TANAWAL MINING CORPORATION (PROGRESS REPORT)

Current Overview of Soap Stone Mine Tanawal

60° 300𝑓𝑡

200𝑓𝑡

There was an adit from the surface to 300ft, after that an inclined shaft was driven at 60® dipping. The length of the inclined shaft was 200ft. From the exposure to the end of the adit there was a black and reddish color schist which was the indication of soap stone. At the end of the adit a black color rock is in majority in front face while white color was exposed in the down portion, therefore the adit was converted into inclined shaft at that point. Radius of the entrance was 10ft but it was varying through out the mine.

OPERATIONS IN MINE The following were the operations in Tanaval Mine Soap stone Corporation    

Drilling Blasting Haulage Dumping

DRILLING Tanaval Mine was an underground mine so the operations were different on the bases of scale as compared to surface mining.

Related Documents

Mine
November 2019 52
Mine
June 2020 36
Mine
December 2019 48
Mine
October 2019 53
Mine
November 2019 45
Mine
May 2020 28

More Documents from "JM Nelson"

Mine
October 2019 53
Mcqs
August 2019 43
Background Note
June 2020 30