Mobilization o Equipment o Tools Temporary Facilities o Construction of Temporary Facilities o Fabrication of Foundation Formworks o Fabrication of Reinforcing Bars o Fabrication of Steel Trusses

Earth Works o o o o o

Stake Out Clearing and Grubbing Excavation Soil Poisoning Levelling

Formworks o Installation Foundation Formworks o Installation of Columns Formworks

Rebar Steel Works o Placement of reinforcing Bar of Footing Foundation o Installation of Reinforcing bars for Tie Beams o Installation of Starter Bars of Columns o Installation of Reinforcing bars of Concrete Hollow Blocks o Installation of Reinforcing bars for tie beams o Provision of formworks for tie beams

Concreting Works o Concrete Pouring of Footing and Tie Beams o Backfill o Compaction of Structural Backfill o Soil poisoning of Structural backfill o Installation of Shrinkage and temperature rebars on slab-on-grade o Pouring of concrete of Slab-on-grade o Preparation of Formworks for Columns o Installation of reinforcing bars for girders and beams o Installation of electricalPouro conduits inside the columns (IF ANY) o Pouring of concrete at mid of column height o Preparation of shoring and formworks for suspended slab o Laying of reinforcing bars for suspended slab and other electrical accessories o Preparation of formworks for beams and girders o Installation of rebar column at second storey and roof beams o Pouring of remaining column height, beams, girders, and suspended slab. o Preparation og forms and shoring at second floor columns, roof beams. o Pouring of concrete column at second floor, beams and girders o CHB laying at ground and second floor o Plastering of CHB exterior and interior walls o Installation of Steel Truss o Installation of purlins, sag rods and bracing o Roof sheet installation

o Installation of doors, windows, and other architectural and sanitary fixtures o Painting works o Testing and commissioning of electrical conduits o Punch listing o Rectification of Punchlist o Acceptance o Occupancy permit o Demobilization

Masonry Works Plumbing Works Laying out of Plumbing Plan Pipe Positioning Installment of Drainage System

Tiling Works Laying out of Tiles Laying out of Flooring Final Coat Hardboard

Ceiling Works Painting Worksn Carpentry Works Electrical Works o o o o

Laying out of Electrical Plan Laying out of Switches Laying out of Outlets Laying out of Lightings

Turnover