SHALOM SUCCESS DRYWALL INC. PROJECT PROPOSAL PROJECT NAME Maximo Gomez Park

LOCATION Dade

Attention Mr Willy Mendoza

GC BMA

Our proposal price is based on the plans provided by your firm . $ 20,126.000(Drywall Paints.and Stucco) The following is breakdownprice.

SCOPE OF WORK; to include Labor & Material at the following (unless otherwise indicated) Provide all necessary supervision, manpower, equipment, and Material for the Metal Stud and Gypsum Drywall Work per Florida Building Code contract documents and local authorities Including, but not limited to the following Layout of walls per plans Installation of Hollow Metall Door Frames in drywall partitions (Labor only No Grouting) 1 5/8” track and studs for all block and concrete walls as indicated in plans 3 5/8” track and studs as indicated in plans 6” flat metal backing for walls with cabinets and accessories 5/8” Type X gypsum wallboard for interior partitions as indicated in plans 5/8” Cement wallboard (Durock) at bathroom walls Smooth Finish at walls and drop ceilings Insulation at interior and partitions as indicated in plans Insulation at exterior block and concrete walls Rigging,lifting,stocking of all materials Debris placed daily to dumpsters provided by your firm Maintain a safe enviroment. Exclusions: • No M.E.P. fire-safing or caulking of any kind • No access panels (framed openings only) • All permit and municipal fees, all offsite trash removal • No demolition Noting: • All work to be completed in a professional manner in strict accordance to standard practices • Any alterations or deviations from the above specifications resulting in additional costs in labor, materials and/or time on rented equipment shall be performed upon the receipt of a signed change order. We hereby furnish material and labor complete in accordance with the above specifications for the sum of: Payment is to be made as follows: Every 10th of the month for value of work performed, and for the value of materials stored on site.

Pg. 2 PBCC Administration Building (Drywall)

___________________________ Manuel Batres, President

Note: This proposal may be withdrawn by us if not accepted within fifteen (15) days. Our prices are based on our material prices currently charged to us by our suppliers. After a thirty (30) day grace period, any increase in price on materials given to us will be passed on to the general contractor. ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. Date of Acceptance: _________________________________________ Company: ___________________________________________________ By: _________________________________________________________ Title: _______________________________________________________

I appreciate the opportunity that you have given me to bid on this project for you and await your response. If you have any questions, please feel free to contact myself at 305.479.5853 or fax 305.383.9486 or by e-mail [email protected] 1 /25/09 /Manuel Batres