HOJA PROYECTO

DE

METRAD OS

:

"CREACIÓN DEL PUENTE ALTERNO LA ESPERANZA, TIPO ACROW DDR2, DISTRITO DE HUANUCO, PROVINCIA DE HUÁNUCO Y REGIÓN HUÁNUCO" DISTRITO

:

DEPARTAMENTO

:

PROYECTISTA :

01 ORD.

HUÁNUCO - AMARILIS

PROV.

: HUÁNUCO

HUÁNUCO

REGION

: HUÁNUCO

ING. KELVIN LUIS RAMÓN PÉREZ

FECHA

: FEBRERO DEL 2016

SUB PRESUPUESTO

DESCRIPCCION

OBRAS PRELIMINARES No

LARGO

ANCHO

ALTO

PARCIAL

TOTAL

UND

01 OBRAS PRELIMINARES 01.01 OBRAS PROVISIONALES 01.01.01 MOVILIZACION Y DESMOVILIZACION PARA LA OBRA

1.00

1.00

1.00

GLB

01.01.02

CAMPAMENTO PROVISIONAL DE LA OBRA - ALQUILER

3.00

3.00

3.00

mes

01.01.03

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M (BANNER GIGANTOGRAFIA)

1.00

1.00

1.00

3.00

3.00

3.00

mes

1.00

1.00

1.00

GLB

1.00

1.00

1.00

GLB

01.02 01.02.01 01.02.02 01.03 01.03.01

SEGURIDAD VIAL Y DEL PERSONAL MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL IMPLEMENTACION DE EQUIPO DE PROTECCION PERSONAL FLETE TERRESTRE TRANSPORTE DE MATERIALES Y AGREGADOS A OBRA

und

HOJA DE METRADOS PROYECTO:

"CREACIÓN DEL PUENTE ALTERNO LA ESPERANZA, TIPO ACROW DDR2, DISTRITO DE HUANUCO, PROVINCIA DE HUÁNUCO Y REGIÓN HUÁNUCO" SUBPRESUPUESTO: FECHA:

EXCAVACIÓN MASIVA DE ESTRIBOS

FEBRERO DEL 2016

ING. KELVIN LUIS RAMÓN PÉREZ HECHO POR : __________

SUB PRESUPUESTO Nº

02 02.01 02.01.01 02.01.01.01

02.01.01.02

02.01.02 02.01.02.01

DESCRIPCION

2.00 UND

1.00

1.00

10.60

4.30

45.58

1.00

1.00

10.60

5.40

57.24

1.00

1.00

7.50

9.60

72.00

Eje proyectado de Puente

1.00

1.00

10.60

8.60

91.16

20 m aguas arriba

1.00

1.00

20.00

4.30

86.00

20 m aguas abajo

1.00

1.00

10.60

4.30

45.58

1.00

1.00

10.60

4.30

2.20

100.28

1.00

1.00

10.60

4.30

1.50

68.37

1.00

1.00

10.60

1.00

1.00

02.02.01 02.02.01.01

1.00

1.00

10.60

4.30

45.58

02.02.01.02

Eje proyectado de Puente

1.00

1.00

10.60

8.60

91.16

20 m aguas arriba

1.00

1.00

20.00

4.30

86.00

20 m aguas abajo

1.00

1.00

10.60

4.30

45.58

02.02.02 02.02.02.01

1.00

1.00

10.60

4.30

3.70

168.65

1.00

1.00

10.60

4.30

1.50

68.37

1.00

1.00

10.60

1.00

1.00

TRABAJOS PRELIMINARES ROCE, DESBROCE Y LIMPIEZA DE TERRENO

TOPOGRAFIA Y GEOREFERENCIACIÓN

m2

174.82

m2

222.74

MOVIMIENTO DE TIERRAS EXCAVACION EN SECO CON MAQUINARIA PESADA

m3

EXCAVACIÓN BAJO AGUA CON MAQUINARIA PESADA

RELLENO CON MATERIAL DE PRESTAMO CON MAQUINARIA PESADA

ELIMINACION DE MATERIAL EXCEDENTE Dprom >= 5 Km.

125.35

m3

82.04

m3

87.13

Area 72.61

6.85

m3 108.92

TRABAJOS PRELIMINARES ROCE, DESBROCE Y LIMPIEZA DE TERRENO

TOPOGRAFIA Y GEOREFERENCIACIÓN

m2

222.74

MOVIMIENTO DE TIERRAS EXCAVACION EN SECO CON MAQUINARIA PESADA

m3

EXCAVACIÓN BAJO AGUA CON MAQUINARIA PESADA

RELLENO CON MATERIAL DE PRESTAMO CON MAQUINARIA PESADA

ELIMINACION DE MATERIAL EXCEDENTE Dprom >= 5 Km.

210.81

m3

82.04

m3

De los planos, con el Autocad se extrae el area 02.02.02.04

45.58

m2

De los planos, con el Autocad se extrae el area 02.02.02.03

108.92

ESTRIBO DERECHO PUENTE (AMARILIS)

Estribo Enterrado 02.01.02.02

TOTAL

ESTRIBO IZQUIERDO PUENTE (HUANUCO)

Materiales Provenientes de escombros y/o sobrantes

02.02

KG.

EXCAVASIÓN MASIVA DE ESTRIBOS

De los planos, con el Autocad se extrae el area 02.01.02.04

SUB-TOTAL KG/ML LONG. VOLUM AREA UNIDAD

N° Veces

De los planos, con el Autocad se extrae el area 02.01.02.03

MEDIDAS Ø Acero LARGO ANCHO ALTO

CANT

Estribo Semi Enterrado 02.01.02.02

EXCAVACIÓN MASIVA DE ESTRIBOS

87.13

Area 6.85

72.61

m3

Materiales Provenientes de escombros y/o sobrantes

108.92 108.92

HOJA DE METRADOS PROYECTO:

"CREACIÓN DEL PUENTE ALTERNO LA ESPERANZA, TIPO ACROW DDR2, DISTRITO DE HUANUCO, PROVINCIA DE HUÁNUCO Y REGIÓN HUÁNUCO" SUBPRESUPUESTO: FECHA:

MONTAJE Y LANZAMIENTO DE PUENTE MODULAR TIPO ACROW

FEBRERO DEL 2016

ING. KELVIN LUIS RAMÓN PÉREZ HECHO POR : __________

SUB PRESUPUESTO Nº

03 03.01 03.01.01 03.01.01.01

DESCRIPCION

3.00 UND

03.01.02 03.01.02.01 03.01.02.01.01

1.00

1.00

10.60

4.30

1.50

68.37

1.00

1.00

10.60

2.60

1.00

27.56

1.00

2.00

10.60

1.00

21.20

1.00

2.00

2.60

1.00

5.20

1.00

1.00

10.00

1.00

2.00

10.00

1.20

24.00

1.00

2.00

2.00

1.20

4.80

03.01.02.01.03

Acero Transversal

1.00

50.00

1/2

1.90

1.02

96.90

Acero Longitudinal

1.00

10.00

1/2

10.00

1.02

102.00

1.00

1.00

6.60

0.30

0.79

1.57

1.00

2.00

1.25

0.30

1.01

0.75

1.00

2.00

6.60

0.79

10.48

1.00

2.00

0.30

0.79

0.48

1.00

4.00

1.25

1.01

5.03

1.00

4.00

0.30

1.01

1.21

KG.

TOTAL

MONTAJE Y LANZAMIENTO PUENTE MODULAR TIPO ACROW SUBESTRUCTURA - DADO DE CONCRETO (ESTRIBO IZQUIERDO) CONCRETO SIMPLE CONCRETO f'c=140 KG/CM2 + 30% PG BAJO AGUA

m3

CONCRETO F'C=140 KG/CM2.+30% PG.PARA MUROS DE CONCRETO CICLOPE

ENCOFRADO Y DESENCOFRADO CARAVISTA

73.16

m3

29.49

m2

26.40

CONCRETO ARMADO DADO DE CONCRETO PARA ANCLAJE CONCRETO f 'c=210 kg/cm2 DADO DE CONCRETO ARMADO

m3

Dado de concreto ciclopeo menor (L=10.60m, A= 2.60 Y H=1.00m.) 03.01.02.01.02

SUB-TOTAL KG/ML LONG. VOLUM AREA UNIDAD

N° Veces

Dado de concreto ciclopeo menor (L=10.60m, A= 2.60 Y H=1.00m.) 03.01.01.03

MEDIDAS Ø Acero LARGO ANCHO ALTO

CANT

Dado de concreto ciclopeo mayor (L=10.60m, A=4.30 Y H=1.50m.) 03.01.01.02

MONTAJE Y LANZAMIENTO DE PUENTE MODULAR TIPO ACROW

ENCOFRADO Y DESENCOFRADO CARAVISTA

25.68 2.00

24.00

1.20

m2

ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60

28.80

kg 208.85

Ø 1/ 2" @ 0. 20m

Ø 1/2" @ 0.20 m

Ø 1/ 2" @ 0.2 0m

Ø 1/ 2" @ 0. 20m Ø 1/ 2" @ 0. 20 m

03.01.02.02 03.01.02.02.01

03.01.02.02.02

03.01.02.02.03

MUROS CONTRA IMPACTO CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2

ENCOFRADO Y DESENCOFRADO CARAVISTA

ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60

m3

2.49

m2

17.19

kg

570.31

Detalle de Muro H= 0.794 m.

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

1.00

38.00

1/2

2.30

1.02

89.15

1.00

38.00

1/2

3.05

1.02

118.22

2.00

6.00

1/2

2.30

1.02

28.15

2.00

6.00

1/2

3.05

1.02

37.33

1.00

10.00

1/2

10.00

1.02

102.00

1.00

15.00

1/2

11.00

1.02

168.30

1.00

2.00

10.00

1.20

24.00

1.00

2.00

7.50

0.79

11.91

1.00

2.00

1.46

1.99

5.82

2.00

2.00

1.25

2.00

10.00

1.00

1.00

4.60

2.00

1.00

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Detalle de Muro H= 1.80 m.

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m Ø 1/2" @ 0.20m

03.01.02.02.04

03.01.02.03 03.01.02.03.01

PINTADO DE MUROS CONTRAIMPACTO

m2

51.73

LOSA DE APROXIMACIÓN CONCRETO FC=210 KG/CM2 - LOSA DE APROXIMACIÓN

m3

7.75 7.75

0.20

7.13

AREA 0.04

7.75

0.62

HOJA DE METRADOS PROYECTO:

"CREACIÓN DEL PUENTE ALTERNO LA ESPERANZA, TIPO ACROW DDR2, DISTRITO DE HUANUCO, PROVINCIA DE HUÁNUCO Y REGIÓN HUÁNUCO" SUBPRESUPUESTO: FECHA:

MONTAJE Y LANZAMIENTO DE PUENTE MODULAR TIPO ACROW

FEBRERO DEL 2016

ING. KELVIN LUIS RAMÓN PÉREZ HECHO POR : __________

SUB PRESUPUESTO Nº 03.01.02.03.02

03.01.02.03.03

DESCRIPCION

3.00 UND

ENCOFRADO Y DESENCOFRADO CARAVISTA

MONTAJE Y LANZAMIENTO DE PUENTE MODULAR TIPO ACROW MEDIDAS Ø Acero LARGO ANCHO ALTO

SUB-TOTAL KG/ML LONG. VOLUM AREA UNIDAD

CANT

N° Veces

1.00

2.00

7.75

0.20

3.10

1.00

2.00

4.60

0.20

1.84

1.00

39.00

3/8

5.60

0.58

1.00

23.00

3/8

8.65

0.58

115.39

1.00

39.00

3/8

4.80

0.58

108.58

7.80

0.58

104.05

KG.

m2

ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60

4.94

kg

Losa Superior Ø 3/8" @ 0.20 m Losa Inferior Ø 3/8" @ 0.20 m.

TOTAL

477.43

3/8

126.67

1.00

23.00

1.00

1.00

10.60

4.30

1.50

68.37

1.00

1.00

10.60

2.60

1.00

27.56

1.00

2.00

10.60

1.00

21.20

1.00

2.00

2.60

1.00

5.20

1.00

1.00

10.00

1.00

2.00

6.60

0.79

10.48

1.00

2.00

0.30

0.79

0.48

1.00

4.00

1.25

1.01

5.03

1.00

4.00

0.30

1.01

1.21

1.00

50.00

PANEL DE PISO JUNTA AS FALTICA Ø 3/8" @ 0.20m

Ø 3/8" @ 0.20m

LOSA DE APROXIMACIÓN

03.02 03.02.01 03.02.01.01

SUBESTRUCTURA - DADO DE CONCRETO (ESTRIBO DERECHO) CONCRETO SIMPLE CONCRETO f'c=140 KG/CM2 + 30% PG BAJO AGUA

m3

Dado de concreto ciclopeo mayor (L=10.60m, A=4.30 Y H=1.50m.) 03.02.01.02

CONCRETO F'C=140 KG/CM2.+30% PG.PARA MUROS DE CONCRETO CICLOPE

m3

Dado de concreto ciclopeo menor (L=10.60m, A= 2.60 Y H=1.00m.) 03.02.01.03

03.02.02 03.02.02.01 03.02.02.01.01

ENCOFRADO Y DESENCOFRADO CARAVISTA

03.02.02.01.03

29.49

m2

26.40

CONCRETO ARMADO DADO DE CONCRETO PARA ANCLAJE CONCRETO f 'c=210 kg/cm2 DADO DE CONCRETO ARMADO

m3

Dado de concreto ciclopeo menor (L=10.60m, A= 2.60 Y H=1.00m.) 03.02.02.01.02

73.16

ENCOFRADO Y DESENCOFRADO CARAVISTA

25.68 2.00

24.00

1.20

m2

ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60

17.19

kg 208.85

Acero Transversal Acero Longitudinal

1/2 1/2

1.90

1.02

96.90

10.00

1.02

102.00

1.00

10.00

1.00

1.00

6.60

0.30

0.79

1.57

1.00

2.00

1.25

0.30

1.01

0.75

1.00

2.00

6.60

0.79

10.48

1.00

2.00

0.30

0.79

0.48

1.00

4.00

1.25

1.01

5.03

1.00

4.00

0.30

1.01

1.21

1.00

38.00

1/2

2.30

1.02

89.15

1.00

38.00

1/2

3.05

1.02

118.22

2.00

6.00

1/2

2.30

1.02

28.15

2.00

6.00

1/2

3.05

1.02

37.33

1.00

10.00

1/2

10.00

1.02

102.00

1.00

15.00

1/2

11.00

1.02

168.30

Ø 1/ 2" @ 0. 20m

Ø 1/2" @ 0.20 m

Ø 1/ 2" @ 0.2 0m

Ø 1/ 2" @ 0. 20m Ø 1/ 2" @ 0. 20 m

03.02.02.02 03.02.02.02.01

03.02.02.02.02

03.02.02.02.03

MUROS CONTRA IMPACTO CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2

ENCOFRADO Y DESENCOFRADO CARAVISTA

ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60

m3

2.49

m2

17.19

kg

570.31

Detalle de Muro H= 0.794 m.

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Detalle de Muro H= 1.80 m.

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m Ø 1/2" @ 0.20m

HOJA DE METRADOS PROYECTO:

"CREACIÓN DEL PUENTE ALTERNO LA ESPERANZA, TIPO ACROW DDR2, DISTRITO DE HUANUCO, PROVINCIA DE HUÁNUCO Y REGIÓN HUÁNUCO" SUBPRESUPUESTO: FECHA:

MONTAJE Y LANZAMIENTO DE PUENTE MODULAR TIPO ACROW

FEBRERO DEL 2016

ING. KELVIN LUIS RAMÓN PÉREZ HECHO POR : __________

SUB PRESUPUESTO Nº

DESCRIPCION

3.00 UND

MONTAJE Y LANZAMIENTO DE PUENTE MODULAR TIPO ACROW

CANT

N° Veces

1.00

2.00

MEDIDAS Ø Acero LARGO ANCHO ALTO

SUB-TOTAL KG/ML LONG. VOLUM AREA UNIDAD

KG.

TOTAL

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

Ø 1/2" @ 0.20m

03.02.02.02.04

03.02.02.03 03.02.02.03.01

PINTADO DE MUROS CONTRAIMPACTO

m2

51.73 10.00

1.20

24.00 11.91

1.00

2.00

7.50

0.79

1.00

2.00

1.46

1.99

5.82

2.00

2.00

1.25

2.00

10.00

1.00

1.00

4.60

2.00

1.00

0.04

1.00

2.00

7.75

0.20

3.10

1.00

2.00

4.60

0.20

1.84

1.00

39.00

3/8

5.60

0.58

1.00

23.00

3/8

8.65

0.58

115.39

1.00

39.00

3/8

4.80

0.58

108.58

7.80

0.58

104.05

Tramos

Ton/m-tramo

Ton

LOSA DE APROXIMACIÓN CONCRETO FC=210 KG/CM2 - LOSA DE APROXIMACIÓN

m3

7.75 7.75

0.20

7.13

AREA

03.02.02.03.02

03.02.02.03.03

ENCOFRADO Y DESENCOFRADO CARAVISTA

ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60

0.62

7.75

m2

4.94

kg

Losa Superior Ø 3/8" @ 0.20 m Losa Inferior Ø 3/8" @ 0.20 m.

477.43

1.00

23.00

3/8

126.67

PANEL DE PISO JUNTA AS FALTICA Ø 3/8" @ 0.20m

Ø 3/8" @ 0.20m

LOSA DE APROXIMACIÓN

03.03 03.03.01 03.03.01.01

SUPER ESTRUCTURA TIPO ACROW DDR2x2W CON PASARELAS L=51.67 m. MONTAJE Y LANZAMIENTO MONTAJE Y LANZAMIENTO DE ESTRUCTURA METALICA

ton

Seg. Tabla

Del manual de Puentes modulares ACROW Tabla 8.3 Peso del Puente

03.03.01.02

A) El peso del piso y los componentes según ancho (2L30)

1.00

1.00

20.00

5.685

113.70

B) El peso de las Vigas Laterales (TDR2)

1.00

1.00

10.00

4.746

47.46

Tramos

Ton/m-tramo

Ton

4.746

23.73

MONTAJE, LANZAMIENTO Y DESMONTAJE DE NARIZ DE LANZAMIENTO

ton

Seg. Tabla

Del manual de Puentes modulares ACROW Tabla 8.3 Peso del Puente B) El peso de las Vigas Laterales (TDR2) 03.03.01.03

TRANSPORTE DE ESTRUCTURA METALICA (PUENTE MODULAR)

1.00

1.00

Seg. Tabla

03.03.02.02

03.03.03 03.03.03.01

03.03.03.02

161.16

Tramos

Ton/m-tramo

Ton

1.00

1.00

20.00

5.685

113.70

B) El peso de las Vigas Laterales (TDR2)

1.00

1.00

10.00

4.746

47.46

Tramos

Ton/m-tramo

Ton

1.00

1.00

5.00

4.746

23.73

6

1

6.00

6

1

6.00

2

1

2.00

4

1

4.00

TRANSPORTE DE ESTRUCTURA METALICA (NARIZ DE LANZAMIENTO)

ton

Seg. Tabla

Del manual de Puentes modulares ACROW Tabla 8.3 Peso del Puente

03.03.02.01

23.73

A) El peso del piso y los componentes según ancho (2L30)

B) El peso de las Vigas Laterales (TDR2) 03.03.02

5.00

ton

Del manual de Puentes modulares ACROW Tabla 8.3 Peso del Puente

03.03.01.04

161.16

23.73

FIJACION DE APOYOS Y PLACAS DE PUENTE MODULAR COLOCACION DE APOYOS FIJOS EN PUENTE MODULAR

COLOCACION DE APOYOS MOVIL EN PUENTE MODULAR

und

6.00

und

6.00

SEÑALIZACIÓN Y SEGURIDAD VIAL SEÑALES INFORMATIVAS (0.45m x 0.40m )

SEÑALES PREVENTIVAS (0.60m x 0.60m)

und

2.00

und

4.00

HOJA DE METRADOS PROYECTO:

"CREACIÓN DEL PUENTE ALTERNO LA ESPERANZA, TIPO ACROW DDR2, DISTRITO DE HUANUCO, PROVINCIA DE HUÁNUCO Y REGIÓN HUÁNUCO" SUBPRESUPUESTO: FECHA:

ACCESOS Y MURO DE ENCAUSAMIENTO

FEBRERO DEL 2016

ING. KELVIN LUIS RAMÓN PÉREZ HECHO POR : __________

SUB PRESUPUESTO Nº

DESCRIPCION

04

MONTAJE Y LANZAMIENTO PUENTE MODULAR TIPO ACROW

04.01

ACCESOS Y MUROS DE ENCAUSAMIENTO (MARGEN DERECHO)

04.01.01

VIAS DE ACCESO PEATONAL AL PUENTE

04.01.01.01 04.01.01.01.01

4.00 UND

SARDINELES DE CONCRETO f'c=175 KG/CM2

04.01.01.01.04

04.01.01.02 04.01.01.02.01

04.01.01.02.02

04.01.01.02.03

04.01.02 04.01.02.01 04.01.02.01.01

04.01.02.01.02

04.01.02.02 04.01.02.02.01

04.01.02.02.02

04.01.02.02.03

04.01.03 04.01.03.01

04.01.03.02

04.01.03.03

ENCOFRADO Y DESENCOFRADO NORMAL

ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60

JUNTA DE DILATACIÓN CON ASFALTO

VEREDA DE CONCRETO f 'c=175 kg/cm2

ENCOFRADO Y DESENCOFRADO NORMAL

JUNTA DE DILATACIÓN CON ASFALTO

ROCE, DESBROCE Y LIMPIEZA DE TERRENO

TOPOGRAFIA Y GEOREFERENCIACIÓN

04.02.01.02.01

11.80

2.00

47.00

1/2

1.90

1.02

96.90

2.00

3.00

1/2

11.80

1.02

102.00

1.00

2.00

10.60

1.00

21.20

1.00

2.00

2.60

1.00

5.20

2.00

1.00

11.80

2.00

2.00

11.80

0.40

18.88

2.00

1.00

0.80

0.40

0.64

2.00

4.00

0.80

1.00

1.00

281.50

1.00

1.00

281.50

1.00

1.00

281.50

1.00

1.00

281.50

1.00

1.00

281.50

1.00

2.00

15.00

1.00

1.00

144.00

1.00

2.00

15.00

1.00

2.00

11.80

1.00

4.00

11.80

2.00

47.00

1/2

1.90

1.02

96.90

2.00

3.00

1/2

11.80

1.02

102.00

1.00

2.00

10.60

1.00

21.20

1.00

2.00

2.60

1.00

5.20

2.00

1.00

11.80

15.15 14.16

0.30

kg

198.90

ml

26.40

m2

20.20 18.88

0.80

m2

19.52

m

6.72 6.40

m2

AREA

m2

EXCAVACIÓN HASTA SUB RASANTE MAT. SUELTO C/TRACTOR

281.50

AREA

AFIRMADO ESPESOR DE 20 CM.

CARPETA ASFALTICA EN CALIENTE DE 2"

m3

281.50

AREA

m3

52.78 0.15

42.23

0.20

56.30

AREA

m2

70.38

AREA

281.50 281.50

MUROS DE ENCAUSAMIENTO Y PROTECCIÓN CON ENROCADO CONCRETO F'C=140 KG/CM2 + 30% PG. PARA MUROS DE CONCRETO CICLO

CARGUIO Y TRANSPORTE DE PIEDRAS CON MAQUINARIA

COLOCACIÓN DE ENROCADO CON EQUIPO PESADO

m3

144.00 1.20

115.20

3.20

m3

100.80 100.80

m3

144.00 1.20

115.20

3.20

SARDINELES DE CONCRETO ARMADO SARDINELES DE CONCRETO f'c=175 KG/CM2

m

ENCOFRADO Y DESENCOFRADO NORMAL

ACERO DE REFUERZO FY=4200 KG/CM2 GRADO 60

JUNTA DE DILATACIÓN CON ASFALTO

25.25 23.60

m2

Dado de concreto ciclopeo menor (L=10.60m, A= 2.60 Y H=1.00m.)

04.02.01.02

4.00

m2

Dado de concreto ciclopeo mayor (L=10.60m, A=4.30 Y H=1.50m.)

04.02.01.01.04

1.00

25.25 23.60

CARPETA ASFALTICA EN ACCESOS AL PUENTE E=0.05 M.

VIAS DE ACCESO PEATONAL AL PUENTE

04.02.01.01.03

11.80

TRABAJOS PRELIMINARES

ACCESOS Y MUROS DE ENCAUSAMIENTO (MARGEN IZQUIERDO)

04.02.01.01.02

2.00

TOTAL

VIAS DE ACCESO VEHICULAR AL PUENTE

04.02.01 04.02.01.01.01

1.00

KG.

VEREDAS DE CONCRETO

04.02 04.02.01.01

SUB-TOTAL KG/ML LONG. VOLUM AREA UNIDAD

N° Veces

m

Dado de concreto ciclopeo menor (L=10.60m, A= 2.60 Y H=1.00m.) 04.01.01.01.03

MEDIDAS Ø Acero LARGO ANCHO ALTO

CANT

SARDINELES DE CONCRETO ARMADO Dado de concreto ciclopeo mayor (L=10.60m, A=4.30 Y H=1.50m.)

04.01.01.01.02

ACCESOS Y MURO DE ENCAUSAMIENTO

15.15 14.16

0.30

kg

198.90

ml

26.40

VEREDAS DE CONCRETO VEREDA DE CONCRETO f 'c=175 kg/cm2

m2

20.20 0.80

18.88

HOJA DE METRADOS PROYECTO:

"CREACIÓN DEL PUENTE ALTERNO LA ESPERANZA, TIPO ACROW DDR2, DISTRITO DE HUANUCO, PROVINCIA DE HUÁNUCO Y REGIÓN HUÁNUCO" SUBPRESUPUESTO: FECHA:

ACCESOS Y MURO DE ENCAUSAMIENTO

FEBRERO DEL 2016

ING. KELVIN LUIS RAMÓN PÉREZ HECHO POR : __________

SUB PRESUPUESTO Nº 04.02.01.02.02

04.02.01.02.03

04.02.02 04.02.02.01 04.02.02.01.01

04.02.02.01.02

04.02.02.02 04.02.02.02.01

04.02.02.02.02

04.02.03 04.02.03.01

04.02.03.02

04.02.03.03

DESCRIPCION ENCOFRADO Y DESENCOFRADO NORMAL

JUNTA DE DILATACIÓN CON ASFALTO

4.00 UND

ACCESOS Y MURO DE ENCAUSAMIENTO MEDIDAS Ø Acero LARGO ANCHO ALTO

SUB-TOTAL KG/ML LONG. VOLUM AREA UNIDAD

CANT

N° Veces

2.00

2.00

11.80

0.40

18.88

2.00

1.00

0.80

0.40

0.64

2.00

4.00

0.80

1.00

1.00

595.00

1.00

1.00

595.00

1.00

1.00

595.00

1.00

1.00

595.00

1.00

2.00

15.00

1.00

1.00

144.00

1.00

2.00

15.00

m2

KG.

TOTAL 19.52

m

6.72 6.40

VIAS DE ACCESO VEHICULAR AL PUENTE TRABAJOS PRELIMINARES ROCE, DESBROCE Y LIMPIEZA DE TERRENO

TOPOGRAFIA Y GEOREFERENCIACIÓN

m2

AREA

m2

AREA

595.00

595.00

CARPETA ASFALTICA EN ACCESOS AL PUENTE E=0.05 M. EXCAVACIÓN HASTA SUB RASANTE MAT. SUELTO C/TRACTOR

PINTADO DE MUROS CONTRAIMPACTO

m3

AREA

m2

111.56 0.15

89.25

AREA

595.00 595.00

MUROS DE ENCAUSAMIENTO Y PROTECCIÓN CON ENROCADO CONCRETO F'C=140 KG/CM2 + 30% PG. PARA MUROS DE CONCRETO CICLO

CARGUIO Y TRANSPORTE DE PIEDRAS CON MAQUINARIA

COLOCACIÓN DE ENROCADO CON EQUIPO PESADO

m3

144.00 1.20

3.20

115.20

m3

100.80 100.80

m3

144.00 1.20

3.20

115.20

Related Documents

Puente
October 2019 25
Metrado Afirmado.xlsx
August 2019 20
Metrado Madera.xlsx
May 2020 9
Metrado Especial.xlsx
April 2020 5
Metrado Referencial
October 2019 13

More Documents from ""