Water Supply & Purification Plant.

Major Targets

100%

District and Tehsil

Pakpattan

748 139 Name of the Scheme

Construction of PCC, RCC, Sewerage Drainage in Streets and Water Supply and Water Purification Plant in each Union Council (UC No.22,23 & 24)

Approval Date

Approved

Major Components

Construction of PCC,RCC,Sew.Drainage in Streets and Water Supply & Purification Plant.

Major Targets

100%

District and Tehsil

Pakpattan

749 140 Name of the Scheme

Urban Sewerage / Drainage Scheme Kahuta

Approval Date

5/5/2007

Major Components

Sewer System and disposal work etc.

Major Targets

90%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.000

2.500

0.000

3.250

0.000

0.000

0.000

3.250

3.250

0.000

0.000

0.000

0.000

5.000

2.500

0.000

3.250

0.000

0.000

0.000

3.250

3.250

0.000

0.000

0.000

0.000

5.000

3.000

0.000

2.750

0.000

0.000

0.000

2.750

2.750

0.000

0.000

0.000

0.000

48.108

17.916

0.000

32.000

0.000

0.000

0.000

32.000

32.000

0.000

0.000

0.000

240

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

750 141 Name of the Scheme

Sewerage Scheme for R.Y.Khan City with treatment Plant (Revised)

Approval Date

18.8.08

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets,Treatment Plants etc.

Major Targets

57%

District and Tehsil

Rahim Yar Khan

751 142 Name of the Scheme

Providing lateral Sewers in Left Over Area Sewerage scheme R.Y.Khan (Revised)

Approval Date

27.8.08

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

58%

District and Tehsil

Rahim Yar Khan

752 143 Name of the Scheme

Urban Drainage and Sewerage Scheme Allah Abad, Tehsil Liaqatpur, Dsitt: R.Y.Khan.

Approval Date

20.02.09

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Liaqatpur

753 144 Name of the Scheme

Completion of Remaining work of comprehensive Sewerage Scheme Phase-I, City Sadiqabad

Approval Date

18.08.07

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Sadiqabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

Foreign Aid Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2,009.018

877.880

0.000

450.000

0.000

0.000

0.000

450.000

450.000

982.491

0.000

0.000

0.000

124.015

62.050

0.000

20.000

0.000

0.000

0.000

20.000

20.000

60.567

0.000

0.000

0.000

9.647

9.138

0.000

1.956

0.000

0.000

0.000

1.956

1.956

0.000

0.000

0.000

0.000

17.903

18.500

0.000

2.088

0.000

0.000

0.000

2.088

2.088

0.000

0.000

0.000

241

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

754 145 Name of the Scheme

Provision / Rehabilitation of Sewerage System City Sadiqabad Phase-I.

Approval Date

06.02.09

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Sadiqabad

755 146 Name of the Scheme

Laying of RCC Sewer from Sillanwali Road Disposal Works to Mona Seepage Drain, Sargodha City

Approval Date

17-11-2006

Major Components

Sewer System and disposal work etc.

Major Targets

90%

District and Tehsil

Sargodha

756 147 Name of the Scheme

Comprehensive Urban Sewerage & Drainage Scheme Kot Momin.

Approval Date

24-09-2008

Major Components

Sewer System and disposal work etc.

Major Targets

74%

District and Tehsil

Sargodha

757 148 Name of the Scheme

Urban Drainage Scheme Miani (Revised)

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

758 149 Name of the Scheme

Comprehensive Sewerage Scheme Bhalwal Colonies

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

8%

District and Tehsil

Sargodha , Bhalwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.000

10.000

0.000

1.500

0.000

0.000

0.000

1.500

1.500

0.000

0.000

0.000

0.000

47.323

36.884

0.000

12.000

0.000

0.000

0.000

12.000

12.000

0.000

0.000

0.000

0.000

78.168

41.487

0.000

25.000

0.000

0.000

0.000

25.000

25.000

23.406

0.000

0.000

0.000

10.263

9.745

0.000

2.057

0.000

0.000

0.000

2.057

2.057

0.000

0.000

0.000

0.000

221.426

10.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

70.000

164.640

0.000

242

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

759 150 Name of the Scheme

Revised Urban Sewerage / Drainage Scheme Kot Abdul Malik

Approval Date

6/1/2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

760 151 Name of the Scheme

Urban Sewerage Scheme Sheikhupura (Phase-II) (Revised)

Approval Date

8/11/2007

Major Components

Sewer System and disposal work etc.

Major Targets

86%

District and Tehsil

Sheikhupura

761 152 Name of the Scheme

Urban Drainage Scheme, Manawala UC-100, Sheikhupura

Approval Date

13-11-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

762 153 Name of the Scheme

Urban Drainage Scheme, Mohalla Bambanwala, Jewanpura UC-57 including remaining abadies.

Approval Date

13-11-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

763 154 Name of the Scheme

Comprehensive Sewerage & Drainage Scheme at Sheikhupura city Sheikhupura

Approval Date

3/12/2008

Major Components

Sewer System and disposal work etc.

Major Targets

25%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

93.782

83.824

0.000

20.000

0.000

0.000

0.000

20.000

20.000

0.000

0.000

0.000

0.000

130.790

114.200

0.000

5.000

0.000

0.000

0.000

5.000

5.000

0.000

0.000

0.000

0.000

2.875

2.933

0.000

0.373

0.000

0.000

0.000

0.373

0.373

0.000

0.000

0.000

0.000

3.450

3.390

0.000

0.578

0.000

0.000

0.000

0.578

0.578

0.000

0.000

0.000

0.000

154.704

20.000

0.000

39.000

0.000

0.000

0.000

39.000

39.000

50.000

68.910

0.000

243

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

764 155 Name of the Scheme

Urban PCC and Drainage Scheme in Streets of City Sheikhupura

Approval Date

3/12/2008

Major Components

Sewer System and disposal work etc.

Major Targets

44%

District and Tehsil

Sheikhupura

765 156 Name of the Scheme

Urban Drainage, PCC Schemes at Kot Abdul Malik & Ferozewala

Approval Date

23-12-2008

Major Components

Sewer System and disposal work etc.

Major Targets

19%

District and Tehsil

Sheikhupura , Ferozewala

766 157 Name of the Scheme

Urban Sewerage / Drainage Scheme Shariqpur (Revised)

Approval Date

26-03-2009

Major Components

Sewer System and disposal work etc.

Major Targets

29%

District and Tehsil

Sheikhupura

767 158 Name of the Scheme

Rehabilitation of Urban Sewerage/ Drainage / Sanitation Scheme Wandala Dial Singh UC 30-31

Approval Date

9/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

13%

District and Tehsil

Sheikhupura

768 159 Name of the Scheme

Comprehensive Sewerage / Drainage Scheme (Renovation & Extension) Daska

Approval Date

20-10-2004

Major Components

Sewer System and disposal work etc.

Major Targets

86%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

68.745

20.000

0.000

15.000

0.000

0.000

0.000

15.000

15.000

44.057

0.000

0.000

0.000

137.597

20.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

128.237

0.000

0.000

0.000

90.829

20.470

0.000

10.000

0.000

0.000

0.000

10.000

10.000

73.983

0.000

0.000

0.000

199.734

10.000

0.000

20.000

0.000

0.000

0.000

20.000

20.000

50.000

149.694

0.000

0.000

99.973

89.401

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

244

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

769 160 Name of the Scheme

Urban Sewerage Scheme Chawinda

Approval Date

13-04-2007

Major Components

Sewer System and disposal work etc.

Major Targets

90%

District and Tehsil

Sialkot

770 161 Name of the Scheme

Comprehensive Package for Pasrur City for pavement of streets

Approval Date

13-04-2007

Major Components

Sewer System and disposal work etc.

Major Targets

89%

District and Tehsil

Sialkot

771 162 Name of the Scheme

Sewerage / Drainage Scheme for Sambrial City

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

90%

District and Tehsil

Sialkot

772 163 Name of the Scheme

Lining of Bhed Nullah Sialkot City

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

26%

District and Tehsil

Sialkot

773 164 Name of the Scheme

Extension Urban Sewerage Scheme, Sahiwal(Rev.)

Approval Date

5.5.07

Major Components

RCC Sewer,P/Machinery etc.

Major Targets

100%

District and Tehsil

Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

47.630

47.186

0.000

2.000

0.000

0.000

0.000

2.000

2.000

0.000

0.000

0.000

0.000

91.380

88.800

0.000

5.000

0.000

0.000

0.000

5.000

5.000

0.000

0.000

0.000

0.000

79.798

72.507

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

0.000

72.054

1.500

0.000

20.000

0.000

0.000

0.000

20.000

20.000

40.000

21.362

0.000

0.000

102.404

98.673

0.000

19.092

0.000

0.000

0.000

19.092

19.092

0.000

0.000

0.000

245

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

774 165 Name of the Scheme

Improvement of Sewerage Scheme Mohallah Rajpura, Sahiwal

Approval Date

Approved

Major Components

AC/PVC Pipe

Major Targets

100%

District and Tehsil

Sahiwal

775 166 Name of the Scheme

Sewerage Sabir Colony katchi Packi Road, Sahiwal.

Approval Date

Approved

Major Components

AC/PVC Pipe

Major Targets

100%

District and Tehsil

Sahiwal

776 167 Name of the Scheme

Sewerage Dastgir colony, Railway Station Road, Opp: GPO Sahiwal.

Approval Date

Approved

Major Components

AC/PVC Pipe

Major Targets

100%

District and Tehsil

Sahiwal

777 168 Name of the Scheme

Repair & Desilting of Sullage Carrier along with Noor shah Road Kot Khadim ali Shah Sahiwal.

Approval Date

6.02.09

Major Components

AC/PVC Pipe

Major Targets

100%

District and Tehsil

Sahiwal

778 169 Name of the Scheme

Provision of Machinery & Equipment for Solid waste Management TMA Sahiwal.

Approval Date

6.02.09

Major Components

AC/PVC Pipe and Machinery etc.

Major Targets

100%

District and Tehsil

Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

0.700

0.700

0.000

0.105

0.000

0.000

0.000

0.105

0.105

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

7.000

7.000

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

246

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

779 170 Name of the Scheme

Construction of Sewerage System DCO House to Kothi Sheikh Ehtishsam canal Road, T.T.Singh

Approval Date

19.3.09

Major Components

Construction of Sewer system etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

780 171 Name of the Scheme

Urban Sewerage Scheme, Burewala Ph-II.

Approval Date

27.1.09

Major Components

Sewer System, Disposal etc.

Major Targets

17%

District and Tehsil

Vehari , Burewala

Sub-Total: Urban Sewerage Drainage

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.600

0.600

0.000

0.090

0.000

0.000

0.000

0.090

0.090

0.000

0.000

0.000

0.000

173.990

10.000

0.000

25.000

0.000

0.000

0.000

25.000

25.000

55.000

110.089

0.000

0.000

9,958.062

2,896.196

3,314.574

200.000

0.000 1,498.829

0.000

0.000

0.000 1,498.829

1,498.829

3,416.721

Rural Water Supply 781 172 Name of the Scheme

Rural Water Supply Scheme Attock Cantt

Approval Date

2/12/2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

782 173 Name of the Scheme

Rural Water Supply Scheme Qabla Bandi

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

783 174 Name of the Scheme

Rural Water Supply Scheme Ghar

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

0.000

7.639

7.084

0.000

1.701

0.000

0.000

0.000

1.701

1.701

0.000

0.000

0.000

0.000

4.694

4.479

0.000

0.919

0.000

0.000

0.000

0.919

0.919

0.000

0.000

0.000

0.000

3.764

2.748

0.000

1.581

0.000

0.000

0.000

1.581

1.581

0.000

0.000

0.000

247

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

784 175 Name of the Scheme

Rural Water Supply Scheme Dhoke Manata

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

785 176 Name of the Scheme

Rural Water Supply Scheme Bhadian

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

786 177 Name of the Scheme

Rehabilitation of Water Supply Scheme Malowala

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

787 178 Name of the Scheme

Rehabilitation of Water Supply Scheme Ratwal

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

788 179 Name of the Scheme

Rehabilitation of Water Supply Scheme Kot Fateh Khan

Approval Date

2-12-206

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.466

5.056

0.000

3.530

0.000

0.000

0.000

3.530

3.530

0.000

0.000

0.000

0.000

3.439

3.854

0.000

0.101

0.000

0.000

0.000

0.101

0.101

0.000

0.000

0.000

0.000

5.193

5.218

0.000

0.754

0.000

0.000

0.000

0.754

0.754

0.000

0.000

0.000

0.000

3.660

2.718

0.000

1.491

0.000

0.000

0.000

1.491

1.491

0.000

0.000

0.000

0.000

11.564

8.470

0.000

4.829

0.000

0.000

0.000

4.829

4.829

0.000

0.000

0.000

248

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

789 180 Name of the Scheme

Rehabilitation of Water Supply Scheme Dhurnal

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

790 181 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chab

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

69%

District and Tehsil

Attock

791 182 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Nukkah Afghan

Approval Date

29-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

792 183 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Injra Afghan.

Approval Date

2/12/2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

46%

District and Tehsil

Attock

793 184 Name of the Scheme

Rehabilitation of Rural Water Supply Kasran

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

56%

District and Tehsil

Attock

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.155

2.144

0.000

0.334

0.000

0.000

0.000

0.334

0.334

0.000

0.000

0.000

0.000

5.862

3.183

0.000

1.500

0.000

0.000

0.000

1.500

1.500

2.058

0.000

0.000

0.000

4.355

3.018

0.000

1.990

0.000

0.000

0.000

1.990

1.990

0.000

0.000

0.000

0.000

5.141

0.207

0.000

2.500

0.000

0.000

0.000

2.500

2.500

3.205

0.000

0.000

0.000

10.000

3.474

0.000

3.000

0.000

0.000

0.000

3.000

3.000

5.026

0.000

0.000

249

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

794 185 Name of the Scheme

Rehabilitation of Rural Water Supply Khour

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

795 186 Name of the Scheme

Rural Water Supply Jangla, Khudi Deri & Gulga Khroan

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

796 187 Name of the Scheme

Rural Water Supply scheme Ghreeb Wal

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

797 188 Name of the Scheme

Rural Water Supply Scheme Dhoke Jabar Wal

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

798 189 Name of the Scheme

Rural Water Supply scheme Sukhwal

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

69%

District and Tehsil

Attock

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

49.319

35.427

0.000

21.290

0.000

0.000

0.000

21.290

21.290

0.000

0.000

0.000

0.000

12.438

12.688

0.000

1.616

0.000

0.000

0.000

1.616

1.616

0.000

0.000

0.000

0.000

8.000

8.646

0.000

0.554

0.000

0.000

0.000

0.554

0.554

0.000

0.000

0.000

0.000

5.000

4.885

0.000

0.865

0.000

0.000

0.000

0.865

0.865

0.000

0.000

0.000

0.000

8.000

3.870

0.000

2.500

0.000

0.000

0.000

2.500

2.500

2.830

0.000

0.000

250

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

799 190 Name of the Scheme

Rural Water Supply Dharal

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

65%

District and Tehsil

Attock

800 191 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Naka Khurd

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

62%

District and Tehsil

Attock

801 192 Name of the Scheme

Reh: of Rural Water Supply Scheme Shaheen Bagh

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

802 193 Name of the Scheme

Reh: of Rural Water Supply Scheme Jassian

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

803 194 Name of the Scheme

Reh: of Rural Water Supply Scheme Attock Khurd and Mullan Mansoor

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

62%

District and Tehsil

Attock

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.000

2.701

0.000

2.500

0.000

0.000

0.000

2.500

2.500

2.849

0.000

0.000

0.000

9.815

3.455

0.000

3.500

0.000

0.000

0.000

3.500

3.500

4.332

0.000

0.000

0.000

5.373

3.900

0.000

2.279

0.000

0.000

0.000

2.279

2.279

0.000

0.000

0.000

0.000

9.564

5.850

0.000

5.149

0.000

0.000

0.000

5.149

5.149

0.000

0.000

0.000

0.000

13.502

4.600

0.000

5.000

0.000

0.000

0.000

5.000

5.000

5.927

0.000

0.000

251

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

804 195 Name of the Scheme

Reh: of Rural Water Supply Scheme Nathial & Rawal

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

805 196 Name of the Scheme

Reh: of Rural Water Supply Scheme Dhulian

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

806 197 Name of the Scheme

Reh: of Rural Water Supply Scheme Pind

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

807 198 Name of the Scheme

Reh: of Rural Water Supply Scheme Sapial

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

808 199 Name of the Scheme

Reh: of Rural Water Supply Scheme Maryala

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.410

1.319

0.000

0.303

0.000

0.000

0.000

0.303

0.303

0.000

0.000

0.000

0.000

4.349

2.970

0.000

2.031

0.000

0.000

0.000

2.031

2.031

0.000

0.000

0.000

0.000

4.711

3.581

0.000

1.837

0.000

0.000

0.000

1.837

1.837

0.000

0.000

0.000

0.000

2.404

2.130

0.000

0.635

0.000

0.000

0.000

0.635

0.635

0.000

0.000

0.000

0.000

4.262

3.100

0.000

1.801

0.000

0.000

0.000

1.801

1.801

0.000

0.000

0.000

252

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

809 200 Name of the Scheme

Reh: of Rural Water Supply Scheme Jaba

Approval Date

2/4/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

75%

District and Tehsil

Attock

810 201 Name of the Scheme

Reh: of Rural Water Supply Scheme Chauntara

Approval Date

27-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

811 202 Name of the Scheme

Rural Water Supply Scheme Akhori

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

812 203 Name of the Scheme

Urban Water Supply Scheme for Dhoke Maskeen & Baba Wali Chandar Hasanabdal City

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Attock

813 204 Name of the Scheme

Rural Water Supply Scheme,Chak No.59/4-R

Approval Date

2006-07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Minchan abad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.323

3.400

0.000

2.031

0.000

0.000

0.000

2.031

2.031

1.840

0.000

0.000

0.000

3.500

3.500

0.000

0.525

0.000

0.000

0.000

0.525

0.525

0.000

0.000

0.000

0.000

5.736

4.656

0.000

1.940

0.000

0.000

0.000

1.940

1.940

0.000

0.000

0.000

0.000

6.728

7.175

0.000

0.562

0.000

0.000

0.000

0.562

0.562

0.000

0.000

0.000

0.000

8.094

7.802

0.000

1.506

0.000

0.000

0.000

1.506

1.506

0.000

0.000

0.000

253

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

814 205 Name of the Scheme

Rural Water Supply Scheme,Chak No.92/6-R

Approval Date

2006-07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Minchan abad

815 206 Name of the Scheme

Rural Water Supply Scheme,Chak No.211/9-R

Approval Date

2006-07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Minchan abad

816 207 Name of the Scheme

Rural Water Supply Scheme,Chak No.301/HR

Approval Date

2006-07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Minchan abad

817 208 Name of the Scheme

Rural Water Supply Scheme,Chak

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.639

4.335

0.000

1.000

0.000

0.000

0.000

1.000

1.000

0.000

0.000

0.000

0.000

4.070

3.944

0.000

0.737

0.000

0.000

0.000

0.737

0.737

0.000

0.000

0.000

0.000

3.269

2.936

0.000

0.823

0.000

0.000

0.000

0.823

0.823

0.000

0.000

0.000

0.000

5.465

4.383

0.000

1.902

0.000

0.000

0.000

1.902

1.902

0.000

0.000

0.000

0.000

6.202

5.224

0.000

1.900

0.000

0.000

0.000

1.900

1.900

0.000

0.000

0.000

No.188/7-R Approval Date

2006-07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Minchan abad

818 209 Name of the Scheme

Rural Water Supply Scheme,Chak No.185/7-R

Approval Date

2006-07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Haroonabad 254

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

819 210 Name of the Scheme

Rehabilitation of Water Supply Scheme Parbatiwala, Chak Jamoon Rehomonka and Wasandi.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

95%

District and Tehsil

Bahawalnagar , Minchan abad

820 211 Name of the Scheme

Rehabilitation of Water Supply Scheme Azafi Basti Darbar Shakar Ganj.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Minchan abad

821 212 Name of the Scheme

Rehabilitation of Water Supply Scheme Dhab Sucha Singh.

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Minchan abad

822 213 Name of the Scheme

Rehabilitation of Water Supply Scheme Noorpur Arain.

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Minchan abad

823 214 Name of the Scheme

Rural Water supply scheme Haranwala.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Minchan abad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.024

6.600

0.000

4.388

0.000

0.000

0.000

4.388

4.388

0.000

0.000

0.000

0.000

4.194

2.456

0.000

2.367

0.000

0.000

0.000

2.367

2.367

0.000

0.000

0.000

0.000

4.546

4.546

0.000

0.682

0.000

0.000

0.000

0.682

0.682

0.000

0.000

0.000

0.000

3.842

3.842

0.000

0.576

0.000

0.000

0.000

0.576

0.576

0.000

0.000

0.000

0.000

3.349

1.200

0.000

2.651

0.000

0.000

0.000

2.651

2.651

0.000

0.000

0.000

255

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

824 215 Name of the Scheme

Rehabilitation Extension Rural Water Supply Scheme Chak No.9/FW to 11/FW & 54/F (Bukhshan Khan),

Approval Date

27.05.2009

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

13%

District and Tehsil

Bahawalnagar , Chistian

825 216 Name of the Scheme

Reh: Water Supply Scheme Chak No. 105/ Fateh.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

73%

District and Tehsil

Bahawalnagar , Chistian

826 217 Name of the Scheme

Reh: Extension Water Supply Scheme Chak No. 48/3R.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Haroonabad

827 218 Name of the Scheme

Reh: Extension Water Supply Scheme Chak No. 108/F (Azafi Basti.)

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Chistian

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

23.102

2.490

0.000

1.000

0.000

0.000

0.000

1.000

1.000

23.077

0.000

0.000

0.000

10.073

5.992

0.000

2.500

0.000

0.000

0.000

2.500

2.500

3.092

0.000

0.000

0.000

1.930

1.930

0.000

0.290

0.000

0.000

0.000

0.290

0.290

0.000

0.000

0.000

0.000

4.373

3.090

0.000

1.939

0.000

0.000

0.000

1.939

1.939

0.000

0.000

0.000

256

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

828 219 Name of the Scheme

Reh: Extension Water Supply Scheme Chak No.5/Fordwah (Azafi Basti.)

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Chistian

829 220 Name of the Scheme

Reh: Extension Water Supply Scheme Chak No.4/Fordwah (Azafi Basti.)

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Chistian

830 221 Name of the Scheme

Reh: Water Supply Scheme Chak No. 126/ Murad.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Chistian

831 222 Name of the Scheme

Reh: Water Supply Scheme Chak No. 118/ M.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Chistian

832 223 Name of the Scheme

Reh: Water Supply Scheme Chak No. 201-205/ Murad.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

43%

District and Tehsil

Bahawalnagar , Chistian

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.373

2.827

0.000

2.202

0.000

0.000

0.000

2.202

2.202

0.000

0.000

0.000

0.000

1.369

0.898

0.000

0.676

0.000

0.000

0.000

0.676

0.676

0.000

0.000

0.000

0.000

3.218

1.988

0.000

1.713

0.000

0.000

0.000

1.713

1.713

0.000

0.000

0.000

0.000

3.394

2.349

0.000

1.554

0.000

0.000

0.000

1.554

1.554

0.000

0.000

0.000

0.000

14.205

4.000

0.000

2.974

0.000

0.000

0.000

2.974

2.974

9.362

0.000

0.000

257

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

833 224 Name of the Scheme

Reh: Water Supply Scheme Chak No. 172/ Murad.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

70%

District and Tehsil

Bahawalnagar , Chistian

834 225 Name of the Scheme

Reh: Water Supply Scheme Chak No. 167/ Murad.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

74%

District and Tehsil

Bahawalnagar , Chistian

835 226 Name of the Scheme

Reh: Water Supply Scheme Chak No. 176/ Murad.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Chistian

836 227 Name of the Scheme

Reh: Water Supply Scheme Chak No.129/ Murad (B).

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Chistian

837 228 Name of the Scheme

Reh: Water Supply Scheme Chak No 114/ 6R.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Haroonabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.231

2.627

0.000

1.600

0.000

0.000

0.000

1.600

1.600

1.789

0.000

0.000

0.000

7.450

4.631

0.000

1.700

0.000

0.000

0.000

1.700

1.700

2.237

0.000

0.000

0.000

3.412

1.957

0.000

1.967

0.000

0.000

0.000

1.967

1.967

0.000

0.000

0.000

0.000

4.567

3.238

0.000

2.014

0.000

0.000

0.000

2.014

2.014

0.000

0.000

0.000

0.000

5.209

3.897

0.000

2.093

0.000

0.000

0.000

2.093

2.093

0.000

0.000

0.000

258

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

838 229 Name of the Scheme

Reh: Water Supply Scheme Chak No 33/ 3R.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Haroonabad

839 230 Name of the Scheme

Reh: Water Supply Scheme Chak No.173/ Murad.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

94%

District and Tehsil

Bahawalnagar , Haroonabad

840 231 Name of the Scheme

Reh: Water Supply Scheme Chak No.111/ Murad.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Chishtian

841 232 Name of the Scheme

Reh: Water Supply Scheme Chak No 77-79/ 1L.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Haroonabad

842 233 Name of the Scheme

Reh: Water Supply Scheme Chak No.133/ 6R.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Haroonabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.424

0.986

0.000

1.802

0.000

0.000

0.000

1.802

1.802

0.000

0.000

0.000

0.000

5.496

2.993

0.000

2.935

0.000

0.000

0.000

2.935

2.935

0.392

0.000

0.000

0.000

2.946

1.900

0.000

1.488

0.000

0.000

0.000

1.488

1.488

0.000

0.000

0.000

0.000

2.995

1.181

0.000

2.263

0.000

0.000

0.000

2.263

2.263

0.000

0.000

0.000

0.000

3.485

1.500

0.000

2.508

0.000

0.000

0.000

2.508

2.508

0.000

0.000

0.000

259

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

843 234 Name of the Scheme

Reh: Water Supply Scheme Chak No. 78/ 1L..

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Haroonabad

844 235 Name of the Scheme

Reh: Water Supply Scheme Chak No 75/ 4R.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Haroonabad

845 236 Name of the Scheme

Reh: Water Supply Scheme Chak No 192/ 7R.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

69%

District and Tehsil

Bahawalnagar , Haroonabad

846 237 Name of the Scheme

Reh: Water Supply Scheme Chak No 90/ 5R.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Haroonabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.610

0.221

0.000

1.631

0.000

0.000

0.000

1.631

1.631

0.000

0.000

0.000

0.000

4.526

3.415

0.000

1.790

0.000

0.000

0.000

1.790

1.790

0.000

0.000

0.000

0.000

4.858

2.228

0.000

1.600

0.000

0.000

0.000

1.600

1.600

1.759

0.000

0.000

0.000

1.609

0.315

0.000

1.535

0.000

0.000

0.000

1.535

1.535

0.000

0.000

0.000

260

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

847 238 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak Najeebabad, Expendation of Machinery and Pipe Line, Tehsil & Distt. Bahawalnagar.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

848 239 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak Dholeywala,Tehsil & Distt. Bahawalnagar.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

849 240 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme of Daddu Mamuka

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

850 241 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak Kishan Garh,Tehsil & Distt. Bahawalnagar.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.819

1.378

0.000

1.864

0.000

0.000

0.000

1.864

1.864

0.000

0.000

0.000

0.000

2.837

2.157

0.000

1.106

0.000

0.000

0.000

1.106

1.106

0.000

0.000

0.000

0.000

3.197

1.650

0.000

2.027

0.000

0.000

0.000

2.027

2.027

0.000

0.000

0.000

0.000

2.315

1.869

0.000

0.793

0.000

0.000

0.000

0.793

0.793

0.000

0.000

0.000

261

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

851 242 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak Nathewala, Tehsil & Distt. Bahawalnagar.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

852 243 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Mohib Ali

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

853 244 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Nathu Dhaka

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

854 245 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Sundar Wali

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

855 246 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Dhani Muhammad Yar Chishti

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.988

3.274

0.000

1.312

0.000

0.000

0.000

1.312

1.312

0.000

0.000

0.000

0.000

2.641

1.599

0.000

1.438

0.000

0.000

0.000

1.438

1.438

0.000

0.000

0.000

0.000

3.191

1.423

0.000

2.247

0.000

0.000

0.000

2.247

2.247

0.000

0.000

0.000

0.000

2.423

1.506

0.000

1.280

0.000

0.000

0.000

1.280

1.280

0.000

0.000

0.000

0.000

2.602

1.370

0.000

1.622

0.000

0.000

0.000

1.622

1.622

0.000

0.000

0.000

262

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

856 247 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Punj Kossi

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

857 248 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme,Kehven Singh Akkan Wali and Ganga Singh.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

858 249 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Nanak Chand and Nihalka

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

859 250 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Hazoor Singh

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

860 251 Name of the Scheme

Rehabilitation of Water Supply Scheme Chak Hotiana.

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.446

0.750

0.000

0.913

0.000

0.000

0.000

0.913

0.913

0.000

0.000

0.000

0.000

2.224

0.783

0.000

1.775

0.000

0.000

0.000

1.775

1.775

0.000

0.000

0.000

0.000

2.855

0.660

0.000

2.623

0.000

0.000

0.000

2.623

2.623

0.000

0.000

0.000

0.000

2.567

1.210

0.000

1.742

0.000

0.000

0.000

1.742

1.742

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

263

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

861 252 Name of the Scheme

Rehabilitation of Water Supply Scheme Adda Basti Molanwala Galla.

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

862 253 Name of the Scheme

Rehabilitation of Water Supply Scheme Khem Ghar.

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

863 254 Name of the Scheme

Ext. of Water Supply Scheme Azafi Basti Ganga Singh.

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

90%

District and Tehsil

Bahawalnagar

864 255 Name of the Scheme

Ext. of Water Supply Scheme Basti Nadir Shah.

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

865 256 Name of the Scheme

Rehabilitation of Water Supply Scheme in Chak Bakhu Shah.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.500

3.500

0.000

0.525

0.000

0.000

0.000

0.525

0.525

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

0.965

0.400

0.000

0.600

0.000

0.000

0.000

0.600

0.600

0.000

0.000

0.000

0.000

1.800

1.800

0.000

0.270

0.000

0.000

0.000

0.270

0.270

0.000

0.000

0.000

0.000

1.218

0.500

0.000

0.901

0.000

0.000

0.000

0.901

0.901

0.000

0.000

0.000

264

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

866 257 Name of the Scheme

Rehabilitation of Water Supply Scheme in Chak Mani Sabooka.

Approval Date

02.02.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

867 258 Name of the Scheme

Rehabilitation of Water Supply Scheme with Generator in Doonga Boonga

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

868 259 Name of the Scheme

Rehabilitation of Water Supply Scheme in Chak Kot Dial Singh.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

869 260 Name of the Scheme

Rehabilitation of Water Supply Scheme in Chak Gulab Ali.

Approval Date

2.2.09

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar

870 261 Name of the Scheme

Rural Water Supply Scheme Maouza Rab Nawaz Pura

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

57%

District and Tehsil

Bahawalnagar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.458

0.400

0.000

1.277

0.000

0.000

0.000

1.277

1.277

0.000

0.000

0.000

0.000

2.970

2.500

0.000

0.916

0.000

0.000

0.000

0.916

0.916

0.000

0.000

0.000

0.000

3.343

2.500

0.000

1.344

0.000

0.000

0.000

1.344

1.344

0.000

0.000

0.000

0.000

1.335

0.500

0.000

1.035

0.000

0.000

0.000

1.035

1.035

0.000

0.000

0.000

0.000

5.000

1.000

0.000

2.300

0.000

0.000

0.000

2.300

2.300

2.450

0.000

0.000

265

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

871 262 Name of the Scheme

Reh. Of Rural Water Supply Scheme Chak No.208-209/Murad,

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

25%

District and Tehsil

Bahawalnagar , Chishtain

872 263 Name of the Scheme

Reh. Of Rural Water Supply Scheme Chak No.121/Murad

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

109%

District and Tehsil

Bahawalnagar , Chishtain

873 264 Name of the Scheme

Reh. Of Rural Water Supply Scheme Chak No.29/3-R,

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalnagar , Chishtain

874 265 Name of the Scheme

Water Disposal Scheme, Meclod Gunj

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

87%

District and Tehsil

Bahawalnagar

875 266 Name of the Scheme

Rural Water Supply Scheme,Chak No.68/DB Jujjawali

Approval Date

31.01.07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalpur , Yazman

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

25.742

5.029

0.000

2.300

0.000

0.000

0.000

2.300

2.300

22.274

0.000

0.000

0.000

3.316

1.860

0.000

2.300

0.000

0.000

0.000

2.300

2.300

0.000

0.000

0.000

0.000

4.110

2.110

0.000

2.617

0.000

0.000

0.000

2.617

2.617

0.000

0.000

0.000

0.000

0.492

0.100

0.000

0.392

0.000

0.000

0.000

0.392

0.392

0.000

0.000

0.000

0.000

7.445

7.605

0.000

0.957

0.000

0.000

0.000

0.957

0.957

0.000

0.000

0.000

266

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

876 267 Name of the Scheme

Rural Water Supply Scheme,Chak No.88/DB

Approval Date

03.08.05

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalpur , Yazman

877 268 Name of the Scheme

Rural Water Supply Scheme,Chak No.14/BC

Approval Date

18.05.07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalpur

878 269 Name of the Scheme

Rural Water Supply Scheme,Chak No.138/DB

Approval Date

10.11.08

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

70%

District and Tehsil

Bahawalpur , Yazman

879 270 Name of the Scheme

Rural Water Supply Scheme,Chak No.49/DB(East)

Approval Date

10.11.08

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

65%

District and Tehsil

Bahawalpur , Yazman

880 271 Name of the Scheme

Rural Water Supply Scheme,Chak No.49/DB(West)

Approval Date

10.11.08

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

70%

District and Tehsil

Bahawalpur , Yazman

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.155

5.717

0.000

0.211

0.000

0.000

0.000

0.211

0.211

0.000

0.000

0.000

0.000

12.379

12.324

0.000

1.912

0.000

0.000

0.000

1.912

1.912

0.000

0.000

0.000

0.000

14.389

9.000

0.000

2.600

0.000

0.000

0.000

2.600

2.600

4.947

0.000

0.000

0.000

5.786

3.000

0.000

1.300

0.000

0.000

0.000

1.300

1.300

2.354

0.000

0.000

0.000

9.272

5.005

0.000

2.500

0.000

0.000

0.000

2.500

2.500

3.158

0.000

0.000

267

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

881 272 Name of the Scheme

Rural Water Supply Scheme,Chak No.102/DB

Approval Date

10.11.08

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

71%

District and Tehsil

Bahawalpur , Yazman

882 273 Name of the Scheme

Rural Water Supply Scheme,Chak No.13/BC

Approval Date

10.11.08

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

74%

District and Tehsil

Bahawalpur , Yazman

883 274 Name of the Scheme

Rural Water Supply Scheme,Chak No.36/DNB

Approval Date

2006-07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalpur

884 275 Name of the Scheme

Rural Water Supply Scheme,Chak No.16/DNB Manzoorabad Azafi Abadi Chak No.106-107/DNB

Approval Date

2006-07

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

100%

District and Tehsil

Bahawalpur

885 276 Name of the Scheme

Water Supply Scheme for Mauza Goth Mehrab and Coty Goyh Mehrab UC Goth Mehrab.

Approval Date

25.05.2009

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

46%

District and Tehsil

Bahawalpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.481

5.005

0.000

3.500

0.000

0.000

0.000

3.500

3.500

3.548

0.000

0.000

0.000

13.746

7.525

0.000

4.100

0.000

0.000

0.000

4.100

4.100

4.183

0.000

0.000

0.000

4.500

4.217

0.000

0.958

0.000

0.000

0.000

0.958

0.958

0.000

0.000

0.000

0.000

6.061

5.513

0.000

1.457

0.000

0.000

0.000

1.457

1.457

0.000

0.000

0.000

0.000

11.607

3.000

0.000

3.100

0.000

0.000

0.000

3.100

3.100

7.248

0.000

0.000

268

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

886 277 Name of the Scheme

Water Supply Mauza Sui Wahar Gullan Ilatti Uc Jindo Missan

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

54%

District and Tehsil

Bahawalpur

887 278 Name of the Scheme

Rural Water Supply at Chak No.105/DB

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

30%

District and Tehsil

Bahawalpur

888 279 Name of the Scheme

Rural Water Supply at Chak No.68/DB (Bangla Wali)

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

32%

District and Tehsil

Bahawalpur

889 280 Name of the Scheme

Separtion of Rising Main Water Supply Scheme of Chak No.153/M

Approval Date

Approved

Major Components

T.Well,R.Main, D.System and allied works etc.

Major Targets

67%

District and Tehsil

Bahawalpur

890 281 Name of the Scheme

Rehabilitation of Water Supply Scheme Mureed

Approval Date

22-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

11.520

3.000

0.000

4.100

0.000

0.000

0.000

4.100

4.100

6.148

0.000

0.000

0.000

11.505

3.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

9.231

0.000

0.000

0.000

10.845

3.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

8.472

0.000

0.000

0.000

6.866

4.311

0.000

1.000

0.000

0.000

0.000

1.000

1.000

2.585

0.000

0.000

0.000

11.118

12.520

0.000

0.266

0.000

0.000

0.000

0.266

0.266

0.000

0.000

0.000

269

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

891 282 Name of the Scheme

Rehabilitation of Water Supply Scheme Dab Kalan

Approval Date

16-04-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

892 283 Name of the Scheme

Rehabilitation of Water Supply Scheme Chak Naurang

Approval Date

16-04-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

893 284 Name of the Scheme

Rehabilitation of Water Supply Scheme Singwala (Revised

Approval Date

23-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

894 285 Name of the Scheme

Rehabilitation of Water Supply Scheme Chawli

Approval Date

16-04-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

895 286 Name of the Scheme

Rehabilitation of Water Supply Scheme Pira Jangla

Approval Date

16-04-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.763

2.938

0.000

0.239

0.000

0.000

0.000

0.239

0.239

0.000

0.000

0.000

0.000

3.856

4.234

0.000

0.200

0.000

0.000

0.000

0.200

0.200

0.000

0.000

0.000

0.000

4.213

3.999

0.000

0.846

0.000

0.000

0.000

0.846

0.846

0.000

0.000

0.000

0.000

7.533

7.717

0.000

0.946

0.000

0.000

0.000

0.946

0.946

0.000

0.000

0.000

0.000

3.990

4.305

0.000

0.284

0.000

0.000

0.000

0.284

0.284

0.000

0.000

0.000

270

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

896 287 Name of the Scheme

Rehabilitation of Water Supply Scheme Pinwal

Approval Date

23-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

897 288 Name of the Scheme

Rehabilitation of Water Supply Scheme Dhab Pari

Approval Date

23-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

898 289 Name of the Scheme

Rehabilitation of Water Supply Scheme Mari

Approval Date

22-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

899 290 Name of the Scheme

Rehabilitation of Water Supply Scheme Nachindi

Approval Date

16-04-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

900 291 Name of the Scheme

Provision of Water Supply Scheme Dhoke Ban Amir Khatoon District Chakwal.

Approval Date

3/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

57%

District and Tehsil

Chakwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.824

2.953

0.000

0.295

0.000

0.000

0.000

0.295

0.295

0.000

0.000

0.000

0.000

4.576

4.934

0.000

0.328

0.000

0.000

0.000

0.328

0.328

0.000

0.000

0.000

0.000

3.334

3.418

0.000

0.416

0.000

0.000

0.000

0.416

0.416

0.000

0.000

0.000

0.000

2.104

2.216

0.000

0.204

0.000

0.000

0.000

0.204

0.204

0.000

0.000

0.000

0.000

8.005

1.700

0.000

3.590

0.000

0.000

0.000

3.590

3.590

3.916

0.000

0.000

271

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

901 292 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Doray, Chakwal (Amended)

Approval Date

3/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

902 293 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Kot Iqbal, Chakwal

Approval Date

11/8/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

903 294 Name of the Scheme

Extension & Improvement of Water Supply Scheme Buchal Kalan.(Revised)

Approval Date

11/8/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

904 295 Name of the Scheme

Water Suppply & Sanitation Scheme Dhoke Khour

Approval Date

24-09-2005

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

71%

District and Tehsil

Chakwal

905 296 Name of the Scheme

Water Suppply Scheme Bigial

Approval Date

23-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.592

1.361

0.000

2.770

0.000

0.000

0.000

2.770

2.770

0.000

0.000

0.000

0.000

5.197

2.625

0.000

3.352

0.000

0.000

0.000

3.352

3.352

0.000

0.000

0.000

0.000

10.990

11.425

0.000

1.214

0.000

0.000

0.000

1.214

1.214

0.000

0.000

0.000

0.000

20.429

11.000

0.000

5.700

0.000

0.000

0.000

5.700

5.700

6.793

0.000

0.000

0.000

6.311

4.637

0.000

2.621

0.000

0.000

0.000

2.621

2.621

0.000

0.000

0.000

272

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

906 297 Name of the Scheme

Water Supply Dhoke Sooba Khan Talyala Village Sethi Tehsil Kallar Khar, District Chakwal.

Approval Date

23-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

907 298 Name of the Scheme

Reh: of Rural Water Supply Scheme Sakriala (Amended)

Approval Date

3/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

908 299 Name of the Scheme

Reh: of Rural Water Supply Scheme Kotlay

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

909 300 Name of the Scheme

Reh: of Rural Water Supply Scheme Khinger (Amended)

Approval Date

3/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

910 301 Name of the Scheme

Reh: of Rural Water Supply Scheme Latifal

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.545

0.200

0.000

0.427

0.000

0.000

0.000

0.427

0.427

0.000

0.000

0.000

0.000

2.534

2.472

0.000

0.442

0.000

0.000

0.000

0.442

0.442

0.000

0.000

0.000

0.000

1.409

1.409

0.000

0.211

0.000

0.000

0.000

0.211

0.211

0.000

0.000

0.000

0.000

2.648

2.432

0.000

0.613

0.000

0.000

0.000

0.613

0.613

0.000

0.000

0.000

0.000

2.504

2.443

0.000

0.437

0.000

0.000

0.000

0.437

0.437

0.000

0.000

0.000

273

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

911 302 Name of the Scheme

Reh: of Rural Water Supply Scheme Munara

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

912 303 Name of the Scheme

Reh: of Rural Water Supply Scheme Khwala (Dakhli Sathi)

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

913 304 Name of the Scheme

Reh: of Rural Water Supply Scheme Makhal

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

914 305 Name of the Scheme

Reh: of Rural Water Supply Scheme Wahali Bala

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

915 306 Name of the Scheme

Water Supply Scheme Tamman UC Tamman Tehsil Talagang

Approval Date

2/4/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

74%

District and Tehsil

Chakwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.832

2.701

0.000

0.556

0.000

0.000

0.000

0.556

0.556

0.000

0.000

0.000

0.000

2.017

2.017

0.000

0.303

0.000

0.000

0.000

0.303

0.303

0.000

0.000

0.000

0.000

1.984

1.984

0.000

0.298

0.000

0.000

0.000

0.298

0.298

0.000

0.000

0.000

0.000

2.085

2.085

0.000

0.313

0.000

0.000

0.000

0.313

0.313

0.000

0.000

0.000

0.000

7.393

4.000

0.000

2.300

0.000

0.000

0.000

2.300

2.300

2.202

0.000

0.000

274

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

916 307 Name of the Scheme

Water Supply Scheme Qadir Pur UC Bhilomar Tehsil Talagang

Approval Date

2/4/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Chakwal

917 308 Name of the Scheme

Rural Water Supply Scheme,Goroo

Approval Date

17.01.07

Major Components

T/Well,R.Main, D/system,GSTs, OHRs,P/Machinery, P/Houses Generating sets.etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

918 309 Name of the Scheme

Rural Water Supply Scheme,Wadoor

Approval Date

10.11.08

Major Components

T/Well,R.Main, D/system,GSTs, OHRs,P/Machinery, P/Houses Generating sets.etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan

919 310 Name of the Scheme

Rural Water Supply Scheme,Basti Bathi

Approval Date

10.11.08

Major Components

T/Well,R.Main, D/system,GSTs, OHRs,P/Machinery, P/Houses Generating sets.etc.

Major Targets

70%

District and Tehsil

Dera Ghazi Khan , Taunsa

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.336

3.336

0.000

0.500

0.000

0.000

0.000

0.500

0.500

0.000

0.000

0.000

0.000

4.540

4.513

0.000

0.708

0.000

0.000

0.000

0.708

0.708

0.000

0.000

0.000

0.000

8.329

7.832

0.000

1.746

0.000

0.000

0.000

1.746

1.746

0.000

0.000

0.000

0.000

11.862

5.401

0.000

4.100

0.000

0.000

0.000

4.100

4.100

4.140

0.000

0.000

275

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

920 311 Name of the Scheme

Rural Water Supply Scheme, Bangal & adj. abadies

Approval Date

10.11.08

Major Components

T/Well,R.Main, D/system,GSTs, OHRs,P/Machinery, P/Houses Generating sets.etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

921 312 Name of the Scheme

Rural Water Supply Scheme, Bajha(North)

Approval Date

10.11.08

Major Components

T/Well,R.Main, D/system,GSTs, OHRs,P/Machinery, P/Houses Generating sets.etc.

Major Targets

71%

District and Tehsil

Dera Ghazi Khan , Taunsa

922 313 Name of the Scheme

Rural Water Supply Scheme, Bajha(South)

Approval Date

10.11.08

Major Components

T/Well,R.Main, D/system,GSTs, OHRs,P/Machinery, P/Houses Generating sets.etc.

Major Targets

69%

District and Tehsil

Dera Ghazi Khan , Taunsa

923 314 Name of the Scheme

Reh. of Rural Water Supply Scheme, Basti Dhamaani

Approval Date

10.11.08

Major Components

T/Well,R.Main, D/system,P/Machinery, P/Houses,LLRes.

Major Targets

70%

District and Tehsil

Dera Ghazi Khan , Taunsa

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.056

4.184

0.000

2.780

0.000

0.000

0.000

2.780

2.780

0.000

0.000

0.000

0.000

7.068

3.466

0.000

2.300

0.000

0.000

0.000

2.300

2.300

2.362

0.000

0.000

0.000

9.068

4.066

0.000

3.100

0.000

0.000

0.000

3.100

3.100

3.262

0.000

0.000

0.000

7.395

3.570

0.000

2.400

0.000

0.000

0.000

2.400

2.400

2.534

0.000

0.000

276

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

924 315 Name of the Scheme

Rural Water Supply Scheme,Jhoke Bodo.

Approval Date

2006-7

Major Components

T/Well,R.Main, D/system,GSTs, OHRs,P/Machinery, P/Houses Generating sets.etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

925 316 Name of the Scheme

Reh. of Rural Water Supply Scheme, Mundrani

Approval Date

2006-07

Major Components

T/Well,R.Main, D/system,P/Machinery, P/Houses,LLRes.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

926 317 Name of the Scheme

Reh. of Rural Water Supply Scheme, Buglani

Approval Date

2006-07

Major Components

T/Well,R.Main, D/system,P/Machinery, P/Houses,LLRes.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

927 318 Name of the Scheme

Rural Water Supply Scheme, Basti Sarfraz.

Approval Date

2006-07

Major Components

T/Well,R.Main, D/system,P/Machinery, P/Houses,LLRes.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.504

0.000

0.071

0.000

0.000

0.000

0.071

0.071

0.000

0.000

0.000

0.000

2.379

2.414

0.000

0.322

0.000

0.000

0.000

0.322

0.322

0.000

0.000

0.000

0.000

4.063

2.989

0.000

1.683

0.000

0.000

0.000

1.683

1.683

0.000

0.000

0.000

0.000

1.800

1.816

0.000

0.254

0.000

0.000

0.000

0.254

0.254

0.000

0.000

0.000

277

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

928 319 Name of the Scheme

Ext.& Improvement of Rural Water Supply Scheme,Kot Qaisrani U.C.Kot Qasrani

Approval Date

20.10.08

Major Components

T/Well,R.Main, D/system,GSTs, OHRs,P/Machinery, P/Houses Generating sets.etc.

Major Targets

54%

District and Tehsil

Dera Ghazi Khan , Taunsa

929 320 Name of the Scheme

WSS Basti Janwar to Wajan UC Lakhani

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

930 321 Name of the Scheme

WSS Dagar wali and Adjoining Abadies UC Vehova

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

53%

District and Tehsil

Dera Ghazi Khan , Taunsa

931 322 Name of the Scheme

WSS Basti Janwar to Bughian Sharqi UC Lakhani.

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

63%

District and Tehsil

Dera Ghazi Khan , Taunsa

932 323 Name of the Scheme

WSS Basti janwar to Ganje wali UC Lakhani

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

69%

District and Tehsil

Dera Ghazi Khan , Taunsa

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

29.403

5.300

0.000

12.900

0.000

0.000

0.000

12.900

12.900

15.613

0.000

0.000

0.000

2.678

0.500

0.000

2.580

0.000

0.000

0.000

2.580

2.580

0.000

0.000

0.000

0.000

8.206

0.500

0.000

4.500

0.000

0.000

0.000

4.500

4.500

4.437

0.000

0.000

0.000

4.142

0.500

0.000

2.500

0.000

0.000

0.000

2.500

2.500

1.763

0.000

0.000

0.000

5.798

0.500

0.000

4.100

0.000

0.000

0.000

4.100

4.100

2.068

0.000

0.000

278

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

933 324 Name of the Scheme

WSS Basti Malha UC Tibbi Qaisrani

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

60%

District and Tehsil

Dera Ghazi Khan , Taunsa

934 325 Name of the Scheme

WSS Basti Balchani UC Tibbi Qaisrani

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

935 326 Name of the Scheme

WSS Phuglo UC Tumman Qaisrani

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

936 327 Name of the Scheme

WSS Basti Marha UC Lakhani

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

60%

District and Tehsil

Dera Ghazi Khan , Taunsa

937 328 Name of the Scheme

Reh. Of Water Supply Scheme at Badit Dalana UC Wadoor

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

938 329 Name of the Scheme

Reh. Of Water Supply Scheme at Gaddai Gharbi UC Gaddai

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

65%

District and Tehsil

Dera Ghazi Khan , Taunsa

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.351

0.500

0.000

3.200

0.000

0.000

0.000

3.200

3.200

2.454

0.000

0.000

0.000

4.632

0.500

0.000

4.827

0.000

0.000

0.000

4.827

4.827

0.000

0.000

0.000

0.000

3.984

0.600

0.000

3.982

0.000

0.000

0.000

3.982

3.982

0.000

0.000

0.000

0.000

4.812

0.500

0.000

2.800

0.000

0.000

0.000

2.800

2.800

2.234

0.000

0.000

0.000

3.965

1.100

0.000

3.460

0.000

0.000

0.000

3.460

3.460

0.000

0.000

0.000

0.000

4.962

1.100

0.000

2.600

0.000

0.000

0.000

2.600

2.600

2.006

0.000

0.000

279

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

939 330 Name of the Scheme

Reh. Of Water Supply Scheme at Gaddai Sharqi UC Gaddai

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

940 331 Name of the Scheme

Reh. Of Water Supply Scheme at Kot Haibat UC Kot Habib

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

941 332 Name of the Scheme

Reh. Of Water Supply Scheme at Patti Zai UC Wadoor

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

55%

District and Tehsil

Dera Ghazi Khan , Taunsa

942 333 Name of the Scheme

Reh. Of Water Supply Scheme at Sadiqabad UC Kot Haibat

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

61%

District and Tehsil

Dera Ghazi Khan , Taunsa

943 334 Name of the Scheme

Reh. Of Water Supply Scheme at Tommi wala UC Wadoor

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

60%

District and Tehsil

Dera Ghazi Khan , Taunsa

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.286

1.100

0.000

2.679

0.000

0.000

0.000

2.679

2.679

0.000

0.000

0.000

0.000

3.121

1.200

0.000

2.389

0.000

0.000

0.000

2.389

2.389

0.000

0.000

0.000

0.000

12.103

1.200

0.000

6.500

0.000

0.000

0.000

6.500

6.500

6.218

0.000

0.000

0.000

5.866

1.100

0.000

3.000

0.000

0.000

0.000

3.000

3.000

2.646

0.000

0.000

0.000

8.915

1.200

0.000

5.000

0.000

0.000

0.000

5.000

5.000

4.052

0.000

0.000

280

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

944 335 Name of the Scheme

Water Supply Scheme Kot Qaisrani

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

945 336 Name of the Scheme

Water Supply Scheme Sokar

Approval Date

24.02.09

Major Components

R.Main,D/system,etc.

Major Targets

100%

District and Tehsil

Dera Ghazi Khan , Taunsa

946 337 Name of the Scheme

Rural Water Supply Scheme,Chak No.171/GB

Approval Date

11.01.07

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

947 338 Name of the Scheme

Rural Water Supply Scheme,Chak No.173/GB

Approval Date

12.12.06

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

948 339 Name of the Scheme

Rural Water Supply Scheme,Chak No.170/GB

Approval Date

11.01.07

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.581

7.690

0.000

2.178

0.000

0.000

0.000

2.178

2.178

0.000

0.000

0.000

0.000

7.955

7.023

0.000

2.125

0.000

0.000

0.000

2.125

2.125

0.000

0.000

0.000

0.000

5.194

5.137

0.000

0.836

0.000

0.000

0.000

0.836

0.836

0.000

0.000

0.000

0.000

4.784

4.422

0.000

1.080

0.000

0.000

0.000

1.080

1.080

0.000

0.000

0.000

0.000

9.536

9.165

0.000

1.801

0.000

0.000

0.000

1.801

1.801

0.000

0.000

0.000

281

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

949 340 Name of the Scheme

Rural Water Supply Scheme,Chak No.230/GB

Approval Date

11.01.07

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

950 341 Name of the Scheme

Rural Water Supply Scheme,Chak No.231/GB

Approval Date

11.01.07

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

951 342 Name of the Scheme

Rural Water Supply Scheme,Chak No.439/GB

Approval Date

18.05.07

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

952 343 Name of the Scheme

Rural Water Supply Scheme,Chak No.466/GB

Approval Date

17.01.07

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

953 344 Name of the Scheme

Rural Water Supply Scheme,Chak No.189/RB

Approval Date

05.03.07

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Chak Jumra

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.493

3.580

0.000

0.437

0.000

0.000

0.000

0.437

0.437

0.000

0.000

0.000

0.000

3.559

3.614

0.000

0.479

0.000

0.000

0.000

0.479

0.479

0.000

0.000

0.000

0.000

6.886

7.045

0.000

0.874

0.000

0.000

0.000

0.874

0.874

0.000

0.000

0.000

0.000

4.644

5.263

0.000

0.078

0.000

0.000

0.000

0.078

0.078

0.000

0.000

0.000

0.000

6.951

7.263

0.000

0.731

0.000

0.000

0.000

0.731

0.731

0.000

0.000

0.000

282

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

954 345 Name of the Scheme

Reh.of Rural Water Supply & Drainage Scheme,Chak No.62/JB(Gastro Case)

Approval Date

3.12.08

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad

955 346 Name of the Scheme

Rural Water Supply Scheme Chak No. 102/JB (BurJ Mandi).

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Chak Jhumra

956 347 Name of the Scheme

Rural Water Supply Scheme Chak No. 102/JB (Burj Village).

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Chak Jhumra

957 348 Name of the Scheme

Rural Water Supply Scheme Chak No. 656/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

65%

District and Tehsil

Faisalabad , jaranwala

958 349 Name of the Scheme

Rural Water Supply Scheme Chak No. 94,96 & 97/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , jaranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.674

2.500

0.000

2.875

0.000

0.000

0.000

2.875

2.875

0.000

0.000

0.000

0.000

5.998

5.740

0.000

1.158

0.000

0.000

0.000

1.158

1.158

0.000

0.000

0.000

0.000

2.897

2.350

0.000

0.982

0.000

0.000

0.000

0.982

0.982

0.000

0.000

0.000

0.000

5.217

1.828

0.000

2.100

0.000

0.000

0.000

2.100

2.100

2.072

0.000

0.000

0.000

0.873

0.127

0.000

0.877

0.000

0.000

0.000

0.877

0.877

0.000

0.000

0.000

283

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

959 350 Name of the Scheme

Rural Water Supply Scheme Chak No. 58/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , jaranwala

960 351 Name of the Scheme

Rural Water Supply Scheme Chak No. 591/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , jaranwala

961 352 Name of the Scheme

Rural Water Supply Scheme Chak No. 98/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , jaranwala

962 353 Name of the Scheme

Rural Water Supply Scheme Chak No. 650/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Tainlianwala

963 354 Name of the Scheme

Rural Water Supply Scheme Chak No. 48/GB (Malo Wal).

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.148

0.408

0.000

0.912

0.000

0.000

0.000

0.912

0.912

0.000

0.000

0.000

0.000

3.028

2.287

0.000

1.195

0.000

0.000

0.000

1.195

1.195

0.000

0.000

0.000

0.000

2.479

1.522

0.000

1.329

0.000

0.000

0.000

1.329

1.329

0.000

0.000

0.000

0.000

10.251

8.470

0.000

3.319

0.000

0.000

0.000

3.319

3.319

0.000

0.000

0.000

0.000

2.921

2.029

0.000

1.330

0.000

0.000

0.000

1.330

1.330

0.000

0.000

0.000

284

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

964 355 Name of the Scheme

Rural Water Supply Scheme Chak No. 49/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

965 356 Name of the Scheme

Rural Water Supply Scheme Chak No. 47/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

966 357 Name of the Scheme

Rural Water Supply Scheme Chak No. 45/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

967 358 Name of the Scheme

Rural Water Supply Scheme Chak No. 50/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

968 359 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No. 137/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.199

2.014

0.000

1.665

0.000

0.000

0.000

1.665

1.665

0.000

0.000

0.000

0.000

1.697

1.000

0.000

0.952

0.000

0.000

0.000

0.952

0.952

0.000

0.000

0.000

0.000

3.711

3.216

0.000

1.052

0.000

0.000

0.000

1.052

1.052

0.000

0.000

0.000

0.000

2.011

1.843

0.000

0.470

0.000

0.000

0.000

0.470

0.470

0.000

0.000

0.000

0.000

1.037

0.203

0.000

0.990

0.000

0.000

0.000

0.990

0.990

0.000

0.000

0.000

285

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

969 360 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No. 136/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

970 361 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No. 463/GB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad , Sammundri

971 362 Name of the Scheme

Rural Water Supply Scheme Chak No. 215/RB.

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

76%

District and Tehsil

Faisalabad

972 363 Name of the Scheme

Rural Water Supply Scheme Chak No. 100/JB .

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad

973 364 Name of the Scheme

Rural Water Supply Scheme Chak No. 8/JB .

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

100%

District and Tehsil

Faisalabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.528

1.693

0.000

1.214

0.000

0.000

0.000

1.214

1.214

0.000

0.000

0.000

0.000

4.554

2.500

0.000

2.737

0.000

0.000

0.000

2.737

2.737

0.000

0.000

0.000

0.000

14.327

8.500

0.000

4.000

0.000

0.000

0.000

4.000

4.000

3.976

0.000

0.000

0.000

7.389

6.194

0.000

2.303

0.000

0.000

0.000

2.303

2.303

0.000

0.000

0.000

0.000

2.930

2.154

0.000

1.216

0.000

0.000

0.000

1.216

1.216

0.000

0.000

0.000

286

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

974 365 Name of the Scheme

Reh. / Improvement of Rural Water Supply Scheme Chak No.452/GB .

Approval Date

9.2.09

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

60%

District and Tehsil

Faisalabad , Tandlianwala

975 366 Name of the Scheme

Rural Water Supply Scheme Chak No. 67/JB .

Approval Date

Approved

Major Components

Source, Main Pipe Distribution& Machineryetc.

Major Targets

44%

District and Tehsil

Faisalabad

976 367 Name of the Scheme

Provision of Water Supply Scheme at Satiana

Approval Date

22.05.2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

17%

District and Tehsil

Fasisalabad , Faisalabad

977 368 Name of the Scheme

Rural Water Supply and Sewerage / Drainage Scheme, Talwandi Khajoorwali

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

70%

District and Tehsil

Gujranwala

978 369 Name of the Scheme

Rural Water Supply Scheme Nokhar

Approval Date

6/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

65%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.504

2.000

0.000

2.500

0.000

0.000

0.000

2.500

2.500

2.980

0.000

0.000

0.000

7.963

2.500

0.000

1.500

0.000

0.000

0.000

1.500

1.500

5.157

0.000

0.000

0.000

18.400

3.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

24.953

0.000

0.000

0.000

29.897

19.117

0.000

5.072

0.000

0.000

0.000

5.072

5.072

10.193

0.000

0.000

0.000

18.781

9.428

0.000

4.600

0.000

0.000

0.000

4.600

4.600

7.570

0.000

0.000

287

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

979 370 Name of the Scheme

Rural Water Supply Scheme Hardo Saharan

Approval Date

6/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

980 371 Name of the Scheme

Reh: of Rural Water Supply Scheme Dillanwali More Eimanabad

Approval Date

12/12/2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

981 372 Name of the Scheme

Reh: of Rural Water Supply Scheme Rasul Nagar

Approval Date

12/12/2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

982 373 Name of the Scheme

Rural Water Supply Scheme Gondlanwala (Gujranwala)

Approval Date

1/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

32%

District and Tehsil

Gujranwala

983 374 Name of the Scheme

Rural Water Supply Scheme Kohluwala

Approval Date

1/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

72%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.498

7.409

0.000

2.364

0.000

0.000

0.000

2.364

2.364

0.000

0.000

0.000

0.000

11.759

9.660

0.000

3.863

0.000

0.000

0.000

3.863

3.863

0.000

0.000

0.000

0.000

8.729

8.591

0.000

1.447

0.000

0.000

0.000

1.447

1.447

0.000

0.000

0.000

0.000

23.673

0.100

0.000

8.500

0.000

0.000

0.000

8.500

8.500

18.737

0.000

0.000

0.000

16.312

8.958

0.000

4.500

0.000

0.000

0.000

4.500

4.500

5.301

0.000

0.000

288

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

984 375 Name of the Scheme

Const: of Water Filtration Plant in Vitnerary Hospital Wazirabad

Approval Date

1/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

985 376 Name of the Scheme

Const: of Water Filtration Plant in Lalzar Colony Wazirabad

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

986 377 Name of the Scheme

Const: of Water Filtration Plant in Guru Kotha Wazirabad

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

987 378 Name of the Scheme

Const: of Water Filtration Plant in Nizamabad Wazirabad

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

988 379 Name of the Scheme

Const: of Water Filtration Plant in Allahabad

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

289

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

989 380 Name of the Scheme

Const: of Water Filtration Plant at Talwara

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

990 381 Name of the Scheme

Const: of Water Filtration Plant in Sohdra

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

991 382 Name of the Scheme

Const: of Water Filtration Plant in Dhounkal

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

992 383 Name of the Scheme

Rural Water Supply and Drainage Scheme Bugha

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

74%

District and Tehsil

Gujranwala

993 384 Name of the Scheme

Rural Water Supply and Drainage Scheme Kurlkey

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

66%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

7.209

4.000

0.000

2.100

0.000

0.000

0.000

2.100

2.100

2.190

0.000

0.000

0.000

10.228

4.000

0.000

3.800

0.000

0.000

0.000

3.800

3.800

3.962

0.000

0.000

290

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

994 385 Name of the Scheme

Installation of water Filtration Plant Qilla Dedar Singh

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

995 386 Name of the Scheme

Installation of water Filtration Plant Botala Janda Singh

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

996 387 Name of the Scheme

Installation of water Filtration Plant Kot Bowanidas

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

997 388 Name of the Scheme

Installation of water Filtration Plant at Mandiala Warraich

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

998 389 Name of the Scheme

Installation of water Filtration Plant at Govt. Girls College Rwhwali

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

291

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

999 390 Name of the Scheme

Installation of water Filtration Plant at Gondlanwala

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1000 391 Name of the Scheme

Installation of water Filtration Plant at Jattan Wala Rahwali

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1001 392 Name of the Scheme

Installation of water Filtration Plant at new Ambalvi Masjid Rahwali

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1002 393 Name of the Scheme

Installation of water Filtration Plant at Darbar Jatti Shah Jamal Rahwali

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1003 394 Name of the Scheme

Installation of water Filtration Plant at Bhagat Garh

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

292

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1004 395 Name of the Scheme

Installation of water Filtration Plant at Raj Kot

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1005 396 Name of the Scheme

Installation of water Filtration Plant at Kushi Town Rahwali

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1006 397 Name of the Scheme

Installation of water Filtration Plant at Zahid Colony,

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1007 398 Name of the Scheme

Installation of water Filtration Plant at PCC Baddoke Gussinian

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

72%

District and Tehsil

Gujranwala

1008 399 Name of the Scheme

Installation of water Filtration Plant at Papular Narsury

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

6.292

0.200

0.000

5.036

0.000

0.000

0.000

5.036

5.036

2.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

293

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1009 400 Name of the Scheme

Installation of water Filtration Plant at Ratta Bajwa

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1010 401 Name of the Scheme

Installation of water Filtration Plant at Line par Ghakhar

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1011 402 Name of the Scheme

Mohallah haidery Mian Jann Muhammad Ladhewala Warriach

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1012 403 Name of the Scheme

Installation of water Filtration Plant at C.O Unit Tanki Ladhey wala Warraich

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1013 404 Name of the Scheme

Installation of water Filtration Plant at Mohallah Telephone Exchange Kot Ishaq

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

294

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1014 405 Name of the Scheme

Installation of water Filtration Plant at Madu Khalil

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1015 406 Name of the Scheme

Installation of water Filtration Plant at Bangla Abadi Ghakhar

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1016 407 Name of the Scheme

Installation of water Filtration Plant at Old Kot Noora Road Ghakhar

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1017 408 Name of the Scheme

Installation of water Filtration Plant at Karima Abad Ghakhar

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1018 409 Name of the Scheme

Installation of water Filtration Plant at Qila Dedar Singh C.O Unit Office

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

295

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1019 410 Name of the Scheme

Installation of water Filtration Plant at BarkatPura Road Qila Dedar

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1020 411 Name of the Scheme

Installation of water Filtration Plant at Uggo Chak

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1021 412 Name of the Scheme

Water Supply for Village Khattana

Approval Date

10/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1022 413 Name of the Scheme

Rural Water Supply & Extension Drainage Scheme Jheeranwali

Approval Date

1/6/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1023 414 Name of the Scheme

Water Supply Scheme Jamoo Boja, U/C 19, Ghakhara Kalan

Approval Date

9/5/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

5.967

4.071

0.000

2.791

0.000

0.000

0.000

2.791

2.791

0.000

0.000

0.000

0.000

16.719

15.119

0.000

4.108

0.000

0.000

0.000

4.108

4.108

0.000

0.000

0.000

0.000

3.822

3.085

0.000

1.310

0.000

0.000

0.000

1.310

1.310

0.000

0.000

0.000

296

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1024 415 Name of the Scheme

Water Supply Scheme Trikha, Kana

Approval Date

11/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1025 416 Name of the Scheme

Water Supply Scheme Majra

Approval Date

4/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1026 417 Name of the Scheme

Rural Water Supply Scheme Rajake

Approval Date

21-08-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1027 418 Name of the Scheme

Rural Water Supply Scheme Nasowali Sohal Khurd

Approval Date

4/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1028 419 Name of the Scheme

Rural Water Supply Scheme Musa Khatana

Approval Date

4/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.326

4.740

0.000

1.385

0.000

0.000

0.000

1.385

1.385

0.000

0.000

0.000

0.000

5.931

4.431

0.000

2.390

0.000

0.000

0.000

2.390

2.390

0.000

0.000

0.000

0.000

4.552

4.361

0.000

0.874

0.000

0.000

0.000

0.874

0.874

0.000

0.000

0.000

0.000

3.252

2.840

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

0.000

3.252

2.440

0.000

1.300

0.000

0.000

0.000

1.300

1.300

0.000

0.000

0.000

297

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1029 420 Name of the Scheme

Rural Water Supply Scheme Ramke Behalpur

Approval Date

4/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1030 421 Name of the Scheme

Rural Water Supply Kot Allah Bakish

Approval Date

4/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1031 422 Name of the Scheme

Rural Water Supply Scheme Wains Dhool

Approval Date

4/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1032 423 Name of the Scheme

Rural Water Supply Scheme Khunan Gharbi

Approval Date

4/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1033 424 Name of the Scheme

Rural Water Supply Scheme Golayke

Approval Date

4/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

80%

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.740

4.619

0.000

0.832

0.000

0.000

0.000

0.832

0.832

0.000

0.000

0.000

0.000

3.443

2.459

0.000

1.500

0.000

0.000

0.000

1.500

1.500

0.000

0.000

0.000

0.000

4.135

4.492

0.000

0.263

0.000

0.000

0.000

0.263

0.263

0.000

0.000

0.000

0.000

2.966

2.511

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

0.000

8.752

5.928

0.000

2.100

0.000

0.000

0.000

2.100

2.100

2.037

0.000

0.000

298

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1034 425 Name of the Scheme

Rural Water Supply Scheme Sheikhpur

Approval Date

4/4/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1035 426 Name of the Scheme

Rural Water Supply Makwal

Approval Date

21-08-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1036 427 Name of the Scheme

Rural Water Supply Tootha Rai Bahadar

Approval Date

21-08-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1037 428 Name of the Scheme

Rural Water Supply Nauteh

Approval Date

21-08-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1038 429 Name of the Scheme

Rural Water Supply Mair

Approval Date

21-08-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.348

8.334

0.000

3.566

0.000

0.000

0.000

3.566

3.566

0.000

0.000

0.000

0.000

6.847

5.052

0.000

2.822

0.000

0.000

0.000

2.822

2.822

0.000

0.000

0.000

0.000

4.695

3.090

0.000

2.309

0.000

0.000

0.000

2.309

2.309

0.000

0.000

0.000

0.000

5.571

5.496

0.000

0.911

0.000

0.000

0.000

0.911

0.911

0.000

0.000

0.000

0.000

4.949

4.885

0.000

0.806

0.000

0.000

0.000

0.806

0.806

0.000

0.000

0.000

299

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1039 430 Name of the Scheme

Installation of Tubewell Village Bhalasier

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1040 431 Name of the Scheme

Water Supply Scheme Mararian

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1041 432 Name of the Scheme

Installation of Tubewell at Domallan Chowk J.P.Jattan

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1042 433 Name of the Scheme

Rural Water Supply Scheme Pinanwal (Revised)

Approval Date

16-04-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1043 434 Name of the Scheme

Water Supply Scheme Village Padhrala

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.128

1.893

0.000

0.554

0.000

0.000

0.000

0.554

0.554

0.000

0.000

0.000

0.000

5.000

5.000

0.000

0.750

0.000

0.000

0.000

0.750

0.750

0.000

0.000

0.000

0.000

2.162

1.397

0.000

1.089

0.000

0.000

0.000

1.089

1.089

0.000

0.000

0.000

0.000

15.095

15.155

0.000

2.204

0.000

0.000

0.000

2.204

2.204

0.000

0.000

0.000

0.000

2.099

2.384

0.000

0.030

0.000

0.000

0.000

0.030

0.030

0.000

0.000

0.000

300

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1044 435 Name of the Scheme

Water Supply Scheme Village Kohali

Approval Date

31-05-2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1045 436 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Haranpur

Approval Date

31-05-2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1046 437 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak Danayal.

Approval Date

31-05-2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1047 438 Name of the Scheme

Rural Water Supply Tibbi Saidan

Approval Date

18-05-2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1048 439 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Sugial

Approval Date

18-05-2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.080

3.284

0.000

0.258

0.000

0.000

0.000

0.258

0.258

0.000

0.000

0.000

0.000

3.950

4.372

0.000

0.171

0.000

0.000

0.000

0.171

0.171

0.000

0.000

0.000

0.000

1.454

1.513

0.000

0.159

0.000

0.000

0.000

0.159

0.159

0.000

0.000

0.000

0.000

7.200

6.426

0.000

1.854

0.000

0.000

0.000

1.854

1.854

0.000

0.000

0.000

0.000

6.200

2.529

0.000

4.601

0.000

0.000

0.000

4.601

4.601

0.000

0.000

0.000

301

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1049 440 Name of the Scheme

Water Suppply Scheme Mehsian

Approval Date

11/5/2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1050 441 Name of the Scheme

Reh: of Rural Water Supply Scheme Salial (Amended)

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1051 442 Name of the Scheme

Reh: of Rural Water Supply Scheme Gurah Amung

Approval Date

31-03-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1052 443 Name of the Scheme

Reh: of Rural Water Supply Scheme Ruper Ramadial

Approval Date

31-03-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1053 444 Name of the Scheme

Rural Water Supply Scheme Dhoke Peero (New Scheme)

Approval Date

31-03-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

12.543

9.549

0.000

4.875

0.000

0.000

0.000

4.875

4.875

0.000

0.000

0.000

0.000

4.086

1.500

0.000

3.199

0.000

0.000

0.000

3.199

3.199

0.000

0.000

0.000

0.000

3.100

3.100

0.000

0.465

0.000

0.000

0.000

0.465

0.465

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

8.944

7.700

0.000

2.586

0.000

0.000

0.000

2.586

2.586

0.000

0.000

0.000

302

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1054 445 Name of the Scheme

Rural Water Supply Scheme Bagrian (New scheme)

Approval Date

31-03-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1055 446 Name of the Scheme

Urban Water Supply Scheme Dina

Approval Date

31-03-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1056 447 Name of the Scheme

Reh: & Aug: of Rural Water Supply Scheme Kotal Kund

Approval Date

31-03-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1057 448 Name of the Scheme

Rural Water Supply Scheme Chamkon Valley Hattar Khair Chanud, Tehsil P.D.Khan (Rs.10.829)

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1058 449 Name of the Scheme

Provision of Pipelines and Machinery Water Supply Schemes, Jalalpur Sharif

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.281

4.500

0.000

2.723

0.000

0.000

0.000

2.723

2.723

0.000

0.000

0.000

0.000

10.000

10.000

0.000

1.500

0.000

0.000

0.000

1.500

1.500

0.000

0.000

0.000

0.000

3.500

3.500

0.000

0.525

0.000

0.000

0.000

0.525

0.525

0.000

0.000

0.000

0.000

10.829

10.470

0.000

1.983

0.000

0.000

0.000

1.983

1.983

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

303

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1059 450 Name of the Scheme

Provision of Pipelines Water Supply Schemes Golepur and its drainage

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1060 451 Name of the Scheme

Provision of Pipelines Water Supply Scheme Wara Phaphra Sammanwal

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1061 452 Name of the Scheme

Water Supply Scheme Khewra

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1062 453 Name of the Scheme

Drainage and Water Supply Scheme for Ahmad Abad

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1063 454 Name of the Scheme

Water Supply Pipe Mouza Kundwal

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

304

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1064 455 Name of the Scheme

Rehabilitation of Well and Pond Thill.

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1065 456 Name of the Scheme

Rural Water Supply scheme Gadari

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

20%

District and Tehsil

Jhelum

1066 457 Name of the Scheme

Provision of Water Supply in Sukheke Town

Approval Date

16-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

76%

District and Tehsil

Hafizabad

1067 458 Name of the Scheme

Extension Water Supply Scheme in Town Kanganpur

Approval Date

13-11-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

73%

District and Tehsil

Kasur

1068 459 Name of the Scheme

Rural Water Supply Scheme Theing More (Ellahabad)

Approval Date

26-02-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

64%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

5.600

0.034

0.000

1.272

0.000

0.000

0.000

1.272

1.272

5.134

0.000

0.000

0.000

19.200

10.200

0.000

6.500

0.000

0.000

0.000

6.500

6.500

5.380

0.000

0.000

0.000

25.872

14.524

0.000

7.300

0.000

0.000

0.000

7.300

7.300

7.929

0.000

0.000

0.000

61.320

26.598

0.000

18.500

0.000

0.000

0.000

18.500

18.500

25.420

0.000

0.000

305

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1069 460 Name of the Scheme

Rural Water Supply Scheme Dolaywala Pull.

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1070 461 Name of the Scheme

Rural Water Supply Todepur.

Approval Date

23-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1071 462 Name of the Scheme

Rural water supply Scheme Jabo Mail

Approval Date

23-08-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1072 463 Name of the Scheme

Rural water supply Scheme Gaggar

Approval Date

21-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1073 464 Name of the Scheme

Rural water supply Scheme Athil pur (Amended)

Approval Date

3/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.729

3.982

0.000

0.306

0.000

0.000

0.000

0.306

0.306

0.000

0.000

0.000

0.000

4.125

4.449

0.000

0.295

0.000

0.000

0.000

0.295

0.295

0.000

0.000

0.000

0.000

7.085

5.653

0.000

2.495

0.000

0.000

0.000

2.495

2.495

0.000

0.000

0.000

0.000

6.700

7.458

0.000

0.247

0.000

0.000

0.000

0.247

0.247

0.000

0.000

0.000

0.000

7.332

7.696

0.000

0.736

0.000

0.000

0.000

0.736

0.736

0.000

0.000

0.000

306

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1074 465 Name of the Scheme

Rural Water Supply Scheme Cheena Arla

Approval Date

25-10-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

72%

District and Tehsil

Kasur

1075 466 Name of the Scheme

Rural Water Supply & Drainage Scheme Mirali Ottar

Approval Date

25-10-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1076 467 Name of the Scheme

Water Suppply Scheme Khankey More

Approval Date

4/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

67%

District and Tehsil

Kasur

1077 468 Name of the Scheme

Water Suppply Scheme Rasool Nagar

Approval Date

4/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1078 469 Name of the Scheme

Water Suppply & Sanitation Scheme Mian Wala

Approval Date

12/9/2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

16.817

9.400

0.000

4.500

0.000

0.000

0.000

4.500

4.500

5.440

0.000

0.000

0.000

9.214

7.601

0.000

2.995

0.000

0.000

0.000

2.995

2.995

0.000

0.000

0.000

0.000

12.258

4.922

0.000

4.500

0.000

0.000

0.000

4.500

4.500

4.675

0.000

0.000

0.000

7.876

6.250

0.000

2.807

0.000

0.000

0.000

2.807

2.807

0.000

0.000

0.000

0.000

6.739

4.000

0.000

3.750

0.000

0.000

0.000

3.750

3.750

0.000

0.000

0.000

307

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1079 470 Name of the Scheme

Water Suppply Scheme Said Pur

Approval Date

12/9/2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

75%

District and Tehsil

Kasur

1080 471 Name of the Scheme

Water Suppply & Sanitation Scheme Dhing Shah (Revised)

Approval Date

3/12/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1081 472 Name of the Scheme

Water Suppply & Sanitation Scheme Saracer Hithar

Approval Date

12/4/2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1082 473 Name of the Scheme

Rural Water Supply & Sewerage/Drainage Scheme Jamber Kalan & Khurd

Approval Date

12/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

51%

District and Tehsil

Kasur

1083 474 Name of the Scheme

Reh: of Water Supply Scheme Khara

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.043

5.450

0.000

2.400

0.000

0.000

0.000

2.400

2.400

2.549

0.000

0.000

0.000

15.530

11.004

0.000

6.856

0.000

0.000

0.000

6.856

6.856

0.000

0.000

0.000

0.000

7.700

7.501

0.000

1.354

0.000

0.000

0.000

1.354

1.354

0.000

0.000

0.000

0.000

57.922

10.000

0.000

23.751

0.000

0.000

0.000

23.751

23.751

32.859

0.000

0.000

0.000

10.967

10.967

0.000

1.645

0.000

0.000

0.000

1.645

1.645

0.000

0.000

0.000

308

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1084 475 Name of the Scheme

Reh: of Water Supply Scheme Hallar Key Pemar

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

64%

District and Tehsil

Kasur

1085 476 Name of the Scheme

Reh: & Augumentation Water Supply Scheme Sheikhum

Approval Date

9/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

68%

District and Tehsil

Kasur

1086 477 Name of the Scheme

Reh: of Water Supply Scheme Rasool Pur

Approval Date

9/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1087 478 Name of the Scheme

Reh: of Water Supply Scheme Joura

Approval Date

9/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

69%

District and Tehsil

Kasur

1088 479 Name of the Scheme

Reh: of Water Supply Scheme Dholan Chak No. 7

Approval Date

22.11.2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

13.015

5.000

0.000

4.600

0.000

0.000

0.000

4.600

4.600

5.367

0.000

0.000

0.000

10.184

3.616

0.000

4.400

0.000

0.000

0.000

4.400

4.400

3.696

0.000

0.000

0.000

6.361

3.316

0.000

3.999

0.000

0.000

0.000

3.999

3.999

0.000

0.000

0.000

0.000

9.067

4.466

0.000

2.700

0.000

0.000

0.000

2.700

2.700

3.261

0.000

0.000

0.000

12.013

12.013

0.000

1.802

0.000

0.000

0.000

1.802

1.802

0.000

0.000

0.000

309

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1089 480 Name of the Scheme

Construction of Oxidation Pond, Sullage Carrier, Pump House installation of Centrifugal Pump etc. in Khai Hithar

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

51%

District and Tehsil

Kasur

1090 481 Name of the Scheme

Rural Water Supply Scheme Katcha Pacca

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

72%

District and Tehsil

Kasur

1091 482 Name of the Scheme

Rural Water Supply Scheme Qila Ganjay

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

78%

District and Tehsil

Kasur

1092 483 Name of the Scheme

Rural Water Supply Scheme Harike Naul

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1093 484 Name of the Scheme

Rural Water Supply Scheme Kotla Sheikh Natha

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

13.373

1.377

0.000

6.500

0.000

0.000

0.000

6.500

6.500

7.502

0.000

0.000

0.000

24.803

14.057

0.000

6.500

0.000

0.000

0.000

6.500

6.500

7.966

0.000

0.000

0.000

22.624

15.117

0.000

5.100

0.000

0.000

0.000

5.100

5.100

5.801

0.000

0.000

0.000

33.576

23.613

0.000

14.999

0.000

0.000

0.000

14.999

14.999

0.000

0.000

0.000

0.000

17.743

15.682

0.000

4.722

0.000

0.000

0.000

4.722

4.722

0.000

0.000

0.000

310

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1094 485 Name of the Scheme

Rural Water Supply Scheme & Drainage Scheme Chah Arror and Adjoining villages in UC Hardo Sahari

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

65%

District and Tehsil

Kasur

1095 486 Name of the Scheme

Rural Water Supply and Drainage Scheme Haveli Budda Singh

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1096 487 Name of the Scheme

Rural Water Supply and Drainage Scheme Bulandi Otar

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

64%

District and Tehsil

Kasur

1097 488 Name of the Scheme

Rural Water Supply and Drainage Scheme Bugry

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Kasur

1098 489 Name of the Scheme

Rural Water Supply & Drainage Scheme Gohar Hittar

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

72%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

91.258

38.336

0.000

30.000

0.000

0.000

0.000

30.000

30.000

36.611

0.000

0.000

0.000

23.614

25.650

0.000

1.506

0.000

0.000

0.000

1.506

1.506

0.000

0.000

0.000

0.000

22.480

7.420

0.000

9.000

0.000

0.000

0.000

9.000

9.000

9.432

0.000

0.000

0.000

20.291

18.682

0.000

4.653

0.000

0.000

0.000

4.653

4.653

0.000

0.000

0.000

0.000

27.262

15.723

0.000

7.000

0.000

0.000

0.000

7.000

7.000

8.628

0.000

0.000

311

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1099 490 Name of the Scheme

Rural Water Supply & Drainage Scheme Fatehpur

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

76%

District and Tehsil

Kasur

1100 491 Name of the Scheme

Comprehensive Rural Water Supply/ Drainage/Sewerage & PCC Streets at Rao Khan Wala

Approval Date

24-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

48%

District and Tehsil

Kasur

1101 492 Name of the Scheme

Rural Water Supply & Drainage Scheme Kanween Jhoke Mallian

Approval Date

4/4/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

51%

District and Tehsil

Kasur

1102 493 Name of the Scheme

Rural Water Supply & Drainage Scheme Bhalla

Approval Date

24-03-2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1103 494 Name of the Scheme

Rural Water Supply & Drainage Scheme Bheela

Approval Date

15-01-2008

Major Components

Sewer System and disposal work etc.

Major Targets

61%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

25.246

15.126

0.000

7.000

0.000

0.000

0.000

7.000

7.000

6.907

0.000

0.000

0.000

59.146

15.000

0.000

17.500

0.000

0.000

0.000

17.500

17.500

35.518

0.000

0.000

0.000

50.380

15.000

0.000

14.500

0.000

0.000

0.000

14.500

14.500

28.437

0.000

0.000

0.000

16.017

14.570

0.000

3.850

0.000

0.000

0.000

3.850

3.850

0.000

0.000

0.000

0.000

25.697

14.904

0.000

3.000

0.000

0.000

0.000

3.000

3.000

11.648

0.000

0.000

312

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1104 495 Name of the Scheme

Rural Water Supply & Drainage Scheme Kotli Rai Abu Bakkar

Approval Date

28-03-2009

Major Components

Sewer System and disposal work etc.

Major Targets

45%

District and Tehsil

Kasur

1105 496 Name of the Scheme

Rural Water Supply & Drainage Scheme Kaisar Garh (Amended)

Approval Date

3/12/2009

Major Components

Sewer System and disposal work etc.

Major Targets

27%

District and Tehsil

Kasur

1106 497 Name of the Scheme

Water Supply Scheme Rakh Chunian UC City one Chunian

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

42%

District and Tehsil

Kasur

1107 498 Name of the Scheme

Water Supply Scheme Wah kharan UC Wah Kharan

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

42%

District and Tehsil

Kasur

1108 499 Name of the Scheme

Extension Water Supply Scheme Padhrar & Muqam

Approval Date

24-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

42.550

18.974

0.000

3.000

0.000

0.000

0.000

3.000

3.000

26.959

0.000

0.000

0.000

17.138

2.300

0.000

3.000

0.000

0.000

0.000

3.000

3.000

14.409

0.000

0.000

0.000

2.500

0.200

0.000

1.000

0.000

0.000

0.000

1.000

1.000

1.675

0.000

0.000

0.000

2.500

0.200

0.000

1.000

0.000

0.000

0.000

1.000

1.000

1.675

0.000

0.000

0.000

12.091

9.588

0.000

4.317

0.000

0.000

0.000

4.317

4.317

0.000

0.000

0.000

313

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1109 500 Name of the Scheme

Rural Water Supply Scheme Uttra

Approval Date

1/9/2005

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1110 501 Name of the Scheme

Rural Water Supply Scheme and New Sewerage Drainage Scheme Gunjial

Approval Date

12/10/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

56%

District and Tehsil

Khushab

1111 502 Name of the Scheme

Rural Water Supply Scheme Khagli Sheikhu

Approval Date

12/3/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1112 503 Name of the Scheme

Water Supply Scheme Jaba (Rehb)

Approval Date

12/3/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

39%

District and Tehsil

Khushab

1113 504 Name of the Scheme

Reh: of Rural Water Supply Scheme Khaliqabad

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.230

9.853

0.000

1.912

0.000

0.000

0.000

1.912

1.912

0.000

0.000

0.000

0.000

41.604

10.753

0.000

16.000

0.000

0.000

0.000

16.000

16.000

21.092

0.000

0.000

0.000

7.755

7.600

0.000

1.318

0.000

0.000

0.000

1.318

1.318

0.000

0.000

0.000

0.000

16.568

5.480

0.000

2.000

0.000

0.000

0.000

2.000

2.000

11.573

0.000

0.000

0.000

4.614

4.700

0.000

0.606

0.000

0.000

0.000

0.606

0.606

0.000

0.000

0.000

314

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1114 505 Name of the Scheme

Imp: & Ext: & Reh: of Rural Water Supply Scheme Khabaki (Derajat) Dhok Maken

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1115 506 Name of the Scheme

Reh: of Rural Water Supply Scheme Jasowal (Derajat)

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1116 507 Name of the Scheme

Reh: of Rural Water Supply Scheme Dhamman

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1117 508 Name of the Scheme

Reh: of Rural Water Supply Scheme Chowi

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1118 509 Name of the Scheme

Reh: of Rural Water Supply Scheme Nali

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.916

4.000

0.000

0.503

0.000

0.000

0.000

0.503

0.503

0.000

0.000

0.000

0.000

2.767

2.857

0.000

0.325

0.000

0.000

0.000

0.325

0.325

0.000

0.000

0.000

0.000

5.055

5.150

0.000

0.663

0.000

0.000

0.000

0.663

0.663

0.000

0.000

0.000

0.000

3.842

3.900

0.000

0.518

0.000

0.000

0.000

0.518

0.518

0.000

0.000

0.000

0.000

4.986

5.000

0.000

0.734

0.000

0.000

0.000

0.734

0.734

0.000

0.000

0.000

315

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1119 510 Name of the Scheme

Reh:/Imp: of Rural Water Supply Scheme Warcha

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1120 511 Name of the Scheme

Reh:/Imp: of Rural Water Supply Scheme Bandial

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1121 512 Name of the Scheme

Reh:/Imp: of Rural Water Supply Scheme Okhali Mohla

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1122 513 Name of the Scheme

Reh:/Imp: of Rural Water Supply Scheme Chowa

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1123 514 Name of the Scheme

Reh:/Imp: of Rural Water Supply Scheme Chak No. 5-TDA

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.810

2.837

0.000

0.395

0.000

0.000

0.000

0.395

0.395

0.000

0.000

0.000

0.000

8.143

8.000

0.000

1.364

0.000

0.000

0.000

1.364

1.364

0.000

0.000

0.000

0.000

2.408

2.500

0.000

0.269

0.000

0.000

0.000

0.269

0.269

0.000

0.000

0.000

0.000

4.473

4.500

0.000

0.644

0.000

0.000

0.000

0.644

0.644

0.000

0.000

0.000

0.000

4.905

5.000

0.000

0.641

0.000

0.000

0.000

0.641

0.641

0.000

0.000

0.000

316

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1124 515 Name of the Scheme

Reh:/Imp: of Rural Water Supply Scheme Quaidabad

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

82%

District and Tehsil

Khushab

1125 516 Name of the Scheme

Reh: of Rural Water Supply Scheme Joyia

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1126 517 Name of the Scheme

Reh: of Rural Water Supply Scheme Sarfraz Colony, Jauharabad

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1127 518 Name of the Scheme

Reh: of Rural Water Supply Scheme Namewali & Thathi Kalrani

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1128 519 Name of the Scheme

Reh:/Imp: of Rural Water Supply Scheme Rangpur Baghoor

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

78%

District and Tehsil

Khushab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.685

4.000

0.000

5.138

0.000

0.000

0.000

5.138

5.138

2.000

0.000

0.000

0.000

6.395

6.500

0.000

0.854

0.000

0.000

0.000

0.854

0.854

0.000

0.000

0.000

0.000

5.213

5.300

0.000

0.695

0.000

0.000

0.000

0.695

0.695

0.000

0.000

0.000

0.000

2.120

2.200

0.000

0.238

0.000

0.000

0.000

0.238

0.238

0.000

0.000

0.000

0.000

20.000

12.790

0.000

5.100

0.000

0.000

0.000

5.100

5.100

5.110

0.000

0.000

317

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1129 520 Name of the Scheme

Reh:/Imp: of Rural Water Supply Scheme Adhi Kot

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Khushab

1130 521 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Kukkar Hatta

Approval Date

16.1.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair of OHR etc.

Major Targets

100%

District and Tehsil

Khanewal , Kabirwala

1131 522 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Shamkot

Approval Date

16.1.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair of OHR etc.

Major Targets

100%

District and Tehsil

Khanewal

1132 523 Name of the Scheme

Rehabilitation Rural Water Supply Scheme, Chak No.125/15-L

Approval Date

3.12.08

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair of OHR etc.

Major Targets

100%

District and Tehsil

Khanewal , M/channu.

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.644

3.700

0.000

0.491

0.000

0.000

0.000

0.491

0.491

0.000

0.000

0.000

0.000

4.993

3.300

0.000

2.442

0.000

0.000

0.000

2.442

2.442

0.000

0.000

0.000

0.000

4.469

2.200

0.000

2.939

0.000

0.000

0.000

2.939

2.939

0.000

0.000

0.000

0.000

8.290

8.290

0.000

1.244

0.000

0.000

0.000

1.244

1.244

0.000

0.000

0.000

318

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1133 524 Name of the Scheme

Rehabilitation Rural Water Supply Scheme, Chak No.80/10-R

Approval Date

16.1.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair of OHR etc.

Major Targets

100%

District and Tehsil

Khanewal

1134 525 Name of the Scheme

Rehabilitation Rural Water Supply Scheme, Chak No.7/8-AR Satt karmaliwala

Approval Date

16.1.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair of OHR etc.

Major Targets

100%

District and Tehsil

Khanewal , M/channu.

1135 526 Name of the Scheme

Rehabilitation Rural Water Supply Scheme, Chak No.6-AH/7V

Approval Date

16.02.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair of other works etc.

Major Targets

100%

District and Tehsil

Khanewal

1136 527 Name of the Scheme

Rehabilitation Rural Water Supply Scheme, Chak No.19/9-R (East)

Approval Date

16.02.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair ofother works etc.

Major Targets

100%

District and Tehsil

Khanewal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.349

7.349

0.000

1.102

0.000

0.000

0.000

1.102

1.102

0.000

0.000

0.000

0.000

3.514

3.514

0.000

0.527

0.000

0.000

0.000

0.527

0.527

0.000

0.000

0.000

0.000

7.144

2.000

0.000

6.216

0.000

0.000

0.000

6.216

6.216

0.000

0.000

0.000

0.000

2.672

2.672

0.000

0.401

0.000

0.000

0.000

0.401

0.401

0.000

0.000

0.000

319

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1137 528 Name of the Scheme

Rehabilitation Rural Water Supply Scheme, Chak No.19/9-R (West)

Approval Date

16.02.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair ofother works etc.

Major Targets

100%

District and Tehsil

Khanewal

1138 529 Name of the Scheme

Rehabilitation Rural Water Supply Scheme, Chak No.15/8-R

Approval Date

16.02.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair ofother works etc.

Major Targets

100%

District and Tehsil

Khanewal

1139 530 Name of the Scheme

Rehabilitation Rural Water Supply Scheme, Thatta Sadiqabad

Approval Date

16.02.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair ofother works etc.

Major Targets

56%

District and Tehsil

Khanewal , Jahanian

1140 531 Name of the Scheme

Rural Water Supply & Drainage Scheme,Chak No.54/15-L

Approval Date

16.02.09

Major Components

Repair of B/wall,repair of P.Machinery,Repair of P/House, Repair ofother works etc.

Major Targets

45%

District and Tehsil

Khanewal , M/channu.

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.915

2.000

0.000

1.352

0.000

0.000

0.000

1.352

1.352

0.000

0.000

0.000

0.000

1.440

1.300

0.000

0.356

0.000

0.000

0.000

0.356

0.356

0.000

0.000

0.000

0.000

18.841

5.000

0.000

7.200

0.000

0.000

0.000

7.200

7.200

9.467

0.000

0.000

0.000

21.422

2.000

0.000

9.100

0.000

0.000

0.000

9.100

9.100

13.535

0.000

0.000

320

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1141 532 Name of the Scheme

Urban Water Supply & Sewerage / Drainage Scheme, Sultan Town (Revised)

Approval Date

9/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Lahore

1142 533 Name of the Scheme

Rural Water Supply Scheme Kamahan

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Lahore

1143 534 Name of the Scheme

Rural Water Supply Scheme Satto Katla

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Lahore

1144 535 Name of the Scheme

Ext. Urban Water Supply Scheme Raiwind

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Lahore

1145 536 Name of the Scheme

Rural Water Supply Scheme,Chak No.251/WB

Approval Date

May,07

Major Components

T.well,P.Machinery,House, R.Main & D and OHR etc.

Major Targets

100%

District and Tehsil

Lodhran , dunya pur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

18.100

9.500

0.000

11.315

0.000

0.000

0.000

11.315

11.315

0.000

0.000

0.000

0.000

6.734

6.774

0.000

0.970

0.000

0.000

0.000

0.970

0.970

0.000

0.000

0.000

0.000

9.994

9.930

0.000

1.563

0.000

0.000

0.000

1.563

1.563

0.000

0.000

0.000

0.000

7.000

6.835

0.000

1.215

0.000

0.000

0.000

1.215

1.215

0.000

0.000

0.000

0.000

7.368

6.385

0.000

2.088

0.000

0.000

0.000

2.088

2.088

0.000

0.000

0.000

321

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1146 537 Name of the Scheme

Rural Water Supply Scheme,Chak No.301/WB

Approval Date

April,2007

Major Components

T.well,P.Machinery,House, R.Main & D and OHR etc.

Major Targets

100%

District and Tehsil

Lodhran , dunya pur

1147 538 Name of the Scheme

Reh: Water Supply Scheme Bohar Bogay Shah

Approval Date

6.12.08

Major Components

T.well,P.Machinery,House, R.Main & D and OHR etc.

Major Targets

100%

District and Tehsil

Lodhran

1148 539 Name of the Scheme

Water Supply Scheme Chak No.54/M

Approval Date

6.12.08

Major Components

T.well,P.Machinery,House, R.Main & D and OHR etc.

Major Targets

100%

District and Tehsil

Lodhran

1149 540 Name of the Scheme

Water Supply Scheme Chak No.51/M

Approval Date

6.12.08

Major Components

T.well,P.Machinery,House, R.Main & D and OHR etc.

Major Targets

100%

District and Tehsil

Lodhran

1150 541 Name of the Scheme

Rural Water Supply Scheme Chak No.343/WB

Approval Date

21.3.2009

Major Components

T.well,P.Machinery,House, R.Main & D and OHR etc.

Major Targets

60%

District and Tehsil

Lodhran , dunya pur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.230

7.796

0.000

1.669

0.000

0.000

0.000

1.669

1.669

0.000

0.000

0.000

0.000

8.861

3.500

0.000

6.690

0.000

0.000

0.000

6.690

6.690

0.000

0.000

0.000

0.000

5.046

4.600

0.000

1.203

0.000

0.000

0.000

1.203

1.203

0.000

0.000

0.000

0.000

8.520

4.700

0.000

5.098

0.000

0.000

0.000

5.098

5.098

0.000

0.000

0.000

0.000

15.917

5.000

0.000

6.000

0.000

0.000

0.000

6.000

6.000

7.305

0.000

0.000

322

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1151 542 Name of the Scheme

Rural Water Supply Scheme Chak No.279/WB

Approval Date

21.3.2009

Major Components

T.well,P.Machinery,House, R.Main & D and OHR etc.

Major Targets

100%

District and Tehsil

Lodhran , dunya pur

1152 543 Name of the Scheme

Rural Water Supply Scheme Chak No.233/WB

Approval Date

21.3.2009

Major Components

T.well,P.Machinery,House, R.Main & D and OHR etc.

Major Targets

100%

District and Tehsil

Lodhran , dunya pur

1153 544 Name of the Scheme

Ext: & Reh: of Rural Water Supply Scheme Jalla Arrian

Approval Date

Approved

Major Components

T.well,P.Machinery,House, R.Main & D and OHR etc.

Major Targets

35%

District and Tehsil

Lodhran , dunya pur

1154 545 Name of the Scheme

Provision of water filtration plant in Pindi Bhauddin Mojianwala and Rakh Baloch (3 Nos.)

Approval Date

7/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1155 546 Name of the Scheme

Provision of water filtration plant in Shaheedanwali Chillianwala Station

Approval Date

7/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mandi Bahauddin

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

11.793

5.000

0.000

8.562

0.000

0.000

0.000

8.562

8.562

0.000

0.000

0.000

0.000

13.945

6.423

0.000

9.614

0.000

0.000

0.000

9.614

9.614

0.000

0.000

0.000

0.000

30.000

6.950

0.000

5.000

0.000

0.000

0.000

5.000

5.000

22.550

0.000

0.000

0.000

2.250

2.250

0.000

0.338

0.000

0.000

0.000

0.338

0.338

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

323

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1156 547 Name of the Scheme

Pilot Project for supply of Safe/Clean Drinking water through Deep Bored Hand Pumps in selected villages

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1157 548 Name of the Scheme

Water Supply/Sewerage/PCC Streets & Drains Mandi Bahauddin City

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1158 549 Name of the Scheme

Provision of Water Filtration Plants in Sohawa Bolani, Jumlani

Approval Date

7/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1159 550 Name of the Scheme

Rural Water Supply & Drainage Scheme Chimmo, District M.B.Din. (Revised)

Approval Date

27-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mandi Bahauddin

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

4.000

4.000

0.000

0.600

0.000

0.000

0.000

0.600

0.600

0.000

0.000

0.000

0.000

2.200

2.200

0.000

0.330

0.000

0.000

0.000

0.330

0.330

0.000

0.000

0.000

0.000

23.280

16.777

0.000

9.995

0.000

0.000

0.000

9.995

9.995

0.000

0.000

0.000

324

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1160 551 Name of the Scheme

Rural Water Supply & Sewerage / Drainage Scheme Harria

Approval Date

19-09-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

25%

District and Tehsil

Mandi Bahauddin

1161 552 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Dedowal Karandi

Approval Date

26-02-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1162 553 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chidroo (Revised)

Approval Date

3/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1163 554 Name of the Scheme

Rural Water Supply Scheme , Wandha Karak.

Approval Date

4/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1164 555 Name of the Scheme

Rural Water Supply Scheme , Qataal Khel, Isa Khel.

Approval Date

20-08-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

18.890

0.500

0.000

5.000

0.000

0.000

0.000

5.000

5.000

16.224

0.000

0.000

0.000

3.639

3.492

0.000

0.693

0.000

0.000

0.000

0.693

0.693

0.000

0.000

0.000

0.000

6.742

3.969

0.000

3.784

0.000

0.000

0.000

3.784

3.784

0.000

0.000

0.000

0.000

6.078

5.469

0.000

1.521

0.000

0.000

0.000

1.521

1.521

0.000

0.000

0.000

0.000

4.287

3.133

0.000

1.797

0.000

0.000

0.000

1.797

1.797

0.000

0.000

0.000

325

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1165 556 Name of the Scheme

Reh: of Water Supply Scheme Tabbisar (Mesaranwala)

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1166 557 Name of the Scheme

Reh: of Water Supply Scheme Tola Bhangikhel

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1167 558 Name of the Scheme

Reh: of Water Supply Scheme Behu Sayyanda

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1168 559 Name of the Scheme

Reh: of Water Supply Scheme Chappri/Chappri Thal

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1169 560 Name of the Scheme

Reh: of Water Supply Scheme Sultankhel Sharqi/Gharbi i/c City

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.896

4.876

0.000

0.754

0.000

0.000

0.000

0.754

0.754

0.000

0.000

0.000

0.000

4.986

4.998

0.000

0.736

0.000

0.000

0.000

0.736

0.736

0.000

0.000

0.000

0.000

3.026

3.030

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

3.045

3.045

0.000

0.457

0.000

0.000

0.000

0.457

0.457

0.000

0.000

0.000

0.000

3.939

3.937

0.000

0.593

0.000

0.000

0.000

0.593

0.593

0.000

0.000

0.000

326

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1170 561 Name of the Scheme

Reh: of Water Supply Scheme Kaloor surrounding Abadies

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1171 562 Name of the Scheme

Reh: of Water Supply Scheme Nawan

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1172 563 Name of the Scheme

Reh: of Water Supply Scheme Dhok Peera

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1173 564 Name of the Scheme

Reh: of Water Supply Scheme Dhoke Miani

Approval Date

11/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1174 565 Name of the Scheme

Reh: of Water Supply Scheme Thamey Wali

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.500

3.500

0.000

0.525

0.000

0.000

0.000

0.525

0.525

0.000

0.000

0.000

0.000

0.600

0.600

0.000

0.090

0.000

0.000

0.000

0.090

0.090

0.000

0.000

0.000

0.000

2.550

2.550

0.000

0.383

0.000

0.000

0.000

0.383

0.383

0.000

0.000

0.000

0.000

2.550

2.550

0.000

0.383

0.000

0.000

0.000

0.383

0.383

0.000

0.000

0.000

0.000

1.200

1.200

0.000

0.180

0.000

0.000

0.000

0.180

0.180

0.000

0.000

0.000

327

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1175 566 Name of the Scheme

Reh: of Water Supply Scheme Thathi Miana

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1176 567 Name of the Scheme

Reh: of Water Supply Scheme Bhariunwala

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1177 568 Name of the Scheme

Reh: of Water Supply Scheme Rokhari (Extension)

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1178 569 Name of the Scheme

Reh: of Water Supply Scheme Dhoke Shatala

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1179 570 Name of the Scheme

Rehabilitation of Water Supply Scheme Samandi Wala U.C.Abbad Khel

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.000

6.000

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

0.000

3.500

3.500

0.000

0.525

0.000

0.000

0.000

0.525

0.525

0.000

0.000

0.000

0.000

0.800

0.800

0.000

0.120

0.000

0.000

0.000

0.120

0.120

0.000

0.000

0.000

0.000

2.244

2.244

0.000

0.337

0.000

0.000

0.000

0.337

0.337

0.000

0.000

0.000

0.000

3.517

3.517

0.000

0.528

0.000

0.000

0.000

0.528

0.528

0.000

0.000

0.000

328

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1180 571 Name of the Scheme

Rehabilitation of Water Supply Scheme Sarwar Chowk with other allied Dera Jats

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1181 572 Name of the Scheme

Rehabilitation of Water Supply Scheme Ali Haider Noor U.C.Chidroo

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1182 573 Name of the Scheme

Rehabilitation of Water Supply Scheme Lalu Khel, U.C.Chidroo

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1183 574 Name of the Scheme

Rehabilitation of Water Supply Scheme Lalu Khel, UC Abbaa Khel

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1184 575 Name of the Scheme

Rural Water Supply Scheme Chak No.7/MR, 9/MR, 12/MR, 13/MR, 14/MR & Khanpur Marral

Approval Date

03.04.2007

Major Components

T/Well, Machinery, R/Main & D/System

Major Targets

71%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.191

3.191

0.000

0.479

0.000

0.000

0.000

0.479

0.479

0.000

0.000

0.000

0.000

3.550

3.550

0.000

0.533

0.000

0.000

0.000

0.533

0.533

0.000

0.000

0.000

0.000

2.014

2.014

0.000

0.302

0.000

0.000

0.000

0.302

0.302

0.000

0.000

0.000

0.000

2.089

2.089

0.000

0.313

0.000

0.000

0.000

0.313

0.313

0.000

0.000

0.000

0.000

57.398

41.773

0.000

4.811

0.000

0.000

0.000

4.811

4.811

19.424

0.000

0.000

329

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1185 576 Name of the Scheme

Rural Water Supply Scheme Basti Khuro Wala Khu Basti Lilheer, Basti Sairwala, Basti Nawab, Basti Phaore, UC Alipur Saddat

Approval Date

03.04.07

Major Components

T/Well, Machinery, R/Main & D/System

Major Targets

100%

District and Tehsil

Multan

1186 577 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Gulzarpur Jumanwali

Approval Date

19.02.2009

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

75%

District and Tehsil

Multan

1187 578 Name of the Scheme

Construction of Water Supply Scheme, in Chak No.15/F & Azafi Abadi.

Approval Date

Approved

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

68%

District and Tehsil

Multan

1188 579 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Sikandarabad

Approval Date

19.02.09

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.041

5.985

0.000

2.112

0.000

0.000

0.000

2.112

2.112

0.000

0.000

0.000

0.000

6.892

2.000

0.000

3.926

0.000

0.000

0.000

3.926

3.926

2.000

0.000

0.000

0.000

8.300

2.000

0.000

4.500

0.000

0.000

0.000

4.500

4.500

3.045

0.000

0.000

0.000

4.300

2.000

0.000

2.945

0.000

0.000

0.000

2.945

2.945

0.000

0.000

0.000

330

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1189 580 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Koti Nijabat

Approval Date

Approved

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

100%

District and Tehsil

Multan

1190 581 Name of the Scheme

New Rural Water Supply Scheme Hayyat Khan Wala UC Basti Mithu

Approval Date

Approved

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

100%

District and Tehsil

Multan

1191 582 Name of the Scheme

New Rural Water Supply Scheme at Jalal Pur Road to Choki Canal Gajju Hatta

Approval Date

Approved

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

100%

District and Tehsil

Multan

1192 583 Name of the Scheme

Rehabilitation of Rural Water Supply scheme Rasulpur

Approval Date

Approved

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.190

4.190

0.000

0.629

0.000

0.000

0.000

0.629

0.629

0.000

0.000

0.000

0.000

7.760

7.760

0.000

1.164

0.000

0.000

0.000

1.164

1.164

0.000

0.000

0.000

0.000

8.160

8.160

0.000

1.224

0.000

0.000

0.000

1.224

1.224

0.000

0.000

0.000

0.000

1.080

1.080

0.000

0.162

0.000

0.000

0.000

0.162

0.162

0.000

0.000

0.000

331

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1193 584 Name of the Scheme

Rural Water Supply scheme Lutaf Pur

Approval Date

19.02.09

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

54%

District and Tehsil

Multan

1194 585 Name of the Scheme

Ext: Rural Water Supply scheme That Ghalwan

Approval Date

24.03.09

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

100%

District and Tehsil

Multan

1195 586 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Chak No.63/M & 69/M

Approval Date

22.04.2009

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

106%

District and Tehsil

Multan , JalalpurPirwala

1196 587 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Chak No.65/M,70/M,71/M Jalalpur Pirwala

Approval Date

19.02.09

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

100%

District and Tehsil

Multan , JalalpurPirwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

13.224

4.000

0.000

4.208

0.000

0.000

0.000

4.208

4.208

7.000

0.000

0.000

0.000

2.061

2.061

0.000

0.309

0.000

0.000

0.000

0.309

0.309

0.000

0.000

0.000

0.000

3.710

3.920

0.000

0.588

0.000

0.000

0.000

0.588

0.588

0.000

0.000

0.000

0.000

6.172

3.416

0.000

3.682

0.000

0.000

0.000

3.682

3.682

0.000

0.000

0.000

332

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1197 588 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Chak No.77/M

Approval Date

19.02.09

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

126%

District and Tehsil

Multan , JalalpurPirwala

1198 589 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Munirabad Rasulpur

Approval Date

19.02.2009

Major Components

Repair of Machinery,Electric Connection,R.Main and Distribution system.

Major Targets

100%

District and Tehsil

Multan , Sadiqabad abad

1199 590 Name of the Scheme

Ext.& Improvement of Rural Water Supply Scheme Makdoom Rasheed Phase-I

Approval Date

19.2.09

Major Components

Repair of Machinery,Electric Connection,R.Main and Distribution system.

Major Targets

48%

District and Tehsil

Multan , Sadiqabad abad

1200 591 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Jehangirabad

Approval Date

Approved

Major Components

Repair of Machinery,Electric Connection,R.Main and Distribution system.

Major Targets

38%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.355

3.355

0.000

1.500

0.000

0.000

0.000

1.500

1.500

0.000

0.000

0.000

0.000

2.280

1.080

0.000

1.542

0.000

0.000

0.000

1.542

1.542

0.000

0.000

0.000

0.000

10.000

2.000

0.000

3.500

0.000

0.000

0.000

3.500

3.500

6.000

0.000

0.000

0.000

8.000

2.000

0.000

1.500

0.000

0.000

0.000

1.500

1.500

5.700

0.000

0.000

333

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1201 592 Name of the Scheme

Rehabilitation Rural Water Supply Scheme Ailampur

Approval Date

Approved

Major Components

Repair of Machinery,Electric Connection,R.Main and Distribution system.

Major Targets

100%

District and Tehsil

Multan

1202 593 Name of the Scheme

Purification Plants 3 Nos. alongwith 1 No. turbine & Rising Main of Multan Darwaza City & UC No95 & 96 Tehsil Shujaabad

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1203 594 Name of the Scheme

Purification Plant 2 Nos. in UC 110 (Gardezpur)

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1204 595 Name of the Scheme

Purification Plants UC 100 Shah Pur

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1205 596 Name of the Scheme

Purification Plants UC 101 Gajju Hattu

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.300

0.095

0.000

0.250

0.000

0.000

0.000

0.250

0.250

0.000

0.000

0.000

0.000

6.628

6.628

0.000

0.994

0.000

0.000

0.000

0.994

0.994

0.000

0.000

0.000

0.000

2.100

2.100

0.000

0.315

0.000

0.000

0.000

0.315

0.315

0.000

0.000

0.000

0.000

1.051

1.051

0.000

0.158

0.000

0.000

0.000

0.158

0.158

0.000

0.000

0.000

0.000

0.951

0.951

0.000

0.143

0.000

0.000

0.000

0.143

0.143

0.000

0.000

0.000

334

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1206 597 Name of the Scheme

Purification Plants UC 102 Basti Mithu

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1207 598 Name of the Scheme

Purification Plants UC 103 Raja Ram

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1208 599 Name of the Scheme

Purification Plants UC 104 Kotli Nija bat

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1209 600 Name of the Scheme

Installation of Purification Plant in Basti Durana Langhana UC-56

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1210 601 Name of the Scheme

Installation of Purification Plant in Basti Shor Kot UC-56

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.051

1.051

0.000

0.158

0.000

0.000

0.000

0.158

0.158

0.000

0.000

0.000

0.000

1.051

1.051

0.000

0.158

0.000

0.000

0.000

0.158

0.158

0.000

0.000

0.000

0.000

1.051

1.051

0.000

0.158

0.000

0.000

0.000

0.158

0.158

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

335

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1211 602 Name of the Scheme

Installation of Purification Plant in Basti Haji Pur UC-56

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1212 603 Name of the Scheme

Installation of Purification Plant in Basti Shari Pura UC-56

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1213 604 Name of the Scheme

Installation of Purification Plant in Basti Mansoor Nagar 5 Marlan Scheme Mati Tal UC-56

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1214 605 Name of the Scheme

Installation of Purification Plant in Basti 5 Marla Scheme Multan Public School Road Multan UC-56

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1215 606 Name of the Scheme

Installation of Purification Plant in Basti Mustafa Abad Mouza Boa Pur, UC-56

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

336

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1216 607 Name of the Scheme

Installation of Purification Plant in Basti Bahawalpur UC-56

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1217 608 Name of the Scheme

Installation of Purification Plant in Basti Rajapur, UC-57

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1218 609 Name of the Scheme

Installation of Purification Plant in Basti Khalique Pura, UC-57

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1219 610 Name of the Scheme

Installation of Purification Plant in Basti Qadirabad UC-57

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1220 611 Name of the Scheme

Installation of Purification Plant in Basti Ameer Abad, UC-58

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

337

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1221 612 Name of the Scheme

Installation of Purification Plant in Shah Town, UC-58

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1222 613 Name of the Scheme

Installation of Purification Plant in Graiy Wala UC-59

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1223 614 Name of the Scheme

Installation of Purification Plant in Basti Muhammad Pura UC-59

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1224 615 Name of the Scheme

Installation of Purification Plant in Basti Dheriban UC-59

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1225 616 Name of the Scheme

Installation of Purification Plant in Basti Tajpur Sandila UC-59

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

338

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1226 617 Name of the Scheme

Installation of Purification Plant in Basti Nawab Pur Khas, UC-60

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1227 618 Name of the Scheme

Installation of Purification Plant in Chak Mahni UC-60

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1228 619 Name of the Scheme

Installation of Purification Plant in Basti Salehmhey UC-61

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1229 620 Name of the Scheme

Installation of Purification Plant in Basti Nandla UC-61

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1230 621 Name of the Scheme

Installation of Purification Plant in Basti Noo, UC-61

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

339

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1231 622 Name of the Scheme

Installation of Purification Plant in Basti Bahawalpur / Labar UC-61

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1232 623 Name of the Scheme

Installation of Purification Plant in Basti Sadiq Abad UC-62

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1233 624 Name of the Scheme

Installation of Purification Plant in Basti Yaara Wala UC-62

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1234 625 Name of the Scheme

Installation of Purification Plant in Basti Sardar Pur UC-62

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1235 626 Name of the Scheme

Installation of Purification Plant in Basti Tahir Pur UC-62

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

340

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1236 627 Name of the Scheme

Installation of Purification Plant in Basti Anayat Pur UC-63

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1237 628 Name of the Scheme

Installation of Purification Plant in Basti Pakay Wala UC-63

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1238 629 Name of the Scheme

Installation of Purification Plant in Basti Bosan Otar UC-64

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1239 630 Name of the Scheme

Installation of Purification Plant in Basti Jhok Wains Parli, UC-64

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1240 631 Name of the Scheme

Installation of Purification Plant in Basti Matay Hatti UC-64

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

341

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1241 632 Name of the Scheme

Installation of Purification Plant in Basti Jhok Wains Warali, Uc-64

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1242 633 Name of the Scheme

Installation of Purification Plant in Basti Alim Pur UC-65

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1243 634 Name of the Scheme

Installation of Purification Plant in Basti Rasool Pur, UC-65

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1244 635 Name of the Scheme

Installation of Purification Plant in Basti Khdal UC-65

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1245 636 Name of the Scheme

Installation of Purification Plant in Basti Chawan, UC-65

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

342

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1246 637 Name of the Scheme

Installation of Purification Plant in Basti Jal Wala UC-67

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1247 638 Name of the Scheme

Installation of Purification Plant in Basti Syed Wala, UC-67

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1248 639 Name of the Scheme

Installation of Purification Plant in Basti Mattital, UC-67

Approval Date

26.05.2009

Major Components

Civil Works & Machinery etc

Major Targets

100%

District and Tehsil

Multan

1249 640 Name of the Scheme

Rural Water Supply Scheme, Shah Jamal (Revised)

Approval Date

27.8.08

Major Components

T/well, Rising Main,D/system, OHR, P/M , Pump Houses etc.

Major Targets

100%

District and Tehsil

Muzaffargarh

1250 641 Name of the Scheme

Rural Water Supply Scheme, Chak No.132-133/ML

Approval Date

25.06.06

Major Components

T/well, Rising Main,D/system, OHR, P/M , Pump Houses etc.

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

31.985

28.199

0.000

8.584

0.000

0.000

0.000

8.584

8.584

0.000

0.000

0.000

0.000

7.693

6.500

0.000

2.347

0.000

0.000

0.000

2.347

2.347

0.000

0.000

0.000

343

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1251 642 Name of the Scheme

Rural Water Supply Scheme,Khanpur Shumali,

Approval Date

4.9.07

Major Components

T/well, Rising Main,D/system, OHR, P/M , Pump Houses etc.

Major Targets

100%

District and Tehsil

Muzaffargarh

1252 643 Name of the Scheme

Provision of Water Supply at Poli UC Fateh Pur

Approval Date

24.02.09

Major Components

T/well, Rising Main,D/system, OHR, P/M , Pump Houses etc.

Major Targets

86%

District and Tehsil

Muzaffargarh

1253 644 Name of the Scheme

Rural Water Supply Scheme Bhemaywala

Approval Date

Approved

Major Components

T/well, Rising Main,D/system, OHR, P/M , Pump Houses etc.

Major Targets

100%

District and Tehsil

Muzaffargarh

1254 645 Name of the Scheme

Construction of Water Filtration Plant Mouza Hassan Pur Tarund UC Manka Phulta Identified by Sardar Hashim Khan Bhutta

Approval Date

30.05.2009

Major Components

T/well, Rising Main,D/system, OHR, P/M , Pump Houses etc.

Major Targets

100%

District and Tehsil

Muzaffargarh

1255 646 Name of the Scheme

Rural Water Supply Scheme Saraj

Approval Date

31-01-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

26.296

22.931

0.000

7.309

0.000

0.000

0.000

7.309

7.309

0.000

0.000

0.000

0.000

10.667

4.700

0.000

5.867

0.000

0.000

0.000

5.867

5.867

1.700

0.000

0.000

0.000

4.819

4.819

0.000

0.700

0.000

0.000

0.000

0.700

0.700

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

5.935

5.781

0.000

1.044

0.000

0.000

0.000

1.044

1.044

0.000

0.000

0.000

344

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1256 647 Name of the Scheme

Ext: Rural Water Supply Scheme Nonar (Revised)

Approval Date

19-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

67%

District and Tehsil

Narowal

1257 648 Name of the Scheme

Rural Water Supply Maddo Kahlwan & Shamshair Pur (NA117)

Approval Date

6/11/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Narowal

1258 649 Name of the Scheme

Rural Water Supply Rayya Khas

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.926

5.216

0.000

0.900

0.000

0.000

0.000

0.900

0.900

2.999

0.000

0.000

0.000

6.220

4.830

0.000

2.323

0.000

0.000

0.000

2.323

2.323

0.000

0.000

0.000

0.000

5.243

3.513

0.000

2.516

0.000

0.000

0.000

2.516

2.516

0.000

0.000

0.000

0.000

9.076

8.273

0.000

2.164

0.000

0.000

0.000

2.164

2.164

0.000

0.000

0.000

0.000

5.320

5.299

0.000

0.819

0.000

0.000

0.000

0.819

0.819

0.000

0.000

0.000

(NA-117) Approval Date

6/11/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Narowal

1259 650 Name of the Scheme

Rural Water Supply Scheme Boobak Murali

Approval Date

1/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Narowal

1260 651 Name of the Scheme

Rural Water Supply Scheme Lalah

Approval Date

17-09-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Narowal

345

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1261 652 Name of the Scheme

Rural Water Supply Scheme Tapiala

Approval Date

1/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Narowal

1262 653 Name of the Scheme

Rural Water Supply Scheme Sangial

Approval Date

17-09-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Narowal

1263 654 Name of the Scheme

Rural Water Supply Scheme Chahal Sarjal

Approval Date

1/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Narowal

1264 655 Name of the Scheme

Rural Water Supply Scheme Chahar Bhatti Virk (Revised)

Approval Date

19-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

78%

District and Tehsil

Narowal

1265 656 Name of the Scheme

Rural Water Supply Scheme Paijowali Auranabad

Approval Date

10/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

82%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.816

4.385

0.000

2.303

0.000

0.000

0.000

2.303

2.303

0.000

0.000

0.000

0.000

5.008

4.353

0.000

1.406

0.000

0.000

0.000

1.406

1.406

0.000

0.000

0.000

0.000

4.692

3.448

0.000

1.948

0.000

0.000

0.000

1.948

1.948

0.000

0.000

0.000

0.000

6.324

5.315

0.000

0.341

0.000

0.000

0.000

0.341

0.341

1.617

0.000

0.000

0.000

9.729

4.000

0.000

5.188

0.000

0.000

0.000

5.188

5.188

2.000

0.000

0.000

346

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1266 657 Name of the Scheme

Installation of Water Purification Plant Mouza Classwali

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1267 658 Name of the Scheme

Installation of Water Purification Plant Mouza Kotli Nawian

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1268 659 Name of the Scheme

Installation of Water Purification Plant Mouza Bathanwali

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1269 660 Name of the Scheme

Installation of Water Purification Plant Mouza Chandarke Rajputan

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1270 661 Name of the Scheme

Installation of Water Purification Plant Mouza Mujahid

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.705

0.350

0.000

0.461

0.000

0.000

0.000

0.461

0.461

0.000

0.000

0.000

0.000

0.705

0.350

0.000

0.461

0.000

0.000

0.000

0.461

0.461

0.000

0.000

0.000

0.000

1.000

0.350

0.000

0.800

0.000

0.000

0.000

0.800

0.800

0.000

0.000

0.000

0.000

1.000

0.350

0.000

0.800

0.000

0.000

0.000

0.800

0.800

0.000

0.000

0.000

0.000

0.705

0.350

0.000

0.461

0.000

0.000

0.000

0.461

0.461

0.000

0.000

0.000

347

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1271 662 Name of the Scheme

Installation of Water Purification Plant Mouza Dadayala

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1272 663 Name of the Scheme

Installation of Water Purification Plant Mouza Nawan Pindi Bado Mehli

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1273 664 Name of the Scheme

Installation of Water Purification Plant Mouza Nangal Machani

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1274 665 Name of the Scheme

Installation of Water Purification Plant Mouza Mangowal

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1275 666 Name of the Scheme

Installation of Water Purification Plant Mouza Agrian

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.902

0.350

0.000

0.687

0.000

0.000

0.000

0.687

0.687

0.000

0.000

0.000

0.000

1.000

0.350

0.000

0.800

0.000

0.000

0.000

0.800

0.800

0.000

0.000

0.000

0.000

0.705

0.350

0.000

0.461

0.000

0.000

0.000

0.461

0.461

0.000

0.000

0.000

0.000

0.705

0.350

0.000

0.461

0.000

0.000

0.000

0.461

0.461

0.000

0.000

0.000

0.000

0.705

0.350

0.000

0.461

0.000

0.000

0.000

0.461

0.461

0.000

0.000

0.000

348

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1276 667 Name of the Scheme

Installation of Water Purification Plant Mouza Gadian

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1277 668 Name of the Scheme

Installation of Water Purification Plant Mouza Manzoorpura

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1278 669 Name of the Scheme

Installation of Water Purification Plant Mouza Mathkey

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1279 670 Name of the Scheme

Water Purification Plant Village Pindi Sainiyan

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1280 671 Name of the Scheme

Water Purification Plant Village Bamboo

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.902

0.350

0.000

0.687

0.000

0.000

0.000

0.687

0.687

0.000

0.000

0.000

0.000

0.705

0.350

0.000

0.461

0.000

0.000

0.000

0.461

0.461

0.000

0.000

0.000

0.000

0.705

0.350

0.000

0.461

0.000

0.000

0.000

0.461

0.461

0.000

0.000

0.000

0.000

0.705

0.300

0.000

0.511

0.000

0.000

0.000

0.511

0.511

0.000

0.000

0.000

0.000

0.705

0.300

0.000

0.511

0.000

0.000

0.000

0.511

0.511

0.000

0.000

0.000

349

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1281 672 Name of the Scheme

Water Purification Plant Village Chak Amro

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1282 673 Name of the Scheme

Water Purification Plant Village Bagga

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1283 674 Name of the Scheme

Water Purification Plant Village Gumtala

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1284 675 Name of the Scheme

Water Purification Plant Village Dussri

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1285 676 Name of the Scheme

Water Purification Plant Village Pandori Dhunda

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.705

0.300

0.000

0.511

0.000

0.000

0.000

0.511

0.511

0.000

0.000

0.000

0.000

0.902

0.300

0.000

0.737

0.000

0.000

0.000

0.737

0.737

0.000

0.000

0.000

0.000

0.902

0.300

0.000

0.737

0.000

0.000

0.000

0.737

0.737

0.000

0.000

0.000

0.000

0.902

0.300

0.000

0.737

0.000

0.000

0.000

0.737

0.737

0.000

0.000

0.000

0.000

0.705

0.300

0.000

0.511

0.000

0.000

0.000

0.511

0.511

0.000

0.000

0.000

350

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1286 677 Name of the Scheme

Water Purification Plant Village Fatwal Sulehrian

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1287 678 Name of the Scheme

Water Purification Plant Village Chhamal

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1288 679 Name of the Scheme

Water Purification Plant Village Masroor

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1289 680 Name of the Scheme

Water Purification Plant Village Sikho Chak

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1290 681 Name of the Scheme

Water Purification Plant Village Majra

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.902

0.300

0.000

0.737

0.000

0.000

0.000

0.737

0.737

0.000

0.000

0.000

0.000

0.902

0.300

0.000

0.737

0.000

0.000

0.000

0.737

0.737

0.000

0.000

0.000

0.000

0.902

0.300

0.000

0.737

0.000

0.000

0.000

0.737

0.737

0.000

0.000

0.000

0.000

0.902

0.300

0.000

0.737

0.000

0.000

0.000

0.737

0.737

0.000

0.000

0.000

0.000

0.705

0.300

0.000

0.511

0.000

0.000

0.000

0.511

0.511

0.000

0.000

0.000

351

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1291 682 Name of the Scheme

Water Purification Plant Village Jalalpur

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1292 683 Name of the Scheme

Filtration Plant UC Talvandi Bahandran Ali Akbar Bagh, Mohallah Usmenpura

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1293 684 Name of the Scheme

Filtration Plant UC Sankhatra, Bolar Kaka Kalas

Approval Date

19-05-2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1294 685 Name of the Scheme

Filtration Plant UC Talvandi Bindran Dhora Chandoke

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1295 686 Name of the Scheme

Filtration Plant U/C Lala Village Kot Ramzani & Gill Kalan.

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.705

0.300

0.000

0.511

0.000

0.000

0.000

0.511

0.511

0.000

0.000

0.000

0.000

1.705

1.130

0.000

0.831

0.000

0.000

0.000

0.831

0.831

0.000

0.000

0.000

0.000

1.840

1.130

0.000

0.986

0.000

0.000

0.000

0.986

0.986

0.000

0.000

0.000

0.000

1.130

1.130

0.000

0.170

0.000

0.000

0.000

0.170

0.170

0.000

0.000

0.000

0.000

1.130

1.130

0.000

0.170

0.000

0.000

0.000

0.170

0.170

0.000

0.000

0.000

352

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1296 687 Name of the Scheme

Filtration Plant UC Fleespur Daher

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1297 688 Name of the Scheme

Filtration Plant at Village Dhodhi Malhian

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1298 689 Name of the Scheme

Filtration Plant UC Dahamthal

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1299 690 Name of the Scheme

Filtration Plant UC Langar Key, Romal Dotial

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1300 691 Name of the Scheme

Filtration Plant UC Halowal Dheli

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

1301 692 Name of the Scheme

Filtration Plant UC Mehwala Sirjal Ainowali

Approval Date

7/2/2009

Major Components

i) Source ii) Filteration plant

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.130

1.130

0.000

0.170

0.000

0.000

0.000

0.170

0.170

0.000

0.000

0.000

0.000

1.130

1.130

0.000

0.170

0.000

0.000

0.000

0.170

0.170

0.000

0.000

0.000

0.000

1.410

1.130

0.000

0.492

0.000

0.000

0.000

0.492

0.492

0.000

0.000

0.000

0.000

2.115

1.130

0.000

1.302

0.000

0.000

0.000

1.302

1.302

0.000

0.000

0.000

0.000

1.130

1.130

0.000

0.170

0.000

0.000

0.000

0.170

0.170

0.000

0.000

0.000

0.000

2.760

1.130

0.000

2.044

0.000

0.000

0.000

2.044

2.044

0.000

0.000

0.000

353

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1302 693 Name of the Scheme

Rural Wate Supply Scheme Bhojo Dhensa Jeon key Merkpur Ghus

Approval Date

Approved

Major Components

i) Source ii) Filteration plant

Major Targets

48%

District and Tehsil

Narowal

1303 694 Name of the Scheme

Rural Water Supply Scheme Chak No. 117/RB, Chahoor Kothly

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1304 695 Name of the Scheme

Rural Water Supply Scheme Chak No. 43/RB

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1305 696 Name of the Scheme

Rural Water Supply Scheme Chak No. 112/RB, Alia Abad

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1306 697 Name of the Scheme

Rural Water Supply Scheme Chak No. 113/RB Badhumalhi

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.200

2.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.280

0.000

0.000

0.000

1.950

1.950

0.000

0.293

0.000

0.000

0.000

0.293

0.293

0.000

0.000

0.000

0.000

1.400

1.400

0.000

0.210

0.000

0.000

0.000

0.210

0.210

0.000

0.000

0.000

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

354

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1307 698 Name of the Scheme

Rural Water Supply Scheme Chak No. 28/RB Langowal

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1308 699 Name of the Scheme

Rural Water Supply Scheme Bhalike

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1309 700 Name of the Scheme

Rural Water Supply Scheme Phularwan

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1310 701 Name of the Scheme

Rural Water Supply Scheme Chak No. 11/GB

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1311 702 Name of the Scheme

Rural Water Supply Scheme Chak No. 18/GB

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

4.650

4.650

0.000

0.698

0.000

0.000

0.000

0.698

0.698

0.000

0.000

0.000

0.000

2.850

2.850

0.000

0.428

0.000

0.000

0.000

0.428

0.428

0.000

0.000

0.000

0.000

1.896

1.896

0.000

0.284

0.000

0.000

0.000

0.284

0.284

0.000

0.000

0.000

0.000

4.000

4.000

0.000

0.600

0.000

0.000

0.000

0.600

0.600

0.000

0.000

0.000

355

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1312 703 Name of the Scheme

Rural Water Supply Scheme Mandi Faizabad

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1313 704 Name of the Scheme

Rural Water Supply Scheme Chak No. 638/GB Watwan

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1314 705 Name of the Scheme

Water Supply Scheme More Khunda

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1315 706 Name of the Scheme

Drainage and Water Supply Scheme at Dara Bazi Gran Shamolah Chak No.18/RB

Approval Date

25-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

39%

District and Tehsil

Nankana Sahib

1316 707 Name of the Scheme

Drainage and Water Supply Scheme at Chak No.26/RB

Approval Date

25-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.280

7.280

0.000

1.092

0.000

0.000

0.000

1.092

1.092

0.000

0.000

0.000

0.000

6.910

6.013

0.000

1.934

0.000

0.000

0.000

1.934

1.934

0.000

0.000

0.000

0.000

5.184

4.219

0.000

1.743

0.000

0.000

0.000

1.743

1.743

0.000

0.000

0.000

0.000

11.239

0.010

0.000

5.082

0.000

0.000

0.000

5.082

5.082

7.833

0.000

0.000

0.000

4.428

0.010

0.000

5.082

0.000

0.000

0.000

5.082

5.082

0.000

0.000

0.000

356

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1317 708 Name of the Scheme

Drainage and Water Supply Scheme at Moran Chak No.48/RB

Approval Date

25-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1318 709 Name of the Scheme

Drainage and Water Supply Scheme at Chak No.112/RB Ali Abad

Approval Date

25-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

48%

District and Tehsil

Nankana Sahib

1319 710 Name of the Scheme

Drainage and Water Supply Scheme at Kotla Khurd Chak No.43/RB

Approval Date

25-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Nankana Sahib

1320 711 Name of the Scheme

Drainage and Water Supply Scheme at Pakhariwali Chak No.32/RB

Approval Date

25.04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

74%

District and Tehsil

Nankana Sahib

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.527

0.010

0.000

6.346

0.000

0.000

0.000

6.346

6.346

0.000

0.000

0.000

0.000

5.527

0.010

0.000

3.020

0.000

0.000

0.000

3.020

3.020

3.326

0.000

0.000

0.000

6.014

0.010

0.000

6.906

0.000

0.000

0.000

6.906

6.906

0.000

0.000

0.000

0.000

6.014

0.010

0.000

5.082

0.000

0.000

0.000

5.082

5.082

1.824

0.000

0.000

357

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1321 712 Name of the Scheme

Rural Water Supply Schme Salhowal.

Approval Date

20-1-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1322 713 Name of the Scheme

Rural Water Supply Schame Dharmawala

Approval Date

13-04-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1323 714 Name of the Scheme

Water Supply / Drainage Scheme New Rajgarh

Approval Date

5/9/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1324 715 Name of the Scheme

Reh: of Water Supply Scheme Chak No. 2/1-AL Renala Khurd

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1325 716 Name of the Scheme

Reh: of Water Supply Scheme Chak No 10/AL-Renala Khurd

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.607

4.128

0.000

1.170

0.000

0.000

0.000

1.170

1.170

0.000

0.000

0.000

0.000

8.038

8.941

0.000

0.303

0.000

0.000

0.000

0.303

0.303

0.000

0.000

0.000

0.000

7.559

8.485

0.000

0.208

0.000

0.000

0.000

0.208

0.208

0.000

0.000

0.000

0.000

6.297

6.397

0.000

0.845

0.000

0.000

0.000

0.845

0.845

0.000

0.000

0.000

0.000

3.372

3.382

0.000

0.496

0.000

0.000

0.000

0.496

0.496

0.000

0.000

0.000

358

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1326 717 Name of the Scheme

Rural Water Supply Scheme Chak No. 8-9/1-L Renala Khurd

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1327 718 Name of the Scheme

Rural Water Supply Scheme Chak No. 1/SP Wasaway Wala Depalpur

Approval Date

2/3/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1328 719 Name of the Scheme

Rural Water Supply Scheme Ali Key Rohila Jamal Kot Basti Bahadar Wala Depalpur

Approval Date

2/3/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1329 720 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Mehar Colony Okara city

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

15.575

11.163

0.000

6.748

0.000

0.000

0.000

6.748

6.748

0.000

0.000

0.000

0.000

0.526

0.526

0.000

0.079

0.000

0.000

0.000

0.079

0.079

0.000

0.000

0.000

0.000

0.630

0.630

0.000

0.095

0.000

0.000

0.000

0.095

0.095

0.000

0.000

0.000

0.000

1.080

0.540

0.000

0.702

0.000

0.000

0.000

0.702

0.702

0.000

0.000

0.000

359

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1330 721 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Fareed Town Fateh Noor Town, Sabri Colony in Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1331 722 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Pak Colony, Mehboob Town in Okara city

Approval Date

2/3/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1332 723 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Peoples Colony, Bhayyan Wala Karkhana in Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1333 724 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Model Town, Government Colony, Quddos Town in Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.700

1.700

0.000

0.255

0.000

0.000

0.000

0.255

0.255

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

1.475

1.475

0.000

0.221

0.000

0.000

0.000

0.221

0.221

0.000

0.000

0.000

0.000

2.300

2.300

0.000

0.345

0.000

0.000

0.000

0.345

0.345

0.000

0.000

0.000

360

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1334 725 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Azeez Yaqoob Town in Okara City

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1335 726 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) E-Line Dubai Town, in Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1336 727 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Kot Jan Muhammad, Muzaffar Colony Chak No. 4/5-L Shamas Town Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1337 728 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Wazeer Colony, Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.200

1.200

0.000

0.180

0.000

0.000

0.000

0.180

0.180

0.000

0.000

0.000

0.000

1.500

0.850

0.000

0.875

0.000

0.000

0.000

0.875

0.875

0.000

0.000

0.000

0.000

1.450

1.450

0.000

0.218

0.000

0.000

0.000

0.218

0.218

0.000

0.000

0.000

0.000

1.200

0.600

0.000

0.780

0.000

0.000

0.000

0.780

0.780

0.000

0.000

0.000

361

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1338 729 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Aziz Housing Scheme Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1339 730 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) at Mohallah Ahmadabad Okara

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1340 731 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Chak No. 54/2-L Okara

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1341 732 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Chak No. 55/2-L Okara

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.912

0.912

0.000

0.137

0.000

0.000

0.000

0.137

0.137

0.000

0.000

0.000

0.000

1.600

1.600

0.000

0.240

0.000

0.000

0.000

0.240

0.240

0.000

0.000

0.000

0.000

1.000

0.250

0.000

0.900

0.000

0.000

0.000

0.900

0.900

0.000

0.000

0.000

0.000

1.000

0.150

0.000

1.000

0.000

0.000

0.000

1.000

1.000

0.000

0.000

0.000

362

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1342 733 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Chak No. 53/2-L Okara

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1343 734 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Seth Colony Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1344 735 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Chak No. 2/4-L Okara

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1345 736 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Kot Ghulam Muhammad, Jalal Town, Ashraf Block, Rafi Floor Mills, Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.100

1.100

0.000

0.165

0.000

0.000

0.000

0.165

0.165

0.000

0.000

0.000

0.000

1.100

1.100

0.000

0.165

0.000

0.000

0.000

0.165

0.165

0.000

0.000

0.000

0.000

1.000

0.500

0.000

0.650

0.000

0.000

0.000

0.650

0.650

0.000

0.000

0.000

0.000

1.000

0.650

0.000

0.500

0.000

0.000

0.000

0.500

0.500

0.000

0.000

0.000

363

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1346 737 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Firdous Town, Makka Madina Town, Yaqoob Abad, Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1347 738 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Muslim Colony, Fire Brigade Colony in Okara city

Approval Date

6/2/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1348 739 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc)Kanal Park Rana Nurery, Okara

Approval Date

2/3/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1349 740 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Ameer Colony, Okara

Approval Date

2/3/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.850

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

1.000

0.650

0.000

0.500

0.000

0.000

0.000

0.500

0.500

0.000

0.000

0.000

0.000

0.800

0.800

0.000

0.120

0.000

0.000

0.000

0.120

0.120

0.000

0.000

0.000

0.000

0.540

0.540

0.000

0.081

0.000

0.000

0.000

0.081

0.081

0.000

0.000

0.000

364

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1350 741 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Lala Zar Colony Okara

Approval Date

2/3/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1351 742 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc)Mehboob Town and Khalid Town, Okara

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1352 743 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc) Azeem Housing Basti Town, Okara

Approval Date

20-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1353 744 Name of the Scheme

Rehabilitation of Streets (Water Supply, Drainage, Sewerage, Resoling etc)Basti Mehar Din Okara

Approval Date

2/3/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.400

0.400

0.000

0.060

0.000

0.000

0.000

0.060

0.060

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.600

1.600

0.000

0.240

0.000

0.000

0.000

0.240

0.240

0.000

0.000

0.000

0.000

0.400

0.400

0.000

0.060

0.000

0.000

0.000

0.060

0.060

0.000

0.000

0.000

365

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1354 745 Name of the Scheme

Rehabilitation / Improvement of Streets Allah Dad Colony, Okara City

Approval Date

2/3/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Okara

1355 746 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No.19/SP.

Approval Date

20.12.08

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

1356 747 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Ferozpur Chistian.

Approval Date

20.12.08

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

1357 748 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme,Kalyana.

Approval Date

20.12.08

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

1358 749 Name of the Scheme

Augmentation of Water Supply & Drainange Scheme, Malka Hans.

Approval Date

20.12.08

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.400

0.400

0.000

0.060

0.000

0.000

0.000

0.060

0.060

0.000

0.000

0.000

0.000

5.416

1.780

0.000

4.448

0.000

0.000

0.000

4.448

4.448

0.000

0.000

0.000

0.000

4.808

2.110

0.000

3.419

0.000

0.000

0.000

3.419

3.419

0.000

0.000

0.000

0.000

5.664

3.000

0.000

3.514

0.000

0.000

0.000

3.514

3.514

0.000

0.000

0.000

0.000

14.796

4.814

0.000

12.201

0.000

0.000

0.000

12.201

12.201

0.000

0.000

0.000

366

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1359 750 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme,Jeween Shah

Approval Date

29.12.08

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

1360 751 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No.29/SP.

Approval Date

20.12.08

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

1361 752 Name of the Scheme

Rural Water Supply Scheme, Chak No.89/EB(Bahu Wala).

Approval Date

20.12.08

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

1362 753 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No.27/SP.

Approval Date

6.2.09

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

1363 754 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No.11/SP.

Approval Date

6.02.09

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

4.293

1.986

0.000

2.951

0.000

0.000

0.000

2.951

2.951

0.000

0.000

0.000

0.000

8.605

3.000

0.000

6.896

0.000

0.000

0.000

6.896

6.896

0.000

0.000

0.000

0.000

3.182

2.845

0.000

0.814

0.000

0.000

0.000

0.814

0.814

0.000

0.000

0.000

0.000

1.106

0.880

0.000

0.392

0.000

0.000

0.000

0.392

0.392

0.000

0.000

0.000

367

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1364 755 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Pir Ghani

Approval Date

6.02.09

Major Components

T/well, R.Main,D/system,P/House,OHR, Electrification,P.Machinery etc.

Major Targets

100%

District and Tehsil

Pakpattan

1365 756 Name of the Scheme

Construction of Filtration Plant at Chak No.17/EB

Approval Date

6.02.09

Major Components

Filteration Plant complete.

Major Targets

100%

District and Tehsil

Pakpattan , Arifwala

1366 757 Name of the Scheme

Construction of Filtration Plant at Chak No.77/EB

Approval Date

6.02.09

Major Components

Filteration Plant complete.

Major Targets

100%

District and Tehsil

Pakpattan , Arifwala

1367 758 Name of the Scheme

Rural Water Supply Scheme Mazar Colony

Approval Date

29-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1368 759 Name of the Scheme

Improvement/ Extension Rural Water Supply Scheme Munir Abad and Asif Abad

Approval Date

29-03-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.932

1.685

0.000

0.537

0.000

0.000

0.000

0.537

0.537

0.000

0.000

0.000

0.000

1.861

1.861

0.000

0.279

0.000

0.000

0.000

0.279

0.279

0.000

0.000

0.000

0.000

1.861

1.861

0.000

0.279

0.000

0.000

0.000

0.279

0.279

0.000

0.000

0.000

0.000

10.580

9.222

0.000

2.945

0.000

0.000

0.000

2.945

2.945

0.000

0.000

0.000

0.000

12.840

12.987

0.000

1.779

0.000

0.000

0.000

1.779

1.779

0.000

0.000

0.000

368

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1369 760 Name of the Scheme

Rehabilitation of Rural Water supply Scheme Thatha Khalil

Approval Date

24-4-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

56%

District and Tehsil

Rawalpindi

1370 761 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Adwal

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1371 762 Name of the Scheme

Water Suppply Scheme Dhaman Syedan (Amended)

Approval Date

3/12/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

32%

District and Tehsil

Rawalpindi

1372 763 Name of the Scheme

Water Suppply Scheme Mohra Sheran

Approval Date

12/12/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1373 764 Name of the Scheme

Reh: of Water Supply Scheme Numb Murree

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

14.560

5.726

0.000

3.725

0.000

0.000

0.000

3.725

3.725

7.293

0.000

0.000

0.000

7.240

2.993

0.000

5.333

0.000

0.000

0.000

5.333

5.333

0.000

0.000

0.000

0.000

138.233

21.000

0.000

29.583

0.000

0.000

0.000

29.583

29.583

40.000

68.385

0.000

0.000

8.600

6.400

0.000

3.490

0.000

0.000

0.000

3.490

3.490

0.000

0.000

0.000

0.000

8.195

8.181

0.000

1.243

0.000

0.000

0.000

1.243

1.243

0.000

0.000

0.000

369

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1374 765 Name of the Scheme

Reh: of Water Supply Scheme Dewal Murree

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1375 766 Name of the Scheme

Reh: of Water Supply Scheme Jondala Murree

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1376 767 Name of the Scheme

Reh: of Water Supply Scheme Dhoke Omlat Murree

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1377 768 Name of the Scheme

Reh: of Water Supply Scheme Perhayan

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1378 769 Name of the Scheme

Water Supply Scheme Manga Village UC Tret

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.156

1.571

0.000

5.508

0.000

0.000

0.000

5.508

5.508

0.000

0.000

0.000

0.000

3.990

3.954

0.000

0.635

0.000

0.000

0.000

0.635

0.635

0.000

0.000

0.000

0.000

0.410

0.410

0.000

0.062

0.000

0.000

0.000

0.062

0.062

0.000

0.000

0.000

0.000

1.167

1.167

0.000

0.175

0.000

0.000

0.000

0.175

0.175

0.000

0.000

0.000

0.000

4.600

4.600

0.000

0.690

0.000

0.000

0.000

0.690

0.690

0.000

0.000

0.000

370

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1379 770 Name of the Scheme

Water Supply Scheme Bewery to Mallot UC Sarwar Lodge

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1380 771 Name of the Scheme

Water Supply Scheme Nallah Muslimana UC Nallah Muslimana

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1381 772 Name of the Scheme

Water Supply Scheme Dhoke Subedar Qurban UC Deberan Kallan

Approval Date

2/4/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1382 773 Name of the Scheme

Water Supply Scheme Narar

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1383 774 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Village Sumbal UC Sumbal District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.264

3.250

0.000

0.504

0.000

0.000

0.000

0.504

0.504

0.000

0.000

0.000

0.000

0.300

0.300

0.000

0.045

0.000

0.000

0.000

0.045

0.045

0.000

0.000

0.000

0.000

0.200

0.200

0.000

0.030

0.000

0.000

0.000

0.030

0.030

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.300

0.300

0.000

0.045

0.000

0.000

0.000

0.045

0.045

0.000

0.000

0.000

371

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1384 775 Name of the Scheme

Reh: of Water Supply Scheme Mankialia Bharahmana Gujar Khan

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1385 776 Name of the Scheme

Reh: of Water Supply Scheme Qazian Gujar Khan

Approval Date

2/4/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1386 777 Name of the Scheme

Reh: of Water Supply Scheme Islampura Jabar Gujar Khan

Approval Date

31-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1387 778 Name of the Scheme

Reh: of Water Supply Scheme Narali Kaswal Gujrar Khan

Approval Date

31-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1388 779 Name of the Scheme

Reh: of Water Supply Scheme Shadhana Gujar Khan

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.700

1.700

0.000

0.255

0.000

0.000

0.000

0.255

0.255

0.000

0.000

0.000

0.000

6.950

4.000

0.000

3.993

0.000

0.000

0.000

3.993

3.993

0.000

0.000

0.000

0.000

6.537

4.000

0.000

3.518

0.000

0.000

0.000

3.518

3.518

0.000

0.000

0.000

0.000

3.773

3.750

0.000

0.589

0.000

0.000

0.000

0.589

0.589

0.000

0.000

0.000

0.000

2.500

2.500

0.000

0.375

0.000

0.000

0.000

0.375

0.375

0.000

0.000

0.000

372

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1389 780 Name of the Scheme

Reh: of Water Supply Scheme Phliana Gujar Khan

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1390 781 Name of the Scheme

Reh: of Water Supply Scheme Kantrila Gujar Khan

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1391 782 Name of the Scheme

Water Supply Scheme Dhoke Kala Khan District Rawalpindi

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1392 783 Name of the Scheme

Water Supply Scheme Dhoke Hafiz Shah

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1393 784 Name of the Scheme

Water Supply Scheme Morgah

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.750

2.750

0.000

0.413

0.000

0.000

0.000

0.413

0.413

0.000

0.000

0.000

0.000

3.700

3.700

0.000

0.555

0.000

0.000

0.000

0.555

0.555

0.000

0.000

0.000

0.000

5.101

4.811

0.000

1.055

0.000

0.000

0.000

1.055

1.055

0.000

0.000

0.000

0.000

10.418

5.293

0.000

6.688

0.000

0.000

0.000

6.688

6.688

0.000

0.000

0.000

0.000

10.000

5.000

0.000

6.500

0.000

0.000

0.000

6.500

6.500

0.000

0.000

0.000

373

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1394 785 Name of the Scheme

Reh: of Rural Water Supply Scheme Jattal

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1395 786 Name of the Scheme

Rural Water Supply Scheme Noorani

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1396 787 Name of the Scheme

Reh: of Rural Water Supply Scheme Dhoke Choudhrian

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1397 788 Name of the Scheme

Reh: of Rural Water Supply Scheme Dhoke Chodhrian Phase-II

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1398 789 Name of the Scheme

Reh: of Rural Water Supply Scheme Balawal

Approval Date

31-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.230

2.230

0.000

0.335

0.000

0.000

0.000

0.335

0.335

0.000

0.000

0.000

0.000

7.076

4.230

0.000

3.907

0.000

0.000

0.000

3.907

3.907

0.000

0.000

0.000

0.000

6.110

6.110

0.000

0.917

0.000

0.000

0.000

0.917

0.917

0.000

0.000

0.000

0.000

2.130

2.130

0.000

0.320

0.000

0.000

0.000

0.320

0.320

0.000

0.000

0.000

0.000

11.416

4.000

0.000

9.128

0.000

0.000

0.000

9.128

9.128

0.000

0.000

0.000

374

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1399 790 Name of the Scheme

Reh: of Rural Water Supply Scheme Chakri RWP

Approval Date

31-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

50%

District and Tehsil

Rawalpindi

1400 791 Name of the Scheme

Reh: of Rural Water Supply Scheme Mial

Approval Date

23-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1401 792 Name of the Scheme

Reh: of Rural Water Supply Scheme Maira Khurd Mira Kalan

Approval Date

31-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

60%

District and Tehsil

Rawalpindi

1402 793 Name of the Scheme

Reh: of Rural Water Supply Scheme Karai

Approval Date

31-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1403 794 Name of the Scheme

Reh: of Rural Water Supply Scheme Safair

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

86%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

13.109

0.577

0.000

7.000

0.000

0.000

0.000

7.000

7.000

7.498

0.000

0.000

0.000

4.023

4.023

0.000

0.603

0.000

0.000

0.000

0.603

0.603

0.000

0.000

0.000

0.000

15.959

4.000

0.000

7.000

0.000

0.000

0.000

7.000

7.000

7.353

0.000

0.000

0.000

6.570

4.000

0.000

3.556

0.000

0.000

0.000

3.556

3.556

0.000

0.000

0.000

0.000

12.000

4.000

0.000

7.800

0.000

0.000

0.000

7.800

7.800

2.000

0.000

0.000

375

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1404 795 Name of the Scheme

Rural Water Supply Scheme Dhoke Sadu Ban bola

Approval Date

23-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1405 796 Name of the Scheme

Rural Water Supply Scheme Jalala

Approval Date

23-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1406 797 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Lab Thatho

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1407 798 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Wah Garden

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1408 799 Name of the Scheme

Rural Water Supply Scheme Ghazi Koli

Approval Date

23-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.532

2.500

0.000

7.312

0.000

0.000

0.000

7.312

7.312

0.000

0.000

0.000

0.000

2.851

1.800

0.000

1.479

0.000

0.000

0.000

1.479

1.479

0.000

0.000

0.000

0.000

2.915

2.760

0.000

0.592

0.000

0.000

0.000

0.592

0.592

0.000

0.000

0.000

0.000

7.314

4.000

0.000

4.411

0.000

0.000

0.000

4.411

4.411

0.000

0.000

0.000

0.000

8.790

1.320

0.000

8.788

0.000

0.000

0.000

8.788

8.788

0.000

0.000

0.000

376

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1409 800 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Godho Summo

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1410 801 Name of the Scheme

Rural Water Supply Scheme at Bhatta

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1411 802 Name of the Scheme

Rehab. Of Rural Water Supply Scheme Taveen Tehsil Gujar Khan District Rawalpindi

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1412 803 Name of the Scheme

Rehab. Of Rural Water Supply Scheme Punjgran Kalan, Tehsil Gujar Khan District Rawalpindi

Approval Date

11/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1413 804 Name of the Scheme

Rural Water Supply Scheme at Wasala Bangial

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.544

1.916

0.000

1.010

0.000

0.000

0.000

1.010

1.010

0.000

0.000

0.000

0.000

2.500

2.500

0.000

0.375

0.000

0.000

0.000

0.375

0.375

0.000

0.000

0.000

0.000

4.208

3.750

0.000

1.089

0.000

0.000

0.000

1.089

1.089

0.000

0.000

0.000

0.000

5.585

3.500

0.000

2.923

0.000

0.000

0.000

2.923

2.923

0.000

0.000

0.000

0.000

2.500

2.500

0.000

0.375

0.000

0.000

0.000

0.375

0.375

0.000

0.000

0.000

377

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1414 805 Name of the Scheme

Rural Water Supply Scheme at Banth

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1415 806 Name of the Scheme

Rural Water Supply Scheme at Buch Mandra I/C Chehari

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1416 807 Name of the Scheme

Repair & Renovation of Rest House at Donga Gali, Tehsil Murree (Revised)

Approval Date

14-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1417 808 Name of the Scheme

Rural Water Supply Scheme Hoon

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

1418 809 Name of the Scheme

Rehabilitation of Water Supply Scheme Choa Khalsa Tehsil Kalar Syedan

Approval Date

2/4/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.250

4.250

0.000

0.638

0.000

0.000

0.000

0.638

0.638

0.000

0.000

0.000

0.000

4.700

4.700

0.000

0.705

0.000

0.000

0.000

0.705

0.705

0.000

0.000

0.000

0.000

7.531

5.364

0.000

3.297

0.000

0.000

0.000

3.297

3.297

0.000

0.000

0.000

0.000

4.056

4.255

0.000

0.409

0.000

0.000

0.000

0.409

0.409

0.000

0.000

0.000

0.000

6.233

2.000

0.000

5.168

0.000

0.000

0.000

5.168

5.168

0.000

0.000

0.000

378

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1419 810 Name of the Scheme

Rural Water Supply Scheme Gola

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rawalpindi , Kotli Sattian

1420 811 Name of the Scheme

Rural Water Supply & Drainage Scheme Parial Sharki Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

7%

District and Tehsil

Rawalpindi

1421 812 Name of the Scheme

Rural Water Supply & Drainage Scheme Kurar Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

7%

District and Tehsil

Rawalpindi

1422 813 Name of the Scheme

Reh. Of Water Supply & Drainage Scheme Shabrian Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

20%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.000

1.500

0.000

1.950

0.000

0.000

0.000

1.950

1.950

0.000

0.000

0.000

0.000

14.730

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

15.940

0.000

0.000

0.000

15.302

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

16.597

0.000

0.000

0.000

4.882

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

4.614

0.000

0.000

379

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1423 814 Name of the Scheme

Rural Water Supply & Drainage Scheme Hunjrial (Punjgran) Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

14%

District and Tehsil

Rawalpindi

1424 815 Name of the Scheme

Rural Water Supply & Drainage Scheme Abn-Chak Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

20%

District and Tehsil

Rawalpindi

1425 816 Name of the Scheme

Reh. Of Rural Water Supply & Drainage Scheme Arazi Budhi Tehsil Kallar Syedian & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

15%

District and Tehsil

Rawalpindi , Kallar Ghar

1426 817 Name of the Scheme

Reh. of Rural Water Supply & Drainage Scheme Arazi Khas Tehsil District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

11%

District and Tehsil

Rawalpindi , Kallar Ghar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.280

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

7.372

0.000

0.000

0.000

4.950

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

4.693

0.000

0.000

0.000

6.600

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

6.590

0.000

0.000

0.000

8.972

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

9.318

0.000

0.000

380

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1427 818 Name of the Scheme

Rural Water Supply & Drainage Scheme Basanta Tehsil District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

15%

District and Tehsil

Rawalpindi , Kallar Ghar

1428 819 Name of the Scheme

Rural Water Supply & Drainage Scheme Nothia Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

14%

District and Tehsil

Rawalpindi , Kallar Ghar

1429 820 Name of the Scheme

Rural Water Supply & Drainage Scheme Chinan Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

17%

District and Tehsil

Rawalpindi , Kallar Ghar

1430 821 Name of the Scheme

Rural Water Supply & Drainage Scheme Mohara Bakhtau Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

15%

District and Tehsil

Rawalpindi , Kallar Ghar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.718

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

6.726

0.000

0.000

0.000

7.211

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

7.293

0.000

0.000

0.000

5.794

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

5.663

0.000

0.000

0.000

6.610

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

6.602

0.000

0.000

381

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1431 822 Name of the Scheme

Rural Water Supply & Drainage Scheme Dera Khalsa Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

8%

District and Tehsil

Rawalpindi , Kallar Ghar

1432 823 Name of the Scheme

Rural Water Supply & Drainage Scheme Guft Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

15%

District and Tehsil

Rawalpindi , Kallar Ghar

1433 824 Name of the Scheme

Rural Water Supply & Drainage Scheme Chappur Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

16%

District and Tehsil

Rawalpindi , Kallar Ghar

1434 825 Name of the Scheme

Rural Water Supply & Drainage Scheme Darkali Hemori Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

8%

District and Tehsil

Rawalpindi , Kallar Ghar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

12.221

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

13.054

0.000

0.000

0.000

6.641

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

6.637

0.000

0.000

0.000

6.386

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

6.344

0.000

0.000

0.000

24.147

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

25.769

0.000

0.000

382

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1435 826 Name of the Scheme

Rural Water Supply & Drainage Scheme Darkali Shair Shahi Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

24%

District and Tehsil

Rawalpindi , Kallar Ghar

1436 827 Name of the Scheme

Rural Water Supply & Drainage Scheme Mangal Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

11%

District and Tehsil

Rawalpindi , Kallar Ghar

1437 828 Name of the Scheme

Rural Water Supply & Drainage Scheme Manglora Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

16%

District and Tehsil

Rawalpindi , Kallar Ghar

1438 829 Name of the Scheme

Rural Water Supply & Drainage Scheme Ghareeba Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

11%

District and Tehsil

Rawalpindi , Kallar Ghar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.315

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

7.562

0.000

0.000

0.000

8.765

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

9.080

0.000

0.000

0.000

6.395

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

6.354

0.000

0.000

0.000

8.972

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

9.318

0.000

0.000

383

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1439 830 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Shakrial

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

12%

District and Tehsil

Rawalpindi

1440 831 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Pial

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

21%

District and Tehsil

Rawalpindi

1441 832 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Dhoke Budhal

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

26%

District and Tehsil

Rawalpindi

1442 833 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Basali

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

10%

District and Tehsil

Rawalpindi

1443 834 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Gurah Gujaran

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

18%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

16.920

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

17.458

0.000

0.000

0.000

9.360

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

8.764

0.000

0.000

0.000

7.740

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

6.901

0.000

0.000

0.000

20.010

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

21.012

0.000

0.000

0.000

11.050

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

10.708

0.000

0.000

384

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1444 835 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Kalar Syedan Tehsil Kalar Syedan

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

3%

District and Tehsil

Rawalpindi

1445 836 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Jattal ehsil Kalar Syedan

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

41%

District and Tehsil

Rawalpindi

1446 837 Name of the Scheme

Rehab. Of Rural Water Supply Scheme Khurmab Kaswal & Jhangi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

116%

District and Tehsil

Rawalpindi , Gujar Khan

1447 838 Name of the Scheme

Rural Water Supply Scheme Chak Beli Khan

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

110%

District and Tehsil

Rawalpindi

1448 839 Name of the Scheme

Rural Water Supply Scheme Sagri

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

110%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

60.707

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

67.813

0.000

0.000

0.000

4.898

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.633

0.000

0.000

0.000

12.750

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

11.663

0.000

0.000

0.000

23.940

1.000

0.000

2.500

0.000

0.000

0.000

2.500

2.500

24.031

0.000

0.000

0.000

20.200

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

20.230

0.000

0.000

385

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1449 840 Name of the Scheme

Rural Water Supply Scheme Dhamial

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

108%

District and Tehsil

Rawalpindi

1450 841 Name of the Scheme

Reh. Of Rural Water Supply SchemeMairakalan Matra Khurd

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

110%

District and Tehsil

Rawalpindi

1451 842 Name of the Scheme

Rural Water Supply Scheme Jewan Colony, Dhoke Layal, Dhoke Thatta Left over area of Lala Rukh

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

108%

District and Tehsil

Rawalpindi

1452 843 Name of the Scheme

Rural Water Supply Scheme Chak Jalal Din

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

106%

District and Tehsil

Rawalpindi

1453 844 Name of the Scheme

Water Supply Scheme Rehmatabad

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

106%

District and Tehsil

Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

31.416

1.000

0.000

2.500

0.000

0.000

0.000

2.500

2.500

32.628

0.000

0.000

0.000

10.353

1.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

9.906

0.000

0.000

0.000

40.000

1.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

42.000

0.000

0.000

0.000

26.570

1.000

0.000

1.500

0.000

0.000

0.000

1.500

1.500

28.056

0.000

0.000

0.000

24.210

1.000

0.000

1.500

0.000

0.000

0.000

1.500

1.500

25.342

0.000

0.000

386

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1454 845 Name of the Scheme

Water Supply Scheme Bhatt

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

111%

District and Tehsil

Rawalpindi

1455 846 Name of the Scheme

Rural Water Supply Scheme,Chak No.111-112/1-L

Approval Date

2006-07

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rahim Yar Khan

1456 847 Name of the Scheme

Rural Water Supply Scheme,Chak No.127/P

Approval Date

10.11.08

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Khanpur

1457 848 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No.88/P, R.Y.Khan.

Approval Date

20.02.09

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rahim Yar Khan

1458 849 Name of the Scheme

Water Supply Scheme Jhelumi Subedar Malik Manzoor Ahmad, Tehsil Liaqatpur.

Approval Date

25.05.2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

51%

District and Tehsil

Rahim Yar Khan , Liaqatpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

19.250

1.000

0.000

2.200

0.000

0.000

0.000

2.200

2.200

18.938

0.000

0.000

0.000

4.498

4.650

0.000

0.523

0.000

0.000

0.000

0.523

0.523

0.000

0.000

0.000

0.000

10.127

4.000

0.000

7.646

0.000

0.000

0.000

7.646

7.646

0.000

0.000

0.000

0.000

6.481

5.474

0.000

1.979

0.000

0.000

0.000

1.979

1.979

0.000

0.000

0.000

0.000

3.952

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

2.245

0.000

0.000

387

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1459 850 Name of the Scheme

Improvement / Rehab. Of Water Supply Scheme Bandoor Abbaasian SDK

Approval Date

22.05.2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rahim Yar Khan

1460 851 Name of the Scheme

Construction of Water Supply Scheme Chak No.116/1-L

Approval Date

30.05.2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Khan Pur

1461 852 Name of the Scheme

Rural Water Supply Scheme Basti Shamsabad / Jattan.

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

1462 853 Name of the Scheme

Rural Water Supply Scheme Ozman (Old)

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

1463 854 Name of the Scheme

Rural Water Supply Scheme Ozman (New)

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

8.000

4.000

0.000

5.200

0.000

0.000

0.000

5.200

5.200

0.000

0.000

0.000

0.000

2.058

1.160

0.000

1.207

0.000

0.000

0.000

1.207

1.207

0.000

0.000

0.000

0.000

1.588

1.200

0.000

0.626

0.000

0.000

0.000

0.626

0.626

0.000

0.000

0.000

0.000

1.897

1.400

0.000

0.782

0.000

0.000

0.000

0.782

0.782

0.000

0.000

0.000

388

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1464 855 Name of the Scheme

Rural Water Supply Scheme Phulan Khalti

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

1465 856 Name of the Scheme

Rural Water Supply Scheme Kot Khewali

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

1466 857 Name of the Scheme

Rural Water Supply Scheme Shah Wali

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

1467 858 Name of the Scheme

Rural Water Supply Scheme Sakhi Rindan

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

1468 859 Name of the Scheme

Rural Water Supply Scheme Meeran Pur

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.010

1.500

0.000

0.812

0.000

0.000

0.000

0.812

0.812

0.000

0.000

0.000

0.000

2.098

1.500

0.000

0.913

0.000

0.000

0.000

0.913

0.913

0.000

0.000

0.000

0.000

0.825

0.500

0.000

0.449

0.000

0.000

0.000

0.449

0.449

0.000

0.000

0.000

0.000

2.090

1.500

0.000

0.904

0.000

0.000

0.000

0.904

0.904

0.000

0.000

0.000

0.000

1.949

1.500

0.000

0.741

0.000

0.000

0.000

0.741

0.741

0.000

0.000

0.000

389

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1469 860 Name of the Scheme

Rural Water Supply Scheme Rakh Qadra

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

1470 861 Name of the Scheme

Rural Water Supply Scheme Fateh Pur

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1471 862 Name of the Scheme

Rural Water Supply Scheme Muhammad Pur Gum Wala

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1472 863 Name of the Scheme

Rural Water Supply Scheme Jahanpur

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1473 864 Name of the Scheme

Rural Water Supply Scheme Ahmadani

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.599

1.290

0.000

0.549

0.000

0.000

0.000

0.549

0.549

0.000

0.000

0.000

0.000

2.037

1.020

0.000

1.323

0.000

0.000

0.000

1.323

1.323

0.000

0.000

0.000

0.000

2.068

1.520

0.000

0.858

0.000

0.000

0.000

0.858

0.858

0.000

0.000

0.000

0.000

2.061

1.500

0.000

0.870

0.000

0.000

0.000

0.870

0.870

0.000

0.000

0.000

0.000

7.882

8.064

0.000

1.000

0.000

0.000

0.000

1.000

1.000

0.000

0.000

0.000

390

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1474 865 Name of the Scheme

Rural Water Supply Scheme Shah Pur

Approval Date

6.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1475 866 Name of the Scheme

Rural Water Supply Scheme Tufki Meh Qasab

Approval Date

3.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1476 867 Name of the Scheme

Rural Water Supply Scheme Tibi Lundan

Approval Date

5.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1477 868 Name of the Scheme

Rural Water Supply Scheme Harrand

Approval Date

5.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1478 869 Name of the Scheme

Rural Water Supply Scheme Ruqba Lundan

Approval Date

5.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.093

0.970

0.000

1.437

0.000

0.000

0.000

1.437

1.437

0.000

0.000

0.000

0.000

5.043

1.975

0.000

3.824

0.000

0.000

0.000

3.824

3.824

0.000

0.000

0.000

0.000

0.900

0.700

0.000

0.335

0.000

0.000

0.000

0.335

0.335

0.000

0.000

0.000

0.000

1.887

1.400

0.000

0.770

0.000

0.000

0.000

0.770

0.770

0.000

0.000

0.000

0.000

2.231

0.519

0.000

2.047

0.000

0.000

0.000

2.047

2.047

0.000

0.000

0.000

391

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1479 870 Name of the Scheme

Rural Water Supply Scheme Naushara Gharbi

Approval Date

5.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1480 871 Name of the Scheme

Rural Water Supply Scheme Basti Hambi

Approval Date

3.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1481 872 Name of the Scheme

Rural Water Supply Scheme Glory

Approval Date

3.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1482 873 Name of the Scheme

Rural Water Supply Scheme Bhahar Pur, Mud Novel.

Approval Date

3.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1483 874 Name of the Scheme

Rural Water Supply Scheme Bumbly

Approval Date

3.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.887

0.650

0.000

0.370

0.000

0.000

0.000

0.370

0.370

0.000

0.000

0.000

0.000

3.545

1.500

0.000

2.577

0.000

0.000

0.000

2.577

2.577

0.000

0.000

0.000

0.000

3.911

2.502

0.000

1.996

0.000

0.000

0.000

1.996

1.996

0.000

0.000

0.000

0.000

5.223

2.866

0.000

3.140

0.000

0.000

0.000

3.140

3.140

0.000

0.000

0.000

0.000

2.391

0.718

0.000

2.032

0.000

0.000

0.000

2.032

2.032

0.000

0.000

0.000

392

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1484 875 Name of the Scheme

Rural Water Supply Scheme Barkatoo

Approval Date

5.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1485 876 Name of the Scheme

Rural Water Supply Scheme Lundi Saydan

Approval Date

3.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1486 877 Name of the Scheme

Rural Water Supply Scheme Lal Garah

Approval Date

3.12.08

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Jampur

1487 878 Name of the Scheme

Ext. in Water Supply Scheme Matt Wah (1&2).

Approval Date

24.02.09

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

55%

District and Tehsil

Rajanpur , Rojhan

1488 879 Name of the Scheme

Water Supply Scheme Mz.Dera Dildar Uc Meeranpur.

Approval Date

24.02.09

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur , Rojhan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.243

0.908

0.000

1.671

0.000

0.000

0.000

1.671

1.671

0.000

0.000

0.000

0.000

11.535

5.000

0.000

8.265

0.000

0.000

0.000

8.265

8.265

0.000

0.000

0.000

0.000

9.361

5.000

0.000

5.765

0.000

0.000

0.000

5.765

5.765

0.000

0.000

0.000

0.000

17.584

4.000

0.000

7.100

0.000

0.000

0.000

7.100

7.100

9.122

0.000

0.000

0.000

7.328

4.000

0.000

4.427

0.000

0.000

0.000

4.427

4.427

0.000

0.000

0.000

393

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1489 880 Name of the Scheme

Ext.of Rural Water Supply Scheme, Nawan Shehar.

Approval Date

2006-07

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1490 881 Name of the Scheme

Rural Water Supply Scheme,Gul Muhammad Dasti.

Approval Date

2006-07

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1491 882 Name of the Scheme

Reh. Of Rural Water Supply Scheme, Mud Rindan.

Approval Date

2006-07

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1492 883 Name of the Scheme

Rural Rural Water Supply Scheme, Drigri.

Approval Date

2006-07

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1493 884 Name of the Scheme

Rural Rural Water Supply Scheme, Kotla Ahmad

Approval Date

2006-07

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.800

2.070

0.000

1.150

0.000

0.000

0.000

1.150

1.150

0.000

0.000

0.000

0.000

5.100

5.300

0.000

0.565

0.000

0.000

0.000

0.565

0.565

0.000

0.000

0.000

0.000

2.900

1.440

0.000

1.895

0.000

0.000

0.000

1.895

1.895

0.000

0.000

0.000

0.000

2.400

0.204

0.000

2.556

0.000

0.000

0.000

2.556

2.556

0.000

0.000

0.000

0.000

2.400

0.204

0.000

2.556

0.000

0.000

0.000

2.556

2.556

0.000

0.000

0.000

394

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1494 885 Name of the Scheme

Rural Water Supply Scheme Basti Fiaz Hussain Khosa

Approval Date

25.05.2009

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

45%

District and Tehsil

Rajanpur

1495 886 Name of the Scheme

Ext. of Pipe line from Kotla Naseer to Khaji wala Basti Mustafa, Ali Muhammad and Basti Khursheed Ahmad, Anwar & Asghar mouza Ghazi abad 4000 to 5000 feet Ext. Water Supply Scheme mouza kotla Ahmad from shop khadium Hussain khan Darishak to ba

Approval Date

25.05.2009

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1496 887 Name of the Scheme

Repair of Water Supply Scheme Null mouza Sahan wala

Approval Date

25.05.2009

Major Components

T/well, Rising Main,P/M,P/House, LLRes.etc.

Major Targets

100%

District and Tehsil

Rajanpur

1497 888 Name of the Scheme

Rural Water Supply & Drainage Scheme Chak No.82/NB (Revised)

Approval Date

12.4.06

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.546

1.000

0.000

3.500

0.000

0.000

0.000

3.500

3.500

5.563

0.000

0.000

0.000

3.385

1.000

0.000

2.893

0.000

0.000

0.000

2.893

2.893

0.000

0.000

0.000

0.000

3.856

1.000

0.000

3.600

0.000

0.000

0.000

3.600

3.600

0.000

0.000

0.000

0.000

10.610

12.196

0.000

0.005

0.000

0.000

0.000

0.005

0.005

0.000

0.000

0.000

395

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1498 889 Name of the Scheme

Water Supply Scheme Mouza Jora Skasar

Approval Date

11/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

129%

District and Tehsil

Sargodha

1499 890 Name of the Scheme

Rural Water Supply Scheme Chak No. 47/NB

Approval Date

8/5/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1500 891 Name of the Scheme

Rural Water Supply Scheme 46/SB

Approval Date

8/5/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1501 892 Name of the Scheme

Rural Water Supply Scheme Chak No.100/NB (Sargodha) (Amended)

Approval Date

4/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1502 893 Name of the Scheme

Rural Water Supply Scheme Chak No.85/NB (Sargodha) (Amended)

Approval Date

4/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.284

9.193

0.000

0.100

0.000

0.000

0.000

0.100

0.100

0.000

0.000

0.000

0.000

19.455

14.934

0.000

7.439

0.000

0.000

0.000

7.439

7.439

0.000

0.000

0.000

0.000

19.562

19.790

0.000

2.706

0.000

0.000

0.000

2.706

2.706

0.000

0.000

0.000

0.000

13.612

7.532

0.000

8.122

0.000

0.000

0.000

8.122

8.122

0.000

0.000

0.000

0.000

10.026

5.437

0.000

6.093

0.000

0.000

0.000

6.093

6.093

0.000

0.000

0.000

396

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1503 894 Name of the Scheme

Rural Water Supply Scheme Ajnala

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1504 895 Name of the Scheme

Rural Water Supply Scheme Chak No. 13/ASB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1505 896 Name of the Scheme

Rural Water Supply Scheme Chak No. 60/NB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1506 897 Name of the Scheme

Rural Water Supply Scheme Chak No. 16/SB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1507 898 Name of the Scheme

Rural Water Supply Scheme Deawol

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.766

0.510

0.000

2.671

0.000

0.000

0.000

2.671

2.671

0.000

0.000

0.000

0.000

1.920

1.920

0.000

0.288

0.000

0.000

0.000

0.288

0.288

0.000

0.000

0.000

0.000

2.553

2.621

0.000

0.315

0.000

0.000

0.000

0.315

0.315

0.000

0.000

0.000

0.000

5.920

5.988

0.000

0.820

0.000

0.000

0.000

0.820

0.820

0.000

0.000

0.000

0.000

6.314

6.382

0.000

0.879

0.000

0.000

0.000

0.879

0.879

0.000

0.000

0.000

397

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1508 899 Name of the Scheme

Rural Water Supply Scheme Chak No. 9/ML

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1509 900 Name of the Scheme

Rural Water Supply Scheme Bhabra (Bashir Colony) Minhaas Bhabra

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1510 901 Name of the Scheme

Rural Water Supply Scheme Ishtaqlalabad

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1511 902 Name of the Scheme

Rural Water Supply Scheme Chak No. 82/NB

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1512 903 Name of the Scheme

Rural Water Supply Scheme Chak No. 48/NB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.031

4.000

0.000

2.936

0.000

0.000

0.000

2.936

2.936

0.000

0.000

0.000

0.000

7.500

7.500

0.000

1.125

0.000

0.000

0.000

1.125

1.125

0.000

0.000

0.000

0.000

9.908

7.400

0.000

3.994

0.000

0.000

0.000

3.994

3.994

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

3.547

3.615

0.000

0.464

0.000

0.000

0.000

0.464

0.464

0.000

0.000

0.000

398

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1513 904 Name of the Scheme

Rural Water Supply Scheme Chak No. 50/NB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

62%

District and Tehsil

Sargodha

1514 905 Name of the Scheme

Rural Water Supply Scheme Chak No. 107/SB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1515 906 Name of the Scheme

Rural Water Supply Scheme Chak No. 113/SB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1516 907 Name of the Scheme

Rural Water Supply Scheme Chak No. 115/SB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1517 908 Name of the Scheme

Reh: of Rural Water Supply Scheme Chak No. 126/SB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

18.692

6.360

0.000

7.000

0.000

0.000

0.000

7.000

7.000

8.136

0.000

0.000

0.000

2.762

2.833

0.000

0.343

0.000

0.000

0.000

0.343

0.343

0.000

0.000

0.000

0.000

4.300

4.370

0.000

0.575

0.000

0.000

0.000

0.575

0.575

0.000

0.000

0.000

0.000

5.556

2.000

0.000

4.389

0.000

0.000

0.000

4.389

4.389

0.000

0.000

0.000

0.000

4.388

4.388

0.000

0.658

0.000

0.000

0.000

0.658

0.658

0.000

0.000

0.000

399

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1518 909 Name of the Scheme

Reh: of Rural Water Supply Scheme Chgak No. 125/SB

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1519 910 Name of the Scheme

Rural Water Supply Scheme Sial Sharif

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1520 911 Name of the Scheme

Rural Water Supply Scheme Nehang

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1521 912 Name of the Scheme

Rural Water Supply Scheme Manowal

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1522 913 Name of the Scheme

Rural Water Supply Scheme Ali Pur Syedan

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.832

5.901

0.000

0.806

0.000

0.000

0.000

0.806

0.806

0.000

0.000

0.000

0.000

6.408

6.408

0.000

0.961

0.000

0.000

0.000

0.961

0.961

0.000

0.000

0.000

0.000

4.120

0.760

0.000

3.978

0.000

0.000

0.000

3.978

3.978

0.000

0.000

0.000

0.000

3.764

1.053

0.000

3.276

0.000

0.000

0.000

3.276

3.276

0.000

0.000

0.000

0.000

10.332

10.400

0.000

1.482

0.000

0.000

0.000

1.482

1.482

0.000

0.000

0.000

400

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1523 914 Name of the Scheme

Reh: of Rural Water Supply Scheme Nawab Pur

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1524 915 Name of the Scheme

Reh: of Rural Water Supply Scheme Kalra

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1525 916 Name of the Scheme

Rural Drainage Scheme village Dodha

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1526 917 Name of the Scheme

Installation of water filtration plant at Rahawali Sharqi

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1527 918 Name of the Scheme

Installation of water filtration plant at Bhatti Bhango

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.616

2.616

0.000

0.392

0.000

0.000

0.000

0.392

0.392

0.000

0.000

0.000

0.000

4.442

4.442

0.000

0.666

0.000

0.000

0.000

0.666

0.666

0.000

0.000

0.000

0.000

7.500

7.500

0.000

1.125

0.000

0.000

0.000

1.125

1.125

0.000

0.000

0.000

0.000

2.000

1.000

0.000

1.300

0.000

0.000

0.000

1.300

1.300

0.000

0.000

0.000

0.000

2.000

1.000

0.000

1.300

0.000

0.000

0.000

1.300

1.300

0.000

0.000

0.000

401

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1528 919 Name of the Scheme

Installation of water filtration plant at village Trigri

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1529 920 Name of the Scheme

Installation of water filtration plant at Aroop

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sargodha

1530 921 Name of the Scheme

Water Supply Scheme Mouza Kulla Virkan (Revised)

Approval Date

5/11/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sheikhupura

1531 922 Name of the Scheme

Rural Water Supply & Drainage Scheme at Shamke and Amanpura

Approval Date

10/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

62%

District and Tehsil

Sheikhupura

1532 923 Name of the Scheme

Rural Water Supply & Drainage Scheme at Kot Pindi Das

Approval Date

10/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

40%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.500

0.000

0.650

0.000

0.000

0.000

0.650

0.650

0.000

0.000

0.000

0.000

2.300

1.000

0.000

1.645

0.000

0.000

0.000

1.645

1.645

0.000

0.000

0.000

0.000

2.608

2.552

0.000

0.447

0.000

0.000

0.000

0.447

0.447

0.000

0.000

0.000

0.000

19.836

6.000

0.000

8.100

0.000

0.000

0.000

8.100

8.100

8.711

0.000

0.000

0.000

51.773

10.000

0.000

14.000

0.000

0.000

0.000

14.000

14.000

20.000

15.539

0.000

402

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1533 924 Name of the Scheme

Rural Water Supply & Drainage Scheme at Sakhum

Approval Date

10/11/2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

64%

District and Tehsil

Sheikhupura

1534 925 Name of the Scheme

Reh: of Water Supply & Sanitation Scheme Kharianwala (Revised)

Approval Date

23-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

91%

District and Tehsil

Sheikhupura

1535 926 Name of the Scheme

Drains & Water Supply Scheme Fatuwala

Approval Date

23-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

60%

District and Tehsil

Sheikhupura

1536 927 Name of the Scheme

Rehabilitation of Water Supply Scheme Dhakumpura

Approval Date

23-12-2008

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

70%

District and Tehsil

Sheikhupura

1537 928 Name of the Scheme

Rehabilitation of Water Supply and Sanitation Scheme Joyanwala and Adjoing abadies

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

17.726

6.000

0.000

7.000

0.000

0.000

0.000

7.000

7.000

7.385

0.000

0.000

0.000

19.937

9.137

0.000

11.791

0.000

0.000

0.000

11.791

11.791

2.000

0.000

0.000

0.000

13.070

3.000

0.000

6.000

0.000

0.000

0.000

6.000

6.000

6.031

0.000

0.000

0.000

14.892

7.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

5.126

0.000

0.000

0.000

37.270

5.000

0.000

6.700

0.000

0.000

0.000

6.700

6.700

21.452

0.000

0.000

Major Targets District and Tehsil

Foreign Aid

Sheikhupura

403

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1538 929 Name of the Scheme

Rural Water Supply & Drainage Scheme Galotian Kalan

Approval Date

13-09-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1539 930 Name of the Scheme

Rural Water Supply & Drainage Scheme Rab Nawaz Colony

Approval Date

10/10/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

80%

District and Tehsil

Sialkot

1540 931 Name of the Scheme

Rural Water Supply & Drainage Scheme Jamke Cheema

Approval Date

10/10/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

101%

District and Tehsil

Sialkot

1541 932 Name of the Scheme

Rural Water Supply & Drainage Scheme Dadu Basara

Approval Date

13-09-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1542 933 Name of the Scheme

Rural Water Supply Scheme Othian

Approval Date

13-09-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.516

8.500

0.000

1.293

0.000

0.000

0.000

1.293

1.293

0.000

0.000

0.000

0.000

26.550

9.998

0.000

14.305

0.000

0.000

0.000

14.305

14.305

6.230

0.000

0.000

0.000

16.400

8.979

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

0.000

4.438

4.704

0.000

0.400

0.000

0.000

0.000

0.400

0.400

0.000

0.000

0.000

0.000

6.485

7.133

0.000

0.325

0.000

0.000

0.000

0.325

0.325

0.000

0.000

0.000

404

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1543 934 Name of the Scheme

Rural Water Supply & Drainage Scheme Galotian Khurd

Approval Date

13-09-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1544 935 Name of the Scheme

Rural Water Supply & Drainage Scheme Viram

Approval Date

13-09-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1545 936 Name of the Scheme

Rural Water Supply & Drainage Scheme Roras

Approval Date

10/10/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

86%

District and Tehsil

Sialkot

1546 937 Name of the Scheme

Rural Water Supply Scheme Book Garha

Approval Date

6/3/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1547 938 Name of the Scheme

Rural Water Supply Scheme Ghopal Pur Kais

Approval Date

6/3/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.607

7.068

0.000

3.980

0.000

0.000

0.000

3.980

3.980

0.000

0.000

0.000

0.000

3.846

3.851

0.000

0.572

0.000

0.000

0.000

0.572

0.572

0.000

0.000

0.000

0.000

18.364

9.888

0.000

8.231

0.000

0.000

0.000

8.231

8.231

3.000

0.000

0.000

0.000

4.605

5.066

0.000

0.230

0.000

0.000

0.000

0.230

0.230

0.000

0.000

0.000

0.000

5.200

4.661

0.000

1.319

0.000

0.000

0.000

1.319

1.319

0.000

0.000

0.000

405

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1548 939 Name of the Scheme

Rural Water Supply Scheme Pathanwali

Approval Date

6/3/2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1549 940 Name of the Scheme

Rural Water Supply Scheme Chobara

Approval Date

18-05-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1550 941 Name of the Scheme

Rural Water Supply Scheme Bhuda Goraya

Approval Date

31-01-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1551 942 Name of the Scheme

Water Suppply Scheme Bharokay

Approval Date

31-01-2007

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1552 943 Name of the Scheme

Water Filtration Plant village Mulagar Pura

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.540

2.695

0.000

1.376

0.000

0.000

0.000

1.376

1.376

0.000

0.000

0.000

0.000

7.900

7.036

0.000

2.049

0.000

0.000

0.000

2.049

2.049

0.000

0.000

0.000

0.000

6.852

7.269

0.000

0.611

0.000

0.000

0.000

0.611

0.611

0.000

0.000

0.000

0.000

6.352

5.689

0.000

1.616

0.000

0.000

0.000

1.616

1.616

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

406

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1553 944 Name of the Scheme

Water Filtration Plant village Pindi Mandlayaan

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1554 945 Name of the Scheme

Water Filtration Plant village Najwal

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1555 946 Name of the Scheme

Water Filtration Plant village Dalowali

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1556 947 Name of the Scheme

Water Filtration Plant village Gujral

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1557 948 Name of the Scheme

Water Filtration Plant village Rawaal

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

407

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1558 949 Name of the Scheme

Water Filtration Plant village Nandpur

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1559 950 Name of the Scheme

Water Filtration Plant village Sarogpur

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1560 951 Name of the Scheme

Water Filtration Plant village Harna

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1561 952 Name of the Scheme

Water Filtration Plant village Sarhali

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1562 953 Name of the Scheme

Water Filtration Plant village Kakowal

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

408

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1563 954 Name of the Scheme

Water Filtration Plant village Machrala

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1564 955 Name of the Scheme

Water Filtration Plant village Chakrala

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1565 956 Name of the Scheme

Water Filtration Plant village Sadariwal

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1566 957 Name of the Scheme

Water Filtration Plant village Munawar Pur

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1567 958 Name of the Scheme

Water Filtration Plant village Choor Chak

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

409

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1568 959 Name of the Scheme

Water Filtration Plant village Jogo Chak

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1569 960 Name of the Scheme

Installation of water supply tubewell alongwith Distribution Jodaywali Kalan UC Pindi Arian

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1570 961 Name of the Scheme

Installation of Water Supply Tubewell along with Distribution Kakaywali UC Talwara Mughlan

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1571 962 Name of the Scheme

Provision of Water Supply Mast Malanay

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1572 963 Name of the Scheme

Water Supply U/C Model Town Daska

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.693

0.300

0.000

0.497

0.000

0.000

0.000

0.497

0.497

0.000

0.000

0.000

0.000

5.795

0.430

0.000

6.234

0.000

0.000

0.000

6.234

6.234

0.000

0.000

0.000

0.000

5.185

4.000

0.000

1.963

0.000

0.000

0.000

1.963

1.963

0.000

0.000

0.000

0.000

7.834

4.000

0.000

5.009

0.000

0.000

0.000

5.009

5.009

0.000

0.000

0.000

0.000

2.400

2.400

0.000

0.360

0.000

0.000

0.000

0.360

0.360

0.000

0.000

0.000

410

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1573 964 Name of the Scheme

Water Supply Scheme Chahar Bhular Baba Colony

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1574 965 Name of the Scheme

Installation of Water Supply with Tubewell alongwith Distribution Jodaywali Kalan UC Pindi Ariyan

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1575 966 Name of the Scheme

Rural Water Supply & Drainage Scheme Dugri Harian (UC Dulham Kahlwan)

Approval Date

14-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1576 967 Name of the Scheme

Rural Water Supply & Drainage Scheme Nar Singh (UC Pindi Bhago)

Approval Date

14-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.368

7.482

0.000

0.991

0.000

0.000

0.000

0.991

0.991

0.000

0.000

0.000

0.000

4.300

2.652

0.000

2.293

0.000

0.000

0.000

2.293

2.293

0.000

0.000

0.000

0.000

10.533

4.000

0.000

8.113

0.000

0.000

0.000

8.113

8.113

0.000

0.000

0.000

0.000

6.539

4.000

0.000

3.520

0.000

0.000

0.000

3.520

3.520

0.000

0.000

0.000

411

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1577 968 Name of the Scheme

Rural Water Supply & drainage Scheme Bajra Garhi & Mahal Data (UC Bajra Garhi)

Approval Date

14-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1578 969 Name of the Scheme

Rural Water Supply & Drainage Scheme, Jamal Jand & Sohal (UC Mirajke)

Approval Date

14-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1579 970 Name of the Scheme

Rural Water Supply & Drainage Scheme, Raja Harpal (UC Rasoolpur Bhallian)

Approval Date

14-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1580 971 Name of the Scheme

Rural Water Supply & Drainage Scheme Vinjal & Nidoke and Bhooni (UC Syedanwali)

Approval Date

14-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.882

4.000

0.000

7.364

0.000

0.000

0.000

7.364

7.364

0.000

0.000

0.000

0.000

6.702

4.000

0.000

3.707

0.000

0.000

0.000

3.707

3.707

0.000

0.000

0.000

0.000

7.459

4.000

0.000

4.578

0.000

0.000

0.000

4.578

4.578

0.000

0.000

0.000

0.000

8.880

4.000

0.000

6.212

0.000

0.000

0.000

6.212

6.212

0.000

0.000

0.000

412

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1581 972 Name of the Scheme

Rural Water Supply Kuthiala

Approval Date

2007-08

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1582 973 Name of the Scheme

Rural Water Supply Scheme Kharota Syedan (Revised)

Approval Date

2007-08

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1583 974 Name of the Scheme

Provision of Water Supply Scheme Village Harar UC Bhagwal

Approval Date

4/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1584 975 Name of the Scheme

Water Filtration Plant Jatheikay

Approval Date

21-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

1585 976 Name of the Scheme

Rural Water Supply Scheme, Chak No. 138/9-L (Ehsan Wala)

Approval Date

6.02.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.816

4.151

0.000

1.387

0.000

0.000

0.000

1.387

1.387

0.000

0.000

0.000

0.000

10.190

9.218

0.000

2.501

0.000

0.000

0.000

2.501

2.501

0.000

0.000

0.000

0.000

9.260

8.300

0.000

2.349

0.000

0.000

0.000

2.349

2.349

0.000

0.000

0.000

0.000

5.850

5.850

0.000

0.878

0.000

0.000

0.000

0.878

0.878

0.000

0.000

0.000

0.000

5.741

5.054

0.000

1.548

0.000

0.000

0.000

1.548

1.548

0.000

0.000

0.000

413

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1586 977 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 78/5-R

Approval Date

6.02.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal

1587 978 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Harappa City.

Approval Date

Approved

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

58%

District and Tehsil

Sahiwal

1588 979 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No.142/9-L.

Approval Date

6.02.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal

1589 980 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 160/9-L.

Approval Date

02.03.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal , Chichawatni

1590 981 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 8/11-L.

Approval Date

6.02.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal , Chichawatni

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.741

5.054

0.000

1.548

0.000

0.000

0.000

1.548

1.548

0.000

0.000

0.000

0.000

15.000

7.500

0.000

2.445

0.000

0.000

0.000

2.445

2.445

7.305

0.000

0.000

0.000

4.882

4.909

0.000

0.705

0.000

0.000

0.000

0.705

0.705

0.000

0.000

0.000

0.000

11.772

6.774

0.000

6.764

0.000

0.000

0.000

6.764

6.764

0.000

0.000

0.000

0.000

5.345

3.459

0.000

2.688

0.000

0.000

0.000

2.688

2.688

0.000

0.000

0.000

414

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1591 982 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 182/9-L.

Approval Date

02.03.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal , Chichawatni

1592 983 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 111/9-L.

Approval Date

6.2.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal

1593 984 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Noor Shah

Approval Date

02.03.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal

1594 985 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 61/4-R.

Approval Date

6.2.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal

1595 986 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 115/9-L.

Approval Date

6.2.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.967

2.667

0.000

3.045

0.000

0.000

0.000

3.045

3.045

0.000

0.000

0.000

0.000

5.620

5.516

0.000

0.947

0.000

0.000

0.000

0.947

0.947

0.000

0.000

0.000

0.000

18.000

5.037

0.000

15.663

0.000

0.000

0.000

15.663

15.663

0.000

0.000

0.000

0.000

3.092

2.647

0.000

0.909

0.000

0.000

0.000

0.909

0.909

0.000

0.000

0.000

0.000

6.879

6.879

0.000

1.032

0.000

0.000

0.000

1.032

1.032

0.000

0.000

0.000

415

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1596 987 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 86/9-L.

Approval Date

6.02.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal

1597 988 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 45/12-L.

Approval Date

02.03.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

51%

District and Tehsil

Sahiwal , Chichawatni

1598 989 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Kassowal.

Approval Date

6.2.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal , Chichawatni

1599 990 Name of the Scheme

Comprehensive Rural Water Supply Scheme, Chak No. 40/12-L

Approval Date

Approved

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

43%

District and Tehsil

Sahiwal

1600 991 Name of the Scheme

Water Supply Scheme Chak No.112/9-L Budhu Dakhu

Approval Date

6.2.09

Major Components

T/well,P.House,P.Machinery, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.725

3.879

0.000

1.555

0.000

0.000

0.000

1.555

1.555

0.000

0.000

0.000

0.000

11.739

1.742

0.000

5.200

0.000

0.000

0.000

5.200

5.200

6.558

0.000

0.000

0.000

2.082

1.989

0.000

0.405

0.000

0.000

0.000

0.405

0.405

0.000

0.000

0.000

0.000

10.000

2.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

6.500

0.000

0.000

0.000

5.234

3.000

0.000

3.019

0.000

0.000

0.000

3.019

3.019

0.000

0.000

0.000

416

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1601 992 Name of the Scheme

Water Supply Scheme Chak No.120/9-L Kameer

Approval Date

27.05.2009

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

17%

District and Tehsil

Sahiwal

1602 993 Name of the Scheme

Rural Water Supply & Drainage Scheme Chak No.85/5-L

Approval Date

Approved

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

53%

District and Tehsil

Sahiwal

1603 994 Name of the Scheme

Rural Water Supply Scheme, Chak No.367/JB

Approval Date

31.01.07

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1604 995 Name of the Scheme

Rural Water Supply Scheme Chak No.158/GB

Approval Date

31.01.07

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1605 996 Name of the Scheme

Rural Water Supply Scheme Chak No.288& 289 & 339/GB(Kalan & Khurd)

Approval Date

12.12.07

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

78.916

3.879

0.000

11.221

0.000

0.000

0.000

11.221

11.221

75.653

0.000

0.000

0.000

15.000

2.000

0.000

7.200

0.000

0.000

0.000

7.200

7.200

8.050

0.000

0.000

0.000

12.569

11.383

0.000

3.071

0.000

0.000

0.000

3.071

3.071

0.000

0.000

0.000

0.000

8.889

7.989

0.000

2.233

0.000

0.000

0.000

2.233

2.233

0.000

0.000

0.000

0.000

30.156

31.610

0.000

3.069

0.000

0.000

0.000

3.069

3.069

0.000

0.000

0.000

417

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1606 997 Name of the Scheme

Rural Water Supply Scheme Chak No.408/JB & 305/GB

Approval Date

06.02.07

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1607 998 Name of the Scheme

Rural Water Supply Scheme Chak No.314 & 315/GB

Approval Date

12.12.07

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1608 999 Name of the Scheme

Rural Water Supply Scheme,Chak No.302/GB Bhatti Chak

Approval Date

21.8.08

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1609 1000 Name of the Scheme

Rural Water Supply Scheme,Chak No.312/GB

Approval Date

2006-07

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1610 1001 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, 324/JB.

Approval Date

9.2.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

20.795

22.936

0.000

0.978

0.000

0.000

0.000

0.978

0.978

0.000

0.000

0.000

0.000

14.349

16.490

0.000

0.011

0.000

0.000

0.000

0.011

0.011

0.000

0.000

0.000

0.000

13.051

11.500

0.000

3.509

0.000

0.000

0.000

3.509

3.509

0.000

0.000

0.000

0.000

6.948

5.821

0.000

2.169

0.000

0.000

0.000

2.169

2.169

0.000

0.000

0.000

0.000

10.805

8.498

0.000

3.928

0.000

0.000

0.000

3.928

3.928

0.000

0.000

0.000

418

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1611 1002 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, 247/JB.

Approval Date

9.2.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1612 1003 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, 287/GB.

Approval Date

9.2.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1613 1004 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, 184/JB.

Approval Date

9.2.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1614 1005 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Chak No. 691/33GB.

Approval Date

9.2.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh , Kamalia

1615 1006 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme,Zeshan Colony Kamalia

Approval Date

9.2.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh , Kamalia

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.917

3.936

0.000

1.719

0.000

0.000

0.000

1.719

1.719

0.000

0.000

0.000

0.000

2.171

1.252

0.000

1.245

0.000

0.000

0.000

1.245

1.245

0.000

0.000

0.000

0.000

5.199

4.467

0.000

1.512

0.000

0.000

0.000

1.512

1.512

0.000

0.000

0.000

0.000

10.175

7.967

0.000

3.734

0.000

0.000

0.000

3.734

3.734

0.000

0.000

0.000

0.000

10.607

8.200

0.000

3.998

0.000

0.000

0.000

3.998

3.998

0.000

0.000

0.000

419

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1616 1007 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, 700/42-GB.

Approval Date

9.2.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh , Kamalia

1617 1008 Name of the Scheme

P.Laying Water Supply Pipeline i.e Turbine at Chak No.318/JB

Approval Date

19.309

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1618 1009 Name of the Scheme

P.Laying Water Supply Pipeline i.e Turbine at Chak No.392/JB Gurd Chitala

Approval Date

19.3.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1619 1010 Name of the Scheme

P.Laying Water Supply Pipeline i.e Turbine at Chak No.327/JB Bhalair Nai Abadi

Approval Date

19.309

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1620 1011 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No.334/GB Rajuwal (Phase-I).

Approval Date

19.3.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.658

6.380

0.000

2.427

0.000

0.000

0.000

2.427

2.427

0.000

0.000

0.000

0.000

3.698

3.698

0.000

0.555

0.000

0.000

0.000

0.555

0.555

0.000

0.000

0.000

0.000

1.736

1.000

0.000

0.996

0.000

0.000

0.000

0.996

0.996

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

2.389

2.145

0.000

0.602

0.000

0.000

0.000

0.602

0.602

0.000

0.000

0.000

420

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1621 1012 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No.334/GB Rajuwal (Phase-II).

Approval Date

19.3.09

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

1622 1013 Name of the Scheme

Water Supply and Sewerage Scheme,Chak No.187/EB(Gaggu)

Approval Date

21.8.08

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

93%

District and Tehsil

Vehari , Burewala

1623 1014 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No. 375/EB.

Approval Date

Approved

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

1624 1015 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No. 199/EB

Approval Date

19.2.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

1625 1016 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No. 419/EB.

Approval Date

Approved

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.119

2.000

0.000

0.437

0.000

0.000

0.000

0.437

0.437

0.000

0.000

0.000

0.000

28.188

21.019

0.000

9.248

0.000

0.000

0.000

9.248

9.248

0.000

0.000

0.000

0.000

1.944

1.944

0.000

0.292

0.000

0.000

0.000

0.292

0.292

0.000

0.000

0.000

0.000

6.937

5.501

0.000

2.477

0.000

0.000

0.000

2.477

2.477

0.000

0.000

0.000

0.000

1.605

1.605

0.000

0.241

0.000

0.000

0.000

0.241

0.241

0.000

0.000

0.000

421

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1626 1017 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No. 325/EB.

Approval Date

19.2.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

1627 1018 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Chak No.435 /EB.

Approval Date

19.02.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

1628 1019 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme Dad kamera.

Approval Date

19.02.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

1629 1020 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Doulatabad.

Approval Date

19.02.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

1630 1021 Name of the Scheme

Rehabilitation of Rural Water Supply Scheme, Sahuka.

Approval Date

19.02.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.072

3.541

0.000

1.142

0.000

0.000

0.000

1.142

1.142

0.000

0.000

0.000

0.000

5.088

4.770

0.000

1.081

0.000

0.000

0.000

1.081

1.081

0.000

0.000

0.000

0.000

3.090

3.090

0.000

0.464

0.000

0.000

0.000

0.464

0.464

0.000

0.000

0.000

0.000

3.786

3.120

0.000

1.234

0.000

0.000

0.000

1.234

1.234

0.000

0.000

0.000

0.000

3.604

2.770

0.000

1.375

0.000

0.000

0.000

1.375

1.375

0.000

0.000

0.000

422

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1631 1022 Name of the Scheme

Rehabilitation of Rural water Supply Scheme Chak No. 497/EB.

Approval Date

19.02.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari

1632 1023 Name of the Scheme

Rehabilitation of Rural water Supply Scheme Chak No. 537/EB.

Approval Date

19.02.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari

1633 1024 Name of the Scheme

Rehabilitation of Rural water Supply Scheme Chak No. 46/WB.

Approval Date

19.2.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari

1634 1025 Name of the Scheme

Rehabilitation of Rural water Supply Scheme Chak No. 76/WB.

Approval Date

19.2.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari

1635 1026 Name of the Scheme

Rehabilitation of Rural water Supply Scheme Umar Khichi

Approval Date

19.02.09

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.540

4.084

0.000

2.287

0.000

0.000

0.000

2.287

2.287

0.000

0.000

0.000

0.000

4.830

4.318

0.000

1.237

0.000

0.000

0.000

1.237

1.237

0.000

0.000

0.000

0.000

5.531

4.996

0.000

1.365

0.000

0.000

0.000

1.365

1.365

0.000

0.000

0.000

0.000

3.761

3.385

0.000

0.940

0.000

0.000

0.000

0.940

0.940

0.000

0.000

0.000

0.000

6.595

6.595

0.000

0.989

0.000

0.000

0.000

0.989

0.989

0.000

0.000

0.000

423

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1636 1027 Name of the Scheme

Rural Water Supply and Drainage Scheme Chak No.247/EB.

Approval Date

12.12.08

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

1637 1028 Name of the Scheme

Rural Water Supply and Drainage Scheme Chak No.175/EB & 365/EB

Approval Date

12.12.08

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

57%

District and Tehsil

Vehari , Burewala

1638 1029 Name of the Scheme

Rural Water Supply and Drainage Scheme Chak No.375/EB.

Approval Date

12.12.08

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

1639 1030 Name of the Scheme

Rural Water Supply and Drainage Scheme Chak No.377/EB.

Approval Date

12.12.08

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

69%

District and Tehsil

Vehari , Burewala

1640 1031 Name of the Scheme

Rural Water Supply and Drainage Scheme Chak No.401/EB.

Approval Date

12.12.08

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.521

6.521

0.000

0.978

0.000

0.000

0.000

0.978

0.978

0.000

0.000

0.000

0.000

32.180

11.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

16.007

0.000

0.000

0.000

4.257

4.257

0.000

0.639

0.000

0.000

0.000

0.639

0.639

0.000

0.000

0.000

0.000

17.520

7.700

0.000

6.200

0.000

0.000

0.000

6.200

6.200

6.248

0.000

0.000

0.000

5.423

5.423

0.000

0.813

0.000

0.000

0.000

0.813

0.813

0.000

0.000

0.000

424

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1641 1032 Name of the Scheme

Rural Water Supply and Drainage Scheme Chak No.407/EB.

Approval Date

12.12.08

Major Components

T.well,P.House,D/system,OHR etc.

Major Targets

100%

District and Tehsil

Vehari , Burewala

Sub-Total: Rural Water Supply

Estimated Cost F. Aid 4

0.000

Total 5

5.099

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

5.099

0.000

0.765

0.000

0.000

0.000 1,875.863

0.000

0.000

Total Cap 11

0.000

Rev 12

0.765

0.000 1,875.863

0.765

1,875.863

0.000

1,608.754

0.000

83.924

0.000

0.000

5,892.163

3,210.915

0.000

0.000

40.220

34.193

0.000

4.000

0.000

0.000

0.000

4.000

4.000

8.060

0.000

0.000

0.000

15.630

17.288

0.000

0.686

0.000

0.000

0.000

0.686

0.686

0.000

0.000

0.000

0.000

9.083

8.975

0.000

1.470

0.000

0.000

0.000

1.470

1.470

0.000

0.000

0.000

0.000

9.970

6.150

0.000

5.316

0.000

0.000

0.000

5.316

5.316

0.000

0.000

0.000

Rural Sewerage Drainage 1642 1033 Name of the Scheme

Rural Drainage Scheme Kamrial (Revised)

Approval Date

26-01-2008

Major Components

Sewer System and disposal work etc.

Major Targets

85%

District and Tehsil

Attock

1643 1034 Name of the Scheme

Rural Drainage Scheme Formali

Approval Date

5/3/2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

1644 1035 Name of the Scheme

Rural Drainage Scheme Malowala (Revised)

Approval Date

5/3/2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

1645 1036 Name of the Scheme

Rural Drainage Scheme Malak Mala

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

425

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1646 1037 Name of the Scheme

Rural Drainage Scheme Sheinka (Revised)

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

74%

District and Tehsil

Attock

1647 1038 Name of the Scheme

Rural Drainage Scheme Jalalia

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

81%

District and Tehsil

Attock

1648 1039 Name of the Scheme

Rural Drainage Scheme Moman Pur

Approval Date

13-04-2007

Major Components

Sewer System and disposal work etc.

Major Targets

82%

District and Tehsil

Attock

1649 1040 Name of the Scheme

Sewerage Scheme Pindi Gheb

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

41%

District and Tehsil

Attock

1650 1041 Name of the Scheme

Rural Drainage Scheme Dhoke Sukhwal

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

1651 1042 Name of the Scheme

Rural Drainage Scheme Ahmdal

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

29.900

21.273

0.000

4.000

0.000

0.000

0.000

4.000

4.000

9.112

0.000

0.000

0.000

12.348

6.474

0.000

4.000

0.000

0.000

0.000

4.000

4.000

3.726

0.000

0.000

0.000

9.899

4.377

0.000

5.000

0.000

0.000

0.000

5.000

5.000

2.007

0.000

0.000

0.000

28.432

7.500

0.000

6.000

0.000

0.000

0.000

6.000

6.000

19.197

0.000

0.000

0.000

8.250

6.820

0.000

2.668

0.000

0.000

0.000

2.668

2.668

0.000

0.000

0.000

0.000

11.320

10.700

0.000

2.318

0.000

0.000

0.000

2.318

2.318

0.000

0.000

0.000

426

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1652 1043 Name of the Scheme

Rural Drainage Scheme Ghurghushti

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

56%

District and Tehsil

Attock

1653 1044 Name of the Scheme

Rural Drainage Scheme Sirka

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

81%

District and Tehsil

Attock

1654 1045 Name of the Scheme

Rural Drainage Scheme Shadi Khan

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

110%

District and Tehsil

Attock

1655 1046 Name of the Scheme

Rural Drainage Scheme Waisa

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

67%

District and Tehsil

Attock

1656 1047 Name of the Scheme

Rural Drainage Scheme Kamalpur Musa

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

1657 1048 Name of the Scheme

Rural Drainage Scheme Pithi Pirzai

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

15.000

5.699

0.000

4.000

0.000

0.000

0.000

4.000

4.000

7.551

0.000

0.000

0.000

9.377

5.699

0.000

3.000

0.000

0.000

0.000

3.000

3.000

2.085

0.000

0.000

0.000

7.860

6.481

0.000

3.500

0.000

0.000

0.000

3.500

3.500

0.000

0.000

0.000

0.000

14.590

6.299

0.000

5.000

0.000

0.000

0.000

5.000

5.000

5.480

0.000

0.000

0.000

7.134

7.199

0.000

1.005

0.000

0.000

0.000

1.005

1.005

0.000

0.000

0.000

0.000

8.738

6.220

0.000

3.829

0.000

0.000

0.000

3.829

3.829

0.000

0.000

0.000

427

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1658 1049 Name of the Scheme

Rural Drainage Scheme Saleem Khan, Tehsil Hazro

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

1659 1050 Name of the Scheme

Rural Drainage Scheme Muraaria

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

1660 1051 Name of the Scheme

Rural Drainage Scheme Randak Tehsil Hazro

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

1661 1052 Name of the Scheme

Rural Drainage Scheme Haroon i/c Ada Pzai, Ababakar, Daman, Kamal Pur Alam, Mullan Kalan

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

59%

District and Tehsil

Attock

1662 1053 Name of the Scheme

Rural Drainage Scheme Yasin i/c Village Asghar

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

66%

District and Tehsil

Attock

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.023

2.023

0.000

0.303

0.000

0.000

0.000

0.303

0.303

0.000

0.000

0.000

0.000

2.031

2.031

0.000

0.305

0.000

0.000

0.000

0.305

0.305

0.000

0.000

0.000

0.000

0.949

0.949

0.000

0.142

0.000

0.000

0.000

0.142

0.142

0.000

0.000

0.000

0.000

8.788

3.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

4.106

0.000

0.000

0.000

6.621

3.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.614

0.000

0.000

428

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1663 1054 Name of the Scheme

Rural Drainage Scheme Khura Khel, i/c village Ghari Matani, Tehsil Hazro, Distt. Attock

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

71%

District and Tehsil

Attock

1664 1055 Name of the Scheme

Rural Drainage Scheme Tajak, i/c Lundi Awan Abad Noor Pur, Rangoo Tehsil Hazro, Distt: Attock

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

30%

District and Tehsil

Attock

1665 1056 Name of the Scheme

Rural Drainage Scheme Shamas Abad, i/c Village Shah Taja Baja Weru, Saba Kamala, Tehsil Hazro, Distt. Attock

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

64%

District and Tehsil

Attock

1666 1057 Name of the Scheme

Rural Drainage Scheme Kalu Kotha, i/c village Basia, Tehsil Hazro, Distt. Attock

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Attock

1667 1058 Name of the Scheme

Rural Drainage Scheme Hameed, Tehsil Hazo Distt. Attock

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

37%

District and Tehsil

Attock

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.116

3.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.033

0.000

0.000

0.000

14.480

3.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

11.652

0.000

0.000

0.000

8.164

3.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

3.389

0.000

0.000

0.000

4.600

3.000

0.000

2.290

0.000

0.000

0.000

2.290

2.290

0.000

0.000

0.000

0.000

12.567

3.000

0.000

2.300

0.000

0.000

0.000

2.300

2.300

9.152

0.000

0.000

429

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1668 1059 Name of the Scheme

Rural Drainage Scheme Musa, i/c village Musa Kudlathi, Chachian (P), Tehsil, Hazro Distt: Attock

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

41%

District and Tehsil

Attock

1669 1060 Name of the Scheme

Rural Drainage Scheme Bahadur Khan, i/c village Jatial Chachian, TehsilHazro, Distt. Attock

Approval Date

11/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

74%

District and Tehsil

Attock

1670 1061 Name of the Scheme

Construction of PCC & Drain TypeI in Mohallah Islam Nagar, Tehsil Darya Khan

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Bhakkar

1671 1062 Name of the Scheme

Construction of Soling & Drain at Hetoo, Tehsil Kallurkot

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Bhakkar

1672 1063 Name of the Scheme

Soling & Drains in left over area in Dully Wala, Tehsil Darya Khan

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Bhakkar

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

14.480

3.000

0.000

3.900

0.000

0.000

0.000

3.900

3.900

9.752

0.000

0.000

0.000

7.038

3.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

2.094

0.000

0.000

0.000

1.884

1.884

0.000

0.283

0.000

0.000

0.000

0.283

0.283

0.000

0.000

0.000

0.000

2.550

2.550

0.000

0.383

0.000

0.000

0.000

0.383

0.383

0.000

0.000

0.000

0.000

3.451

3.451

0.000

0.518

0.000

0.000

0.000

0.518

0.518

0.000

0.000

0.000

430

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1673 1064 Name of the Scheme

Soling & Drains in left over area in Jandan Wala Tehsil Kallurkot

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Bhakkar

1674 1065 Name of the Scheme

Rural Drainage Scheme Bekhan Bodla.

Approval Date

2.2.09

Major Components

T.Well,R.Main,D.System and allied works etc.

Major Targets

47%

District and Tehsil

Bahawalnagar , minchan abad

1675 1066 Name of the Scheme

Construction of Drainage Scheme, Bhindi Noor Sial.

Approval Date

2006-07

Major Components

Drains,Disposal work and other works.

Major Targets

100%

District and Tehsil

Bahawalpur

1676 1067 Name of the Scheme

Rural Drainage Scheme,Chak No.33/DNB

Approval Date

2006-07

Major Components

Drains,Disposal work and other works.

Major Targets

100%

District and Tehsil

Bahawalpur

1677 1068 Name of the Scheme

Rural Drainage Scheme, Manzoorabad Mouza Qaimpur

Approval Date

2006-07

Major Components

Drains,Disposal work and other works.

Major Targets

100%

District and Tehsil

Bahawalpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.017

3.017

0.000

0.453

0.000

0.000

0.000

0.453

0.453

0.000

0.000

0.000

0.000

5.726

1.112

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.473

0.000

0.000

0.000

1.200

0.700

0.000

0.680

0.000

0.000

0.000

0.680

0.680

0.000

0.000

0.000

0.000

3.348

3.033

0.000

0.817

0.000

0.000

0.000

0.817

0.817

0.000

0.000

0.000

0.000

0.600

0.400

0.000

0.290

0.000

0.000

0.000

0.290

0.290

0.000

0.000

0.000

431

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1678 1069 Name of the Scheme

Rural Drainage Scheme,Chak No.48/DB

Approval Date

05.03.07

Major Components

Drains,Disposal work and other works.

Major Targets

100%

District and Tehsil

Bahawalpur , Yazman

1679 1070 Name of the Scheme

Rural Drainage Scheme,Chak No.116/DNB

Approval Date

03.08.05

Major Components

Drains,Disposal work and other works.

Major Targets

100%

District and Tehsil

Bahawalpur , Yazman

1680 1071 Name of the Scheme

Rural Drainage Scheme,Chak No.58/DB

Approval Date

08.03.07

Major Components

Drains,Disposal work and other works.

Major Targets

100%

District and Tehsil

Bahawalpur , Yazman

1681 1072 Name of the Scheme

Construction of Streets, Soling and Drains in Union Council Chak Ramdas

Approval Date

31-01-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1682 1073 Name of the Scheme

Construction of Streets, Soling and Drains in Union Council Dhensar Pain (Revised)

Approval Date

27-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

36%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.970

3.975

0.000

2.891

0.000

0.000

0.000

2.891

2.891

0.000

0.000

0.000

0.000

5.740

4.874

0.000

1.727

0.000

0.000

0.000

1.727

1.727

0.000

0.000

0.000

0.000

4.222

3.975

0.000

0.880

0.000

0.000

0.000

0.880

0.880

0.000

0.000

0.000

0.000

3.500

0.992

0.000

3.033

0.000

0.000

0.000

3.033

3.033

0.000

0.000

0.000

0.000

9.859

2.961

0.000

1.064

0.000

0.000

0.000

1.064

1.064

7.313

0.000

0.000

432

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1683 1074 Name of the Scheme

Construction of PCC Streets & Drain Shanke (Revised)

Approval Date

7/3/2007

Major Components

Sewer System and disposal work etc.

Major Targets

16%

District and Tehsil

Gujranwala

1684 1075 Name of the Scheme

Construction of Streets and drains at Linepar Tibba Kamoke (Revised)

Approval Date

27-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

30%

District and Tehsil

Gujranwala

1685 1076 Name of the Scheme

Rural Drainage Scheme Union Council Ferozewala, Chak Joyia & Pandoo Pur (Revised)

Approval Date

27-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

20%

District and Tehsil

Gujranwala

1686 1077 Name of the Scheme

Rural Drainage Scheme Union Council Kali Suba including Thatha Rao, Panama Kala Bootawali Nath, Ladher, Sahib, Tawang Up / Bucha.

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

22.686

2.731

0.000

1.510

0.000

0.000

0.000

1.510

1.510

21.848

0.000

0.000

0.000

64.207

20.192

0.000

2.000

0.000

0.000

0.000

2.000

2.000

51.646

0.000

0.000

0.000

7.365

0.826

0.000

0.899

0.000

0.000

0.000

0.899

0.899

6.745

0.000

0.000

0.000

3.500

3.515

0.000

0.510

0.000

0.000

0.000

0.510

0.510

0.000

0.000

0.000

433

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1687 1078 Name of the Scheme

Rural Drainage Scheme Union Council Gunaour including Gunaour, Pull Shah Dohalla & Rujhan Wali

Approval Date

16-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1688 1079 Name of the Scheme

Rural Drainage Scheme Union Council Sohawa Dhiluwan including Sohawa & Jabo, Sahiboke Dhandian, Kulo Kalan & Khurd, Kotli Maqbara & Shahdi Mata, Ghari, Rustampur, Dhera Jamuian & Gorali

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1689 1080 Name of the Scheme

Rural Drainage Scheme Mauza Gondlanwala

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

65%

District and Tehsil

Gujranwala

1690 1081 Name of the Scheme

Construction of Sewerage, Drainage & Soling at Kalaske (Revised)

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

26%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.500

1.567

0.000

0.158

0.000

0.000

0.000

0.158

0.158

0.000

0.000

0.000

0.000

3.000

3.021

0.000

0.429

0.000

0.000

0.000

0.429

0.429

0.000

0.000

0.000

0.000

6.000

2.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.400

0.000

0.000

0.000

57.074

16.169

0.000

1.000

0.000

0.000

0.000

1.000

1.000

48.466

0.000

0.000

434

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1691 1082 Name of the Scheme

Ext: Rural Drainage Scheme Nokhar (Revised)

Approval Date

11/12/2006

Major Components

Sewer System and disposal work etc.

Major Targets

32%

District and Tehsil

Gujranwala

1692 1083 Name of the Scheme

Const: of Nullah both sides Bazar No. 4 Gulberg Colony

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1693 1084 Name of the Scheme

Const: of PCC Sewerage Main Baza Qila Sunder Singh including branches

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1694 1085 Name of the Scheme

Const: of PCC Sewerage Bazar Captain Anwar Wala Abu Bakkar Park

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1695 1086 Name of the Scheme

Const: of PCC Sewerage Bazar Gogay Numberdar Wala Khiali Shahpur

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

19.375

5.710

0.000

1.525

0.000

0.000

0.000

1.525

1.525

15.046

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

1.800

1.800

0.000

0.270

0.000

0.000

0.000

0.270

0.270

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

435

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1696 1087 Name of the Scheme

Const: of PCC Sewerage Gali Shafi School Mohallah Pir Qasim Ali Shah

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1697 1088 Name of the Scheme

Const: of PCC Sewerage Bazar No. 1 Ajmal Town

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1698 1089 Name of the Scheme

Const: of PCC Sewerage Gallah Bhabey Patwari Wala, Gulberg Colony Noshera Road

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1699 1090 Name of the Scheme

Laying of Sewerage line near Thana Jinnah Road Ibrahim Park

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1700 1091 Name of the Scheme

Const: of Sewerage More Aminabad Gazni

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

61%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

10.000

5.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.500

0.000

0.000

436

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1701 1092 Name of the Scheme

Rural Drainage Scheme Hambokey and Make Wali

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1702 1093 Name of the Scheme

Rural Drainage Scheme Nitherkey and Adjoining Abadies

Approval Date

7/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Gujranwala

1703 1094 Name of the Scheme

Construction of Sewerage 18" dia Qazafi Road, Garjakh

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1704 1095 Name of the Scheme

Construction of Sewerage 12" dia Galu Mehar Shehzad to Chowk Juma Dukandar Garjakh

Approval Date

18-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1705 1096 Name of the Scheme

Construction of PCC and Sewerage Riaz Bhatti Chouncillor Road Afzal Abad

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.540

4.000

0.000

2.371

0.000

0.000

0.000

2.371

2.371

0.000

0.000

0.000

0.000

3.236

3.241

0.000

0.480

0.000

0.000

0.000

0.480

0.480

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.567

0.500

0.000

0.152

0.000

0.000

0.000

0.152

0.152

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

437

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1706 1097 Name of the Scheme

Construction of PCC and Sewerage Azam Chowk Ratty Road Dhullay Sauued Pak Bazar to Chowk Hameed Shaheen

Approval Date

18-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1707 1098 Name of the Scheme

Sewerage of Liaqat road to Khota Pully Jinnah Road Gujranwala

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1708 1099 Name of the Scheme

Construction of Sewerage 18" dia with Islam Wala Gallah Gorjakh

Approval Date

18-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1709 1100 Name of the Scheme

Cnstruction of Seweage , Drainage, PCC Streets Madokhalil Bhakerewali Kalan Khurd

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

11%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

8.000

8.000

0.000

1.200

0.000

0.000

0.000

1.200

1.200

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

47.600

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

48.740

0.000

0.000

438

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1710 1101 Name of the Scheme

Cnstruction of Seweage , Drainage, PCC Streets Uggo Chak Haiger Deorian

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

11%

District and Tehsil

Gujranwala

1711 1102 Name of the Scheme

Cnstruction of Seweage , Drainage, PCC Streets ManJhugian Khabeke Kotli Raitwali Peero Kot

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

12%

District and Tehsil

Gujranwala

1712 1103 Name of the Scheme

Cnstruction of Seweage , Drainage, PCC Streets Botala Janda Singh Khaliqpur Bajomill Nat sill Behladpur

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

10%

District and Tehsil

Gujranwala

1713 1104 Name of the Scheme

Cnstruction of Seweage , Drainage, PCC Streets Bhawanedas Landha Tarugha Dhendsay Nawan Pind

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

11%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

40.147

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

41.169

0.000

0.000

0.000

53.008

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

53.459

0.000

0.000

0.000

47.779

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

49.346

0.000

0.000

0.000

39.783

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

40.550

0.000

0.000

439

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1714 1105 Name of the Scheme

Rehab:/Imp: & Extension of Drainage Scheme Talwandi Musa Khan

Approval Date

27-04-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

47%

District and Tehsil

Gujranwala

1715 1106 Name of the Scheme

Sewerage Scheme Deganwali Dullay

Approval Date

18-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1716 1107 Name of the Scheme

Sewerage/Drainage Scheme Mohallah Kangni Wala

Approval Date

7/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1717 1108 Name of the Scheme

Sewerage/Drainage Scheme Shahbaz Colony

Approval Date

7/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1718 1109 Name of the Scheme

Construction of Nullah Grave Yard G.T Road to Master Tiles Chianwali

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

40.766

19.098

0.000

2.865

0.000

0.000

0.000

2.865

2.865

24.918

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

4.467

4.467

0.000

0.670

0.000

0.000

0.000

0.670

0.670

0.000

0.000

0.000

0.000

4.490

4.490

0.000

0.674

0.000

0.000

0.000

0.674

0.674

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

440

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1719 1110 Name of the Scheme

Construction of Rural Drainage Scheme Faiz Town and Sharif Pura Kamoke

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1720 1111 Name of the Scheme

Construction of Rural Drainage Scheme Salamat Pura Rasool Nagar Kamoke

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1721 1112 Name of the Scheme

Rural Drainage Scheme & PCC at Tatlay Wali

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1722 1113 Name of the Scheme

Rural Drainage Scheme & PCC at Baddo Ratta

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1723 1114 Name of the Scheme

Rural Drainage Scheme & PCC at Baigpur

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.000

3.000

0.000

1.600

0.000

0.000

0.000

1.600

1.600

0.000

0.000

0.000

0.000

4.000

2.800

0.000

1.800

0.000

0.000

0.000

1.800

1.800

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

441

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1724 1115 Name of the Scheme

Rural Drainage Scheme & PCC at Germula Virkan

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1725 1116 Name of the Scheme

Rural Drainage Scheme & PCC at Ghumman Wala

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1726 1117 Name of the Scheme

Rural Drainage Scheme & PCC at MattoBlaike

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1727 1118 Name of the Scheme

Rural Drainage Scheme & PCC at Daburgi Virkan

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1728 1119 Name of the Scheme

Rural Drainage Scheme & PCC at Mohar Qasim Pur

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

442

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1729 1120 Name of the Scheme

Rural Drainage Scheme & PCC at Marri Bhindran

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1730 1121 Name of the Scheme

Rural Drainage Scheme & PCC at Bhadday

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1731 1122 Name of the Scheme

Rural Drainage Scheme & PCC at Karyal Kalan

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1732 1123 Name of the Scheme

Rural Drainage Scheme & PCC at Khan Musliman

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1733 1124 Name of the Scheme

Rural Drainage Scheme & PCC at Abid Abad

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

443

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1734 1125 Name of the Scheme

Rural Drainage Scheme & PCC at Pilthi Pur

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1735 1126 Name of the Scheme

Rural Drainage Scheme & PCC at Challay Key

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1736 1127 Name of the Scheme

Rural Drainage Scheme Noshera Virkan

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1737 1128 Name of the Scheme

Rural Drainage Scheme Jagu Wala

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1738 1129 Name of the Scheme

Rural Drainage Scheme Gamuwala

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

2.000

0.300

0.000

2.000

0.000

0.000

0.000

2.000

2.000

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

444

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1739 1130 Name of the Scheme

Rural Drainage Scheme Buduratta

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1740 1131 Name of the Scheme

Rural Drainage Scheme Budha Gorayya

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1741 1132 Name of the Scheme

Rural Drainage Scheme Naiwala

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1742 1133 Name of the Scheme

Rural Drainage Scheme Noiwala

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1743 1134 Name of the Scheme

Rural Drainage Scheme Sadmanwali

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

445

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1744 1135 Name of the Scheme

Rural Drainage Scheme Ghumanwala

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1745 1136 Name of the Scheme

Rural Drainage Scheme Marikhrd

Approval Date

7/5/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujranwala

1746 1137 Name of the Scheme

Ext Rural Drainage Scheme Langay

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1747 1138 Name of the Scheme

Rural Drainage Scheme Kojianwala

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

1.000

0.200

0.000

0.950

0.000

0.000

0.000

0.950

0.950

0.000

0.000

0.000

0.000

4.776

1.904

0.000

3.588

0.000

0.000

0.000

3.588

3.588

0.000

0.000

0.000

0.000

3.986

1.765

0.000

2.819

0.000

0.000

0.000

2.819

2.819

0.000

0.000

0.000

446

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1748 1139 Name of the Scheme

Construction of Storm Water drain along both sides of G.T.Road from Service More to Sargodha Road Chowk and from Sargodha Road Chowk to Village Khatala (South West side of G.T.Road)

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

70%

District and Tehsil

Gujrat

1749 1140 Name of the Scheme

Rehabilitation of Nullah Shah Hussain and Nullah Chah Tarang upto Ram Talai Chowk (Revised)

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

81%

District and Tehsil

Gujrat

1750 1141 Name of the Scheme

RDS Mandeer, Malikpur Jandawala

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Gujrat

1751 1142 Name of the Scheme

Rural Sewerage Scheme Chak Bhatti

Approval Date

16-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

117.430

90.823

0.000

4.000

0.000

0.000

0.000

4.000

4.000

15.000

25.222

0.000

0.000

51.629

45.386

0.000

3.000

0.000

0.000

0.000

3.000

3.000

10.987

0.000

0.000

0.000

1.017

0.262

0.000

0.908

0.000

0.000

0.000

0.908

0.908

0.000

0.000

0.000

0.000

5.649

5.645

0.000

0.851

0.000

0.000

0.000

0.851

0.851

0.000

0.000

0.000

447

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1752 1143 Name of the Scheme

Extension Rural Drainage Scheme Badar Ali

Approval Date

16-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1753 1144 Name of the Scheme

Rural Drainage Scheme Hinduana

Approval Date

16-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1754 1145 Name of the Scheme

Rural Drainage Scheme Alaoudinke

Approval Date

19-04-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1755 1146 Name of the Scheme

Uraban Drainage Scheme Pindi Bhattian

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

93%

District and Tehsil

Hafizabad

1756 1147 Name of the Scheme

Urban Drainage Scheme Sukheke Town

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

11.782

10.500

0.000

3.049

0.000

0.000

0.000

3.049

3.049

0.000

0.000

0.000

0.000

11.586

10.000

0.000

3.324

0.000

0.000

0.000

3.324

3.324

0.000

0.000

0.000

0.000

13.939

13.999

0.000

2.031

0.000

0.000

0.000

2.031

2.031

0.000

0.000

0.000

0.000

30.000

30.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.500

0.000

0.000

0.000

20.000

20.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

0.000

0.000

0.000

448

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1757 1148 Name of the Scheme

Construction of Nullah and Sewerage Mangot Road Hafizabad

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1758 1149 Name of the Scheme

Construction of fully covered Nullah alongwith Mangtan Wala Road Jalalpur Bhattian

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1759 1150 Name of the Scheme

Construction of Nullah From Kassesay Road by-pass to Naya Adda Jalalpur

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1760 1151 Name of the Scheme

Construction of Nullah Do-Abna Rice Mills to Saim Nullah Near EDO(H) Office, Hafizabad

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1761 1152 Name of the Scheme

Rural Drainage Scheme Bhoon Khurd

Approval Date

Approved

Major Components

Drainage System etc.

Major Targets

18%

District and Tehsil

Hafizabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.300

5.300

0.000

0.795

0.000

0.000

0.000

0.795

0.795

0.000

0.000

0.000

0.000

7.000

4.550

0.000

3.500

0.000

0.000

0.000

3.500

3.500

0.000

0.000

0.000

0.000

2.982

2.982

0.000

0.447

0.000

0.000

0.000

0.447

0.447

0.000

0.000

0.000

0.000

0.800

0.010

0.000

0.910

0.000

0.000

0.000

0.910

0.910

0.000

0.000

0.000

0.000

5.000

0.010

0.000

1.000

0.000

0.000

0.000

1.000

1.000

4.740

0.000

0.000

449

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1762 1153 Name of the Scheme

Construction of Nullah, Village Pindi Wala

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1763 1154 Name of the Scheme

Construction of Nullah, Ghanian Wala

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1764 1155 Name of the Scheme

Construction of Nullah, Wachoki Khurd

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1765 1156 Name of the Scheme

Construction of Nullah, Muhhala Kareem Pur, Hafizabad

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

1766 1157 Name of the Scheme

Construction of Nullah and Sewerage Hussain Town, Hafizabad

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Hafizabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.300

0.010

0.000

0.335

0.000

0.000

0.000

0.335

0.335

0.000

0.000

0.000

0.000

0.400

0.010

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

0.400

0.010

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

0.400

0.010

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

0.200

0.010

0.000

0.220

0.000

0.000

0.000

0.220

0.220

0.000

0.000

0.000

450

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1767 1158 Name of the Scheme

Rural Drainage Scheme Pinanwal

Approval Date

21-05-2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Jhelum

1768 1159 Name of the Scheme

Rural Drainage Scheme Kala Dave

Approval Date

16-04-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Jhelum

1769 1160 Name of the Scheme

Rural Drainage Scheme Mohra Roshan

Approval Date

16-04-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Jhelum

1770 1161 Name of the Scheme

Rural Drainage Scheme Surg Dhan

Approval Date

16-04-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Jhelum

1771 1162 Name of the Scheme

Rural Drainage Scheme Diali Langer, Bakhral Rakha, Dhamail

Approval Date

18-05-007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Jhelum

1772 1163 Name of the Scheme

Rural Drainage Scheme Guraha Utam Singh

Approval Date

18-05-007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Jhelum

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.417

7.345

0.000

1.185

0.000

0.000

0.000

1.185

1.185

0.000

0.000

0.000

0.000

3.212

3.478

0.000

0.216

0.000

0.000

0.000

0.216

0.216

0.000

0.000

0.000

0.000

3.205

3.486

0.000

0.200

0.000

0.000

0.000

0.200

0.200

0.000

0.000

0.000

0.000

2.306

2.424

0.000

0.228

0.000

0.000

0.000

0.228

0.228

0.000

0.000

0.000

0.000

6.732

7.346

0.000

0.396

0.000

0.000

0.000

0.396

0.396

0.000

0.000

0.000

0.000

1.957

2.160

0.000

0.091

0.000

0.000

0.000

0.091

0.091

0.000

0.000

0.000

451

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1773 1164 Name of the Scheme

Rural Drainage Scheme Domeli

Approval Date

18-05-007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Jhelum

1774 1165 Name of the Scheme

Rural Drainage Scheme Dharyala Jalip

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

73%

District and Tehsil

Jhelum

1775 1166 Name of the Scheme

Drainage Scheme Mouza Jala Pur Sharif

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1776 1167 Name of the Scheme

Drainage Scheme Pindi Said Pur

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1777 1168 Name of the Scheme

Soling from Dera Raja Lehrasib Khan to Dera Hayat Khan Raja Pinawal

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.100

2.246

0.000

0.169

0.000

0.000

0.000

0.169

0.169

0.000

0.000

0.000

0.000

5.276

2.410

0.000

2.000

0.000

0.000

0.000

2.000

2.000

1.657

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

452

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1778 1169 Name of the Scheme

Drainage Scheme Darayala Jalip

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1779 1170 Name of the Scheme

Drainage Scheme Mouza Saroba (Graveyard Street)

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1780 1171 Name of the Scheme

Drainage Scheme Mouza Toba

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1781 1172 Name of the Scheme

Drainage for Dhudi Phaphra Gharibwal and Samanwal

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

1782 1173 Name of the Scheme

Drainage Scheme for Mouza Lilla and Street Asad Bashir Ullah

Approval Date

Approved

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Jhelum

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

453

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1783 1174 Name of the Scheme

Rural Drainage Scheme Khara (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

47%

District and Tehsil

Kasur

1784 1175 Name of the Scheme

Rural Drainage Scheme Adjoining Abadies Bhambah

Approval Date

25-11-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1785 1176 Name of the Scheme

Extension Sewerage / Drainage Scheme Theing More (Ellahabad)

Approval Date

26-02-2007

Major Components

Sewer System and disposal work etc.

Major Targets

37%

District and Tehsil

Kasur

1786 1177 Name of the Scheme

Rural Drainage Scheme Saad (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

48%

District and Tehsil

Kasur

1787 1178 Name of the Scheme

Rural Drainage Scheme Gaggar (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

35%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

21.764

10.301

0.000

1.500

0.000

0.000

0.000

1.500

1.500

13.228

0.000

0.000

0.000

8.569

8.353

0.000

1.501

0.000

0.000

0.000

1.501

1.501

0.000

0.000

0.000

0.000

67.600

25.978

0.000

3.000

0.000

0.000

0.000

3.000

3.000

15.000

33.762

0.000

0.000

22.000

10.732

0.000

1.317

0.000

0.000

0.000

1.317

1.317

13.251

0.000

0.000

0.000

29.000

8.735

0.000

3.000

0.000

0.000

0.000

3.000

3.000

21.615

0.000

0.000

454

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1788 1179 Name of the Scheme

Construction of Drains and PCC Street between Dhodhoo Chak and Soodan

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1789 1180 Name of the Scheme

Construction of Drains and PCC Street in Maingra UC Tola

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1790 1181 Name of the Scheme

Construction of Drains and PCC Street Walipur Boora Graveyard

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1791 1182 Name of the Scheme

Construction of Drains and PCC Street Motey (Northren Side), UC Gumtala

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1792 1183 Name of the Scheme

Construction of Nullah and Sanitation Abad kot Manga Kot Massu UC Mundaki

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

0.800

0.100

0.000

0.820

0.000

0.000

0.000

0.820

0.820

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

455

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1793 1184 Name of the Scheme

Construction of Nullah and Sanitation Atari Karam Singh UC Mola Pur

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1794 1185 Name of the Scheme

Construction of Nullah and Sanitation Moqam UC Mojoki

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1795 1186 Name of the Scheme

Construction of Nullah and Sanitation Darbar Sheikh Ilam Din UC Jamsher Khurd

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1796 1187 Name of the Scheme

Construction of Nullah and Sanitation Arzani Pur UC Bhaqewal

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1797 1188 Name of the Scheme

Rural Drainage Scheme Sarhali Khurd

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

1.000

0.100

0.000

1.050

0.000

0.000

0.000

1.050

1.050

0.000

0.000

0.000

0.000

2.200

2.200

0.000

0.329

0.000

0.000

0.000

0.329

0.329

0.000

0.000

0.000

456

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1798 1189 Name of the Scheme

Rural Drainage Scheme Chatianwala

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1799 1190 Name of the Scheme

Rural Drainage Scheme Aroda

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1800 1191 Name of the Scheme

Rural Drainage Scheme Rayekalaan

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1801 1192 Name of the Scheme

Rural Drainage Scheme Daftu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Kasur

1802 1193 Name of the Scheme

Rural Drainage Scheme Zafar Key

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

87%

District and Tehsil

Kasur , Chunian

1803 1194 Name of the Scheme

Rural Draiange Scheme Chak No.67/15-L Distt: Khanewal.

Approval Date

16.1.09

Major Components

Sewer System and disposal work etc.

Major Targets

82%

District and Tehsil

Khanewal , Mian channu.

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.200

2.200

0.000

0.329

0.000

0.000

0.000

0.329

0.329

0.000

0.000

0.000

0.000

2.200

2.200

0.000

0.329

0.000

0.000

0.000

0.329

0.329

0.000

0.000

0.000

0.000

2.200

2.200

0.000

0.329

0.000

0.000

0.000

0.329

0.329

0.000

0.000

0.000

0.000

2.167

2.167

0.000

0.329

0.000

0.000

0.000

0.329

0.329

0.000

0.000

0.000

0.000

6.683

5.000

0.000

1.683

0.000

0.000

0.000

1.683

1.683

0.000

0.000

0.000

0.000

8.300

5.785

0.000

2.000

0.000

0.000

0.000

2.000

2.000

1.760

0.000

0.000

457

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1804 1195 Name of the Scheme

Rural Drainage Scheme,Chak No.80/10-R

Approval Date

16.2.09

Major Components

Sewer System and disposal work etc.

Major Targets

21%

District and Tehsil

Khanewal

1805 1196 Name of the Scheme

Laying of Sewerage in Gali Bahai Arif Wali Faisal Town and Street of Mr. Abdul Waheed Rubbaini

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1806 1197 Name of the Scheme

Sewerage / Soling remaining Street Mushtaq Colony Street of Dr. Iqbal Faizabad Colony.

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1807 1198 Name of the Scheme

Sewerage / Soling / Drains in Street of Shumai Basti

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1808 1199 Name of the Scheme

Sewerage / Soling / Drains in Abdullah Town & Ali Town

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

21.118

2.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

19.286

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.300

1.300

0.000

0.195

0.000

0.000

0.000

0.195

0.195

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

1.100

1.100

0.000

0.165

0.000

0.000

0.000

0.165

0.165

0.000

0.000

0.000

458

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1809 1200 Name of the Scheme

Sewerage /Gali No.7 Ilam Din Colony

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1810 1201 Name of the Scheme

Seweragen and PCC Link Street of Khursheed Town and Shamspura

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1811 1202 Name of the Scheme

Sewerage and Soling in Street of Sabzi Mandi Road

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1812 1203 Name of the Scheme

Drains / Sewerage Chak No. 93/15L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1813 1204 Name of the Scheme

Drains / Sewerage Chak No. 57/15L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.600

0.600

0.000

0.090

0.000

0.000

0.000

0.090

0.090

0.000

0.000

0.000

0.000

0.700

0.700

0.000

0.105

0.000

0.000

0.000

0.105

0.105

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

459

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1814 1205 Name of the Scheme

Drains / Sewerage Chak No. 48/15L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1815 1206 Name of the Scheme

Drains / Sewerage Chak No. 41A/15-L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1816 1207 Name of the Scheme

Drains / Sewerage Chak No. 127/15-L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1817 1208 Name of the Scheme

Drains / Sewerage Allah Rakha Colony Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1818 1209 Name of the Scheme

Drains / Sewerage Chak No. 45/15L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

460

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1819 1210 Name of the Scheme

Drains / Sewerage Chak No. 121/15-L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1820 1211 Name of the Scheme

Drains / Sewerage Chak No. 114/15-L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1821 1212 Name of the Scheme

Drains / Sewerage Chak No. 117/15-L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1822 1213 Name of the Scheme

Drains / Sewerage Chak No. 51/15L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1823 1214 Name of the Scheme

Drains / Sewerage Chak No.94/15L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

461

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1824 1215 Name of the Scheme

Drains / Sewerage Chak No. 53/15L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1825 1216 Name of the Scheme

Drains / Sewerage Chak No. 56/15L Mian Channu

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Khanewal

1826 1217 Name of the Scheme

Rural Drainage Scheme Manawan G.T. Road Lahore

Approval Date

20-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

67%

District and Tehsil

Lahore

1827 1218 Name of the Scheme

Rural Drainage Scheme Lakho Dair

Approval Date

20-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

48%

District and Tehsil

Lahore

1828 1219 Name of the Scheme

Rural Drainage Scheme Rampura

Approval Date

20-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

87%

District and Tehsil

Lahore

1829 1220 Name of the Scheme

Rural Drainage Scheme Attoki Awan

Approval Date

20-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

87%

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

15.000

7.000

0.000

4.500

0.000

0.000

0.000

4.500

4.500

5.750

0.000

0.000

0.000

15.000

6.000

0.000

2.250

0.000

0.000

0.000

2.250

2.250

9.000

0.000

0.000

0.000

10.000

7.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

0.000

0.000

0.000

0.000

10.000

7.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

0.000

0.000

0.000

462

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1830 1221 Name of the Scheme

Rehabilitation & Improvement of Sewerage Scheme Attoki Awan

Approval Date

28-08-2008

Major Components

Sewer System and disposal work etc.

Major Targets

53%

District and Tehsil

Lahore

1831 1222 Name of the Scheme

Construction of Drainage Scheme in Basti Lodhran Chak No.116A/TDA

Approval Date

24.02.09

Major Components

RCC Sewer,Disposal Works, Force Main, Drains,B/Pavements.etc

Major Targets

100%

District and Tehsil

Layyah , Karor

1832 1223 Name of the Scheme

Sewerage Drainage Scheme in Rana Nagar.

Approval Date

24.02.09

Major Components

RCC Sewer,Disposal Works, Force Main, Drains,B/Pavements.etc

Major Targets

100%

District and Tehsil

Layyah , Karor

1833 1224 Name of the Scheme

Rural Sewerage Scheme,Lawyers Colony, City Layyah.

Approval Date

Approved

Major Components

RCC Sewer,Disposal Works, Force Main, Drains,B/Pavements.etc

Major Targets

73%

District and Tehsil

Layyah

1834 1225 Name of the Scheme

Sewerage Drainage Scheme in Jaman Shah Fazal Shaheed and Purana Jaman Shah.

Approval Date

24.02.09

Major Components

RCC Sewer,Disposal Works, Force Main, Drains,B/Pavements.etc

Major Targets

100%

District and Tehsil

Layyah

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.953

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.696

0.000

0.000

0.000

1.800

1.800

0.000

0.270

0.000

0.000

0.000

0.270

0.270

0.000

0.000

0.000

0.000

4.092

4.000

0.000

0.706

0.000

0.000

0.000

0.706

0.706

0.000

0.000

0.000

0.000

9.562

5.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

2.996

0.000

0.000

0.000

8.593

8.000

0.000

1.882

0.000

0.000

0.000

1.882

1.882

0.000

0.000

0.000

463

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1835 1226 Name of the Scheme

Sewerage Scheme for Pahar Pur Scop: RCC Sewer, Disposal Works, Pumping Machinery Sullage Carrier and OHT Line)

Approval Date

24.02.09

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

44%

District and Tehsil

Layyah

1836 1227 Name of the Scheme

Sewerage /Drainage Scheme Fateh Pur Town, Tehsil Karor,

Approval Date

Approved

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

17%

District and Tehsil

Layyah , Karor

1837 1228 Name of the Scheme

Sewerage /Drainage Scheme Chak Tibba Kalan, Tehsil Karor,

Approval Date

Approved

Major Components

Sewer lines, D/Stations,Sullage Carrier,G.Sets etc.

Major Targets

59%

District and Tehsil

Layyah , Karor

1838 1229 Name of the Scheme

Construction of Drain & PCC Slab Talagang Road to Col. Anwar House Muse Khel.

Approval Date

30-01-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1839 1230 Name of the Scheme

Construction of Slab and Drain Chah Miana,

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

71%

District and Tehsil

Mianwali

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

11.860

3.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

7.639

0.000

0.000

0.000

45.421

5.000

0.000

4.000

0.000

0.000

0.000

4.000

4.000

15.000

28.234

0.000

0.000

10.232

5.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.767

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

5.000

2.095

0.000

2.000

0.000

0.000

0.000

2.000

2.000

1.655

0.000

0.000

464

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1840 1231 Name of the Scheme

Construction of PCC Slab Mujahid Town alongwith Railway Line U.C. Watta Khel.

Approval Date

30-01-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1841 1232 Name of the Scheme

Construction of Drain & PCC Slab Dera Suian Wala Chavary U.C.Wan Bachran.

Approval Date

30-01-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1842 1233 Name of the Scheme

Construction of Sewerage & PCC Slab in Officer Colony , Mianwali.

Approval Date

11/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1843 1234 Name of the Scheme

Construction of Slab in Yaroo Khel U.C.18

Approval Date

30-01-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1844 1235 Name of the Scheme

Construction of Slab YQIS press Street New Abadi Mianwali City.

Approval Date

30-01-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.999

0.999

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

0.988

0.988

0.000

0.148

0.000

0.000

0.000

0.148

0.148

0.000

0.000

0.000

465

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1845 1236 Name of the Scheme

Construction of Drain & PCC Slab Street No.9 Mohallah Qadir Abad U.C.16.

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1846 1237 Name of the Scheme

Construction of Drain / Nallah Mohallah Yateem Khanaa Mosque to Faiz Chowk Gali Mohallah Yateem Khana

Approval Date

30-01-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1847 1238 Name of the Scheme

Construction of Tuff Tiles soling in Main Bazar Street Mianwali City

Approval Date

30-01-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1848 1239 Name of the Scheme

Construction of Drain / PCC Slab at Gulmiri

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1849 1240 Name of the Scheme

Construction of Drain / PCC Slab UC Abba Khel

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.600

0.600

0.000

0.090

0.000

0.000

0.000

0.090

0.090

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

1.020

0.200

0.000

0.973

0.000

0.000

0.000

0.973

0.973

0.000

0.000

0.000

0.000

0.467

0.010

0.000

0.527

0.000

0.000

0.000

0.527

0.527

0.000

0.000

0.000

0.000

0.810

0.010

0.000

0.922

0.000

0.000

0.000

0.922

0.922

0.000

0.000

0.000

466

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1850 1241 Name of the Scheme

Construction of Drain / PCC Slab Qurban Khan Samandi Wala

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1851 1242 Name of the Scheme

Construction of Drain / PCC Slab in Jamal Nasir Street UC No.15

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1852 1243 Name of the Scheme

Construction of Drain / PCC Slab in Mohallah Ramzan Abad

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1853 1244 Name of the Scheme

Construction of Drain / PCC Slab Aslam Khan Hathi Khel

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1854 1245 Name of the Scheme

Construction of Drain / PCC Slab Hayat Abad UC 20 Yarcoo Khel

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.389

0.010

0.000

0.437

0.000

0.000

0.000

0.437

0.437

0.000

0.000

0.000

0.000

0.120

0.010

0.000

0.128

0.000

0.000

0.000

0.128

0.128

0.000

0.000

0.000

0.000

0.435

0.010

0.000

0.490

0.000

0.000

0.000

0.490

0.490

0.000

0.000

0.000

0.000

0.510

0.010

0.000

0.576

0.000

0.000

0.000

0.576

0.576

0.000

0.000

0.000

0.000

0.555

0.010

0.000

0.628

0.000

0.000

0.000

0.628

0.628

0.000

0.000

0.000

467

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1855 1246 Name of the Scheme

Construction of Drain / PCC Slab Galli Mehr Khan Truck Adda Mianwali

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1856 1247 Name of the Scheme

Construction of Drain / PCC Slab Zia Ullah Master Shaheen Town

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1857 1248 Name of the Scheme

Construction of Drain / PCC Slab Galli Hafiz Mumtaz Musa Khel

Approval Date

6/5/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1858 1249 Name of the Scheme

Construction of PCC Slab Dera Sultan Wala Chandni UC Wan Cachran

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

104%

District and Tehsil

Mianwali

1859 1250 Name of the Scheme

Construction of Slab Yaroo Khel UC No.19

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.398

0.010

0.000

0.448

0.000

0.000

0.000

0.448

0.448

0.000

0.000

0.000

0.000

0.512

0.010

0.000

0.579

0.000

0.000

0.000

0.579

0.579

0.000

0.000

0.000

0.000

0.638

0.010

0.000

0.724

0.000

0.000

0.000

0.724

0.724

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.100

0.000

0.000

0.000

0.100

0.100

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

468

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1860 1251 Name of the Scheme

Construction of Slab in near Faizzn-e-Madina new Abadi UC 15

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mianwali

1861 1252 Name of the Scheme

Construction of Drain / Nullah Mohallah Yateem Khana UC 17

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

104%

District and Tehsil

Mianwali

1862 1253 Name of the Scheme

Reh: of Sewerage Scheme Dilaywali

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1863 1254 Name of the Scheme

Reh: of Sewerage Scheme Daudkhel

Approval Date

11/2/2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Mianwali

1864 1255 Name of the Scheme

Rural Drainage Scheme Lasori Kalan (Revised)

Approval Date

2/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin , Phalia

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.923

0.923

0.000

0.138

0.000

0.000

0.000

0.138

0.138

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.100

0.000

0.000

0.000

0.100

0.100

0.000

0.000

0.000

0.000

2.500

2.500

0.000

0.375

0.000

0.000

0.000

0.375

0.375

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

5.274

3.644

0.000

2.421

0.000

0.000

0.000

2.421

2.421

0.000

0.000

0.000

469

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1865 1256 Name of the Scheme

Extension Rural Drainage Scheme Pindi Kalu (Revised)

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

44%

District and Tehsil

Mandi Bahauddin

1866 1257 Name of the Scheme

Extension Rural Drainage Scheme Lala Pindi (Revised)

Approval Date

26-02-2007

Major Components

Sewer System and disposal work etc.

Major Targets

47%

District and Tehsil

Mandi Bahauddin

1867 1258 Name of the Scheme

Extension Rural Drainage Scheme Maiken (Revised)

Approval Date

28-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

30%

District and Tehsil

Mandi Bahauddin

1868 1259 Name of the Scheme

Extension of Rural Drainage / Sewerage Scheme Dherekan Kalan (Revised)

Approval Date

30-05-2006

Major Components

Sewer System and disposal work etc.

Major Targets

39%

District and Tehsil

Mandi Bahauddin

1869 1260 Name of the Scheme

Extension of Rural Drainage Scheme Charanwala (Revised)

Approval Date

2/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin , Phalia

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

12.450

3.356

0.000

3.000

0.000

0.000

0.000

3.000

3.000

7.962

0.000

0.000

0.000

14.295

4.700

0.000

3.000

0.000

0.000

0.000

3.000

3.000

8.739

0.000

0.000

0.000

14.019

1.786

0.000

3.000

0.000

0.000

0.000

3.000

3.000

11.336

0.000

0.000

0.000

9.818

2.419

0.000

2.000

0.000

0.000

0.000

2.000

2.000

6.872

0.000

0.000

0.000

5.451

3.136

0.000

3.133

0.000

0.000

0.000

3.133

3.133

0.000

0.000

0.000

470

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1870 1261 Name of the Scheme

Extension / Renovation Rural Drainage Scheme Pahrianwali with Abadies (Revised)

Approval Date

2/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

82%

District and Tehsil

Mandi Bahauddin , Phalia

1871 1262 Name of the Scheme

Extension of Rural Drainage Scheme Khoosar, Dhudra with Abadies(Revised)

Approval Date

2/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin , Phalia

1872 1263 Name of the Scheme

Extension of Rural Drainage Scheme Jhanda Chohan, Chak Jeewan & Sandhanwala (Revised)

Approval Date

2/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

59%

District and Tehsil

Mandi Bahauddin , Phalia

1873 1264 Name of the Scheme

Extension of Rural Drainage Scheme Dshaul, Ledhar, Chak Mirak with Abadies. (Revised)

Approval Date

2/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

69%

District and Tehsil

Mandi Bahauddin , Phalia

1874 1265 Name of the Scheme

Construction of Nullah from drain Sohawa Bullani Jumlani

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.541

6.946

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.026

0.000

0.000

0.000

3.890

3.082

0.000

1.392

0.000

0.000

0.000

1.392

1.392

0.000

0.000

0.000

0.000

8.628

3.889

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.033

0.000

0.000

0.000

9.998

5.921

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.577

0.000

0.000

0.000

7.796

3.000

0.000

5.965

0.000

0.000

0.000

5.965

5.965

0.000

0.000

0.000

471

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1875 1266 Name of the Scheme

Construction of PCC/Drainage Scheme Pindi Bahaudin Part-II

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1876 1267 Name of the Scheme

Drainage System village Dhaboola

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1877 1268 Name of the Scheme

Drainage System village Noor Jamal

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1878 1269 Name of the Scheme

Drainage System Village Ranmal

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1879 1270 Name of the Scheme

Drainage System Village Madhray

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1880 1271 Name of the Scheme

Const: of Streets & Drainage and Sewerage Adda Gojra

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.000

4.000

0.000

0.600

0.000

0.000

0.000

0.600

0.600

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

3.067

1.000

0.000

2.527

0.000

0.000

0.000

2.527

2.527

0.000

0.000

0.000

472

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1881 1272 Name of the Scheme

Const: of PCC Streets & Drains Mohallah Sabri Malakwal

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1882 1273 Name of the Scheme

Const: of PCC Streets & Drains UC No. 50 Malakwal

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1883 1274 Name of the Scheme

Const: of PCC Streets & Drains/Drainage Ajjowal including Mukhtar Colony Ajjowal

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1884 1275 Name of the Scheme

Const: of PCC Streets & Drains/Drainage Waryait

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1885 1276 Name of the Scheme

Const: of PCC Streets & Drains/ Sewerage Colony Khan Baig Bukhan

Approval Date

702-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

0.500

0.000

0.650

0.000

0.000

0.000

0.650

0.650

0.000

0.000

0.000

0.000

1.000

0.500

0.000

0.650

0.000

0.000

0.000

0.650

0.650

0.000

0.000

0.000

473

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1886 1277 Name of the Scheme

Const: of PCC Streets & Drains/ Sewerage Chak No. 9 including Abadies

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1887 1278 Name of the Scheme

Const: of PCC Streets & Drains/ Sewerage Chak No. 29

Approval Date

7/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1888 1279 Name of the Scheme

Const: of PCC Streets & Drains & Soling Chak No. 16

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Mandi Bahauddin

1889 1280 Name of the Scheme

Rehabilitation Sewerage Scheme Dograna / Budhla Sant

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Multan

1890 1281 Name of the Scheme

Rural Drainage Scheme Javed Town

Approval Date

16.04.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Multan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.500

1.000

0.000

0.725

0.000

0.000

0.000

0.725

0.725

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

3.000

1.500

0.000

1.950

0.000

0.000

0.000

1.950

1.950

0.000

0.000

0.000

0.000

1.607

1.000

0.000

0.848

0.000

0.000

0.000

0.848

0.848

0.000

0.000

0.000

474

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1891 1282 Name of the Scheme

Rural Drainage Scheme Sajjad Town

Approval Date

10.4.09

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Multan

1892 1283 Name of the Scheme

Rural Drainage Scheme Al-Fateh

Approval Date

16.04.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Multan

1893 1284 Name of the Scheme

Rehabilitation Rural Sewerage / Drainage Scheme Qasba Maral

Approval Date

19.02.2009

Major Components

Repair of Machinery,Electrict Connection,R.Main and Distribution system.

Major Targets

40%

District and Tehsil

Multan

1894 1285 Name of the Scheme

Brick Pavement from Chah Wasli Wala to Shah Wala

Approval Date

10.4.09

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Multan

1895 1286 Name of the Scheme

Rural Drainage Scheme,Kashif Abad Khar Sharqi (Revised)

Approval Date

27.8.08

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

36%

District and Tehsil

Muzaffargarh , Kot Addu

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.994

1.000

0.000

1.293

0.000

0.000

0.000

1.293

1.293

0.000

0.000

0.000

0.000

1.195

1.195

0.000

0.179

0.000

0.000

0.000

0.179

0.179

0.000

0.000

0.000

0.000

15.446

5.168

0.000

2.000

0.000

0.000

0.000

2.000

2.000

10.595

0.000

0.000

0.000

1.300

0.407

0.000

1.088

0.000

0.000

0.000

1.088

1.088

0.000

0.000

0.000

0.000

17.685

5.365

0.000

2.000

0.000

0.000

0.000

2.000

2.000

12.973

0.000

0.000

475

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1896 1287 Name of the Scheme

Construction of Sewerage and Water Supply at Town Murad Abad

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

34%

District and Tehsil

Muzaffargarh

1897 1288 Name of the Scheme

Provision of Sanitation Facility at Qasba Gujrat.

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

1898 1289 Name of the Scheme

Construction of Drains and Brick pavement at Basti Jindoo Wala.

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

1899 1290 Name of the Scheme

Construction of Drains and Brick pavement UC Ghazi Ghat

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

1900 1291 Name of the Scheme

Construction of Drains and Brick Pavement at Basti Ghani Wala Mauza Daya Chocka Western

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

24.207

7.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

18.338

0.000

0.000

0.000

2.310

1.155

0.000

1.502

0.000

0.000

0.000

1.502

1.502

0.000

0.000

0.000

0.000

0.514

0.500

0.000

0.091

0.000

0.000

0.000

0.091

0.091

0.000

0.000

0.000

0.000

0.843

0.800

0.000

0.169

0.000

0.000

0.000

0.169

0.169

0.000

0.000

0.000

0.000

1.039

1.000

0.000

0.195

0.000

0.000

0.000

0.195

0.195

0.000

0.000

0.000

476

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1901 1292 Name of the Scheme

Construction of Sewerage and Brick Pavement at Gurmmani Adda

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

1902 1293 Name of the Scheme

Construction of Drains and Brick Pavement at Basti Nawan Korai Wala

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

1903 1294 Name of the Scheme

Construction of Sewerage and Brick Pavement at UC Gujrat

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

1904 1295 Name of the Scheme

Rural Drainage Scheme Basti Meer Hazar Khan

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

1905 1296 Name of the Scheme

Rural Drainage Scheme Qasba Basti Allah Bukhsh & Bailaywala

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

4.149

2.700

0.000

2.071

0.000

0.000

0.000

2.071

2.071

0.000

0.000

0.000

0.000

0.528

0.500

0.000

0.107

0.000

0.000

0.000

0.107

0.107

0.000

0.000

0.000

0.000

1.599

1.500

0.000

0.339

0.000

0.000

0.000

0.339

0.339

0.000

0.000

0.000

0.000

4.000

2.000

0.000

2.600

0.000

0.000

0.000

2.600

2.600

0.000

0.000

0.000

0.000

4.000

2.000

0.000

2.600

0.000

0.000

0.000

2.600

2.600

0.000

0.000

0.000

477

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1906 1297 Name of the Scheme

Rural Drainage Scheme Qasba Bait Hazari

Approval Date

24.02.09

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh , Kot Addu

1907 1298 Name of the Scheme

Construction of Open Drain and PCC Slab Mouza Kamal Pur Identified by Ghulam Fakhar-udDin

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1908 1299 Name of the Scheme

Construction of Drain and PCC Slab Basti Jhoke Mouza Nohan Wali Identified by Master Munir

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1909 1300 Name of the Scheme

Construction of Drain and PCC Slab Basti Kan Wala Mouza Lang Identified by Malik Iqbal Lang

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.000

1.000

0.000

1.300

0.000

0.000

0.000

1.300

1.300

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

2.500

2.500

0.000

0.375

0.000

0.000

0.000

0.375

0.375

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

478

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1910 1301 Name of the Scheme

Construction of Soling Drain Culverts inside UC Shah Jamal

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1911 1302 Name of the Scheme

Construction of Soling Drain Culverts inside UC Aloday Wali

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1912 1303 Name of the Scheme

Construction of Soling Drain Culverts inside UC Manak Pur

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1913 1304 Name of the Scheme

Construction of Soling Drain Culverts inside UC Mahra Sharqi

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1914 1305 Name of the Scheme

Construction of Soling Drain Culverts inside UC Dainrien

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

0.000

5.000

5.000

0.000

0.750

0.000

0.000

0.000

0.750

0.750

0.000

0.000

0.000

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

479

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1915 1306 Name of the Scheme

Construction of Soling Drain Culverts inside UC Usman Koria

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1916 1307 Name of the Scheme

Construction of Soling Drain inside Basti Rawali UC Usman Koria

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1917 1308 Name of the Scheme

Construction of Soling Drain Culverts inside UC Utra Sandila

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1918 1309 Name of the Scheme

Construction of Soling Drain Culverts inside UC Manka Bhutta

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1919 1310 Name of the Scheme

Construction of Soling Drain Culverts inside UC Ahmad Mohana

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.500

2.500

0.000

0.375

0.000

0.000

0.000

0.375

0.375

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

4.500

4.500

0.000

0.675

0.000

0.000

0.000

0.675

0.675

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

480

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1920 1311 Name of the Scheme

Construction of Tuff Tile inside City Muzaffargarh

Approval Date

30.05.2009

Major Components

RCC Sewer, Disposal Works, Force Main,Drains, B/Pavement

Major Targets

100%

District and Tehsil

Muzaffargarh

1921 1312 Name of the Scheme

Rural Sewerage Scheme Mandi Faizabad (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

82%

District and Tehsil

Nankana Sahib

1922 1313 Name of the Scheme

Rural Sewerage Scheme Syed Wala (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Nankana Sahib

1923 1314 Name of the Scheme

Rural Drainage Scheme Maili Burji

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

31%

District and Tehsil

Nankana Sahib

1924 1315 Name of the Scheme

Rural Drainage Scheme Nawan Kot (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

28%

District and Tehsil

Nankana Sahib

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

26.430

22.937

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.147

0.000

0.000

0.000

8.780

7.518

0.000

2.579

0.000

0.000

0.000

2.579

2.579

0.000

0.000

0.000

0.000

5.565

0.010

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.390

0.000

0.000

0.000

9.228

0.010

0.000

2.998

0.000

0.000

0.000

2.998

2.998

7.604

0.000

0.000

481

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1925 1316 Name of the Scheme

Rural Drainage Scheme Nizam Pura

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

28%

District and Tehsil

Nankana Sahib

1926 1317 Name of the Scheme

Rural Drainage Scheme Dera Jaat

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Nankana Sahib

1927 1318 Name of the Scheme

Rural Drainage Scheme Hanjil

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

28%

District and Tehsil

Nankana Sahib

1928 1319 Name of the Scheme

Rural Drainage Scheme Sirranwali

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

30%

District and Tehsil

Nankana Sahib

1929 1320 Name of the Scheme

Rural Drainage Scheme Chahbour Mugailian

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

46%

District and Tehsil

Nankana Sahib

1930 1321 Name of the Scheme

Rural Drainage Scheme Jhugian Karnalian / Odan Shamola Wali Pur Bura Chak No.175/RB

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

24%

District and Tehsil

Nankana Sahib

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.189

0.010

0.000

2.000

0.000

0.000

0.000

2.000

2.000

5.107

0.000

0.000

0.000

3.124

0.010

0.000

3.583

0.000

0.000

0.000

3.583

3.583

0.000

0.000

0.000

0.000

6.189

0.010

0.000

2.000

0.000

0.000

0.000

2.000

2.000

5.107

0.000

0.000

0.000

5.854

0.010

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.722

0.000

0.000

0.000

3.765

0.010

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.320

0.000

0.000

0.000

6.640

0.010

0.000

1.800

0.000

0.000

0.000

1.800

1.800

5.826

0.000

0.000

482

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1931 1322 Name of the Scheme

Drainage / Rehabilitation Schemes for Villages Hallowal & Dheli, Union Council Halowal

Approval Date

11/12/2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1932 1323 Name of the Scheme

Construction of Soling / Drain of Model Village Saidu Data - Ratta Sankhatra, U/C Sankhatra

Approval Date

31.5.2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1933 1324 Name of the Scheme

Construction of Soling / Drain of Model Village Ahloo Lal Klan & Ahloo Lal Khund - Shahabdikay, U/C Khan khasa,

Approval Date

31.5.2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1934 1325 Name of the Scheme

Construction of Soling / Drain of Model Village Khara Dewan

Approval Date

31.5.2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1935 1326 Name of the Scheme

Rural Drainage Scheme for Village Kalkhana Bahadur Pura Dherg Niena

Approval Date

31.12.2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.290

9.274

0.000

0.260

0.000

0.000

0.000

0.260

0.260

0.000

0.000

0.000

0.000

2.080

2.194

0.000

0.198

0.000

0.000

0.000

0.198

0.198

0.000

0.000

0.000

0.000

2.075

2.194

0.000

0.192

0.000

0.000

0.000

0.192

0.192

0.000

0.000

0.000

0.000

1.000

1.102

0.000

0.048

0.000

0.000

0.000

0.048

0.048

0.000

0.000

0.000

0.000

2.065

2.100

0.000

0.275

0.000

0.000

0.000

0.275

0.275

0.000

0.000

0.000

483

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1936 1327 Name of the Scheme

Rural Drainage Scheme for Village Mahais

Approval Date

31.12.2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1937 1328 Name of the Scheme

Rural Drainage Scheme for Village Rattian Bhala Pind

Approval Date

31.5.2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1938 1329 Name of the Scheme

Rural Drainage Scheme for Village Gullah Khana Mianwali

Approval Date

17-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1939 1330 Name of the Scheme

Rural Drainage Scheme Spanwal, Chala, Chakwala

Approval Date

20-12-2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1940 1331 Name of the Scheme

Rural Drainage Scheme Bhojo Chak Jhalli

Approval Date

20-12-2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.045

2.121

0.000

0.231

0.000

0.000

0.000

0.231

0.231

0.000

0.000

0.000

0.000

2.078

2.161

0.000

0.229

0.000

0.000

0.000

0.229

0.229

0.000

0.000

0.000

0.000

1.551

1.518

0.000

0.266

0.000

0.000

0.000

0.266

0.266

0.000

0.000

0.000

0.000

5.200

3.295

0.000

2.685

0.000

0.000

0.000

2.685

2.685

0.000

0.000

0.000

0.000

5.550

4.715

0.000

1.668

0.000

0.000

0.000

1.668

1.668

0.000

0.000

0.000

484

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1941 1332 Name of the Scheme

Rural Drainage Scheme Rasinwali

Approval Date

27-08-2008

Major Components

Sewer System and disposal work etc.

Major Targets

81%

District and Tehsil

Narowal

1942 1333 Name of the Scheme

Construction of Soling / Drain of Model Village Bhogwal & Jabal to Dholee Dhalla U/C Dhadu Chak

Approval Date

2007-08

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1943 1334 Name of the Scheme

Ext. Rural Drainage Scheme Fattowal Salahrian

Approval Date

2007-08

Major Components

Sewer System and disposal work etc.

Major Targets

55%

District and Tehsil

Narowal

1944 1335 Name of the Scheme

Rural Drainage Scheme Natlan Kalan Deria

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

63%

District and Tehsil

Narowal

1945 1336 Name of the Scheme

Rural Drainage Scheme Behlol Pur, Muthi Chakwal Sulehrian

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.522

7.800

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.300

0.000

0.000

0.000

1.115

0.496

0.000

0.786

0.000

0.000

0.000

0.786

0.786

0.000

0.000

0.000

0.000

5.638

1.590

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.894

0.000

0.000

0.000

8.273

4.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.514

0.000

0.000

0.000

4.589

4.000

0.000

1.277

0.000

0.000

0.000

1.277

1.277

0.000

0.000

0.000

485

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1946 1337 Name of the Scheme

Rural Drainage Scheme Jhumian Kalan & Khurd, Chak Sawera Chakwal

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1947 1338 Name of the Scheme

Rural Drainage Scheme Kothay, Chak Amru, Chani, Timber Chak

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1948 1339 Name of the Scheme

Rural Drainage Scheme Hawalian, Peela Gujran, Dongran, Tola, Surryia Gujran, Shehzad Pur, Maingra

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

34%

District and Tehsil

Narowal

1949 1340 Name of the Scheme

Rural Drainage Scheme Chichra, Lakhnour, Ghalor, Fatehpur Kalan and Khurd, Saidpur Khanna UC Chatrana

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1950 1341 Name of the Scheme

Rural Drainage Scheme Chammal, Handal, Rotu Chak, Changrawan

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.381

4.000

0.000

2.188

0.000

0.000

0.000

2.188

2.188

0.000

0.000

0.000

0.000

4.200

4.000

0.000

0.830

0.000

0.000

0.000

0.830

0.830

0.000

0.000

0.000

0.000

20.660

6.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

15.759

0.000

0.000

0.000

5.575

5.575

0.000

0.836

0.000

0.000

0.000

0.836

0.836

0.000

0.000

0.000

0.000

6.833

5.425

0.000

2.433

0.000

0.000

0.000

2.433

2.433

0.000

0.000

0.000

486

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1951 1342 Name of the Scheme

Rural Drainage Scheme Gholo Mehlo, Alipur Kohlian, Lalian, Anyat Pur

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

35%

District and Tehsil

Narowal

1952 1343 Name of the Scheme

Rural Drainage Scheme Chanda, Danwal, Rigala

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1953 1344 Name of the Scheme

Rural Drainage Scheme Bhopalpur, Chigla, Manjla, Tugalpur, Poran, Khaira, Kharal

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Narowal

1954 1345 Name of the Scheme

Rural Drainage Scheme Kaian Bajar, Bharwal, Kotly, Behlolpur

Approval Date

20-12-2009

Major Components

Sewer System and disposal work etc.

Major Targets

61%

District and Tehsil

Narowal

1955 1346 Name of the Scheme

Rural Drainage Scheme Village Shahbazpur, Krail Baran, Natla Khurd UC Baran.

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

50%

District and Tehsil

Narowal , Shakargarh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

14.783

4.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

11.000

0.000

0.000

0.000

5.119

3.000

0.000

2.887

0.000

0.000

0.000

2.887

2.887

0.000

0.000

0.000

0.000

7.363

5.000

0.000

3.467

0.000

0.000

0.000

3.467

3.467

0.000

0.000

0.000

0.000

9.923

5.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.411

0.000

0.000

0.000

7.000

2.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.050

0.000

0.000

487

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1956 1347 Name of the Scheme

Rural Drainage SchemeVillage Japolota Pindi Sanian,, Chatrana, Taira Gujran, Shapur Chanjora UC Chatrana

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

45%

District and Tehsil

Narowal , Shakargarh

1957 1348 Name of the Scheme

Rural Drainage Scheme Brumana, Chijwana, Jatwal, Phalwari UC Phalwari

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

44%

District and Tehsil

Narowal , Shakargarh

1958 1349 Name of the Scheme

Rural Drainage Scheme Village Khandrian Dalial Antowall, Afzalpur UC Phalwari

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

18%

District and Tehsil

Narowal , Shakargarh

1959 1350 Name of the Scheme

Rural Drainage Scheme Village Dhodo Chak Kholian, Sood Gujran, Ladial, Mewandey khothey UC Dhodo Cha

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

30%

District and Tehsil

Narowal , Shakargarh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.800

2.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.970

0.000

0.000

0.000

8.900

2.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

5.735

0.000

0.000

0.000

26.147

2.500

0.000

3.000

0.000

0.000

0.000

3.000

3.000

24.569

0.000

0.000

0.000

13.200

2.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

10.680

0.000

0.000

488

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1960 1351 Name of the Scheme

Rural Drainage SchemeVillage Sher Pura, Sohawa Bussari, Bamboo UC Sarjal & Raiba

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

47%

District and Tehsil

Narowal , Shakargarh

1961 1352 Name of the Scheme

Rural Drainage Scheme Soling Lasser to Dera Haji Shafi, Village Badwal to Graveyard, Village Bara Pind Road to Village Wada and Wadah Kothay UC Ramberi

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

45%

District and Tehsil

Narowal , Shakargarh

1962 1353 Name of the Scheme

Rural Drainage Scheme Village Manka Gumtala Gumtali Chora, Sultanpura UC Gumtala

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

42%

District and Tehsil

Narowal , Shakargarh

1963 1354 Name of the Scheme

Rural Drainage Scheme Village Sngran, Majwal, Channi Hndal, Shahpur Bhango including Pandori, Culvert at Chamal to ChanniHandal UC Sukho Chak

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

40%

District and Tehsil

Narowal , Shakargarh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.400

2.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.510

0.000

0.000

0.000

8.700

2.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

5.505

0.000

0.000

0.000

9.300

2.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

6.195

0.000

0.000

0.000

9.800

2.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

6.770

0.000

0.000

489

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1964 1355 Name of the Scheme

Rural Drainage Scheme Village Patto Chak, Gorsial, Bhadwal, Bhatti Afghana, Ordra Kial & Banial UC Phagwari

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

39%

District and Tehsil

Narowal , Shakargarh

1965 1356 Name of the Scheme

village Chakra, Hamrial, Terah, Harrar Kalan & Khurd Gjgal UC Sarjal

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

41%

District and Tehsil

Narowal , Shakargarh

1966 1357 Name of the Scheme

Construction of Streets & Drain in Village yousaf Pur Kuthi UC Ghona

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

43%

District and Tehsil

Narowal

1967 1358 Name of the Scheme

Construction of Streets & Drain in Village Ghona UC Ghona

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

38%

District and Tehsil

Narowal

1968 1359 Name of the Scheme

Construction of Streets & Drain in Village Khudai Pur UC Ghona

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

53%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.950

2.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

6.943

0.000

0.000

0.000

8.527

2.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

5.806

0.000

0.000

0.000

6.001

0.500

0.000

2.500

0.000

0.000

0.000

2.500

2.500

3.901

0.000

0.000

0.000

7.850

0.500

0.000

2.900

0.000

0.000

0.000

2.900

2.900

5.628

0.000

0.000

0.000

6.550

0.500

0.000

3.500

0.000

0.000

0.000

3.500

3.500

3.533

0.000

0.000

490

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1969 1360 Name of the Scheme

Construction of Streets & Drain in Village Kadiala UC Ghona

Approval Date

19-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

49%

District and Tehsil

Narowal

1970 1361 Name of the Scheme

Construction of Streets & Drain in Village Fatwal UC Mallah

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

39%

District and Tehsil

Narowal

1971 1362 Name of the Scheme

Construction of Streets & Drain in Village Mallah UC Mallah

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

49%

District and Tehsil

Narowal

1972 1363 Name of the Scheme

Construction of Streets & Drain in Village Malik Afghanan UC Langah

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

43%

District and Tehsil

Narowal

1973 1364 Name of the Scheme

Construction of Streets & Drain in Village Jhandy Langh UC Langah

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

40%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.200

0.500

0.000

3.000

0.000

0.000

0.000

3.000

3.000

3.630

0.000

0.000

0.000

5.640

0.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.986

0.000

0.000

0.000

7.120

0.500

0.000

3.500

0.000

0.000

0.000

3.500

3.500

4.188

0.000

0.000

0.000

7.000

0.500

0.000

3.000

0.000

0.000

0.000

3.000

3.000

4.550

0.000

0.000

0.000

6.450

0.500

0.000

2.500

0.000

0.000

0.000

2.500

2.500

4.418

0.000

0.000

491

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1974 1365 Name of the Scheme

Construction of Streets & Drain in Village Sattowal Misiriwal UC Langah

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

51%

District and Tehsil

Narowal

1975 1366 Name of the Scheme

Construction of Streets & Drain in Village Kot Harsai UC Langah

Approval Date

19-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

45%

District and Tehsil

Narowal

1976 1367 Name of the Scheme

Construction of Streets & Drain in Village Manzoorpura Kot, Lotli Soodkan

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

43%

District and Tehsil

Narowal

1977 1368 Name of the Scheme

Construction of Streets & Drain in Village Samrai Pabra UC Mallah

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

54%

District and Tehsil

Narowal

1978 1369 Name of the Scheme

Construction of Streets & Drain in Village Chak hakeem UC Wali Pur Bora

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

48%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.150

0.500

0.000

2.500

0.000

0.000

0.000

2.500

2.500

2.923

0.000

0.000

0.000

4.814

0.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.036

0.000

0.000

0.000

7.140

0.500

0.000

3.000

0.000

0.000

0.000

3.000

3.000

4.711

0.000

0.000

0.000

6.450

0.500

0.000

3.500

0.000

0.000

0.000

3.500

3.500

3.418

0.000

0.000

0.000

5.640

0.500

0.000

2.600

0.000

0.000

0.000

2.600

2.600

3.386

0.000

0.000

492

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1979 1370 Name of the Scheme

Construction of Streets & Drain in Village Ghool UC Wali Pur Bora

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

50%

District and Tehsil

Narowal

1980 1371 Name of the Scheme

Construction of Streets & Drain in Village Langh, Eisa Ghazi UC Langah

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

43%

District and Tehsil

Narowal

1981 1372 Name of the Scheme

Construction of Streets & Drain in Village Sheenay Nagal UC Kanjrur

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

27%

District and Tehsil

Narowal

1982 1373 Name of the Scheme

Construction of Streets & Drain in Village Aikeke Kaka Wali UC Ghona

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

47%

District and Tehsil

Narowal

1983 1374 Name of the Scheme

Construction of Streets & Drain in Village Cheema Kalair, Natt UC Ghona

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

48%

District and Tehsil

Narowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.950

0.500

0.000

3.500

0.000

0.000

0.000

3.500

3.500

3.993

0.000

0.000

0.000

7.140

0.500

0.000

3.000

0.000

0.000

0.000

3.000

3.000

4.711

0.000

0.000

0.000

8.000

0.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

6.700

0.000

0.000

0.000

7.450

0.500

0.000

3.500

0.000

0.000

0.000

3.500

3.500

4.568

0.000

0.000

0.000

6.550

0.500

0.000

3.100

0.000

0.000

0.000

3.100

3.100

3.933

0.000

0.000

493

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1984 1375 Name of the Scheme

Construction of Streets & Drain in Village Mallowal UC Gorala

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

37%

District and Tehsil

Narowal

1985 1376 Name of the Scheme

Construction of Streets & Drain in Village Sultan Pur Kothri Kothey UC Langh

Approval Date

18-05-2009

Major Components

Sewer System and disposal work etc.

Major Targets

45%

District and Tehsil

Narowal

1986 1377 Name of the Scheme Approval Date

Rural Drainage Scheme of UC Akhlas Pur including Village Kanwal and Saanpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

7.110

0.500

0.000

2.500

0.000

0.000

0.000

2.500

2.500

5.177

0.000

0.000

0.000

7.810

0.500

0.000

3.500

0.000

0.000

0.000

3.500

3.500

4.982

0.000

0.000

0.000

9.748

5.000

0.000

0.750

0.000

0.000

0.000

0.750

0.750

5.460

0.000

0.000

0.000

7.816

5.000

0.000

0.750

0.000

0.000

0.000

0.750

0.750

3.238

0.000

0.000

0.000

5.000

5.000

0.000

0.743

0.000

0.000

0.000

0.743

0.743

0.000

0.000

0.000

19-05-2009

Major Components Major Targets District and Tehsil

1987 1378 Name of the Scheme Approval Date

Narowal

Rural Drainage Scheme of UC Bheri including VillageTarpi Bheri and Danoors Donori 19-05-2009

Major Components Major Targets District and Tehsil

1988 1379 Name of the Scheme Approval Date

Narowal

Rural Drainage Scheme of Village Chun Lidder Cheema Kalair and Kundaipur UC Ghona 18-05-2009

Major Components Major Targets District and Tehsil

Narowal

494

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1989 1380 Name of the Scheme Approval Date

Rural Drainage Scheme of Fazalpur Bajrie Nangal and Village Ferowal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.000

5.000

0.000

0.750

0.000

0.000

0.000

0.750

0.750

0.000

0.000

0.000

0.000

4.515

2.300

0.000

0.750

0.000

0.000

0.000

0.750

0.750

0.000

0.000

0.000

0.000

1.595

0.800

0.000

1.034

0.000

0.000

0.000

1.034

1.034

0.000

0.000

0.000

0.000

0.965

0.965

0.000

0.145

0.000

0.000

0.000

0.145

0.145

0.000

0.000

0.000

18-05-2009

Major Components Major Targets District and Tehsil

1990 1381 Name of the Scheme Approval Date

Narowal

Rural Drainage Scheme of Village Khanpur Achli of UC Kallah 19-05-2009

Major Components Major Targets District and Tehsil

1991 1382 Name of the Scheme

Approval Date

Narowal

Rural Drainage Scheme Construction of Brick pavement of Village Mottay to Nothern Side to main Passage UC Gumtala Tehsil Shakargarh 19-05-2009

Major Components Major Targets District and Tehsil

1992 1383 Name of the Scheme

Approval Date

Narowal

Rural Drainage Scheme Construction of Brick pavement of Village Maingra UC Tola, Tehsil Shakargarh 19-05-2009

Major Components Major Targets District and Tehsil

Narowal

495

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1993 1384 Name of the Scheme

Approval Date

Rural Drainage Scheme Construction of Brick pavement of Village Dudhu Chak to Village Soodan Tehsil Shakargarh

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.767

0.767

0.000

0.115

0.000

0.000

0.000

0.115

0.115

0.000

0.000

0.000

0.000

1.336

1.000

0.000

0.536

0.000

0.000

0.000

0.536

0.536

0.000

0.000

0.000

0.000

17.731

18.519

0.000

1.872

0.000

0.000

0.000

1.872

1.872

0.000

0.000

0.000

0.000

10.510

1.200

0.000

1.000

0.000

0.000

0.000

1.000

1.000

9.887

0.000

0.000

0.000

2.500

2.500

0.000

0.375

0.000

0.000

0.000

0.375

0.375

0.000

0.000

0.000

19-05-2009

Major Components Major Targets District and Tehsil

1994 1385 Name of the Scheme

Approval Date

Narowal

Rural Drainage Scheme Construction of Brick pavement of Village Wali Pur Bura UC WaliPur Bura Tehsil Shakargarh 19-05-2009

Major Components Major Targets District and Tehsil

1995 1386 Name of the Scheme

Narowal

Sewerage / Drainage Scheme 18/GD, District Okara

Approval Date

10/3/2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

1996 1387 Name of the Scheme

Rural Sewerage / Drainage Scheme Madu Chak No.16/GD

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

18%

District and Tehsil

Okara

1997 1388 Name of the Scheme

Construction of Soling / Drains Adda Gamber, Kausar Colony Chak No. 52/5-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

496

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

1998 1389 Name of the Scheme

Construction of Soling / Drains Chak No.37/4-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

1999 1390 Name of the Scheme

Construction of Soling / Drains Chak No.32/2-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

2000 1391 Name of the Scheme

Construction of Soling / Drains Chak No.51/2-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

2001 1392 Name of the Scheme

Construction of Soling / Drains Chak No.50/2-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

2002 1393 Name of the Scheme

Construction of Soling / Drains Chak No.45/2-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

497

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2003 1394 Name of the Scheme

Construction of Soling / Drains Chak No.25/4-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

2004 1395 Name of the Scheme

Construction of Soling / Drains Chak No.24/4-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

2005 1396 Name of the Scheme

Construction of Soling / Drains Chak No.52/4-R

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

2006 1397 Name of the Scheme

Construction of Soling / Drains Chak No.47/3-R

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

2007 1398 Name of the Scheme

Construction of Soling / Drains Chak No.36/4-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

498

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2008 1399 Name of the Scheme

Construction of Soling / Drains Chak No.38/4-L

Approval Date

30.05.2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Okara

2009 1400 Name of the Scheme

Rural Drainage Scheme Chak No.17/SP

Approval Date

31.03.09

Major Components

Drains,B/pavement etc.

Major Targets

100%

District and Tehsil

Pakpattan

2010 1401 Name of the Scheme

Rural Drainage Scheme Chak No.95/EB

Approval Date

20.12.08

Major Components

Drain-1,II, Soling, Sullage Carrier

Major Targets

32%

District and Tehsil

Pakpattan , Arifwala

2011 1402 Name of the Scheme

Rural Drainage Scheme Chak No.79/EB

Approval Date

20.12.08

Major Components

Drain-1,II, Soling, Sullage Carrier

Major Targets

100%

District and Tehsil

Pakpattan , Arifwala

2012 1403 Name of the Scheme

Rural Drainage Scheme Chak No.25/EB

Approval Date

20.12.08

Major Components

Drain-1,II, Soling, Sullage Carrier

Major Targets

32%

District and Tehsil

Pakpattan , Arifwala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

0.700

0.700

0.000

0.105

0.000

0.000

0.000

0.105

0.105

0.000

0.000

0.000

0.000

10.122

1.000

0.000

2.700

0.000

0.000

0.000

2.700

2.700

7.940

0.000

0.000

0.000

1.300

1.300

0.000

0.195

0.000

0.000

0.000

0.195

0.195

0.000

0.000

0.000

0.000

8.202

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

6.432

0.000

0.000

499

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2013 1404 Name of the Scheme

Rural Drainage Scheme Chak No.81/EB

Approval Date

20.12.08

Major Components

Drain-1,II, Soling, Sullage Carrier

Major Targets

30%

District and Tehsil

Pakpattan , Arifwala

2014 1405 Name of the Scheme

Rural Drainage Scheme Chak No.41/EB

Approval Date

20.12.08

Major Components

Drain-1,II, Soling, Sullage Carrier

Major Targets

46%

District and Tehsil

Pakpattan , Arifwala

2015 1406 Name of the Scheme

Drainage Scheme in Left Area in Chak No.88/EB

Approval Date

Approved

Major Components

Drain-1,II, Soling, Sullage Carrier

Major Targets

100%

District and Tehsil

Pakpattan , Arifwala

2016 1407 Name of the Scheme

Construction of Drainage Ghazi Pur Khanpur

Approval Date

2.2.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Khanpur

2017 1408 Name of the Scheme

Construction of Sewerage Basti Kahi Khair Shah.

Approval Date

2.2.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Khanpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.605

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

6.896

0.000

0.000

0.000

5.655

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.503

0.000

0.000

0.000

3.700

1.000

0.000

3.255

0.000

0.000

0.000

3.255

3.255

0.000

0.000

0.000

0.000

2.185

2.161

0.000

0.352

0.000

0.000

0.000

0.352

0.352

0.000

0.000

0.000

0.000

1.011

1.000

0.000

0.163

0.000

0.000

0.000

0.163

0.163

0.000

0.000

0.000

500

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2018 1409 Name of the Scheme

Construction of Sewerage Mari Allaha Bachaya.

Approval Date

2.2.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Khanpur

2019 1410 Name of the Scheme

Construction of Sewerage Basti Nawan kot Mouza Noor Wah.

Approval Date

20.02.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Khanpur

2020 1411 Name of the Scheme

Construction of Sewerage Chak No. 67/P Basti Ali Akhtar Ch.

Approval Date

2.2.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Khanpur

2021 1412 Name of the Scheme

Rural Sewerage/Drainage Scheme, Nawan Kot.

Approval Date

05.03.07

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , R,Y,Khan

2022 1413 Name of the Scheme

Rural Draiane and Sewerage Chak No.158/P.

Approval Date

6.2.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Sadiqabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.760

1.783

0.000

0.241

0.000

0.000

0.000

0.241

0.241

0.000

0.000

0.000

0.000

1.454

1.454

0.000

0.218

0.000

0.000

0.000

0.218

0.218

0.000

0.000

0.000

0.000

1.468

1.453

0.000

0.235

0.000

0.000

0.000

0.235

0.235

0.000

0.000

0.000

0.000

4.996

4.407

0.000

1.338

0.000

0.000

0.000

1.338

1.338

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

501

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2023 1414 Name of the Scheme

Construction of Sewerage Basti Jind Wadda Khan Numberdar Mauza Mehmood Garh R.Y.Khan

Approval Date

20.02.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , R,Y,Khan

2024 1415 Name of the Scheme

Construction of Sewerage Basti Ijaz Chanar R.Y.Khan

Approval Date

20.02.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , R,Y,Khan

2025 1416 Name of the Scheme

Construction of Sewerage Basti Purani & Sewerage i/c Frashbandi R.Y.Khan

Approval Date

20.02.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , R,Y,Khan

2026 1417 Name of the Scheme

Construction of Sewerage Basti i/c Frashbandi Mohallah Makhdoom Altaf Ahmad Hashmi UC Kot Samaba R.Y.Khan

Approval Date

20.02.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan

2027 1418 Name of the Scheme

Construction of Sewerage Abu Zaibi Colony No.2

Approval Date

20.02.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.723

0.723

0.000

0.108

0.000

0.000

0.000

0.108

0.108

0.000

0.000

0.000

0.000

1.305

1.296

0.000

0.205

0.000

0.000

0.000

0.205

0.205

0.000

0.000

0.000

0.000

1.553

0.719

0.000

1.067

0.000

0.000

0.000

1.067

1.067

0.000

0.000

0.000

0.000

1.553

1.031

0.000

0.755

0.000

0.000

0.000

0.755

0.755

0.000

0.000

0.000

0.000

1.039

0.983

0.000

0.212

0.000

0.000

0.000

0.212

0.212

0.000

0.000

0.000

502

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2028 1419 Name of the Scheme

Construction of Sewerage Chak No.88/P

Approval Date

20.02.09

Major Components

Drains,Disposal Work and other works.

Major Targets

27%

District and Tehsil

Rahim Yar Khan

2029 1420 Name of the Scheme

Sewerage Scheme basti Rindan UC Janpur, Tehsil Liaqatpur,

Approval Date

25.05.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Liaqatpur

2030 1421 Name of the Scheme

Sewerage Scheme Thul Hamza, Tehsil Liaqatpur,

Approval Date

25.05.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan , Liaqatpur

2031 1422 Name of the Scheme

Improvement / Rehab. Of Sewerage Scheme Machka City SDK

Approval Date

22.05.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan

2032 1423 Name of the Scheme

Improvement / Rehab. Of Sewerage Scheme Bhong City

Approval Date

22.05.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.481

1.080

0.000

0.969

0.000

0.000

0.000

0.969

0.969

5.404

0.000

0.000

0.000

1.018

1.000

0.000

0.171

0.000

0.000

0.000

0.171

0.171

0.000

0.000

0.000

0.000

4.010

4.000

0.000

0.611

0.000

0.000

0.000

0.611

0.611

0.000

0.000

0.000

0.000

4.000

4.000

0.000

0.600

0.000

0.000

0.000

0.600

0.600

0.000

0.000

0.000

0.000

3.000

3.000

0.000

0.450

0.000

0.000

0.000

0.450

0.450

0.000

0.000

0.000

503

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2033 1424 Name of the Scheme

Construction of Sewerage, Mild Gangoo, Hussainabad

Approval Date

01.06.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan

2034 1425 Name of the Scheme

Construction of Sewerage, Basti Khokhran, UC Tranda Swae Khan

Approval Date

01.06.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan

2035 1426 Name of the Scheme

Construction of Sewerage, Basti Bandoor, UC R.Y.Khan

Approval Date

01.06.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Rahim Yar Khan

2036 1427 Name of the Scheme

Drainage and Sewerage Scheme Hajipur

Approval Date

25.05.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

17%

District and Tehsil

Rajanpur

2037 1428 Name of the Scheme

Drainage and Sewerage Scheme Lal Garh

Approval Date

25.05.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

47%

District and Tehsil

Rajanpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.700

0.700

0.000

0.105

0.000

0.000

0.000

0.105

0.105

0.000

0.000

0.000

0.000

0.700

0.700

0.000

0.105

0.000

0.000

0.000

0.105

0.105

0.000

0.000

0.000

0.000

0.600

0.600

0.000

0.090

0.000

0.000

0.000

0.090

0.090

0.000

0.000

0.000

0.000

36.443

5.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

20.000

14.909

0.000

0.000

8.192

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

5.050

0.000

0.000

504

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2038 1429 Name of the Scheme

Rural Drainage Scheme Adwal Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.700

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

10.155

0.000

0.000

0.000

9.870

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

10.351

0.000

0.000

0.000

3.240

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

2.726

0.000

0.000

0.000

4.895

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

4.629

0.000

0.000

0.000

2.630

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

2.025

0.000

0.000

Major Targets District and Tehsil

2039 1430 Name of the Scheme

Rawalpindi

Rural Drainage Scheme Misrial Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets District and Tehsil

2040 1431 Name of the Scheme

Rawalpindi

Rural Drainage Scheme Dudhar Mirza Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets District and Tehsil

2041 1432 Name of the Scheme

Rawalpindi

Rural Drainage Scheme Deer Wala Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets District and Tehsil

2042 1433 Name of the Scheme

Rawalpindi

Rural Drainage Scheme Mohra BhattianTehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets District and Tehsil

Rawalpindi

505

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2043 1434 Name of the Scheme

Rural Drainage Scheme Dudhar Najar Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.296

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

8.540

0.000

0.000

0.000

6.138

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

6.059

0.000

0.000

0.000

5.000

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

4.750

0.000

0.000

0.000

5.000

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

4.750

0.000

0.000

Major Targets District and Tehsil

2044 1435 Name of the Scheme

Rawalpindi

Rural Drainage Scheme Chatroo Tehsil & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets District and Tehsil

2045 1436 Name of the Scheme

Rawalpindi

Rural Drainage Scheme Razi Bandi Tehsil Kallar Syedian & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets District and Tehsil

2046 1437 Name of the Scheme

Rawalpindi , Kallar Ghar

Rural Drainage Scheme Razi Khais Tehsil Kallar Syedian & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets District and Tehsil

Rawalpindi , Kallar Ghar

506

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2047 1438 Name of the Scheme

Rural Drainage Scheme Basanta Tehsil Kallar Syedian & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

5.000

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

4.750

0.000

0.000

0.000

5.000

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

4.750

0.000

0.000

0.000

5.000

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

4.750

0.000

0.000

0.000

8.464

8.704

0.000

1.030

0.000

0.000

0.000

1.030

1.030

0.000

0.000

0.000

0.000

11.055

10.693

0.000

2.020

0.000

0.000

0.000

2.020

2.020

0.000

0.000

0.000

Major Targets District and Tehsil

2048 1439 Name of the Scheme

Rawalpindi , Kallar Ghar

Rural Drainage Scheme Jattian Nandanian Tehsil Kallar Syedian & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets District and Tehsil

2049 1440 Name of the Scheme

Rawalpindi , Kallar Ghar

Rural Drainage Scheme Nothia Tehsil Kallar Syedian & District Rawalpindi

Approval Date

24-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets District and Tehsil

2050 1441 Name of the Scheme

Rawalpindi , Kallar Ghar

Rural Drainage Scheme Chak No. 127-131/SB

Approval Date

20-10-2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2051 1442 Name of the Scheme

Rural Drainage Scheme Chak No. 122-121/SB

Approval Date

20-10-2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha 507

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2052 1443 Name of the Scheme

Rural Drainage Scheme Chak No.112-113/NB

Approval Date

20-10-2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2053 1444 Name of the Scheme

Rural Drainage Scheme Chak No. 130/NB

Approval Date

20-10-2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2054 1445 Name of the Scheme

Rural Drainage Scheme Chak No. 165/NB

Approval Date

27-08-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2055 1446 Name of the Scheme

Rural Drainage Scheme Chak No.161-162/NB

Approval Date

27-08-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2056 1447 Name of the Scheme

Rural Drainage Scheme Chak No. 151/NB with three Colonies

Approval Date

27-08-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

13.570

13.000

0.000

2.606

0.000

0.000

0.000

2.606

2.606

0.000

0.000

0.000

0.000

11.873

10.460

0.000

3.194

0.000

0.000

0.000

3.194

3.194

0.000

0.000

0.000

0.000

13.616

13.000

0.000

2.658

0.000

0.000

0.000

2.658

2.658

0.000

0.000

0.000

0.000

14.072

13.275

0.000

2.908

0.000

0.000

0.000

2.908

2.908

0.000

0.000

0.000

0.000

15.498

16.631

0.000

1.192

0.000

0.000

0.000

1.192

1.192

0.000

0.000

0.000

508

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2057 1448 Name of the Scheme

Rural Drainage Scheme Chak No.170-171/NB

Approval Date

27-08-2007

Major Components

Sewer System and disposal work etc.

Major Targets

83%

District and Tehsil

Sargodha

2058 1449 Name of the Scheme

Rural Drainage Scheme Chak No.169-173/NB

Approval Date

27-08-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2059 1450 Name of the Scheme

Rural Drainage Scheme Chak No.40-42/SB

Approval Date

13-04-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2060 1451 Name of the Scheme

Rural Drainage Scheme Chak No. 54/SB

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

64%

District and Tehsil

Sargodha

2061 1452 Name of the Scheme

Rural Drainage Scheme Chak No. 111/SB

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

19.689

16.717

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.925

0.000

0.000

0.000

14.499

14.402

0.000

2.272

0.000

0.000

0.000

2.272

2.272

0.000

0.000

0.000

0.000

6.578

6.578

0.000

0.987

0.000

0.000

0.000

0.987

0.987

0.000

0.000

0.000

0.000

10.009

5.409

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.101

0.000

0.000

0.000

7.308

7.790

0.000

0.614

0.000

0.000

0.000

0.614

0.614

0.000

0.000

0.000

509

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2062 1453 Name of the Scheme

Rural Drainage Scheme Chak No. 50/NB

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2063 1454 Name of the Scheme

Rural Drainage Scheme Chak No. 144-145/NB

Approval Date

31-01-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2064 1455 Name of the Scheme

Rural Drainage Scheme Chak No. 26/SB

Approval Date

31-01-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2065 1456 Name of the Scheme

Rural Drainage Scheme Chak No. 125/SB

Approval Date

31-01-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2066 1457 Name of the Scheme

Rural Drainage Scheme Chak No.109/SB

Approval Date

17-11-2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

12.099

13.875

0.000

0.039

0.000

0.000

0.000

0.039

0.039

0.000

0.000

0.000

0.000

4.330

4.563

0.000

0.417

0.000

0.000

0.000

0.417

0.417

0.000

0.000

0.000

0.000

6.886

5.896

0.000

2.023

0.000

0.000

0.000

2.023

2.023

0.000

0.000

0.000

0.000

6.216

6.047

0.000

1.101

0.000

0.000

0.000

1.101

1.101

0.000

0.000

0.000

0.000

4.743

5.092

0.000

0.362

0.000

0.000

0.000

0.362

0.362

0.000

0.000

0.000

510

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2067 1458 Name of the Scheme

Rural Drainage Scheme Chak No. 23/SB

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2068 1459 Name of the Scheme

Rural Drainage Scheme Dhrema with Colonies

Approval Date

11/12/2006

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sargodha

2069 1460 Name of the Scheme

Extension Rural Drainage Scheme Beerball Sharif (Murtazabad)

Approval Date

31-01-2007

Major Components

Sewer System and disposal work etc.

Major Targets

52%

District and Tehsil

Sargodha

2070 1461 Name of the Scheme

Rural Sewerage / Drainage Scheme for Village Mateela

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

20%

District and Tehsil

Sargodha

2071 1462 Name of the Scheme

Sewerage Scheme at Salam

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

35%

District and Tehsil

Sargodha

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

8.731

8.670

0.000

1.371

0.000

0.000

0.000

1.371

1.371

0.000

0.000

0.000

0.000

8.639

9.752

0.000

0.183

0.000

0.000

0.000

0.183

0.183

0.000

0.000

0.000

0.000

3.500

0.100

0.000

2.000

0.000

0.000

0.000

2.000

2.000

1.925

0.000

0.000

0.000

17.485

2.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

16.108

0.000

0.000

0.000

25.200

2.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

24.980

0.000

0.000

511

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2072 1463 Name of the Scheme

Rural Drainage Scheme Mid Ranja Tehsil Kot Momin

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

35%

District and Tehsil

Sargodha

2073 1464 Name of the Scheme

Rural Drainage Scheme Gopi Rai (Revised)

Approval Date

27-08-2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2074 1465 Name of the Scheme

Rural Drainage Scheme Bhikhi, Sheikhupura (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

70%

District and Tehsil

Sheikhupura

2075 1466 Name of the Scheme

Rural Drainage Scheme Kharianwala i/e abadies, Sheikhupura.(Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

30%

District and Tehsil

Sheikhupura

2076 1467 Name of the Scheme

Rural Drainage Scheme Kudlathi, Sheikhupura.(Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

65%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.500

1.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

8.575

0.000

0.000

0.000

12.214

12.870

0.000

1.176

0.000

0.000

0.000

1.176

1.176

0.000

0.000

0.000

0.000

6.167

2.942

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.150

0.000

0.000

0.000

19.937

6.400

0.000

0.513

0.000

0.000

0.000

0.513

0.513

16.015

0.000

0.000

0.000

11.651

5.719

0.000

3.000

0.000

0.000

0.000

3.000

3.000

4.680

0.000

0.000

512

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2077 1468 Name of the Scheme

Rural Drainage Scheme Lagar, Sheikhupura

Approval Date

13-11-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2078 1469 Name of the Scheme

Rural Drainage Scheme Hathiana Dewanwala, Sheikhupura.(Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

49%

District and Tehsil

Sheikhupura

2079 1470 Name of the Scheme

Rural Drainage Scheme Nawankot, Sheikhupura.(Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

65%

District and Tehsil

Sheikhupura

2080 1471 Name of the Scheme

Rural Drainage Scheme Mamoon, Sheikhupura.(Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

69%

District and Tehsil

Sheikhupura

2081 1472 Name of the Scheme

Rural Drainage Scheme Dera Khojian, Sheikhupura.(Revised)

Approval Date

24-12-2008

Major Components

Sewer System and disposal work etc.

Major Targets

56%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.849

3.849

0.000

0.577

0.000

0.000

0.000

0.577

0.577

0.000

0.000

0.000

0.000

6.893

3.443

0.000

0.421

0.000

0.000

0.000

0.421

0.421

4.063

0.000

0.000

0.000

9.228

6.141

0.000

0.759

0.000

0.000

0.000

0.759

0.759

3.712

0.000

0.000

0.000

12.433

7.710

0.000

2.148

0.000

0.000

0.000

2.148

2.148

4.440

0.000

0.000

0.000

15.192

6.700

0.000

3.000

0.000

0.000

0.000

3.000

3.000

7.771

0.000

0.000

513

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2082 1473 Name of the Scheme

Rural Drainage Scheme UC101,Shabdev Singh including abadies, Sheikhupura. (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

60%

District and Tehsil

Sheikhupura

2083 1474 Name of the Scheme

Rural Drainage Scheme UC-56 Bahoman including Derajat, Sheikhupura.(Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

66%

District and Tehsil

Sheikhupura

2084 1475 Name of the Scheme

Rural Drainage Scheme UC-55 i/e Derajat (Revised)

Approval Date

25-04-2009

Major Components

Sewer System and disposal work etc.

Major Targets

91%

District and Tehsil

Sheikhupura

2085 1476 Name of the Scheme

Rural Drainage Scheme Feroze Wattoan (Revised)

Approval Date

25.04.2009

Major Components

Sewer System and disposal work etc.

Major Targets

61%

District and Tehsil

Sheikhupura

2086 1477 Name of the Scheme

Rural Drainage Scheme at Gharyal Khurd/Kalan, Bhaiglan

Approval Date

10/11/2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.513

5.665

0.000

0.948

0.000

0.000

0.000

0.948

0.948

4.327

0.000

0.000

0.000

9.525

6.540

0.000

0.702

0.000

0.000

0.000

0.702

0.702

3.712

0.000

0.000

0.000

23.250

22.250

0.000

1.969

0.000

0.000

0.000

1.969

1.969

2.519

0.000

0.000

0.000

16.995

10.958

0.000

1.000

0.000

0.000

0.000

1.000

1.000

7.586

0.000

0.000

0.000

5.013

3.000

0.000

2.765

0.000

0.000

0.000

2.765

2.765

0.000

0.000

0.000

514

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2087 1478 Name of the Scheme

Rural Drainage Scheme at Gandowal, Bagika, Kot Abdullah

Approval Date

10/11/2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura , Ferozewala

2088 1479 Name of the Scheme

Rural Drainage Scheme at Nangal Kaswala i/c Abadies

Approval Date

10/11/2008

Major Components

Sewer System and disposal work etc.

Major Targets

50%

District and Tehsil

Sheikhupura

2089 1480 Name of the Scheme

Rural Drainage Scheme at Javed Nagar,

Approval Date

4/11/2008

Major Components

Sewer System and disposal work etc.

Major Targets

68%

District and Tehsil

Sheikhupura

2090 1481 Name of the Scheme

Rural Drainage Scheme at Mandialy including Dera Rehmat Colony, Den Colony and Sad Colony,

Approval Date

4/11/2008

Major Components

Sewer System and disposal work etc.

Major Targets

58%

District and Tehsil

Sheikhupura

2091 1482 Name of the Scheme

Rural Drainage Scheme Measion

Approval Date

3/12/2008

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

3.655

2.500

0.000

1.703

0.000

0.000

0.000

1.703

1.703

0.000

0.000

0.000

0.000

13.000

4.500

0.000

3.000

0.000

0.000

0.000

3.000

3.000

7.450

0.000

0.000

0.000

9.768

5.000

0.000

2.611

0.000

0.000

0.000

2.611

2.611

3.622

0.000

0.000

0.000

17.984

9.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

8.682

0.000

0.000

0.000

3.422

3.422

0.000

0.513

0.000

0.000

0.000

0.513

0.513

0.000

0.000

0.000

515

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2092 1483 Name of the Scheme

Rural Drainage & Sanitation Scheme Burj Attari

Approval Date

23-12-2008

Major Components

Sewer System and disposal work etc.

Major Targets

65%

District and Tehsil

Sheikhupura

2093 1484 Name of the Scheme

Rural Drainage & Sanitation Scheme Tradewali i/c abadies

Approval Date

23-12-2008

Major Components

Sewer System and disposal work etc.

Major Targets

54%

District and Tehsil

Sheikhupura

2094 1485 Name of the Scheme

Rural Drainage & Sanitation Scheme Dhaka Nizampura (UC-32) (Revised)

Approval Date

23-12-2008

Major Components

Sewer System and disposal work etc.

Major Targets

14%

District and Tehsil

Sheikhupura

2095 1486 Name of the Scheme

Rural Drainage & Sanitation Scheme Dhamke i/c abadies

Approval Date

23-12-2008

Major Components

Sewer System and disposal work etc.

Major Targets

52%

District and Tehsil

Sheikhupura

2096 1487 Name of the Scheme

Rural Drainage Scheme Faizpur Khurd i/c abadies

Approval Date

23-12-2008

Major Components

Sewer System and disposal work etc.

Major Targets

56%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

9.322

4.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

3.720

0.000

0.000

0.000

11.262

4.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

5.951

0.000

0.000

0.000

42.653

4.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

20.000

22.051

0.000

0.000

10.050

3.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

5.558

0.000

0.000

0.000

7.744

3.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.906

0.000

0.000

516

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2097 1488 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Esan

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2098 1489 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Thatha Rugwaan

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2099 1490 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Kot Mehmood

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2100 1491 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Nazar Lubana

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

62%

District and Tehsil

Sheikhupura

2101 1492 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Sagian Moti Fuji

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.879

1.000

0.000

1.161

0.000

0.000

0.000

1.161

1.161

0.000

0.000

0.000

0.000

1.232

0.500

0.000

0.917

0.000

0.000

0.000

0.917

0.917

0.000

0.000

0.000

0.000

2.301

1.000

0.000

1.646

0.000

0.000

0.000

1.646

1.646

0.000

0.000

0.000

0.000

4.237

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

1.873

0.000

0.000

0.000

1.604

0.500

0.000

1.345

0.000

0.000

0.000

1.345

1.345

0.000

0.000

0.000

517

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2102 1493 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Said Pur

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2103 1494 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Dosair

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2104 1495 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Meerpur

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2105 1496 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Thatha Lungian

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2106 1497 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Sehjowal

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.192

0.500

0.000

2.021

0.000

0.000

0.000

2.021

2.021

0.000

0.000

0.000

0.000

1.680

0.500

0.000

1.432

0.000

0.000

0.000

1.432

1.432

0.000

0.000

0.000

0.000

0.978

0.500

0.000

0.625

0.000

0.000

0.000

0.625

0.625

0.000

0.000

0.000

0.000

1.511

0.500

0.000

1.238

0.000

0.000

0.000

1.238

1.238

0.000

0.000

0.000

0.000

4.153

1.000

0.000

3.776

0.000

0.000

0.000

3.776

3.776

0.000

0.000

0.000

518

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2107 1498 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Bohaywal

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2108 1499 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Ghazi Pur

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2109 1500 Name of the Scheme

Construction of Soling, Drains and Nallah, Mousa Purani Bhani

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2110 1501 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Rajhian Arrian

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2111 1502 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Mandian Wala

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.826

0.500

0.000

2.750

0.000

0.000

0.000

2.750

2.750

0.000

0.000

0.000

0.000

1.941

0.500

0.000

1.732

0.000

0.000

0.000

1.732

1.732

0.000

0.000

0.000

0.000

1.700

0.500

0.000

1.455

0.000

0.000

0.000

1.455

1.455

0.000

0.000

0.000

0.000

1.211

0.500

0.000

0.893

0.000

0.000

0.000

0.893

0.893

0.000

0.000

0.000

0.000

2.691

0.500

0.000

2.595

0.000

0.000

0.000

2.595

2.595

0.000

0.000

0.000

519

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2112 1503 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Khanowal

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2113 1504 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Matham Pind

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2114 1505 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Rana Bhatti

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2115 1506 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Nawan Pindi

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2116 1507 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Moran Wala

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.483

0.500

0.000

1.205

0.000

0.000

0.000

1.205

1.205

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.390

0.500

0.000

1.099

0.000

0.000

0.000

1.099

1.099

0.000

0.000

0.000

0.000

1.699

0.500

0.000

1.454

0.000

0.000

0.000

1.454

1.454

0.000

0.000

0.000

0.000

2.604

1.000

0.000

1.995

0.000

0.000

0.000

1.995

1.995

0.000

0.000

0.000

520

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2117 1508 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Chak No. 12-UC

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2118 1509 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Pind Piaria

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2119 1510 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Chak No. 17-UC

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2120 1511 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Sagian Kalan

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

97%

District and Tehsil

Sheikhupura

2121 1512 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Chak No. 11-UC

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.096

0.500

0.000

0.760

0.000

0.000

0.000

0.760

0.760

0.000

0.000

0.000

0.000

1.366

0.500

0.000

1.071

0.000

0.000

0.000

1.071

1.071

0.000

0.000

0.000

0.000

1.270

0.500

0.000

0.961

0.000

0.000

0.000

0.961

0.961

0.000

0.000

0.000

0.000

2.808

0.500

0.000

2.619

0.000

0.000

0.000

2.619

2.619

0.000

0.000

0.000

0.000

1.311

0.500

0.000

1.008

0.000

0.000

0.000

1.008

1.008

0.000

0.000

0.000

521

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2122 1513 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Bohala Shah

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2123 1514 Name of the Scheme

Construction of Soling, Drain and Nallah Mouza Toheed Park UC-30 Wandala Dial Shah, Tibba Rehmat

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

38%

District and Tehsil

Sheikhupura

2124 1515 Name of the Scheme

Construction of Soling, Drains and Nallah, Mouza Waghary

Approval Date

11/1/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sheikhupura

2125 1516 Name of the Scheme

Rural Drainage Scheme / PCC / Soling Scheme, Nizampura, Farooqabad, District Sheikhupura

Approval Date

Approved

Major Components

Sewer System and disposal work etc.

Major Targets

36%

District and Tehsil

Sheikhupura

2126 1517 Name of the Scheme

Construction of Rural PCC and Drainage Scheme at UC Noon Allied Abadies

Approval Date

23-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

15%

District and Tehsil

Sheikhupura

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.067

1.000

0.000

1.377

0.000

0.000

0.000

1.377

1.377

0.000

0.000

0.000

0.000

6.822

1.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.845

0.000

0.000

0.000

2.228

0.500

0.000

2.062

0.000

0.000

0.000

2.062

2.062

0.000

0.000

0.000

0.000

6.000

0.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

4.400

0.000

0.000

0.000

31.795

0.500

0.000

5.000

0.000

0.000

0.000

5.000

5.000

31.064

0.000

0.000

522

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2127 1518 Name of the Scheme

Rehabilitation of Streets of Narang Mandi Town

Approval Date

23-05-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

3%

District and Tehsil

Sheikhupura

2128 1519 Name of the Scheme

Extension Rural Drainage Scheme Miani, Sadra Badra, Suyedanwali, Kotli Amir

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2129 1520 Name of the Scheme

Extension Rural Drainage Scheme Saho Chak Badipur, Chahal Manewali

Approval Date

18-05-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2130 1521 Name of the Scheme

Extension Rural Drainage Scheme Kakhwanwali

Approval Date

10/10/2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2131 1522 Name of the Scheme

Rural Drainage Scheme Bhathay, Kalan, Sadheray Wahgray Garhi Karloop

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

79.696

0.500

0.000

2.000

0.000

0.000

0.000

2.000

2.000

89.150

0.000

0.000

0.000

9.838

8.661

0.000

2.653

0.000

0.000

0.000

2.653

2.653

0.000

0.000

0.000

0.000

9.793

7.726

0.000

3.536

0.000

0.000

0.000

3.536

3.536

0.000

0.000

0.000

0.000

4.995

3.055

0.000

2.690

0.000

0.000

0.000

2.690

2.690

0.000

0.000

0.000

0.000

8.475

5.668

0.000

4.078

0.000

0.000

0.000

4.078

4.078

0.000

0.000

0.000

523

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2132 1523 Name of the Scheme

Rural Drainage Scheme Baghwal Awan, Bahoo Bhatti, Shanker Pur

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2133 1524 Name of the Scheme

Rural Drainage Scheme Partanwali, Gillan Chak Sirajwali, Aakiwal

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2134 1525 Name of the Scheme

Rural Drainage Scheme Badhal Channo Mom, Nawan Pind, Akbar Abad

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2135 1526 Name of the Scheme

Rural Drainage Scheme Chak Bidia, Tarkalian, Darghanwali, Sada Chak Baghowal

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

80%

District and Tehsil

Sialkot

2136 1527 Name of the Scheme

Extension Rural Drainage Scheme Aley Wali, Molowal, Chak Baso, Kotli Joia, Nawan Pind Lopowali, Kotli Miani, Kotli Channo

Approval Date

19-03-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

6.827

5.463

0.000

2.388

0.000

0.000

0.000

2.388

2.388

0.000

0.000

0.000

0.000

7.413

5.492

0.000

3.033

0.000

0.000

0.000

3.033

3.033

0.000

0.000

0.000

0.000

7.834

6.479

0.000

2.530

0.000

0.000

0.000

2.530

2.530

0.000

0.000

0.000

0.000

9.742

5.991

0.000

3.000

0.000

0.000

0.000

3.000

3.000

2.212

0.000

0.000

0.000

9.405

6.177

0.000

4.639

0.000

0.000

0.000

4.639

4.639

0.000

0.000

0.000

524

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2137 1528 Name of the Scheme

Extension Rural Drainage Scheme Channi Gondal, Laelwali

Approval Date

10/10/2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2138 1529 Name of the Scheme

Extension Rural Drainage Scheme Sohawala

Approval Date

27-08-2007

Major Components

Sewer System and disposal work etc.

Major Targets

70%

District and Tehsil

Sialkot

2139 1530 Name of the Scheme

Extension Rural Drainage Scheme Dhilum Balagon, Kung Chailo

Approval Date

27-08-2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2140 1531 Name of the Scheme

Extension Rural Drainage Scheme Kulluwal

Approval Date

27-08-2007

Major Components

Sewer System and disposal work etc.

Major Targets

82%

District and Tehsil

Sialkot

2141 1532 Name of the Scheme

Extension Rural Drainage Scheme Gojra

Approval Date

8/10/2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.862

11.948

0.000

0.543

0.000

0.000

0.000

0.543

0.543

0.000

0.000

0.000

0.000

43.905

33.198

0.000

2.000

0.000

0.000

0.000

2.000

2.000

15.293

0.000

0.000

0.000

13.136

10.200

0.000

4.906

0.000

0.000

0.000

4.906

4.906

0.000

0.000

0.000

0.000

14.568

10.420

0.000

3.244

0.000

0.000

0.000

3.244

3.244

3.089

0.000

0.000

0.000

9.598

7.282

0.000

3.756

0.000

0.000

0.000

3.756

3.756

0.000

0.000

0.000

525

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2142 1533 Name of the Scheme

Estimated Cost F. Aid 4

Rural Drainage Scheme Mitranwali

Approval Date

13-09-2007

Major Components

Sewer System and disposal work etc.

Major Targets

38%

District and Tehsil

Sialkot

2143 1534 Name of the Scheme

Rural Drainage Scheme Habib Pur

Approval Date

27-08-2007

Major Components

Sewer System and disposal work etc.

Major Targets

57%

District and Tehsil

Sialkot

2144 1535 Name of the Scheme

Rural Drainage Scheme Cheema

Burj

Approval Date

10/10/2007

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2145 1536 Name of the Scheme

Tameer Nullah Jatt Musewala to Saim Nala Raja Ghumman

Approval Date

4/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2146 1537 Name of the Scheme

Tameer Nullah Sulfkar Rehman House to Afzal Sahi House Bharoke

Approval Date

4/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

27.786

8.988

0.000

3.000

0.000

0.000

0.000

3.000

3.000

19.966

0.000

0.000

0.000

9.350

3.147

0.000

3.000

0.000

0.000

0.000

3.000

3.000

4.606

0.000

0.000

0.000

7.342

8.076

0.000

0.367

0.000

0.000

0.000

0.367

0.367

0.000

0.000

0.000

0.000

1.500

0.900

0.000

0.825

0.000

0.000

0.000

0.825

0.825

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

526

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2147 1538 Name of the Scheme

Tameer Nullah Abadi Kalan to UC Raja Ghumman

Approval Date

4/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2148 1539 Name of the Scheme

Tameer Nullah Jmain Nullah Burj Arriyan to Saim Nullah

Approval Date

4/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2149 1540 Name of the Scheme

Tameer Nullah Fatima Hospital to Civil Chowk Daska

Approval Date

4/2/2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2150 1541 Name of the Scheme

Rural Drainage Scheme Baghiari (UC Prail)

Approval Date

14-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

2151 1542 Name of the Scheme

Drainage Nullah around Village Shahzada UC Chahoor

Approval Date

14-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

0.500

0.500

0.000

0.075

0.000

0.000

0.000

0.075

0.075

0.000

0.000

0.000

0.000

1.500

1.500

0.000

0.225

0.000

0.000

0.000

0.225

0.225

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

2.005

2.000

0.000

0.306

0.000

0.000

0.000

0.306

0.306

0.000

0.000

0.000

0.000

2.000

2.000

0.000

0.300

0.000

0.000

0.000

0.300

0.300

0.000

0.000

0.000

527

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2152 1543 Name of the Scheme

Construction of PCC Streets in Chawinda Bazar UC Chawinda

Approval Date

14-02-2009

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

100%

District and Tehsil

Sialkot

2153 1544 Name of the Scheme

Rural Drainage Feasilities for Village Jassoran Council in NA114

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

41%

District and Tehsil

Sialkot

2154 1545 Name of the Scheme

Rural Drainage Scheme Libbay

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

51%

District and Tehsil

Sialkot

2155 1546 Name of the Scheme

Construction of Main Drain for proper sewerage system in Village Rattian Syedan, Union Council Bounkan, Tehsil & District Sialkot

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2156 1547 Name of the Scheme

Construction of Soling & Drain at U/C Shehi

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

2.020

2.000

0.000

0.323

0.000

0.000

0.000

0.323

0.323

0.000

0.000

0.000

0.000

4.660

0.200

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.159

0.000

0.000

0.000

4.144

0.449

0.000

2.000

0.000

0.000

0.000

2.000

2.000

2.317

0.000

0.000

0.000

0.800

0.300

0.000

0.620

0.000

0.000

0.000

0.620

0.620

0.000

0.000

0.000

0.000

1.500

1.000

0.000

0.725

0.000

0.000

0.000

0.725

0.725

0.000

0.000

0.000

528

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2157 1548 Name of the Scheme

Construction of Soling & Drain at U/C Dallowali

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2158 1549 Name of the Scheme

Construction of Soling & Drain at U/C Kharota Syeddan

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2159 1550 Name of the Scheme

Construction of Soling & Drain at U/C Kotli Loharan

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2160 1551 Name of the Scheme

Construction of Soling & Drain at U/C Head Marala

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2161 1552 Name of the Scheme

Construction of Soling & Drain at U/C Kachhi Maand

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.500

1.000

0.000

0.725

0.000

0.000

0.000

0.725

0.725

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

529

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2162 1553 Name of the Scheme

Construction of Soling & Drain at U/C Phoklian

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2163 1554 Name of the Scheme

Construction of Soling & Drain at U/C Gondal

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2164 1555 Name of the Scheme

Construction of Soling & Drain at U/C Pindi Khokhran

Approval Date

14-02-2009

Major Components

Sewer System and disposal work etc.

Major Targets

100%

District and Tehsil

Sialkot

2165 1556 Name of the Scheme

Rehabilitation Sewerage Scheme Chak No.81/5R Resoling etc

Approval Date

6.2.09

Major Components

Drains,Disposal Work and other works.

Major Targets

100%

District and Tehsil

Sahiwal

2166 1557 Name of the Scheme

Rehabilitation Sewerage Scheme Chak No.85/6-R

Approval Date

27.05.2009

Major Components

Drains,Disposal Work and other works.

Major Targets

74%

District and Tehsil

Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

1.000

1.000

0.000

0.150

0.000

0.000

0.000

0.150

0.150

0.000

0.000

0.000

0.000

0.600

0.600

0.000

0.090

0.000

0.000

0.000

0.090

0.090

0.000

0.000

0.000

0.000

3.479

2.500

0.000

0.472

0.000

0.000

0.000

0.472

0.472

1.029

0.000

0.000

530

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2167 1558 Name of the Scheme

Rural Drainage Scheme Chak No.24/11-1-L

Approval Date

28.08.08

Major Components

Drains,Disposal Work and other works.

Major Targets

58%

District and Tehsil

Sahiwal

2168 1559 Name of the Scheme

Feasibilities for Low Cost Sanitation/Treatment Facility for medium/large villages in PunjabPilot Sanitation Project in Village 302/GB

Approval Date

27.8.08

Major Components

T/well,P.House,P.M, AC/PVC pipe etc.

Major Targets

100%

District and Tehsil

Toba Tek Singh

2169 1560 Name of the Scheme

Construction of Sullage Carrier Oxidation Pound form Chak No.256/GB Phaloor to Azafi Abadi Chak No.256/GB

Approval Date

19.3.09

Major Components

Construction of Sullage Carrier and Oxidation Pound etx.

Major Targets

100%

District and Tehsil

Toba Tek Singh

2170 1561 Name of the Scheme

Sewerage Scheme, Machiwall

Approval Date

15.03.07

Major Components

Sewer,Surface Drain, B/Pavement.

Major Targets

100%

District and Tehsil

Vehari , Burewala

2171 1562 Name of the Scheme

Rehabilitation of Sewerage/Drainage Scheme,Tibba Sultan Pur.

Approval Date

19.02.09

Major Components

Sewer,Surface Drain, B/Pavement.

Major Targets

55%

District and Tehsil

Vehari , Burewala

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

10.567

5.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

5.152

0.000

0.000

0.000

11.845

12.000

0.000

1.573

0.000

0.000

0.000

1.573

1.573

0.000

0.000

0.000

0.000

1.541

1.541

0.000

0.231

0.000

0.000

0.000

0.231

0.231

0.000

0.000

0.000

0.000

6.062

3.442

0.000

3.529

0.000

0.000

0.000

3.529

3.529

0.000

0.000

0.000

0.000

16.248

8.300

0.000

2.000

0.000

0.000

0.000

2.000

2.000

8.385

0.000

0.000

531

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

1,544.874

124.178

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Sub-Total: Rural Sewerage Drainage

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

0.000

Foreign Aid Rev 8

708.398

Cap 9

Rev 10

Total Cap 11

Rev 12

708.398

708.398

0.000

10.385

10.385

7.615

0.000

0.000

0.000

0.000

310.000

310.000

218.686

0.000

0.000

0.000

0.000

0.000

50.000

50.000

19.812

0.000

0.000

0.000

0.000

0.000

10.385

10.385

15.902

0.000

0.000

0.000

3,646.396

1,793.608

0.000

0.000

0.000

20.000

5.000

0.000

10.385

0.000

0.000

0.000

891.031

496.000

0.000

310.000

0.000

0.000

72.010

13.000

0.000

50.000

0.000

33.293

12.000

0.000

10.385

0.000

0.000

Punjab Basis 2172 1563 Name of the Scheme

Establishment of PHE Research and training Institute

Approval Date

2/8/2006

Major Components

Capacity Building of HRM

Major Targets

67%

District and Tehsil

Punjab

2173 1564 Name of the Scheme

Establishment of PHED PMUs / CDUs Staff and Design Directorates Staff at Provincial Level for a period of 36-Months (Including cost of Vehicles) PHED North Zone (1165 Posts) & South Zone(987 Posts) Total (1152 Posts)

Approval Date

16-03-2007

Major Components

Strengthening and Capacity Building of PHED

Major Targets

79%

District and Tehsil

Punjab

2174 1565 Name of the Scheme

Up-gradation of Head Quarter Office Building at 2-Lake Road, Lahore.

Approval Date

10/11/2008

Major Components

Civil Works and Allied Works

Major Targets

76%

District and Tehsil

Punjab

2175 1566 Name of the Scheme

Improvement & Extension of Water Testing Laboratories (Phase-I)

Approval Date

31-10-2006

Major Components

Improvement in working of PHED Laboratories

Major Targets

58%

District and Tehsil

Punjab

532

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2176 1567 Name of the Scheme

Study and preparation of comprehensive plan of Urban Water Supply, Sewerage Scheme and Sewerage treatment Plant.

Approval Date

24-09-2008

Major Components

To engage Consultancy Services for preparation of master plan of urban areas in Punjab

Major Targets

82%

District and Tehsil

Punjab

2177 1568 Name of the Scheme

Public awareness campaign for preventing wastage of postable water and Sanitation practices through print & electric media & seminars (Revised)

Approval Date

24-03-2007

Major Components

Awareness cmpaign about safe drinking water and santitation facilities through electric and print media etc

Major Targets

100%

District and Tehsil

Punjab

2178 1569 Name of the Scheme

Strengthening and Capacity Building of PHED in MIS / ME (PCI).(Revised)

Approval Date

7/9/2007

Major Components

Establishment linkage among Head quarter and Field offices with web based MIS Software

Major Targets

88%

District and Tehsil

Punjab

2179 1570 Name of the Scheme

Construction of Residential Building for Superintending Engineer / Executive Engineer, PHE Lahore

Approval Date

25-11-2007

Major Components

Civil Works and Allied Works

Major Targets

100%

District and Tehsil

Punjab

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

76.931

42.833

0.000

30.000

0.000

0.000

0.000

30.000

30.000

15.638

0.000

0.000

0.000

25.000

3.000

0.000

25.750

0.000

0.000

0.000

25.750

25.750

0.000

0.000

0.000

0.000

35.600

23.780

0.000

12.160

0.000

0.000

0.000

12.160

12.160

5.000

0.000

0.000

0.000

10.000

5.200

0.000

6.300

0.000

0.000

0.000

6.300

6.300

0.000

0.000

0.000

533

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2180 1571 Name of the Scheme

Construction of Residential Buildings for officers (BS-16 to 18)

Approval Date

8/5/2009

Major Components

Civil Works and Allied Works

Major Targets

22%

District and Tehsil

Punjab

2181 1572 Name of the Scheme

Establishment of 31 Laboratories at Districts H/Q of Punjab at District Level (Replacement of Outlived Water Supply lines Causing Treats of Gastroenteries & other Borne Disease) for a period of 01-04.2009 to 30.06.2011

Approval Date

8/5/2009

Major Components

Establishment at District Level

Major Targets

48%

District and Tehsil

Punjab

Sub-Total: Punjab Basis

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

77.987

0.100

0.000

20.000

0.000

0.000

0.000

20.000

20.000

40.000

29.585

0.000

0.000

137.147

16.000

0.000

60.000

0.000

0.000

0.000

60.000

60.000

60.000

21.719

0.000

0.000

1,378.999

616.913

534.980

534.980

382.652

51.304

397.980

486.500

7.248

20.000

20.000

0.000

0.000

0.000

534.980

0.000

0.000

0.000

0.000

Forieign Aided Project 2182 1573 Name of the Scheme

Rural Water Supply & Drainage Schemes Chashma Right Bank Canal D.G.Khan(CRBC)ADB Loan(SF-PK-1146) on the basis of (86% ADB Loan +14% Punjab Govt. Share)

Approval Date

Approved

Major Components

T/Well,D/system,R.Main,Pump House,Drains and other allied works.

0.000

20.000

0.000

0.000

0.000

0.000

Major Targets District and Tehsil

Dera Ghazi Khan

Sub-Total: Forieign Aided Project

397.980

486.500

7.248

0.000

534

20.000

0.000

0.000

0.000

20.000

20.000

0.000

0.000

0.000

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

PSDP 2183 1574 Name of the Scheme

Water Supply Schemes for all Tehsils Head Quarters of Distt. Muzaffargarh, Kot Addu.

Approval Date

19.10.07

Major Components

Source,T/Well,P/Machinery,Electrification, staff Quarter,RCC sewer, P/Machinery,OHTL,Pacca Sullage Carrier,Diesel Oil Generartor.etc.

Major Targets

68%

District and Tehsil

Muzaffargarh , Kot Addu

2184 1575 Name of the Scheme

Water Supply Schemes for all Tehsils Head Quarters of Distt. Muzaffargarh, Jatoi.

Approval Date

19.10.07

Major Components

Source,T/Well,P/Machinery,Electrification, staff Quarter,RCC sewer, P/Machinery,OHTL,Pacca Sullage Carrier,Diesel Oil Generartor.etc.

Major Targets

51%

District and Tehsil

Muzaffargarh , Jatoi

2185 1576 Name of the Scheme

Water Supply Schemes for all Tehsils Head Quarters of Distt. Muzaffargarh, Ali Pur.

Approval Date

19.10.07

Major Components

Source,T/Well,P/Machinery,Electrification, staff Quarter,RCC sewer, P/Machinery,OHTL,Pacca Sullage Carrier,Diesel Oil Generartor.etc.

Major Targets

73%

District and Tehsil

Muzaffargarh , Alipur

2186 1577 Name of the Scheme

Urban Water Supply Scheme, Muzaffargarh (Ammended)

Approval Date

10.11.08

Major Components

Source,T/Well,P/Machinery,Electrification, staff Quarter,RCC sewer, P/Machinery,OHTL,Pacca Sullage Carrier,Diesel Oil Generartor.etc.

Major Targets

12%

District and Tehsil

Muzaffargarh , M/garh

0.000

188.781

139.595

0.000

7.795

0.000

0.000

0.000

7.795

7.795

10.000

59.708

0.000

0.000

65.866

31.315

0.000

7.000

0.000

0.000

0.000

7.000

7.000

37.431

0.000

0.000

0.000

40.088

24.090

0.000

9.505

0.000

0.000

0.000

9.505

9.505

12.506

0.000

0.000

0.000

419.689

40.000

0.000

20.000

0.000

0.000

0.000

20.000

20.000

80.000

80.000

0.000

535

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2187 1578 Name of the Scheme

Clean Water Scheme Depalpur City.

Approval Date

18-11-2006

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

67.556

59.826

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

0.000

643.061

20.000

0.000

100.000

0.000

0.000

0.000

100.000

100.000

100.000

101.000

0.000

0.000

391.000

50.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

0.000

0.000

0.000

0.000

54.815

57.639

0.000

5.000

0.000

0.000

0.000

5.000

5.000

0.000

0.000

0.000

0.000

201.959

189.660

0.000

10.000

0.000

0.000

0.000

10.000

10.000

32.593

0.000

0.000

Major Targets District and Tehsil

2188 1579 Name of the Scheme

Okara

Urban Water Supply and Sanitation Scheme,Pakpattan and Arifwala City.

Approval Date

17.1.09

Major Components

Source,T/Well,P/Machinery,Electrification, staff Quarter,RCC sewer, P/Machinery,OHTL,Pacca Sullage Carrier,Diesel Oil Generartor.etc.

Major Targets District and Tehsil

2189 1580 Name of the Scheme

Pakpattan , Pakpattan/Arifwala

Urban Water Supply T.T.Singh

Approval Date

Approved

Major Components

Source,T/Well,P/Machinery,Electrification, staff Quarter,P/Machinery, D/System etc.

Major Targets District and Tehsil

2190 1581 Name of the Scheme

Toba Tek Singh

Drainage Scheme & Sewerage System Okara City (KPP Programme)

Approval Date

25-10-2007

Major Components

Sewer System and disposal work etc.

Major Targets District and Tehsil

2191 1582 Name of the Scheme

Okara

Sewerage / Drainage Scheme South Disposal Okara City (KPP Programme)

Approval Date

25-10-2007

Major Components

Sewer System and disposal work etc.

Major Targets District and Tehsil

Okara 536

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2192 1583 Name of the Scheme

Urban Sewerage / Drainage Scheme Ferozewala

Approval Date

18.10.2008

Major Components

Sewer System and disposal work etc.

Major Targets

39%

District and Tehsil

Sheikhupura

2193 1584 Name of the Scheme

Urban Sewerage / Drainage Scheme Muridke

Approval Date

22-11-2008

Major Components

Sewer System and disposal work etc.

Major Targets

13%

District and Tehsil

Sheikhupura

2194 1585 Name of the Scheme Approval Date

Rural Water Supply / Sewerage & Drainage Under P.M Package in Multan (27 No Scheem) :-

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

78.850

15.000

0.000

20.000

0.000

0.000

0.000

20.000

20.000

55.678

0.000

0.000

0.000

489.045

25.000

0.000

50.000

0.000

0.000

0.000

50.000

50.000

200.000

287.402

0.000

0.000

1,120.670

0.000

0.000

2.700

0.000

0.000

0.000

2.700

2.700

0.000

0.000

0.000

243.000

243.000

528.207

528.110

0.000

6,000.000 11,521.663

7,772.634

230.000

285.000

0.000

Approved

Major Components Major Targets District and Tehsil

multan

Sub-Total: PSDP

0.000

Total: ON-GOING SCHEMES

397.980

3,761.380

652.125

0.000

35,827.413 11,795.343

243.000

0.000

0.000

0.000

0.000 6,000.000

0.000

0.000

0.000 6,000.000

NEW SCHEMES Urban Water Supply 2195 1586 Name of the Scheme

Augmentation of Water Supply Scheme, Sargodha

Approval Date

Un-approved

Major Components

i) Sourceii) Main Pipe Line, Distribution & Machinery

Major Targets

25%

District and Tehsil

Sargodha

0.000

600.000

0.000

0.000

537

150.000

0.000

0.000

0.000

150.000

150.000

255.000

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2196 1587 Name of the Scheme

Ext. Urban Water Supply Scheme & Sewerage Nankana Sahib

Approval Date

Un-approved

Major Components

i) Sourceii) Main Pipe Line, Distribution & Machinery

Major Targets

25%

District and Tehsil

Nankana Sahib

2197 1588 Name of the Scheme

Comprehensive water Supply & Sewearge Scheme Khushab

Approval Date

Un-approved

Major Components

i) Sourceii) Main Pipe Line, Distribution & Machinery

Major Targets

25%

District and Tehsil

Khushab

2198 1589 Name of the Scheme

Comprehensive water supply & Sewerage Scheme Mianwali

Approval Date

Un-approved

Major Components

i) Sourceii) Main Pipe Line, Distribution & Machinery

Major Targets

18%

District and Tehsil

Mianwali

2199 1590 Name of the Scheme

Rehabilation of Water Supply Scheme Khewra

Approval Date

Un- Approved

Major Components

) Source ii) Main Pipe Distribution & Machinery

Major Targets

30%

District and Tehsil

Jhelum , P. D. Khan

2200 1591 Name of the Scheme

Water Supply Scheme Kot Momin

Approval Date

Un- Approved

Major Components

) Source ii) Main Pipe Distribution &

Major Targets

15%

District and Tehsil

Sargodha

Sub-Total: Urban Water Supply

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

300.000

0.000

0.000

75.000

0.000

0.000

0.000

75.000

75.000

120.000

150.000

0.000

0.000

400.000

0.000

0.000

100.000

0.000

0.000

0.000

100.000

100.000

170.000

190.000

0.000

0.000

400.000

0.000

0.000

75.000

0.000

0.000

0.000

75.000

75.000

165.000

220.000

0.000

0.000

20.000

0.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

20.000

0.000

0.000

0.000

50.000

0.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

40.000

0.000

0.000

0.000

1,770.000

420.000

420.000

770.000

845.000

0.000

0.000

538

420.000

0.000

0.000

0.000

0.000

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Foreign Aid Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

Urban Sewerage Drainage 2201 1592 Name of the Scheme

Urban Sewerage Scheme Jhelum with Treatment Plant

Approval Date

Un-approved

Major Components

Sewer System and disposal work etc.

Major Targets

25%

District and Tehsil

Jhelum

2202 1593 Name of the Scheme

Provision of Sewerage System Lala Musa

Approval Date

Un- Approved

Major Components

Sewer System and disposal work etc.

Major Targets

30%

District and Tehsil

Gujrat

2203 1594 Name of the Scheme

Urban Sewerage Drainage Scheme, Pattoki

Approval Date

Un-app.

Major Components

Drains,Disposal Work and other works.

Major Targets

25%

District and Tehsil

Kasur , Pattoki

Sub-Total: Urban Sewerage Drainage

0.000

400.000

0.000

0.000

100.000

0.000

0.000

0.000

100.000

100.000

170.000

190.000

0.000

0.000

20.000

0.000

0.000

10.000

0.000

0.000

0.000

10.000

10.000

10.000

0.000

0.000

0.000

125.000

0.000

0.000

30.000

0.000

0.000

0.000

30.000

30.000

70.000

25.000

0.000

140.000

140.000

250.000

215.000

0.000

545.000

0.000

0.000

140.000

0.000

0.000

0.000

0.000

Rural Water Supply 2204 1595 Name of the Scheme

Rehabilitation of Non Functional Rural Water Supply Schemes (232)

Approval Date

Un- Approved

Major Components

Source ii) Main Pipe Distribution &

Major Targets

100%

District and Tehsil

Punjab

2205 1596 Name of the Scheme Approval Date

Water Supply and Sanitation Schemes

0.000

800.000

0.000

0.000

800.000

0.000

0.000

0.000

800.000

800.000

0.000

0.000

0.000

0.000

955.000

0.000

0.000

955.000

0.000

0.000

0.000

955.000

955.000

0.000

0.000

0.000

0.000

1,755.000

1,755.000

0.000

Un- Approved

Major Components Major Targets

100%

District and Tehsil

Punjab

Sub-Total: Rural Water Supply

0.000

0.000 1,755.000 539

0.000

0.000

0.000 1,755.000

0.000

0.000

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

Punjab Basis 2206 1597 Name of the Scheme Approval Date

Establishment of Incubation & Facilitation Centers for new Consultancy in HUD & PHED

0.000

15.000

0.000

0.000

15.000

0.000

0.000

0.000

15.000

15.000

15.000

0.000

0.000

0.000

100.000

0.000

0.000

25.000

0.000

0.000

0.000

25.000

25.000

75.000

0.000

0.000

0.000

500.000

0.000

0.000

45.000

0.000

0.000

0.000

45.000

45.000

100.000

200.000

155.000

0.000

20.000

0.000

0.000

20.000

0.000

0.000

0.000

20.000

20.000

0.000

0.000

0.000

Un-app.

Major Components Major Targets

100%

District and Tehsil

Punjab

2207 1598 Name of the Scheme

Provision of Funds for incomplete Schemes Targetted for 2008-09

Approval Date

Un-app.

Major Components

i) Source ii) Main Pipe Distribution & Machinery

Major Targets

25%

District and Tehsil

Punjab

2208 1599 Name of the Scheme

Improvement of Drinking Water Quality in all Arsenic Affected areas of Punjab

Approval Date

Un-app.

Major Components

To improve the working of the Department.

Major Targets

9%

District and Tehsil

Punjab

2209 1600 Name of the Scheme

Digital Mapping of Urban / Rural Areas

Approval Date

Un-app.

Major Components

Identification of Sewerage/Drainage alternate disposal treatment solid waste water facilities.

Major Targets

100%

District and Tehsil

Punjab

540

WATER SUPPLY & SANITATION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2210 1601 Name of the Scheme

Construction of PHED Office Buildings in Punjab.

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

Foreign Aid

6

Cap 7

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

0.000

50.000

0.000

0.000

50.000

0.000

0.000

0.000

50.000

50.000

0.000

0.000

0.000

0.000

30.000

0.000

0.000

30.000

0.000

0.000

0.000

30.000

30.000

0.000

0.000

0.000

Sub-Total: Punjab Basis

0.000

715.000

0.000

0.000

185.000

0.000

0.000

0.000

185.000

185.000

190.000

200.000

155.000

Total: NEW SCHEMES

0.000

4,785.000

0.000

0.000 2,500.000

0.000

0.000

0.000 2,500.000

2,500.000

1,210.000

1,260.000

155.000

40,612.413 11,795.343

0.000 8,500.000

0.000

0.000

0.000 8,500.000

8,500.000 12,731.663

9,032.634

385.000

Approval Date

Un-app.

Major Components

Civil and allied works

Major Targets

100%

District and Tehsil

Punjab

2211 1602 Name of the Scheme

Third Party Validation for Quality Control of the New Initiatives through out Punjab

Approval Date

Un-app.

Major Components

Checking of Civil Works

Major Targets

100%

District and Tehsil

Punjab

Grand Total

397.980

541

SOCIAL PROTECTION

542

SOCIAL PROTECTION VISION Strive to attain the ultimate objective of welfare state according to collective social and ethical aspirations of people free form exploitation, deprivation and discrimination. POLICY •

The major objective in the social protection sector is the creation of welfare facilities and healthy living opportunities of vulnerable groups including destitute and old age women and Children.



Gender mainstreaming in Public and Private Setup.



Impart marketable skills for self employment.



Eradication of drug menace and rehabilitation of drug addicts.



Establishment of beggar centre to eradicate menace of beggary from the society.

NEW INITITAIVES •

Establishment of working women hostel at Sahiwal



Construction of building of shelter home at Attock



Establishment of welfare home for beggars at Lahore.



Establishment of Family counseling centres at Lahore & Rawalpindi



Establishment of one stop crisis centres at the major hospitals of Lahore.



Socio Economic Development of Destitute & Neglected Children Families under the Head of Child Protection.



Establishment of 100 Vocational training institutes by Punjab Vocational Training Council and up gradation of 134 Existing VTIS.

543

MTDF 2009-12 Social Protection : Summary Development Programme 2009-10 (Million Rs) Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Social Protection

251.925

633.075

885.000

0.000

885.000

12.000

3.000

15.000

0.000

15.000

263.925

636.075

900.000

0.000

900.000

Total

251.925

633.075

885.000

0.000

885.000

12.000

3.000

15.000

0.000

15.000

263.925

636.075

900.000

0.000

900.000

15

Number of Schemes

6

21

Development Programme 2010-11 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Social Protection

262.121

625.879

888.000

0.000

888.000

175.350

136.650

312.000

0.000

312.000

437.471

762.529

1,200.000

0.000

1,200.000

Total

262.121

625.879

888.000

0.000

888.000

175.350

136.650

312.000

0.000

312.000

437.471

762.529

1,200.000

0.000

1,200.000

Development Programme 2011-12 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Social Protection

540.250

569.750

1,110.000

0.000

1,110.000

198.950

191.050

390.000

0.000

390.000

739.200

760.800

1,500.000

0.000

1,500.000

Total

540.250

569.750

1,110.000

0.000

1,110.000

198.950

191.050

390.000

0.000

390.000

739.200

760.800

1,500.000

0.000

1,500.000

SOCIAL PROTECTION MTDF 2009-12 GRAND TOTAL

544

3,600.000

SOCIAL PROTECTION: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES 13

251.925

333.416

0.000

0.000

251.925

333.416

585.341

353.528

0.000

Punjab Vocational & Training Council

1

0.000

134.870

0.000

0.000

0.000

134.870

134.870

0.000

0.000

Child Protection & Welfare Bureau (CPWB)

1

0.000

164.789

0.000

0.000

0.000

164.789

164.789

72.351

0.000

15

251.925

633.075

0.000

0.000

251.925

633.075

885.000

425.879

0.000

Social Welfare, Women Development & Bait-ul-Maal

6

12.000

3.000

0.000

0.000

12.000

3.000

15.000

104.000

51.000

Total: NEW SCHEMES

6

12.000

3.000

0.000

0.000

12.000

3.000

15.000

104.000

51.000

21

263.925

636.075

0.000

0.000

263.925

636.075

900.000

529.879

51.000

Social Welfare, Women Development & Bait-ul-Maal

Total: ON-GOING SCHEMES NEW SCHEMES

Grand Total

545

SOCIAL PROTECTION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

ON-GOING SCHEMES Social Welfare, Women Development & Bait-ul-Maal 2212

2213

2214

1 Name of the Scheme

Construction of Building of Gehwara at Rawalpindi.

Approval Date

Approved 28/08/ 2008

Major Components

Construction of building

Major Targets

Completion of construction work

District and Tehsil

Rawalpindi

2 Name of the Scheme

Construction of Building of District Industrial Home (Dih) At Rawalpindi

Approval Date

Approved 19/08/ 2008

Major Components

Construction of building

Major Targets

Completion of construction work

District and Tehsil

Rawalpindi

3 Name of the Scheme

Establishment of Children Homes (Orphanages) at Gujranwala

Approval Date

Approved 10/09/08

Major Components

Boarding & lodging facility, Medical care, Technical & Vocational trainning, Religious education.

Major Targets

completion of construction work, finalizing purchases, Provision of institutional care to 400 orphan children annually.

District and Tehsil

Gujranwala

0.000

35.144

10.000

25.144

0.000

0.000

0.000

25.144

0.000

25.144

0.000

0.000

0.000

0.000

23.990

15.000

8.990

0.000

0.000

0.000

8.990

0.000

8.990

0.000

0.000

0.000

0.000

39.542

16.000

13.719

9.823

0.000

0.000

13.719

9.823

23.542

0.000

0.000

0.000

546

SOCIAL PROTECTION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2215

2216

2217

4 Name of the Scheme

Enhancing capacity of existing Women Development Centre in Model Town Extension Lahore

Approval Date

Approved 03/07/2008

Major Components

Construction of building, including day care centre, display centre, nursery classes, gym, library ,staff room & production centre

Major Targets

Completion of construction work, finalizing purchases & conducting trainings in 25 different skills & training 10,000 trainees per year.

District and Tehsil

Lahore

5 Name of the Scheme

Strengthening & upgradation of home for disabled persons (Nasheman)

Approval Date

Approved 19/08/ 2008

Major Components

Strengthening of existing structure. provision of machinery equipment& transport.

Major Targets

Strengthening & upgradation of the institute.

District and Tehsil

Lahore

6 Name of the Scheme

Strengthening & capacity building of Dar-ul-Falah

Approval Date

Approved 19/08/ 2008

Major Components

Strengthening of existing structure. provision of machinery equipment & transport.

Major Targets

Strengthening & upgradation of the institute.

District and Tehsil

Lahore

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

160.710

93.952

66.153

0.912

0.000

0.000

66.153

0.912

67.065

0.000

0.000

0.000

0.000

23.207

5.000

0.916

17.291

0.000

0.000

0.916

17.291

18.207

0.000

0.000

0.000

0.000

29.947

3.236

0.000

26.711

0.000

0.000

0.000

26.711

26.711

0.000

0.000

0.000

547

SOCIAL PROTECTION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2218

2219

2220

7 Name of the Scheme

Establishment of Drug Rehabilitation Centre At Multan

Approval Date

Approved 27/12/2006

Major Components

Detoxification centre,vocational trainning centre, hostel for detoxified patients& trainning workshops for them.

Major Targets

Detoxfication of 200 addicts annually, trainning of 200 inmates in 6 different skills, Job placement.

District and Tehsil

Multan

8 Name of the Scheme

Implementation of Gender Reform Action Plan (GRAP)

Approval Date

Approved 18/07/2007

Major Components

GRAP targets critcal areas of political, fiscal, policy & institutional reforms, women employment & capacity building in public sector.

Major Targets

Establishment of Grap support units all over punjab * Gender Mainstreaming units in 8 line departments.

District and Tehsil

Punjab

9 Name of the Scheme

Establishment of 7 Model Children Homes (Orphanages) in 5 districts of Punjab

Approval Date

Approved 19/08/2008

Major Components

Boarding & lodging facility, medical care, technical & vocational trainning, religious education.

Major Targets

completion of construction work, finalizing purchases, provision of institutional care to 400 orphan children annually.

District and Tehsil

Narowal,Dera Ghazi Khan, Sialkot, Sargodha, Rawalpindi

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

52.423

31.768

4.590

16.065

0.000

0.000

4.590

16.065

20.655

0.000

0.000

0.000

0.000

605.370

109.304

0.000

148.848

0.000

0.000

0.000

148.848

148.848

353.528

0.000

0.000

0.000

197.952

106.175

29.908

61.869

0.000

0.000

29.908

61.869

91.777

0.000

0.000

0.000

548

SOCIAL PROTECTION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2221 10 Name of the Scheme

Strengthening and capacity building of existing Old Age Homes And Establishment of 3 more homes in Punjab

Approval Date

Approved 19/08/2008

Major Components

Refurbishment of existing old age homes,provision of machinery, equipment and transport.

Major Targets

Completion of construction work, recruitment of staff, provision of institutional care to 250 old age people

District and Tehsil

Sahiwal, Narowal,Toba Tek Singh, Rawalpindi,Multan, Lahore

2222 11 Name of the Scheme

Construction of building of Shelter Homes in 5 districts of Punjab ( Phase-I)

Approval Date

Approved 19/08/2008

Major Components

Construction of building of shelter homes

Major Targets

completion of consruction work, provision of shelter facilties to 250 women in distress

District and Tehsil

Jhang, Muzaffargarh, Rajanpur, Bahawalnagar ,Toba Tek Singh

2223 12 Name of the Scheme

Construction of female barracks in the central / districts jails of Rawalpindi & Faisalabad

Approval Date

Approved 03/07/2008

Major Components

Construction of female barracks in district jail R/Pindi & central jail F/Bad.

Major Targets

Completion of construction work, provision of accommodation for 400 women prisoners in both jails.

District and Tehsil

Rawalpindi,Faisalabad

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

129.984

72.129

5.958

51.897

0.000

0.000

5.958

51.897

57.855

0.000

0.000

0.000

0.000

62.445

39.916

22.529

0.000

0.000

0.000

22.529

0.000

22.529

0.000

0.000

0.000

0.000

21.563

5.100

16.463

0.000

0.000

0.000

16.463

0.000

16.463

0.000

0.000

0.000

549

SOCIAL PROTECTION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

0.000

57.555

0.000

333.416

585.341

353.528

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2224 13 Name of the Scheme

Construction of building of Shelter Homes in 5 districts of Punjab (Phase-II)

Approval Date

Approved 19/08/ 2008

Major Components

Construction of building of shelter homes

Major Targets

completion of consruction work, provision of shelter facilties to 250 women in distress

District and Tehsil

Khushab, Khanewal, Vehari, Sahiwal, Mianwali

Sub-Total: Social Welfare, Women Development & Bait-ul-Maal

Estimated Cost F. Aid 4

Total 5

0.000

87.295

0.000

1,469.572

0.000

535.100

Exp. upto 2008-09

Local Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

29.740

57.555

0.000

0.000

537.320

251.925

6

333.416

0.000

0.000

0.000

Total Cap 11

Rev 12

57.555

251.925

0.000

0.000

0.000

0.000

Punjab Vocational & Training Council 2225 14 Name of the Scheme

Establishment of 100 Vocational Training Institutes (VTIs) by Punjab Vocational Training Council (PVTC) and up gradation of 134 existing VTIs.

Approval Date

09/02/2008

Major Components

Establishment of VTIs and upgradation of existing VTIs.

Major Targets

Establishment of VTIs and upgradation of existing VTIs.

District and Tehsil

Punjab

Sub-Total: Punjab Vocational & Training Council

0.000

535.100

400.230

0.000

400.230

0.000

134.870

134.870

0.000

0.000

0.000

0.000

0.000

0.000

134.870

134.870

134.870

134.870

0.000

0.000

0.000

0.000

0.000

0.000

Child Protection & Welfare Bureau (CPWB) 2226 15 Name of the Scheme

Socio-economic development of destitute & neglected children's families

Approval Date

27/11/07

Major Components

Income generation grants, micro-finance, vocational technical training

Major Targets

Income generation grants, micro-finance, vocational technical training

District and Tehsil

Lahore, Gujranwala,Multan, Faisalabad, Rawalpindi

0.000

360.440

123.300

0.000

550

164.789

0.000

0.000

0.000

164.789

164.789

72.351

0.000

0.000

SOCIAL PROTECTION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local Cap 7

6

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

Sub-Total: Child Protection & Welfare Bureau (CPWB)

0.000

360.440

123.300

0.000

164.789

0.000

0.000

0.000

164.789

164.789

72.351

0.000

0.000

Total: ON-GOING SCHEMES

0.000

2,365.112

1,060.850

251.925

633.075

0.000

0.000

251.925

633.075

885.000

425.879

0.000

0.000

0.000

15.000

0.000

3.000

0.000

0.000

0.000

3.000

0.000

3.000

12.000

0.000

0.000

0.000

45.000

0.000

4.000

0.000

0.000

0.000

4.000

0.000

4.000

30.000

11.000

0.000

0.000

50.000

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

30.000

19.000

0.000

NEW SCHEMES Social Welfare, Women Development & Bait-ul-Maal 2227 16 Name of the Scheme

Construction of building of Shelter Home at Attock

Approval Date

Un-Approved

Major Components

Construction of building of shelter homes

Major Targets

Completion of consruction work, provision of shelter facilities to 250 women in distress.

District and Tehsil

Attock

2228 17 Name of the Scheme

Establishment of Children Home (Orphanage) at Faisalabad

Approval Date

Un-Approved

Major Components

Boarding & lodging facility, medical care, technical & vocational trainning, religious education.

Major Targets

completion of construction work, finalizing purchases provision o of institutional care to 400 orphan children annually.

District and Tehsil

Faisalabad

2229 18 Name of the Scheme

Establishment of Beggar's Home at Lahore

Approval Date

Un-Approved

Major Components

Medical treatment, psychological counselling, vocational trainning & rehabilitation services of beggars

Major Targets

To help beggars earn their own living through some profession.to minimize the menance of beggary from the city.

District and Tehsil

Lahore

551

SOCIAL PROTECTION

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2230 19 Name of the Scheme

Establishment of hostel for working women at Sahiwal

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

25.000

0.000

5.000

0.000

0.000

0.000

5.000

0.000

5.000

10.000

5.000

5.000

0.000

60.000

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

10.000

4.000

45.000

0.000

40.000

0.000

0.000

1.000

0.000

0.000

0.000

1.000

1.000

12.000

12.000

15.000

Sub-Total: Social Welfare, Women Development & Bait-ul-Maal

0.000

235.000

0.000

12.000

3.000

0.000

0.000

12.000

3.000

15.000

104.000

51.000

65.000

Total: NEW SCHEMES

0.000

235.000

0.000

12.000

3.000

0.000

0.000

12.000

3.000

15.000

104.000

51.000

65.000

Grand Total

0.000

2,600.112

1,060.850

263.925

636.075

0.000

0.000

263.925

636.075

900.000

529.879

51.000

65.000

Approval Date

Un-Approved

Major Components

Construction of building of hostel, purchase of equipment ,recruitment of staff.

Major Targets

To facilitate the 50 working women of Sahiwal division at one time.

District and Tehsil

Sahiwal

2231 20 Name of the Scheme

Family Counselling Centres

Approval Date

Un-Approved

Major Components

Psychological therapy, counselling, rehabilitation services. provision of round the clock helpline service

Major Targets

Strengthening of family institution in the Community. To provide instant guidance & counsellig to the client.

District and Tehsil

Lahore ,Rawalpindi

2232 21 Name of the Scheme

One stop crisis centre for women In distress

Approval Date

Un-Approved

Major Components

Medical treatment, psychological counselling & rehabilitation services of women in distress

Major Targets

To provide multiple rehabilitative services to the women in distress.

District and Tehsil

Lahore,Rawalpindi,Bahawalpur ,Multan

552

REGIONAL PLANNING

553

REGIONAL PLANNING VISION Eliminate regional disparities by bridging the gap between developed and less developed areas and providing equal opportunities of income generation and growth to all areas in Punjab. POLICY •

Removal of regional imbalances



Multi-sectoral integrated development programmes in the less privileged areas i.e. Barani tract, Cholistan Thal and parts of Southern Punjab.



Provision of physical and social infrastructure in Cholistan (water, electricity and roads) under Cholistan Development Authority.



Special focused interventions in the poorer districts of Southern Punjab



Targeted poverty alleviation schemes for less development areas.

STRATEGIC INTERVENTIONS •

Southern Punjab Development Programme



DFID assisted Punjab Economic Opportunities Programme in Southern Areas.



Command Areas Development Project of Small Dams and Contiguous Areas in Pothohar Region, Barani Tracts of Punjab.



Water Resource Development (through Construction of 200 Mini Dams alongwith Command Area Development) of Pothohar Region, Barani Areas of Punjab.



Provision of Necessary Infrastructure like Roads and Water Supply in Cholistan Area.



Shaadbad Cholistan Project.



Provision of Drinking water through pipe line from Bahawal Canal at Jaganpir to Khutri Dahar Water Works.

554

OUTCOME-BASED TARGETS ACTIVITIES

TARGETS 2009-10

Southern Punjab Community Development Sub-Projects

85

Rehabilitation & construction of jeep-able tracks/ Pacca Roads

64

Alternate Energy Resources

14 chaks

Institutional Support (training) in Education and Health fields

714

Water Resources Development (Small Dam Reservoirs etc.)

3

Skill Development

20,000 Persons

Livestock Sector Loans

10,000 Loans

Barani Area Medium Scale Interventions

216

Training of community members

2200

No. of Loans

7000

Small Scale Interventions

600

Mini Dams with Water Conveyance System

75

Ponds / Water Storage Tanks , Dug / Sump Wells with Water Conveyance System

100

Lift Irrigation System

10

Establishment of Nurseries including Fruit Plants

9

Check Dams and Related Soil Conservation Work

400 acres

Cholistan Development Programme Water Supply through Pipelines

4 chaks

Canal Water Storages Ponds

10

Construction and Rehabilitation of Roads

23 KM

VR Bridges

3

Veterinary Dispensaries

6 555

MTDF 2009-12 Regional Planning : Summary Development Programme 2009-10 (Million Rs) Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

SOUTHERN PUNJAB DEVELOPMENT PROGRAMME

0.000

0.000

0.000

0.000

0.000

3,000.000

2,000.000

5,000.000

0.000

5,000.000

3,000.000

2,000.000

5,000.000

0.000

5,000.000

PUNJAB ECONOMIC OPPORTUNITIES PROGRAMME (DFID)

0.000

0.000

0.000

0.000

0.000

0.000

700.000

700.000

700.000

1,400.000

0.000

700.000

700.000

700.000

1,400.000

AGENCY FOR BARANI AREAS DEVELOPMENT (ABAD)

8.376

131.624

140.000

400.000

540.000

0.000

150.000

150.000

0.000

150.000

8.376

281.624

290.000

400.000

690.000

CHOLISTAN DEVELOPMENT AUTHORITY (CDA)

0.000

225.000

225.000

0.000

225.000

0.000

100.000

100.000

0.000

100.000

0.000

325.000

325.000

0.000

325.000

INTEGRATED POVERTY ALLEVIATION PROGRAMME FOR SOUTHERN PUNJAB (PRSP)

0.000

50.000

50.000

0.000

50.000

0.000

0.000

0.000

0.000

0.000

0.000

50.000

50.000

0.000

50.000

Bahawalpur Rural Development Project (BRDP)

0.000

10.000

10.000

0.000

10.000

0.000

0.000

0.000

0.000

0.000

0.000

10.000

10.000

0.000

10.000

Total

8.376

416.624

425.000

400.000

825.000

3,000.000

2,950.000

5,950.000

700.000

6,650.000

3,008.376

3,366.624

6,375.000

1,100.000

7,475.000

54

No. of schemes

11

65

Development Programme 2010-11 Ongoing Programme

New Programme

Total

Sub-Sector Capital PUNJAB ECONOMIC OPPORTUNITIES PROGRAMME (DFID)

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

0.000

950.000

950.000

950.000

1,900.000

0.000

0.000

0.000

0.000

0.000

0.000

950.000

950.000

950.000

1,900.000

20.000

426.282

446.282

794.000

1,240.282

0.000

150.000

150.000

0.000

150.000

20.000

576.282

596.282

794.000

1,390.282

CHOLISTAN DEVELOPMENT AUTHORITY (CDA)

0.000

597.125

597.125

0.000

597.125

0.000

200.000

200.000

0.000

200.000

0.000

797.125

797.125

0.000

797.125

INTEGRATED POVERTY ALLEVIATION PROGRAMME FOR SOUTHERN PUNJAB (PRSP)

0.000

100.000

100.000

0.000

100.000

0.000

0.000

0.000

0.000

0.000

0.000

100.000

100.000

0.000

100.000

AGENCY FOR BARANI AREAS DEVELOPMENT (ABAD)

NEW INITIATIVES Total

0.000

0.000

0.000

0.000

0.000

3,000.000

1,812.593

4,812.593

0.000

4,812.593

3,000.000

1,812.593

4,812.593

0.000

4,812.593

20.000

2,073.407

2,093.407

1,744.000

3,837.407

3,000.000

2,162.593

5,162.593

0.000

5,162.593

3,020.000

4,236.000

7,256.000

1,744.000

9,000.000

Development Programme 2011-12 Ongoing Programme

New Programme

Total

Sub-Sector Capital PUNJAB ECONOMIC OPPORTUNITIES PROGRAMME (DFID)

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

0.000

950.000

950.000

950.000

1,900.000

0.000

0.000

0.000

0.000

0.000

0.000

950.000

950.000

950.000

1,900.000

16.000

590.000

606.000

265.000

871.000

0.000

200.000

200.000

0.000

200.000

16.000

790.000

806.000

265.000

1,071.000

CHOLISTAN DEVELOPMENT AUTHORITY (CDA)

0.000

376.000

376.000

0.000

376.000

0.000

200.000

200.000

0.000

200.000

0.000

576.000

576.000

0.000

576.000

INTEGRATED POVERTY ALLEVIATION PROGRAMME FOR SOUTHERN PUNJAB (PRSP)

0.000

163.130

163.130

0.000

163.130

0.000

100.000

100.000

0.000

100.000

0.000

263.130

263.130

0.000

263.130

AGENCY FOR BARANI AREAS DEVELOPMENT (ABAD)

NEW INITIATIVES Total

0.000

0.000

0.000

0.000

0.000

4,000.000

2,189.870

6,189.870

0.000

6,189.870

4,000.000

2,189.870

6,189.870

0.000

6,189.870

16.000

2,079.130

2,095.130

1,215.000

3,310.130

4,000.000

2,689.870

6,689.870

0.000

6,689.870

4,016.000

4,769.000

8,785.000

1,215.000

10,000.000

REGIONAL PLANNING MTDF 2009-12 GRAND TOTAL:

556

26,475.000

REGIONAL PLANNING: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES Integrated Poverty Alleviation Programme for Southern Punjab (PRSP)

1

0.000

50.000

0.000

0.000

0.000

50.000

50.000

100.000

163.130

Agency for Barani Areas Development (ABAD)

3

8.376

131.624

0.000

400.000

8.376

531.624

540.000

978.282

326.094

Cholistan Development Authority (CDA)

49

0.000

225.000

0.000

0.000

0.000

225.000

225.000

381.707

167.025

Bahawalpur Rural Development Project (BRDP)

1

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

Total: ON-GOING SCHEMES

54

8.376

416.624

0.000

400.000

8.376

816.624

825.000

1,459.989

656.249

Southern Punjab Development Programme

1

3,000.000

2,000.000

0.000

0.000

3,000.000

2,000.000

5,000.000

0.000

0.000

Punjab Economic Opportunities Programme (DFID).

1

0.000

700.000

0.000

700.000

0.000

1,400.000

1,400.000

1,900.000

1,900.000

Agency for Barani Areas Development (ABAD)

3

0.000

150.000

0.000

0.000

0.000

150.000

150.000

260.000

295.000

Cholistan Development Authority (CDA)

6

0.000

100.000

0.000

0.000

0.000

100.000

100.000

217.418

154.582

Total: NEW SCHEMES

11

3,000.000

2,950.000

0.000

700.000

3,000.000

3,650.000

6,650.000

2,377.418

2,349.582

Grand Total

65

3,008.376

3,366.624

0.000

1,100.000

3,008.376

4,466.624

7,475.000

3,837.407

3,005.831

NEW SCHEMES

557

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

100.000

163.130

100.000

163.130

0.000

0.000

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

0.000

50.000

0.000

Total Cap 11

Rev 12

ON-GOING SCHEMES Integrated Poverty Alleviation Programme for Southern Punjab (PRSP) 2233

1 Name of the Scheme

Integrated Poverty Alleviation Programme for Southern Punjab (PRSP)

Approval Date

Approved 27-05-2006

Major Components

CO formulation, Community Physical, infrastructure schmes, Activists to be trained through Community Trainings, Credit Disbursement

Major Targets

No. 1000, No. 193, No. 2000

District and Tehsil

Muzaffargarh, Dera Ghazi Khan, Rajanpur, Layyah , M.Garh, D.G.Khan, Rajanpur, Layyah

Sub-Total: Integrated Poverty Alleviation Programme for Southern Punjab (PRSP)

0.000

608.130

295.000

0.000

608.130

295.000

0.000

28.745

11.055

0.000

50.000

0.000

0.000

0.000

0.000

0.000

50.000

50.000

50.000

50.000

0.000

0.000

Agency for Barani Areas Development (ABAD) 2234

2 Name of the Scheme

Addition/ Alteration of old ABAD Colony

Approval Date

Approved 05-06-2007 Revised 14-022009

Major Components

Repair, Renovation and Alteration

Major Targets

Repair and Renovation of Houses of ABAD Colony

District and Tehsil

Rawalpindi

8.376

558

9.314

0.000

0.000

8.376

9.314

17.690

0.000

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2235

2236

3 Name of the Scheme

Sustainable Livelihood in Barani Areas Project.

Approval Date

Approved ECNEC 25-02-2005

Major Components

1. Union Council Development Component, 2. Targeted Poverty Allevation, 3. Literacy Through Skill Training

Major Targets

Medium Scale Intervention (MIS)=955, Formulation of COs=4738, Training of COs=42292, Loans=46062, Small Scale Interventions = 2216, Income Generation Training = 25,000, Literacy/skill trainings = 12000, Training of master trainers=60.

District and Tehsil

Rawalpindi, Jhelum, Chakwal, Mianwali, Sialkot, Gujrat, Bhakkar, Layyah, Narowal, Khushab , Kotli Sattian, Jhelum, C.S.Shah, Mianwali, Isa Khel, Piplan, Pasrur, Sari Alamgir, Kharian, Bhakkar, Darya Khan, Mankera, Layyah, Narowal, Khushab, Nurpur

4 Name of the Scheme

Development of Left Over Barani Areas.

Approval Date

Approved 25-01-2007

Major Components

Soil & Water Resources Development

Major Targets

1. Mini Dams with Water Conveyance System (25 Nos.), 2. Ponds/ Water Storage Tanks, Dugs/Sums Wells with Water Conveyance System (40 N0s), 3. Lift Irrigation System (10 Nos.), 4. Estt. Of Nurseries including Furit Plants (09 Nos.). 5. Check Dams and related Soil Conservation Works (400 Acers).

District and Tehsil

Attock, Rawalpindi, Jhelum, Chakwal, , Fatehjhang, Rawalpindi, Taxila, Khuhta, Kallar Syedan & Murree, Sohawa, Chakwal, Kalar Kahar.

Sub-Total: Agency for Barani Areas Development (ABAD)

Estimated Cost

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

1,182.180

0.000

92.165

0.000

400.000

0.000

492.165

492.165

978.282

326.094

0.000

60.000

29.855

0.000

30.145

0.000

0.000

0.000

30.145

30.145

0.000

0.000

0.000

3,604.745

1,223.090

531.624

540.000

978.282

326.094

F. Aid 4

Total 5

2,460.000

3,516.000

0.000

2,460.000

Exp. upto 2008-09

Local

6

8.376

559

131.624

0.000

400.000

Total Cap 11

8.376

Rev 12

0.000

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

Cholistan Development Authority (CDA) 2237

2238

2239

2240

5 Name of the Scheme

Construction of Missing Link road from Pul Kalar wala to Qila Derawar (Phase-II).

Approval Date

Approved 28.09.2006

Major Components

Construction of Road

Major Targets

8 Km

District and Tehsil

Bahawalpur , Yazman

6 Name of the Scheme

Const. Of Metalled Road from Mithra Road to Qilla Derawar Along 1-L Derawar (Phase-II)

Approval Date

Approved 28.09.2006

Major Components

Construction of Road

Major Targets

2 Km

District and Tehsil

Bahawalpur , Yazman

7 Name of the Scheme

Construction of Missing Link road from Yazman-Kud wala road to 87/DB road via 86/DB (Alif).

Approval Date

Approved 28.09.2006

Major Components

Construction of Road

Major Targets

4 Km

District and Tehsil

Bahawalpur , Yazman

8 Name of the Scheme

Construction of Metalled Road from Jugaitpir to Mouza Jand Awan.

Approval Date

Approved 28.09.2006

Major Components

Construction of Road

Major Targets

5 Km

District and Tehsil

Bahawalpur , Yazman

0.000

19.973

10.000

0.000

2.973

0.000

0.000

0.000

2.973

2.973

7.000

0.000

0.000

0.000

7.081

3.000

0.000

4.081

0.000

0.000

0.000

4.081

4.081

0.000

0.000

0.000

0.000

10.248

6.000

0.000

4.248

0.000

0.000

0.000

4.248

4.248

0.000

0.000

0.000

0.000

10.037

6.598

0.000

3.439

0.000

0.000

0.000

3.439

3.439

0.000

0.000

0.000

560

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2241

9 Name of the Scheme

Construction of Metalled Road from 74/DB to NAGRA.

Approval Date

Approved 28.09.2006

Major Components

Construction of Road

Major Targets

4 Km

District and Tehsil

Bahawalpur , Yazman

2242 10 Name of the Scheme

Const. of Missing Link Road from 133/DNB Kalar Wala Road to Pul Chak No. 134/DNB Road via Chak No. 135/DNB Abadi Deh.

Approval Date

Approved 28.09.2006

Major Components

Construction of Road

Major Targets

4 Km

District and Tehsil

Bahawalpur , Yazman

2243 11 Name of the Scheme

Construction of 10 Nos. Veterinary Dispensaries in Cholistan.

Approval Date

Approved 07.03.2007

Major Components

Provision of Veterinary Dispensary

Major Targets

10 Nos.

District and Tehsil

Bahawalpur , Yazman

2244 12 Name of the Scheme

Construction of Metalled Road form Chak No. 146/DNB to Toba Azim Wali.

Approval Date

Approved 28.09.2006

Major Components

Construction of Road

Major Targets

8 Km

District and Tehsil

Bahawalpur , Yazman

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

13.996

11.774

0.000

2.222

0.000

0.000

0.000

2.222

2.222

0.000

0.000

0.000

0.000

9.129

5.039

0.000

4.090

0.000

0.000

0.000

4.090

4.090

0.000

0.000

0.000

0.000

20.000

12.000

0.000

4.000

0.000

0.000

0.000

4.000

4.000

4.000

0.000

0.000

0.000

19.353

12.000

0.000

7.353

0.000

0.000

0.000

7.353

7.353

0.000

0.000

0.000

561

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2245 13 Name of the Scheme

Construction of Metalled Road from 58/DRB Link Canal to Bakhu Wala.

Approval Date

Approved 28.09.2006

Major Components

Construction of Road

Major Targets

8 Km

District and Tehsil

Bahawalpur , Yazman

2246 14 Name of the Scheme

Widening & Improvement of Metalled road from Kanday wala Bridge to Derawar Fort District Bahawalpur.

Approval Date

Approved 31.03.2009

Major Components

Widening of Road

Major Targets

34 Kms

District and Tehsil

Bahawalpur , Yazman

2247 15 Name of the Scheme

Widening & Improvement of Metalled road from Mukdee Chowk to Derbar Channanpir District Bahawalpur.

Approval Date

Approved 12.02.2009

Major Components

Widening of Road

Major Targets

16.5 Kms

District and Tehsil

Bahawalpur , Yazman

2248 16 Name of the Scheme

Rural Water Supply Scheme at 73/DB Distt. Bahawalpur.

Approval Date

Approved 01.04.2009

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Bahawalpur , Yazman

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

18.357

8.347

0.000

4.010

0.000

0.000

0.000

4.010

4.010

6.000

0.000

0.000

0.000

162.530

10.000

0.000

4.000

0.000

0.000

0.000

4.000

4.000

70.000

83.000

0.000

0.000

79.860

23.960

0.000

5.364

0.000

0.000

0.000

5.364

5.364

35.900

15.000

0.000

0.000

9.364

1.000

0.000

5.364

0.000

0.000

0.000

5.364

5.364

3.000

0.000

0.000

562

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2249 17 Name of the Scheme

Rural Water Supply Scheme at Chak No. 144/DB District Bahawalpur.

Approval Date

Approved 01.04.2009

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Bahawalpur , Yazman

2250 18 Name of the Scheme

Rural Water Supply Scheme at 145/DB District Bahawalpur.

Approval Date

Approved 01.04.2009

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Bahawalpur , Yazman

2251 19 Name of the Scheme

Rural Water Supply Scheme at Chak No. 147/DB District Bahawalpur.

Approval Date

Approved 01.04.2009

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Bahawalpur , Yazman

2252 20 Name of the Scheme

Rural Water Supply Scheme Basti Lateef Abad, Jugaitpir, and Basti Ther district Bahawalpur.

Approval Date

Approved 01.04.2009

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Bahawalpur , Yazman

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

10.256

1.000

0.000

5.256

0.000

0.000

0.000

5.256

5.256

4.000

0.000

0.000

0.000

8.328

1.000

0.000

5.328

0.000

0.000

0.000

5.328

5.328

2.000

0.000

0.000

0.000

7.600

1.000

0.000

4.600

0.000

0.000

0.000

4.600

4.600

2.000

0.000

0.000

0.000

9.531

1.000

0.000

5.531

0.000

0.000

0.000

5.531

5.531

3.000

0.000

0.000

563

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2253 21 Name of the Scheme

Solar Electrification of Houses in Kalay Pahar, Janu Wali & Jam Sar.

Approval Date

Approved 01.04.2009

Major Components

Solar Energy for 135 Houses

Major Targets

1. Fan, 2. Lights, 3. Mobile Charging for each house.

District and Tehsil

Bahawalpur , Yazman

2254 22 Name of the Scheme

Rural Water Supply Scheme Jinah Colony Muttan Wali 286 more.

Approval Date

Approved 01.04.2009

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Bahawalnagar , Fort Abbas

2255 23 Name of the Scheme

Provision of drinking water facilities through pipeline at Saurian.

Approval Date

Approved 23-01-2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

2256 24 Name of the Scheme

Provision of drinking water facilities through pipeline Saurian to Rither wala.

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

19.370

17.500

0.000

1.800

0.000

0.000

0.000

1.800

1.800

0.000

0.000

0.000

0.000

8.028

1.000

0.000

5.028

0.000

0.000

0.000

5.028

5.028

2.000

0.000

0.000

0.000

18.633

17.144

0.000

1.489

0.000

0.000

0.000

1.489

1.489

0.000

0.000

0.000

0.000

21.691

15.397

0.000

4.294

0.000

0.000

0.000

4.294

4.294

2.000

0.000

0.000

564

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2257 25 Name of the Scheme

Provision of drinking water facilities through pipeline Rither wala to Chai wala (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

73%

District and Tehsil

Rahim Yar Khan , Liaqatpur

2258 26 Name of the Scheme

Provision of drinking water facilities through pipeline Rither wala to Bahoo wala. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

38%

District and Tehsil

Rahim Yar Khan , Liaqatpur

2259 27 Name of the Scheme

Provision of drinking water facilities through pipeline Bahoo wala to Lamban wala. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

2260 28 Name of the Scheme

Provision of drinking water facilities through pipeline Lamban wala to Ghamney wala. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

39%

District and Tehsil

Rahim Yar Khan , Liaqatpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

15.125

4.000

0.000

4.125

0.000

0.000

0.000

4.125

4.125

4.000

7.125

0.000

0.000

21.106

3.000

0.000

4.000

0.000

0.000

0.000

4.000

4.000

10.106

2.000

0.000

0.000

21.278

15.664

0.000

3.614

0.000

0.000

0.000

3.614

3.614

0.000

0.000

0.000

0.000

20.436

2.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

10.436

0.000

0.000

565

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2261 29 Name of the Scheme

Provision of drinking water facilities through pipeline Lamban wala to Bhai Khan wala. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

53%

District and Tehsil

Rahim Yar Khan , Liaqatpur

2262 30 Name of the Scheme

Provision of drinking water facilities through pipeline 240/P to Baghla. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

2263 31 Name of the Scheme

Provision of drinking water facilities through pipeline Baghla to Chai wala.

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

2264 32 Name of the Scheme

Provision of drinking water facilities through pipeline Chai wala to Jabil wala. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

15.128

2.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

5.128

3.000

0.000

0.000

18.219

12.279

0.000

3.940

0.000

0.000

0.000

3.940

3.940

2.000

0.000

0.000

0.000

18.719

16.711

0.000

2.008

0.000

0.000

0.000

2.008

2.008

0.000

0.000

0.000

0.000

13.373

5.413

0.000

4.960

0.000

0.000

0.000

4.960

4.960

3.000

0.000

0.000

566

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2265 33 Name of the Scheme

Provision of drinking water facilities through pipeline Qabil wala to Ghari Bhit. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

2266 34 Name of the Scheme

Provision of drinking water facilities through pipeline Saurian to Dhare wala.

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

2267 35 Name of the Scheme

Provision of drinking water facilities through pipeline Dhare wala to Bhi wala.

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

2268 36 Name of the Scheme

Provision of drinking water facilities through pipeline Bhi wala to Atharan Khoi. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

12.755

4.000

0.000

4.755

0.000

0.000

0.000

4.755

4.755

4.000

0.000

0.000

0.000

22.210

20.090

0.000

2.120

0.000

0.000

0.000

2.120

2.120

0.000

0.000

0.000

0.000

20.080

12.000

0.000

4.080

0.000

0.000

0.000

4.080

4.080

4.000

0.000

0.000

0.000

21.330

12.000

0.000

4.330

0.000

0.000

0.000

4.330

4.330

5.000

0.000

0.000

567

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2269 37 Name of the Scheme

Provision of drinking water facilities through pipeline Atharan Khoi to Khair Bara. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

57%

District and Tehsil

Rahim Yar Khan , Liaqatpur

2270 38 Name of the Scheme

Provision of drinking water facilities through pipeline Khair Bara to Shahi wala. (Revised)

Approval Date

Approved 23.01.2007

Major Components

Source, Main Pipeline, Distribution & Machinery

Major Targets

Completion

District and Tehsil

Rahim Yar Khan , Liaqatpur

2271 39 Name of the Scheme

Construction of 9 Nos. Ponds in Cholistan.

Approval Date

Approved 30.12.2005

Major Components

Provision of Ponds

Major Targets

9 Nos.

District and Tehsil

Rahim Yar Khan , Liaqatpur

2272 40 Name of the Scheme

Construction of 9 Nos. Ponds in Cholistan.

Approval Date

Approved 31.12.2005

Major Components

Provision of Ponds

Major Targets

9 Nos.

District and Tehsil

Rahim Yar Khan , Liaqatpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

20.924

2.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

6.924

7.000

0.000

0.000

18.668

2.000

0.000

5.600

0.000

0.000

0.000

5.600

5.600

11.068

0.000

0.000

0.000

13.840

5.000

0.000

5.840

0.000

0.000

0.000

5.840

5.840

3.000

0.000

0.000

0.000

13.840

6.000

0.000

2.840

0.000

0.000

0.000

2.840

2.840

6.000

0.000

0.000

568

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2273 41 Name of the Scheme

Widening & Improvement of Metalled Road from Feroza to Head Farid.

Approval Date

Approved 31.03.2009

Major Components

Widening of Road

Major Targets

24 Kms

District and Tehsil

Rahim Yar Khan , Liaqatpur

2274 42 Name of the Scheme

Const. of Metalled Road from Chak No.159/7R to Chak No.174/7R.

Approval Date

Approved 01.04.2009

Major Components

Construction of Road

Major Targets

2.5 Kms

District and Tehsil

Rahim Yar Khan , Liaqatpur

2275 43 Name of the Scheme

Const. of Metalled Road from Feroza Head Fareed road to Chak No.159/7R via Basti Haji Mohd. Musa Gunian.

Approval Date

Approved 01.04.2009

Major Components

Construction of Road

Major Targets

5 Kms

District and Tehsil

Rahim Yar Khan , Liaqatpur

2276 44 Name of the Scheme

Const. of Metalled Road from 186/7R to 174/7R.

Approval Date

Approved 01.04.2009

Major Components

Construction of Road

Major Targets

4 Kms

District and Tehsil

Rahim Yar Khan , Liaqatpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

121.390

10.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

61.000

30.000

15.390

0.000

6.819

1.000

0.000

5.819

0.000

0.000

0.000

5.819

5.819

0.000

0.000

0.000

0.000

13.423

1.000

0.000

5.423

0.000

0.000

0.000

5.423

5.423

7.000

0.000

0.000

0.000

11.195

1.000

0.000

5.195

0.000

0.000

0.000

5.195

5.195

5.000

0.000

0.000

569

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2277 45 Name of the Scheme

Const. of Metalled Road from Pul Noor Ifshan Bagi wali Mori to 37000 RD via Chak No.156/7R, 155/7R.

Approval Date

Approved 01.04.2009

Major Components

Construction of Road

Major Targets

3 Kms

District and Tehsil

Rahim Yar Khan , Liaqatpur

2278 46 Name of the Scheme

Const. of Metalled Road from Chak No.156/7R to Chak No.153/7R via Chak No.154/7R.

Approval Date

Approved 01.04.2009

Major Components

Construction of Road

Major Targets

3 Kms

District and Tehsil

Rahim Yar Khan , Liaqatpur

2279 47 Name of the Scheme

Const. of Metalled Road from 183/7R to Canal 1/L,1/R.

Approval Date

Approved 01.04.2009

Major Components

Construction of Road

Major Targets

1.5 Kms

District and Tehsil

Rahim Yar Khan , Liaqatpur

2280 48 Name of the Scheme

Const. of Metalled Road from Chak No.200/2R to Canal 2-R via Chak No.198/2R.

Approval Date

Approved 01.04.2009

Major Components

Construction of Road

Major Targets

2 Kms

District and Tehsil

Rahim Yar Khan , Liaqatpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

11.835

1.000

0.000

5.835

0.000

0.000

0.000

5.835

5.835

5.000

0.000

0.000

0.000

11.821

1.000

0.000

5.821

0.000

0.000

0.000

5.821

5.821

5.000

0.000

0.000

0.000

4.673

1.000

0.000

3.673

0.000

0.000

0.000

3.673

3.673

0.000

0.000

0.000

0.000

13.265

1.000

0.000

5.265

0.000

0.000

0.000

5.265

5.265

7.000

0.000

0.000

570

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2281 49 Name of the Scheme

Construction of 27 Diggies fed by Canal Water for drinking water facilities in Cholistani Chaks District Rahimyar Khan (Chak 183/7-R, 153/7-R, 238/1-L, 316/6-R, 313/6-R, 207/7-R, 162/7-R, 156/7-R, 189/7-R, 204/2-R, 240/1-L, 186/7-R (Hospital), 159/7-R (Basti Habib), 227/1-L (Ghullam Din), 198/2-R (Abdul Majeed), 199/2-R (Abdul Aziz), 163/7-R (Jam Manzor), 243/1L, 269/2-L, 267/1-L, 174/7-R, 176/7R, 218/1-L, 219/7-R, 193/1-L, 207/2R, 196/1-L)

Approval Date

Approved 01.04.2009

Major Components

Construction of Diggies

Major Targets

27 Nos.

District and Tehsil

Rahim Yar Khan , Liaqatpur

2282 50 Name of the Scheme

Construction of 10 VR Bridge on various canals in Cholistan area (1/R Canal Near Chak 191 & 184 / 1R/7R, 1/L Canal Between Chak 220 & 218 / 1-L, 7/R Canal Near Chak 158 & 174 / 7R, 7/R Canal Near Chak 162 /7R (Basti Muhammad Mutuja), 7/R Canal Near Chak 150 & 178 /7R, 1/R Canal Near Chak 180 & 194 / 1-R, 7/R Canal at RD 17000, 2/R Canal in front of Chak 216 /2R, 7/R Canal at RD 8000, 5/R Canal Near Chak 144 / 5R Near Basti Haji Kutwal)

Approval Date

Approved 01.04.2009

Major Components

Construction of V.R Bridges

Major Targets

10 Nos.

District and Tehsil

Rahim Yar Khan , Liaqatpur

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

25.019

3.000

0.000

5.019

0.000

0.000

0.000

5.019

5.019

17.000

0.000

0.000

0.000

22.678

1.000

0.000

5.678

0.000

0.000

0.000

5.678

5.678

16.000

0.000

0.000

571

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2283 51 Name of the Scheme

Cholistan Social Development Project.

Approval Date

Approved 01.04.2009

Major Components

Community Service Centres, Agriculture Implements Centers, Women Development Centers and de-siltation of tobas

Major Targets

15, 15, 200 Nos.

District and Tehsil

Bahawalpur, Rahim Yar Khan, Bahawalnagar , Yazman, Fort Abbas & Liaqatpur

2284 52 Name of the Scheme

Purchase of 07 Nos. 4x4 ambulances for Cholistan area.

Approval Date

Approved 01.04.2009

Major Components

Provision of Mobile Civil Dispensaries/ Ambulances at Union Council Level.

Major Targets

07 Nos.

District and Tehsil

Bahawalpur, Rahim Yar Khan, Bahawalnagar , Yazman, Fort Abbas & Liaqatpur

2285 53 Name of the Scheme

Literate Cholistan.

Approval Date

Approved 01.04.2009

Major Components

Literacy campain, Non Formal Basic Education Centres (NFBEC), Education Development Fund.

Major Targets

Literacy, 75 Centers, Scholarship for Cholistani Students.

District and Tehsil

Bahawalpur, Rahim Yar Khan, Bahawalnagar , Yazman, Fort Abbas & Liaqatpur

Sub-Total: Cholistan Development Authority (CDA)

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

51.876

6.000

0.000

12.631

0.000

0.000

0.000

12.631

12.631

33.245

0.000

0.000

0.000

36.759

34.000

0.000

2.759

0.000

0.000

0.000

2.759

2.759

0.000

0.000

0.000

0.000

57.905

3.000

0.000

5.200

0.000

0.000

0.000

5.200

5.200

9.900

19.900

19.900

0.000

1,159.054

352.916

225.000

225.000

381.707

167.025

0.000

572

225.000

0.000

0.000

0.000

35.290

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

10.000

0.000

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

0.000

10.000

0.000

Total Cap 11

Rev 12

Bahawalpur Rural Development Project (BRDP) 2286 54 Name of the Scheme

Continuation of PMU of Bahawalpur Rural Development Project (BRDP)

Approval Date

Approved

Major Components

i. Construction of leftover roads, ii. Strenthening of SSIs, iii. Community organized farming, iv. Capacity building and training.

Major Targets

i. 12 kms, ii. 560 Nos., iii. 50 No.

District and Tehsil

Bahawalpur, Bahawalnagar, Rahim Yar Khan

Sub-Total: Bahawalpur Rural Development Project (BRDP) Total: ON-GOING SCHEMES

0.000

59.990

49.990

0.000

0.000

10.000

0.000

0.000

0.000

59.990

49.990

0.000

10.000

0.000

0.000

0.000

10.000

10.000

0.000

0.000

0.000

2,460.000

5,431.919

1,920.996

8.376

416.624

0.000

400.000

8.376

816.624

825.000

1,459.989

656.249

35.290

NEW SCHEMES Southern Punjab Development Programme 2287 55 Name of the Scheme

Southern Punjab Development Programme.

0.000

5,000.000

0.000

3,000.000

2,000.000

0.000

0.000

3,000.000

2,000.000

5,000.000

0.000

5,000.000

0.000

0.000

0.000

Approval Date Major Components Major Targets District and Tehsil

Sub-Total: Southern Punjab Development Programme

0.000

5,000.000

0.000 3,000.000 2,000.000

573

0.000

0.000 3,000.000 2,000.000

0.000

0.000

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

0.000

0.000

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

Punjab Economic Opportunities Programme (DFID). 2288 56 Name of the Scheme

Punjab Economic Opportunities Programme (DFID).

Approval Date

Un-Approved

Major Components

i. Skill Development, ii. Livestock & Dairy Development, iii. Access to Land, iv. Empowerment of the Poor, v. Social Protection.

Major Targets

250,000 Skill Training, 150,000 Livestock Loans

District and Tehsil

Bahawalpur, Lodhran, Muzaffargarh, Bahawalnagar , Ahmadpur East, Bahawalpur, Hasilpur, Khairpur Tame Wali, Yazman, Dunyapur, Karor Pacca, Lodhran, Alipur, Jatoi, Kot Addu, Muzaffar-garh, Bahawal-nagar, Chishtian, Fort Abbas, Haroonabad, Minchinabad

Sub-Total: Punjab Economic Opportunities Programme (DFID).

0.000

6,900.000

0.000

6,900.000

0.000

500.000

0.000

0.000

700.000

700.000

0.000

0.000

700.000

700.000

0.000

1,400.000

0.000 1,400.000

1,400.000

1,900.000

1,900.000

1,400.000

1,900.000

1,900.000

1,700.000

75.000

200.000

225.000

0.000

1,700.000

Agency for Barani Areas Development (ABAD) 2289 57 Name of the Scheme

Command Areas Development Project of Small Dams and Contiguous Areas in Pothohar Region, Barani Tracts of Punjab

Approval Date

Un-Approved

Major Components

Command Areas Development, Water Resource Development, Soil conservation component, Farm Incom Generating Activities.

Major Targets

Command Areas Development 16 Small Dams.

District and Tehsil

Rawalpindi, Attock, Chakwal, Jhelum , All Tehsils of Four Districts

0.000

0.000

574

75.000

0.000

0.000

0.000

75.000

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2290 58 Name of the Scheme

Water Resource Development (through Construction of 200 Mini Dams along with Command Area Development) of Pothohar Region, Barani Areas of Punjab

Approval Date

Un-Approved

Major Components

Construction of Mini Dams and Command Areas Development, Water Resource Development, Soil conservation component, Farm Incom Generating Activities.

Major Targets

200 Mini Dams and Command Areas Development.

District and Tehsil

Rawalpindi, Attock, Chakwal, Jhelum , All Tehsils of Four Districts

2291 59 Name of the Scheme

PC-II study of Water Resource Development in Non Pothohar Area, Barani Tract

Approval Date

Un-Approved

Major Components

Assessment of most suitable interventions required for water resource development and command area development in non Pothohar barani area, mapping of existing water development structures, development plan for each district highlighting available facilities, missing facilities and proposed facilities.

Major Targets

Completion of Study

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

200.000

0.000

0.000

70.000

0.000

0.000

0.000

70.000

70.000

60.000

70.000

0.000

0.000

5.000

0.000

0.000

5.000

0.000

0.000

0.000

5.000

5.000

0.000

0.000

0.000

0.000

705.000

150.000

150.000

260.000

295.000

District and Tehsil

Sub-Total: Agency for Barani Areas Development (ABAD)

0.000

0.000

575

150.000

0.000

0.000

0.000

0.000

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

Cholistan Development Authority (CDA) 2292 60 Name of the Scheme

Provision of Drinking water through pipe line from Bahawal Canal at Jugaitpir to Khutri Dahar Water Works.

Approval Date

Un-Approved

Major Components

Installation of Tube well & pump house at Bahoo Wala, Ground storage Tank, Pumping Machinery, Generator room, Const. of Low level reservoir.

Major Targets

Rising main 40000 RFT, Underground Tank 100000 galons, Tube wells 4, Pump house 4 sets

District and Tehsil

Bahawalpur , Yazman

2293 61 Name of the Scheme

PC-II study for Cholistan Rangland Development along Perennial Canal.

Approval Date

Un-Approved

Major Components

Assessing the availability of fresh water lenses, potential of rangeland development, assessment of risks involved in depletion of lenses

Major Targets

Completion of Study

District and Tehsil

Bahawalpur , Yazman

2294 62 Name of the Scheme

Raising Jatropha Nursery for Plantation along existing Water Pipe Lines (Pilot Project).

Approval Date

Un-Approved

Major Components

Development of Jatropha Nursery, Jatropha Plantation on 5 Acres Plot at 5 Nos. Sites.

Major Targets

i. Raising of Nursery, ii. Plantation of Jatropha on 25 Acres.

District and Tehsil

Bahawalpur , Yazman

0.000

160.000

0.000

0.000

31.000

0.000

0.000

0.000

31.000

31.000

64.418

64.582

0.000

0.000

2.000

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

0.000

0.000

0.000

0.000

5.000

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

3.000

0.000

0.000

576

REGIONAL PLANNING

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2295 63 Name of the Scheme

Development of Camel Sports Festival Arena near Derawar at Dilwash Dahar, District Bahawalpur.

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Foreign Aid Cap Rev 9 10

Total Cap 11

Rev 12

0.000

3.000

0.000

0.000

3.000

0.000

0.000

0.000

3.000

3.000

0.000

0.000

0.000

0.000

300.000

0.000

0.000

60.000

0.000

0.000

0.000

60.000

60.000

150.000

90.000

0.000

0.000

2.000

0.000

0.000

2.000

0.000

0.000

0.000

2.000

2.000

0.000

0.000

0.000

Sub-Total: Cholistan Development Authority (CDA)

0.000

472.000

100.000

100.000

217.418

154.582

0.000

Total: NEW SCHEMES

0.000

700.000 3,000.000 3,650.000

6,650.000

2,377.418

2,349.582

1,700.000

2,460.000

0.000 1,100.000 3,008.376 4,466.624

7,475.000

3,837.407

3,005.831

1,735.290

Approval Date

Un-Approved

Major Components

Construction of Festival Arena

Major Targets

Completion

District and Tehsil

Bahawalpur , Yazman

2296 64 Name of the Scheme

Shaadbad Cholistan Project.

Approval Date

Un-Approved

Major Components

1. 10 Selected clusters of Tobas for development of livestock, range land, 2. Meat processing plants, 3. Development of Milk and Meat Chain.

Major Targets

10 Clusters of Tobas, Milk and Meat Chain and Training

District and Tehsil

Bahawalpur, Rahim Yar Khan, Bahawalnagar , Yazman, Fort Abbas & Liaqatpur

2297 65 Name of the Scheme

PC-II for Preparation of Master Plan for Cholistan Area.

Approval Date

Un-Approved

Major Components

Listing of completed Projects, Impact of Projects on Welfare of the Communities, Demarcation of Negaive/ Positive Areas and Potential of Development in Cholistan.

Major Targets

Completion of Study

District and Tehsil

Bahawalpur,Rahim Yar Khan, Bahawalnagar , Yazman, Fort Abbas & Liaqatpur

Grand Total

0.000

0.000

100.000

0.000

13,077.000

0.000 3,000.000 2,950.000

0.000

18,508.919

1,920.996 3,008.376 3,366.624

577

0.000

0.000

LG&CD

578

LOCAL GOVERNMENT AND COMMUNITY DEVELOPMENT Local Government and Community Development sector comprises Southern Punjab Basic Urban Services Project, Punjab Municipal Improvement Services Project, Up-gradation of Villages, Institutional Capacity Building of LG&CD and District Governments and Punjab Development Programme. It also covers the development of Katchi Abadies through provision of basic municipal services (water supply & sanitation, small link roads, pavement of streets and disposal of solid waste etc.) and decent housing to devellers VISION Assist local governments in enhancing their financial and institutional capacity for effective and efficient delivery of municipal services.

TREND OF ALLOCATIONS (Million Rs) Revised Allocation

Year

Original Allocation

2005-06

1200

2636

2006-07

1800

2568

2007-08

6955

14291

2008-09

8410

8237

2009-10

7700

POLICY INTERVENSIONS •

Promote participatory local development based on principles of equity, responsibility and sustainability.



Revamp UIPT in urban tehsils to improve financial health of TMAs for sustainable service delivery.

579



Evaluation of Punjab Development, Katchi Abadies Development and Up-gradation of Villages Programmes including review of eligibility criteria/guidelines for inclusion of schemes under the said programmes.



Implementation of globally tested self-sustaining models for development of Katchi Abadies, in phased/prioritized manner, through innovative instruments and partnership with agencies with proven track record.



Strengthen social mobilization capacity of department for greater beneficiary participation and ownership in local development.



Strengthen capacities for sustainable O&M of services in TMAs based on clear assessment of resource generation potential, rationalization of user fees, systems for collection of user fees etc.

FUNDING STRATEGY (2009-10) •

Adequate funding for Foreign Aided Projects



Completion of leftover works under ‘Model Villages Program’ for its evaluation and replication, if required, after selection of villages under modified comprehensive criteria and their prioritization.



Provision of seed money for 2-3 storey apartments and resource generation for its recycling



Sufficient allocation for implementation of local development projects identified by public representatives

MAJOR INITIATIVES i)

Punjab Development Programme (PDP)

This programme comprises of small projects/schemes to be identified by the local representatives for employment generation, and poverty reduction in Punjab.

580

ii)

Katchi Abadies Development Programme Out of 1210 reported Katchi Abadies, 900 have already been notified by Punjab Government. Katchi Abadies development programme

envisages provision of basic services like water supply, sewerage, roads and street lights in Katchi abadies. Under this programme, 128 and 366 abadies have been fully and partially developed respectively in Punjab. This year, a new initiative for construction of 2-3 storey apartments in two abadies each at divisional headquarter would be initiated on pilot project basis. Same will be replication based on findings of evaluation and success of the program.

iii)

Southern Punjab Basic Urban Services (ADB Assisted) This ADB assisted project envisages implementation of sub-projects for provision of municipal services in 21 TMAs of six districts of

Southern Punjab to improve quality of life in the deprived areas. Emphasis during this year will be on completion of remaining sub-projects and establishment of sustainable O&M systems in TMAs.

iv)

Punjab Municipal Improvement Services Project has been sponsored by Punjab Government with World Bank’s assistance for provision of municipal infrastructure (water

supply, sewerage, solid waste management, drainage, street lighting, roads, parks development, bus stands, bridges, fire fighting and capacity building project) in the selected TMAs. Extra efforts will be made to compensate for the earlier slow progress of this project. v)

Capacity Building Project for LG&CD Under this initiative, Strategic Policy Unit (SPU) Model, already implemented in Faisalabad, would be replicated in eight districts of

Punjab. Gender Justice through Musallhat Anjuman Project (GJTMAP) Punjab would also be implemented with UNDP assistance during 2009-10. 581

MTDF 2009-12 LG & CD : Summary Development Programme 2009-10 (Million Rs) Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

Total

Capital Revenue

1,800.000 2,429.704

0.000

Total

F. Aid

Total

170.296

170.296

100.000

270.296

LG&CD

0.000

629.704

629.704

PDP

0.000

0.000

0.000

0.000

0.000

0.000 3,000.000

3,000.000

Katchi Abadis

0.000

0.000

0.000

0.000

0.000

0.000 2,000.000

Total

0.000

629.704

629.704

1,800.000 2,429.704

0.000 5,170.296

4

No. of schemes

Capital 0.000

Revenue 800.000

Total

F. Aid

Total

800.000

1,900.000

2,700.000

0.000 3,000.000

0.000 3,000.000 3,000.000

0.000

3,000.000

2,000.000

0.000 2,000.000

0.000 2,000.000 2,000.000

0.000

2,000.000

5,170.296

100.000 5,270.296

0.000 5,800.000 5,800.000

1,900.000

7,700.000

4

8

Development Programme 2010-11 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

LG&CD

0.000

773.914

773.914

PDP

0.000

0.000

0.000

0.000

Katchi Abadis

0.000

0.000

0.000

0.000

Total

0.000

773.914

773.914

Total

Capital Revenue

700.000 1,473.914

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

0.000 1,526.086

1,526.086

0.000 1,526.086

0.000 2,300.000 2,300.000

700.000

3,000.000

0.000

0.000 3,000.000

3,000.000

0.000 3,000.000

0.000 3,000.000 3,000.000

0.000

3,000.000

0.000

0.000 2,500.000

2,500.000

0.000 2,500.000

0.000 2,500.000 2,500.000

0.000

2,500.000

700.000 1,473.914

0.000 7,026.086

7,026.086

0.000 7,026.086

0.000 7,800.000 7,800.000

700.000

8,500.000

Development Programme 2011-12 Ongoing Programme

New Programme

Total

Sub-Sector Capital

Revenue

Total

F. Aid

LG&CD

0.000

370.725

370.725

PDP

0.000

0.000

0.000

0.000

Katchi Abadis

0.000

0.000

0.000

0.000

Total

0.000

370.725

370.725

Total

700.920 1,071.645

Capital Revenue

Total

F. Aid

Total

Capital

Revenue

Total

F. Aid

Total

0.000 2,428.355

2,428.355

0.000 2,428.355

0.000 2,799.080 2,799.080

700.920

3,500.000

0.000

0.000 3,000.000

3,000.000

0.000 3,000.000

0.000 3,000.000 3,000.000

0.000

3,000.000

0.000

0.000 3,000.000

3,000.000

0.000 3,000.000

0.000 3,000.000 3,000.000

0.000

3,000.000

700.920 1,071.645

0.000 8,428.355

8,428.355

0.000 8,428.355

0.000 8,799.080 8,799.080

700.920

9,500.000

LG&CD MTDF 2009-12 Grand Total:

582

25,700.000

LG&CD: SUMMARY Type / Sub Sector

No. of Schemes

Local Capital

Revenue

(Million Rs)

Provision for 2009-10 Foreign Aid Total Capital Revenue Capital Revenue

G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

ON-GOING SCHEMES

4

0.000

629.704

0.000

1,800.000

0.000

2,429.704

2,429.704

1,223.835

1,071.645

NEW SCHEMES

4

0.000

5,170.296

0.000

100.000

0.000

5,270.296

5,270.296

5,577.856

5,572.225

Grand Total

8

0.000

5,800.000

0.000

1,900.000

0.000

7,700.000

7,700.000

6,801.691

6,643.870

583

LG&CD

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

Estimated Cost

Exp. upto 2008-09

Local Cap 7

Foreign Aid

F. Aid 4

Total 5

5,220.120

7,458.920

5,126.680

0.000

473.000

0.000

1,300.000

0.000

1,773.000

1,773.000

0.000

0.000

0.000

2,640.000

3,540.000

873.710

0.000

23.000

0.000

500.000

0.000

523.000

523.000

1,071.645

1,071.645

0.000

0.000

231.011

28.821

0.000

50.000

0.000

0.000

0.000

50.000

50.000

152.190

0.000

0.000

6

Rev 8

Cap 9

Rev 10

Total Cap 11

Rev 12

ON-GOING SCHEMES Regular 2298

2299

2300

1 Name of the Scheme

Southern Punjab Basic Urban Services Project (SPBUSP)

Approval Date

Approved 27-07-2004

Major Components

Water supply, Sewerage, Slaughter House, Solid Waste Management,Incremental Land, Development, Road Links for poor

Major Targets

Coverage of Municipal Services in 425 low income areas (21 Towns of 6 Districts). Provision of safe drinking water in 7 towns. Const. of sewerage / new waste water treatment plants 19 Slaughter houses, 11 Municipal Management System Dev.in 21 Towns, Low cost housing for poor in one TMA.

District and Tehsil

Multan, Khanewal, Bahawalpur, Dera Ghazi Khan, Muzzafargarh, Rajan Pur,

2 Name of the Scheme

Punjab Municipal Services Improvement Project

Approval Date

Approved 24-04-2006

Major Components

Development of municipal services infrastructure and capacity building of the selected TMAs

Major Targets

Development of municipal services infrastructure, water supply, sewerage / drainage, solid waste management, streets lights, park, roads, bus stands, bridges and capacity building of the selected TMAs.

District and Tehsil

Punjab

3 Name of the Scheme

PMU, for Clean Drinking Water for all

Approval Date

Approved 01-09-2007

Major Components

Establishment of PMU to coordinate / implementation of the project.

Major Targets

Establishment of PMU to coordinate / implementation of the project.

District and Tehsil

Punjab

584

LG&CD

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

83.704

0.000

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2301

4 Name of the Scheme

Up-gradation of 6 Villages i.e. Gurah Manghot District Chakwal , Daval Sharif, ,Alliot and Kia & Mohra District Rawalpindi, Chak No.12/Janubi District Sargodha and Jhallan District Gujranwala to Model Villages

Approval Date

Approved 25-05-2004

Major Components

Provision of basic infrastructure and social servies like road, water supply,sanitation, BHU Establishment of Girls & boys high school.

Major Targets

Completion of on-going projects of 6 villages

District and Tehsil

Punjab,Rawalpindi,Sargodha,Gujranwa la.

Estimated Cost F. Aid 4

0.000

Total 5

Exp. upto 2008-09

Local

6

393.601

309.897

Foreign Aid

Cap 7

Rev 8

Cap 9

Rev 10

0.000

83.704

0.000

0.000

Total Cap 11

0.000

Rev 12

83.704

0.000

0.000

Sub-Total: Regular

7,860.120

11,623.532

6,339.108

0.000

629.704

0.000 1,800.000

0.000 2,429.704

2,429.704

1,223.835

1,071.645

0.000

Total: ON-GOING SCHEMES

7,860.120

11,623.532

6,339.108

0.000

629.704

0.000 1,800.000

0.000 2,429.704

2,429.704

1,223.835

1,071.645

0.000

1,899.297

0.000

237.570

566.404

566.403

NEW SCHEMES Regular 2302

5 Name of the Scheme

Strengthening Governance in Punjab

Approval Date

Un-Approved

Major Components

Improvement in service delivery in the area of education, health and police. Building Financial & Human Resource Management System.

Major Targets

Long term macro economic, social and enviornmental stability implies security of life, liberty, satisfactory state of law and order, accountability,transparency and community participation at all levels in the affairs of the state.

District and Tehsil

Faisalabad, Lahore, Gujranwala,Dera Ghazi Khan,Multan' Bahawalpur,Sargodha, Sahiwal, Rawalpindi

528.920

0.000

585

137.570

0.000

100.000

0.000

237.570

528.920

LG&CD

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2303

2304

6 Name of the Scheme

Gender Justice through Musalihat Anjuman Project (GJTMAP) (on cost sharing with (UNDP = Rs117.150 million GOP =Rs 50.000 million)

Approval Date

14.3.2009

Major Components

To provide women victims of violence an alternative mechansim, whereby they can obtain gender justice. To build the capacity of Musalihat Anjuman for dispensing gender-responsive justice. To enhnace public engagement with utilization of the services of Musalihat Anjuman. To promote women's awareness of their legal rights & men's active participation in ending gender based violence.

Major Targets

To provide women victims of violence an alternative mechansim, whereby they can obtain gender justice. To build the capacity of Musalihat Anjuman for dispensing gender-responsive justice. To enhance public engagement with utilization of the services of Musalihat Anjuman. To promote women's awareness of their legal rights & men's active participation in ending gender based violence.

District and Tehsil

Punjab

7 Name of the Scheme

Punjab Development Programme.

Estimated Cost F. Aid 4

Total 5

Exp. upto 2008-09

Local

6

Cap 7

Rev 8

Cap 9

Rev 10

Construction of drains including pavement of streets provision of water supply electricity and gas.

Major Targets

Generation of economic activity and employment at local level.

District and Tehsil

Punjab

Total Cap 11

Rev 12

0.000

50.000

0.000

0.000

32.726

0.000

0.000

0.000

32.726

32.726

11.452

5.822

0.000

0.000

3,000.000

0.000

0.000

3,000.000

0.000

0.000

0.000

3,000.000

3,000.000

3,000.000

3,000.000

0.000

Approval Date Major Components

Foreign Aid

586

LG&CD

(Million Rs) G. Total (Cap+Rev)

Projection for 2010-11

Projection for 2011-12

Throw fwd beyond June, 2012

13

14

15

16

Provision for 2009-10 GS No

SS No

Scheme Information

1

2

3

2305

8 Name of the Scheme

Development of Katchi Abadis and Construction of 2/3 Storey Apartments for Dwellers in Punjab (Revolving fund)

Estimated Cost F. Aid 4

0.000

Total 5

2,000.000

Exp. upto 2008-09

Local

6

Cap 7

0.000

0.000

Foreign Aid Rev 8

2,000.000

Cap 9

Rev 10

0.000

0.000

Total Cap 11

0.000

Rev 12

2,000.000

2,000.000

2,000.000

2,000.000

0.000

Approval Date Major Components

Provision of main infrastructure (sewerage, water supply,roads,electricity lines, sui gas lines) and public parks. Construction of 2/3 storey apartments for resettlement of katchi abadis dewellers (Pilot Project).

Major Targets

Provision of 2/3 storey apartments for resettlement of katchi abadis at 2 places of each Divisional Headquarters in Punjab.

District and Tehsil

Punjab

Sub-Total: Regular

528.920

6,949.297

0.000

0.000 5,170.296

0.000

100.000

0.000 5,270.296

5,270.296

5,577.856

5,572.225

528.920

Total: NEW SCHEMES

528.920

6,949.297

0.000

0.000 5,170.296

0.000

100.000

0.000 5,270.296

5,270.296

5,577.856

5,572.225

528.920

8,389.040

18,572.829

6,339.108

0.000 5,800.000

0.000 1,900.000

0.000 7,700.000

7,700.000

6,801.691

6,643.870

528.920

Grand Total

587

Related Documents

200910
June 2020 49
Broadcast 200910
June 2020 48
200910 Newsletter
June 2020 41
Lampea Doc 200910
April 2020 8

More Documents from "LampeaDoc"