Reimbursement of Moshin Brothers 1. It is my understanding with them that CU shall be reimbursing actual amounts to Moshin Brothers based on the bills. Based on this principle, I am providing AC's, Power Inverter, Crane Hire Charges actual amounts. 2. Following are not required to be reimbursed due to specified reasons below: Relating to Bill AA: a) In the project proposal, we have very clearly given that they should Safety Path. Thus, we do not need to reimburse the Zebra Marking. (Point 4) b) I have not requested Garden as I am constrained with space. It is likely to hinder the movement of trucks. Now I am destroying it, people will see me a company against environment. (Point 5) c) I have never and not called for a generator. (Point 6) d) Cabling, Panel Board and related works fall well within electrical works and generator shed. (Point 7) e) We have to receive the signage. (Point 9) f) We have used the crane for two days. First day, Mr. Nagababu paid the crane charges, which is Rs. 1,500. Second day, the crane was only used for 2 hours. Thus, the charges are rationalized. Relating to Bill BB: a) My personnel have not used or requested for operation of generator as they have inverter. The inverter was installed on 24th April 2009. Our occupying premise effectively was on 1st May 2009. I believe my staff. The above has been prepared based on indepth discussion with our team. I have done my duty duly without any unbias.
Reimbursement of Moshin Bill AA 1
Air Conditioner
75,050
2
Power Invertor
31,000
3
D-Link Cable
12500
8
Cost of Providing Concrete Shelving & Construction of 35000 Toilet & Wash Room in Warehouse
10
Crane Hire Charges
2000
11
Window Blinds
35000
Total
190,550
Bill BB 1
Security Charges
2
Electricity Charges
3
36000
- May
8385
- June
15772
Water Charges - May
1800
- June
1800
Total
63757
Total AA + BB
254,307